100% found this document useful (1 vote)
88 views94 pages

08 - WBS Summary

The document provides a detailed work breakdown structure summary for the Rua Al Madinah Main Infrastructure Package project. It includes over 50 line items with activity names, original durations, start and finish dates, budgets and costs. The multi-year project runs from 2022 through 2027 and has a total budget of over 3 billion Saudi Riyals.

Uploaded by

Erickson Malicsi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
88 views94 pages

08 - WBS Summary

The document provides a detailed work breakdown structure summary for the Rua Al Madinah Main Infrastructure Package project. It includes over 50 line items with activity names, original durations, start and finish dates, budgets and costs. The multi-year project runs from 2022 through 2027 and has a total budget of over 3 billion Saudi Riyals.

Uploaded by

Erickson Malicsi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 94

RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE

REV03- UPDATE AS OF 14-12-2023


WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
RUA AL MADINAH MAIN
M INFRASTRUCTURE PACKAGE REV03- UPDATE AS OF 14-12-2023 1279 30-May-22 26-Nov-25 21-May-22 A 08-Aug-26 SAR3,209,799,000.18 SAR522,095,863.70 54.75% 16.27% 08-Aug-26, RU

MILESTONES 1279 30-May-22 26-Nov-25 30-May-22 A 08-Aug-26 SAR0.00 SAR0.00 0% 0% 08-Aug-26, MI


LEAD EVENTS 1034 30-May-22 18-Nov-25 30-May-22 A 16-Oct-25 SAR0.00 SAR0.00 0% 0% 16-Oct-25, LEAD EVENT
IFC DRAWINGS 2 26-Jun-22 27-Jun-22 15-Jun-22 A 02-Aug-23 A SAR0.00 SAR0.00 0% 0% 02-Aug-23 A, IFC DRAWINGS
CONTRACTUAL KEY
KE MILESTONES 207 27-Aug-23 18-Feb-24 08-Sep-24 13-May-25 SAR0.00 SAR0.00 0% 0% 13-May-25, CONTRACTUAL K
PERFORMANCE MILESTONE
MI 363 20-Apr-25 26-Nov-25 27-May-25 08-Aug-26 SAR0.00 SAR0.00 0% 0% 08-Aug-26, PE
INTERMEDIATE MILESTONE
MIL 1002 07-Jul-22 19-Oct-25 26-Sep-22 A 30-Jul-26 SAR0.00 SAR0.00 0% 0% 30-Jul-26, INTE
MOBILIZATION & G
GENERAL ARRANGEMENT 1233 31-May-22 26-Nov-25 21-May-22 A 26-Apr-26 SAR200,548,230.00 SAR93,033,532.76 50.22% 46.39% 26-Apr-26, MOBIL
SITE OFFICES FOR CLIENT/CONSULTANT/CONTRACTOR 1233 31-May-22 26-Nov-25 07-Jun-22 A 16-Oct-25 SAR19,142,300.00 SAR16,972,840.40 89.45% 88.67% 16-Oct-25, SITE OFFICES
SITE FACILITIES & OFFICES 331 31-May-22 06-Oct-22 07-Jun-22 A 26-Jun-23 A SAR15,877,500.00 SAR15,877,500.00 100% 100% 26-Jun-23 A, SITE FACILITIES & OFFICES
SITE OFFICE MAI
MAINTENANCE 1125 08-Oct-22 20-Nov-25 01-Dec-22 A 16-Oct-25 SAR2,321,600.00 SAR778,896.80 38.22% 33.55% 16-Oct-25, SITE OFFICE
SITE OFFICE OPERATION
OPE 900 08-Oct-22 26-Nov-25 28-Dec-22 A 16-Oct-25 SAR943,200.00 SAR316,443.60 38.02% 33.55% 16-Oct-25, SITE OFFICE
CLIENT/CONSULTANT VEHICLES
CLIENT/CONSULTA 1060 01-Jun-22 18-Nov-25 31-May-22 A 16-Oct-25 SAR2,136,000.00 SAR1,866,436.80 44.53% 87.38% 16-Oct-25, CLIENT/CONS
JV ACCOMMODATION
ACCOMMODATI & BUILDING 945 08-Oct-22 09-Nov-25 01-Aug-22 A 01-Jun-25 SAR17,062,500.00 SAR13,965,656.25 38.62% 81.85% 01-Jun-25, JV ACCOMMODAT
OTHER GENERAL IITEMS 1151 23-Jul-22 03-Nov-25 01-Aug-22 A 26-Apr-26 SAR122,121,963.00 SAR29,726,350.33 36.95% 24.34% 26-Apr-26, OTHER
Material Testing a
at Site and/ or Manufacturer 331 13-Dec-22 28-Nov-24 01-Feb-23 A 01-Feb-25 SAR14,980,000.00 SAR3,745,000.00 30% 25% 01-Feb-25, Material Testing at Site an
PLANTS 800 08-Oct-22 03-Nov-25 14-Feb-23 A 18-Jan-26 SAR14,350,000.00 SAR11,480,000.00 38.83% 80% 18-Jan-26, PLANTS
TEMPORARY WO
WORKS METHOD RELATED CHARGES 499 17-Dec-22 14-Dec-24 01-Feb-23 A 31-Dec-24 SAR17,766,963.00 SAR10,212,450.33 60% 57.48% 31-Dec-24, TEMPORARY WORKS
PROVISIONAL SUM
SU 497 28-Aug-23 22-Jul-25 08-Sep-24 26-Apr-26 SAR55,775,000.00 SAR0.00 20.67% 0% 26-Apr-26, PROVI
Specified Tempor
Temporary Works 1050 23-Jul-22 28-Jun-25 01-Aug-22 A 24-Dec-25 SAR12,162,500.00 SAR3,892,000.00 65% 32% 24-Dec-25, Specified Te
KEEPING THE EXISTING
EX UTILITY SERVICE ARE OPERTIONAL 648 31-Jul-22 02-Jan-25 10-May-23 A 05-Jul-25 SAR7,087,500.00 SAR396,900.00 70% 5.6% 05-Jul-25, KEEPING THE EX
CONTRACTOR'S DELIVERABLES
D 111 31-May-22 10-Oct-22 21-May-22 A 20-Dec-23 SAR9,020,000.00 SAR8,948,000.00 100% 99.2% 20-Dec-23, CONTRACTOR'S DELIVERABLES
TRAFFIC MANAGMENT
MANAGM 900 08-Oct-22 03-Nov-25 01-Dec-22 A 13-Oct-25 SAR14,980,000.00 SAR6,433,910.00 38.83% 42.95% 13-Oct-25, TRAFFIC MAN
TRAFFIC DIVERSION
DIVERSIO PLAN 221 04-Sep-22 13-Mar-23 04-Sep-22 A 18-Dec-23 SAR16,085,467.00 SAR15,120,338.98 100% 94% 18-Dec-23, TRAFFIC DIVERSION PLAN
KEY DATES 0 24-Nov-22 24-Nov-22 18-Jan-23 A 18-Jan-23 A SAR0.00 SAR0.00 0% 0% 18-Jan-23 A, KEY DATES
KAAR TRAFFIC DIVERSION
D -1 FOR ZONE 8 & 9 169 04-Sep-22 13-Oct-22 04-Sep-22 A 16-Dec-23 SAR4,021,366.75 SAR3,699,657.41 100% 92% 16-Dec-23, KAAR TRAFFIC DIVERSION -1 FOR
AIRPORT ROAD TUNNEL DIVERSION - 2 FOR ZONE 6 & 7 156 15-Oct-22 26-Nov-22 15-Oct-22 A 17-Dec-23 SAR4,021,366.75 SAR3,699,657.41 100% 92% 17-Dec-23, AIRPORT ROAD TUNNEL DIVERSIO
ABU THAR ROAD DIVERSION - 03 - FOR ZONE 6 37 27-Nov-22 08-Jan-23 15-Oct-22 A 15-Nov-22 A SAR4,021,366.75 SAR4,021,366.75 100% 100% 15-Nov-22 A, ABU THAR ROAD DIVERSION - 03 - FOR ZONE
AL AMIDA ROAD DETOUR - 1 FOR ZONE 8 & 9 112 09-Jan-23 13-Mar-23 15-Oct-22 A 18-Dec-23 SAR4,021,366.75 SAR3,699,657.41 100% 92% 18-Dec-23, AL AMIDA ROAD DETOUR - 1 FOR Z
PERMITS & APPROVALS
APPRO 84 31-May-22 24-Aug-22 06-Oct-22 A 23-Jan-23 A SAR0.00 SAR0.00 0% 0% 23-Jan-23 A, PERMITS & APPROVALS

GENERAL ENGINEERING
ENGINE 665 01-Jun-22 17-Aug-23 01-Jun-22 A 04-Aug-24 SAR0.00 SAR0.00 0% 0% 04-Aug-24, GENERAL ENGINEERING
PROCUREMENT OF SUBCONTRACTORS/VENDERS 412 01-Jun-22 16-Nov-22 01-Jun-22 A 18-Jan-24 SAR0.00 SAR0.00 0% 0% 18-Jan-24, PROCUREMENT OF SUBCONTRAC
CIVIL 39 01-Jun-22 19-Jul-22 01-Jun-22 A 27-Oct-22 A SAR0.00 SAR0.00 0% 0% 27-Oct-22 A, CIVIL
MECHANICAL 183 12-Jul-22 07-Sep-22 12-Jul-22 A 28-Mar-23 A SAR0.00 SAR0.00 0% 0% 28-Mar-23 A, MECHANICAL
ELECTRICAL 350 16-Aug-22 16-Nov-22 29-Aug-22 A 18-Jan-24 SAR0.00 SAR0.00 0% 0% 18-Jan-24, ELECTRICAL
MATERIAL SUBMITTAL
SUBMITT 602 17-Aug-22 17-Aug-23 06-Oct-22 A 04-Aug-24 SAR0.00 SAR0.00 0% 0% 04-Aug-24, MATERIAL SUBMITTAL
DUCTILE IRON P
PIPES 206 17-Aug-22 08-Sep-22 20-Nov-22 A 07-Dec-22 A SAR0.00 SAR0.00 0% 0% 07-Dec-22 A, DUCTILE IRON PIPES
MILD STEEL PIPES
PIPE 20 27-Aug-22 18-Sep-22 16-Dec-23 07-Jan-24 SAR0.00 SAR0.00 0% 0% 07-Jan-24, MILD STEEL PIPES
GRP PIPES 20 19-Sep-22 11-Oct-22 24-Nov-22 A 05-Dec-22 A SAR0.00 SAR0.00 0% 0% 05-Dec-22 A, GRP PIPES
WATER METER 22 12-Oct-22 06-Nov-22 07-Jan-24 01-Feb-24 SAR0.00 SAR0.00 0% 0% 01-Feb-24, WATER METER
RC PIPES 20 07-Nov-22 29-Nov-22 01-Feb-24 24-Feb-24 SAR0.00 SAR0.00 0% 0% 24-Feb-24, RC PIPES
DI & GRP PIPES F
FITTINGS 22 12-Oct-22 06-Nov-22 21-Nov-22 A 07-Dec-22 A SAR0.00 SAR0.00 0% 0% 07-Dec-22 A, DI & GRP PIPES FITTINGS
HDPE PIPES 20 12-Oct-22 03-Nov-22 10-Jul-23 A 30-Jul-23 A SAR0.00 SAR0.00 0% 0% 30-Jul-23 A, HDPE PIPES
UPVC PIPES 20 05-Nov-22 27-Nov-22 06-Oct-22 A 13-Oct-22 A SAR0.00 SAR0.00 0% 0% 13-Oct-22 A, UPVC PIPES
VALVES & FITTIN
FITTINGS (GV, BV, AV, WO) 22 28-Nov-22 22-Dec-22 03-May-23 A 21-May-23 A SAR0.00 SAR0.00 0% 0% 21-May-23 A, VALVES & FITTINGS (GV, BV, AV, WO)
PRECAST RC MANHOLES
MA 22 24-Dec-22 17-Jan-23 07-Jan-24 01-Feb-24 SAR0.00 SAR0.00 0% 0% 01-Feb-24, PRECAST RC MANHOLES
FIRE HYDRANTS 22 18-Jan-23 12-Feb-23 06-Jul-23 A 24-Jul-23 A SAR0.00 SAR0.00 0% 0% 24-Jul-23 A, FIRE HYDRANTS
SUBMERSIBALE PUMPS 21 13-Feb-23 09-Mar-23 01-Feb-24 26-Feb-24 SAR0.00 SAR0.00 0% 0% 26-Feb-24, SUBMERSIBALE PUMPS
IMPOUNDING SUMP
SU PUMP 22 11-Mar-23 04-Apr-23 26-Feb-24 23-Mar-24 SAR0.00 SAR0.00 0% 0% 23-Mar-24, IMPOUNDING SUMP PUMP

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
1 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
AUTOMATIC SCREEN
SCR FILTERS 22 05-Apr-23 03-May-23 23-Mar-24 20-Apr-24 SAR0.00 SAR0.00 0% 0% 20-Apr-24, AUTOMATIC SCREEN FILTERS
VERTICAL MULTI
MULTISTAGE CLOSE COUPLED PUMPS 22 04-May-23 29-May-23 21-Apr-24 15-May-24 SAR0.00 SAR0.00 0% 0% 15-May-24, VERTICAL MULTISTAGE CLOS
BEARINGS, EXPANSION
EXPA JOINTS 22 30-May-23 24-Jun-23 16-May-24 10-Jun-24 SAR0.00 SAR0.00 0% 0% 10-Jun-24, BEARINGS, EXPANSION JOIN
GRC PANELS 22 25-Jun-23 23-Jul-23 10-Jun-24 10-Jul-24 SAR0.00 SAR0.00 0% 0% 10-Jul-24, GRC PANELS
EXTRACT FANS 22 24-Jul-23 17-Aug-23 10-Jul-24 04-Aug-24 SAR0.00 SAR0.00 0% 0% 04-Aug-24, EXTRACT FANS
FIRE PROTECTION
PROTECTIO BOARD 22 28-Nov-22 22-Dec-22 07-Jan-24 01-Feb-24 SAR0.00 SAR0.00 0% 0% 01-Feb-24, FIRE PROTECTION BOARD
110 KV HIGH VOLTAGE
VOL CABLES 22 12-Oct-22 06-Nov-22 07-Jan-24 01-Feb-24 SAR0.00 SAR0.00 0% 0% 01-Feb-24, 110 KV HIGH VOLTAGE CABLES
MEDIUM VOLTAGE
VOLTAG CABLES 22 07-Nov-22 01-Dec-22 15-Oct-22 A 27-Oct-22 A SAR0.00 SAR0.00 0% 0% 27-Oct-22 A, MEDIUM VOLTAGE CABLES
LOW VOLTAGE C
CABLES 22 03-Dec-22 27-Dec-22 09-Oct-22 A 27-Oct-22 A SAR0.00 SAR0.00 0% 0% 27-Oct-22 A, LOW VOLTAGE CABLES
LIGHTING POLES 22 28-Dec-22 22-Jan-23 20-Oct-22 A 27-Oct-22 A SAR0.00 SAR0.00 0% 0% 27-Oct-22 A, LIGHTING POLES
TELECOM CABLES
CABLE 21 23-Jan-23 16-Feb-23 01-Feb-24 26-Feb-24 SAR0.00 SAR0.00 0% 0% 26-Feb-24, TELECOM CABLES
POWER DISTRIBUTION
DISTRIB BOARDS 22 18-Feb-23 14-Mar-23 26-Feb-24 23-Mar-24 SAR0.00 SAR0.00 0% 0% 23-Mar-24, POWER DISTRIBUTION BOARDS
SCADA SYSTEM 21 24-Dec-22 17-Jan-23 01-Feb-24 26-Feb-24 SAR0.00 SAR0.00 0% 0% 26-Feb-24, SCADA SYSTEM
DIESEL GENERATOR
GENERA 22 18-Jan-23 12-Feb-23 26-Feb-24 23-Mar-24 SAR0.00 SAR0.00 0% 0% 23-Mar-24, DIESEL GENERATOR
QUALITY ENGINEE
ENGINEERING 496 12-Jul-22 16-Jul-23 12-Jul-22 A 18-Feb-24 SAR0.00 SAR0.00 0% 0% 18-Feb-24, QUALITY ENGINEERING
METHOD STATEMENT
STATEM 391 12-Nov-22 16-Jul-23 13-Sep-22 A 18-Feb-24 SAR0.00 SAR0.00 0% 0% 18-Feb-24, METHOD STATEMENT
CONCRETE MIX D
DESIGN 214 12-Jul-22 20-Oct-22 12-Jul-22 A 18-Dec-22 A SAR0.00 SAR0.00 0% 0% 18-Dec-22 A, CONCRETE MIX DESIGN
CLASS 20/20 50 12-Jul-22 07-Sep-22 12-Jul-22 A 04-Oct-22 A SAR0.00 SAR0.00 0% 0% 04-Oct-22 A, CLASS 20/20
CLASS 25/20 182 18-Jul-22 07-Sep-22 18-Jul-22 A 18-Dec-22 A SAR0.00 SAR0.00 0% 0% 18-Dec-22 A, CLASS 25/20
CLASS 50/20 55 07-Aug-22 09-Oct-22 18-Aug-22 A 18-Dec-22 A SAR0.00 SAR0.00 0% 0% 18-Dec-22 A, CLASS 50/20
CLASS 40/20 55 18-Aug-22 20-Oct-22 18-Aug-22 A 18-Dec-22 A SAR0.00 SAR0.00 0% 0% 18-Dec-22 A, CLASS 40/20
TUNNEL CONSTRUCTION
CONSTRU 1255 27-Jun-22 10-Sep-25 07-Jun-22 A 08-Aug-26 SAR2,136,133,038.93 SAR423,403,341.89 62.69% 19.82% 08-Aug-26, TU
JADAT AL HARAM TUNNEL
T 1234 27-Jun-22 10-Sep-25 07-Jun-22 A 13-Jul-26 SAR1,341,874,508.98 SAR262,182,030.97 56.79% 19.54% 13-Jul-26, JADA
ZONE 1 - FROM S
STA. 0+000 ~ 0+500 1085 25-Oct-22 10-Sep-25 07-Jun-22 A 14-May-26 SAR296,947,101.08 SAR33,264,917.18 35.2% 11.2% 14-May-26, ZONE
ENGINEERING 610 25-Oct-22 06-Jun-24 07-Jun-22 A 22-Oct-24 SAR0.00 SAR0.00 0% 0% 22-Oct-24, ENGINEERING
SITE SURVEY 15 25-Oct-22 10-Nov-22 07-Jun-22 A 16-Jun-22 A SAR0.00 SAR0.00 0% 0% 16-Jun-22 A, SITE SURVEY
SHOP DRAWINGS
DRAWIN 300 28-Jan-23 03-Jun-23 11-Sep-22 A 20-Jan-24 SAR0.00 SAR0.00 0% 0% 20-Jan-24, SHOP DRAWINGS
CIVIL/STRUCTURAL 0+133 ~0+233
CIVIL/STRU 290 28-Jan-23 06-Apr-23 11-Sep-22 A 08-Jan-24 SAR0.00 SAR0.00 0% 0% 08-Jan-24, CIVIL/STRUCTURAL 0+133 ~0+233
CIVIL/STRUCTURAL 0+233 ~0+333
CIVIL/STRU 282 18-Feb-23 20-Apr-23 11-Sep-22 A 20-Jan-24 SAR0.00 SAR0.00 0% 0% 20-Jan-24, CIVIL/STRUCTURAL 0+233 ~0+333
CIVIL/STRUCTURAL 0+333 ~0+433
CIVIL/STRU 252 11-Mar-23 15-May-23 11-Sep-22 A 06-Jan-24 SAR0.00 SAR0.00 0% 0% 06-Jan-24, CIVIL/STRUCTURAL 0+333 ~0+433
CIVIL/STRUCTURAL 0+433 ~0+500
CIVIL/STRU 100 01-Apr-23 29-May-23 10-Sep-23 A 06-Jan-24 SAR0.00 SAR0.00 0% 0% 06-Jan-24, CIVIL/STRUCTURAL 0+433 ~0+500
ARCHITECTURAL
ARCHITECT 21 09-May-23 03-Jun-23 17-Dec-23 10-Jan-24 SAR0.00 SAR0.00 0% 0% 10-Jan-24, ARCHITECTURAL
UTILITIES 475 01-Apr-23 06-Jun-24 25-Oct-22 A 22-Oct-24 SAR0.00 SAR0.00 0% 0% 22-Oct-24, UTILITIES
WET UTILITIES
UTILIT 338 01-Apr-23 11-Oct-23 25-Oct-22 A 09-May-24 SAR0.00 SAR0.00 0% 0% 09-May-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 32 01-Apr-23 10-May-23 25-Oct-22 A 13-Nov-22 A SAR0.00 SAR0.00 0% 0% 13-Nov-22 A, POTABLE WATER NETWORK BRANCH, HOUSE
GREY WA
WATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 32 11-May-23 17-Jun-23 13-Dec-22 A 16-Jan-24 SAR0.00 SAR0.00 0% 0% 16-Jan-24, GREY WATER DISTRIBUTION NETW
IRR & FF NETWORK BRANCHES & TIE IN POINTS 32 18-Jun-23 27-Jul-23 16-Jan-24 22-Feb-24 SAR0.00 SAR0.00 0% 0% 22-Feb-24, IRR & FF NETWORK BRANCHES
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 32 29-Jul-23 03-Sep-23 22-Feb-24 30-Mar-24 SAR0.00 SAR0.00 0% 0% 30-Mar-24, CHILLED WATER SUPPLY & RET
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 32 04-Sep-23 11-Oct-23 31-Mar-24 09-May-24 SAR0.00 SAR0.00 0% 0% 09-May-24, AUTOMATIC WASTE COLLECT
DRY UTILITI
UTILITIES 241 12-Oct-23 06-Jun-24 01-Nov-22 A 22-Oct-24 SAR0.00 SAR0.00 0% 0% 22-Oct-24, DRY UTILITIES
POWER 177 12-Oct-23 30-Apr-24 01-Nov-22 A 14-Sep-24 SAR0.00 SAR0.00 0% 0% 14-Sep-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 32 12-Oct-23 18-Nov-23 09-May-24 20-Jun-24 SAR0.00 SAR0.00 0% 0% 20-Jun-24, HIGH VOLTAGE 110 KV NETW
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 32 30-Nov-23 06-Jan-24 02-Jul-24 08-Aug-24 SAR0.00 SAR0.00 0% 0% 08-Aug-24, MEDIUM VOLTAGE 13.8 KV
LOW VVOLTAGE NETWORK 32 07-Jan-24 12-Feb-24 27-Nov-22 A 14-Sep-24 SAR0.00 SAR0.00 0% 0% 14-Sep-24, LOW VOLTAGE NETWORK
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 32 13-Feb-24 20-Mar-24 01-Nov-22 A 12-Nov-22 A SAR0.00 SAR0.00 0% 0% 12-Nov-22 A, ELECTRICAL DISTRIBUTION SYSTEM
LIGHTING SYSTEM
LIGHT 32 21-Mar-24 30-Apr-24 26-Nov-22 A 27-Dec-22 A SAR0.00 SAR0.00 0% 0% 27-Dec-22 A, LIGHTING SYSTEM
LOW CUR
CURRENT 32 01-May-24 06-Jun-24 15-Sep-24 22-Oct-24 SAR0.00 SAR0.00 0% 0% 22-Oct-24, LOW CURRENT
TELECOM SERVICES
TELEC 32 01-May-24 06-Jun-24 15-Sep-24 22-Oct-24 SAR0.00 SAR0.00 0% 0% 22-Oct-24, TELECOM SERVICES
MEP 164 15-Apr-23 16-Oct-23 31-Dec-23 17-Jul-24 SAR0.00 SAR0.00 0% 0% 17-Jul-24, MEP
TUNNEL MECHANICAL
ME WORKS 98 15-Apr-23 13-Aug-23 13-Jan-24 11-May-24 SAR0.00 SAR0.00 0% 0% 11-May-24, TUNNEL MECHANICAL WORK
FIRE FIG
FIGHTING SYSTEM 88 15-Apr-23 01-Aug-23 13-Jan-24 28-Apr-24 SAR0.00 SAR0.00 0% 0% 28-Apr-24, FIRE FIGHTING SYSTEM
VENTILATION SYSTEM
VENTILA 44 14-May-23 06-Jul-23 07-Feb-24 30-Mar-24 SAR0.00 SAR0.00 0% 0% 30-Mar-24, VENTILATION SYSTEM
PUMPS INSTALLATION
I 22 08-Jul-23 01-Aug-23 30-Mar-24 28-Apr-24 SAR0.00 SAR0.00 0% 0% 28-Apr-24, PUMPS INSTALLATION
DUCTING SYSTEM 88 30-Apr-23 13-Aug-23 24-Jan-24 11-May-24 SAR0.00 SAR0.00 0% 0% 11-May-24, DUCTING SYSTEM
TUNNEL ELECTRICAL
EL WORKS 164 30-Apr-23 16-Oct-23 31-Dec-23 17-Jul-24 SAR0.00 SAR0.00 0% 0% 17-Jul-24, TUNNEL ELECTRICAL WORK
CABLE TRAYS
T 110 11-May-23 19-Sep-23 31-Dec-23 11-May-24 SAR0.00 SAR0.00 0% 0% 11-May-24, CABLE TRAYS

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
2 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
POWER CABLES 44 23-May-23 16-Jul-23 11-Jan-24 02-Mar-24 SAR0.00 SAR0.00 0% 0% 02-Mar-24, POWER CABLES
ELECTRICAL INSTALLATIONS
ELECTRI 110 30-Apr-23 07-Sep-23 24-Jan-24 05-Jun-24 SAR0.00 SAR0.00 0% 0% 05-Jun-24, ELECTRICAL INSTALLATIONS
LOW CUR
CURRENT 132 11-May-23 16-Oct-23 05-Feb-24 17-Jul-24 SAR0.00 SAR0.00 0% 0% 17-Jul-24, LOW CURRENT
FIRE D
DETECTION AND ALARM SYSTEM 132 11-May-23 16-Oct-23 05-Feb-24 17-Jul-24 SAR0.00 SAR0.00 0% 0% 17-Jul-24, FIRE DETECTION AND ALARM
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 110 23-May-23 02-Oct-23 17-Feb-24 02-Jul-24 SAR0.00 SAR0.00 0% 0% 02-Jul-24, COMMUNICATION SYSTEM/ E
PUBLIC ADDRESS
PUBLI 66 04-Jun-23 22-Aug-23 28-Feb-24 19-May-24 SAR0.00 SAR0.00 0% 0% 19-May-24, PUBLIC ADDRESS
VIDEO SURVEILLANCE 44 15-Jun-23 08-Aug-23 11-Mar-24 05-May-24 SAR0.00 SAR0.00 0% 0% 05-May-24, VIDEO SURVEILLANCE
SACADA SYSTEM
SACA 44 01-Jul-23 20-Aug-23 23-Mar-24 16-May-24 SAR0.00 SAR0.00 0% 0% 16-May-24, SACADA SYSTEM
RADIO RE-BROADCASTING SYSTEM 44 12-Jul-23 31-Aug-23 03-Apr-24 28-May-24 SAR0.00 SAR0.00 0% 0% 28-May-24, RADIO RE-BROADCASTING S
TUNNEL PLUMBING
PL WORKS 21 02-Sep-23 26-Sep-23 28-May-24 26-Jun-24 SAR0.00 SAR0.00 0% 0% 26-Jun-24, TUNNEL PLUMBING WORKS
PROCUREMENT 510 18-Mar-23 28-Nov-24 20-Nov-22 A 11-May-25 SAR46,092,642.16 SAR0.00 97.35% 0% 11-May-25, PROCUREMENT
CIVIL/STRUCTU
CIVIL/STRUCTURAL 144 18-Mar-23 09-Sep-23 31-Dec-23 24-Jun-24 SAR40,961,067.08 SAR0.00 100% 0% 24-Jun-24, CIVIL/STRUCTURAL
UTILITIES 487 11-May-23 28-Nov-24 20-Nov-22 A 14-Apr-25 SAR661,854.74 SAR0.00 41.26% 0% 14-Apr-25, UTILITIES
WET UTILITIES
UTILIT 350 11-May-23 28-Mar-24 20-Nov-22 A 31-Oct-24 SAR490,452.14 SAR0.00 55.34% 0% 31-Oct-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 268 11-May-23 31-Oct-23 20-Nov-22 A 27-Jul-24 SAR50,276.79 SAR0.00 100% 0% 27-Jul-24, POTABLE WATER NETWORK
DI PIPES
PIP 230 11-May-23 31-Oct-23 20-Nov-22 A 08-Jun-24 SAR5,530.45 SAR0.00 100% 0% 08-Jun-24, DI PIPES
HDPE PIPES 221 11-May-23 31-Oct-23 29-Mar-23 A 20-Jun-24 SAR6,535.98 SAR0.00 100% 0% 20-Jun-24, HDPE PIPES
GRP PPIPES 230 11-May-23 31-Oct-23 08-Jan-23 A 20-Jun-24 SAR5,027.68 SAR0.00 100% 0% 20-Jun-24, GRP PIPES
DI & G
GRP FITTING 230 11-May-23 31-Oct-23 01-May-23 A 20-Jun-24 SAR5,027.68 SAR0.00 100% 0% 20-Jun-24, DI & GRP FITTING
GATE VALVE 221 11-May-23 31-Oct-23 01-May-23 A 20-Jun-24 SAR5,027.68 SAR0.00 100% 0% 20-Jun-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 221 11-May-23 31-Oct-23 01-May-23 A 20-Jun-24 SAR4,524.91 SAR0.00 100% 0% 20-Jun-24, BUTTERFLAY VALVE
WATER METER
WATE 144 11-May-23 31-Oct-23 01-Feb-24 27-Jul-24 SAR7,541.52 SAR0.00 100% 0% 27-Jul-24, WATER METER
AIR RELASE
RE VALVE 221 11-May-23 31-Oct-23 04-Jul-23 A 20-Jun-24 SAR5,027.68 SAR0.00 100% 0% 20-Jun-24, AIR RELASE VALVE
WASHOUT VALVE
WASH 221 11-May-23 31-Oct-23 04-Jul-23 A 20-Jun-24 SAR6,033.22 SAR0.00 100% 0% 20-Jun-24, WASHOUT VALVE
GREY WAWATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 229 18-Jun-23 07-Dec-23 20-Nov-22 A 30-Jun-24 SAR38,672.58 SAR0.00 100% 0% 30-Jun-24, GREY WATER DISTRIBUTION
DI PIPES
PIP 229 18-Jun-23 07-Dec-23 20-Nov-22 A 30-Jun-24 SAR6,574.34 SAR0.00 100% 0% 30-Jun-24, DI PIPES
HDPE PIPES 228 18-Jun-23 07-Dec-23 29-Mar-23 A 30-Jun-24 SAR6,961.06 SAR0.00 100% 0% 30-Jun-24, HDPE PIPES
GRP PPIPES 229 18-Jun-23 07-Dec-23 08-Jan-23 A 30-Jun-24 SAR5,027.44 SAR0.00 100% 0% 30-Jun-24, GRP PIPES
DI & G
GRP FITTING 229 18-Jun-23 07-Dec-23 01-May-23 A 30-Jun-24 SAR4,640.71 SAR0.00 100% 0% 30-Jun-24, DI & GRP FITTING
GATE VALVE 228 18-Jun-23 07-Dec-23 01-May-23 A 30-Jun-24 SAR2,707.08 SAR0.00 100% 0% 30-Jun-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 228 18-Jun-23 07-Dec-23 01-May-23 A 30-Jun-24 SAR3,867.26 SAR0.00 100% 0% 30-Jun-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 228 18-Jun-23 07-Dec-23 04-Jul-23 A 30-Jun-24 SAR4,253.98 SAR0.00 100% 0% 30-Jun-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 228 18-Jun-23 07-Dec-23 04-Jul-23 A 30-Jun-24 SAR4,640.71 SAR0.00 100% 0% 30-Jun-24, WASEHOUT VALVE
IRR & FF NETWORK BRANCHES & TIE IN POINTS 229 29-Jul-23 14-Jan-24 29-Mar-23 A 06-Aug-24 SAR56,787.37 SAR0.00 76.89% 0% 06-Aug-24, IRR & FF NETWORK BRAN
HDPE PIPES 229 29-Jul-23 14-Jan-24 29-Mar-23 A 06-Aug-24 SAR14,196.84 SAR0.00 76.89% 0% 06-Aug-24, HDPE PIPES
GATE VALVE 229 29-Jul-23 14-Jan-24 01-May-23 A 06-Aug-24 SAR5,678.74 SAR0.00 76.89% 0% 06-Aug-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 229 29-Jul-23 14-Jan-24 01-May-23 A 06-Aug-24 SAR5,678.74 SAR0.00 76.89% 0% 06-Aug-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 229 29-Jul-23 14-Jan-24 04-Jul-23 A 06-Aug-24 SAR5,678.74 SAR0.00 76.89% 0% 06-Aug-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 229 29-Jul-23 14-Jan-24 04-Jul-23 A 06-Aug-24 SAR5,678.74 SAR0.00 76.89% 0% 06-Aug-24, WASEHOUT VALVE
FIRE H
HYDRANT 229 29-Jul-23 14-Jan-24 04-Jul-23 A 06-Aug-24 SAR19,875.58 SAR0.00 76.89% 0% 06-Aug-24, FIRE HYDRANT
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 239 04-Sep-23 20-Feb-24 01-May-23 A 24-Sep-24 SAR245,550.16 SAR0.00 48.44% 0% 24-Sep-24, CHILLED WATER SUPPLY &
MILD STEEL PIPE 145 04-Sep-23 20-Feb-24 31-Mar-24 24-Sep-24 SAR98,220.07 SAR0.00 48.44% 0% 24-Sep-24, MILD STEEL PIPE
MILD STEEL FITTING 145 04-Sep-23 20-Feb-24 31-Mar-24 24-Sep-24 SAR98,220.07 SAR0.00 48.44% 0% 24-Sep-24, MILD STEEL FITTING
GATE VALVE 229 04-Sep-23 20-Feb-24 01-May-23 A 11-Sep-24 SAR49,110.03 SAR0.00 48.44% 0% 11-Sep-24, GATE VALVE
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 145 12-Oct-23 28-Mar-24 09-May-24 31-Oct-24 SAR99,165.24 SAR0.00 20% 0% 31-Oct-24, AUTOMATIC WASTE COL
AUTOMATIC WASTE
AUTO 145 12-Oct-23 28-Mar-24 09-May-24 31-Oct-24 SAR99,165.24 SAR0.00 20% 0% 31-Oct-24, AUTOMATIC WASTE
DRY UTILITI
UTILITIES 302 19-Nov-23 28-Nov-24 19-Jun-23 A 14-Apr-25 SAR171,402.60 SAR0.00 0.96% 0% 14-Apr-25, DRY UTILITIES
POWER 269 19-Nov-23 22-Oct-24 19-Jun-23 A 03-Mar-25 SAR156,587.78 SAR0.00 1.06% 0% 03-Mar-25, POWER
HIGH VOLTAGE
V 110 KV NETWORK 145 19-Nov-23 08-May-24 20-Jun-24 08-Dec-24 SAR9,539.83 SAR0.00 17.33% 0% 08-Dec-24, HIGH VOLTAGE 110 KV
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 228 07-Jan-24 01-Jul-24 19-Jun-23 A 14-Jan-25 SAR122,016.98 SAR0.00 0% 0% 14-Jan-25, MEDIUM VOLTAGE 13.
LOW V VOLTAGE NETWORK 228 13-Feb-24 07-Aug-24 19-Jun-23 A 19-Feb-25 SAR25,030.97 SAR0.00 0% 0% 19-Feb-25, LOW VOLTAGE NETW
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 144 21-Mar-24 14-Sep-24 15-Sep-24 03-Mar-25 SAR0.00 SAR0.00 0% 0% 03-Mar-25, ELECTRICAL DISTRI
LIGHTING SYSTEM
LIGHT 144 01-May-24 22-Oct-24 15-Sep-24 03-Mar-25 SAR0.00 SAR0.00 0% 0% 03-Mar-25, LIGHTING SYSTEM
LOW CUR
CURRENT 145 08-Jun-24 28-Nov-24 22-Oct-24 14-Apr-25 SAR14,814.81 SAR0.00 0% 0% 14-Apr-25, LOW CURRENT
TELECOM SERVICES
TELEC 145 08-Jun-24 28-Nov-24 22-Oct-24 14-Apr-25 SAR14,814.81 SAR0.00 0% 0% 14-Apr-25, TELECOM SERVICE
MEP 235 19-Aug-23 22-May-24 05-Aug-24 11-May-25 SAR4,469,720.33 SAR0.00 81.39% 0% 11-May-25, MEP
ARCHITECTURAL
ARCHITECTUR 115 24-Jul-23 05-Dec-23 10-Jul-24 21-Nov-24 SAR0.00 SAR0.00 0% 0% 21-Nov-24, ARCHITECTURAL
CONSTRUCTION 1014 16-Jan-23 10-Sep-25 14-Aug-22 A 14-May-26 SAR250,854,458.92 SAR33,264,917.18 23.79% 13.26% 14-May-26, CONS
GENERAL SITE ARRANGEMENT 139 16-Jan-23 12-Mar-23 04-Sep-22 A 10-Jan-23 A SAR1,745,742.98 SAR1,745,742.98 100% 100% 10-Jan-23 A, GENERAL SITE ARRANGEMENT
SITE PREPARATION
PREPA 139 16-Jan-23 12-Mar-23 04-Sep-22 A 10-Jan-23 A SAR1,745,742.98 SAR1,745,742.98 100% 100% 10-Jan-23 A, SITE PREPARATION
GEO-TECHNICAL INVESTIGATION
GEO-TECHNICA 56 13-Mar-23 20-May-23 14-Aug-22 A 01-Oct-22 A SAR146,179.99 SAR146,179.99 100% 100% 01-Oct-22 A, GEO-TECHNICAL INVESTIGATION
EXCAVATION & DEWATERING 469 21-May-23 16-Sep-24 13-Sep-22 A 23-Oct-24 SAR32,900,759.25 SAR24,845,830.86 94.69% 75.52% 23-Oct-24, EXCAVATION & DEWATER

