What Is A Validation Master Plan (VMP) and How Do You Write One
What Is A Validation Master Plan (VMP) and How Do You Write One
com/validation/validation-master-plan/)
As a summary document, VMP should be brief, concise and clear and outline a program of
work under which there may be several individual validation plans. It explains the validation
rationale and defines the preliminary test and acceptance criteria. A VMP is commonly used
for new product introductions but they are also used to plan and manage ongoing validation
projects within companies.
The validation master plan should not repeat information that could be found elsewhere but
instead would refer to existing documents such as policy documents, SOPs, validation
protocols and reports. The regulations around the validation master plan are not very rigid so
the best advice is to create a plan that will best fit your organisation and your processes.
1
Table of Contents
Why do we need a Validation Master Plan?
How to write a Validation Master Plan
1. Outline the Validation policy
2. Define the organizational structure for validation activities
3. Identify the facilities, equipment, systems, and processes to be validated
4. Define the acceptance criteria
5. Describe the document format to be used for protocols and reports
6. Develop the validation plan and schedule
7. Define change control and deviation management procedures
8. Outline qualification and validation strategy, including requalification
9. Include references to existing documents
Conclusion
2
How to Write a Validation Master Plan
The FDA hasn’t defined any regulation regarding the validation master plan so let’s take our
cue from the EU Guide for GMP regulations and look at the validation master plan under the
headings there.
In addition, the Pharmaceutical Inspection Co-operation Scheme
(PICs) provides Recommendations on a Validation Master Plan.
The World Health Organisation also provides guidance in its document on Good
Manufacturing Practices: Guidance on Validation.
3
Each company will have its own organizational structure for the validation teams and the
management and control of the validation activities. However, validation is a team effort and it
generally requires involvement and close interaction of the validation department with
personnel from:
Quality assurance
Production
Packaging
Product development
Quality control
Project Engineering
Maintenance engineering
So the validation team should include representatives from these departments to provide the
necessary expertise and guidance. Usually, each validation project will be assigned a lead
member of the validation team who will work together with the rest of the departments and
manage the project.
Each protocol and report would be checked by the review team who typically comprises the
head of validation, the head of quality assurance, validation team members, and the validation
team leader.
In addition, personnel from external validation services may be included. The validation
master plan will typically describe the validation activities the company will undertake and
these are summarized here.
4
Looking at the graphic above, you would have a Design Qualification (DQ) Installation
Qualification, (IQ), Operational Qualification (OQ), and Performance Qualification (PQ).
Then you move into the phase of process validation where you would also at this stage look
at Cleaning Validation and Computer System Validation. Cleaning Validation and Process
Validation should be underpinned by clear Analytical Method Validation (AMV).
In addition, when the validation is complete you would write a validation summary report.
These feed into routine monitoring and maintenance of equipment and change control which
would indicate whether revalidation needs to occur and this would then be linked back into an
update of the validation master plan or the individual validation plans themselves.
And all these activities should be underpinned by quality risk management and the activities
should focus on the aspects that are critical to product quality and patient safety.
5
Usually, you would list reference drawings or attach them in appendices as necessary and you
would identify critical areas of the facility that will be the GMP versus the non-GMP areas.
Also in the section, you would list all the equipment and processes that need to be qualified
and validated and give a summary of the validation and qualification requirements together
with operating procedures for the equipment if needed
A matrix approach is useful to identify all components to be validated and the level of
validation required and operational procedures associated with these if needed.
Here is an example of a typical matrix that might be included in a validation plan.
On the left-hand side, we have the piece of equipment or the system listed by number and
then we’d indicate whether you need DQ, IQ, OQ, PQ, Process Validation (PV), Computer
System Validation (CSV) or Cleaning Validation (CV).
6
This section of the validation master plan would reference and describe a wide variety of
documents used throughout the validation project.
Validation Documents
This section of the validation master plan would usually include reference to SOPs that
describes the format of these documents and samples of these documents could also be
included. For example:
DQ, IQ, OQ and PQ protocols
Cleaning validation protocols
Process validation protocols
Validation protocols
Supporting Documents
The second set of documents that are important is support documents. These could be:
Development reports
SOPs on equipment or processes
Manufacturing instructions – these could come from batch manufacturing records or
instructions
Design specifications – for the facility and equipment
Material specifications – for the raw materials
Equipment specifications
Product specifications – for the release of the products that you’re making
Document Approval Process
Finally, you would describe the documentation approval process in the Validation Master Plan.
In this section, you would describe details of who actually is required to approve each of the
validation documents and in particular, you would describe the reasons for their signatures.
For example, if the purpose of the signature is to verify that the information in the protocol is
technically correct, signed approval would usually be completed by the production manager or
the validation team lead. If the purpose of the signature is to verify that we are complying with
regulations, company policies and procedures, signed approval would usually be completed by
personal from the regulatory department or the quality department or even by management.
Some of the signatures are there to indicate management support and commitment to the
validation process and the documentation. Finally, the quality unit is required to sign and
approve all validation documents.
Validation Protocol
7
Another crucial document is the validation protocol which is a document that specifies how a
specific qualification and validation project will be conducted. There are different types of
protocols.
