Checklist On Daily Inspection
Checklist On Daily Inspection
TASKS MAY NOT BE CONDUCTED WITHOUT CONTRACTOR PROCEDURE IN PLACE and CONDUCTING OF TOOL BOX TALK.
Frequency of use: Daily
1. Hot Work (Welding, and Gas cutting) Lifting gears operator been instructed not to leave the load suspended
Contractor procedure in place: YES NO Electrical power line clearance (12ft) checked Signal man identified
Precautions Taken Outriggers supported, Crane leveled Load chart available in the crane
Has PTW been obtained? Barrier Installed Riggers are competent
Is a supervisor present on the spot? Slings are inspected for free from cut marks, pressing, denting, bird caging, twist, kinks or
Flammables / Combustibles (paper, rags, wood, etc.) removed? core protrusion prior to use.
Fire Watch Established? Slings mechanically spliced (Hand spliced slings may not be allowed)
Welding & Cutting equipment positioned properly D / Bow shackles are free from any crack, dent, distortion or weld mark, wear / tear
Leads up and do not pose a tripping hazard Special lift as per erection / lift plan
Area hazards reviewed Job Hazards is explained to all concern thru tool box talk meeting
Electrical connections through GFCI of 30 mA sensitivity Guide rope is provided while shifting / lifting the load.
Electrical equipments are free from damage and earthed properly
Performer/s are competent and equipped with appropriate PPEs i.e. including face 6. Electrical Work Contractor procedure in place: YES NO
shield/welding goggles/ apron, safety shoes etc Precautions Taken
No tampering / manipulation attempted in safety device of the equipments LIVE ELECTRICAL WORK PERFORMED BY LICENCED ELECRTRICIAN ONLY
Only industrial type electrical appliances are in use Has PTW been obtained?
Cables / fuses are of adequate size & capacity fit with the requirement Is a supervisor present on the spot?
Hoses are free from damage and connected with J clamp. Power supply locked and tagged Circuit checked for zero voltage
No cable joint within 1 Mtr. from the holder / grinding machine and completely insulated Portable cords and electric tools inspected Safety back-up man appointed
from with M/C body Job Hazards is explained to all concern thru tool box talk meeting.
Gas cylinders used: Oxygen / Industrial LPG / Dissolved Acetylene placed on trolleys? Physical isolation is ensured If yes, State the method
Gas cutting torch of reputed make, ISI marked, installed with Flash back arrestors are in In case of lock applied, ensure the safe custody of the key
use at both ends If physical isolation is not possible state the alternative method of precaution
Regulator pressure gauges in working condition, visible and not damaged. Equipment Provided
Welding cable and earthing cable are crimped with proper size lugs. Approved rubber and leather gloves Insulating mat Fuse puller
Job Hazards is explained to all concern thru tool box talk meeting Disconnect pole or safety rope Non-conductive hard hat
Fire Protection Earth Leakage Circuit Breaker ( ELCB )is installed
Precautions Taken
Combustible gas or liquid containers removed 7. Scaffolding Erection & Dismantling: Contractor procedure in place: YES / NO
Area wet down Spark shields installed Precautions Taken
Other (explain) ________________________________ Has PTW been obtained?
Equipments Provided Presence of competent person assigned to ensure safe erection, maintenance, or modification
Fire extinguishers of scaffolds. Name:
Type: CO2 Dry Chemical Powder Other ______________ That person prior to use by personnel other than scaffolders inspects scaffold.
Size_____________________ Quantity __________________ Job Hazards is explained to all concern thru tool box talk meeting
All pipes, clamps, H-frames, couplers, boards checked before assembly
2. Excavations Exceeding 1 m (3 ft ) Contractor procedure in place: YES / NO Scaffolds provided with proper access and egress
Precautions Taken Standard guardrail (42” top rail, 21” mid-rail, and 4” toe board) been used whenever possible
Contractor has a competent person assigned to inspect & control condition of excavation Complete decking provided whenever possible
on site Platforms, walkways on scaffolds are wide of minimum of 600 mm wherever possible
Is a supervisor present on the spot? Precautions taken to ensure scaffolds are not overloaded
Underground utilities identified Power equipment grounded Overhead protection provided where there is exposure
Electrical or mechanical overhead clearances checked No opening / Gap in the platform / walkway.
Hard / Soft Barricades, area warning placed All component of the scaffold more than 12’ away from any exposed power lines
Means of egress (ladder or steps) placed –At least 2 no.s Side walls shored or laid
back 8. Plant & Machinery Contractor procedure in place: YES / NO
Area adequately lighted Material or soil removed from excavation edge Precautions Taken
Excavator is fit for the job Banks man provided to guide the operator Is the right plant and machinery being used for the job?