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
3 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
SOIL IMPROVEMENT
IMPROVE 30 13-Jun-23 11-Sep-23 19-Aug-23 A 26-Feb-24 SAR9,371,388.77 SAR3,649,687.36 100% 38.95% 26-Feb-24, SOIL IMPROVEMENT
STRUCTURAL WORKS 563 25-Jun-23 22-Dec-24 04-Nov-23 A 08-Sep-25 SAR120,122,999.51 SAR2,877,475.99 12.27% 2.4% 08-Sep-25, STRUCTURAL
STA. 0+133 ~ 0+153 102 25-Jun-23 25-Oct-23 09-Jan-24 11-May-24 SAR2,882,774.72 SAR0.00 100% 0% 11-May-24, STA. 0+133 ~ 0+153
BASE SLAB
SL 28 25-Jun-23 30-Jul-23 09-Jan-24 10-Feb-24 SAR1,738,040.36 SAR0.00 100% 0% 10-Feb-24, BASE SLAB
TUNNEL WALLS 37 31-Jul-23 11-Sep-23 11-Feb-24 24-Mar-24 SAR702,209.81 SAR0.00 100% 0% 24-Mar-24, TUNNEL WALLS
BARRIER 33 29-Aug-23 07-Oct-23 11-Mar-24 22-Apr-24 SAR70,692.33 SAR0.00 100% 0% 22-Apr-24, BARRIER
PLAIN CO
CONCRETE FILL 16 08-Oct-23 25-Oct-23 22-Apr-24 11-May-24 SAR371,832.21 SAR0.00 100% 0% 11-May-24, PLAIN CONCRETE FILL
STA. 0+153 ~ 0+173 243 11-Jul-23 25-Jan-24 22-Jan-24 10-Nov-24 SAR2,882,774.72 SAR0.00 86.56% 0% 10-Nov-24, STA. 0+153 ~ 0+173
BASE SLAB
SL 150 11-Jul-23 09-Oct-23 22-Jan-24 23-Jul-24 SAR1,738,040.36 SAR0.00 100% 0% 23-Jul-24, BASE SLAB
TUNNEL WALLS 37 10-Oct-23 21-Nov-23 23-Jul-24 04-Sep-24 SAR702,209.81 SAR0.00 100% 0% 04-Sep-24, TUNNEL WALLS
BARRIER 33 22-Nov-23 30-Dec-23 04-Sep-24 14-Oct-24 SAR70,692.33 SAR0.00 77.71% 0% 14-Oct-24, BARRIER
PLAIN CO
CONCRETE FILL 23 31-Dec-23 25-Jan-24 14-Oct-24 10-Nov-24 SAR371,832.21 SAR0.00 0% 0% 10-Nov-24, PLAIN CONCRETE FILL
STA. 0+173 ~ 0+193 120 19-Sep-23 06-Feb-24 03-Jul-24 21-Nov-24 SAR2,882,774.72 SAR0.00 86.02% 0% 21-Nov-24, STA. 0+173 ~ 0+193
BASE SLAB
SL 27 19-Sep-23 21-Oct-23 03-Jul-24 04-Aug-24 SAR1,738,040.36 SAR0.00 100% 0% 04-Aug-24, BASE SLAB
TUNNEL WALLS 37 22-Oct-23 03-Dec-23 04-Aug-24 16-Sep-24 SAR702,209.81 SAR0.00 100% 0% 16-Sep-24, TUNNEL WALLS
BARRIER 33 04-Dec-23 10-Jan-24 16-Sep-24 26-Oct-24 SAR70,692.33 SAR0.00 55.96% 0% 26-Oct-24, BARRIER
PLAIN CO
CONCRETE FILL 23 11-Jan-24 06-Feb-24 26-Oct-24 21-Nov-24 SAR371,832.21 SAR0.00 0% 0% 21-Nov-24, PLAIN CONCRETE FILL
STA. 0+193 ~ 0+213 115 10-Oct-23 20-Feb-24 23-Jul-24 05-Dec-24 SAR2,882,774.72 SAR0.00 83.06% 0% 05-Dec-24, STA. 0+193 ~ 0+213
BASE SLAB
SL 27 10-Oct-23 09-Nov-23 23-Jul-24 24-Aug-24 SAR1,738,040.36 SAR0.00 100% 0% 24-Aug-24, BASE SLAB
TUNNEL WALLS 37 11-Nov-23 23-Dec-23 24-Aug-24 07-Oct-24 SAR702,209.81 SAR0.00 93.49% 0% 07-Oct-24, TUNNEL WALLS
BARRIER 33 24-Dec-23 30-Jan-24 07-Oct-24 14-Nov-24 SAR70,692.33 SAR0.00 0% 0% 14-Nov-24, BARRIER
PLAIN CO
CONCRETE FILL 18 31-Jan-24 20-Feb-24 14-Nov-24 05-Dec-24 SAR371,832.21 SAR0.00 0% 0% 05-Dec-24, PLAIN CONCRETE FILL
STA. 0+213 ~ 0+233 115 30-Oct-23 11-Mar-24 12-Aug-24 25-Dec-24 SAR2,882,774.72 SAR0.00 76.45% 0% 25-Dec-24, STA. 0+213 ~ 0+233
BASE SLAB
SL 27 30-Oct-23 29-Nov-23 12-Aug-24 12-Sep-24 SAR1,738,040.36 SAR0.00 100% 0% 12-Sep-24, BASE SLAB
TUNNEL WALLS 37 30-Nov-23 11-Jan-24 12-Sep-24 27-Oct-24 SAR702,209.81 SAR0.00 66.32% 0% 27-Oct-24, TUNNEL WALLS
BARRIER 33 13-Jan-24 19-Feb-24 27-Oct-24 04-Dec-24 SAR70,692.33 SAR0.00 0% 0% 04-Dec-24, BARRIER
PLAIN CO
CONCRETE FILL 18 20-Feb-24 11-Mar-24 04-Dec-24 25-Dec-24 SAR371,832.21 SAR0.00 0% 0% 25-Dec-24, PLAIN CONCRETE FILL
STA. 0+233 ~ 0+253 120 19-Nov-23 06-Apr-24 01-Sep-24 20-Jan-25 SAR2,882,774.72 SAR0.00 58.22% 0% 20-Jan-25, STA. 0+233 ~ 0+253
BASE SLAB
SL 27 19-Nov-23 19-Dec-23 01-Sep-24 03-Oct-24 SAR1,738,040.36 SAR0.00 96.57% 0% 03-Oct-24, BASE SLAB
TUNNEL WALLS 37 20-Dec-23 31-Jan-24 03-Oct-24 16-Nov-24 SAR702,209.81 SAR0.00 0% 0% 16-Nov-24, TUNNEL WALLS
BARRIER 33 01-Feb-24 10-Mar-24 16-Nov-24 24-Dec-24 SAR70,692.33 SAR0.00 0% 0% 24-Dec-24, BARRIER
PLAIN CO
CONCRETE FILL 23 11-Mar-24 06-Apr-24 24-Dec-24 20-Jan-25 SAR371,832.21 SAR0.00 0% 0% 20-Jan-25, PLAIN CONCRETE FILL
STA.0+253 ~ 0+273 120 09-Dec-23 29-Apr-24 21-Sep-24 09-Feb-25 SAR2,882,774.72 SAR0.00 21.14% 0% 09-Feb-25, STA.0+253 ~ 0+273
BASE SLAB
SL 27 09-Dec-23 08-Jan-24 21-Sep-24 23-Oct-24 SAR1,738,040.36 SAR0.00 35.06% 0% 23-Oct-24, BASE SLAB
TUNNEL WALLS 37 09-Jan-24 20-Feb-24 23-Oct-24 05-Dec-24 SAR702,209.81 SAR0.00 0% 0% 05-Dec-24, TUNNEL WALLS
BARRIER 33 21-Feb-24 30-Mar-24 05-Dec-24 13-Jan-25 SAR70,692.33 SAR0.00 0% 0% 13-Jan-25, BARRIER
PLAIN CO
CONCRETE FILL 23 31-Mar-24 29-Apr-24 13-Jan-25 09-Feb-25 SAR371,832.21 SAR0.00 0% 0% 09-Feb-25, PLAIN CONCRETE FIL
STA. 0+273 ~ 0+293 121 28-Dec-23 20-May-24 12-Oct-24 02-Mar-25 SAR2,882,774.72 SAR0.00 0% 0% 02-Mar-25, STA. 0+273 ~ 0+293
BASE SLAB
SL 28 28-Dec-23 29-Jan-24 12-Oct-24 13-Nov-24 SAR1,738,040.36 SAR0.00 0% 0% 13-Nov-24, BASE SLAB
TUNNEL WALLS 37 30-Jan-24 12-Mar-24 13-Nov-24 26-Dec-24 SAR702,209.81 SAR0.00 0% 0% 26-Dec-24, TUNNEL WALLS
BARRIER 33 13-Mar-24 23-Apr-24 26-Dec-24 03-Feb-25 SAR70,692.33 SAR0.00 0% 0% 03-Feb-25, BARRIER
PLAIN CO
CONCRETE FILL 23 24-Apr-24 20-May-24 03-Feb-25 02-Mar-25 SAR371,832.21 SAR0.00 0% 0% 02-Mar-25, PLAIN CONCRETE FI
STA. 0+293 ~ 0+313 123 09-Jan-24 03-Jun-24 23-Oct-24 16-Mar-25 SAR6,750,143.89 SAR0.00 0% 0% 16-Mar-25, STA. 0+293 ~ 0+313
BASE SLAB
SL 27 09-Jan-24 08-Feb-24 23-Oct-24 24-Nov-24 SAR1,738,040.36 SAR0.00 0% 0% 24-Nov-24, BASE SLAB
COLUMN 23 10-Feb-24 06-Mar-24 24-Nov-24 21-Dec-24 SAR763,329.18 SAR0.00 0% 0% 21-Dec-24, COLUMN
TUNNEL WALLS 37 10-Feb-24 23-Mar-24 24-Nov-24 06-Jan-25 SAR702,209.81 SAR0.00 0% 0% 06-Jan-25, TUNNEL WALLS
TOP SLAB
SLA 47 10-Mar-24 06-May-24 23-Dec-24 16-Feb-25 SAR2,411,413.81 SAR0.00 0% 0% 16-Feb-25, TOP SLAB
MASS CO
CONCRETE WORK 24 07-May-24 03-Jun-24 16-Feb-25 16-Mar-25 SAR1,135,150.73 SAR0.00 0% 0% 16-Mar-25, MASS CONCRETE W
STA. 0+313 ~ 0+333 123 29-Jan-24 27-Jun-24 12-Nov-24 09-Apr-25 SAR6,750,390.86 SAR0.00 0% 0% 09-Apr-25, STA. 0+313 ~ 0+333
BASE SLAB
SL 27 29-Jan-24 28-Feb-24 12-Nov-24 14-Dec-24 SAR1,738,040.36 SAR0.00 0% 0% 14-Dec-24, BASE SLAB
COLUMN 23 29-Feb-24 26-Mar-24 14-Dec-24 09-Jan-25 SAR763,329.18 SAR0.00 0% 0% 09-Jan-25, COLUMN
TUNNEL WALLS 37 29-Feb-24 15-Apr-24 14-Dec-24 26-Jan-25 SAR702,209.81 SAR0.00 0% 0% 26-Jan-25, TUNNEL WALLS
TOP SLAB
SLA 47 30-Mar-24 26-May-24 12-Jan-25 08-Mar-25 SAR2,411,413.81 SAR0.00 0% 0% 08-Mar-25, TOP SLAB
MASS CO
CONCRETE WORK 24 27-May-24 27-Jun-24 08-Mar-25 09-Apr-25 SAR1,135,397.70 SAR0.00 0% 0% 09-Apr-25, MASS CONCRETE W
STA. 0+333 ~ 0+353 123 18-Feb-24 17-Jul-24 02-Dec-24 29-Apr-25 SAR6,750,390.86 SAR0.00 0% 0% 29-Apr-25, STA. 0+333 ~ 0+353
BASE SLAB
SL 27 18-Feb-24 19-Mar-24 02-Dec-24 02-Jan-25 SAR1,738,040.36 SAR0.00 0% 0% 02-Jan-25, BASE SLAB
COLUMN 23 20-Mar-24 18-Apr-24 02-Jan-25 29-Jan-25 SAR763,329.18 SAR0.00 0% 0% 29-Jan-25, COLUMN
TUNNEL WALLS 37 20-Mar-24 05-May-24 02-Jan-25 15-Feb-25 SAR702,209.81 SAR0.00 0% 0% 15-Feb-25, TUNNEL WALLS
TOP SLAB
SLA 47 22-Apr-24 19-Jun-24 01-Feb-25 27-Mar-25 SAR2,411,413.81 SAR0.00 0% 0% 27-Mar-25, TOP SLAB
MASS CO
CONCRETE WORK 24 20-Jun-24 17-Jul-24 27-Mar-25 29-Apr-25 SAR1,135,397.70 SAR0.00 0% 0% 29-Apr-25, MASS CONCRETE W
STA. 0+353 ~ 0+373 443 09-Mar-24 06-Aug-24 15-Nov-23 A 29-Apr-25 SAR6,750,390.86 SAR1,382,538.92 0% 20.48% 29-Apr-25, STA. 0+353 ~ 0+373
BASE SLAB
SL 347 09-Mar-24 08-Apr-24 15-Nov-23 A 02-Jan-25 SAR1,738,040.36 SAR1,382,538.92 0% 79.55% 02-Jan-25, BASE SLAB

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
4 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
COLUMN 23 13-Apr-24 08-May-24 02-Jan-25 29-Jan-25 SAR763,329.18 SAR0.00 0% 0% 29-Jan-25, COLUMN
TUNNEL WALLS 37 13-Apr-24 25-May-24 02-Jan-25 15-Feb-25 SAR702,209.81 SAR0.00 0% 0% 15-Feb-25, TUNNEL WALLS
TOP SLAB
SLA 47 12-May-24 09-Jul-24 01-Feb-25 27-Mar-25 SAR2,411,413.81 SAR0.00 0% 0% 27-Mar-25, TOP SLAB
MASS COCONCRETE WORK 24 10-Jul-24 06-Aug-24 27-Mar-25 29-Apr-25 SAR1,135,397.70 SAR0.00 0% 0% 29-Apr-25, MASS CONCRETE W
STA. 0+373 ~ 0+393 148 20-Mar-24 18-Aug-24 04-Nov-23 A 18-May-25 SAR6,750,390.86 SAR28,099.54 0% 0.42% 18-May-25, STA. 0+373 ~ 0+39
BASE SLAB
SL 52 20-Mar-24 23-Apr-24 04-Nov-23 A 21-Jan-25 SAR1,738,040.36 SAR28,099.54 0% 1.62% 21-Jan-25, BASE SLAB
COLUMN 23 24-Apr-24 20-May-24 21-Jan-25 17-Feb-25 SAR763,329.18 SAR0.00 0% 0% 17-Feb-25, COLUMN
TUNNEL WALLS 37 24-Apr-24 05-Jun-24 21-Jan-25 05-Mar-25 SAR702,209.81 SAR0.00 0% 0% 05-Mar-25, TUNNEL WALLS
TOP SLAB
SLA 47 23-May-24 21-Jul-24 19-Feb-25 20-Apr-25 SAR2,411,413.81 SAR0.00 0% 0% 20-Apr-25, TOP SLAB
MASS COCONCRETE WORK 24 22-Jul-24 18-Aug-24 20-Apr-25 18-May-25 SAR1,135,397.70 SAR0.00 0% 0% 18-May-25, MASS CONCRETE
STA. 0+393 ~ 0+413 469 13-Apr-24 07-Sep-24 04-Nov-23 A 18-May-25 SAR6,750,390.86 SAR1,382,538.92 0% 20.48% 18-May-25, STA. 0+393 ~ 0+41
BASE SLAB
SL 373 13-Apr-24 13-May-24 04-Nov-23 A 21-Jan-25 SAR1,738,040.36 SAR1,382,538.92 0% 79.55% 21-Jan-25, BASE SLAB
COLUMN 23 14-May-24 09-Jun-24 21-Jan-25 17-Feb-25 SAR763,329.18 SAR0.00 0% 0% 17-Feb-25, COLUMN
TUNNEL WALLS 37 14-May-24 30-Jun-24 21-Jan-25 05-Mar-25 SAR702,209.81 SAR0.00 0% 0% 05-Mar-25, TUNNEL WALLS
TOP SLAB
SLA 47 12-Jun-24 10-Aug-24 19-Feb-25 20-Apr-25 SAR2,411,413.81 SAR0.00 0% 0% 20-Apr-25, TOP SLAB
MASS COCONCRETE WORK 24 11-Aug-24 07-Sep-24 20-Apr-25 18-May-25 SAR1,135,397.70 SAR0.00 0% 0% 18-May-25, MASS CONCRETE
STA. 0+413 ~ 0+433 482 24-Apr-24 18-Sep-24 07-Nov-23 A 09-Jun-25 SAR6,750,390.86 SAR28,099.54 0% 0.42% 09-Jun-25, STA. 0+413 ~ 0+43
BASE SLAB
SL 386 24-Apr-24 25-May-24 07-Nov-23 A 09-Feb-25 SAR1,738,040.36 SAR28,099.54 0% 1.62% 09-Feb-25, BASE SLAB
COLUMN 23 26-May-24 25-Jun-24 09-Feb-25 08-Mar-25 SAR763,329.18 SAR0.00 0% 0% 08-Mar-25, COLUMN
TUNNEL WALLS 37 26-May-24 11-Jul-24 09-Feb-25 24-Mar-25 SAR702,209.81 SAR0.00 0% 0% 24-Mar-25, TUNNEL WALLS
TOP SLAB
SLA 47 29-Jun-24 21-Aug-24 10-Mar-25 08-May-25 SAR2,411,413.81 SAR0.00 0% 0% 08-May-25, TOP SLAB
MASS COCONCRETE WORK 24 22-Aug-24 18-Sep-24 08-May-25 09-Jun-25 SAR1,135,397.70 SAR0.00 0% 0% 09-Jun-25, MASS CONCRETE
STA. 0+433 ~ 0+453 468 06-May-24 01-Oct-24 04-Dec-23 A 19-Jun-25 SAR6,750,390.86 SAR28,099.54 0% 0.42% 19-Jun-25, STA. 0+433 ~ 0+45
BASE SLAB
SL 372 06-May-24 05-Jun-24 04-Dec-23 A 19-Feb-25 SAR1,738,040.36 SAR28,099.54 0% 1.62% 19-Feb-25, BASE SLAB
COLUMN 23 06-Jun-24 07-Jul-24 19-Feb-25 18-Mar-25 SAR763,329.18 SAR0.00 0% 0% 18-Mar-25, COLUMN
TUNNEL WALLS 37 06-Jun-24 23-Jul-24 19-Feb-25 08-Apr-25 SAR702,209.81 SAR0.00 0% 0% 08-Apr-25, TUNNEL WALLS
TOP SLAB
SLA 47 10-Jul-24 02-Sep-24 20-Mar-25 19-May-25 SAR2,411,413.81 SAR0.00 0% 0% 19-May-25, TOP SLAB
MASS COCONCRETE WORK 24 03-Sep-24 01-Oct-24 19-May-25 19-Jun-25 SAR1,135,397.70 SAR0.00 0% 0% 19-Jun-25, MASS CONCRETE
STA. 0+453 ~ 0+473 530 18-May-24 14-Dec-24 04-Dec-23 A 31-Aug-25 SAR21,528,960.91 SAR28,099.54 0% 0.13% 31-Aug-25, STA. 0+453 ~ 0
BASE SLAB
SL 381 18-May-24 22-Jun-24 04-Dec-23 A 02-Mar-25 SAR1,738,040.36 SAR28,099.54 0% 1.62% 02-Mar-25, BASE SLAB
COLUMN 23 23-Jun-24 18-Jul-24 02-Mar-25 29-Mar-25 SAR763,329.18 SAR0.00 0% 0% 29-Mar-25, COLUMN
TUNNEL WALLS 45 23-Jun-24 13-Aug-24 02-Mar-25 28-Apr-25 SAR702,209.81 SAR0.00 0% 0% 28-Apr-25, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 31-Jul-24 03-Sep-24 14-Apr-25 19-May-25 SAR9,371,587.96 SAR0.00 0% 0% 19-May-25, MIDDLE SLAB FO
UTILITY CCULVERT WALLS 25 04-Sep-24 03-Oct-24 19-May-25 21-Jun-25 SAR5,406,982.09 SAR0.00 0% 0% 21-Jun-25, UTILITY CULVER
TOP SLAB
SLA 37 05-Oct-24 16-Nov-24 21-Jun-25 03-Aug-25 SAR2,411,413.81 SAR0.00 0% 0% 03-Aug-25, TOP SLAB
MASS COCONCRETE WORK 24 17-Nov-24 14-Dec-24 03-Aug-25 31-Aug-25 SAR1,135,397.70 SAR0.00 0% 0% 31-Aug-25, MASS CONCR
STA. 0+473 ~ 0+500 166 06-Jun-24 22-Dec-24 18-Feb-25 08-Sep-25 SAR21,528,960.91 SAR0.00 0% 0% 08-Sep-25, STA. 0+473 ~ 0+
BASE SLAB
SL 27 06-Jun-24 11-Jul-24 18-Feb-25 22-Mar-25 SAR1,738,040.36 SAR0.00 0% 0% 22-Mar-25, BASE SLAB
COLUMN 23 13-Jul-24 07-Aug-24 22-Mar-25 22-Apr-25 SAR763,329.18 SAR0.00 0% 0% 22-Apr-25, COLUMN
TUNNEL WALLS 37 13-Jul-24 24-Aug-24 22-Mar-25 08-May-25 SAR702,209.81 SAR0.00 0% 0% 08-May-25, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 31 11-Aug-24 15-Sep-24 24-Apr-25 31-May-25 SAR9,371,587.96 SAR0.00 0% 0% 31-May-25, MIDDLE SLAB FO
UTILITY CCULVERT WALLS 25 12-Sep-24 12-Oct-24 27-May-25 29-Jun-25 SAR5,406,982.09 SAR0.00 0% 0% 29-Jun-25, UTILITY CULVER
TOP SLAB
SLA 37 13-Oct-24 24-Nov-24 29-Jun-25 11-Aug-25 SAR2,411,413.81 SAR0.00 0% 0% 11-Aug-25, TOP SLAB
MASS COCONCRETE WORK 24 25-Nov-24 22-Dec-24 11-Aug-25 08-Sep-25 SAR1,135,397.70 SAR0.00 0% 0% 08-Sep-25, MASS CONCR
WET CULVERT 262 31-Oct-23 08-Sep-24 13-Aug-24 24-Jun-25 SAR20,874,193.62 SAR0.00 4.62% 0% 24-Jun-25, WET CULVERT
Sta 0+000-0+369.618
0+000-0 - @ZONE 1 262 31-Oct-23 08-Sep-24 13-Aug-24 24-Jun-25 SAR20,874,193.62 SAR0.00 4.62% 0% 24-Jun-25, Sta 0+000-0+369.61
1st Sta 0+000-0+200
0 161 31-Oct-23 08-May-24 13-Aug-24 18-Feb-25 SAR10,493,684.04 SAR0.00 9.19% 0% 18-Feb-25, 1st Sta 0+000-0+200
BASE SLAB 95 31-Oct-23 18-Feb-24 13-Aug-24 03-Dec-24 SAR2,924,766.64 SAR0.00 32.97% 0% 03-Dec-24, BASE SLAB
CULVERT WALL
CULVE 63 09-Jan-24 21-Mar-24 23-Oct-24 05-Jan-25 SAR2,837,841.88 SAR0.00 0% 0% 05-Jan-25, CULVERT WALL
TOP SSLAB 62 24-Feb-24 08-May-24 08-Dec-24 18-Feb-25 SAR3,005,210.13 SAR0.00 0% 0% 18-Feb-25, TOP SLAB
PLAIN CONCRETE 9 14-Apr-24 23-Apr-24 23-Jan-25 03-Feb-25 SAR1,602,878.44 SAR0.00 0% 0% 03-Feb-25, PLAIN CONCRETE
FINISHING
FINISH 10 24-Apr-24 05-May-24 03-Feb-25 15-Feb-25 SAR122,986.94 SAR0.00 0% 0% 15-Feb-25, FINISHING
2nd Sta 0+200-0+369.618
0 156 03-Mar-24 08-Sep-24 16-Dec-24 24-Jun-25 SAR10,380,509.59 SAR0.00 0% 0% 24-Jun-25, 2nd Sta 0+200-0+36
BASE SLAB 90 03-Mar-24 23-Jun-24 16-Dec-24 05-Apr-25 SAR2,811,592.19 SAR0.00 0% 0% 05-Apr-25, BASE SLAB
CULVERT WALL
CULVE 62 11-May-24 25-Jul-24 19-Feb-25 07-May-25 SAR2,837,841.88 SAR0.00 0% 0% 07-May-25, CULVERT WALL
TOP SSLAB 62 29-Jun-24 08-Sep-24 09-Apr-25 24-Jun-25 SAR3,005,210.13 SAR0.00 0% 0% 24-Jun-25, TOP SLAB
PLAIN CONCRETE 9 14-Aug-24 24-Aug-24 26-May-25 09-Jun-25 SAR1,602,878.44 SAR0.00 0% 0% 09-Jun-25, PLAIN CONCRETE
FINISHING
FINISH 10 25-Aug-24 04-Sep-24 09-Jun-25 21-Jun-25 SAR122,986.94 SAR0.00 0% 0% 21-Jun-25, FINISHING
DRY CULVERT ZONE 1 268 03-Feb-24 19-Dec-24 17-Nov-24 05-Oct-25 SAR21,312,393.20 SAR0.00 0% 0% 05-Oct-25, DRY CULVERT
DRY CULVERT
CULVE D91 - @ZONE 1 215 03-Feb-24 19-Oct-24 17-Nov-24 03-Aug-25 SAR8,197,074.31 SAR0.00 0% 0% 03-Aug-25, DRY CULVERT
BASE SLAB
SL 91 03-Feb-24 21-May-24 17-Nov-24 03-Mar-25 SAR1,913,734.48 SAR0.00 0% 0% 03-Mar-25, BASE SLAB
CULVERT WALL 76 07-May-24 07-Aug-24 16-Feb-25 20-May-25 SAR2,212,504.26 SAR0.00 0% 0% 20-May-25, CULVERT WALL

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
5 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
TOP SLAB
SLA 61 17-Jul-24 26-Sep-24 28-Apr-25 12-Jul-25 SAR1,765,351.55 SAR0.00 0% 0% 12-Jul-25, TOP SLAB
PLAIN CO
CONCRETE 9 28-Sep-24 07-Oct-24 12-Jul-25 22-Jul-25 SAR1,026,941.36 SAR0.00 0% 0% 22-Jul-25, PLAIN CONCRET
FINISHING
FINISHIN 10 08-Oct-24 19-Oct-24 22-Jul-25 03-Aug-25 SAR1,278,542.65 SAR0.00 0% 0% 03-Aug-25, FINISHING
Sta0+000-Sta0+149.628 - @ZONE 1
Sta0+000-S 190 07-May-24 19-Dec-24 16-Feb-25 05-Oct-25 SAR6,557,659.44 SAR0.00 0% 0% 05-Oct-25, Sta0+000-Sta0+
BASE SLAB
SL 101 07-May-24 05-Sep-24 16-Feb-25 22-Jun-25 SAR1,530,987.58 SAR0.00 0% 0% 22-Jun-25, BASE SLAB
CULVERT WALL 68 25-Jul-24 13-Oct-24 06-May-25 28-Jul-25 SAR1,770,003.41 SAR0.00 0% 0% 28-Jul-25, CULVERT WALL
TOP SLAB
SLA 61 15-Sep-24 25-Nov-24 30-Jun-25 09-Sep-25 SAR1,412,281.24 SAR0.00 0% 0% 09-Sep-25, TOP SLAB
PLAIN CO
CONCRETE 7 26-Nov-24 03-Dec-24 09-Sep-25 17-Sep-25 SAR821,553.09 SAR0.00 0% 0% 17-Sep-25, PLAIN CONCR
FINISHING
FINISHIN 14 04-Dec-24 19-Dec-24 17-Sep-25 05-Oct-25 SAR1,022,834.12 SAR0.00 0% 0% 05-Oct-25, FINISHING
DRY CULVERT
CULVE D92 - @ZONE 1 151 07-May-24 04-Nov-24 16-Feb-25 19-Aug-25 SAR6,557,659.44 SAR0.00 0% 0% 19-Aug-25, DRY CULVERT
BASE SLAB
SL 73 07-May-24 04-Aug-24 16-Feb-25 17-May-25 SAR1,530,987.58 SAR0.00 0% 0% 17-May-25, BASE SLAB
CULVERT WALL 72 06-Jul-24 28-Sep-24 16-Apr-25 13-Jul-25 SAR1,770,003.41 SAR0.00 0% 0% 13-Jul-25, CULVERT WALL
TOP SLAB
SLA 47 27-Aug-24 21-Oct-24 11-Jun-25 05-Aug-25 SAR1,412,281.24 SAR0.00 0% 0% 05-Aug-25, TOP SLAB
PLAIN CO
CONCRETE 7 15-Oct-24 22-Oct-24 29-Jul-25 06-Aug-25 SAR821,553.09 SAR0.00 0% 0% 06-Aug-25, PLAIN CONCRE
FINISHING
FINISHIN 11 23-Oct-24 04-Nov-24 06-Aug-25 19-Aug-25 SAR1,022,834.12 SAR0.00 0% 0% 19-Aug-25, FINISHING
BACKFILLING UPTO TUNNEL WALL 215 05-Dec-23 16-Sep-24 17-Sep-24 01-Jun-25 SAR10,285,727.62 SAR0.00 15% 0% 01-Jun-25, BACKFILLING UP
STRUCTURAL FILL 234 12-Mar-24 14-Jan-25 25-Dec-24 04-Oct-25 SAR10,285,727.62 SAR0.00 0% 0% 04-Oct-25, STRUCTURAL
WET & DRY UTILITIES
UT 133 23-Dec-24 31-May-25 08-Sep-25 11-Feb-26 SAR5,625,765.26 SAR0.00 0% 0% 11-Feb-26, WET & D
INSIDE WET CULVERT 133 23-Dec-24 31-May-25 08-Sep-25 11-Feb-26 SAR4,168,843.22 SAR0.00 0% 0% 11-Feb-26, INSIDE W
POTABLE WATER NETWORK 59 23-Dec-24 01-Mar-25 08-Sep-25 17-Nov-25 SAR427,352.76 SAR0.00 0% 0% 17-Nov-25, POTABLE W
GREY WAWATER DISTRIBUTION SYSTEM 49 21-Jan-25 18-Mar-25 08-Oct-25 04-Dec-25 SAR328,716.92 SAR0.00 0% 0% 04-Dec-25, GREY WATE
IRRIGATION NETWORK
IRRIGATI 78 23-Dec-24 23-Mar-25 08-Sep-25 09-Dec-25 SAR482,692.61 SAR0.00 0% 0% 09-Dec-25, IRRIGATION
CHILLED WATER SUPPLY NETWORK 59 13-Feb-25 27-Apr-25 01-Nov-25 08-Jan-26 SAR1,043,588.20 SAR0.00 0% 0% 08-Jan-26, CHILLED W
CHILLED WATER RETURN NETWORK 59 15-Mar-25 26-May-25 30-Nov-25 07-Feb-26 SAR1,043,588.20 SAR0.00 0% 0% 07-Feb-26, CHILLED
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 108 21-Jan-25 31-May-25 08-Oct-25 11-Feb-26 SAR842,904.54 SAR0.00 0% 0% 11-Feb-26, AUTOMA
INSIDE DRY CULVERT 114 23-Dec-24 08-May-25 08-Sep-25 20-Jan-26 SAR1,456,922.04 SAR0.00 0% 0% 20-Jan-26, INSIDE DR
POWER 100 23-Dec-24 22-Apr-25 08-Sep-25 04-Jan-26 SAR1,330,996.11 SAR0.00 0% 0% 04-Jan-26, POWER
HIGH VOLTAGE
V 110 KV NETWORK 30 23-Dec-24 26-Jan-25 08-Sep-25 14-Oct-25 SAR81,088.57 SAR0.00 0% 0% 14-Oct-25, HIGH VOLTAG
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 32 27-Jan-25 04-Mar-25 14-Oct-25 20-Nov-25 SAR1,037,144.34 SAR0.00 0% 0% 20-Nov-25, MEDIUM V
LOW V VOLTAGE NETWORK 32 05-Mar-25 15-Apr-25 20-Nov-25 28-Dec-25 SAR212,763.20 SAR0.00 0% 0% 28-Dec-25, LOW VOLT
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 70 27-Jan-25 22-Apr-25 14-Oct-25 04-Jan-26 SAR0.00 SAR0.00 0% 0% 04-Jan-26, ELECTRICA
LIGHTING SYSTEM
LIGHT 35 08-Feb-25 19-Mar-25 26-Oct-25 06-Dec-25 SAR0.00 SAR0.00 0% 0% 06-Dec-25, LIGHTING S
TELECOM SERVICES 20 16-Apr-25 08-May-25 28-Dec-25 20-Jan-26 SAR125,925.93 SAR0.00 0% 0% 20-Jan-26, TELECOM
MEP VEHICULAR
VEHICULA TUNNEL/ DRY & WET CULVERTS 231 17-Sep-24 22-Jun-25 01-Jun-25 02-Mar-26 SAR13,714,988.43 SAR0.00 0% 0% 02-Mar-26, MEP VEH
TUNNEL MECHANICAL
ME WORKS 160 17-Sep-24 23-Mar-25 01-Jun-25 09-Dec-25 SAR2,704,813.47 SAR0.00 0% 0% 09-Dec-25, TUNNEL M
FIRE FIG
FIGHTING SYSTEM 56 17-Sep-24 21-Nov-24 01-Jun-25 09-Aug-25 SAR1,967,257.19 SAR0.00 0% 0% 09-Aug-25, FIRE FIGHTING
VENTILATION SYSTEM
VENTILA 23 23-Nov-24 18-Dec-24 09-Aug-25 04-Sep-25 SAR220,591.82 SAR0.00 0% 0% 04-Sep-25, VENTILATION
PUMPS INSTALLATION
I 15 19-Dec-24 05-Jan-25 04-Sep-25 22-Sep-25 SAR414,510.98 SAR0.00 0% 0% 22-Sep-25, PUMPS INSTA
DUCTING SYSTEM 66 06-Jan-25 23-Mar-25 22-Sep-25 09-Dec-25 SAR102,453.48 SAR0.00 0% 0% 09-Dec-25, DUCTING S
TUNNEL ELECTRICAL
EL WORKS 178 12-Oct-24 11-May-25 28-Jun-25 22-Jan-26 SAR9,998,791.68 SAR0.00 0% 0% 22-Jan-26, TUNNEL E
CABLE TRAYS
T 101 12-Oct-24 05-Feb-25 28-Jun-25 25-Oct-25 SAR1,290,145.40 SAR0.00 0% 0% 25-Oct-25, CABLE TRAY
POWER CABLES 114 05-Nov-24 17-Mar-25 22-Jul-25 03-Dec-25 SAR1,744,342.81 SAR0.00 0% 0% 03-Dec-25, POWER CA
ELECTRICAL INSTALLATIONS
ELECTRI 109 19-Nov-24 25-Mar-25 05-Aug-25 11-Dec-25 SAR1,427,303.37 SAR0.00 0% 0% 11-Dec-25, ELECTRICA
LOW CUR
CURRENT 178 12-Oct-24 11-May-25 28-Jun-25 22-Jan-26 SAR5,537,000.09 SAR0.00 0% 0% 22-Jan-26, LOW CUR
FIRE D
DETECTION AND ALARM SYSTEM 82 12-Oct-24 14-Jan-25 28-Jun-25 02-Oct-25 SAR209,231.73 SAR0.00 0% 0% 02-Oct-25, FIRE DETECTI
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 73 26-Oct-24 18-Jan-25 12-Jul-25 06-Oct-25 SAR174,339.40 SAR0.00 0% 0% 06-Oct-25, COMMUNICA
PUBLIC ADDRESS SYSTEM
PUBLI 22 19-Jan-25 12-Feb-25 06-Oct-25 01-Nov-25 SAR135,232.89 SAR0.00 0% 0% 01-Nov-25, PUBLIC ADD
VIDEO SURVEILLANCE & ACCESS CONTROL SYSTEM 25 13-Feb-25 13-Mar-25 01-Nov-25 30-Nov-25 SAR162,725.26 SAR0.00 0% 0% 30-Nov-25, VIDEO SUR
RADIO RE-BROADCASTING SYSTEM 20 22-Feb-25 16-Mar-25 09-Nov-25 02-Dec-25 SAR108,151.30 SAR0.00 0% 0% 02-Dec-25, RADIO RE-B
TRAFFIC MANAGEMENT SYSTEM
TRAFF 59 27-Feb-25 11-May-25 15-Nov-25 22-Jan-26 SAR4,312,893.00 SAR0.00 0% 0% 22-Jan-26, TRAFFIC M
SCADA SYSTEM 18 03-Mar-25 23-Mar-25 18-Nov-25 09-Dec-25 SAR434,426.52 SAR0.00 0% 0% 09-Dec-25, SCADA SYS
TUNNEL PLUMBING
PL WORKS 35 10-May-25 22-Jun-25 20-Jan-26 02-Mar-26 SAR1,011,383.28 SAR0.00 0% 0% 02-Mar-26, TUNNEL
DRAINAGE SYSTEM
DRAINAG 35 10-May-25 22-Jun-25 20-Jan-26 02-Mar-26 SAR1,011,383.28 SAR0.00 0% 0% 02-Mar-26, DRAINA
TUNNEL INTERNAL
INTER ROAD WORK 42 23-Jun-25 10-Aug-25 02-Mar-26 25-Apr-26 SAR1,052,160.92 SAR0.00 0% 0% 25-Apr-26, TUNNE
TUNNEL INTERNAL
INTER DECORATIVE WORKS 40 27-Jul-25 10-Sep-25 29-Mar-26 14-May-26 SAR3,416,431.77 SAR0.00 0% 0% 14-May-26, TUNN
ZONE 2 - FROM S
STA. 0+500 ~ 0+994 852 27-Sep-22 04-Jun-25 13-Jul-22 A 13-Jul-25 SAR233,599,310.51 SAR60,125,481.24 40.38% 25.74% 13-Jul-25, ZONE 2 - FROM S
ENGINEERING 653 23-Oct-22 23-May-24 13-Jul-22 A 09-Dec-24 SAR0.00 SAR0.00 0% 0% 09-Dec-24, ENGINEERING
SITE SURVEY 14 23-Oct-22 07-Nov-22 13-Jul-22 A 25-Aug-22 A SAR0.00 SAR0.00 0% 0% 25-Aug-22 A, SITE SURVEY
SHOP DRAWINGS
DRAWIN 192 21-Jan-23 27-Sep-23 17-Jul-23 A 07-Apr-24 SAR0.00 SAR0.00 0% 0% 07-Apr-24, SHOP DRAWINGS
CIVIL/STRUCTURAL 0+510 ~0+610
CIVIL/STRU 77 21-Jan-23 09-Mar-23 17-Jul-23 A 04-Jan-24 SAR0.00 SAR0.00 0% 0% 04-Jan-24, CIVIL/STRUCTURAL 0+510 ~0+610
CIVIL/STRUCTURAL 0+610 ~0+710
CIVIL/STRU 104 04-Mar-23 20-Apr-23 17-Jul-23 A 04-Jan-24 SAR0.00 SAR0.00 0% 0% 04-Jan-24, CIVIL/STRUCTURAL 0+610 ~0+710
CIVIL/STRUCTURAL 0+710 ~0+810
CIVIL/STRU 55 15-Apr-23 05-Jun-23 17-Jul-23 A 10-Jan-24 SAR0.00 SAR0.00 0% 0% 10-Jan-24, CIVIL/STRUCTURAL 0+710 ~0+810