Equipment Qualification (DQ, IQ, OQ and PQ) Protocols
This protocol will outline the specific acceptance criteria that must be met to demonstrate
that the equipment or the system was properly designed, installed and operates correctly.
This is a regulatory requirement outlined in EU GMP regulations annex 15, which stipulates
that a written protocol should be established.
The protocol should be reviewed and approved by appropriate personnel and the protocols
should specify critical steps and acceptance criteria. Typical protocol content would be an:
Introduction
Objectives – Description of what validation is trying to achieve and what you’re
validating
The responsibilities of the personnel involved in the validation
Prerequisites – Activities or procedures that have to happened prior to the validation
exercises
Production equipment – detailing the equipment necessary
Test scripts and methods
Test parameters and acceptance criteria
Test check sheets – documenting and recording the test results
Final approval
Once qualification is complete the system, piece of equipment or facility can be released for
use to produce pharmaceutical products. So that leads you into the stage which is process
validation.
Process Validation Protocol
Process validation is a specific validation activity carried out on manufacturing processes to
establish a high degree of assurance that a specific production or manufacturing process will
consistently yield a product that meets predetermined specifications and quality
characteristics.
A Process Validation Protocol is a documented plan for executing and capturing data from
process validation activities.
Typical prerequisites for process validation are that there are:
Approved standard operation procedures available for the use, control and
maintenance of all the systems and processes that are going to be validated
8
Critical systems and instruments are calibrated and entered into the calibration program
prior to embarking upon process validation
Critical consistent components must be entered into the site preventive maintenance
program prior to starting process validation
Training requirements must be established for personnel involved in manufacturing
operational procedures prior to starting process validation
Key Process Validation Support Documents
Here are some of the key documents that would be reviewed throughout the process of
developing a process validation protocol.
1. Process development reports or reports where product characterization studies were
carried out and technical transfer reports would be key reports to review to design the
process validation
2. Equipment design requirements and specifications are key documents that will be
reviewed
3. Operation manuals of the equipment drawings for the equipment schematics etc., are
also key documents that will be referred to
4. Risk analysis documents and reports would be reviewed
5. Calibration records of the equipment and instruments that would be used in process
validation would be useful documents.
6. Standard operating procedures for the equipment and the cleaning would be required
7. Training records would be reviewed and these will be the training records typically of
the operative staff that would be operating the equipment that the process validation is
going to use.
8. FAT and SAT documentation for the equipment manufacturer are key parts of the
equipment qualification. The information in this would also be information that would
be useful for to review prior to developing process validation documents.
9. Verification protocols of the validation protocols or qualification reports that would be
the DQ IQ OQ and PQ and associated data and reports for the equipment
10.Process monitoring parameters are also key support documents and these may be part
of a batch record or an SOP
11.Change management procedure is a further key support document for process
validation activities
Document Format
9
The validation master plan also looks at document format. For each type of validation
document, the SOP number which describes the format and the contents should be listed in
the validation master plan.
In each SOP the document format and typical content together with approval and document
control procedures would be given. Here is an example of a header that would be used in a
typical validation document.
10
7) Define Change Control and Deviation Management Procedures
Validation programs are subject to change control. Each company or organisation should have
a procedure describing the change management process.
Change control is a formal process in which changes to equipment systems, procedures,
processes, product designs, protocols, etc., are proposed by individuals planning to make them
in a documented format. Any system, facility, document or process that has the potential to
impact product quality and the validated state is subject to this formal change control process.
You would document the reason and justification for the proposed change and submit it for
approval. Qualified representatives would review proposed changes and approve them in
advance.
You would agree on any additional tests required to make the change in advance of the
change. Qualified representatives would review the outcome of this additional testing and the
outcome of the change. If the change is approved, it will be documented. Finally, the accepted
changes will be communicated to the training department if necessary.
In addition to the statement on change control, you must also address deviations in this
section. For example, a typical statement in the validation master plan would be that
deviations that occur during validation shall be documented and investigated in accordance
with the company’s deviation procedures.
Conclusion
In summary, a Validation Master Plan is a crucial document that outlines the overall strategy
for the validation of a project in a pharmaceutical or medical device company. It helps to
ensure that validation activities are planned and executed effectively and that they align with
the business objectives of the company.
11
Further Reading
You might also be interested in reading:
What is pharmaceutical validation?
What are IQ OQ PQ?
What is an equipment validation protocol?
Validation regulations
The 8 most “in demand” skills for validation professionals
What is computer system validation or CSV?
Donagh Fitzgerald
Head of Marketing & Product Development
Mechanical/Production Engineer
Donagh looks after the marketing and product development including the training and
pedagogical elements of our programs and makes sure that all GetReskilled’s users can have a
great online learning experience. Donagh has lived and worked in many countries including
Ireland, America, the UK, Singapore, Hong Kong and Japan. Donagh has also served as the
Program Manager for the Farmleigh Fellowship based out of Singapore.
Donagh holds Degrees in Production Engineering and Mechanical Engineering from South East
Technological University, Ireland.
12