Method of dewatering is established and ensured the stoppage of water return Are all dangerous part guarded?
Excavated pit edges free from heavy over-burden, stack of materials Are all safety device (emergency stop devices, limit switches) operating correctly?
People are prevented from working inside pits if heavy vehicle movement in the vicinity Are the all operators are trained and competent e.g. do the plant operators hold a valid license
due to which soil collapse may take place. for which they are operating?
Job Hazards is explained to all concern thru tool box talk meeting. Are there barricades with warning signs to areas where unauthorized persons must not
venture?
3. Height Work (More Than 1.8 M High) Contractor procedure in place: Y / N Are stair cases / ladders if any, are properly installed and adequately guarded?
Precautions Taken Is the machine electrically grounded appropriately and adequately?
Is a supervisor present on the spot? Is the level of illumination proper?
Only medically fit personnel engaged in work and list is available. Are gauges, look-through glasses and other visual warning devices tested and operational?
Job Hazards is explained to all concern thru tool box talk meeting.
Ladder(s) inspected prior to use 9. Vehicles Contractor procedure in place: YES / NO
Ladder properly supported and leveled Precautions taken
Tied Top Tied Bottom Horn and reverse horns provided and working properly
Distance between the ladder support and the ladder base is at least ¼ the total length of the Are all tyres in good condition
ladder Ladder been provided with skid resistant feet Head lights, side indicator, back light and brake light provided & functioning properly
Scaffolds/platforms inspected for good repair and proper construction (secured Are Brakes / parking brakes in good condition
flooring and guardrails) Floor openings covered Guarded Are mirrors available and in good condition
Work area roped off and warning signs in place Proper Housekeeping is done Condition of guards to the moving / rotating parts
Personnel assigned to warn of floor opening or other hazardous exposure. Platform, ladder & hand rails (at Churner)-Transit mixer
Tools and other equipment stored in safe manner Valid HMV License possessed by the driver
Area cleared below prior to starting work
Equipment Provided 10. Portable power tools (Circular saws, Board cutters, Drills, Jack hammers,
Safety Harness and Lanyard anchored to independent rigid object power chippers and Grinders)
Lifeline with rope grab shock absorber/fall arrestor Contractor procedure in place: YES / NO
Full Body harness is used by all workmen engaged at height work. Is the worker qualified to operate the machine and have enough experience with the machine?
Safety net is provided but not less than 5 M from the work area. Is operator provided with adequate PPE (Helmet with attached face shield, ear plugs, snugly
Full Body harness is used by all workmen engaged at height work. fitted hand gloves, tightly fitted apron, stiff leg guard, chipping goggles)?
Has it been ensured that the spindle speed of the machine does not exceed the rated marking
4. Suspended work basket / Platform Contractor procedure in place: YES / NO on grinding wheel?
Precautions Taken When in use, is the guard on portable grinders located between the operator and the wheel?
Use strictly controlled Certified by third party competent authority Is the area where the electrical tool is used is dry?
Lifelines and harnesses approved type with separate anchorage Is excessively worn grinding disks discarded and replaced?
Communications established Basket properly labeled with load capacity Are screens positioned to prevent flying particles and sparks hitting other workers and
Lifting appliance is certified by third party competent authority materials?
Guardrails are provided Workmen are competent and medically fit Is the physical condition of the machine inspected and worn or damaged parts replace or
Proper means of access is provided to the work platform repaired?
Lifting appliances operator never left the site while man bucket is in use Are the hose conditions, connections, grips, drill bits etc. checked for the jack hammer?
Kept at secured mode while not in use. Is the machine body doubly insulated? Is the insulation in good condition?
Job Hazards is explained to all concern thru tool box talk meeting. Is the housekeeping in the area satisfactory?
Is the magnetic shoe operating properly and having good grip when switched on? (Check by
5. Crane, lifting tools & tackles and Critical Rigging. Contractor procedure in placing on a plate and switching on the electromagnet)[Magnetic drill]
place: YES NO Is the Drill machine guide bar tight enough so that the drill does not slide down on its own?
Precautions Taken (Check by elevating the drill and releasing the operating lever)[Magnetic drill]
Safety devices of the lifting appliances are inspected before use Is the condition of the power chipper checked and found OK in all aspects?