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
6 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
CIVIL/STRU
CIVIL/STRUCTURAL 0+810 ~0+910 74 30-May-23 20-Jul-23 17-Jul-23 A 31-Jan-24 SAR0.00 SAR0.00 0% 0% 31-Jan-24, CIVIL/STRUCTURAL 0+810 ~0+910
CIVIL/STRUCTURAL 0+910 ~0+994
CIVIL/STRU 41 15-Jul-23 31-Aug-23 24-Jan-24 12-Mar-24 SAR0.00 SAR0.00 0% 0% 12-Mar-24, CIVIL/STRUCTURAL 0+910 ~0+99
ARCHITECTURAL
ARCHITECT 22 02-Sep-23 27-Sep-23 12-Mar-24 07-Apr-24 SAR0.00 SAR0.00 0% 0% 07-Apr-24, ARCHITECTURAL
UTILITIES 270 02-Sep-23 06-Mar-24 25-Oct-22 A 22-Jul-24 SAR0.00 SAR0.00 0% 0% 22-Jul-24, UTILITIES
WET UTILITIES
UTILIT 270 02-Sep-23 07-Feb-24 25-Oct-22 A 22-Jul-24 SAR0.00 SAR0.00 0% 0% 22-Jul-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 32 02-Sep-23 09-Oct-23 25-Oct-22 A 13-Nov-22 A SAR0.00 SAR0.00 0% 0% 13-Nov-22 A, POTABLE WATER NETWORK BRANCH, HOUSE
GREY WAWATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 32 26-Sep-23 01-Nov-23 13-Dec-22 A 04-Apr-24 SAR0.00 SAR0.00 0% 0% 04-Apr-24, GREY WATER DISTRIBUTION NE
IRR & FF NETWORK BRANCHES & TIE IN POINTS 32 19-Oct-23 25-Nov-23 24-Mar-24 04-May-24 SAR0.00 SAR0.00 0% 0% 04-May-24, IRR & FF NETWORK BRANCH
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 32 26-Nov-23 01-Jan-24 04-May-24 10-Jun-24 SAR0.00 SAR0.00 0% 0% 10-Jun-24, CHILLED WATER SUPPLY & RE
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 32 02-Jan-24 07-Feb-24 10-Jun-24 22-Jul-24 SAR0.00 SAR0.00 0% 0% 22-Jul-24, AUTOMATIC WASTE COLLEC
DRY UTILITI
UTILITIES 197 10-Oct-23 06-Mar-24 01-Nov-22 A 29-May-24 SAR0.00 SAR0.00 0% 0% 29-May-24, DRY UTILITIES
POWER 165 10-Oct-23 29-Jan-24 01-Nov-22 A 22-Apr-24 SAR0.00 SAR0.00 0% 0% 22-Apr-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 32 10-Oct-23 15-Nov-23 12-Mar-24 22-Apr-24 SAR0.00 SAR0.00 0% 0% 22-Apr-24, HIGH VOLTAGE 110 KV NETWO
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 32 10-Oct-23 15-Nov-23 12-Mar-24 22-Apr-24 SAR0.00 SAR0.00 0% 0% 22-Apr-24, MEDIUM VOLTAGE 13.8 KV NET
LOW V VOLTAGE NETWORK 32 10-Oct-23 15-Nov-23 27-Nov-22 A 22-Apr-24 SAR0.00 SAR0.00 0% 0% 22-Apr-24, LOW VOLTAGE NETWORK
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 32 16-Nov-23 23-Dec-23 01-Nov-22 A 12-Nov-22 A SAR0.00 SAR0.00 0% 0% 12-Nov-22 A, ELECTRICAL DISTRIBUTION SYSTEM
LIGHTING SYSTEM
LIGHT 32 24-Dec-23 29-Jan-24 26-Nov-22 A 27-Dec-22 A SAR0.00 SAR0.00 0% 0% 27-Dec-22 A, LIGHTING SYSTEM
LOW CUR
CURRENT 32 30-Jan-24 06-Mar-24 22-Apr-24 29-May-24 SAR0.00 SAR0.00 0% 0% 29-May-24, LOW CURRENT
TELECOM SERVICES
TELEC 32 30-Jan-24 06-Mar-24 22-Apr-24 29-May-24 SAR0.00 SAR0.00 0% 0% 29-May-24, TELECOM SERVICES
MEP 272 08-Jul-23 23-May-24 17-Jan-24 09-Dec-24 SAR0.00 SAR0.00 0% 0% 09-Dec-24, MEP
TUNNEL MECHANICAL
ME WORKS 176 08-Jul-23 29-Jan-24 17-Jan-24 18-Aug-24 SAR0.00 SAR0.00 0% 0% 18-Aug-24, TUNNEL MECHANICAL WO
FIRE FIG
FIGHTING SYSTEM 88 08-Jul-23 18-Oct-23 17-Jan-24 02-May-24 SAR0.00 SAR0.00 0% 0% 02-May-24, FIRE FIGHTING SYSTEM
VENTILATION SYSTEM
VENTILA 44 05-Oct-23 25-Nov-23 18-Apr-24 09-Jun-24 SAR0.00 SAR0.00 0% 0% 09-Jun-24, VENTILATION SYSTEM
PUMPS INSTALLATION
I 22 26-Nov-23 20-Dec-23 09-Jun-24 09-Jul-24 SAR0.00 SAR0.00 0% 0% 09-Jul-24, PUMPS INSTALLATION
DUCTING SYSTEM 88 19-Oct-23 29-Jan-24 02-May-24 18-Aug-24 SAR0.00 SAR0.00 0% 0% 18-Aug-24, DUCTING SYSTEM
TUNNEL ELECTRICAL
EL WORKS 184 19-Oct-23 23-May-24 02-May-24 09-Dec-24 SAR0.00 SAR0.00 0% 0% 09-Dec-24, TUNNEL ELECTRICAL W
CABLE TRAYS
T 110 31-Oct-23 06-Mar-24 14-May-24 25-Sep-24 SAR0.00 SAR0.00 0% 0% 25-Sep-24, CABLE TRAYS
POWER CABLES 44 02-Jan-24 21-Feb-24 21-Jul-24 10-Sep-24 SAR0.00 SAR0.00 0% 0% 10-Sep-24, POWER CABLES
ELECTRICAL INSTALLATIONS
ELECTRI 110 14-Jan-24 23-May-24 01-Aug-24 09-Dec-24 SAR0.00 SAR0.00 0% 0% 09-Dec-24, ELECTRICAL INSTALLA
LOW CUR
CURRENT 132 19-Oct-23 20-Mar-24 02-May-24 09-Oct-24 SAR0.00 SAR0.00 0% 0% 09-Oct-24, LOW CURRENT
FIRE D
DETECTION AND ALARM SYSTEM 132 19-Oct-23 20-Mar-24 02-May-24 09-Oct-24 SAR0.00 SAR0.00 0% 0% 09-Oct-24, FIRE DETECTION AND AL
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 110 31-Oct-23 06-Mar-24 14-May-24 25-Sep-24 SAR0.00 SAR0.00 0% 0% 25-Sep-24, COMMUNICATION SYSTE
PUBLIC ADDRESS
PUBLI 66 16-Nov-23 31-Jan-24 30-May-24 20-Aug-24 SAR0.00 SAR0.00 0% 0% 20-Aug-24, PUBLIC ADDRESS
VIDEO SURVEILLANCE 44 28-Nov-23 17-Jan-24 11-Jun-24 06-Aug-24 SAR0.00 SAR0.00 0% 0% 06-Aug-24, VIDEO SURVEILLANCE
SACADA SYSTEM
SACA 44 10-Dec-23 29-Jan-24 27-Jun-24 18-Aug-24 SAR0.00 SAR0.00 0% 0% 18-Aug-24, SACADA SYSTEM
RADIO RE-BROADCASTING SYSTEM 44 21-Dec-23 10-Feb-24 09-Jul-24 29-Aug-24 SAR0.00 SAR0.00 0% 0% 29-Aug-24, RADIO RE-BROADCASTIN
TUNNEL PLUMBING
PL WORKS 21 02-Jan-24 25-Jan-24 21-Jul-24 14-Aug-24 SAR0.00 SAR0.00 0% 0% 14-Aug-24, TUNNEL PLUMBING WORK
PROCUREMENT 583 11-Feb-23 31-Aug-24 20-Nov-22 A 07-Jan-25 SAR27,081,439.99 SAR9,401,019.77 97.46% 34.71% 07-Jan-25, PROCUREMENT
CIVIL/STRUCTU
CIVIL/STRUCTURAL 225 11-Feb-23 27-Apr-23 01-Dec-22 A 18-Jan-24 SAR21,862,836.68 SAR9,401,019.77 100% 43% 18-Jan-24, CIVIL/STRUCTURAL
UTILITIES 307 10-Oct-23 31-Aug-24 20-Nov-22 A 07-Jan-25 SAR748,882.98 SAR0.00 8.21% 0% 07-Jan-25, UTILITIES
WET UTILITIES
UTILIT 307 10-Oct-23 03-Aug-24 20-Nov-22 A 07-Jan-25 SAR531,226.90 SAR0.00 4.22% 0% 07-Jan-25, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 202 10-Oct-23 26-Mar-24 20-Nov-22 A 05-Sep-24 SAR50,276.79 SAR0.00 21.78% 0% 05-Sep-24, POTABLE WATER NETWOR
DI PIPES
PIP 192 10-Oct-23 26-Mar-24 20-Nov-22 A 25-Aug-24 SAR5,530.45 SAR0.00 21.78% 0% 25-Aug-24, DI PIPES
HDPE PIPES 192 10-Oct-23 26-Mar-24 29-Mar-23 A 25-Aug-24 SAR6,535.98 SAR0.00 21.78% 0% 25-Aug-24, HDPE PIPES
GRP PPIPES 192 10-Oct-23 26-Mar-24 08-Jan-23 A 25-Aug-24 SAR5,027.68 SAR0.00 21.78% 0% 25-Aug-24, GRP PIPES
DI & G
GRP FITTING 192 10-Oct-23 26-Mar-24 01-May-23 A 25-Aug-24 SAR5,027.68 SAR0.00 21.78% 0% 25-Aug-24, DI & GRP FITTING
GATE VALVE 192 10-Oct-23 26-Mar-24 01-May-23 A 25-Aug-24 SAR5,027.68 SAR0.00 21.78% 0% 25-Aug-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 192 10-Oct-23 26-Mar-24 01-May-23 A 25-Aug-24 SAR4,524.91 SAR0.00 21.78% 0% 25-Aug-24, BUTTERFLAY VALVE
WATER METER
WATE 145 10-Oct-23 26-Mar-24 12-Mar-24 05-Sep-24 SAR7,541.52 SAR0.00 21.78% 0% 05-Sep-24, WATER METER
AIR RELASE
RE VALVE 192 10-Oct-23 26-Mar-24 04-Jul-23 A 25-Aug-24 SAR5,027.68 SAR0.00 21.78% 0% 25-Aug-24, AIR RELASE VALVE
WASHOUT VALVE
WASH 192 10-Oct-23 26-Mar-24 04-Jul-23 A 25-Aug-24 SAR6,033.22 SAR0.00 21.78% 0% 25-Aug-24, WASHOUT VALVE
GREY WAWATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 192 02-Nov-23 22-Apr-24 20-Nov-22 A 17-Sep-24 SAR30,938.06 SAR0.00 20% 0% 17-Sep-24, GREY WATER DISTRIBUTI
DI PIPES
PIP 192 02-Nov-23 22-Apr-24 20-Nov-22 A 17-Sep-24 SAR5,259.47 SAR0.00 20% 0% 17-Sep-24, DI PIPES
HDPE PIPES 192 02-Nov-23 22-Apr-24 29-Mar-23 A 17-Sep-24 SAR5,568.85 SAR0.00 20% 0% 17-Sep-24, HDPE PIPES
GRP PPIPES 192 02-Nov-23 22-Apr-24 08-Jan-23 A 17-Sep-24 SAR4,021.95 SAR0.00 20% 0% 17-Sep-24, GRP PIPES
DI & G
GRP FITTING 192 02-Nov-23 22-Apr-24 01-May-23 A 17-Sep-24 SAR3,712.57 SAR0.00 20% 0% 17-Sep-24, DI & GRP FITTING
GATE VALVE 192 02-Nov-23 22-Apr-24 01-May-23 A 17-Sep-24 SAR2,165.66 SAR0.00 20% 0% 17-Sep-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 192 02-Nov-23 22-Apr-24 01-May-23 A 17-Sep-24 SAR3,093.81 SAR0.00 20% 0% 17-Sep-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 192 02-Nov-23 22-Apr-24 04-Jul-23 A 17-Sep-24 SAR3,403.19 SAR0.00 20% 0% 17-Sep-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 192 02-Nov-23 22-Apr-24 04-Jul-23 A 17-Sep-24 SAR3,712.57 SAR0.00 20% 0% 17-Sep-24, WASEHOUT VALVE
IRR & FF NETWORK BRANCHES & TIE IN POINTS 192 26-Nov-23 15-May-24 29-Mar-23 A 14-Oct-24 SAR56,304.75 SAR0.00 9.33% 0% 14-Oct-24, IRR & FF NETWORK BRAN
HDPE PIPES 192 26-Nov-23 15-May-24 29-Mar-23 A 14-Oct-24 SAR14,076.19 SAR0.00 9.33% 0% 14-Oct-24, HDPE PIPES

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
7 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
GATE VALVE 192 26-Nov-23 15-May-24 01-May-23 A 14-Oct-24 SAR5,630.48 SAR0.00 9.33% 0% 14-Oct-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 192 26-Nov-23 15-May-24 01-May-23 A 14-Oct-24 SAR5,630.48 SAR0.00 9.33% 0% 14-Oct-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 192 26-Nov-23 15-May-24 04-Jul-23 A 14-Oct-24 SAR5,630.48 SAR0.00 9.33% 0% 14-Oct-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 192 26-Nov-23 15-May-24 04-Jul-23 A 14-Oct-24 SAR5,630.48 SAR0.00 9.33% 0% 14-Oct-24, WASEHOUT VALVE
FIRE H
HYDRANT 192 26-Nov-23 15-May-24 04-Jul-23 A 14-Oct-24 SAR19,706.66 SAR0.00 9.33% 0% 14-Oct-24, FIRE HYDRANT
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 201 02-Jan-24 26-Jun-24 01-May-23 A 02-Dec-24 SAR306,937.71 SAR0.00 0% 0% 02-Dec-24, CHILLED WATER SUPPL
MILD STEEL PIPE 145 02-Jan-24 26-Jun-24 10-Jun-24 02-Dec-24 SAR122,775.08 SAR0.00 0% 0% 02-Dec-24, MILD STEEL PIPE
MILD STEEL FITTING 145 02-Jan-24 26-Jun-24 10-Jun-24 02-Dec-24 SAR122,775.08 SAR0.00 0% 0% 02-Dec-24, MILD STEEL FITTING
GATE VALVE 191 02-Jan-24 26-Jun-24 01-May-23 A 20-Nov-24 SAR61,387.54 SAR0.00 0% 0% 20-Nov-24, GATE VALVE
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 144 08-Feb-24 03-Aug-24 22-Jul-24 07-Jan-25 SAR86,769.59 SAR0.00 0% 0% 07-Jan-25, AUTOMATIC WASTE CO
AUTOMATIC WASTE
AUTO 144 08-Feb-24 03-Aug-24 22-Jul-24 07-Jan-25 SAR86,769.59 SAR0.00 0% 0% 07-Jan-25, AUTOMATIC WASTE
DRY UTILITI
UTILITIES 177 16-Nov-23 31-Aug-24 22-Apr-24 20-Nov-24 SAR217,656.08 SAR0.00 17.96% 0% 20-Nov-24, DRY UTILITIES
POWER 145 16-Nov-23 24-Jul-24 22-Apr-24 14-Oct-24 SAR195,433.86 SAR0.00 20% 0% 14-Oct-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 145 16-Nov-23 06-May-24 22-Apr-24 14-Oct-24 SAR12,719.78 SAR0.00 20% 0% 14-Oct-24, HIGH VOLTAGE 110 KV N
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 145 16-Nov-23 06-May-24 22-Apr-24 14-Oct-24 SAR162,689.31 SAR0.00 20% 0% 14-Oct-24, MEDIUM VOLTAGE 13.8 K
LOW VVOLTAGE NETWORK 145 16-Nov-23 06-May-24 22-Apr-24 14-Oct-24 SAR20,024.77 SAR0.00 20% 0% 14-Oct-24, LOW VOLTAGE NETWORK
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 145 24-Dec-23 12-Jun-24 22-Apr-24 14-Oct-24 SAR0.00 SAR0.00 0% 0% 14-Oct-24, ELECTRICAL DISTRIBUTIO
LIGHTING SYSTEM
LIGHT 145 30-Jan-24 24-Jul-24 22-Apr-24 14-Oct-24 SAR0.00 SAR0.00 0% 0% 14-Oct-24, LIGHTING SYSTEM
LOW CUR
CURRENT 145 07-Mar-24 31-Aug-24 29-May-24 20-Nov-24 SAR22,222.22 SAR0.00 0% 0% 20-Nov-24, LOW CURRENT
TELECOM SERVICES
TELEC 145 07-Mar-24 31-Aug-24 29-May-24 20-Nov-24 SAR22,222.22 SAR0.00 0% 0% 20-Nov-24, TELECOM SERVICES
MEP 235 04-Mar-23 10-Dec-23 16-Dec-23 22-Sep-24 SAR4,469,720.33 SAR0.00 100% 0% 22-Sep-24, MEP
ARCHITECTURAL
ARCHITECTUR 115 28-Sep-23 08-Feb-24 07-Apr-24 27-Aug-24 SAR0.00 SAR0.00 0% 0% 27-Aug-24, ARCHITECTURAL
CONSTRUCTION 852 27-Sep-22 04-Jun-25 17-Aug-22 A 13-Jul-25 SAR206,517,870.52 SAR50,724,461.47 32.89% 24.56% 13-Jul-25, CONSTRUCTION
GENERAL SITE ARRANGEMENT 147 13-Jun-23 16-Aug-23 14-Sep-22 A 10-Sep-23 A SAR1,043,716.54 SAR1,043,716.54 100% 100% 10-Sep-23 A, GENERAL SITE ARRANGEMENT
SITE PREPARATION
PREPA 147 13-Jun-23 16-Aug-23 14-Sep-22 A 10-Sep-23 A SAR1,043,716.54 SAR1,043,716.54 100% 100% 10-Sep-23 A, SITE PREPARATION
GEO-TECHNICAL INVESTIGATION
GEO-TECHNICA 72 27-Sep-22 19-Dec-22 17-Aug-22 A 01-Oct-22 A SAR163,726.33 SAR163,726.33 100% 100% 01-Oct-22 A, GEO-TECHNICAL INVESTIGATION
EXCAVATION & DEWATERING 568 04-Mar-23 22-Jul-24 04-Oct-22 A 09-Jan-25 SAR32,505,950.14 SAR27,538,572.87 94.97% 84.72% 09-Jan-25, EXCAVATION & DEWAT
SOIL IMPROVEMENT
IMPROVE 150 08-Apr-23 11-Oct-23 11-Jun-23 A 27-Mar-24 SAR9,258,932.10 SAR6,229,594.70 100% 67.28% 27-Mar-24, SOIL IMPROVEMENT
STRUCTURAL WORKS 367 17-Aug-23 29-Oct-24 05-Sep-23 A 03-Dec-24 SAR118,333,701.14 SAR15,748,851.02 21.87% 13.31% 03-Dec-24, STRUCTURAL WORKS
STA. 0+510.033
0+510. ~ 0+530.033 168 17-Aug-23 29-Feb-24 04-Jan-24 27-Jul-24 SAR5,635,070.16 SAR0.00 67.12% 0% 27-Jul-24, STA. 0+510.033 ~ 0+530.033
BASE SLAB
SL 27 17-Aug-23 17-Sep-23 04-Jan-24 05-Feb-24 SAR1,472,296.43 SAR0.00 100% 0% 05-Feb-24, BASE SLAB
COLUMN 23 18-Sep-23 15-Oct-23 05-Feb-24 03-Mar-24 SAR353,753.63 SAR0.00 100% 0% 03-Mar-24, COLUMN
TUNNEL WALLS 37 18-Sep-23 31-Oct-23 05-Feb-24 19-Mar-24 SAR602,870.99 SAR0.00 100% 0% 19-Mar-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 18-Oct-23 21-Nov-23 05-Mar-24 13-Apr-24 SAR884,333.12 SAR0.00 100% 0% 13-Apr-24, MIDDLE SLAB FOR UTILITY CU
UTILITY C
CULVERT WALLS 25 22-Nov-23 20-Dec-23 13-Apr-24 12-May-24 SAR511,282.59 SAR0.00 91.76% 0% 12-May-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 21-Dec-23 01-Feb-24 12-May-24 29-Jun-24 SAR1,135,980.71 SAR0.00 0% 0% 29-Jun-24, TOP SLAB
MASS CO
CONCRETE WORK 24 03-Feb-24 29-Feb-24 29-Jun-24 27-Jul-24 SAR674,552.69 SAR0.00 0% 0% 27-Jul-24, MASS CONCRETE WORK
STA.0+530.033 ~ 0+550.033
STA.0+530.0 215 29-Aug-23 12-Mar-24 05-Sep-23 A 03-Jun-24 SAR5,635,070.16 SAR2,362,601.58 64.71% 41.93% 03-Jun-24, STA.0+530.033 ~ 0+550.033
BASE SLAB
SL 76 29-Aug-23 30-Sep-23 05-Sep-23 A 30-Sep-23 A SAR1,472,296.43 SAR1,472,296.43 100% 100% 30-Sep-23 A, BASE SLAB
COLUMN 23 01-Oct-23 26-Oct-23 19-Oct-23 A 07-Dec-23 A SAR353,753.63 SAR353,753.63 100% 100% 07-Dec-23 A, COLUMN
TUNNEL WALLS 88 01-Oct-23 12-Nov-23 19-Oct-23 A 30-Jan-24 SAR602,870.99 SAR536,551.52 100% 89% 30-Jan-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 30-Oct-23 03-Dec-23 16-Jan-24 20-Feb-24 SAR884,333.12 SAR0.00 100% 0% 20-Feb-24, MIDDLE SLAB FOR UTILITY CULV
UTILITY C
CULVERT WALLS 25 04-Dec-23 01-Jan-24 20-Feb-24 20-Mar-24 SAR511,282.59 SAR0.00 65.13% 0% 20-Mar-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 02-Jan-24 13-Feb-24 20-Mar-24 06-May-24 SAR1,135,980.71 SAR0.00 0% 0% 06-May-24, TOP SLAB
MASS CO
CONCRETE WORK 24 14-Feb-24 12-Mar-24 06-May-24 03-Jun-24 SAR674,552.69 SAR0.00 0% 0% 03-Jun-24, MASS CONCRETE WORK
STA. 0+550.033
0+550. ~ 0+570.033 226 10-Sep-23 24-Mar-24 05-Sep-23 A 27-Jun-24 SAR5,635,070.16 SAR2,275,053.63 58.8% 40.37% 27-Jun-24, STA. 0+550.033 ~ 0+570.033
BASE SLAB
SL 48 10-Sep-23 11-Oct-23 05-Sep-23 A 23-Oct-23 A SAR1,472,296.43 SAR1,472,296.43 100% 100% 23-Oct-23 A, BASE SLAB
COLUMN 63 12-Oct-23 07-Nov-23 14-Nov-23 A 03-Feb-24 SAR353,753.63 SAR336,759.58 100% 95.2% 03-Feb-24, COLUMN
TUNNEL WALLS 83 12-Oct-23 23-Nov-23 14-Nov-23 A 19-Feb-24 SAR602,870.99 SAR465,997.62 100% 77.3% 19-Feb-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 11-Nov-23 14-Dec-23 05-Feb-24 11-Mar-24 SAR884,333.12 SAR0.00 100% 0% 11-Mar-24, MIDDLE SLAB FOR UTILITY CUL
UTILITY C
CULVERT WALLS 25 16-Dec-23 13-Jan-24 11-Mar-24 13-Apr-24 SAR511,282.59 SAR0.00 0% 0% 13-Apr-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 14-Jan-24 25-Feb-24 13-Apr-24 26-May-24 SAR1,135,980.71 SAR0.00 0% 0% 26-May-24, TOP SLAB
MASS CO
CONCRETE WORK 24 26-Feb-24 24-Mar-24 26-May-24 27-Jun-24 SAR674,552.69 SAR0.00 0% 0% 27-Jun-24, MASS CONCRETE WORK
STA. 0+570.033~
0+570. 0+590.033 222 21-Sep-23 27-Mar-24 13-Sep-23 A 22-Jun-24 SAR5,632,297.99 SAR2,327,970.55 58.28% 41.33% 22-Jun-24, STA. 0+570.033~ 0+590.033
BASE SLAB
SL 73 21-Sep-23 15-Oct-23 13-Sep-23 A 03-Oct-23 A SAR1,469,524.26 SAR1,469,524.26 100% 100% 03-Oct-23 A, BASE SLAB
COLUMN 23 16-Oct-23 07-Nov-23 01-Nov-23 A 30-Jan-24 SAR353,753.63 SAR336,759.58 100% 95.2% 30-Jan-24, COLUMN
TUNNEL WALLS 77 16-Oct-23 27-Nov-23 01-Nov-23 A 10-Feb-24 SAR602,870.99 SAR521,686.71 100% 86.53% 10-Feb-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 14-Nov-23 18-Dec-23 30-Jan-24 05-Mar-24 SAR884,333.12 SAR0.00 96.86% 0% 05-Mar-24, MIDDLE SLAB FOR UTILITY CUL
UTILITY C
CULVERT WALLS 25 19-Dec-23 16-Jan-24 05-Mar-24 03-Apr-24 SAR511,282.59 SAR0.00 0% 0% 03-Apr-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 17-Jan-24 28-Feb-24 03-Apr-24 20-May-24 SAR1,135,980.71 SAR0.00 0% 0% 20-May-24, TOP SLAB
MASS CO
CONCRETE WORK 24 29-Feb-24 27-Mar-24 20-May-24 22-Jun-24 SAR674,552.69 SAR0.00 0% 0% 22-Jun-24, MASS CONCRETE WORK
STA. 0+590.033
0+590. ~ 0+610.033 233 04-Oct-23 20-Apr-24 17-Sep-23 A 07-Jul-24 SAR5,635,070.16 SAR1,974,924.82 51.1% 35.05% 07-Jul-24, STA. 0+590.033 ~ 0+610.033

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
8 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
BASE SLAB
SL 80 04-Oct-23 04-Nov-23 17-Sep-23 A 17-Dec-23 A SAR1,472,296.43 SAR1,472,296.43 100% 100% 17-Dec-23 A, BASE SLAB
COLUMN 23 05-Nov-23 30-Nov-23 26-Nov-23 A 12-Feb-24 SAR353,753.63 SAR216,983.17 100% 61.34% 12-Feb-24, COLUMN
TUNNEL WALLS 81 05-Nov-23 17-Dec-23 26-Nov-23 A 28-Feb-24 SAR602,870.99 SAR285,645.22 98.17% 47.38% 28-Feb-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 04-Dec-23 07-Jan-24 14-Feb-24 20-Mar-24 SAR884,333.12 SAR0.00 52.23% 0% 20-Mar-24, MIDDLE SLAB FOR UTILITY CUL
UTILITY C
CULVERT WALLS 25 08-Jan-24 05-Feb-24 20-Mar-24 22-Apr-24 SAR511,282.59 SAR0.00 0% 0% 22-Apr-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 06-Feb-24 19-Mar-24 22-Apr-24 04-Jun-24 SAR1,135,980.71 SAR0.00 0% 0% 04-Jun-24, TOP SLAB
MASS COCONCRETE WORK 24 20-Mar-24 20-Apr-24 04-Jun-24 07-Jul-24 SAR674,552.69 SAR0.00 0% 0% 07-Jul-24, MASS CONCRETE WORK
STA. 0+610.033
0+610. ~ 0+630.033 243 16-Oct-23 28-Apr-24 26-Sep-23 A 14-Jul-24 SAR5,635,070.16 SAR1,419,739.05 41.93% 25.19% 14-Jul-24, STA. 0+610.033 ~ 0+630.033
BASE SLAB
SL 105 16-Oct-23 15-Nov-23 26-Sep-23 A 27-Jan-24 SAR1,472,296.43 SAR1,419,739.05 100% 96.43% 27-Jan-24, BASE SLAB
COLUMN 23 16-Nov-23 12-Dec-23 27-Jan-24 22-Feb-24 SAR353,753.63 SAR0.00 100% 0% 22-Feb-24, COLUMN
TUNNEL WALLS 37 16-Nov-23 28-Dec-23 27-Jan-24 10-Mar-24 SAR602,870.99 SAR0.00 89% 0% 10-Mar-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 16-Dec-23 18-Jan-24 25-Feb-24 31-Mar-24 SAR884,333.12 SAR0.00 0% 0% 31-Mar-24, MIDDLE SLAB FOR UTILITY CU
UTILITY C
CULVERT WALLS 25 20-Jan-24 17-Feb-24 31-Mar-24 02-May-24 SAR511,282.59 SAR0.00 0% 0% 02-May-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 34 18-Feb-24 27-Mar-24 02-May-24 11-Jun-24 SAR1,135,980.71 SAR0.00 0% 0% 11-Jun-24, TOP SLAB
MASS COCONCRETE WORK 24 28-Mar-24 28-Apr-24 11-Jun-24 14-Jul-24 SAR674,552.69 SAR0.00 0% 0% 14-Jul-24, MASS CONCRETE WORK
STA.0+630.033 ~ 0+650.033
STA.0+630.0 241 28-Oct-23 13-May-24 11-Oct-23 A 27-Jul-24 SAR5,635,070.16 SAR971,672.09 39.56% 17.24% 27-Jul-24, STA.0+630.033 ~ 0+650.033
BASE SLAB
SL 100 28-Oct-23 27-Nov-23 11-Oct-23 A 05-Feb-24 SAR1,472,296.43 SAR971,672.09 100% 66% 05-Feb-24, BASE SLAB
COLUMN 23 28-Nov-23 24-Dec-23 05-Feb-24 03-Mar-24 SAR353,753.63 SAR0.00 91.98% 0% 03-Mar-24, COLUMN
TUNNEL WALLS 37 28-Nov-23 09-Jan-24 05-Feb-24 19-Mar-24 SAR602,870.99 SAR0.00 71.56% 0% 19-Mar-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 27-Dec-23 30-Jan-24 05-Mar-24 13-Apr-24 SAR884,333.12 SAR0.00 0% 0% 13-Apr-24, MIDDLE SLAB FOR UTILITY CU
UTILITY C
CULVERT WALLS 25 31-Jan-24 28-Feb-24 13-Apr-24 12-May-24 SAR511,282.59 SAR0.00 0% 0% 12-May-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 29-Feb-24 15-Apr-24 12-May-24 29-Jun-24 SAR1,135,980.71 SAR0.00 0% 0% 29-Jun-24, TOP SLAB
MASS COCONCRETE WORK 24 16-Apr-24 13-May-24 29-Jun-24 27-Jul-24 SAR674,552.69 SAR0.00 0% 0% 27-Jul-24, MASS CONCRETE WORK
STA. 0+650.033
0+650. ~ 0+670.033 237 08-Nov-23 25-May-24 26-Sep-23 A 07-Jul-24 SAR5,635,070.16 SAR1,472,296.43 33.15% 26.13% 07-Jul-24, STA. 0+650.033 ~ 0+670.033
BASE SLAB
SL 93 08-Nov-23 09-Dec-23 26-Sep-23 A 23-Nov-23 A SAR1,472,296.43 SAR1,472,296.43 100% 100% 23-Nov-23 A, BASE SLAB
COLUMN 23 10-Dec-23 04-Jan-24 16-Jan-24 12-Feb-24 SAR353,753.63 SAR0.00 53.67% 0% 12-Feb-24, COLUMN
TUNNEL WALLS 37 10-Dec-23 21-Jan-24 16-Jan-24 28-Feb-24 SAR602,870.99 SAR0.00 34.11% 0% 28-Feb-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 08-Jan-24 11-Feb-24 14-Feb-24 20-Mar-24 SAR884,333.12 SAR0.00 0% 0% 20-Mar-24, MIDDLE SLAB FOR UTILITY CUL
UTILITY C
CULVERT WALLS 25 12-Feb-24 11-Mar-24 20-Mar-24 22-Apr-24 SAR511,282.59 SAR0.00 0% 0% 22-Apr-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 12-Mar-24 27-Apr-24 22-Apr-24 04-Jun-24 SAR1,135,980.71 SAR0.00 0% 0% 04-Jun-24, TOP SLAB
MASS COCONCRETE WORK 24 28-Apr-24 25-May-24 04-Jun-24 07-Jul-24 SAR674,552.69 SAR0.00 0% 0% 07-Jul-24, MASS CONCRETE WORK
STA. 0+670.033~
0+670. 0+690.033 238 20-Nov-23 05-Jun-24 25-Sep-23 A 07-Jul-24 SAR5,635,070.16 SAR1,472,296.43 25.22% 26.13% 07-Jul-24, STA. 0+670.033~ 0+690.033
BASE SLAB
SL 97 20-Nov-23 20-Dec-23 25-Sep-23 A 04-Nov-23 A SAR1,472,296.43 SAR1,472,296.43 96.54% 100% 04-Nov-23 A, BASE SLAB
COLUMN 23 21-Dec-23 16-Jan-24 16-Jan-24 12-Feb-24 SAR353,753.63 SAR0.00 0% 0% 12-Feb-24, COLUMN
TUNNEL WALLS 37 21-Dec-23 01-Feb-24 16-Jan-24 28-Feb-24 SAR602,870.99 SAR0.00 0% 0% 28-Feb-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 20-Jan-24 22-Feb-24 14-Feb-24 20-Mar-24 SAR884,333.12 SAR0.00 0% 0% 20-Mar-24, MIDDLE SLAB FOR UTILITY CUL
UTILITY C
CULVERT WALLS 25 24-Feb-24 23-Mar-24 20-Mar-24 22-Apr-24 SAR511,282.59 SAR0.00 0% 0% 22-Apr-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 24-Mar-24 08-May-24 22-Apr-24 04-Jun-24 SAR1,135,980.71 SAR0.00 0% 0% 04-Jun-24, TOP SLAB
MASS COCONCRETE WORK 24 09-May-24 05-Jun-24 04-Jun-24 07-Jul-24 SAR674,552.69 SAR0.00 0% 0% 07-Jul-24, MASS CONCRETE WORK
STA. 0+690.033~
0+690. 0+710.033 222 02-Dec-23 19-Jun-24 11-Oct-23 A 07-Nov-24 SAR5,635,070.16 SAR1,472,296.43 18.25% 26.13% 07-Nov-24, STA. 0+690.033~ 0+710.03
BASE SLAB
SL 88 02-Dec-23 01-Jan-24 11-Oct-23 A 07-Nov-24 A SAR1,472,296.43 SAR1,472,296.43 69.86% 100% 07-Nov-24 A, BASE SLAB
COLUMN 23 02-Jan-24 28-Jan-24 16-Jan-24 12-Feb-24 SAR353,753.63 SAR0.00 0% 0% 12-Feb-24, COLUMN
TUNNEL WALLS 34 02-Jan-24 10-Feb-24 16-Jan-24 25-Feb-24 SAR602,870.99 SAR0.00 0% 0% 25-Feb-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 29-Jan-24 03-Mar-24 12-Feb-24 18-Mar-24 SAR884,333.12 SAR0.00 0% 0% 18-Mar-24, MIDDLE SLAB FOR UTILITY CUL
UTILITY C
CULVERT WALLS 25 04-Mar-24 01-Apr-24 18-Mar-24 20-Apr-24 SAR511,282.59 SAR0.00 0% 0% 20-Apr-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 02-Apr-24 18-May-24 20-Apr-24 02-Jun-24 SAR1,135,980.71 SAR0.00 0% 0% 02-Jun-24, TOP SLAB
MASS COCONCRETE WORK 24 19-May-24 19-Jun-24 02-Jun-24 04-Jul-24 SAR674,552.69 SAR0.00 0% 0% 04-Jul-24, MASS CONCRETE WORK
STA. 0+710.033~
0+710. 0+730.033 168 13-Dec-23 03-Jul-24 16-Jan-24 07-Aug-24 SAR5,635,070.16 SAR0.00 1.07% 0% 07-Aug-24, STA. 0+710.033~ 0+730.033
BASE SLAB
SL 27 13-Dec-23 13-Jan-24 16-Jan-24 17-Feb-24 SAR1,472,296.43 SAR0.00 4.1% 0% 17-Feb-24, BASE SLAB
COLUMN 23 14-Jan-24 08-Feb-24 17-Feb-24 14-Mar-24 SAR353,753.63 SAR0.00 0% 0% 14-Mar-24, COLUMN
TUNNEL WALLS 37 14-Jan-24 25-Feb-24 17-Feb-24 31-Mar-24 SAR602,870.99 SAR0.00 0% 0% 31-Mar-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 12-Feb-24 17-Mar-24 17-Mar-24 24-Apr-24 SAR884,333.12 SAR0.00 0% 0% 24-Apr-24, MIDDLE SLAB FOR UTILITY CU
UTILITY C
CULVERT WALLS 25 18-Mar-24 18-Apr-24 24-Apr-24 23-May-24 SAR511,282.59 SAR0.00 0% 0% 23-May-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 20-Apr-24 01-Jun-24 23-May-24 10-Jul-24 SAR1,135,980.71 SAR0.00 0% 0% 10-Jul-24, TOP SLAB
MASS COCONCRETE WORK 24 02-Jun-24 03-Jul-24 10-Jul-24 07-Aug-24 SAR674,552.69 SAR0.00 0% 0% 07-Aug-24, MASS CONCRETE WORK
STA. 0+730.033
0+730. ~ 0+750.033 168 25-Dec-23 15-Jul-24 28-Jan-24 19-Aug-24 SAR5,635,070.16 SAR0.00 0% 0% 19-Aug-24, STA. 0+730.033 ~ 0+750.033
BASE SLAB
SL 27 25-Dec-23 24-Jan-24 28-Jan-24 28-Feb-24 SAR1,472,296.43 SAR0.00 0% 0% 28-Feb-24, BASE SLAB
COLUMN 23 25-Jan-24 20-Feb-24 28-Feb-24 26-Mar-24 SAR353,753.63 SAR0.00 0% 0% 26-Mar-24, COLUMN
TUNNEL WALLS 37 25-Jan-24 07-Mar-24 28-Feb-24 15-Apr-24 SAR602,870.99 SAR0.00 0% 0% 15-Apr-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 24-Feb-24 28-Mar-24 28-Mar-24 06-May-24 SAR884,333.12 SAR0.00 0% 0% 06-May-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 30-Mar-24 30-Apr-24 06-May-24 04-Jun-24 SAR511,282.59 SAR0.00 0% 0% 04-Jun-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 01-May-24 12-Jun-24 04-Jun-24 22-Jul-24 SAR1,135,980.71 SAR0.00 0% 0% 22-Jul-24, TOP SLAB

