RA - Rain Cafe Shell and Core Demolition
RA - Rain Cafe Shell and Core Demolition
Company Name: Malabar Interiors L.L.C RA Ref. No: 24-RA-RC-001 RA Revision No: -
Work/Activity Location: Al Jimi Mall - G-FB07 - Rain Cafe Persons at Risk:(A) Employee, (B) Client, (C) Visitors & Public
Work/Activity Description: Demolition – Shell and Core
RA Date: 28/03/2024
Persons at Risk
(L / M / H / E)
(L / M / H / E)
Consequence
Consequence
Item No.
Risk Rating
Priority
Priority
Risk Factor
Probability
Probability
Hazards Risks Existing Control Measures
Additional Control Measures
Page 2 of 5
• Check the equipment before work
commencement to make sure if it
is safe to use.
• Tag line should be attached with
hand tools - if required.
• Ensure that cleaning equipment
Proper hand tools provided.
Personal Injury - will not contact with any
5 Hand tools A Provision of skilled 3 2 6 M 3 1 3 L
minor/major accessories while performing the
operatives
task.
• Use the safe guard/cap on the
tool when not in use.
• Don't tamper the tools.
• Appropriate PPE must be worn
throughout the activity.
• Use the correct the tool for the
job.
Temporary braces,
• Use of adequate man power and
propping, shoring or guys
proper techniques under
may need to be added to
competent supervision.
ensure that stability of the
• Regular inspection of hand
structure is maintained so
tools/Power tools. Avoids chisel
as to prevent the
and punches with mushroom
Workers and unexpected collapse of part
Demolishing the 1 heads. Protect the sharp edges
6 others injured by A or all the structure. A wall is 4 3 H 4 1 4 M
building or structure 2 of tools that are to be stored or
structural collapse not to be permitted to
carried.
stand unless it is effectively
• Permit to be obtained while
supported against collapse.
using the power tools Cables
This includes checking
must be fully inspected prior to
whether the wall to be
use; all power tools must be
demolished is providing
connected through an ELCB /
support for other walls
RCD. Tools to be earthed
wherever possible.
Page 3 of 5
• Worker must be taught the
cause of an accident, be
instructed and shown how to
The installation of
do things safely, and horseplay
temporary supports must
must be stopped at site.
be according to
• The site must be kept clean and
manufacturer’s instructions
tidy at all times and the highest
and the installation of their
priority must be given to
positioning must be
housekeeping to ensure safe
according to: –
access and egress on site.
Structural alterations specifications in the
• Constant. Supervision required
or repairs that Workers and demolition procedure –
1 at all time for Anti termite M
8 require temporary others injured by A instructions on when to 4 3 H 4 1 4
2 activities on site.
support to prevent structural collapse remove rubble to prevent
• Safe Access with guardrails
collapse slabs being overloaded –
must be provided where there
instructions on where a
is risk of falling hazards from
ramp is to be used and
working at height, Level walk
whether it needs temporary
way to the working area.
supports – the prescribed
• Safe access must be well
distances between
demarcated with provision of
machines when they’re
adequate illumination. All
located on slabs.
operatives must use task
Specific PPE (Hand Gloves,
Mask, Goggle)
• Use 'A' type Aluminium step
ladders with locked cross arms.
• Keep one person on hold the
ladder while working on it.
Slip, Fall Minor Instruction has been passed • Never use the higher two steps
Work at height (Use Cuts/injury among all operatives to use of ladder. Maintain hands free
provided access and clear 1
9 of Step ladders and Falling object from A 4 3 H while climbing up or down the 4 1 4 M
the spillages upon 2
scaffolding) height that will notification. ladder.
lead to injury • Don't keep any material &
tools on step ladder. Use 3
point of contact while climbing
the ladder Inspection of
scaffolding and safety tags
Page 4 of 5
• Supervision.
• Scaffolding erection and
inspector certificate,
competent staff to conduct the
works