Operator qualified and medically fit including eye sight examined by authority Is a long stem wire brush or rod available to break off long pieces of drill burr?[Magnetic
Lifting appliances (Cranes & Hydra) are certified by competent authority and labeled drill]
properly. Is rain protection adequate and the area is dry?
Hoist chain (Chain pulley Block) or hoist rope free of kinks or twists and not wrapped Is a push stick used to push forward the last section of the timber into the saw blade?
around the load. Is the upper half of the saw blade is permanently guarded?
Lifting Hook has a Safety Hook Latch that will prevent the rope from slipping out. Is an emergency switch installed near the operator? Is the operator wearing loose clothes?
Has adequate lightning protection provided where necessary?
Page 1 of 2
DAILY SITE INSPECTION CHECKLIST
TASKS MAY NOT BE CONDUCTED WITHOUT CONTRACTOR PROCEDURE IN PLACE and CONDUCTING OF TOOL BOX TALK.
11. Temporary Electrical Connection 16. Concreting (Using a concrete pump& Boom placer)
Contractor procedure in place: YES NO Contractor procedure in place: YES NO
Precautions Taken Precautions Taken
Is a supervisor present on the spot? Has the shuttering/ formwork been inspected for stability?
Are all power panels, DBs, power points protected from weather? Is a supervisor present on the spot?
Are ‘Danger’ (approved) sign displayed mentioning the voltage involved? Has the staging been checked for stability?
Are welding / electrical booths providing adequate shelter from weather? Is the base hard Is the approach to the work area having a gentle slope, is free from obstructions and free from
(preferably PCC)? tripping hazards?
Are all the welding machines individually grounded (series earthing is not allowed)? Is the work platform used (if required) meeting all the requirements of 13?
Are all DBs and Electrical Panels located in easily accessible area? Have all persons been briefed about the hazards through a tool box?
Are bare cables inserted into sockets? The persons engaged in the job physically fit?
Are all floodlights covered with protective glasses? Has the vibrator in used been grounded?
Is only 4 core double insulated flexible wire with 4 pin industrial sockets used for power Is diesel vibrator being used while concreting inside an enclosed area?
connection to 3 phase power supply? Is the concrete pump (if in use) stably placed on the ground?
Is only 3 core double insulated flexible wire with 3 pin industrial sockets used for power Has the concrete pump (if in use) been barricaded to prevent unauthorized entry?
connection for single phase supply? Are all the moving parts guarded?
Are double layer electrical insulation tape and ferrule used for jointing of flexible wire / Is the operator trained and competent?
cable? Is the approach for the transit mixer safe and a wooden runner been used as a stop block?
Are welding & Electrical Cables overlapping? Are signalman posted to guide the logistics?
Are the DBs being overloaded? Are all components e.g. pipes, bends, clamps wedges are of proper specification and in good
Has earthing been provided with heavy duty, 40 mm dia , hollow GI pipe with 3.15 mm condition?
GI wire ( up to 63 Amp.) and GI flat of 25 X 5 mm? If concrete pump is diesel operated then place DCP type fire extinguisher and if electrical
Are trip devices e.g. Earth Leakage Circuit Breakers (ELCBs) sensitivity <= 30mA been operated then check connection through ELCB, proper cable, earthing & DCPs or CO2 type
used? fire extinguisher?
Are cables, cable joints and leads checked and protected from damage by: Is a ‘Ball Catcher’ available and shall be used for ball passing through pipe line?
a) Protective enclosure (conduit) b) Positioning c) Protected from sharp edges d) Tied Are adequate persons on the platform to control the elephant hose?
using plastic strips (Not binding wires) e) Preventing bad workmanship? Is the boom placer placed on a stable ground?
Are fire extinguishers maintained in the welding booth? Is the boom placer free from technical snags?
12. Material Storage Contractor procedure in place: YES / NO 17. Work inside Confined space Contractor procedure in place: YES / NO
Precautions Taken Precautions Taken Specify the job to be performed:
Is a supervisor present on the spot? Presence of fully trained attendants Name:
Are similar members stacked separately and identified? Presence of fully trained entrants Name:
Are members uniformly stacked and not posing a toppling hazard?
Are the members placed on packing woods and not directly on the ground? Has PTW been obtained?
Is the area clear of trip hazards? Is there sufficient area for movement? Has Atmospheric test been done? What is the percentage of oxygen?
Is adequate illumination provided? What is the interval for testing? Mention: _____ checks / hour.
Are the stack heights within acceptable limits and are the stacks staggered? Safe access provided to enter the confined space?
Is there adequate and obstruction free space for movement? 24 Volt hand lamp provided?