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
9 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
MASS COCONCRETE WORK 24 13-Jun-24 15-Jul-24 22-Jul-24 19-Aug-24 SAR674,552.69 SAR0.00 0% 0% 19-Aug-24, MASS CONCRETE WORK
STA. 0+750.033
0+750. ~ 0+770.033 168 06-Jan-24 27-Jul-24 08-Feb-24 31-Aug-24 SAR5,635,070.16 SAR0.00 0% 0% 31-Aug-24, STA. 0+750.033 ~ 0+770.033
BASE SLAB
SL 27 06-Jan-24 05-Feb-24 08-Feb-24 11-Mar-24 SAR1,472,296.43 SAR0.00 0% 0% 11-Mar-24, BASE SLAB
COLUMN 23 06-Feb-24 03-Mar-24 11-Mar-24 07-Apr-24 SAR353,753.63 SAR0.00 0% 0% 07-Apr-24, COLUMN
TUNNEL WALLS 37 06-Feb-24 19-Mar-24 11-Mar-24 27-Apr-24 SAR602,870.99 SAR0.00 0% 0% 27-Apr-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 06-Mar-24 13-Apr-24 13-Apr-24 18-May-24 SAR884,333.12 SAR0.00 0% 0% 18-May-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 14-Apr-24 12-May-24 18-May-24 20-Jun-24 SAR511,282.59 SAR0.00 0% 0% 20-Jun-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 13-May-24 29-Jun-24 20-Jun-24 03-Aug-24 SAR1,135,980.71 SAR0.00 0% 0% 03-Aug-24, TOP SLAB
MASS COCONCRETE WORK 24 30-Jun-24 27-Jul-24 03-Aug-24 31-Aug-24 SAR674,552.69 SAR0.00 0% 0% 31-Aug-24, MASS CONCRETE WORK
STA. 0+770.033
0+770. ~ 0+790.033 168 17-Jan-24 07-Aug-24 20-Feb-24 11-Sep-24 SAR5,635,070.16 SAR0.00 0% 0% 11-Sep-24, STA. 0+770.033 ~ 0+790.033
BASE SLAB
SL 27 17-Jan-24 17-Feb-24 20-Feb-24 23-Mar-24 SAR1,472,296.43 SAR0.00 0% 0% 23-Mar-24, BASE SLAB
COLUMN 23 18-Feb-24 14-Mar-24 23-Mar-24 22-Apr-24 SAR353,753.63 SAR0.00 0% 0% 22-Apr-24, COLUMN
TUNNEL WALLS 37 18-Feb-24 31-Mar-24 23-Mar-24 08-May-24 SAR602,870.99 SAR0.00 0% 0% 08-May-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 18-Mar-24 24-Apr-24 24-Apr-24 29-May-24 SAR884,333.12 SAR0.00 0% 0% 29-May-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 25-Apr-24 23-May-24 29-May-24 02-Jul-24 SAR511,282.59 SAR0.00 0% 0% 02-Jul-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 25-May-24 10-Jul-24 02-Jul-24 14-Aug-24 SAR1,135,980.71 SAR0.00 0% 0% 14-Aug-24, TOP SLAB
MASS COCONCRETE WORK 24 11-Jul-24 07-Aug-24 14-Aug-24 11-Sep-24 SAR674,552.69 SAR0.00 0% 0% 11-Sep-24, MASS CONCRETE WORK
STA. 0+790.033~
0+790. 0+810.033 168 29-Jan-24 19-Aug-24 03-Mar-24 24-Sep-24 SAR5,635,070.16 SAR0.00 0% 0% 24-Sep-24, STA. 0+790.033~ 0+810.033
BASE SLAB
SL 27 29-Jan-24 28-Feb-24 03-Mar-24 03-Apr-24 SAR1,472,296.43 SAR0.00 0% 0% 03-Apr-24, BASE SLAB
COLUMN 23 29-Feb-24 26-Mar-24 03-Apr-24 04-May-24 SAR353,753.63 SAR0.00 0% 0% 04-May-24, COLUMN
TUNNEL WALLS 37 29-Feb-24 15-Apr-24 03-Apr-24 20-May-24 SAR602,870.99 SAR0.00 0% 0% 20-May-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 30-Mar-24 06-May-24 06-May-24 10-Jun-24 SAR884,333.12 SAR0.00 0% 0% 10-Jun-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 07-May-24 04-Jun-24 10-Jun-24 14-Jul-24 SAR511,282.59 SAR0.00 0% 0% 14-Jul-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 05-Jun-24 22-Jul-24 14-Jul-24 26-Aug-24 SAR1,135,980.71 SAR0.00 0% 0% 26-Aug-24, TOP SLAB
MASS COCONCRETE WORK 24 23-Jul-24 19-Aug-24 26-Aug-24 24-Sep-24 SAR674,552.69 SAR0.00 0% 0% 24-Sep-24, MASS CONCRETE WORK
STA. 0+810.033
0+810. ~ 0+830.033-1 168 10-Feb-24 31-Aug-24 14-Mar-24 06-Oct-24 SAR5,635,070.16 SAR0.00 0% 0% 06-Oct-24, STA. 0+810.033 ~ 0+830.033
BASE SLAB
SL 27 10-Feb-24 11-Mar-24 14-Mar-24 18-Apr-24 SAR1,472,296.43 SAR0.00 0% 0% 18-Apr-24, BASE SLAB
COLUMN 23 12-Mar-24 07-Apr-24 18-Apr-24 15-May-24 SAR353,753.63 SAR0.00 0% 0% 15-May-24, COLUMN
TUNNEL WALLS 37 12-Mar-24 27-Apr-24 18-Apr-24 01-Jun-24 SAR602,870.99 SAR0.00 0% 0% 01-Jun-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 14-Apr-24 18-May-24 18-May-24 26-Jun-24 SAR884,333.12 SAR0.00 0% 0% 26-Jun-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 19-May-24 20-Jun-24 26-Jun-24 25-Jul-24 SAR511,282.59 SAR0.00 0% 0% 25-Jul-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 22-Jun-24 03-Aug-24 25-Jul-24 07-Sep-24 SAR1,135,980.71 SAR0.00 0% 0% 07-Sep-24, TOP SLAB
MASS COCONCRETE WORK 24 04-Aug-24 31-Aug-24 07-Sep-24 06-Oct-24 SAR674,552.69 SAR0.00 0% 0% 06-Oct-24, MASS CONCRETE WORK
STA. 0+830.033
0+830. ~ 0+850.033 168 21-Feb-24 11-Sep-24 26-Mar-24 17-Oct-24 SAR5,635,070.16 SAR0.00 0% 0% 17-Oct-24, STA. 0+830.033 ~ 0+850.033
BASE SLAB
SL 27 21-Feb-24 23-Mar-24 26-Mar-24 30-Apr-24 SAR1,472,296.43 SAR0.00 0% 0% 30-Apr-24, BASE SLAB
COLUMN 23 24-Mar-24 22-Apr-24 30-Apr-24 27-May-24 SAR353,753.63 SAR0.00 0% 0% 27-May-24, COLUMN
TUNNEL WALLS 37 24-Mar-24 08-May-24 30-Apr-24 12-Jun-24 SAR602,870.99 SAR0.00 0% 0% 12-Jun-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 25-Apr-24 29-May-24 29-May-24 08-Jul-24 SAR884,333.12 SAR0.00 0% 0% 08-Jul-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 30-May-24 02-Jul-24 08-Jul-24 06-Aug-24 SAR511,282.59 SAR0.00 0% 0% 06-Aug-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 03-Jul-24 14-Aug-24 06-Aug-24 18-Sep-24 SAR1,135,980.71 SAR0.00 0% 0% 18-Sep-24, TOP SLAB
MASS COCONCRETE WORK 24 15-Aug-24 11-Sep-24 18-Sep-24 17-Oct-24 SAR674,552.69 SAR0.00 0% 0% 17-Oct-24, MASS CONCRETE WORK
STA. 0+850.033
0+850. ~ 0+870.033 168 04-Mar-24 24-Sep-24 07-Apr-24 29-Oct-24 SAR5,635,070.16 SAR0.00 0% 0% 29-Oct-24, STA. 0+850.033 ~ 0+870.03
BASE SLAB
SL 27 04-Mar-24 03-Apr-24 07-Apr-24 12-May-24 SAR1,472,296.43 SAR0.00 0% 0% 12-May-24, BASE SLAB
COLUMN 23 04-Apr-24 04-May-24 12-May-24 08-Jun-24 SAR353,753.63 SAR0.00 0% 0% 08-Jun-24, COLUMN
TUNNEL WALLS 37 04-Apr-24 20-May-24 12-May-24 29-Jun-24 SAR602,870.99 SAR0.00 0% 0% 29-Jun-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 07-May-24 10-Jun-24 10-Jun-24 20-Jul-24 SAR884,333.12 SAR0.00 0% 0% 20-Jul-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 11-Jun-24 14-Jul-24 20-Jul-24 18-Aug-24 SAR511,282.59 SAR0.00 0% 0% 18-Aug-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 15-Jul-24 26-Aug-24 18-Aug-24 01-Oct-24 SAR1,135,980.71 SAR0.00 0% 0% 01-Oct-24, TOP SLAB
MASS COCONCRETE WORK 24 27-Aug-24 24-Sep-24 01-Oct-24 29-Oct-24 SAR674,552.69 SAR0.00 0% 0% 29-Oct-24, MASS CONCRETE WORK
STA. 0+870.033
0+870. ~ 0+890.033 168 16-Mar-24 06-Oct-24 22-Apr-24 10-Nov-24 SAR5,635,070.16 SAR0.00 0% 0% 10-Nov-24, STA. 0+870.033 ~ 0+890.0
BASE SLAB
SL 27 16-Mar-24 18-Apr-24 22-Apr-24 23-May-24 SAR1,472,296.43 SAR0.00 0% 0% 23-May-24, BASE SLAB
COLUMN 23 20-Apr-24 15-May-24 23-May-24 24-Jun-24 SAR353,753.63 SAR0.00 0% 0% 24-Jun-24, COLUMN
TUNNEL WALLS 37 20-Apr-24 01-Jun-24 23-May-24 10-Jul-24 SAR602,870.99 SAR0.00 0% 0% 10-Jul-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 19-May-24 26-Jun-24 26-Jun-24 31-Jul-24 SAR884,333.12 SAR0.00 0% 0% 31-Jul-24, MIDDLE SLAB FOR UTILITY
UTILITY C
CULVERT WALLS 25 27-Jun-24 25-Jul-24 31-Jul-24 29-Aug-24 SAR511,282.59 SAR0.00 0% 0% 29-Aug-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 27-Jul-24 07-Sep-24 29-Aug-24 13-Oct-24 SAR1,135,980.71 SAR0.00 0% 0% 13-Oct-24, TOP SLAB
MASS COCONCRETE WORK 24 08-Sep-24 06-Oct-24 13-Oct-24 10-Nov-24 SAR674,552.69 SAR0.00 0% 0% 10-Nov-24, MASS CONCRETE WORK
STA. 0+890.033
0+890. ~ 0+910.033 168 27-Mar-24 17-Oct-24 04-May-24 21-Nov-24 SAR5,635,070.16 SAR0.00 0% 0% 21-Nov-24, STA. 0+890.033 ~ 0+910.0
BASE SLAB
SL 27 27-Mar-24 30-Apr-24 04-May-24 04-Jun-24 SAR1,472,296.43 SAR0.00 0% 0% 04-Jun-24, BASE SLAB
COLUMN 23 01-May-24 27-May-24 04-Jun-24 06-Jul-24 SAR353,753.63 SAR0.00 0% 0% 06-Jul-24, COLUMN
TUNNEL WALLS 37 01-May-24 12-Jun-24 04-Jun-24 22-Jul-24 SAR602,870.99 SAR0.00 0% 0% 22-Jul-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 30-May-24 08-Jul-24 08-Jul-24 12-Aug-24 SAR884,333.12 SAR0.00 0% 0% 12-Aug-24, MIDDLE SLAB FOR UTILITY

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
10 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
UTILITY C
CULVERT WALLS 25 09-Jul-24 06-Aug-24 12-Aug-24 10-Sep-24 SAR511,282.59 SAR0.00 0% 0% 10-Sep-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 07-Aug-24 18-Sep-24 10-Sep-24 24-Oct-24 SAR1,135,980.71 SAR0.00 0% 0% 24-Oct-24, TOP SLAB
MASS COCONCRETE WORK 24 19-Sep-24 17-Oct-24 24-Oct-24 21-Nov-24 SAR674,552.69 SAR0.00 0% 0% 21-Nov-24, MASS CONCRETE WOR
STA. 0+910.033
0+910. ~ 0+993.979 168 08-Apr-24 29-Oct-24 15-May-24 03-Dec-24 SAR5,635,070.16 SAR0.00 0% 0% 03-Dec-24, STA. 0+910.033 ~ 0+993.9
BASE SLAB
SL 27 08-Apr-24 12-May-24 15-May-24 20-Jun-24 SAR1,472,296.43 SAR0.00 0% 0% 20-Jun-24, BASE SLAB
COLUMN 23 13-May-24 08-Jun-24 20-Jun-24 17-Jul-24 SAR353,753.63 SAR0.00 0% 0% 17-Jul-24, COLUMN
TUNNEL WALLS 37 13-May-24 29-Jun-24 20-Jun-24 03-Aug-24 SAR602,870.99 SAR0.00 0% 0% 03-Aug-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 11-Jun-24 20-Jul-24 20-Jul-24 24-Aug-24 SAR884,333.12 SAR0.00 0% 0% 24-Aug-24, MIDDLE SLAB FOR UTILIT
UTILITY C
CULVERT WALLS 25 21-Jul-24 18-Aug-24 24-Aug-24 22-Sep-24 SAR511,282.59 SAR0.00 0% 0% 22-Sep-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 19-Aug-24 01-Oct-24 22-Sep-24 05-Nov-24 SAR1,135,980.71 SAR0.00 0% 0% 05-Nov-24, TOP SLAB
MASS COCONCRETE WORK 24 02-Oct-24 29-Oct-24 05-Nov-24 03-Dec-24 SAR674,552.69 SAR0.00 0% 0% 03-Dec-24, MASS CONCRETE WOR
EGRESS STAIR-1
STAIR (ZONE-2) 236 03-Dec-23 10-Sep-24 16-Jan-24 26-Oct-24 SAR2,352,338.08 SAR0.00 16.32% 0% 26-Oct-24, EGRESS STAIR-1 (ZONE-2
WALL AND 1 1ST FLIGHT 31 03-Dec-23 07-Jan-24 16-Jan-24 20-Feb-24 SAR544,958.40 SAR0.00 70.44% 0% 20-Feb-24, WALL AND 1ST FLIGHT
WALL AND 2 2ND FLIGHT 17 08-Jan-24 27-Jan-24 21-Feb-24 11-Mar-24 SAR111,087.10 SAR0.00 0% 0% 11-Mar-24, WALLAND 2ND FLIGHT
WALL AND 3 3RD FLIGHT 17 28-Jan-24 15-Feb-24 12-Mar-24 31-Mar-24 SAR111,087.10 SAR0.00 0% 0% 31-Mar-24, WALL AND 3RD FLIGHT
WALL AND 4 4TH FLIGHT 17 17-Feb-24 06-Mar-24 01-Apr-24 23-Apr-24 SAR111,087.10 SAR0.00 0% 0% 23-Apr-24, WALL AND 4TH FLIGHT
WALL AND 5 5TH FLIGHT 17 07-Mar-24 26-Mar-24 24-Apr-24 13-May-24 SAR111,087.10 SAR0.00 0% 0% 13-May-24, WALL AND 5TH FLIGHT
WALL AND 6 6TH FLIGHT 17 27-Mar-24 18-Apr-24 14-May-24 02-Jun-24 SAR111,087.10 SAR0.00 0% 0% 02-Jun-24, WALL AND 6TH FLIGHT
WALL AND 7 7TH FLIGHT 17 20-Apr-24 08-May-24 03-Jun-24 26-Jun-24 SAR111,087.10 SAR0.00 0% 0% 26-Jun-24, WALL AND 7TH FLIGHT
WALL AND 8 8TH FLIGHT 17 09-May-24 28-May-24 27-Jun-24 16-Jul-24 SAR111,087.10 SAR0.00 0% 0% 16-Jul-24, WALL AND 8TH FLIGHT
WALL AND 9 9TH FLIGHT 17 29-May-24 22-Jun-24 17-Jul-24 05-Aug-24 SAR111,087.10 SAR0.00 0% 0% 05-Aug-24, WALL AND 9TH FLIGHT
WALL AND 1 10TH FLIGHT 17 23-Jun-24 11-Jul-24 06-Aug-24 25-Aug-24 SAR111,087.10 SAR0.00 0% 0% 25-Aug-24, WALL AND 10TH FLIGHT
WALL AND 1 11TH FLIGHT 17 13-Jul-24 31-Jul-24 26-Aug-24 14-Sep-24 SAR111,087.10 SAR0.00 0% 0% 14-Sep-24, WALL AND 11TH FLIGHT
TOP SLAB 35 01-Aug-24 10-Sep-24 15-Sep-24 26-Oct-24 SAR696,508.72 SAR0.00 0% 0% 26-Oct-24, TOP SLAB
EGRESS STAIR-2
STAIR (ZONE-2) 236 31-Dec-23 09-Oct-24 13-Feb-24 23-Nov-24 SAR2,352,338.08 SAR0.00 0% 0% 23-Nov-24, EGRESS STAIR-2 (ZONE
WALL AND 1 1ST FLIGHT 31 31-Dec-23 04-Feb-24 13-Feb-24 19-Mar-24 SAR544,958.40 SAR0.00 0% 0% 19-Mar-24, WALL AND 1ST FLIGHT
WALL AND 2 2ND FLIGHT 17 05-Feb-24 24-Feb-24 19-Mar-24 08-Apr-24 SAR111,087.10 SAR0.00 0% 0% 08-Apr-24, WALL AND 2ND FLIGHT
WALL AND 3 3RD FLIGHT 17 25-Feb-24 14-Mar-24 08-Apr-24 01-May-24 SAR111,087.10 SAR0.00 0% 0% 01-May-24, WALL AND 3RD FLIGHT
WALL AND 4 4TH FLIGHT 17 16-Mar-24 03-Apr-24 01-May-24 21-May-24 SAR111,087.10 SAR0.00 0% 0% 21-May-24, WALL AND 4TH FLIGHT
WALL AND 5 5TH FLIGHT 17 04-Apr-24 27-Apr-24 21-May-24 10-Jun-24 SAR111,087.10 SAR0.00 0% 0% 10-Jun-24, WALL AND 5TH FLIGHT
WALL AND 6 6TH FLIGHT 17 28-Apr-24 16-May-24 10-Jun-24 04-Jul-24 SAR111,087.10 SAR0.00 0% 0% 04-Jul-24, WALL AND 6TH FLIGHT
WALL AND 7 7TH FLIGHT 17 18-May-24 05-Jun-24 04-Jul-24 24-Jul-24 SAR111,087.10 SAR0.00 0% 0% 24-Jul-24, WALL AND 7TH FLIGHT
WALL AND 8 8TH FLIGHT 17 06-Jun-24 30-Jun-24 24-Jul-24 13-Aug-24 SAR111,087.10 SAR0.00 0% 0% 13-Aug-24, WALL AND 8TH FLIGHT
WALL AND 9 9TH FLIGHT 17 01-Jul-24 20-Jul-24 13-Aug-24 02-Sep-24 SAR111,087.10 SAR0.00 0% 0% 02-Sep-24, WALL AND 9TH FLIGHT
WALL AND 1 10TH FLIGHT 17 21-Jul-24 08-Aug-24 02-Sep-24 22-Sep-24 SAR111,087.10 SAR0.00 0% 0% 22-Sep-24, WALL AND 10TH FLIGHT
WALL AND 1 11TH FLIGHT 17 10-Aug-24 28-Aug-24 22-Sep-24 13-Oct-24 SAR111,087.10 SAR0.00 0% 0% 13-Oct-24, WALL AND 11TH FLIGHT
TOP SLAB 35 29-Aug-24 09-Oct-24 13-Oct-24 23-Nov-24 SAR696,508.72 SAR0.00 0% 0% 23-Nov-24, TOP SLAB
BACKFILLING UPTO TUNNEL WALL 268 12-Dec-23 22-Jul-24 22-Feb-24 09-Jan-25 SAR10,162,298.89 SAR0.00 3% 0% 09-Jan-25, BACKFILLING UPTO TU
STRUCTURAL FILL 211 21-Apr-24 21-Nov-24 27-Jul-24 05-Apr-25 SAR10,162,298.89 SAR0.00 0% 0% 05-Apr-25, STRUCTURAL FILL
WET & DRY UTILITIES
UT 300 16-Nov-23 09-Mar-25 22-Apr-24 17-Apr-25 SAR6,365,505.33 SAR0.00 0.34% 0% 17-Apr-25, WET & DRY UTILIT
INSIDE WET CULVERT 122 19-Oct-24 09-Mar-25 21-Nov-24 17-Apr-25 SAR4,515,428.67 SAR0.00 0% 0% 17-Apr-25, INSIDE WET CULVE
POTABLE WATER NETWORK 59 30-Oct-24 06-Jan-25 03-Dec-24 10-Feb-25 SAR427,352.76 SAR0.00 0% 0% 10-Feb-25, POTABLE WATER NET
GREY WA
WATER DISTRIBUTION SYSTEM 49 28-Nov-24 23-Jan-25 01-Jan-25 27-Feb-25 SAR262,973.54 SAR0.00 0% 0% 27-Feb-25, GREY WATER DISTRI
IRRIGATION NETWORK
IRRIGATI 88 19-Oct-24 28-Jan-25 21-Nov-24 04-Mar-25 SAR478,590.40 SAR0.00 0% 0% 04-Mar-25, IRRIGATION NETWO
CHILLED WATER SUPPLY NETWORK 59 22-Dec-24 27-Feb-25 25-Jan-25 08-Apr-25 SAR1,304,485.25 SAR0.00 0% 0% 08-Apr-25, CHILLED WATER SU
CHILLED WATER RETURN NETWORK 63 22-Dec-24 04-Mar-25 25-Jan-25 13-Apr-25 SAR1,304,485.25 SAR0.00 0% 0% 13-Apr-25, CHILLED WATER RE
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 87 28-Nov-24 09-Mar-25 01-Jan-25 17-Apr-25 SAR737,541.47 SAR0.00 0% 0% 17-Apr-25, AUTOMATIC WAST
INSIDE DRY CULVERT 261 16-Nov-23 06-Oct-24 22-Apr-24 26-Feb-25 SAR1,850,076.66 SAR0.00 1.17% 0% 26-Feb-25, INSIDE DRY CULVER
POWER 261 16-Nov-23 24-Sep-24 22-Apr-24 26-Feb-25 SAR1,661,187.78 SAR0.00 1.3% 0% 26-Feb-25, POWER
HIGH VOLTAGE
V 110 KV NETWORK 163 16-Nov-23 27-May-24 22-Apr-24 04-Nov-24 SAR108,118.10 SAR0.00 20% 0% 04-Nov-24, HIGH VOLTAGE 110 KV N
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 32 28-May-24 08-Jul-24 04-Nov-24 11-Dec-24 SAR1,382,859.12 SAR0.00 0% 0% 11-Dec-24, MEDIUM VOLTAGE 13.8
LOW VVOLTAGE NETWORK 32 09-Jul-24 14-Aug-24 11-Dec-24 18-Jan-25 SAR170,210.56 SAR0.00 0% 0% 18-Jan-25, LOW VOLTAGE NETWO
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 66 09-Jul-24 24-Sep-24 11-Dec-24 26-Feb-25 SAR0.00 SAR0.00 0% 0% 26-Feb-25, ELECTRICAL DISTRIB
LIGHTING SYSTEM
LIGHT 35 21-Jul-24 29-Aug-24 23-Dec-24 02-Feb-25 SAR0.00 SAR0.00 0% 0% 02-Feb-25, LIGHTING SYSTEM
TELECOM SERVICES 30 01-Sep-24 06-Oct-24 18-Jan-25 22-Feb-25 SAR188,888.89 SAR0.00 0% 0% 22-Feb-25, TELECOM SERVICES
MEP VEHICULAR
VEHICULA TUNNEL/ DRY & WET CULVERTS 145 16-Oct-24 07-Apr-25 19-Nov-24 12-May-25 SAR9,402,095.43 SAR0.00 0% 0% 12-May-25, MEP VEHICULAR
TUNNEL MECHANICAL
ME WORKS 132 19-Oct-24 20-Mar-25 21-Nov-24 29-Apr-25 SAR2,704,813.47 SAR0.00 0% 0% 29-Apr-25, TUNNEL MECHAN
FIRE FIG
FIGHTING SYSTEM 56 19-Oct-24 22-Dec-24 21-Nov-24 26-Jan-25 SAR1,967,257.19 SAR0.00 0% 0% 26-Jan-25, FIRE FIGHTING SYSTE
VENTILATION SYSTEM
VENTILA 23 23-Dec-24 18-Jan-25 26-Jan-25 22-Feb-25 SAR220,591.82 SAR0.00 0% 0% 22-Feb-25, VENTILATION SYSTE
PUMPS INSTALLATION
I 15 19-Jan-25 04-Feb-25 22-Feb-25 11-Mar-25 SAR414,510.98 SAR0.00 0% 0% 11-Mar-25, PUMPS INSTALLATI
DUCTING SYSTEM 66 04-Jan-25 20-Mar-25 06-Feb-25 29-Apr-25 SAR102,453.48 SAR0.00 0% 0% 29-Apr-25, DUCTING SYSTEM
TUNNEL ELECTRICAL
EL WORKS 145 16-Oct-24 07-Apr-25 19-Nov-24 12-May-25 SAR5,685,898.68 SAR0.00 0% 0% 12-May-25, TUNNEL ELECTRI

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
11 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
CABLE TRAYS
T 101 21-Oct-24 15-Feb-25 24-Nov-24 22-Mar-25 SAR1,290,145.40 SAR0.00 0% 0% 22-Mar-25, CABLE TRAYS
POWER CABLES 134 21-Oct-24 25-Mar-25 24-Nov-24 04-May-25 SAR1,744,342.81 SAR0.00 0% 0% 04-May-25, POWER CABLES
ELECTRICAL INSTALLATIONS
ELECTRI 97 11-Dec-24 07-Apr-25 14-Jan-25 12-May-25 SAR1,427,303.37 SAR0.00 0% 0% 12-May-25, ELECTRICAL INST
LOW CUR
CURRENT 145 16-Oct-24 07-Apr-25 19-Nov-24 12-May-25 SAR1,224,107.09 SAR0.00 0% 0% 12-May-25, LOW CURRENT
FIRE D
DETECTION AND ALARM SYSTEM 145 16-Oct-24 07-Apr-25 19-Nov-24 12-May-25 SAR209,231.73 SAR0.00 0% 0% 12-May-25, FIRE DETECTION
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 28 30-Oct-24 01-Dec-24 03-Dec-24 05-Jan-25 SAR174,339.40 SAR0.00 0% 0% 05-Jan-25, COMMUNICATION SYS
PUBLIC ADDRESS
PUBLI 28 30-Oct-24 01-Dec-24 03-Dec-24 05-Jan-25 SAR135,232.89 SAR0.00 0% 0% 05-Jan-25, PUBLIC ADDRESS
VIDEO SURVEILLANCE 49 07-Nov-24 02-Jan-25 11-Dec-24 06-Feb-25 SAR162,725.26 SAR0.00 0% 0% 06-Feb-25, VIDEO SURVEILLANC
SACADA SYSTEM
SACA 35 04-Jan-25 12-Feb-25 06-Feb-25 19-Mar-25 SAR434,426.52 SAR0.00 0% 0% 19-Mar-25, SACADA SYSTEM
RADIO RE-BROADCASTING SYSTEM 28 13-Feb-25 17-Mar-25 19-Mar-25 26-Apr-25 SAR108,151.30 SAR0.00 0% 0% 26-Apr-25, RADIO RE-BROAD
TUNNEL PLUMBING
PL WORKS 35 11-Nov-24 21-Dec-24 15-Dec-24 25-Jan-25 SAR1,011,383.28 SAR0.00 0% 0% 25-Jan-25, TUNNEL PLUMBING W
DRAINAGE SYSTEM
DRAINAG 35 11-Nov-24 21-Dec-24 15-Dec-24 25-Jan-25 SAR1,011,383.28 SAR0.00 0% 0% 25-Jan-25, DRAINAGE SYSTEM
TUNNEL INTERNAL
INTER ROAD WORK 42 18-Mar-25 10-May-25 26-Apr-25 17-Jun-25 SAR1,039,534.99 SAR0.00 0% 0% 17-Jun-25, TUNNEL INTERNA
TUNNEL INTERNAL
INTER DECORATIVE WORKS 35 26-Apr-25 04-Jun-25 29-May-25 13-Jul-25 SAR3,375,434.59 SAR0.00 0% 0% 13-Jul-25, TUNNEL INTERN
ZONE 3 - FROM S
STA. 0+994 ~ 1+268 1207 27-Jun-22 07-May-25 27-Jun-22 A 11-Jun-26 SAR134,840,113.57 SAR44,397,039.60 92.98% 32.93% 11-Jun-26, ZONE
ENGINEERING 733 27-Jun-22 10-Aug-23 27-Jun-22 A 18-Nov-24 SAR0.00 SAR0.00 0% 0% 18-Nov-24, ENGINEERING
SITE SURVEY 14 27-Jun-22 16-Jul-22 27-Jun-22 A 22-Aug-22 A SAR0.00 SAR0.00 0% 0% 22-Aug-22 A, SITE SURVEY
SHOP DRAWINGS
DRAWIN 410 20-Aug-22 29-Dec-22 22-Aug-22 A 09-Jan-24 SAR0.00 SAR0.00 0% 0% 09-Jan-24, SHOP DRAWINGS
CIVIL/STRUCTURAL 0+994 ~1+094
CIVIL/STRU 310 20-Aug-22 16-Oct-22 30-Oct-22 A 09-Aug-23 A SAR0.00 SAR0.00 0% 0% 09-Aug-23 A, CIVIL/STRUCTURAL 0+994 ~1+094
CIVIL/STRUCTURAL1+094 ~1+194
CIVIL/STRU 42 01-Oct-22 17-Nov-22 22-Aug-22 A 25-Jul-23 A SAR0.00 SAR0.00 0% 0% 25-Jul-23 A, CIVIL/STRUCTURAL1+094 ~1+194
CIVIL/STRUCTURAL 1+194 ~1+268
CIVIL/STRU 264 12-Nov-22 29-Dec-22 01-Sep-22 A 24-Jul-23 A SAR0.00 SAR0.00 0% 0% 24-Jul-23 A, CIVIL/STRUCTURAL 1+194 ~1+268
ARCHITECTURAL
ARCHITECT 21 10-Sep-22 04-Oct-22 16-Dec-23 09-Jan-24 SAR0.00 SAR0.00 0% 0% 09-Jan-24, ARCHITECTURAL
UTILITIES 469 21-Sep-22 04-Feb-23 21-Sep-22 A 28-Mar-24 SAR0.00 SAR0.00 0% 0% 28-Mar-24, UTILITIES
WET UTILITIES
UTILIT 469 21-Sep-22 04-Feb-23 21-Sep-22 A 28-Mar-24 SAR0.00 SAR0.00 0% 0% 28-Mar-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 22 21-Sep-22 16-Oct-22 21-Sep-22 A 13-Nov-22 A SAR0.00 SAR0.00 0% 0% 13-Nov-22 A, POTABLE WATER NETWORK BRANCH, HOUSE
GREY WAWATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 25 17-Oct-22 14-Nov-22 13-Dec-22 A 08-Jan-24 SAR0.00 SAR0.00 0% 0% 08-Jan-24, GREY WATER DISTRIBUTION NETW
IRR & FF NETWORK BRANCHES & TIE IN POINTS 22 15-Nov-22 10-Dec-22 09-Jan-24 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, IRR & FF NETWORK BRANCHES &
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 21 11-Dec-22 03-Jan-23 03-Feb-24 27-Feb-24 SAR0.00 SAR0.00 0% 0% 27-Feb-24, CHILLED WATER SUPPLY & RETU
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 26 04-Jan-23 04-Feb-23 27-Feb-24 28-Mar-24 SAR0.00 SAR0.00 0% 0% 28-Mar-24, AUTOMATIC WASTE COLLECTIO
DRY UTILITI
UTILITIES 422 17-Oct-22 04-Feb-23 01-Nov-22 A 28-Feb-24 SAR0.00 SAR0.00 0% 0% 28-Feb-24, DRY UTILITIES
POWER 422 17-Oct-22 09-Jan-23 01-Nov-22 A 28-Feb-24 SAR0.00 SAR0.00 0% 0% 28-Feb-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 22 15-Nov-22 10-Dec-22 09-Jan-24 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, HIGH VOLTAGE 110 KV NETWORK
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 22 11-Dec-22 04-Jan-23 03-Feb-24 28-Feb-24 SAR0.00 SAR0.00 0% 0% 28-Feb-24, MEDIUM VOLTAGE 13.8 KV NETW
LOW V VOLTAGE NETWORK 25 17-Oct-22 14-Nov-22 27-Nov-22 A 23-Jan-24 SAR0.00 SAR0.00 0% 0% 23-Jan-24, LOW VOLTAGE NETWORK
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 21 15-Nov-22 08-Dec-22 01-Nov-22 A 12-Nov-22 A SAR0.00 SAR0.00 0% 0% 12-Nov-22 A, ELECTRICAL DISTRIBUTION SYSTEM
LIGHTING SYSTEM
LIGHT 27 10-Dec-22 09-Jan-23 26-Nov-22 A 27-Dec-22 A SAR0.00 SAR0.00 0% 0% 27-Dec-22 A, LIGHTING SYSTEM
LOW CUR
CURRENT 22 10-Jan-23 04-Feb-23 24-Jan-24 18-Feb-24 SAR0.00 SAR0.00 0% 0% 18-Feb-24, LOW CURRENT
TELECOM SERVICES
TELEC 22 10-Jan-23 04-Feb-23 24-Jan-24 18-Feb-24 SAR0.00 SAR0.00 0% 0% 18-Feb-24, TELECOM SERVICES
MEP 273 21-Sep-22 10-Aug-23 26-Dec-23 18-Nov-24 SAR0.00 SAR0.00 0% 0% 18-Nov-24, MEP
TUNNEL MECHANICAL
ME WORKS 177 21-Sep-22 13-Apr-23 26-Dec-23 28-Jul-24 SAR0.00 SAR0.00 0% 0% 28-Jul-24, TUNNEL MECHANICAL WOR
FIRE FIG
FIGHTING SYSTEM 88 21-Sep-22 01-Jan-23 26-Dec-23 07-Apr-24 SAR0.00 SAR0.00 0% 0% 07-Apr-24, FIRE FIGHTING SYSTEM
VENTILATION SYSTEM
VENTILA 44 19-Dec-22 07-Feb-23 24-Mar-24 19-May-24 SAR0.00 SAR0.00 0% 0% 19-May-24, VENTILATION SYSTEM
PUMPS INSTALLATION
I 22 08-Feb-23 05-Mar-23 19-May-24 13-Jun-24 SAR0.00 SAR0.00 0% 0% 13-Jun-24, PUMPS INSTALLATION
DUCTING SYSTEM 88 02-Jan-23 13-Apr-23 07-Apr-24 28-Jul-24 SAR0.00 SAR0.00 0% 0% 28-Jul-24, DUCTING SYSTEM
TUNNEL ELECTRICAL
EL WORKS 185 02-Jan-23 10-Aug-23 07-Apr-24 18-Nov-24 SAR0.00 SAR0.00 0% 0% 18-Nov-24, TUNNEL ELECTRICAL W
CABLE TRAYS
T 110 14-Jan-23 24-May-23 23-Apr-24 03-Sep-24 SAR0.00 SAR0.00 0% 0% 03-Sep-24, CABLE TRAYS
POWER CABLES 44 18-Mar-23 10-May-23 30-Jun-24 20-Aug-24 SAR0.00 SAR0.00 0% 0% 20-Aug-24, POWER CABLES
ELECTRICAL INSTALLATIONS
ELECTRI 110 29-Mar-23 10-Aug-23 11-Jul-24 18-Nov-24 SAR0.00 SAR0.00 0% 0% 18-Nov-24, ELECTRICAL INSTALLAT
LOW CUR
CURRENT 133 02-Jan-23 07-Jun-23 07-Apr-24 17-Sep-24 SAR0.00 SAR0.00 0% 0% 17-Sep-24, LOW CURRENT
FIRE D
DETECTION AND ALARM SYSTEM 133 02-Jan-23 07-Jun-23 07-Apr-24 17-Sep-24 SAR0.00 SAR0.00 0% 0% 17-Sep-24, FIRE DETECTION AND ALA
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 110 14-Jan-23 24-May-23 23-Apr-24 03-Sep-24 SAR0.00 SAR0.00 0% 0% 03-Sep-24, COMMUNICATION SYSTEM
PUBLIC ADDRESS
PUBLI 66 30-Jan-23 16-Apr-23 09-May-24 30-Jul-24 SAR0.00 SAR0.00 0% 0% 30-Jul-24, PUBLIC ADDRESS
VIDEO SURVEILLANCE 44 11-Feb-23 02-Apr-23 21-May-24 16-Jul-24 SAR0.00 SAR0.00 0% 0% 16-Jul-24, VIDEO SURVEILLANCE
SACADA SYSTEM
SACA 44 22-Feb-23 13-Apr-23 02-Jun-24 28-Jul-24 SAR0.00 SAR0.00 0% 0% 28-Jul-24, SACADA SYSTEM
RADIO RE-BROADCASTING SYSTEM 44 06-Mar-23 29-Apr-23 13-Jun-24 08-Aug-24 SAR0.00 SAR0.00 0% 0% 08-Aug-24, RADIO RE-BROADCASTING
TUNNEL PLUMBING
PL WORKS 21 18-Mar-23 10-Apr-23 30-Jun-24 24-Jul-24 SAR0.00 SAR0.00 0% 0% 24-Jul-24, TUNNEL PLUMBING WORKS
PROCUREMENT 684 27-Aug-22 24-Oct-23 27-Aug-22 A 18-Nov-24 SAR17,335,666.44 SAR6,975,804.51 100% 40.24% 18-Nov-24, PROCUREMENT
CIVIL/STRUCTU
CIVIL/STRUCTURAL 358 27-Aug-22 24-Nov-22 27-Aug-22 A 02-Jan-24 SAR12,126,350.71 SAR6,975,804.51 100% 57.53% 02-Jan-24, CIVIL/STRUCTURAL
UTILITIES 346 10-Sep-22 24-Oct-23 20-Nov-22 A 12-Oct-24 SAR739,595.40 SAR0.00 100% 0% 12-Oct-24, UTILITIES
WET UTILITIES
UTILIT 346 10-Sep-22 24-Oct-23 20-Nov-22 A 12-Oct-24 SAR575,600.21 SAR0.00 100% 0% 12-Oct-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 281 10-Sep-22 13-Jun-23 20-Nov-22 A 27-Jul-24 SAR75,415.19 SAR0.00 100% 0% 27-Jul-24, POTABLE WATER NETWORK
DI PIPES
PIP 230 10-Sep-22 25-Feb-23 20-Nov-22 A 23-May-24 SAR8,295.67 SAR0.00 100% 0% 23-May-24, DI PIPES

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
12 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
HDPE PIPES 221 05-Nov-22 25-Apr-23 29-Mar-23 A 20-Jun-24 SAR9,803.98 SAR0.00 100% 0% 20-Jun-24, HDPE PIPES
GRP PPIPES 230 12-Oct-22 29-Mar-23 08-Jan-23 A 20-Jun-24 SAR7,541.52 SAR0.00 100% 0% 20-Jun-24, GRP PIPES
DI & G
GRP FITTING 230 07-Nov-22 27-Apr-23 01-May-23 A 20-Jun-24 SAR7,541.52 SAR0.00 100% 0% 20-Jun-24, DI & GRP FITTING
GATE VALVE 221 24-Dec-22 13-Jun-23 01-May-23 A 20-Jun-24 SAR7,541.52 SAR0.00 100% 0% 20-Jun-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 221 24-Dec-22 13-Jun-23 01-May-23 A 20-Jun-24 SAR6,787.37 SAR0.00 100% 0% 20-Jun-24, BUTTERFLAY VALVE
WATER METER
WATE 144 07-Nov-22 27-Apr-23 01-Feb-24 27-Jul-24 SAR11,312.28 SAR0.00 100% 0% 27-Jul-24, WATER METER
AIR RELASE
RE VALVE 221 24-Dec-22 13-Jun-23 04-Jul-23 A 20-Jun-24 SAR7,541.52 SAR0.00 100% 0% 20-Jun-24, AIR RELASE VALVE
WASHOUT VALVE
WASH 221 24-Dec-22 13-Jun-23 04-Jul-23 A 20-Jun-24 SAR9,049.82 SAR0.00 100% 0% 20-Jun-24, WASHOUT VALVE
GREY WAWATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 250 10-Sep-22 13-Jun-23 20-Nov-22 A 20-Jun-24 SAR38,672.58 SAR0.00 100% 0% 20-Jun-24, GREY WATER DISTRIBUTION
DI PIPES
PIP 230 10-Sep-22 25-Feb-23 20-Nov-22 A 23-May-24 SAR6,574.34 SAR0.00 100% 0% 23-May-24, DI PIPES
HDPE PIPES 221 05-Nov-22 25-Apr-23 29-Mar-23 A 20-Jun-24 SAR6,961.06 SAR0.00 100% 0% 20-Jun-24, HDPE PIPES
GRP PPIPES 230 12-Oct-22 29-Mar-23 08-Jan-23 A 20-Jun-24 SAR5,027.44 SAR0.00 100% 0% 20-Jun-24, GRP PIPES
DI & G
GRP FITTING 230 07-Nov-22 27-Apr-23 01-May-23 A 20-Jun-24 SAR4,640.71 SAR0.00 100% 0% 20-Jun-24, DI & GRP FITTING
GATE VALVE 221 24-Dec-22 13-Jun-23 01-May-23 A 20-Jun-24 SAR2,707.08 SAR0.00 100% 0% 20-Jun-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 221 24-Dec-22 13-Jun-23 01-May-23 A 20-Jun-24 SAR3,867.26 SAR0.00 100% 0% 20-Jun-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 221 24-Dec-22 13-Jun-23 04-Jul-23 A 20-Jun-24 SAR4,253.98 SAR0.00 100% 0% 20-Jun-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 221 24-Dec-22 13-Jun-23 04-Jul-23 A 20-Jun-24 SAR4,640.71 SAR0.00 100% 0% 20-Jun-24, WASEHOUT VALVE
IRR & FF NETWORK BRANCHES & TIE IN POINTS 242 05-Nov-22 07-Aug-23 29-Mar-23 A 16-Jul-24 SAR31,208.92 SAR0.00 100% 0% 16-Jul-24, IRR & FF NETWORK BRANCH
HDPE PIPES 221 05-Nov-22 25-Apr-23 29-Mar-23 A 20-Jun-24 SAR7,802.23 SAR0.00 100% 0% 20-Jun-24, HDPE PIPES
GATE VALVE 221 24-Dec-22 13-Jun-23 01-May-23 A 20-Jun-24 SAR3,120.89 SAR0.00 100% 0% 20-Jun-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 221 24-Dec-22 13-Jun-23 01-May-23 A 20-Jun-24 SAR3,120.89 SAR0.00 100% 0% 20-Jun-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 221 24-Dec-22 13-Jun-23 04-Jul-23 A 20-Jun-24 SAR3,120.89 SAR0.00 100% 0% 20-Jun-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 221 24-Dec-22 13-Jun-23 04-Jul-23 A 20-Jun-24 SAR3,120.89 SAR0.00 100% 0% 20-Jun-24, WASEHOUT VALVE
FIRE H
HYDRANT 220 13-Feb-23 07-Aug-23 04-Jul-23 A 16-Jul-24 SAR10,923.12 SAR0.00 100% 0% 16-Jul-24, FIRE HYDRANT
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 230 19-Sep-22 13-Jun-23 01-May-23 A 02-Jul-24 SAR368,325.25 SAR0.00 100% 0% 02-Jul-24, CHILLED WATER SUPPLY & R
MILD STEEL PIPE 145 19-Sep-22 06-Mar-23 07-Jan-24 02-Jul-24 SAR147,330.10 SAR0.00 100% 0% 02-Jul-24, MILD STEEL PIPE
MILD STEEL FITTING 145 19-Sep-22 06-Mar-23 07-Jan-24 02-Jul-24 SAR147,330.10 SAR0.00 100% 0% 02-Jul-24, MILD STEEL FITTING
GATE VALVE 221 24-Dec-22 13-Jun-23 01-May-23 A 20-Jun-24 SAR73,665.05 SAR0.00 100% 0% 20-Jun-24, GATE VALVE
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 145 04-May-23 24-Oct-23 21-Apr-24 12-Oct-24 SAR61,978.28 SAR0.00 100% 0% 12-Oct-24, AUTOMATIC WASTE COLL
AUTOMATIC WASTE
AUTO 145 04-May-23 24-Oct-23 21-Apr-24 12-Oct-24 SAR61,978.28 SAR0.00 100% 0% 12-Oct-24, AUTOMATIC WASTE
DRY UTILITI
UTILITIES 188 11-Dec-22 06-Sep-23 01-Feb-24 15-Sep-24 SAR163,995.19 SAR0.00 100% 0% 15-Sep-24, DRY UTILITIES
POWER 188 11-Dec-22 06-Sep-23 01-Feb-24 15-Sep-24 SAR156,587.78 SAR0.00 100% 0% 15-Sep-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 145 11-Dec-22 31-May-23 03-Feb-24 29-Jul-24 SAR9,539.83 SAR0.00 100% 0% 29-Jul-24, HIGH VOLTAGE 110 KV NETW
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 144 05-Jan-23 26-Jun-23 28-Feb-24 22-Aug-24 SAR122,016.98 SAR0.00 100% 0% 22-Aug-24, MEDIUM VOLTAGE 13.8 KV
LOW V VOLTAGE NETWORK 144 28-Dec-22 18-Jun-23 01-Feb-24 27-Jul-24 SAR25,030.97 SAR0.00 100% 0% 27-Jul-24, LOW VOLTAGE NETWORK
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 145 15-Mar-23 06-Sep-23 23-Mar-24 15-Sep-24 SAR0.00 SAR0.00 0% 0% 15-Sep-24, ELECTRICAL DISTRIBUTIO
LIGHTING SYSTEM
LIGHT 144 23-Jan-23 17-Jul-23 01-Feb-24 27-Jul-24 SAR0.00 SAR0.00 0% 0% 27-Jul-24, LIGHTING SYSTEM
LOW CUR
CURRENT 145 18-Feb-23 12-Aug-23 26-Feb-24 21-Aug-24 SAR7,407.41 SAR0.00 100% 0% 21-Aug-24, LOW CURRENT
TELECOM SERVICES
TELEC 145 18-Feb-23 12-Aug-23 26-Feb-24 21-Aug-24 SAR7,407.41 SAR0.00 100% 0% 21-Aug-24, TELECOM SERVICES
MEP 235 07-Sep-22 11-Jun-23 16-Dec-23 22-Sep-24 SAR4,469,720.33 SAR0.00 100% 0% 22-Sep-24, MEP
ARCHITECTURAL
ARCHITECTUR 114 05-Oct-22 15-Feb-23 09-Jan-24 25-May-24 SAR0.00 SAR0.00 0% 0% 25-May-24, ARCHITECTURAL
CONSTRUCTION 1203 02-Jul-22 07-May-25 02-Jul-22 A 11-Jun-26 SAR117,504,447.14 SAR37,421,235.09 91.94% 31.85% 11-Jun-26, CONS
GENERAL SITE ARRANGEMENT 251 17-Jul-22 03-Sep-22 17-Jul-22 A 12-Jan-23 A SAR1,741,137.44 SAR1,741,137.44 100% 100% 12-Jan-23 A, GENERAL SITE ARRANGEMENT
SITE PREPARATION
PREPA 251 17-Jul-22 03-Sep-22 17-Jul-22 A 12-Jan-23 A SAR1,741,137.44 SAR1,741,137.44 100% 100% 12-Jan-23 A, SITE PREPARATION
GEO-TECHNICAL INVESTIGATION
GEO-TECHNICA 72 02-Jul-22 26-Sep-22 02-Jul-22 A 01-Oct-22 A SAR78,297.21 SAR78,297.21 100% 100% 01-Oct-22 A, GEO-TECHNICAL INVESTIGATION
EXCAVATION & DEWATERING 269 01-Oct-22 15-Jun-23 04-Sep-22 A 28-Feb-24 SAR18,029,616.07 SAR15,712,186.58 100% 87.15% 28-Feb-24, EXCAVATION & DEWATERING
SOIL IMPROVEMENT
IMPROVE 18 20-Oct-22 26-Jan-23 28-Feb-23 A 18-Dec-23 SAR5,135,521.04 SAR4,865,906.19 100% 94.75% 18-Dec-23, SOIL IMPROVEMENT
STRUCTURAL WORKS 314 01-Nov-22 03-Sep-23 03-Jul-23 A 05-Oct-24 SAR65,457,982.43 SAR15,023,707.67 100% 22.95% 05-Oct-24, STRUCTURAL WORKS
STA. 0+994 ~ 1+014 163 01-Nov-22 13-May-23 26-Dec-23 11-Jul-24 SAR4,763,269.03 SAR0.00 100% 0% 11-Jul-24, STA. 0+994 ~ 1+014
BASE SLAB
SL 24 01-Nov-22 28-Nov-22 26-Dec-23 23-Jan-24 SAR1,319,440.28 SAR0.00 100% 0% 23-Jan-24, BASE SLAB
COLUMNS
COLUMN 23 27-Nov-22 22-Dec-22 21-Jan-24 17-Feb-24 SAR301,745.04 SAR0.00 100% 0% 17-Feb-24, COLUMNS
TUNNEL WALLS 37 27-Nov-22 08-Jan-23 21-Jan-24 04-Mar-24 SAR268,276.62 SAR0.00 100% 0% 04-Mar-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 26-Dec-22 29-Jan-23 19-Feb-24 25-Mar-24 SAR792,635.41 SAR0.00 100% 0% 25-Mar-24, MIDDLE SLAB FOR UTILITY CU
UTILITY C
CULVERT WALLS 25 30-Jan-23 27-Feb-23 25-Mar-24 27-Apr-24 SAR458,388.64 SAR0.00 100% 0% 27-Apr-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 28-Feb-23 11-Apr-23 27-Apr-24 09-Jun-24 SAR1,018,107.26 SAR0.00 100% 0% 09-Jun-24, TOP SLAB
FINISHING WORK
FINISHIN 24 12-Apr-23 13-May-23 09-Jun-24 11-Jul-24 SAR604,675.80 SAR0.00 100% 0% 11-Jul-24, FINISHING WORK
STA. 1+014 ~ 1+034 169 12-Nov-22 30-May-23 06-Jan-24 29-Jul-24 SAR5,058,123.80 SAR0.00 100% 0% 29-Jul-24, STA. 1+014 ~ 1+034
BASE SLAB
SL 24 12-Nov-22 08-Dec-22 06-Jan-24 03-Feb-24 SAR1,319,440.28 SAR0.00 100% 0% 03-Feb-24, BASE SLAB
COLUMNS
COLUMN 23 07-Dec-22 02-Jan-23 31-Jan-24 27-Feb-24 SAR301,745.04 SAR0.00 100% 0% 27-Feb-24, COLUMNS
TUNNEL WALLS 37 07-Dec-22 18-Jan-23 31-Jan-24 14-Mar-24 SAR563,131.38 SAR0.00 100% 0% 14-Mar-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 05-Jan-23 08-Feb-23 29-Feb-24 04-Apr-24 SAR792,635.41 SAR0.00 100% 0% 04-Apr-24, MIDDLE SLAB FOR UTILITY CU
UTILITY C
CULVERT WALLS 25 09-Feb-23 09-Mar-23 04-Apr-24 07-May-24 SAR458,388.64 SAR0.00 100% 0% 07-May-24, UTILITY CULVERT WALLS

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
13 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
TOP SLAB
SLA 37 11-Mar-23 25-Apr-23 07-May-24 24-Jun-24 SAR1,018,107.26 SAR0.00 100% 0% 24-Jun-24, TOP SLAB
FINISHING WORK
FINISHIN 30 26-Apr-23 30-May-23 24-Jun-24 29-Jul-24 SAR604,675.80 SAR0.00 100% 0% 29-Jul-24, FINISHING WORK
STA. 1+034 ~ 1+054 175 14-Nov-22 08-Jun-23 08-Jan-24 07-Aug-24 SAR5,058,123.80 SAR0.00 100% 0% 07-Aug-24, STA. 1+034 ~ 1+054
BASE SLAB
SL 24 14-Nov-22 11-Dec-22 08-Jan-24 05-Feb-24 SAR1,319,440.28 SAR0.00 100% 0% 05-Feb-24, BASE SLAB
COLUMNS
COLUMN 23 12-Dec-22 07-Jan-23 05-Feb-24 03-Mar-24 SAR301,745.04 SAR0.00 100% 0% 03-Mar-24, COLUMNS
TUNNEL WALLS 37 12-Dec-22 23-Jan-23 05-Feb-24 19-Mar-24 SAR563,131.38 SAR0.00 100% 0% 19-Mar-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 10-Jan-23 13-Feb-23 05-Mar-24 13-Apr-24 SAR792,635.41 SAR0.00 100% 0% 13-Apr-24, MIDDLE SLAB FOR UTILITY CU
UTILITY C
CULVERT WALLS 25 14-Feb-23 14-Mar-23 13-Apr-24 12-May-24 SAR458,388.64 SAR0.00 100% 0% 12-May-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 15-Mar-23 30-Apr-23 12-May-24 29-Jun-24 SAR1,018,107.26 SAR0.00 100% 0% 29-Jun-24, TOP SLAB
FINISHING WORK
FINISHIN 34 01-May-23 08-Jun-23 29-Jun-24 07-Aug-24 SAR604,675.80 SAR0.00 100% 0% 07-Aug-24, FINISHING WORK
STA. 1+054 ~ 1+074 170 30-Nov-22 19-Jun-23 24-Jan-24 18-Aug-24 SAR5,058,123.80 SAR0.00 100% 0% 18-Aug-24, STA. 1+054 ~ 1+074
BASE SLAB
SL 23 30-Nov-22 26-Dec-22 24-Jan-24 20-Feb-24 SAR1,319,440.28 SAR0.00 100% 0% 20-Feb-24, BASE SLAB
COLUMNS
COLUMN 21 27-Dec-22 19-Jan-23 20-Feb-24 16-Mar-24 SAR301,745.04 SAR0.00 100% 0% 16-Mar-24, COLUMNS
TUNNEL WALLS 37 27-Dec-22 07-Feb-23 20-Feb-24 03-Apr-24 SAR563,131.38 SAR0.00 100% 0% 03-Apr-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 25-Jan-23 28-Feb-23 20-Mar-24 28-Apr-24 SAR792,635.41 SAR0.00 100% 0% 28-Apr-24, MIDDLE SLAB FOR UTILITY CU
UTILITY C
CULVERT WALLS 25 01-Mar-23 29-Mar-23 28-Apr-24 27-May-24 SAR458,388.64 SAR0.00 100% 0% 27-May-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 30-Mar-23 15-May-23 27-May-24 14-Jul-24 SAR1,018,107.26 SAR0.00 100% 0% 14-Jul-24, TOP SLAB
FINISHING WORK
FINISHIN 30 16-May-23 19-Jun-23 14-Jul-24 18-Aug-24 SAR604,675.80 SAR0.00 100% 0% 18-Aug-24, FINISHING WORK
STA. 1+074 ~ 1+094 171 15-Dec-22 09-Jul-23 08-Feb-24 03-Sep-24 SAR5,058,123.80 SAR0.00 100% 0% 03-Sep-24, STA. 1+074 ~ 1+094
BASE SLAB
SL 24 15-Dec-22 11-Jan-23 08-Feb-24 07-Mar-24 SAR1,319,440.28 SAR0.00 100% 0% 07-Mar-24, BASE SLAB
COLUMNS
COLUMN 23 12-Jan-23 07-Feb-23 07-Mar-24 03-Apr-24 SAR301,745.04 SAR0.00 100% 0% 03-Apr-24, COLUMNS
TUNNEL WALLS 37 12-Jan-23 23-Feb-23 07-Mar-24 23-Apr-24 SAR563,131.38 SAR0.00 100% 0% 23-Apr-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 11-Feb-23 16-Mar-23 06-Apr-24 14-May-24 SAR792,635.41 SAR0.00 100% 0% 14-May-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 18-Mar-23 15-Apr-23 14-May-24 12-Jun-24 SAR458,388.64 SAR0.00 100% 0% 12-Jun-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 16-Apr-23 31-May-23 12-Jun-24 30-Jul-24 SAR1,018,107.26 SAR0.00 100% 0% 30-Jul-24, TOP SLAB
FINISHING WORK
FINISHIN 30 01-Jun-23 09-Jul-23 30-Jul-24 03-Sep-24 SAR604,675.80 SAR0.00 100% 0% 03-Sep-24, FINISHING WORK
STA. 1+094 ~ 1+114 275 01-Jan-23 25-Jul-23 22-Aug-23 A 12-Sep-24 SAR5,058,123.80 SAR2,124,895.61 100% 42.01% 12-Sep-24, STA. 1+094 ~ 1+114
BASE SLAB
SL 36 01-Jan-23 28-Jan-23 22-Aug-23 A 25-Sep-23 A SAR1,319,440.28 SAR1,319,440.28 100% 100% 25-Sep-23 A, BASE SLAB
COLUMNS
COLUMN 89 29-Jan-23 23-Feb-23 19-Oct-23 A 30-Nov-23 A SAR301,745.04 SAR301,745.04 100% 100% 30-Nov-23 A, COLUMNS
TUNNEL WALLS 122 29-Jan-23 12-Mar-23 19-Oct-23 A 10-Mar-24 SAR563,131.38 SAR503,710.29 100% 89.45% 10-Mar-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 27-Feb-23 02-Apr-23 25-Feb-24 31-Mar-24 SAR792,635.41 SAR0.00 100% 0% 31-Mar-24, MIDDLE SLAB FOR UTILITY CU
UTILITY C
CULVERT WALLS 25 03-Apr-23 04-May-23 31-Mar-24 02-May-24 SAR458,388.64 SAR0.00 100% 0% 02-May-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 06-May-23 17-Jun-23 02-May-24 19-Jun-24 SAR1,018,107.26 SAR0.00 100% 0% 19-Jun-24, TOP SLAB
FINISHING WORK
FINISHIN 73 18-Jun-23 25-Jul-23 19-Jun-24 12-Sep-24 SAR604,675.80 SAR0.00 100% 0% 12-Sep-24, FINISHING WORK
STA. 1+114 ~ 1+134 255 17-Jan-23 10-Aug-23 19-Aug-23 A 22-Sep-24 SAR5,058,123.80 SAR1,319,440.28 100% 26.09% 22-Sep-24, STA. 1+114 ~ 1+134
BASE SLAB
SL 48 17-Jan-23 13-Feb-23 19-Aug-23 A 07-Oct-23 A SAR1,319,440.28 SAR1,319,440.28 100% 100% 07-Oct-23 A, BASE SLAB
COLUMNS
COLUMN 23 14-Feb-23 12-Mar-23 25-Feb-24 23-Mar-24 SAR301,745.04 SAR0.00 100% 0% 23-Mar-24, COLUMNS
TUNNEL WALLS 37 14-Feb-23 28-Mar-23 25-Feb-24 08-Apr-24 SAR563,131.38 SAR0.00 100% 0% 08-Apr-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 15-Mar-23 18-Apr-23 25-Mar-24 02-May-24 SAR792,635.41 SAR0.00 100% 0% 02-May-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 19-Apr-23 21-May-23 02-May-24 01-Jun-24 SAR458,388.64 SAR0.00 100% 0% 01-Jun-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 22-May-23 06-Jul-23 01-Jun-24 18-Jul-24 SAR1,018,107.26 SAR0.00 100% 0% 18-Jul-24, TOP SLAB
FINISHING WORK
FINISHIN 56 08-Jul-23 10-Aug-23 18-Jul-24 22-Sep-24 SAR604,675.80 SAR0.00 100% 0% 22-Sep-24, FINISHING WORK
STA. 1+134 ~ 1+154 271 04-Feb-23 26-Aug-23 19-Aug-23 A 29-Sep-24 SAR5,058,123.80 SAR1,715,632.54 100% 33.92% 29-Sep-24, STA. 1+134 ~ 1+154
BASE SLAB
SL 32 04-Feb-23 04-Mar-23 19-Aug-23 A 21-Sep-23 A SAR1,319,440.28 SAR1,319,440.28 100% 100% 21-Sep-23 A, BASE SLAB
COLUMNS
COLUMN 23 05-Mar-23 30-Mar-23 25-Feb-24 23-Mar-24 SAR301,745.04 SAR0.00 100% 0% 23-Mar-24, COLUMNS
TUNNEL WALLS 122 05-Mar-23 16-Apr-23 04-Nov-23 A 30-Mar-24 SAR563,131.38 SAR396,192.26 100% 70.36% 30-Mar-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 03-Apr-23 10-May-23 23-Mar-24 30-Apr-24 SAR792,635.41 SAR0.00 100% 0% 30-Apr-24, MIDDLE SLAB FOR UTILITY CU
UTILITY C
CULVERT WALLS 25 11-May-23 08-Jun-23 30-Apr-24 29-May-24 SAR458,388.64 SAR0.00 100% 0% 29-May-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 10-Jun-23 25-Jul-23 29-May-24 16-Jul-24 SAR1,018,107.26 SAR0.00 100% 0% 16-Jul-24, TOP SLAB
FINISHING WORK
FINISHIN 63 26-Jul-23 26-Aug-23 16-Jul-24 29-Sep-24 SAR604,675.80 SAR0.00 100% 0% 29-Sep-24, FINISHING WORK
STA. 1+154 ~ 1+174 175 06-Feb-23 24-Aug-23 04-Jul-23 A 24-Jun-24 SAR5,055,351.63 SAR2,890,207.25 100% 57.17% 24-Jun-24, STA. 1+154 ~ 1+174
BASE SLAB
SL 37 06-Feb-23 06-Mar-23 04-Jul-23 A 24-Aug-23 A SAR1,319,440.28 SAR1,319,440.28 100% 100% 24-Aug-23 A, BASE SLAB
COLUMNS
COLUMN 50 07-Mar-23 01-Apr-23 26-Aug-23 A 07-Nov-23 A SAR301,745.04 SAR301,745.04 100% 100% 07-Nov-23 A, COLUMNS
TUNNEL WALLS 79 07-Mar-23 18-Apr-23 26-Aug-23 A 10-Mar-24 SAR563,131.38 SAR503,710.29 100% 89.45% 10-Mar-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 88 05-Apr-23 11-May-23 11-Nov-23 A 06-Mar-24 SAR792,635.41 SAR765,311.64 100% 96.55% 06-Mar-24, MIDDLE SLAB FOR UTILITY CUL
UTILITY C
CULVERT WALLS 24 13-May-23 08-Jun-23 06-Mar-24 03-Apr-24 SAR458,388.64 SAR0.00 100% 0% 03-Apr-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 33 10-Jun-23 20-Jul-23 03-Apr-24 15-May-24 SAR1,018,107.26 SAR0.00 100% 0% 15-May-24, TOP SLAB
FINISHING WORK
FINISHIN 30 22-Jul-23 24-Aug-23 15-May-24 24-Jun-24 SAR601,903.63 SAR0.00 100% 0% 24-Jun-24, FINISHING WORK
STA. 1+174 ~ 1+194 216 06-Feb-23 24-Aug-23 08-Jul-23 A 15-Aug-24 SAR5,058,123.80 SAR1,514,044.42 100% 29.93% 15-Aug-24, STA. 1+174 ~ 1+194
BASE SLAB
SL 27 06-Feb-23 06-Mar-23 08-Jul-23 A 13-Sep-23 A SAR1,319,440.28 SAR1,319,440.28 100% 100% 13-Sep-23 A, BASE SLAB
COLUMNS
COLUMN 23 07-Mar-23 02-Apr-23 25-Feb-24 23-Mar-24 SAR301,745.04 SAR0.00 100% 0% 23-Mar-24, COLUMNS
TUNNEL WALLS 112 07-Mar-23 18-Apr-23 29-Nov-23 A 08-Apr-24 SAR563,131.38 SAR194,604.14 100% 34.56% 08-Apr-24, TUNNEL WALLS

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
14 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
MIDDLE SLAB FOR UTILITY CULVERT 30 05-Apr-23 13-May-23 25-Mar-24 02-May-24 SAR792,635.41 SAR0.00 100% 0% 02-May-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 14-May-23 11-Jun-23 02-May-24 01-Jun-24 SAR458,388.64 SAR0.00 100% 0% 01-Jun-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 12-Jun-23 27-Jul-23 01-Jun-24 18-Jul-24 SAR1,018,107.26 SAR0.00 100% 0% 18-Jul-24, TOP SLAB
FINISHING WORK
FINISHIN 24 29-Jul-23 24-Aug-23 18-Jul-24 15-Aug-24 SAR604,675.80 SAR0.00 100% 0% 15-Aug-24, FINISHING WORK
STA. 1+194 ~ 1+214 228 08-Feb-23 27-Aug-23 03-Jul-23 A 13-Aug-24 SAR5,058,123.80 SAR1,775,181.77 100% 35.1% 13-Aug-24, STA. 1+194 ~ 1+214
BASE SLAB
SL 35 08-Feb-23 08-Mar-23 03-Jul-23 A 15-Aug-23 A SAR1,319,440.28 SAR1,319,440.28 100% 100% 15-Aug-23 A, BASE SLAB
COLUMNS
COLUMN 53 09-Mar-23 04-Apr-23 04-Nov-23 A 23-Mar-24 SAR301,745.04 SAR89,817.30 100% 29.77% 23-Mar-24, COLUMNS
TUNNEL WALLS 114 09-Mar-23 20-Apr-23 04-Nov-23 A 25-Mar-24 SAR563,131.38 SAR365,924.19 100% 64.98% 25-Mar-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 08-Apr-23 15-May-23 23-Mar-24 30-Apr-24 SAR792,635.41 SAR0.00 100% 0% 30-Apr-24, MIDDLE SLAB FOR UTILITY CU
UTILITY C
CULVERT WALLS 25 16-May-23 13-Jun-23 30-Apr-24 29-May-24 SAR458,388.64 SAR0.00 100% 0% 29-May-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 35 14-Jun-23 27-Jul-23 29-May-24 14-Jul-24 SAR1,018,107.26 SAR0.00 100% 0% 14-Jul-24, TOP SLAB
FINISHING WORK
FINISHIN 26 29-Jul-23 27-Aug-23 14-Jul-24 13-Aug-24 SAR604,675.80 SAR0.00 100% 0% 13-Aug-24, FINISHING WORK
STA. 1+214 ~ 1+239 207 11-Feb-23 28-Aug-23 08-Jul-23 A 14-Aug-24 SAR5,058,123.80 SAR1,573,133.31 100% 31.1% 14-Aug-24, STA. 1+214 ~ 1+239
BASE SLAB
SL 42 11-Feb-23 11-Mar-23 08-Jul-23 A 07-Oct-23 A SAR1,319,440.28 SAR1,319,440.28 100% 100% 07-Oct-23 A, BASE SLAB
COLUMNS
COLUMN 23 12-Mar-23 06-Apr-23 28-Nov-23 A 23-Mar-24 SAR301,745.04 SAR99,575.86 100% 33% 23-Mar-24, COLUMNS
TUNNEL WALLS 43 12-Mar-23 26-Apr-23 28-Nov-23 A 08-Apr-24 SAR563,131.38 SAR154,117.17 100% 27.37% 08-Apr-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 10-Apr-23 17-May-23 25-Mar-24 02-May-24 SAR792,635.41 SAR0.00 100% 0% 02-May-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 18-May-23 15-Jun-23 02-May-24 01-Jun-24 SAR458,388.64 SAR0.00 100% 0% 01-Jun-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 33 17-Jun-23 27-Jul-23 01-Jun-24 14-Jul-24 SAR1,018,107.26 SAR0.00 100% 0% 14-Jul-24, TOP SLAB
FINISHING WORK
FINISHIN 27 29-Jul-23 28-Aug-23 14-Jul-24 14-Aug-24 SAR604,675.80 SAR0.00 100% 0% 14-Aug-24, FINISHING WORK
STA. 1+239 ~ 1+268 314 12-Feb-23 03-Sep-23 01-Aug-23 A 05-Oct-24 SAR5,058,123.80 SAR2,111,172.47 100% 41.74% 05-Oct-24, STA. 1+239 ~ 1+268
BASE SLAB
SL 23 12-Feb-23 12-Mar-23 01-Aug-23 A 31-Aug-23 A SAR1,319,440.28 SAR1,319,440.28 100% 100% 31-Aug-23 A, BASE SLAB
COLUMNS
COLUMN 63 13-Mar-23 08-Apr-23 10-Sep-23 A 09-Mar-24 SAR301,745.04 SAR291,690.76 100% 96.67% 09-Mar-24, COLUMNS
TUNNEL WALLS 145 13-Mar-23 27-Apr-23 10-Sep-23 A 12-Mar-24 SAR563,131.38 SAR500,041.44 100% 88.8% 12-Mar-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 11-Apr-23 18-May-23 09-Mar-24 16-Apr-24 SAR792,635.41 SAR0.00 100% 0% 16-Apr-24, MIDDLE SLAB FOR UTILITY CU
UTILITY C
CULVERT WALLS 25 20-May-23 17-Jun-23 16-Apr-24 15-May-24 SAR458,388.64 SAR0.00 100% 0% 15-May-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 31 18-Jun-23 26-Jul-23 15-May-24 25-Jun-24 SAR1,018,107.26 SAR0.00 100% 0% 25-Jun-24, TOP SLAB
FINISHING WORK
FINISHIN 86 27-Jul-23 03-Sep-23 25-Jun-24 05-Oct-24 SAR604,675.80 SAR0.00 100% 0% 05-Oct-24, FINISHING WORK
EGRESS STAIR-5
STAIR (ZONE-03) 236 01-Dec-22 09-Sep-23 25-Jan-24 05-Nov-24 SAR2,352,338.08 SAR0.00 100% 0% 05-Nov-24, EGRESS STAIR-5 (ZONE-
WALL AND 1 1ST FLIGHT 31 01-Dec-22 05-Jan-23 25-Jan-24 02-Mar-24 SAR544,958.40 SAR0.00 100% 0% 02-Mar-24, WALL AND 1ST FLIGHT
WALL AND 2 2ND FLIGHT 17 07-Jan-23 25-Jan-23 02-Mar-24 21-Mar-24 SAR111,087.10 SAR0.00 100% 0% 21-Mar-24, WALL AND 2ND FLIGHT
WALL AND 3 3RD FLIGHT 17 26-Jan-23 14-Feb-23 21-Mar-24 14-Apr-24 SAR111,087.10 SAR0.00 100% 0% 14-Apr-24, WALL AND 3RD FLIGHT
WALL AND 4 4TH FLIGHT 17 15-Feb-23 06-Mar-23 14-Apr-24 04-May-24 SAR111,087.10 SAR0.00 100% 0% 04-May-24, WALL AND 4TH FLIGHT
WALL AND 5 5TH FLIGHT 17 07-Mar-23 26-Mar-23 04-May-24 23-May-24 SAR111,087.10 SAR0.00 100% 0% 23-May-24, WALL AND 5TH FLIGHT
WALL AND 6 6TH FLIGHT 17 27-Mar-23 15-Apr-23 23-May-24 12-Jun-24 SAR111,087.10 SAR0.00 100% 0% 12-Jun-24, WALL AND 6TH FLIGHT
WALL AND 7 7TH FLIGHT 17 16-Apr-23 08-May-23 12-Jun-24 07-Jul-24 SAR111,087.10 SAR0.00 100% 0% 07-Jul-24, WALL AND 7TH FLIGHT
WALL AND 8 8TH FLIGHT 17 09-May-23 28-May-23 07-Jul-24 27-Jul-24 SAR111,087.10 SAR0.00 100% 0% 27-Jul-24, WALL AND 8TH FLIGHT
WALL AND 9 9TH FLIGHT 17 29-May-23 17-Jun-23 27-Jul-24 15-Aug-24 SAR111,087.10 SAR0.00 100% 0% 15-Aug-24, WALL AND 9TH FLIGHT
WALL AND 1 10TH FLIGHT 17 18-Jun-23 10-Jul-23 15-Aug-24 04-Sep-24 SAR111,087.10 SAR0.00 100% 0% 04-Sep-24, WALL AND 10TH FLIGHT
WALL AND 1 11TH FLIGHT 17 11-Jul-23 30-Jul-23 04-Sep-24 25-Sep-24 SAR111,087.10 SAR0.00 100% 0% 25-Sep-24, WALL AND 11TH FLIGHT
TOP SLAB 35 31-Jul-23 09-Sep-23 25-Sep-24 05-Nov-24 SAR696,508.72 SAR0.00 100% 0% 05-Nov-24, TOP SLAB
BACKFILLING UPTO TUNNEL WALL 34 25-Feb-23 15-Jun-23 30-Mar-24 12-May-24 SAR5,636,578.73 SAR0.00 100% 0% 12-May-24, BACKFILLING UPTO TUNNEL
STRUCTURAL FILL 34 01-Jun-23 27-Aug-23 30-Jul-24 08-Sep-24 SAR5,636,578.73 SAR0.00 100% 0% 08-Sep-24, STRUCTURAL FILL
WET & DRY UTILITIES
UT 367 04-Sep-23 14-Nov-24 05-Oct-24 16-Dec-25 SAR6,286,560.89 SAR0.00 28.28% 0% 16-Dec-25, WET & DRY
INSIDE WET CULVERT 367 04-Sep-23 14-Nov-24 05-Oct-24 16-Dec-25 SAR4,892,601.81 SAR0.00 15.52% 0% 16-Dec-25, INSIDE WE
POTABLE WATER NETWORK 67 04-Sep-23 21-Nov-23 05-Oct-24 22-Dec-24 SAR641,029.14 SAR0.00 100% 0% 22-Dec-24, POTABLE WATER NETW
GREY WA
WATER DISTRIBUTION SYSTEM 67 14-Nov-23 30-Jan-24 14-Dec-24 02-Mar-25 SAR328,716.92 SAR0.00 36% 0% 02-Mar-25, GREY WATER DISTR
IRRIGATION NETWORK
IRRIGATI 67 23-Jan-24 13-Apr-24 22-Feb-25 15-May-25 SAR265,275.82 SAR0.00 0% 0% 15-May-25, IRRIGATION NETW
CHILLED WATER SUPPLY NETWORK 67 02-Apr-24 26-Jun-24 07-May-25 28-Jul-25 SAR1,565,382.30 SAR0.00 0% 0% 28-Jul-25, CHILLED WATER
CHILLED WATER RETURN NETWORK 67 19-Jun-24 04-Sep-24 20-Jul-25 07-Oct-25 SAR1,565,382.30 SAR0.00 0% 0% 07-Oct-25, CHILLED WAT
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 67 28-Aug-24 14-Nov-24 29-Sep-25 16-Dec-25 SAR526,815.34 SAR0.00 0% 0% 16-Dec-25, AUTOMATI
INSIDE DRY CULVERT 367 04-Sep-23 14-Nov-24 05-Oct-24 16-Dec-25 SAR1,393,959.08 SAR0.00 73.08% 0% 16-Dec-25, INSIDE DRY
POWER 315 04-Sep-23 14-Sep-24 05-Oct-24 16-Oct-25 SAR1,330,996.11 SAR0.00 76.53% 0% 16-Oct-25, POWER
HIGH VOLTAGE
V 110 KV NETWORK 45 04-Sep-23 26-Oct-23 05-Oct-24 26-Nov-24 SAR81,088.57 SAR0.00 100% 0% 26-Nov-24, HIGH VOLTAGE 110 KV
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 45 28-Oct-23 18-Dec-23 26-Nov-24 18-Jan-25 SAR1,037,144.34 SAR0.00 90.4% 0% 18-Jan-25, MEDIUM VOLTAGE 13.
LOW VVOLTAGE NETWORK 45 19-Dec-23 08-Feb-24 18-Jan-25 11-Mar-25 SAR212,763.20 SAR0.00 0% 0% 11-Mar-25, LOW VOLTAGE NET
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 150 10-Feb-24 10-Aug-24 11-Mar-25 10-Sep-25 SAR0.00 SAR0.00 0% 0% 10-Sep-25, ELECTRICAL D
LIGHTING SYSTEM
LIGHT 45 24-Jul-24 14-Sep-24 24-Aug-25 16-Oct-25 SAR0.00 SAR0.00 0% 0% 16-Oct-25, LIGHTING SY
TELECOM SERVICES 52 15-Sep-24 14-Nov-24 18-Oct-25 16-Dec-25 SAR62,962.96 SAR0.00 0% 0% 16-Dec-25, TELECOM S
MEP VEHICULAR
VEHICULA TUNNEL/ DRY & WET CULVERTS 474 04-Sep-23 19-Mar-25 05-Oct-24 25-Apr-26 SAR4,701,047.71 SAR0.00 46.56% 0% 25-Apr-26, MEP V
TUNNEL MECHANICAL
ME WORKS 474 04-Sep-23 19-Mar-25 05-Oct-24 25-Apr-26 SAR1,352,406.73 SAR0.00 72.73% 0% 25-Apr-26, TUNNE
FIRE FIG
FIGHTING SYSTEM 370 04-Sep-23 18-Nov-24 05-Oct-24 20-Dec-25 SAR983,628.59 SAR0.00 100% 0% 20-Dec-25, FIRE FIGHT