Is any dust control system in place and operative? (cement go down) Forced ventilation/ exhaust fan provided?
Are fire extinguishers installed? (in case of storing inflammables) Is the work inside the confined area as described conforming to the requirements in relevant
Are NO SMOKING sign boards posted? (in case of storing inflammables) checklists?
Are the salient points of the MSDS displayed? (in case of storing chemicals) Are energy sources like DBs, compressed gas cylinders, etc. being taken inside the confined
Are the cylinders so arranged that full Oxygen cylinders are 20 ft away from full DA / space?
LPG cylinders? Are sign boards provided to identify the same? Have the hazards been explained to the workers?
Is an electrical power source running through or nearby the shed where inflammables Is an attendance register being maintained?
and compressed gases are stored? Is there an established means of communication?
Are there hard stands available with chains to prevent cylinders from toppling? Are means of rescue in place? First aid box and team ready?
Have concerned departments been informed?
13. Scaffold and work platform Contractor procedure in place: YES / NO
Precautions Taken 18. Personal protective equipments Contractor procedure in place: YES / NO
Has PTW been obtained? Precautions Taken
Is a supervisor present on the spot? Have safety helmets been worn by all the persons?
Only medically fit personnel engaged in work and list is available. Have safety shoes been worn by all the persons?
Has the Safety briefing made to all people working on / for scaffolding? Have safety goggles been worn by all the persons?
Has the erection site been evaluated for hazards such as earth fills, ditches, debris, Have full body harness been worn by persons working at a height of 1.8 meters and above?
underground electric wires, unguarded openings, or conditions created by other trades? Have gum boots been worn by persons working in slushy and wet conditions?
Is the footing sound and rigid - not set on soft ground, frozen ground (that could melt), or Have the persons, engaged in material handling worn suitable hand gloves?
resting on blocks? If the area is noisy, are persons wearing ear plugs/ earmuffs?
Whether proper sole plates and base plates provided? If the area is dusty or full of fumes, are persons wearing suitable nose musk?
Is the scaffold level? Are persons doing specialized activities wearing the entire job specific PPEs (check up with
Have all the members (verticals, transoms, bracings, putlogs etc.) been properly placed? the relevant checklist)?
Is the platform complete front to back and side to side (fully planked or decked, with no
gaps greater than 1 inch)? 18. Material handling Contractor procedure in place: YES / NO
Is the width of a working platform properly maintained according to usage? Precautions Taken
If wooden plank, whether thickness is maintained as per standard or not? Is the job planned? Is a supervisor present on the spot?
Is overhanging of the working platform restricted to less than 50mm/four times the Are the persons competent and experienced?
thickness of the board? Is the route or path along which the material shall be transported surveyed?
Are guardrails 980 mm inches high? Is the methodology adopted suitable for the material to be handled?
Are toe boards at least 6 inches high? Is the lifting appliance fit for use?
Has mid rail been provided below the guardrail to avoid falling of objects from working During manual material handling, is the number of people engaged for the job sufficient?
platform? Are the lifting tools and tackles free from visible defects?
Has the scaffold been supported vertically at every 6 meters with a stable structure? Is SWL written on all the lifting tools and tackles?
When employees are working on suspended scaffolds, are lifelines firmly anchored to an Are all accessories like tag line, crowbar, turn buckles etc. needed for the job present on the
overhead structure and not to the scaffold? spot?
Does the scaffold meet electrical safety clearance distances? Have wooden packing, ropes etc. materials needed for stacking and securing the load been
Has adequate lightning protection provided where necessary? arranged well in advance to avoid haste?
Are suitable numbers signal men trained and experienced present to guide the job?
14. Housekeeping Contractor procedure in place: YES NO
Precautions Taken 18. General site conditions Contractor procedure in place: YES / NO
Are there any tripping /slipping Hazards? Precautions Taken
Are sufficient skips, bins located at all work area? Is the weather suitable for the job in hand?
Is material stored orderly and not causing obstruction/ Hazards? Is the wind speed below 25 Kmph?
Are all flammable materials kept in proper way? Is the atmosphere humid?
Is safety signage displayed to aware the workmen? Is there any possibility of a thunder storm?
Is the designated housekeeping gang existing? Any adversities noticed in the climate or any forecasts intercepted?
Are wooden boards with projected nails lying scattered? Any possibility of labour unrest?
Are there any signs of oil spillage?
Is the level of illumination in the site adequate? 19. Others
Are all the pits / trenches cordoned off? Precautions Taken
Has adequate lightning protection provided where necessary? __________________________________
__________________________________
__________________________________