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
15 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
VENTILA
VENTILATION SYSTEM 23 19-Nov-24 15-Dec-24 20-Dec-25 15-Jan-26 SAR110,295.91 SAR0.00 0% 0% 15-Jan-26, VENTILAT
PUMPS INSTALLATION
I 15 16-Dec-24 01-Jan-25 15-Jan-26 02-Feb-26 SAR207,255.49 SAR0.00 0% 0% 02-Feb-26, PUMPS IN
DUCTING SYSTEM 66 02-Jan-25 19-Mar-25 02-Feb-26 25-Apr-26 SAR51,226.74 SAR0.00 0% 0% 25-Apr-26, DUCTI
TUNNEL ELECTRICAL
EL WORKS 186 04-Sep-23 08-Apr-24 05-Oct-24 14-May-25 SAR2,842,949.34 SAR0.00 42.39% 0% 14-May-25, TUNNEL ELECTRI
CABLE TRAYS
T 129 28-Sep-23 25-Feb-24 28-Oct-24 27-Mar-25 SAR645,072.70 SAR0.00 57.65% 0% 27-Mar-25, CABLE TRAYS
POWER CABLES 141 23-Oct-23 03-Apr-24 21-Nov-24 10-May-25 SAR872,171.41 SAR0.00 64.31% 0% 10-May-25, POWER CABLES
ELECTRICAL INSTALLATIONS
ELECTRI 86 31-Dec-23 08-Apr-24 29-Jan-25 14-May-25 SAR713,651.69 SAR0.00 0% 0% 14-May-25, ELECTRICAL INST
LOW CUR
CURRENT 180 04-Sep-23 01-Apr-24 05-Oct-24 07-May-25 SAR612,053.55 SAR0.00 44.5% 0% 07-May-25, LOW CURRENT
FIRE D
DETECTION AND ALARM SYSTEM 82 04-Sep-23 09-Dec-23 05-Oct-24 08-Jan-25 SAR104,615.86 SAR0.00 100% 0% 08-Jan-25, FIRE DETECTION AND
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 28 18-Sep-23 21-Oct-23 19-Oct-24 20-Nov-24 SAR87,169.70 SAR0.00 100% 0% 20-Nov-24, COMMUNICATION SYS
PUBLIC ADDRESS
PUBLI 28 22-Oct-23 22-Nov-23 20-Nov-24 23-Dec-24 SAR67,616.45 SAR0.00 100% 0% 23-Dec-24, PUBLIC ADDRESS
VIDEO SURVEILLANCE 49 23-Nov-23 18-Jan-24 23-Dec-24 18-Feb-25 SAR81,362.63 SAR0.00 15.92% 0% 18-Feb-25, VIDEO SURVEILLANC
SACADA SYSTEM
SACA 35 20-Jan-24 28-Feb-24 18-Feb-25 05-Apr-25 SAR217,213.26 SAR0.00 0% 0% 05-Apr-25, SACADA SYSTEM
RADIO RE-BROADCASTING SYSTEM 28 29-Feb-24 01-Apr-24 05-Apr-25 07-May-25 SAR54,075.65 SAR0.00 0% 0% 07-May-25, RADIO RE-BROAD
TUNNEL PLUMBING
PL WORKS 35 02-Jan-25 11-Feb-25 02-Feb-26 15-Mar-26 SAR505,691.64 SAR0.00 0% 0% 15-Mar-26, TUNNEL
DRAINAGE SYSTEM
DRAINAG 35 02-Jan-25 11-Feb-25 02-Feb-26 15-Mar-26 SAR505,691.64 SAR0.00 0% 0% 15-Mar-26, DRAINA
TUNNEL INTERNAL
INTER ROAD WORK 42 12-Feb-25 06-Apr-25 15-Mar-26 07-May-26 SAR576,584.18 SAR0.00 0% 0% 07-May-26, TUNN
TUNNEL INTERNAL
INTER DECORATIVE WORKS 40 18-Mar-25 07-May-25 22-Apr-26 11-Jun-26 SAR1,872,204.61 SAR0.00 0% 0% 11-Jun-26, TUNN
ZONE 4 - FROM S
STA. 1+268 ~ 1+753 948 20-Oct-22 30-Apr-25 01-Aug-22 A 30-Oct-25 SAR228,099,076.46 SAR71,561,638.90 51.49% 31.37% 30-Oct-25, ZONE 4 - FRO
ENGINEERING 673 20-Oct-22 23-Jun-24 01-Aug-22 A 30-Dec-24 SAR0.00 SAR0.00 0% 0% 30-Dec-24, ENGINEERING
SITE SURVEY 14 20-Oct-22 05-Nov-22 01-Aug-22 A 04-Oct-22 A SAR0.00 SAR0.00 0% 0% 04-Oct-22 A, SITE SURVEY
SHOP DRAWINGS
DRAWIN 357 31-Dec-22 27-Jul-23 04-Jul-23 A 28-Feb-24 SAR0.00 SAR0.00 0% 0% 28-Feb-24, SHOP DRAWINGS
CIVIL/STRUCTURAL 1+268 ~1+374
CIVIL/STRU 210 31-Dec-22 16-Feb-23 04-Jul-23 A 10-Jan-24 SAR0.00 SAR0.00 0% 0% 10-Jan-24, CIVIL/STRUCTURAL 1+268 ~1+374
CIVIL/STRUCTURAL 1+374 ~1+474
CIVIL/STRU 30 11-Feb-23 30-Mar-23 04-Jul-23 A 31-Jan-24 SAR0.00 SAR0.00 0% 0% 31-Jan-24, CIVIL/STRUCTURAL 1+374 ~1+474
CIVIL/STRUCTURAL 1+474 ~1+574
CIVIL/STRU 197 25-Mar-23 15-May-23 04-Jul-23 A 14-Feb-24 SAR0.00 SAR0.00 0% 0% 14-Feb-24, CIVIL/STRUCTURAL 1+474 ~1+574
CIVIL/STRUCTURAL 1+574 ~1+674
CIVIL/STRU 232 09-May-23 26-Jun-23 04-Jul-23 A 07-Feb-24 SAR0.00 SAR0.00 0% 0% 07-Feb-24, CIVIL/STRUCTURAL 1+574 ~1+674
CIVIL/STRUCTURAL 1+674 ~1+754
CIVIL/STRU 225 06-Jun-23 27-Jul-23 04-Jul-23 A 28-Feb-24 SAR0.00 SAR0.00 0% 0% 28-Feb-24, CIVIL/STRUCTURAL 1+674 ~1+754
ARCHITECTURAL
ARCHITECT 22 06-Jun-23 04-Jul-23 31-Jan-24 26-Feb-24 SAR0.00 SAR0.00 0% 0% 26-Feb-24, ARCHITECTURAL
UTILITIES 271 08-Jul-23 30-Dec-23 25-Oct-22 A 22-May-24 SAR0.00 SAR0.00 0% 0% 22-May-24, UTILITIES
WET UTILITIES
UTILIT 271 08-Jul-23 28-Nov-23 25-Oct-22 A 22-May-24 SAR0.00 SAR0.00 0% 0% 22-May-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 22 08-Jul-23 01-Aug-23 25-Oct-22 A 13-Nov-22 A SAR0.00 SAR0.00 0% 0% 13-Nov-22 A, POTABLE WATER NETWORK BRANCH, HOUSE
GREY WAWATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 25 02-Aug-23 30-Aug-23 13-Dec-22 A 21-Feb-24 SAR0.00 SAR0.00 0% 0% 21-Feb-24, GREY WATER DISTRIBUTION NET
IRR & FF NETWORK BRANCHES & TIE IN POINTS 27 31-Aug-23 02-Oct-23 21-Feb-24 23-Mar-24 SAR0.00 SAR0.00 0% 0% 23-Mar-24, IRR & FF NETWORK BRANCHES
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 22 03-Oct-23 28-Oct-23 23-Mar-24 21-Apr-24 SAR0.00 SAR0.00 0% 0% 21-Apr-24, CHILLED WATER SUPPLY & RET
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 27 29-Oct-23 28-Nov-23 21-Apr-24 22-May-24 SAR0.00 SAR0.00 0% 0% 22-May-24, AUTOMATIC WASTE COLLECT
DRY UTILITI
UTILITIES 225 02-Aug-23 30-Dec-23 01-Nov-22 A 24-Apr-24 SAR0.00 SAR0.00 0% 0% 24-Apr-24, DRY UTILITIES
POWER 193 02-Aug-23 22-Nov-23 01-Nov-22 A 16-Mar-24 SAR0.00 SAR0.00 0% 0% 16-Mar-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 32 02-Aug-23 07-Sep-23 07-Feb-24 16-Mar-24 SAR0.00 SAR0.00 0% 0% 16-Mar-24, HIGH VOLTAGE 110 KV NETWOR
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 32 02-Aug-23 07-Sep-23 07-Feb-24 16-Mar-24 SAR0.00 SAR0.00 0% 0% 16-Mar-24, MEDIUM VOLTAGE 13.8 KV NET
LOW V VOLTAGE NETWORK 32 02-Aug-23 07-Sep-23 27-Nov-22 A 16-Mar-24 SAR0.00 SAR0.00 0% 0% 16-Mar-24, LOW VOLTAGE NETWORK
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 32 09-Sep-23 16-Oct-23 01-Nov-22 A 12-Nov-22 A SAR0.00 SAR0.00 0% 0% 12-Nov-22 A, ELECTRICAL DISTRIBUTION SYSTEM
LIGHTING SYSTEM
LIGHT 32 17-Oct-23 22-Nov-23 26-Nov-22 A 27-Dec-22 A SAR0.00 SAR0.00 0% 0% 27-Dec-22 A, LIGHTING SYSTEM
LOW CUR
CURRENT 32 23-Nov-23 30-Dec-23 16-Mar-24 24-Apr-24 SAR0.00 SAR0.00 0% 0% 24-Apr-24, LOW CURRENT
TELECOM SERVICES
TELEC 32 23-Nov-23 30-Dec-23 16-Mar-24 24-Apr-24 SAR0.00 SAR0.00 0% 0% 24-Apr-24, TELECOM SERVICES
MEP 272 02-Aug-23 23-Jun-24 07-Feb-24 30-Dec-24 SAR0.00 SAR0.00 0% 0% 30-Dec-24, MEP
TUNNEL MECHANICAL
ME WORKS 176 02-Aug-23 24-Feb-24 07-Feb-24 08-Sep-24 SAR0.00 SAR0.00 0% 0% 08-Sep-24, TUNNEL MECHANICAL WO
FIRE FIG
FIGHTING SYSTEM 88 02-Aug-23 13-Nov-23 07-Feb-24 23-May-24 SAR0.00 SAR0.00 0% 0% 23-May-24, FIRE FIGHTING SYSTEM
VENTILATION SYSTEM
VENTILA 44 31-Oct-23 20-Dec-23 09-May-24 04-Jul-24 SAR0.00 SAR0.00 0% 0% 04-Jul-24, VENTILATION SYSTEM
PUMPS INSTALLATION
I 22 21-Dec-23 15-Jan-24 04-Jul-24 30-Jul-24 SAR0.00 SAR0.00 0% 0% 30-Jul-24, PUMPS INSTALLATION
DUCTING SYSTEM 88 14-Nov-23 24-Feb-24 23-May-24 08-Sep-24 SAR0.00 SAR0.00 0% 0% 08-Sep-24, DUCTING SYSTEM
TUNNEL ELECTRICAL
EL WORKS 184 14-Nov-23 23-Jun-24 23-May-24 30-Dec-24 SAR0.00 SAR0.00 0% 0% 30-Dec-24, TUNNEL ELECTRICAL W
CABLE TRAYS
T 110 26-Nov-23 01-Apr-24 04-Jun-24 16-Oct-24 SAR0.00 SAR0.00 0% 0% 16-Oct-24, CABLE TRAYS
POWER CABLES 44 28-Jan-24 18-Mar-24 11-Aug-24 02-Oct-24 SAR0.00 SAR0.00 0% 0% 02-Oct-24, POWER CABLES
ELECTRICAL INSTALLATIONS
ELECTRI 110 08-Feb-24 23-Jun-24 22-Aug-24 30-Dec-24 SAR0.00 SAR0.00 0% 0% 30-Dec-24, ELECTRICAL INSTALLA
LOW CUR
CURRENT 132 14-Nov-23 18-Apr-24 23-May-24 30-Oct-24 SAR0.00 SAR0.00 0% 0% 30-Oct-24, LOW CURRENT
FIRE D
DETECTION AND ALARM SYSTEM 132 14-Nov-23 18-Apr-24 23-May-24 30-Oct-24 SAR0.00 SAR0.00 0% 0% 30-Oct-24, FIRE DETECTION AND AL
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 110 26-Nov-23 01-Apr-24 04-Jun-24 16-Oct-24 SAR0.00 SAR0.00 0% 0% 16-Oct-24, COMMUNICATION SYSTE
PUBLIC ADDRESS
PUBLI 66 12-Dec-23 26-Feb-24 25-Jun-24 10-Sep-24 SAR0.00 SAR0.00 0% 0% 10-Sep-24, PUBLIC ADDRESS
VIDEO SURVEILLANCE 44 24-Dec-23 12-Feb-24 07-Jul-24 27-Aug-24 SAR0.00 SAR0.00 0% 0% 27-Aug-24, VIDEO SURVEILLANCE
SACADA SYSTEM
SACA 44 04-Jan-24 24-Feb-24 18-Jul-24 08-Sep-24 SAR0.00 SAR0.00 0% 0% 08-Sep-24, SACADA SYSTEM
RADIO RE-BROADCASTING SYSTEM 44 16-Jan-24 06-Mar-24 30-Jul-24 19-Sep-24 SAR0.00 SAR0.00 0% 0% 19-Sep-24, RADIO RE-BROADCASTIN
TUNNEL PLUMBING
PL WORKS 21 28-Jan-24 20-Feb-24 11-Aug-24 04-Sep-24 SAR0.00 SAR0.00 0% 0% 04-Sep-24, TUNNEL PLUMBING WORK

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
16 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
PROCUREMENT 606 07-Jan-23 24-Jun-24 20-Nov-22 A 30-Dec-24 SAR26,495,554.75 SAR11,782,307.55 98.54% 44.47% 30-Dec-24, PROCUREMENT
CIVIL/STRUCTU
CIVIL/STRUCTURAL 300 07-Jan-23 15-Apr-23 01-Dec-22 A 07-Jan-24 SAR21,464,525.89 SAR11,782,307.55 100% 54.89% 07-Jan-24, CIVIL/STRUCTURAL
UTILITIES 325 02-Aug-23 24-Jun-24 20-Nov-22 A 13-Nov-24 SAR561,308.52 SAR0.00 31.16% 0% 13-Nov-24, UTILITIES
WET UTILITIES
UTILIT 325 02-Aug-23 19-May-24 20-Nov-22 A 13-Nov-24 SAR407,325.72 SAR0.00 26.79% 0% 13-Nov-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 238 02-Aug-23 18-Jan-24 20-Nov-22 A 03-Aug-24 SAR50,276.79 SAR0.00 73.33% 0% 03-Aug-24, POTABLE WATER NETWORK
DI PIPES
PIP 229 02-Aug-23 18-Jan-24 20-Nov-22 A 22-Jul-24 SAR5,530.45 SAR0.00 73.33% 0% 22-Jul-24, DI PIPES
HDPE PIPES 229 02-Aug-23 18-Jan-24 29-Mar-23 A 22-Jul-24 SAR6,535.98 SAR0.00 73.33% 0% 22-Jul-24, HDPE PIPES
GRP PPIPES 229 02-Aug-23 18-Jan-24 08-Jan-23 A 22-Jul-24 SAR5,027.68 SAR0.00 73.33% 0% 22-Jul-24, GRP PIPES
DI & G
GRP FITTING 229 02-Aug-23 18-Jan-24 01-May-23 A 22-Jul-24 SAR5,027.68 SAR0.00 73.33% 0% 22-Jul-24, DI & GRP FITTING
GATE VALVE 229 02-Aug-23 18-Jan-24 01-May-23 A 22-Jul-24 SAR5,027.68 SAR0.00 73.33% 0% 22-Jul-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 229 02-Aug-23 18-Jan-24 01-May-23 A 22-Jul-24 SAR4,524.91 SAR0.00 73.33% 0% 22-Jul-24, BUTTERFLAY VALVE
WATER METER
WATE 145 02-Aug-23 18-Jan-24 07-Feb-24 03-Aug-24 SAR7,541.52 SAR0.00 73.33% 0% 03-Aug-24, WATER METER
AIR RELASE
RE VALVE 229 02-Aug-23 18-Jan-24 04-Jul-23 A 22-Jul-24 SAR5,027.68 SAR0.00 73.33% 0% 22-Jul-24, AIR RELASE VALVE
WASHOUT VALVE
WASH 145 02-Aug-23 18-Jan-24 07-Feb-24 03-Aug-24 SAR6,033.22 SAR0.00 73.33% 0% 03-Aug-24, WASHOUT VALVE
GREY WAWATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 228 31-Aug-23 17-Feb-24 20-Nov-22 A 04-Aug-24 SAR30,938.06 SAR0.00 51.11% 0% 04-Aug-24, GREY WATER DISTRIBUTIO
DI PIPES
PIP 228 31-Aug-23 17-Feb-24 20-Nov-22 A 04-Aug-24 SAR5,259.47 SAR0.00 51.11% 0% 04-Aug-24, DI PIPES
HDPE PIPES 228 31-Aug-23 17-Feb-24 29-Mar-23 A 04-Aug-24 SAR5,568.85 SAR0.00 51.11% 0% 04-Aug-24, HDPE PIPES
GRP PPIPES 228 31-Aug-23 17-Feb-24 08-Jan-23 A 04-Aug-24 SAR4,021.95 SAR0.00 51.11% 0% 04-Aug-24, GRP PIPES
DI & G
GRP FITTING 228 31-Aug-23 17-Feb-24 01-May-23 A 04-Aug-24 SAR3,712.57 SAR0.00 51.11% 0% 04-Aug-24, DI & GRP FITTING
GATE VALVE 228 31-Aug-23 17-Feb-24 01-May-23 A 04-Aug-24 SAR2,165.66 SAR0.00 51.11% 0% 04-Aug-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 228 31-Aug-23 17-Feb-24 01-May-23 A 04-Aug-24 SAR3,093.81 SAR0.00 51.11% 0% 04-Aug-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 228 31-Aug-23 17-Feb-24 04-Jul-23 A 04-Aug-24 SAR3,403.19 SAR0.00 51.11% 0% 04-Aug-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 228 31-Aug-23 17-Feb-24 04-Jul-23 A 04-Aug-24 SAR3,712.57 SAR0.00 51.11% 0% 04-Aug-24, WASEHOUT VALVE
IRR & FF NETWORK BRANCHES & TIE IN POINTS 228 03-Oct-23 19-Mar-24 29-Mar-23 A 04-Sep-24 SAR55,178.66 SAR0.00 27.11% 0% 04-Sep-24, IRR & FF NETWORK BRAN
HDPE PIPES 228 03-Oct-23 19-Mar-24 29-Mar-23 A 04-Sep-24 SAR13,794.66 SAR0.00 27.11% 0% 04-Sep-24, HDPE PIPES
GATE VALVE 228 03-Oct-23 19-Mar-24 01-May-23 A 04-Sep-24 SAR5,517.87 SAR0.00 27.11% 0% 04-Sep-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 228 03-Oct-23 19-Mar-24 01-May-23 A 04-Sep-24 SAR5,517.87 SAR0.00 27.11% 0% 04-Sep-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 228 03-Oct-23 19-Mar-24 04-Jul-23 A 04-Sep-24 SAR5,517.87 SAR0.00 27.11% 0% 04-Sep-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 228 03-Oct-23 19-Mar-24 04-Jul-23 A 04-Sep-24 SAR5,517.87 SAR0.00 27.11% 0% 04-Sep-24, WASEHOUT VALVE
FIRE H
HYDRANT 228 03-Oct-23 19-Mar-24 04-Jul-23 A 04-Sep-24 SAR19,312.53 SAR0.00 27.11% 0% 04-Sep-24, FIRE HYDRANT
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 238 29-Oct-23 17-Apr-24 01-May-23 A 13-Oct-24 SAR184,162.62 SAR0.00 20% 0% 13-Oct-24, CHILLED WATER SUPPLY
MILD STEEL PIPE 145 29-Oct-23 17-Apr-24 21-Apr-24 13-Oct-24 SAR73,665.05 SAR0.00 20% 0% 13-Oct-24, MILD STEEL PIPE
MILD STEEL FITTING 145 29-Oct-23 17-Apr-24 21-Apr-24 13-Oct-24 SAR73,665.05 SAR0.00 20% 0% 13-Oct-24, MILD STEEL FITTING
GATE VALVE 228 29-Oct-23 17-Apr-24 01-May-23 A 01-Oct-24 SAR36,832.52 SAR0.00 20% 0% 01-Oct-24, GATE VALVE
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 145 29-Nov-23 19-May-24 22-May-24 13-Nov-24 SAR86,769.59 SAR0.00 5.33% 0% 13-Nov-24, AUTOMATIC WASTE CO
AUTOMATIC WASTE
AUTO 145 29-Nov-23 19-May-24 22-May-24 13-Nov-24 SAR86,769.59 SAR0.00 5.33% 0% 13-Nov-24, AUTOMATIC WASTE
DRY UTILITI
UTILITIES 177 09-Sep-23 24-Jun-24 16-Mar-24 16-Oct-24 SAR153,982.80 SAR0.00 42.73% 0% 16-Oct-24, DRY UTILITIES
POWER 151 09-Sep-23 13-May-24 16-Mar-24 15-Sep-24 SAR146,575.39 SAR0.00 44.89% 0% 15-Sep-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 145 09-Sep-23 25-Feb-24 16-Mar-24 08-Sep-24 SAR9,539.83 SAR0.00 44.89% 0% 08-Sep-24, HIGH VOLTAGE 110 KV NE
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 145 09-Sep-23 25-Feb-24 16-Mar-24 08-Sep-24 SAR122,016.98 SAR0.00 44.89% 0% 08-Sep-24, MEDIUM VOLTAGE 13.8 KV
LOW V VOLTAGE NETWORK 145 09-Sep-23 25-Feb-24 16-Mar-24 08-Sep-24 SAR15,018.58 SAR0.00 44.89% 0% 08-Sep-24, LOW VOLTAGE NETWORK
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 145 17-Oct-23 02-Apr-24 23-Mar-24 15-Sep-24 SAR0.00 SAR0.00 0% 0% 15-Sep-24, ELECTRICAL DISTRIBUTIO
LIGHTING SYSTEM
LIGHT 145 23-Nov-23 13-May-24 16-Mar-24 08-Sep-24 SAR0.00 SAR0.00 0% 0% 08-Sep-24, LIGHTING SYSTEM
LOW CUR
CURRENT 145 31-Dec-23 24-Jun-24 24-Apr-24 16-Oct-24 SAR7,407.41 SAR0.00 0% 0% 16-Oct-24, LOW CURRENT
TELECOM SERVICES
TELEC 145 31-Dec-23 24-Jun-24 24-Apr-24 16-Oct-24 SAR7,407.41 SAR0.00 0% 0% 16-Oct-24, TELECOM SERVICES
MEP 235 05-Feb-23 13-Nov-23 16-Dec-23 22-Sep-24 SAR4,469,720.33 SAR0.00 100% 0% 22-Sep-24, MEP
ARCHITECTURAL
ARCHITECTUR 114 05-Jul-23 16-Nov-23 26-Feb-24 16-Jul-24 SAR0.00 SAR0.00 0% 0% 16-Jul-24, ARCHITECTURAL
CONSTRUCTION 948 28-Jan-23 30-Apr-25 14-Aug-22 A 30-Oct-25 SAR201,603,521.72 SAR59,779,331.34 45.3% 29.65% 30-Oct-25, CONSTRUCT
GENERAL SITE ARRANGEMENT 164 28-Jan-23 16-Mar-23 03-Oct-22 A 12-Jan-23 A SAR1,302,752.37 SAR1,302,752.37 100% 100% 12-Jan-23 A, GENERAL SITE ARRANGEMENT
SITE PREPARATION
PREPA 164 28-Jan-23 16-Mar-23 03-Oct-22 A 12-Jan-23 A SAR1,302,752.37 SAR1,302,752.37 100% 100% 12-Jan-23 A, SITE PREPARATION
GEO-TECHNICAL INVESTIGATION
GEO-TECHNICA 50 11-Feb-23 09-Apr-23 14-Aug-22 A 01-Oct-22 A SAR124,077.33 SAR124,077.33 100% 100% 01-Oct-22 A, GEO-TECHNICAL INVESTIGATION
EXCAVATION & DEWATERING 478 10-Apr-23 09-Jun-24 10-Oct-22 A 09-Nov-24 SAR31,913,736.47 SAR28,374,503.10 95.99% 88.91% 09-Nov-24, EXCAVATION & DEWATE
SOIL IMPROVEMENT
IMPROVE 240 18-May-23 21-Oct-23 01-Feb-23 A 29-Feb-24 SAR9,090,247.10 SAR8,817,539.69 100% 97% 29-Feb-24, SOIL IMPROVEMENT
STRUCTURAL WORKS 849 11-Jun-23 31-Dec-24 24-Sep-22 A 06-Jul-25 SAR116,005,967.91 SAR21,160,458.86 40.31% 18.24% 06-Jul-25, STRUCTURAL WO
STA. 1+268.979
1+268. ~ 1+293.979 540 11-Jun-23 27-Dec-23 24-Sep-22 A 01-Jul-24 SAR4,763,062.04 SAR1,265,179.78 97.72% 26.56% 01-Jul-24, STA. 1+268.979 ~ 1+293.979
BASE SLAB
SL 401 11-Jun-23 17-Jul-23 24-Sep-22 A 13-Jan-24 SAR1,345,659.15 SAR1,265,179.78 100% 94.02% 13-Jan-24, BASE SLAB
COLUMN 23 18-Jul-23 13-Aug-23 14-Jan-24 08-Feb-24 SAR292,082.15 SAR0.00 100% 0% 08-Feb-24, COLUMN
TUNNEL WALLS 37 16-Jul-23 27-Aug-23 11-Jan-24 22-Feb-24 SAR518,292.28 SAR0.00 100% 0% 22-Feb-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 14-Aug-23 17-Sep-23 10-Feb-24 14-Mar-24 SAR689,465.33 SAR0.00 100% 0% 14-Mar-24, MIDDLE SLAB FOR UTILITY CUL
UTILITY C
CULVERT WALLS 25 18-Sep-23 17-Oct-23 14-Mar-24 16-Apr-24 SAR441,906.60 SAR0.00 100% 0% 16-Apr-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 18-Oct-23 29-Nov-23 16-Apr-24 29-May-24 SAR976,264.83 SAR0.00 100% 0% 29-May-24, TOP SLAB
MASS CO
CONCRETE WORK 24 30-Nov-23 27-Dec-23 29-May-24 01-Jul-24 SAR499,391.70 SAR0.00 78.23% 0% 01-Jul-24, MASS CONCRETE WORK

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
17 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
STA.1+293.9 ~ 1+313.979
STA.1+293.979 509 22-Jun-23 06-Jan-24 16-Oct-23 A 10-Jul-24 SAR4,763,062.04 SAR1,981,012.74 94.58% 41.59% 10-Jul-24, STA.1+293.979 ~ 1+313.979
BASE SLAB
SL 38 22-Jun-23 29-Jul-23 16-Oct-23 A 13-Jan-24 SAR1,345,659.15 SAR1,265,179.78 100% 94.02% 13-Jan-24, BASE SLAB
COLUMN 30 30-Jul-23 24-Aug-23 09-Nov-23 A 22-Jan-24 SAR292,082.15 SAR285,355.65 100% 97.7% 22-Jan-24, COLUMN
TUNNEL WALLS 380 27-Jul-23 07-Sep-23 09-Nov-23 A 03-Feb-24 SAR518,292.28 SAR430,477.31 100% 83.06% 03-Feb-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 25 26-Aug-23 24-Sep-23 23-Jan-24 20-Feb-24 SAR689,465.33 SAR0.00 100% 0% 20-Feb-24, MIDDLE SLAB FOR UTILITY CULV
UTILITY C
CULVERT WALLS 25 25-Sep-23 23-Oct-23 21-Feb-24 20-Mar-24 SAR441,906.60 SAR0.00 100% 0% 20-Mar-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 24-Oct-23 05-Dec-23 21-Mar-24 06-May-24 SAR976,264.83 SAR0.00 100% 0% 06-May-24, TOP SLAB
MASS COCONCRETE WORK 52 06-Dec-23 06-Jan-24 07-May-24 10-Jul-24 SAR499,391.70 SAR0.00 48.35% 0% 10-Jul-24, MASS CONCRETE WORK
STA. 1+313.979
1+313. ~ 1+333.979 157 08-Jul-23 15-Jan-24 11-Jan-24 20-Jul-24 SAR4,763,062.04 SAR0.00 92.89% 0% 20-Jul-24, STA. 1+313.979 ~ 1+333.979
BASE SLAB
SL 29 08-Jul-23 09-Aug-23 11-Jan-24 13-Feb-24 SAR1,345,659.15 SAR0.00 100% 0% 13-Feb-24, BASE SLAB
COLUMN 26 29-Jul-23 27-Aug-23 01-Feb-24 02-Mar-24 SAR292,082.15 SAR0.00 100% 0% 02-Mar-24, COLUMN
TUNNEL WALLS 37 29-Jul-23 09-Sep-23 01-Feb-24 14-Mar-24 SAR518,292.28 SAR0.00 100% 0% 14-Mar-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 25 27-Aug-23 25-Sep-23 02-Mar-24 30-Mar-24 SAR689,465.33 SAR0.00 100% 0% 30-Mar-24, MIDDLE SLAB FOR UTILITY CU
UTILITY C
CULVERT WALLS 25 26-Sep-23 24-Oct-23 31-Mar-24 01-May-24 SAR441,906.60 SAR0.00 100% 0% 01-May-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 25-Oct-23 06-Dec-23 02-May-24 13-Jun-24 SAR976,264.83 SAR0.00 100% 0% 13-Jun-24, TOP SLAB
MASS COCONCRETE WORK 27 07-Dec-23 15-Jan-24 19-Jun-24 20-Jul-24 SAR499,391.70 SAR0.00 32.23% 0% 20-Jul-24, MASS CONCRETE WORK
STA. 1+333.979~
1+333. 1+353.979 171 19-Jul-23 12-Feb-24 23-Jan-24 17-Aug-24 SAR4,846,542.15 SAR0.00 87.79% 0% 17-Aug-24, STA. 1+333.979~ 1+353.979
BASE SLAB
SL 36 19-Jul-23 29-Aug-23 23-Jan-24 04-Mar-24 SAR1,348,431.32 SAR0.00 100% 0% 04-Mar-24, BASE SLAB
COLUMN 24 20-Aug-23 16-Sep-23 24-Feb-24 21-Mar-24 SAR292,082.15 SAR0.00 100% 0% 21-Mar-24, COLUMN
TUNNEL WALLS 37 20-Aug-23 02-Oct-23 24-Feb-24 06-Apr-24 SAR518,292.28 SAR0.00 100% 0% 06-Apr-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 18-Sep-23 23-Oct-23 24-Mar-24 30-Apr-24 SAR770,173.27 SAR0.00 100% 0% 30-Apr-24, MIDDLE SLAB FOR UTILITY CU
UTILITY C
CULVERT WALLS 25 24-Oct-23 21-Nov-23 01-May-24 29-May-24 SAR441,906.60 SAR0.00 100% 0% 29-May-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 22-Nov-23 03-Jan-24 30-May-24 16-Jul-24 SAR976,264.83 SAR0.00 90.54% 0% 16-Jul-24, TOP SLAB
MASS COCONCRETE WORK 24 16-Jan-24 12-Feb-24 20-Jul-24 17-Aug-24 SAR499,391.70 SAR0.00 0% 0% 17-Aug-24, MASS CONCRETE WORK
STA. 1+353.979
1+353. ~ 1+373.979 177 31-Jul-23 02-Mar-24 04-Feb-24 04-Sep-24 SAR4,843,769.98 SAR0.00 77.52% 0% 04-Sep-24, STA. 1+353.979 ~ 1+373.979
BASE SLAB
SL 29 31-Jul-23 02-Sep-23 04-Feb-24 07-Mar-24 SAR1,345,659.15 SAR0.00 100% 0% 07-Mar-24, BASE SLAB
COLUMN 23 03-Sep-23 30-Sep-23 09-Mar-24 03-Apr-24 SAR292,082.15 SAR0.00 100% 0% 03-Apr-24, COLUMN
TUNNEL WALLS 37 31-Aug-23 14-Oct-23 06-Mar-24 21-Apr-24 SAR518,292.28 SAR0.00 100% 0% 21-Apr-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 01-Oct-23 04-Nov-23 04-Apr-24 12-May-24 SAR770,173.27 SAR0.00 100% 0% 12-May-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 05-Nov-23 03-Dec-23 13-May-24 10-Jun-24 SAR441,906.60 SAR0.00 100% 0% 10-Jun-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 04-Dec-23 15-Jan-24 11-Jun-24 28-Jul-24 SAR976,264.83 SAR0.00 39.59% 0% 28-Jul-24, TOP SLAB
MASS COCONCRETE WORK 33 16-Jan-24 02-Mar-24 29-Jul-24 04-Sep-24 SAR499,391.70 SAR0.00 0% 0% 04-Sep-24, MASS CONCRETE WORK
STA. 1+373.979
1+373. ~ 1+393.979 183 12-Aug-23 20-Mar-24 15-Feb-24 24-Sep-24 SAR4,843,769.98 SAR0.00 69.53% 0% 24-Sep-24, STA. 1+373.979 ~ 1+393.979
BASE SLAB
SL 29 12-Aug-23 13-Sep-23 15-Feb-24 19-Mar-24 SAR1,345,659.15 SAR0.00 100% 0% 19-Mar-24, BASE SLAB
COLUMN 23 14-Sep-23 11-Oct-23 20-Mar-24 18-Apr-24 SAR292,082.15 SAR0.00 100% 0% 18-Apr-24, COLUMN
TUNNEL WALLS 37 12-Sep-23 25-Oct-23 18-Mar-24 02-May-24 SAR518,292.28 SAR0.00 100% 0% 02-May-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 12-Oct-23 15-Nov-23 20-Apr-24 23-May-24 SAR770,173.27 SAR0.00 100% 0% 23-May-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 16-Nov-23 14-Dec-23 25-May-24 26-Jun-24 SAR441,906.60 SAR0.00 100% 0% 26-Jun-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 16-Dec-23 27-Jan-24 27-Jun-24 08-Aug-24 SAR976,264.83 SAR0.00 0% 0% 08-Aug-24, TOP SLAB
MASS COCONCRETE WORK 39 28-Jan-24 20-Mar-24 10-Aug-24 24-Sep-24 SAR499,391.70 SAR0.00 0% 0% 24-Sep-24, MASS CONCRETE WORK
STA.1+393.979 ~ 1+413.979
STA.1+393.9 289 23-Aug-23 08-Apr-24 02-Nov-23 A 13-Oct-24 SAR4,846,542.15 SAR1,265,179.78 67.63% 26.1% 13-Oct-24, STA.1+393.979 ~ 1+413.979
BASE SLAB
SL 109 23-Aug-23 04-Oct-23 02-Nov-23 A 07-Mar-24 SAR1,348,431.32 SAR1,265,179.78 100% 93.83% 07-Mar-24, BASE SLAB
COLUMN 24 25-Sep-23 22-Oct-23 27-Feb-24 25-Mar-24 SAR292,082.15 SAR0.00 100% 0% 25-Mar-24, COLUMN
TUNNEL WALLS 37 25-Sep-23 06-Nov-23 27-Feb-24 13-Apr-24 SAR518,292.28 SAR0.00 100% 0% 13-Apr-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 24-Oct-23 27-Nov-23 27-Mar-24 04-May-24 SAR770,173.27 SAR0.00 100% 0% 04-May-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 28-Nov-23 26-Dec-23 05-May-24 02-Jun-24 SAR441,906.60 SAR0.00 78.95% 0% 02-Jun-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 27-Dec-23 07-Feb-24 03-Jun-24 20-Jul-24 SAR976,264.83 SAR0.00 0% 0% 20-Jul-24, TOP SLAB
MASS COCONCRETE WORK 72 08-Feb-24 08-Apr-24 21-Jul-24 13-Oct-24 SAR499,391.70 SAR0.00 0% 0% 13-Oct-24, MASS CONCRETE WORK
STA. 1+413.979
1+413. ~ 1+433.979 343 04-Sep-23 30-Apr-24 17-Sep-23 A 31-Oct-24 SAR4,846,542.15 SAR2,018,581.90 63.8% 41.65% 31-Oct-24, STA. 1+413.979 ~ 1+433.97
BASE SLAB
SL 147 04-Sep-23 16-Oct-23 17-Sep-23 A 07-Mar-24 SAR1,348,431.32 SAR1,265,179.78 100% 93.83% 07-Mar-24, BASE SLAB
COLUMN 35 07-Oct-23 02-Nov-23 28-Oct-23 A 13-Dec-23 A SAR292,082.15 SAR292,082.15 100% 100% 13-Dec-23 A, COLUMN
TUNNEL WALLS 115 07-Oct-23 18-Nov-23 28-Oct-23 A 11-Mar-24 SAR518,292.28 SAR461,319.97 100% 89.01% 11-Mar-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 05-Nov-23 09-Dec-23 09-Mar-24 15-Apr-24 SAR770,173.27 SAR0.00 100% 0% 15-Apr-24, MIDDLE SLAB FOR UTILITY CU
UTILITY C
CULVERT WALLS 25 10-Dec-23 07-Jan-24 16-Apr-24 14-May-24 SAR441,906.60 SAR0.00 36.91% 0% 14-May-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 08-Jan-24 19-Feb-24 15-May-24 01-Jul-24 SAR976,264.83 SAR0.00 0% 0% 01-Jul-24, TOP SLAB
MASS COCONCRETE WORK 104 20-Feb-24 30-Apr-24 02-Jul-24 31-Oct-24 SAR499,391.70 SAR0.00 0% 0% 31-Oct-24, MASS CONCRETE WORK
STA. 1+433.979~
1+433. 1+453.979 345 16-Sep-23 19-May-24 16-Sep-23 A 19-Nov-24 SAR4,846,542.15 SAR1,265,179.78 59.92% 26.1% 19-Nov-24, STA. 1+433.979~ 1+453.97
BASE SLAB
SL 133 16-Sep-23 28-Oct-23 16-Sep-23 A 07-Mar-24 SAR1,348,431.32 SAR1,265,179.78 100% 93.83% 07-Mar-24, BASE SLAB
COLUMN 24 18-Oct-23 14-Nov-23 27-Feb-24 25-Mar-24 SAR292,082.15 SAR0.00 100% 0% 25-Mar-24, COLUMN
TUNNEL WALLS 37 18-Oct-23 29-Nov-23 27-Feb-24 13-Apr-24 SAR518,292.28 SAR0.00 100% 0% 13-Apr-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 16-Nov-23 20-Dec-23 27-Mar-24 04-May-24 SAR770,173.27 SAR0.00 96.79% 0% 04-May-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 21-Dec-23 18-Jan-24 05-May-24 02-Jun-24 SAR441,906.60 SAR0.00 0% 0% 02-Jun-24, UTILITY CULVERT WALLS

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
18 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
TOP SLAB
SLA 37 20-Jan-24 02-Mar-24 03-Jun-24 20-Jul-24 SAR976,264.83 SAR0.00 0% 0% 20-Jul-24, TOP SLAB
MASS COCONCRETE WORK 104 03-Mar-24 19-May-24 21-Jul-24 19-Nov-24 SAR499,391.70 SAR0.00 0% 0% 19-Nov-24, MASS CONCRETE WOR
STA. 1+453.979~
1+453. 1+473.979 374 28-Sep-23 06-Jun-24 06-Sep-23 A 08-Dec-24 SAR4,846,542.15 SAR1,977,860.95 57.25% 40.81% 08-Dec-24, STA. 1+453.979~ 1+473.9
BASE SLAB
SL 146 28-Sep-23 08-Nov-23 06-Sep-23 A 07-Mar-24 SAR1,348,431.32 SAR1,265,179.78 100% 93.83% 07-Mar-24, BASE SLAB
COLUMN 116 30-Oct-23 26-Nov-23 02-Nov-23 A 16-Mar-24 SAR292,082.15 SAR289,309.98 100% 99.05% 16-Mar-24, COLUMN
TUNNEL WALLS 121 30-Oct-23 11-Dec-23 02-Nov-23 A 21-Mar-24 SAR518,292.28 SAR423,371.18 100% 81.69% 21-Mar-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 28-Nov-23 01-Jan-24 17-Mar-24 23-Apr-24 SAR770,173.27 SAR0.00 79.99% 0% 23-Apr-24, MIDDLE SLAB FOR UTILITY CU
UTILITY CCULVERT WALLS 25 02-Jan-24 30-Jan-24 24-Apr-24 22-May-24 SAR441,906.60 SAR0.00 0% 0% 22-May-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 31-Jan-24 13-Mar-24 23-May-24 09-Jul-24 SAR976,264.83 SAR0.00 0% 0% 09-Jul-24, TOP SLAB
MASS COCONCRETE WORK 129 14-Mar-24 06-Jun-24 10-Jul-24 08-Dec-24 SAR499,391.70 SAR0.00 0% 0% 08-Dec-24, MASS CONCRETE WOR
STA. 1+473.979~
1+473. 1+493.979 386 10-Oct-23 29-Jun-24 13-Aug-23 A 25-Dec-24 SAR4,846,542.15 SAR1,511,612.56 45.52% 31.19% 25-Dec-24, STA. 1+473.979~ 1+493.9
BASE SLAB
SL 143 10-Oct-23 20-Nov-23 13-Aug-23 A 07-Mar-24 SAR1,348,431.32 SAR1,265,179.78 100% 93.83% 07-Mar-24, BASE SLAB
COLUMN 41 11-Nov-23 07-Dec-23 09-Sep-23 A 23-Mar-24 SAR292,082.15 SAR89,858.45 100% 30.76% 23-Mar-24, COLUMN
TUNNEL WALLS 165 11-Nov-23 23-Dec-23 30-Sep-23 A 13-Apr-24 SAR518,292.28 SAR156,574.34 93.59% 30.21% 13-Apr-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 10-Dec-23 13-Jan-24 27-Mar-24 04-May-24 SAR770,173.27 SAR0.00 10.48% 0% 04-May-24, MIDDLE SLAB FOR UTILITY C
UTILITY CCULVERT WALLS 25 14-Jan-24 11-Feb-24 05-May-24 02-Jun-24 SAR441,906.60 SAR0.00 0% 0% 02-Jun-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 12-Feb-24 25-Mar-24 03-Jun-24 20-Jul-24 SAR976,264.83 SAR0.00 0% 0% 20-Jul-24, TOP SLAB
MASS COCONCRETE WORK 135 26-Mar-24 29-Jun-24 21-Jul-24 25-Dec-24 SAR499,391.70 SAR0.00 0% 0% 25-Dec-24, MASS CONCRETE WOR
STA. 1+493.979
1+493. ~ 1+513.979 380 22-Oct-23 17-Jul-24 13-Aug-23 A 13-Jan-25 SAR4,791,483.10 SAR1,782,995.30 43.07% 37.21% 13-Jan-25, STA. 1+493.979 ~ 1+513.
BASE SLAB
SL 39 22-Oct-23 02-Dec-23 13-Aug-23 A 07-Mar-24 SAR1,348,431.32 SAR1,265,179.78 100% 93.83% 07-Mar-24, BASE SLAB
COLUMN 24 22-Nov-23 19-Dec-23 27-Feb-24 25-Mar-24 SAR292,082.15 SAR0.00 99.46% 0% 25-Mar-24, COLUMN
TUNNEL WALLS 124 22-Nov-23 03-Jan-24 18-Oct-23 A 11-Mar-24 SAR518,292.28 SAR461,319.97 81.99% 89.01% 11-Mar-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 134 21-Dec-23 24-Jan-24 25-Nov-23 A 01-May-24 SAR770,173.27 SAR56,495.56 0% 7.34% 01-May-24, MIDDLE SLAB FOR UTILITY C
UTILITY CCULVERT WALLS 25 25-Jan-24 22-Feb-24 02-May-24 30-May-24 SAR386,847.55 SAR0.00 0% 0% 30-May-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 24-Feb-24 06-Apr-24 01-Jun-24 17-Jul-24 SAR976,264.83 SAR0.00 0% 0% 17-Jul-24, TOP SLAB
MASS COCONCRETE WORK 153 07-Apr-24 17-Jul-24 18-Jul-24 13-Jan-25 SAR499,391.70 SAR0.00 0% 0% 13-Jan-25, MASS CONCRETE WOR
STA. 1+513.979
1+513. ~ 1+533.979 354 02-Nov-23 04-Aug-24 30-Jul-23 A 30-Jan-25 SAR4,846,542.15 SAR1,519,021.62 34.85% 31.34% 30-Jan-25, STA. 1+513.979 ~ 1+533
BASE SLAB
SL 41 02-Nov-23 13-Dec-23 30-Jul-23 A 07-Mar-24 SAR1,348,431.32 SAR1,265,179.78 100% 93.83% 07-Mar-24, BASE SLAB
COLUMN 23 14-Dec-23 09-Jan-24 26-Nov-23 A 03-Apr-24 SAR292,082.15 SAR96,387.11 11.17% 33% 03-Apr-24, COLUMN
TUNNEL WALLS 108 04-Dec-23 15-Jan-24 26-Nov-23 A 13-Apr-24 SAR518,292.28 SAR157,454.73 59.39% 30.38% 13-Apr-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 02-Jan-24 05-Feb-24 27-Mar-24 04-May-24 SAR770,173.27 SAR0.00 0% 0% 04-May-24, MIDDLE SLAB FOR UTILITY C
UTILITY CCULVERT WALLS 25 06-Feb-24 05-Mar-24 05-May-24 02-Jun-24 SAR441,906.60 SAR0.00 0% 0% 02-Jun-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 06-Mar-24 21-Apr-24 03-Jun-24 20-Jul-24 SAR976,264.83 SAR0.00 0% 0% 20-Jul-24, TOP SLAB
MASS COCONCRETE WORK 166 22-Apr-24 04-Aug-24 21-Jul-24 30-Jan-25 SAR499,391.70 SAR0.00 0% 0% 30-Jan-25, MASS CONCRETE WO
STA. 1+533.979
1+533. ~ 1+553.979 420 14-Nov-23 22-Aug-24 18-Jul-23 A 18-Feb-25 SAR4,846,542.15 SAR2,018,581.90 26.1% 41.65% 18-Feb-25, STA. 1+533.979 ~ 1+55
BASE SLAB
SL 74 14-Nov-23 25-Dec-23 18-Jul-23 A 07-Mar-24 SAR1,348,431.32 SAR1,265,179.78 93.83% 93.83% 07-Mar-24, BASE SLAB
COLUMN 23 26-Dec-23 21-Jan-24 08-Oct-23 A 06-Nov-23 A SAR292,082.15 SAR292,082.15 0% 100% 06-Nov-23 A, COLUMN
TUNNEL WALLS 133 16-Dec-23 27-Jan-24 08-Oct-23 A 11-Mar-24 SAR518,292.28 SAR461,319.97 0% 89.01% 11-Mar-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 22-Jan-24 25-Feb-24 04-Apr-24 12-May-24 SAR770,173.27 SAR0.00 0% 0% 12-May-24, MIDDLE SLAB FOR UTILITY C
UTILITY CCULVERT WALLS 25 26-Feb-24 25-Mar-24 13-May-24 10-Jun-24 SAR441,906.60 SAR0.00 0% 0% 10-Jun-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 26-Mar-24 11-May-24 11-Jun-24 28-Jul-24 SAR976,264.83 SAR0.00 0% 0% 28-Jul-24, TOP SLAB
MASS COCONCRETE WORK 175 12-May-24 22-Aug-24 29-Jul-24 18-Feb-25 SAR499,391.70 SAR0.00 0% 0% 18-Feb-25, MASS CONCRETE WO
STA. 1+553.979~
1+553 1+573.979 321 16-Nov-23 01-Sep-24 22-Jul-23 A 27-Feb-25 SAR4,846,542.15 SAR1,265,179.78 25.22% 26.1% 27-Feb-25, STA. 1+553.979~ 1+57
BASE SLAB
SL 73 16-Nov-23 27-Dec-23 22-Jul-23 A 07-Mar-24 SAR1,348,431.32 SAR1,265,179.78 90.65% 93.83% 07-Mar-24, BASE SLAB
COLUMN 23 28-Dec-23 23-Jan-24 09-Mar-24 03-Apr-24 SAR292,082.15 SAR0.00 0% 0% 03-Apr-24, COLUMN
TUNNEL WALLS 37 18-Dec-23 29-Jan-24 27-Feb-24 13-Apr-24 SAR518,292.28 SAR0.00 0% 0% 13-Apr-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 46 06-Jan-24 27-Feb-24 17-Mar-24 12-May-24 SAR770,173.27 SAR0.00 0% 0% 12-May-24, MIDDLE SLAB FOR UTILITY C
UTILITY CCULVERT WALLS 25 18-Feb-24 17-Mar-24 02-May-24 30-May-24 SAR441,906.60 SAR0.00 0% 0% 30-May-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 07-Mar-24 22-Apr-24 21-May-24 07-Jul-24 SAR976,264.83 SAR0.00 0% 0% 07-Jul-24, TOP SLAB
MASS COCONCRETE WORK 201 23-Apr-24 01-Sep-24 08-Jul-24 27-Feb-25 SAR499,391.70 SAR0.00 0% 0% 27-Feb-25, MASS CONCRETE WO
STA. 1+573.979-~
1+573. 1+593.979 425 28-Nov-23 10-Sep-24 17-Jul-23 A 09-Mar-25 SAR4,846,542.15 SAR2,018,581.90 19.74% 41.65% 09-Mar-25, STA. 1+573.979-~ 1+5
BASE SLAB
SL 82 28-Nov-23 08-Jan-24 17-Jul-23 A 07-Mar-24 SAR1,348,431.32 SAR1,265,179.78 70.97% 93.83% 07-Mar-24, BASE SLAB
COLUMN 126 09-Jan-24 04-Feb-24 09-Sep-23 A 25-Oct-23 A SAR292,082.15 SAR292,082.15 0% 100% 25-Oct-23 A, COLUMN
TUNNEL WALLS 122 30-Dec-23 10-Feb-24 26-Aug-23 A 11-Mar-24 SAR518,292.28 SAR461,319.97 0% 89.01% 11-Mar-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 05-Feb-24 10-Mar-24 09-Mar-24 15-Apr-24 SAR770,173.27 SAR0.00 0% 0% 15-Apr-24, MIDDLE SLAB FOR UTILITY CU
UTILITY CCULVERT WALLS 25 11-Mar-24 08-Apr-24 16-Apr-24 14-May-24 SAR441,906.60 SAR0.00 0% 0% 14-May-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 13-Apr-24 25-May-24 15-May-24 01-Jul-24 SAR976,264.83 SAR0.00 0% 0% 01-Jul-24, TOP SLAB
MASS COCONCRETE WORK 214 26-May-24 10-Sep-24 02-Jul-24 09-Mar-25 SAR499,391.70 SAR0.00 0% 0% 09-Mar-25, MASS CONCRETE W
STA. 1+593.979
1+593. ~ 1+613.979 323 10-Dec-23 19-Sep-24 27-Feb-24 18-Mar-25 SAR4,846,542.15 SAR0.00 7.13% 0% 18-Mar-25, STA. 1+593.979 ~ 1+6
BASE SLAB
SL 36 10-Dec-23 20-Jan-24 27-Feb-24 08-Apr-24 SAR1,348,431.32 SAR0.00 25.62% 0% 08-Apr-24, BASE SLAB
COLUMN 23 21-Jan-24 15-Feb-24 13-Apr-24 08-May-24 SAR292,082.15 SAR0.00 0% 0% 08-May-24, COLUMN
TUNNEL WALLS 37 10-Jan-24 21-Feb-24 30-Mar-24 14-May-24 SAR518,292.28 SAR0.00 0% 0% 14-May-24, TUNNEL WALLS

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
19 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
MIDDLE SLAB FOR UTILITY CULVERT 30 17-Feb-24 21-Mar-24 09-May-24 12-Jun-24 SAR770,173.27 SAR0.00 0% 0% 12-Jun-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 23-Mar-24 23-Apr-24 13-Jun-24 16-Jul-24 SAR441,906.60 SAR0.00 0% 0% 16-Jul-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 24-Apr-24 05-Jun-24 17-Jul-24 28-Aug-24 SAR976,264.83 SAR0.00 0% 0% 28-Aug-24, TOP SLAB
MASS COCONCRETE WORK 172 06-Jun-24 19-Sep-24 29-Aug-24 18-Mar-25 SAR499,391.70 SAR0.00 0% 0% 18-Mar-25, MASS CONCRETE W
STA. 1+613.979
1+613. ~ 1+633.979 321 21-Dec-23 30-Sep-24 10-Mar-24 27-Mar-25 SAR4,846,542.15 SAR0.00 0% 0% 27-Mar-25, STA. 1+613.979 ~ 1+6
BASE SLAB
SL 36 21-Dec-23 31-Jan-24 10-Mar-24 23-Apr-24 SAR1,348,431.32 SAR0.00 0% 0% 23-Apr-24, BASE SLAB
COLUMN 23 22-Jan-24 17-Feb-24 14-Apr-24 09-May-24 SAR292,082.15 SAR0.00 0% 0% 09-May-24, COLUMN
TUNNEL WALLS 37 22-Jan-24 04-Mar-24 14-Apr-24 26-May-24 SAR518,292.28 SAR0.00 0% 0% 26-May-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 20-Feb-24 25-Mar-24 13-May-24 20-Jun-24 SAR770,173.27 SAR0.00 0% 0% 20-Jun-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 26-Mar-24 27-Apr-24 22-Jun-24 20-Jul-24 SAR441,906.60 SAR0.00 0% 0% 20-Jul-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 28-Apr-24 09-Jun-24 21-Jul-24 01-Sep-24 SAR976,264.83 SAR0.00 0% 0% 01-Sep-24, TOP SLAB
MASS COCONCRETE WORK 177 10-Jun-24 30-Sep-24 02-Sep-24 27-Mar-25 SAR499,391.70 SAR0.00 0% 0% 27-Mar-25, MASS CONCRETE W
STA. 1+633.979
1+633. ~ 1+653.979 327 02-Jan-24 19-Oct-24 21-Mar-24 20-Apr-25 SAR4,846,542.15 SAR0.00 0% 0% 20-Apr-25, STA. 1+633.979 ~ 1+
BASE SLAB
SL 36 02-Jan-24 12-Feb-24 21-Mar-24 05-May-24 SAR1,348,431.32 SAR0.00 0% 0% 05-May-24, BASE SLAB
COLUMN 23 03-Feb-24 28-Feb-24 25-Apr-24 21-May-24 SAR292,082.15 SAR0.00 0% 0% 21-May-24, COLUMN
TUNNEL WALLS 37 03-Feb-24 16-Mar-24 25-Apr-24 06-Jun-24 SAR518,292.28 SAR0.00 0% 0% 06-Jun-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 03-Mar-24 06-Apr-24 25-May-24 02-Jul-24 SAR770,173.27 SAR0.00 0% 0% 02-Jul-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 07-Apr-24 08-May-24 03-Jul-24 31-Jul-24 SAR441,906.60 SAR0.00 0% 0% 31-Jul-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 09-May-24 25-Jun-24 01-Aug-24 12-Sep-24 SAR976,264.83 SAR0.00 0% 0% 12-Sep-24, TOP SLAB
MASS COCONCRETE WORK 183 26-Jun-24 19-Oct-24 14-Sep-24 20-Apr-25 SAR499,391.70 SAR0.00 0% 0% 20-Apr-25, MASS CONCRETE W
STA. 1+653.979
1+653. ~ 1+673.979 332 14-Jan-24 05-Nov-24 02-Apr-24 07-May-25 SAR4,846,542.15 SAR0.00 0% 0% 07-May-25, STA. 1+653.979 ~ 1
BASE SLAB
SL 39 14-Jan-24 27-Feb-24 02-Apr-24 20-May-24 SAR1,348,431.32 SAR0.00 0% 0% 20-May-24, BASE SLAB
COLUMN 23 14-Feb-24 11-Mar-24 07-May-24 02-Jun-24 SAR292,082.15 SAR0.00 0% 0% 02-Jun-24, COLUMN
TUNNEL WALLS 37 14-Feb-24 27-Mar-24 07-May-24 23-Jun-24 SAR518,292.28 SAR0.00 0% 0% 23-Jun-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 14-Mar-24 21-Apr-24 05-Jun-24 14-Jul-24 SAR770,173.27 SAR0.00 0% 0% 14-Jul-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 22-Apr-24 20-May-24 15-Jul-24 12-Aug-24 SAR441,906.60 SAR0.00 0% 0% 12-Aug-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 21-May-24 07-Jul-24 13-Aug-24 25-Sep-24 SAR976,264.83 SAR0.00 0% 0% 25-Sep-24, TOP SLAB
MASS COCONCRETE WORK 188 08-Jul-24 05-Nov-24 26-Sep-24 07-May-25 SAR499,391.70 SAR0.00 0% 0% 07-May-25, MASS CONCRETE
STA. 1+673.979~
1+673. 1+693.979 338 25-Jan-24 24-Nov-24 17-Apr-24 26-May-25 SAR4,846,542.15 SAR0.00 0% 0% 26-May-25, STA. 1+673.979~ 1
BASE SLAB
SL 36 25-Jan-24 06-Mar-24 17-Apr-24 28-May-24 SAR1,348,431.32 SAR0.00 0% 0% 28-May-24, BASE SLAB
COLUMN 23 26-Feb-24 23-Mar-24 19-May-24 13-Jun-24 SAR292,082.15 SAR0.00 0% 0% 13-Jun-24, COLUMN
TUNNEL WALLS 37 26-Feb-24 08-Apr-24 19-May-24 04-Jul-24 SAR518,292.28 SAR0.00 0% 0% 04-Jul-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 26-Mar-24 02-May-24 22-Jun-24 25-Jul-24 SAR770,173.27 SAR0.00 0% 0% 25-Jul-24, MIDDLE SLAB FOR UTILITY
UTILITY C
CULVERT WALLS 25 04-May-24 01-Jun-24 27-Jul-24 24-Aug-24 SAR441,906.60 SAR0.00 0% 0% 24-Aug-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 02-Jun-24 18-Jul-24 25-Aug-24 07-Oct-24 SAR976,264.83 SAR0.00 0% 0% 07-Oct-24, TOP SLAB
MASS COCONCRETE WORK 194 20-Jul-24 24-Nov-24 08-Oct-24 26-May-25 SAR499,391.70 SAR0.00 0% 0% 26-May-25, MASS CONCRETE
STA. 1+693.979
1+693. ~ 1+713.979 168 06-Feb-24 27-Aug-24 29-Apr-24 16-Nov-24 SAR4,846,542.15 SAR0.00 0% 0% 16-Nov-24, STA. 1+693.979 ~ 1+713.9
BASE SLAB
SL 36 06-Feb-24 18-Mar-24 29-Apr-24 09-Jun-24 SAR1,348,431.32 SAR0.00 0% 0% 09-Jun-24, BASE SLAB
COLUMN 23 09-Mar-24 03-Apr-24 30-May-24 30-Jun-24 SAR292,082.15 SAR0.00 0% 0% 30-Jun-24, COLUMN
TUNNEL WALLS 37 09-Mar-24 23-Apr-24 30-May-24 16-Jul-24 SAR518,292.28 SAR0.00 0% 0% 16-Jul-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 07-Apr-24 14-May-24 03-Jul-24 06-Aug-24 SAR770,173.27 SAR0.00 0% 0% 06-Aug-24, MIDDLE SLAB FOR UTILITY
UTILITY C
CULVERT WALLS 25 15-May-24 12-Jun-24 07-Aug-24 04-Sep-24 SAR441,906.60 SAR0.00 0% 0% 04-Sep-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 13-Jun-24 30-Jul-24 05-Sep-24 19-Oct-24 SAR976,264.83 SAR0.00 0% 0% 19-Oct-24, TOP SLAB
MASS COCONCRETE WORK 24 31-Jul-24 27-Aug-24 20-Oct-24 16-Nov-24 SAR499,391.70 SAR0.00 0% 0% 16-Nov-24, MASS CONCRETE WOR
STA. 1+713.979
1+713. ~1+733.979 492 18-Feb-24 22-Dec-24 14-Nov-23 A 26-Jun-25 SAR4,846,542.15 SAR51,851.69 0% 1.07% 26-Jun-25, STA. 1+713.979 ~1
BASE SLAB
SL 184 18-Feb-24 30-Mar-24 14-Nov-23 A 23-Jun-24 SAR1,348,431.32 SAR51,851.69 0% 3.85% 23-Jun-24, BASE SLAB
COLUMN 23 20-Mar-24 18-Apr-24 09-Jun-24 09-Jul-24 SAR292,082.15 SAR0.00 0% 0% 09-Jul-24, COLUMN
TUNNEL WALLS 37 20-Mar-24 05-May-24 09-Jun-24 25-Jul-24 SAR518,292.28 SAR0.00 0% 0% 25-Jul-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 22-Apr-24 26-May-24 13-Jul-24 15-Aug-24 SAR770,173.27 SAR0.00 0% 0% 15-Aug-24, MIDDLE SLAB FOR UTILIT
UTILITY C
CULVERT WALLS 25 27-May-24 29-Jun-24 17-Aug-24 14-Sep-24 SAR441,906.60 SAR0.00 0% 0% 14-Sep-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 30-Jun-24 11-Aug-24 15-Sep-24 28-Oct-24 SAR976,264.83 SAR0.00 0% 0% 28-Oct-24, TOP SLAB
MASS COCONCRETE WORK 24 25-Nov-24 22-Dec-24 26-May-25 26-Jun-25 SAR499,391.70 SAR0.00 0% 0% 26-Jun-25, MASS CONCRETE
STA. 1+733.979~
1+733. 1+753.979 500 29-Feb-24 31-Dec-24 14-Nov-23 A 06-Jul-25 SAR4,846,542.15 SAR1,219,639.19 0% 25.17% 06-Jul-25, STA. 1+733.979~ 1
BASE SLAB
SL 176 29-Feb-24 14-Apr-24 14-Nov-23 A 09-Jun-24 SAR1,348,431.32 SAR1,219,639.19 0% 90.45% 09-Jun-24, BASE SLAB
COLUMN 24 01-Apr-24 01-May-24 30-May-24 01-Jul-24 SAR292,082.15 SAR0.00 0% 0% 01-Jul-24, COLUMN
TUNNEL WALLS 37 01-Apr-24 16-May-24 30-May-24 16-Jul-24 SAR518,292.28 SAR0.00 0% 0% 16-Jul-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 04-May-24 06-Jun-24 03-Jul-24 06-Aug-24 SAR770,173.27 SAR0.00 0% 0% 06-Aug-24, MIDDLE SLAB FOR UTILITY
UTILITY C
CULVERT WALLS 25 08-Jun-24 10-Jul-24 07-Aug-24 04-Sep-24 SAR441,906.60 SAR0.00 0% 0% 04-Sep-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 11-Jul-24 22-Aug-24 05-Sep-24 19-Oct-24 SAR976,264.83 SAR0.00 0% 0% 19-Oct-24, TOP SLAB
MASS COCONCRETE WORK 216 24-Aug-24 31-Dec-24 20-Oct-24 06-Jul-25 SAR499,391.70 SAR0.00 0% 0% 06-Jul-25, MASS CONCRETE
EGRESS STAIR-6
STAIR (ZONE-4) 236 30-Sep-23 08-Jul-24 27-Feb-24 07-Dec-24 SAR2,352,338.08 SAR0.00 32.78% 0% 07-Dec-24, EGRESS STAIR-6 (ZONE
WALL AND 11ST FLIGHT 31 30-Sep-23 04-Nov-23 27-Feb-24 02-Apr-24 SAR544,958.40 SAR0.00 100% 0% 02-Apr-24, WALL AND 1ST FLIGHT

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
20 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
WALL AND 2 2ND FLIGHT 17 05-Nov-23 23-Nov-23 02-Apr-24 25-Apr-24 SAR111,087.10 SAR0.00 100% 0% 25-Apr-24, WALL AND 2ND FLIGHT
WALL AND 3 3RD FLIGHT 17 25-Nov-23 13-Dec-23 25-Apr-24 15-May-24 SAR111,087.10 SAR0.00 100% 0% 15-May-24, WALL AND 3RD FLIGHT
WALL AND 4 4TH FLIGHT 17 14-Dec-23 02-Jan-24 15-May-24 04-Jun-24 SAR111,087.10 SAR0.00 3.46% 0% 04-Jun-24, WALL AND 4TH FLIGHT
WALL AND 5 5TH FLIGHT 17 03-Jan-24 22-Jan-24 04-Jun-24 29-Jun-24 SAR111,087.10 SAR0.00 0% 0% 29-Jun-24, WALL AND 5TH FLIGHT
WALL AND 6 6TH FLIGHT 17 23-Jan-24 11-Feb-24 29-Jun-24 18-Jul-24 SAR111,087.10 SAR0.00 0% 0% 18-Jul-24, WALL AND 6TH FLIGHT
WALL AND 7 7TH FLIGHT 17 12-Feb-24 02-Mar-24 18-Jul-24 07-Aug-24 SAR111,087.10 SAR0.00 0% 0% 07-Aug-24, WALL AND 7TH FLIGHT
WALL AND 8 8TH FLIGHT 17 03-Mar-24 21-Mar-24 07-Aug-24 27-Aug-24 SAR111,087.10 SAR0.00 0% 0% 27-Aug-24, WALL AND 8TH FLIGHT
WALL AND 9 9TH FLIGHT 17 23-Mar-24 14-Apr-24 27-Aug-24 16-Sep-24 SAR111,087.10 SAR0.00 0% 0% 16-Sep-24, WALL AND 9TH FLIGHT
WALL AND 1 10TH FLIGHT 17 15-Apr-24 04-May-24 16-Sep-24 07-Oct-24 SAR111,087.10 SAR0.00 0% 0% 07-Oct-24, WALL AND 10TH FLIGHT
WALL AND 1 11TH FLIGHT 17 05-May-24 23-May-24 07-Oct-24 27-Oct-24 SAR111,087.10 SAR0.00 0% 0% 27-Oct-24, WALL AND 11TH FLIGHT
TOP SLAB 35 25-May-24 08-Jul-24 27-Oct-24 07-Dec-24 SAR696,508.72 SAR0.00 0% 0% 07-Dec-24, TOP SLAB
EGRESS STAIR-7
STAIR (ZONE-4) 235 28-Oct-23 05-Aug-24 25-Mar-24 04-Jan-25 SAR2,352,338.08 SAR0.00 27.68% 0% 04-Jan-25, EGRESS STAIR-7 (ZONE
WALL AND 1 1ST FLIGHT 30 28-Oct-23 02-Dec-23 25-Mar-24 04-May-24 SAR544,958.40 SAR0.00 100% 0% 04-May-24, WALL AND 1ST FLIGHT
WALL AND 2 2ND FLIGHT 17 03-Dec-23 21-Dec-23 04-May-24 23-May-24 SAR111,087.10 SAR0.00 95.61% 0% 23-May-24, WALL AND 2ND FLIGHT
WALL AND 3 3RD FLIGHT 17 23-Dec-23 10-Jan-24 23-May-24 12-Jun-24 SAR111,087.10 SAR0.00 0% 0% 12-Jun-24, WALL AND 3RD FLIGHT
WALL AND 4 4TH FLIGHT 17 11-Jan-24 30-Jan-24 12-Jun-24 07-Jul-24 SAR111,087.10 SAR0.00 0% 0% 07-Jul-24, WALL AND 4TH FLIGHT
WALL AND 5 5TH FLIGHT 17 31-Jan-24 19-Feb-24 07-Jul-24 27-Jul-24 SAR111,087.10 SAR0.00 0% 0% 27-Jul-24, WALL AND 5TH FLIGHT
WALL AND 6 6TH FLIGHT 17 20-Feb-24 10-Mar-24 27-Jul-24 15-Aug-24 SAR111,087.10 SAR0.00 0% 0% 15-Aug-24, WALL AND 6TH FLIGHT
WALL AND 7 7TH FLIGHT 17 11-Mar-24 30-Mar-24 15-Aug-24 04-Sep-24 SAR111,087.10 SAR0.00 0% 0% 04-Sep-24, WALL AND 7TH FLIGHT
WALL AND 8 8TH FLIGHT 17 31-Mar-24 22-Apr-24 04-Sep-24 25-Sep-24 SAR111,087.10 SAR0.00 0% 0% 25-Sep-24, WALL AND 8TH FLIGHT
WALL AND 9 9TH FLIGHT 17 23-Apr-24 12-May-24 25-Sep-24 15-Oct-24 SAR111,087.10 SAR0.00 0% 0% 15-Oct-24, WALL AND 9TH FLIGHT
WALL AND 1 10TH FLIGHT 17 13-May-24 01-Jun-24 15-Oct-24 04-Nov-24 SAR111,087.10 SAR0.00 0% 0% 04-Nov-24, WALL AND 10TH FLIGHT
WALL AND 1 11TH FLIGHT 17 02-Jun-24 25-Jun-24 04-Nov-24 24-Nov-24 SAR111,087.10 SAR0.00 0% 0% 24-Nov-24, WALL AND 11TH FLIGH
TOP SLAB 35 26-Jun-24 05-Aug-24 24-Nov-24 04-Jan-25 SAR696,508.72 SAR0.00 0% 0% 04-Jan-25, TOP SLAB
BACKFILLING UPTO TUNNEL WALL 176 01-Nov-23 09-Jun-24 13-Apr-24 09-Nov-24 SAR9,977,155.79 SAR0.00 20% 0% 09-Nov-24, BACKFILLING UPTO TU
STRUCTURAL FILL 289 13-Feb-24 23-Jan-25 17-Aug-24 29-Jul-25 SAR9,977,155.79 SAR0.00 0% 0% 29-Jul-25, STRUCTURAL FI
WET & DRY UTILITIES
UT 253 28-Aug-24 10-Apr-25 17-Nov-24 15-Sep-25 SAR4,771,122.46 SAR0.00 0% 0% 15-Sep-25, WET & DRY U
INSIDE WET CULVERT 253 28-Aug-24 12-Mar-25 17-Nov-24 15-Sep-25 SAR3,462,268.66 SAR0.00 0% 0% 15-Sep-25, INSIDE WET C
POTABLE WATER NETWORK 59 28-Aug-24 05-Nov-24 17-Nov-24 23-Jan-25 SAR427,352.76 SAR0.00 0% 0% 23-Jan-25, POTABLE WATER NETW
GREY WAWATER DISTRIBUTION SYSTEM 49 28-Sep-24 23-Nov-24 16-Dec-24 10-Feb-25 SAR262,973.54 SAR0.00 0% 0% 10-Feb-25, GREY WATER DISTRIB
IRRIGATION NETWORK
IRRIGATI 49 01-Jan-25 26-Feb-25 06-Jul-25 01-Sep-25 SAR469,018.60 SAR0.00 0% 0% 01-Sep-25, IRRIGATION N
CHILLED WATER SUPPLY NETWORK 200 21-Oct-24 03-Mar-25 08-Jan-25 06-Sep-25 SAR782,691.15 SAR0.00 0% 0% 06-Sep-25, CHILLED WATE
CHILLED WATER RETURN NETWORK 204 21-Oct-24 08-Mar-25 08-Jan-25 10-Sep-25 SAR782,691.15 SAR0.00 0% 0% 10-Sep-25, CHILLED WAT
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 228 28-Sep-24 12-Mar-25 16-Dec-24 15-Sep-25 SAR737,541.47 SAR0.00 0% 0% 15-Sep-25, AUTOMATIC W
INSIDE DRY CULVERT 164 28-Sep-24 10-Apr-25 16-Dec-24 02-Jul-25 SAR1,308,853.79 SAR0.00 0% 0% 02-Jul-25, INSIDE DRY CULV
POWER 164 28-Sep-24 10-Apr-25 16-Dec-24 02-Jul-25 SAR1,245,890.83 SAR0.00 0% 0% 02-Jul-25, POWER
HIGH VOLTAGE
V 110 KV NETWORK 30 28-Sep-24 31-Oct-24 16-Dec-24 19-Jan-25 SAR81,088.57 SAR0.00 0% 0% 19-Jan-25, HIGH VOLTAGE 110 KV
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 32 02-Nov-24 08-Dec-24 20-Jan-25 25-Feb-25 SAR1,037,144.34 SAR0.00 0% 0% 25-Feb-25, MEDIUM VOLTAGE 1
LOW V VOLTAGE NETWORK 32 09-Dec-24 14-Jan-25 26-Feb-25 08-Apr-25 SAR127,657.92 SAR0.00 0% 0% 08-Apr-25, LOW VOLTAGE NET
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 70 15-Jan-25 10-Apr-25 09-Apr-25 02-Jul-25 SAR0.00 SAR0.00 0% 0% 02-Jul-25, ELECTRICAL DIST
LIGHTING SYSTEM
LIGHT 35 27-Jan-25 08-Mar-25 21-Apr-25 31-May-25 SAR0.00 SAR0.00 0% 0% 31-May-25, LIGHTING SYSTE
TELECOM SERVICES 30 15-Jan-25 18-Feb-25 09-Apr-25 13-May-25 SAR62,962.96 SAR0.00 0% 0% 13-May-25, TELECOM SERVIC
MEP VEHICULAR
VEHICULA TUNNEL/ DRY & WET CULVERTS 227 28-Aug-24 26-Mar-25 17-Nov-24 16-Aug-25 SAR9,402,095.43 SAR0.00 0% 0% 16-Aug-25, MEP VEHICULA
TUNNEL MECHANICAL
ME WORKS 160 28-Aug-24 03-Mar-25 17-Nov-24 27-May-25 SAR2,704,813.47 SAR0.00 0% 0% 27-May-25, TUNNEL MECHAN
FIRE FIG
FIGHTING SYSTEM 56 28-Aug-24 02-Nov-24 17-Nov-24 21-Jan-25 SAR1,967,257.19 SAR0.00 0% 0% 21-Jan-25, FIRE FIGHTING SYSTE
VENTILATION SYSTEM
VENTILA 23 03-Nov-24 28-Nov-24 21-Jan-25 17-Feb-25 SAR220,591.82 SAR0.00 0% 0% 17-Feb-25, VENTILATION SYSTE
PUMPS INSTALLATION
I 15 30-Nov-24 16-Dec-24 17-Feb-25 06-Mar-25 SAR414,510.98 SAR0.00 0% 0% 06-Mar-25, PUMPS INSTALLATIO
DUCTING SYSTEM 66 17-Dec-24 03-Mar-25 06-Mar-25 27-May-25 SAR102,453.48 SAR0.00 0% 0% 27-May-25, DUCTING SYSTE
TUNNEL ELECTRICAL
EL WORKS 180 28-Aug-24 26-Mar-25 17-Nov-24 23-Jun-25 SAR5,685,898.68 SAR0.00 0% 0% 23-Jun-25, TUNNEL ELECTRI
CABLE TRAYS
T 101 28-Aug-24 24-Dec-24 17-Nov-24 13-Mar-25 SAR1,290,145.40 SAR0.00 0% 0% 13-Mar-25, CABLE TRAYS
POWER CABLES 129 22-Sep-24 19-Feb-25 11-Dec-24 14-May-25 SAR1,744,342.81 SAR0.00 0% 0% 14-May-25, POWER CABLES
ELECTRICAL INSTALLATIONS
ELECTRI 86 12-Dec-24 22-Mar-25 02-Mar-25 17-Jun-25 SAR1,427,303.37 SAR0.00 0% 0% 17-Jun-25, ELECTRICAL INST
LOW CUR
CURRENT 180 28-Aug-24 26-Mar-25 17-Nov-24 23-Jun-25 SAR1,224,107.09 SAR0.00 0% 0% 23-Jun-25, LOW CURRENT
FIRE D
DETECTION AND ALARM SYSTEM 82 28-Aug-24 02-Dec-24 17-Nov-24 19-Feb-25 SAR209,231.73 SAR0.00 0% 0% 19-Feb-25, FIRE DETECTION AND
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 28 11-Sep-24 14-Oct-24 01-Dec-24 02-Jan-25 SAR174,339.40 SAR0.00 0% 0% 02-Jan-25, COMMUNICATION SYS
PUBLIC ADDRESS
PUBLI 28 15-Oct-24 16-Nov-24 02-Jan-25 04-Feb-25 SAR135,232.89 SAR0.00 0% 0% 04-Feb-25, PUBLIC ADDRESS
VIDEO SURVEILLANCE 49 17-Nov-24 12-Jan-25 04-Feb-25 07-Apr-25 SAR162,725.26 SAR0.00 0% 0% 07-Apr-25, VIDEO SURVEILLAN
SACADA SYSTEM
SACA 35 13-Jan-25 22-Feb-25 07-Apr-25 18-May-25 SAR434,426.52 SAR0.00 0% 0% 18-May-25, SACADA SYSTEM
RADIO RE-BROADCASTING SYSTEM 28 23-Feb-25 26-Mar-25 18-May-25 23-Jun-25 SAR108,151.30 SAR0.00 0% 0% 23-Jun-25, RADIO RE-BROA
TUNNEL PLUMBING
PL WORKS 35 01-Jan-25 10-Feb-25 06-Jul-25 16-Aug-25 SAR1,011,383.28 SAR0.00 0% 0% 16-Aug-25, TUNNEL PLUM
DRAINAGE SYSTEM
DRAINAG 35 01-Jan-25 10-Feb-25 06-Jul-25 16-Aug-25 SAR1,011,383.28 SAR0.00 0% 0% 16-Aug-25, DRAINAGE SY
TUNNEL INTERNAL
INTER ROAD WORK 42 11-Feb-25 05-Apr-25 16-Aug-25 05-Oct-25 SAR1,020,596.09 SAR0.00 0% 0% 05-Oct-25, TUNNEL INTE

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
21 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
TUNNEL INTERNAL
INTER DECORATIVE WORKS 35 17-Mar-25 30-Apr-25 18-Sep-25 30-Oct-25 SAR3,313,938.82 SAR0.00 0% 0% 30-Oct-25, TUNNEL INTE
ZONE 5 - FROM S
STA. 1+753 ~ 2+157 1069 06-Nov-22 23-Jul-25 02-Jul-22 A 06-May-26 SAR198,512,447.29 SAR13,828,325.94 55.2% 6.97% 06-May-26, ZONE
ENGINEERING 587 06-Nov-22 22-Nov-23 02-Jul-22 A 07-Oct-24 SAR0.00 SAR0.00 0% 0% 07-Oct-24, ENGINEERING
SITE SURVEY 14 06-Nov-22 21-Nov-22 02-Jul-22 A 04-Oct-22 A SAR0.00 SAR0.00 0% 0% 04-Oct-22 A, SITE SURVEY
SHOP DRAWINGS
DRAWIN 347 04-Feb-23 24-Jun-23 22-Aug-22 A 21-Mar-24 SAR0.00 SAR0.00 0% 0% 21-Mar-24, SHOP DRAWINGS
CIVIL/STRUCTURAL 1+754 ~1+854
CIVIL/STRU 309 04-Feb-23 23-Mar-23 01-Nov-22 A 06-Feb-24 SAR0.00 SAR0.00 0% 0% 06-Feb-24, CIVIL/STRUCTURAL 1+754 ~1+854
CIVIL/STRUCTURAL 1+854 ~1+954
CIVIL/STRU 307 25-Feb-23 13-Apr-23 27-Oct-22 A 26-Feb-24 SAR0.00 SAR0.00 0% 0% 26-Feb-24, CIVIL/STRUCTURAL 1+854 ~1+954
CIVIL/STRUCTURAL 1+954 ~2+093
CIVIL/STRU 289 18-Mar-23 08-May-23 22-Aug-22 A 26-Feb-24 SAR0.00 SAR0.00 0% 0% 26-Feb-24, CIVIL/STRUCTURAL 1+954 ~2+093
CIVIL/STRUCTURAL 2+093 ~2+157
CIVIL/STRU 271 08-Apr-23 29-May-23 22-Aug-22 A 26-Feb-24 SAR0.00 SAR0.00 0% 0% 26-Feb-24, CIVIL/STRUCTURAL 2+093 ~2+157
ARCHITECTURAL
ARCHITECT 22 30-May-23 24-Jun-23 26-Feb-24 21-Mar-24 SAR0.00 SAR0.00 0% 0% 21-Mar-24, ARCHITECTURAL
UTILITIES 323 01-Apr-23 18-Nov-23 01-Nov-22 A 28-Jul-24 SAR0.00 SAR0.00 0% 0% 28-Jul-24, UTILITIES
WET UTILITIES
UTILIT 118 01-Apr-23 24-Aug-23 12-Feb-24 07-Jul-24 SAR0.00 SAR0.00 0% 0% 07-Jul-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 31 01-Apr-23 10-May-23 12-Feb-24 19-Mar-24 SAR0.00 SAR0.00 0% 0% 19-Mar-24, POTABLE WATER NETWORK BR
GREY WAWATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 22 11-May-23 05-Jun-23 19-Mar-24 17-Apr-24 SAR0.00 SAR0.00 0% 0% 17-Apr-24, GREY WATER DISTRIBUTION N
IRR & FF NETWORK BRANCHES & TIE IN POINTS 22 06-Jun-23 04-Jul-23 17-Apr-24 13-May-24 SAR0.00 SAR0.00 0% 0% 13-May-24, IRR & FF NETWORK BRANCH
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 22 05-Jul-23 30-Jul-23 13-May-24 08-Jun-24 SAR0.00 SAR0.00 0% 0% 08-Jun-24, CHILLED WATER SUPPLY & RE
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 21 31-Jul-23 24-Aug-23 08-Jun-24 07-Jul-24 SAR0.00 SAR0.00 0% 0% 07-Jul-24, AUTOMATIC WASTE COLLECT
DRY UTILITI
UTILITIES 323 11-May-23 18-Nov-23 01-Nov-22 A 28-Jul-24 SAR0.00 SAR0.00 0% 0% 28-Jul-24, DRY UTILITIES
POWER 265 11-May-23 11-Oct-23 01-Nov-22 A 22-Jun-24 SAR0.00 SAR0.00 0% 0% 22-Jun-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 22 11-May-23 05-Jun-23 19-Mar-24 17-Apr-24 SAR0.00 SAR0.00 0% 0% 17-Apr-24, HIGH VOLTAGE 110 KV NETWO
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 25 06-Jun-23 08-Jul-23 17-Apr-24 16-May-24 SAR0.00 SAR0.00 0% 0% 16-May-24, MEDIUM VOLTAGE 13.8 KV NE
LOW V VOLTAGE NETWORK 27 09-Jul-23 08-Aug-23 27-Nov-22 A 22-Jun-24 SAR0.00 SAR0.00 0% 0% 22-Jun-24, LOW VOLTAGE NETWORK
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 22 09-Aug-23 03-Sep-23 01-Nov-22 A 12-Nov-22 A SAR0.00 SAR0.00 0% 0% 12-Nov-22 A, ELECTRICAL DISTRIBUTION SYSTEM
LIGHTING SYSTEM
LIGHT 32 04-Sep-23 11-Oct-23 26-Nov-22 A 27-Dec-22 A SAR0.00 SAR0.00 0% 0% 27-Dec-22 A, LIGHTING SYSTEM
LOW CUR
CURRENT 31 12-Oct-23 18-Nov-23 22-Jun-24 28-Jul-24 SAR0.00 SAR0.00 0% 0% 28-Jul-24, LOW CURRENT
TELECOM SERVICES
TELEC 31 12-Oct-23 18-Nov-23 22-Jun-24 28-Jul-24 SAR0.00 SAR0.00 0% 0% 28-Jul-24, TELECOM SERVICES
MEP 220 04-Mar-23 22-Nov-23 15-Jan-24 07-Oct-24 SAR0.00 SAR0.00 0% 0% 07-Oct-24, MEP
TUNNEL MECHANICAL
ME WORKS 176 04-Mar-23 02-Oct-23 15-Jan-24 15-Aug-24 SAR0.00 SAR0.00 0% 0% 15-Aug-24, TUNNEL MECHANICAL WO
FIRE FIG
FIGHTING SYSTEM 88 04-Mar-23 17-Jun-23 15-Jan-24 30-Apr-24 SAR0.00 SAR0.00 0% 0% 30-Apr-24, FIRE FIGHTING SYSTEM
VENTILATION SYSTEM
VENTILA 44 04-Jun-23 27-Jul-23 16-Apr-24 06-Jun-24 SAR0.00 SAR0.00 0% 0% 06-Jun-24, VENTILATION SYSTEM
PUMPS INSTALLATION
I 22 29-Jul-23 22-Aug-23 06-Jun-24 07-Jul-24 SAR0.00 SAR0.00 0% 0% 07-Jul-24, PUMPS INSTALLATION
DUCTING SYSTEM 88 18-Jun-23 02-Oct-23 30-Apr-24 15-Aug-24 SAR0.00 SAR0.00 0% 0% 15-Aug-24, DUCTING SYSTEM
TUNNEL ELECTRICAL
EL WORKS 210 15-Mar-23 22-Nov-23 27-Jan-24 07-Oct-24 SAR0.00 SAR0.00 0% 0% 07-Oct-24, TUNNEL ELECTRICAL WO
CABLE TRAYS
T 110 15-Mar-23 27-Jul-23 27-Jan-24 06-Jun-24 SAR0.00 SAR0.00 0% 0% 06-Jun-24, CABLE TRAYS
POWER CABLES 44 21-May-23 13-Jul-23 30-Mar-24 23-May-24 SAR0.00 SAR0.00 0% 0% 23-May-24, POWER CABLES
ELECTRICAL INSTALLATIONS
ELECTRI 124 01-Jun-23 28-Oct-23 14-Apr-24 10-Sep-24 SAR0.00 SAR0.00 0% 0% 10-Sep-24, ELECTRICAL INSTALLATIO
LOW CUR
CURRENT 132 18-Jun-23 22-Nov-23 30-Apr-24 07-Oct-24 SAR0.00 SAR0.00 0% 0% 07-Oct-24, LOW CURRENT
FIRE D
DETECTION AND ALARM SYSTEM 132 18-Jun-23 22-Nov-23 30-Apr-24 07-Oct-24 SAR0.00 SAR0.00 0% 0% 07-Oct-24, FIRE DETECTION AND AL
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 110 03-Jul-23 08-Nov-23 12-May-24 22-Sep-24 SAR0.00 SAR0.00 0% 0% 22-Sep-24, COMMUNICATION SYSTE
PUBLIC ADDRESS
PUBLI 66 19-Jul-23 04-Oct-23 28-May-24 18-Aug-24 SAR0.00 SAR0.00 0% 0% 18-Aug-24, PUBLIC ADDRESS
VIDEO SURVEILLANCE 44 31-Jul-23 19-Sep-23 09-Jun-24 04-Aug-24 SAR0.00 SAR0.00 0% 0% 04-Aug-24, VIDEO SURVEILLANCE
SACADA SYSTEM
SACA 44 12-Aug-23 02-Oct-23 25-Jun-24 15-Aug-24 SAR0.00 SAR0.00 0% 0% 15-Aug-24, SACADA SYSTEM
RADIO RE-BROADCASTING SYSTEM 44 23-Aug-23 14-Oct-23 07-Jul-24 27-Aug-24 SAR0.00 SAR0.00 0% 0% 27-Aug-24, RADIO RE-BROADCASTIN
TUNNEL PLUMBING
PL WORKS 21 27-Mar-23 19-Apr-23 07-Feb-24 03-Mar-24 SAR0.00 SAR0.00 0% 0% 03-Mar-24, TUNNEL PLUMBING WORKS
PROCUREMENT 534 29-Mar-23 08-May-24 20-Nov-22 A 14-Jan-25 SAR23,011,506.90 SAR2,871,484.44 99.42% 12.48% 14-Jan-25, PROCUREMENT
CIVIL/STRUCTU
CIVIL/STRUCTURAL 386 15-Apr-23 08-Oct-23 01-Dec-22 A 23-Jul-24 SAR17,879,728.78 SAR2,871,484.44 100% 16.06% 23-Jul-24, CIVIL/STRUCTURAL
UTILITIES 342 11-May-23 08-May-24 20-Nov-22 A 14-Jan-25 SAR662,057.79 SAR0.00 79.79% 0% 14-Jan-25, UTILITIES
WET UTILITIES
UTILIT 324 11-May-23 11-Feb-24 20-Nov-22 A 24-Dec-24 SAR451,809.12 SAR0.00 77.39% 0% 24-Dec-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 238 11-May-23 31-Oct-23 20-Nov-22 A 12-Sep-24 SAR50,276.79 SAR0.00 100% 0% 12-Sep-24, POTABLE WATER NETWOR
DI PIPES
PIP 228 11-May-23 31-Oct-23 20-Nov-22 A 01-Sep-24 SAR5,530.45 SAR0.00 100% 0% 01-Sep-24, DI PIPES
HDPE PIPES 228 11-May-23 31-Oct-23 29-Mar-23 A 01-Sep-24 SAR6,535.98 SAR0.00 100% 0% 01-Sep-24, HDPE PIPES
GRP PPIPES 228 11-May-23 31-Oct-23 08-Jan-23 A 01-Sep-24 SAR5,027.68 SAR0.00 100% 0% 01-Sep-24, GRP PIPES
DI & G
GRP FITTING 228 11-May-23 31-Oct-23 01-May-23 A 01-Sep-24 SAR5,027.68 SAR0.00 100% 0% 01-Sep-24, DI & GRP FITTING
GATE VALVE 228 11-May-23 31-Oct-23 01-May-23 A 01-Sep-24 SAR5,027.68 SAR0.00 100% 0% 01-Sep-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 228 11-May-23 31-Oct-23 01-May-23 A 01-Sep-24 SAR4,524.91 SAR0.00 100% 0% 01-Sep-24, BUTTERFLAY VALVE
WATER METER
WATE 145 11-May-23 31-Oct-23 19-Mar-24 12-Sep-24 SAR7,541.52 SAR0.00 100% 0% 12-Sep-24, WATER METER
AIR RELASE
RE VALVE 228 11-May-23 31-Oct-23 04-Jul-23 A 01-Sep-24 SAR5,027.68 SAR0.00 100% 0% 01-Sep-24, AIR RELASE VALVE
WASHOUT VALVE
WASH 228 11-May-23 31-Oct-23 04-Jul-23 A 01-Sep-24 SAR6,033.22 SAR0.00 100% 0% 01-Sep-24, WASHOUT VALVE
GREY WA
WATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 228 06-Jun-23 26-Nov-23 20-Nov-22 A 28-Sep-24 SAR23,203.55 SAR0.00 100% 0% 28-Sep-24, GREY WATER DISTRIBUTI
DI PIPES
PIP 228 06-Jun-23 26-Nov-23 20-Nov-22 A 28-Sep-24 SAR3,944.60 SAR0.00 100% 0% 28-Sep-24, DI PIPES
HDPE PIPES 228 06-Jun-23 26-Nov-23 29-Mar-23 A 28-Sep-24 SAR4,176.64 SAR0.00 100% 0% 28-Sep-24, HDPE PIPES
GRP PPIPES 228 06-Jun-23 26-Nov-23 08-Jan-23 A 28-Sep-24 SAR3,016.46 SAR0.00 100% 0% 28-Sep-24, GRP PIPES

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
22 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
DI & G
GRP FITTING 228 06-Jun-23 26-Nov-23 01-May-23 A 28-Sep-24 SAR2,784.43 SAR0.00 100% 0% 28-Sep-24, DI & GRP FITTING
GATE VALVE 228 06-Jun-23 26-Nov-23 01-May-23 A 28-Sep-24 SAR1,624.25 SAR0.00 100% 0% 28-Sep-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 228 06-Jun-23 26-Nov-23 01-May-23 A 28-Sep-24 SAR2,320.35 SAR0.00 100% 0% 28-Sep-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 228 06-Jun-23 26-Nov-23 04-Jul-23 A 28-Sep-24 SAR2,552.39 SAR0.00 100% 0% 28-Sep-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 228 06-Jun-23 26-Nov-23 04-Jul-23 A 28-Sep-24 SAR2,784.43 SAR0.00 100% 0% 28-Sep-24, WASEHOUT VALVE
IRR & FF NETWORK BRANCHES & TIE IN POINTS 228 05-Jul-23 21-Dec-23 29-Mar-23 A 23-Oct-24 SAR46,009.03 SAR0.00 94.67% 0% 23-Oct-24, IRR & FF NETWORK BRA
HDPE PIPES 228 05-Jul-23 21-Dec-23 29-Mar-23 A 23-Oct-24 SAR11,502.26 SAR0.00 94.67% 0% 23-Oct-24, HDPE PIPES
GATE VALVE 228 05-Jul-23 21-Dec-23 01-May-23 A 23-Oct-24 SAR4,600.90 SAR0.00 94.67% 0% 23-Oct-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 228 05-Jul-23 21-Dec-23 01-May-23 A 23-Oct-24 SAR4,600.90 SAR0.00 94.67% 0% 23-Oct-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 228 05-Jul-23 21-Dec-23 04-Jul-23 A 23-Oct-24 SAR4,600.90 SAR0.00 94.67% 0% 23-Oct-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 228 05-Jul-23 21-Dec-23 04-Jul-23 A 23-Oct-24 SAR4,600.90 SAR0.00 94.67% 0% 23-Oct-24, WASEHOUT VALVE
FIRE H
HYDRANT 228 05-Jul-23 21-Dec-23 04-Jul-23 A 23-Oct-24 SAR16,103.16 SAR0.00 94.67% 0% 23-Oct-24, FIRE HYDRANT
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 237 31-Jul-23 16-Jan-24 01-May-23 A 28-Nov-24 SAR245,550.16 SAR0.00 75.11% 0% 28-Nov-24, CHILLED WATER SUPPL
MILD STEEL PIPE 144 31-Jul-23 16-Jan-24 08-Jun-24 28-Nov-24 SAR98,220.07 SAR0.00 75.11% 0% 28-Nov-24, MILD STEEL PIPE
MILD STEEL FITTING 144 31-Jul-23 16-Jan-24 08-Jun-24 28-Nov-24 SAR98,220.07 SAR0.00 75.11% 0% 28-Nov-24, MILD STEEL FITTING
GATE VALVE 227 31-Jul-23 16-Jan-24 01-May-23 A 18-Nov-24 SAR49,110.03 SAR0.00 75.11% 0% 18-Nov-24, GATE VALVE
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 145 26-Aug-23 11-Feb-24 07-Jul-24 24-Dec-24 SAR86,769.59 SAR0.00 55.56% 0% 24-Dec-24, AUTOMATIC WASTE CO
AUTOMATIC WASTE
AUTO 145 26-Aug-23 11-Feb-24 07-Jul-24 24-Dec-24 SAR86,769.59 SAR0.00 55.56% 0% 24-Dec-24, AUTOMATIC WASTE
DRY UTILITI
UTILITIES 228 06-Jun-23 08-May-24 17-Apr-24 14-Jan-25 SAR210,248.67 SAR0.00 84.94% 0% 14-Jan-25, DRY UTILITIES
POWER 197 06-Jun-23 28-Mar-24 17-Apr-24 09-Dec-24 SAR195,433.86 SAR0.00 90.06% 0% 09-Dec-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 145 06-Jun-23 26-Nov-23 17-Apr-24 09-Oct-24 SAR12,719.78 SAR0.00 100% 0% 09-Oct-24, HIGH VOLTAGE 110 KV NE
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 145 09-Jul-23 25-Dec-23 16-May-24 07-Nov-24 SAR162,689.31 SAR0.00 92% 0% 07-Nov-24, MEDIUM VOLTAGE 13.8
LOW V VOLTAGE NETWORK 145 09-Aug-23 25-Jan-24 22-Jun-24 09-Dec-24 SAR20,024.77 SAR0.00 68% 0% 09-Dec-24, LOW VOLTAGE NETWO
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 144 04-Sep-23 20-Feb-24 22-Jun-24 08-Dec-24 SAR0.00 SAR0.00 0% 0% 08-Dec-24, ELECTRICAL DISTRIBU
LIGHTING SYSTEM
LIGHT 144 12-Oct-23 28-Mar-24 22-Jun-24 08-Dec-24 SAR0.00 SAR0.00 0% 0% 08-Dec-24, LIGHTING SYSTEM
LOW CUR
CURRENT 145 19-Nov-23 08-May-24 28-Jul-24 14-Jan-25 SAR14,814.81 SAR0.00 17.33% 0% 14-Jan-25, LOW CURRENT
TELECOM SERVICES
TELEC 145 19-Nov-23 08-May-24 28-Jul-24 14-Jan-25 SAR14,814.81 SAR0.00 17.33% 0% 14-Jan-25, TELECOM SERVICES
MEP 147 29-Mar-23 24-Sep-23 10-Feb-24 07-Aug-24 SAR4,469,720.33 SAR0.00 100% 0% 07-Aug-24, MEP
ARCHITECTURAL
ARCHITECTUR 115 25-Jun-23 09-Nov-23 21-Mar-24 11-Aug-24 SAR0.00 SAR0.00 0% 0% 11-Aug-24, ARCHITECTURAL
CONSTRUCTION 1055 22-Nov-22 23-Jul-25 11-Aug-22 A 06-May-26 SAR175,500,940.39 SAR10,956,841.50 49.4% 6.24% 06-May-26, CONS
GENERAL SITE ARRANGEMENT 357 22-Nov-22 22-Jan-23 11-Aug-22 A 20-Jan-24 SAR1,392,424.27 SAR347,930.93 100% 24.99% 20-Jan-24, GENERAL SITE ARRANGEMENT
SITE PREPARATION
PREPA 357 22-Nov-22 22-Jan-23 11-Aug-22 A 20-Jan-24 SAR1,392,424.27 SAR347,930.93 100% 24.99% 20-Jan-24, SITE PREPARATION
GEO-TECHNICAL INVESTIGATION
GEO-TECHNICA 62 23-Jan-23 04-Apr-23 14-Aug-22 A 01-Oct-22 A SAR125,351.12 SAR125,351.12 100% 100% 01-Oct-22 A, GEO-TECHNICAL INVESTIGATION
EXCAVATION & DEWATERING 522 05-Apr-23 20-Apr-24 04-Sep-22 A 21-Dec-24 SAR26,583,813.47 SAR10,483,559.45 96.96% 39.44% 21-Dec-24, EXCAVATION & DEWAT
SOIL IMPROVEMENT
IMPROVE 48 14-May-23 01-Aug-23 01-Feb-24 28-Mar-24 SAR7,572,082.12 SAR0.00 100% 0% 28-Mar-24, SOIL IMPROVEMENT
STRUCTURAL WORKS 448 23-May-23 19-Oct-24 11-Feb-24 04-Aug-25 SAR97,036,390.80 SAR0.00 47.67% 0% 04-Aug-25, STRUCTURAL W
STA. 1+753.979~
1+753. 1+773.979 168 23-May-23 09-Dec-23 11-Feb-24 02-Sep-24 SAR5,383,929.86 SAR0.00 100% 0% 02-Sep-24, STA. 1+753.979~ 1+773.979
BASE SLAB
SL 34 23-May-23 04-Jul-23 11-Feb-24 21-Mar-24 SAR1,407,641.04 SAR0.00 100% 0% 21-Mar-24, BASE SLAB
COLUMNS
COLUMN 23 24-Jun-23 23-Jul-23 13-Mar-24 13-Apr-24 SAR341,405.59 SAR0.00 100% 0% 13-Apr-24, COLUMNS
TUNNEL WALLS 37 24-Jun-23 08-Aug-23 13-Mar-24 29-Apr-24 SAR575,336.09 SAR0.00 100% 0% 29-Apr-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 26-Jul-23 29-Aug-23 15-Apr-24 20-May-24 SAR843,883.63 SAR0.00 100% 0% 20-May-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 30-Aug-23 28-Sep-23 20-May-24 23-Jun-24 SAR487,950.13 SAR0.00 100% 0% 23-Jun-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 30-Sep-23 11-Nov-23 23-Jun-24 05-Aug-24 SAR1,083,984.64 SAR0.00 100% 0% 05-Aug-24, TOP SLAB
FINISHING WORK
FINISHIN 24 12-Nov-23 09-Dec-23 05-Aug-24 02-Sep-24 SAR643,728.75 SAR0.00 100% 0% 02-Sep-24, FINISHING WORK
STA. 1+773.979
1+773. ~ 1+793.979 175 04-Jun-23 28-Dec-23 22-Feb-24 22-Sep-24 SAR5,381,157.69 SAR0.00 97.75% 0% 22-Sep-24, STA. 1+773.979 ~ 1+793.979
BASE SLAB
SL 27 04-Jun-23 08-Jul-23 22-Feb-24 25-Mar-24 SAR1,404,868.87 SAR0.00 100% 0% 25-Mar-24, BASE SLAB
COLUMNS
COLUMN 23 09-Jul-23 03-Aug-23 25-Mar-24 24-Apr-24 SAR341,405.59 SAR0.00 100% 0% 24-Apr-24, COLUMNS
TUNNEL WALLS 37 09-Jul-23 20-Aug-23 25-Mar-24 11-May-24 SAR575,336.09 SAR0.00 100% 0% 11-May-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 07-Aug-23 10-Sep-23 27-Apr-24 01-Jun-24 SAR843,883.63 SAR0.00 100% 0% 01-Jun-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 11-Sep-23 10-Oct-23 01-Jun-24 04-Jul-24 SAR487,950.13 SAR0.00 100% 0% 04-Jul-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 11-Oct-23 22-Nov-23 04-Jul-24 17-Aug-24 SAR1,083,984.64 SAR0.00 100% 0% 17-Aug-24, TOP SLAB
FINISHING WORK
FINISHIN 31 23-Nov-23 28-Dec-23 17-Aug-24 22-Sep-24 SAR643,728.75 SAR0.00 81.2% 0% 22-Sep-24, FINISHING WORK
STA. 1+793.979~
1+793 1+813.979 181 15-Jun-23 16-Jan-24 05-Mar-24 12-Oct-24 SAR5,381,157.69 SAR0.00 94.68% 0% 12-Oct-24, STA. 1+793.979~ 1+813.979
BASE SLAB
SL 27 15-Jun-23 19-Jul-23 05-Mar-24 06-Apr-24 SAR1,404,868.87 SAR0.00 100% 0% 06-Apr-24, BASE SLAB
COLUMNS
COLUMN 23 20-Jul-23 15-Aug-23 06-Apr-24 06-May-24 SAR341,405.59 SAR0.00 100% 0% 06-May-24, COLUMNS
TUNNEL WALLS 37 20-Jul-23 31-Aug-23 06-Apr-24 22-May-24 SAR575,336.09 SAR0.00 100% 0% 22-May-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 19-Aug-23 21-Sep-23 08-May-24 12-Jun-24 SAR843,883.63 SAR0.00 100% 0% 12-Jun-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 24-Sep-23 22-Oct-23 12-Jun-24 16-Jul-24 SAR487,950.13 SAR0.00 100% 0% 16-Jul-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 23-Oct-23 04-Dec-23 16-Jul-24 28-Aug-24 SAR1,083,984.64 SAR0.00 100% 0% 28-Aug-24, TOP SLAB
FINISHING WORK
FINISHIN 37 05-Dec-23 16-Jan-24 28-Aug-24 12-Oct-24 SAR643,728.75 SAR0.00 55.54% 0% 12-Oct-24, FINISHING WORK
STA. 1+813.979
1+813. ~ 1+833.979 187 01-Jul-23 04-Feb-24 17-Mar-24 30-Oct-24 SAR5,381,157.69 SAR0.00 87.99% 0% 30-Oct-24, STA. 1+813.979 ~ 1+833.97
BASE SLAB
SL 27 01-Jul-23 31-Jul-23 17-Mar-24 21-Apr-24 SAR1,404,868.87 SAR0.00 100% 0% 21-Apr-24, BASE SLAB

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
23 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
COLUMN
COLUMNS 23 01-Aug-23 27-Aug-23 21-Apr-24 18-May-24 SAR341,405.59 SAR0.00 100% 0% 18-May-24, COLUMNS
TUNNEL WALLS 37 01-Aug-23 12-Sep-23 21-Apr-24 03-Jun-24 SAR575,336.09 SAR0.00 100% 0% 03-Jun-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 30-Aug-23 04-Oct-23 20-May-24 29-Jun-24 SAR843,883.63 SAR0.00 100% 0% 29-Jun-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 05-Oct-23 02-Nov-23 29-Jun-24 28-Jul-24 SAR487,950.13 SAR0.00 100% 0% 28-Jul-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 04-Nov-23 16-Dec-23 28-Jul-24 09-Sep-24 SAR1,083,984.64 SAR0.00 99.76% 0% 09-Sep-24, TOP SLAB
FINISHING WORK
FINISHIN 43 17-Dec-23 04-Feb-24 09-Sep-24 30-Oct-24 SAR643,728.75 SAR0.00 0% 0% 30-Oct-24, FINISHING WORK
STA. 1+833.979
1+833. ~ 1+853.979 194 12-Jul-23 24-Feb-24 28-Mar-24 19-Nov-24 SAR5,383,929.86 SAR0.00 87.52% 0% 19-Nov-24, STA. 1+833.979 ~ 1+853.9
BASE SLAB
SL 34 12-Jul-23 20-Aug-23 28-Mar-24 11-May-24 SAR1,407,641.04 SAR0.00 100% 0% 11-May-24, BASE SLAB
COLUMNS
COLUMN 23 13-Aug-23 07-Sep-23 02-May-24 29-May-24 SAR341,405.59 SAR0.00 100% 0% 29-May-24, COLUMNS
TUNNEL WALLS 37 13-Aug-23 25-Sep-23 02-May-24 19-Jun-24 SAR575,336.09 SAR0.00 100% 0% 19-Jun-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 11-Sep-23 16-Oct-23 01-Jun-24 10-Jul-24 SAR843,883.63 SAR0.00 100% 0% 10-Jul-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 17-Oct-23 14-Nov-23 10-Jul-24 08-Aug-24 SAR487,950.13 SAR0.00 100% 0% 08-Aug-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 15-Nov-23 27-Dec-23 08-Aug-24 21-Sep-24 SAR1,083,984.64 SAR0.00 97.41% 0% 21-Sep-24, TOP SLAB
FINISHING WORK
FINISHIN 50 28-Dec-23 24-Feb-24 21-Sep-24 19-Nov-24 SAR643,728.75 SAR0.00 0% 0% 19-Nov-24, FINISHING WORK
STA. 1+853.979
1+853. ~ 1+873.979 199 24-Jul-23 12-Mar-24 13-Apr-24 07-Dec-24 SAR5,381,157.69 SAR0.00 86.1% 0% 07-Dec-24, STA. 1+853.979 ~ 1+873.9
BASE SLAB
SL 27 24-Jul-23 23-Aug-23 13-Apr-24 14-May-24 SAR1,404,868.87 SAR0.00 100% 0% 14-May-24, BASE SLAB
COLUMNS
COLUMN 23 24-Aug-23 19-Sep-23 14-May-24 10-Jun-24 SAR341,405.59 SAR0.00 100% 0% 10-Jun-24, COLUMNS
TUNNEL WALLS 37 24-Aug-23 07-Oct-23 14-May-24 01-Jul-24 SAR575,336.09 SAR0.00 100% 0% 01-Jul-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 24-Sep-23 28-Oct-23 12-Jun-24 22-Jul-24 SAR843,883.63 SAR0.00 100% 0% 22-Jul-24, MIDDLE SLAB FOR UTILITY C
UTILITY C
CULVERT WALLS 25 29-Oct-23 26-Nov-23 22-Jul-24 20-Aug-24 SAR487,950.13 SAR0.00 100% 0% 20-Aug-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 27-Nov-23 08-Jan-24 20-Aug-24 03-Oct-24 SAR1,083,984.64 SAR0.00 90.41% 0% 03-Oct-24, TOP SLAB
FINISHING WORK
FINISHIN 55 09-Jan-24 12-Mar-24 03-Oct-24 07-Dec-24 SAR643,728.75 SAR0.00 0% 0% 07-Dec-24, FINISHING WORK
STA. 1+873.979
1+873. ~ 1+893.979 205 05-Aug-23 31-Mar-24 24-Apr-24 25-Dec-24 SAR5,381,157.69 SAR0.00 75.97% 0% 25-Dec-24, STA. 1+873.979 ~ 1+893.
BASE SLAB
SL 27 05-Aug-23 04-Sep-23 24-Apr-24 26-May-24 SAR1,404,868.87 SAR0.00 100% 0% 26-May-24, BASE SLAB
COLUMNS
COLUMN 23 05-Sep-23 02-Oct-23 26-May-24 26-Jun-24 SAR341,405.59 SAR0.00 100% 0% 26-Jun-24, COLUMNS
TUNNEL WALLS 37 05-Sep-23 18-Oct-23 26-May-24 13-Jul-24 SAR575,336.09 SAR0.00 100% 0% 13-Jul-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 05-Oct-23 08-Nov-23 29-Jun-24 03-Aug-24 SAR843,883.63 SAR0.00 100% 0% 03-Aug-24, MIDDLE SLAB FOR UTILITY
UTILITY C
CULVERT WALLS 25 09-Nov-23 07-Dec-23 03-Aug-24 01-Sep-24 SAR487,950.13 SAR0.00 100% 0% 01-Sep-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 37 09-Dec-23 20-Jan-24 01-Sep-24 15-Oct-24 SAR1,083,984.64 SAR0.00 40.11% 0% 15-Oct-24, TOP SLAB
FINISHING WORK
FINISHIN 61 21-Jan-24 31-Mar-24 15-Oct-24 25-Dec-24 SAR643,728.75 SAR0.00 0% 0% 25-Dec-24, FINISHING WORK
STA. 1+893.979
1+893. ~ 1+913.979 229 16-Aug-23 22-Apr-24 06-May-24 03-Feb-25 SAR5,381,157.69 SAR0.00 48.25% 0% 03-Feb-25, STA. 1+893.979 ~ 1+913
BASE SLAB
SL 88 16-Aug-23 06-Nov-23 06-May-24 21-Aug-24 SAR1,404,868.87 SAR0.00 100% 0% 21-Aug-24, BASE SLAB
COLUMNS
COLUMN 23 07-Nov-23 03-Dec-23 22-Aug-24 17-Sep-24 SAR341,405.59 SAR0.00 100% 0% 17-Sep-24, COLUMNS
TUNNEL WALLS 37 07-Nov-23 19-Dec-23 22-Aug-24 05-Oct-24 SAR575,336.09 SAR0.00 96.33% 0% 05-Oct-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 06-Dec-23 09-Jan-24 21-Sep-24 26-Oct-24 SAR843,883.63 SAR0.00 35.05% 0% 26-Oct-24, MIDDLE SLAB FOR UTILI
UTILITY C
CULVERT WALLS 25 10-Jan-24 07-Feb-24 27-Oct-24 24-Nov-24 SAR487,950.13 SAR0.00 0% 0% 24-Nov-24, UTILITY CULVERT WAL
TOP SLAB
SLA 37 08-Feb-24 21-Mar-24 25-Nov-24 06-Jan-25 SAR1,083,984.64 SAR0.00 0% 0% 06-Jan-25, TOP SLAB
FINISHING WORK
FINISHIN 24 23-Mar-24 22-Apr-24 07-Jan-25 03-Feb-25 SAR643,728.75 SAR0.00 0% 0% 03-Feb-25, FINISHING WORK
STA. 1+913.979~
1+913. 1+933.979 168 18-Oct-23 04-May-24 03-Aug-24 15-Feb-25 SAR5,381,157.69 SAR0.00 41.24% 0% 15-Feb-25, STA. 1+913.979~ 1+933
BASE SLAB
SL 27 18-Oct-23 18-Nov-23 03-Aug-24 02-Sep-24 SAR1,404,868.87 SAR0.00 100% 0% 02-Sep-24, BASE SLAB
COLUMNS
COLUMN 23 19-Nov-23 14-Dec-23 03-Sep-24 30-Sep-24 SAR341,405.59 SAR0.00 100% 0% 30-Sep-24, COLUMNS
TUNNEL WALLS 37 19-Nov-23 31-Dec-23 03-Sep-24 16-Oct-24 SAR575,336.09 SAR0.00 82.21% 0% 16-Oct-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 18-Dec-23 21-Jan-24 03-Oct-24 06-Nov-24 SAR843,883.63 SAR0.00 0% 0% 06-Nov-24, MIDDLE SLAB FOR UTIL
UTILITY C
CULVERT WALLS 25 22-Jan-24 19-Feb-24 07-Nov-24 05-Dec-24 SAR487,950.13 SAR0.00 0% 0% 05-Dec-24, UTILITY CULVERT WAL
TOP SLAB
SLA 37 20-Feb-24 02-Apr-24 07-Dec-24 18-Jan-25 SAR1,083,984.64 SAR0.00 0% 0% 18-Jan-25, TOP SLAB
FINISHING WORK
FINISHIN 24 03-Apr-24 04-May-24 19-Jan-25 15-Feb-25 SAR643,728.75 SAR0.00 0% 0% 15-Feb-25, FINISHING WORK
STA. 1+933.979
1+933. ~ 1+953.979 175 30-Oct-23 23-May-24 14-Aug-24 06-Mar-25 SAR5,381,157.69 SAR0.00 38.9% 0% 06-Mar-25, STA. 1+933.979 ~ 1+9
BASE SLAB
SL 27 30-Oct-23 29-Nov-23 14-Aug-24 14-Sep-24 SAR1,404,868.87 SAR0.00 100% 0% 14-Sep-24, BASE SLAB
COLUMNS
COLUMN 23 30-Nov-23 26-Dec-23 15-Sep-24 12-Oct-24 SAR341,405.59 SAR0.00 89.21% 0% 12-Oct-24, COLUMNS
TUNNEL WALLS 37 30-Nov-23 11-Jan-24 15-Sep-24 28-Oct-24 SAR575,336.09 SAR0.00 66.69% 0% 28-Oct-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 30-Dec-23 01-Feb-24 15-Oct-24 18-Nov-24 SAR843,883.63 SAR0.00 0% 0% 18-Nov-24, MIDDLE SLAB FOR UTIL
UTILITY C
CULVERT WALLS 25 03-Feb-24 02-Mar-24 19-Nov-24 17-Dec-24 SAR487,950.13 SAR0.00 0% 0% 17-Dec-24, UTILITY CULVERT WAL
TOP SLAB
SLA 37 03-Mar-24 17-Apr-24 18-Dec-24 29-Jan-25 SAR1,083,984.64 SAR0.00 0% 0% 29-Jan-25, TOP SLAB
FINISHING WORK
FINISHIN 31 18-Apr-24 23-May-24 30-Jan-25 06-Mar-25 SAR643,728.75 SAR0.00 0% 0% 06-Mar-25, FINISHING WORK
STA. 1+953.979~
1+953. 1+968.979 182 11-Nov-23 12-Jun-24 26-Aug-24 26-Mar-25 SAR5,381,157.69 SAR0.00 30.31% 0% 26-Mar-25, STA. 1+953.979~ 1+9
BASE SLAB
SL 27 11-Nov-23 11-Dec-23 26-Aug-24 26-Sep-24 SAR1,404,868.87 SAR0.00 100% 0% 26-Sep-24, BASE SLAB
COLUMNS
COLUMN 23 12-Dec-23 07-Jan-24 28-Sep-24 23-Oct-24 SAR341,405.59 SAR0.00 31.84% 0% 23-Oct-24, COLUMNS
TUNNEL WALLS 37 12-Dec-23 23-Jan-24 28-Sep-24 09-Nov-24 SAR575,336.09 SAR0.00 20.46% 0% 09-Nov-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 10-Jan-24 13-Feb-24 27-Oct-24 30-Nov-24 SAR843,883.63 SAR0.00 0% 0% 30-Nov-24, MIDDLE SLAB FOR UTI
UTILITY C
CULVERT WALLS 25 14-Feb-24 13-Mar-24 01-Dec-24 29-Dec-24 SAR487,950.13 SAR0.00 0% 0% 29-Dec-24, UTILITY CULVERT WAL
TOP SLAB
SLA 37 14-Mar-24 29-Apr-24 30-Dec-24 10-Feb-25 SAR1,083,984.64 SAR0.00 0% 0% 10-Feb-25, TOP SLAB
FINISHING WORK
FINISHIN 38 30-Apr-24 12-Jun-24 11-Feb-25 26-Mar-25 SAR643,728.75 SAR0.00 0% 0% 26-Mar-25, FINISHING WORK

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
24 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
STA. 1+968.979
1+968. ~ 2+032.088 189 22-Nov-23 07-Jul-24 07-Sep-24 20-Apr-25 SAR5,381,157.69 SAR0.00 25.19% 0% 20-Apr-25, STA. 1+968.979 ~ 2+
BASE SLAB
SL 27 22-Nov-23 23-Dec-23 07-Sep-24 08-Oct-24 SAR1,404,868.87 SAR0.00 96.48% 0% 08-Oct-24, BASE SLAB
COLUMNS
COLUMN 23 24-Dec-23 18-Jan-24 09-Oct-24 04-Nov-24 SAR341,405.59 SAR0.00 0% 0% 04-Nov-24, COLUMNS
TUNNEL WALLS 37 24-Dec-23 04-Feb-24 09-Oct-24 20-Nov-24 SAR575,336.09 SAR0.00 0% 0% 20-Nov-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 22-Jan-24 25-Feb-24 07-Nov-24 11-Dec-24 SAR843,883.63 SAR0.00 0% 0% 11-Dec-24, MIDDLE SLAB FOR UTI
UTILITY C
CULVERT WALLS 25 26-Feb-24 25-Mar-24 12-Dec-24 09-Jan-25 SAR487,950.13 SAR0.00 0% 0% 09-Jan-25, UTILITY CULVERT WAL
TOP SLAB
SLA 37 26-Mar-24 11-May-24 11-Jan-25 22-Feb-25 SAR1,083,984.64 SAR0.00 0% 0% 22-Feb-25, TOP SLAB
FINISHING WORK
FINISHIN 45 12-May-24 07-Jul-24 23-Feb-25 20-Apr-25 SAR643,728.75 SAR0.00 0% 0% 20-Apr-25, FINISHING WORK
STA. 2+032.088~
2+032. 2+052.088 196 04-Dec-23 27-Jul-24 18-Sep-24 10-May-25 SAR5,381,157.69 SAR0.00 17.23% 0% 10-May-25, STA. 2+032.088~ 2+
BASE SLAB
SL 27 04-Dec-23 03-Jan-24 18-Sep-24 20-Oct-24 SAR1,404,868.87 SAR0.00 65.99% 0% 20-Oct-24, BASE SLAB
COLUMNS
COLUMN 23 04-Jan-24 30-Jan-24 21-Oct-24 16-Nov-24 SAR341,405.59 SAR0.00 0% 0% 16-Nov-24, COLUMNS
TUNNEL WALLS 37 04-Jan-24 15-Feb-24 21-Oct-24 02-Dec-24 SAR575,336.09 SAR0.00 0% 0% 02-Dec-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 03-Feb-24 07-Mar-24 19-Nov-24 23-Dec-24 SAR843,883.63 SAR0.00 0% 0% 23-Dec-24, MIDDLE SLAB FOR UT
UTILITY C
CULVERT WALLS 25 09-Mar-24 06-Apr-24 24-Dec-24 21-Jan-25 SAR487,950.13 SAR0.00 0% 0% 21-Jan-25, UTILITY CULVERT WA
TOP SLAB
SLA 37 07-Apr-24 22-May-24 22-Jan-25 05-Mar-25 SAR1,083,984.64 SAR0.00 0% 0% 05-Mar-25, TOP SLAB
FINISHING WORK
FINISHIN 52 23-May-24 27-Jul-24 06-Mar-25 10-May-25 SAR643,728.75 SAR0.00 0% 0% 10-May-25, FINISHING WORK
STA. 2+052.088~
2+052. 2+072.088 212 05-Dec-23 15-Aug-24 19-Sep-24 29-May-25 SAR5,381,157.69 SAR0.00 15.21% 0% 29-May-25, STA. 2+052.088~ 2
BASE SLAB
SL 27 05-Dec-23 04-Jan-24 19-Sep-24 21-Oct-24 SAR1,404,868.87 SAR0.00 58.25% 0% 21-Oct-24, BASE SLAB
COLUMNS
COLUMN 23 06-Jan-24 31-Jan-24 22-Oct-24 17-Nov-24 SAR341,405.59 SAR0.00 0% 0% 17-Nov-24, COLUMNS
TUNNEL WALLS 37 06-Jan-24 17-Feb-24 22-Oct-24 03-Dec-24 SAR575,336.09 SAR0.00 0% 0% 03-Dec-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 04-Feb-24 09-Mar-24 20-Nov-24 24-Dec-24 SAR843,883.63 SAR0.00 0% 0% 24-Dec-24, MIDDLE SLAB FOR UT
UTILITY C
CULVERT WALLS 25 10-Mar-24 07-Apr-24 25-Dec-24 22-Jan-25 SAR487,950.13 SAR0.00 0% 0% 22-Jan-25, UTILITY CULVERT WA
TOP SLAB
SLA 37 08-Apr-24 23-May-24 23-Jan-25 06-Mar-25 SAR1,083,984.64 SAR0.00 0% 0% 06-Mar-25, TOP SLAB
FINISHING WORK
FINISHIN 68 25-May-24 15-Aug-24 08-Mar-25 29-May-25 SAR643,728.75 SAR0.00 0% 0% 29-May-25, FINISHING WORK
STA. 2+072.088~
2+072. 2+092.088 168 06-Dec-23 26-Jun-24 21-Sep-24 09-Apr-25 SAR5,381,157.69 SAR0.00 13.19% 0% 09-Apr-25, STA. 2+072.088~ 2+0
BASE SLAB
SL 27 06-Dec-23 06-Jan-24 21-Sep-24 22-Oct-24 SAR1,404,868.87 SAR0.00 50.52% 0% 22-Oct-24, BASE SLAB
COLUMNS
COLUMN 23 07-Jan-24 01-Feb-24 23-Oct-24 19-Nov-24 SAR341,405.59 SAR0.00 0% 0% 19-Nov-24, COLUMNS
TUNNEL WALLS 37 07-Jan-24 18-Feb-24 23-Oct-24 04-Dec-24 SAR575,336.09 SAR0.00 0% 0% 04-Dec-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 05-Feb-24 10-Mar-24 21-Nov-24 25-Dec-24 SAR843,883.63 SAR0.00 0% 0% 25-Dec-24, MIDDLE SLAB FOR UT
UTILITY C
CULVERT WALLS 25 11-Mar-24 08-Apr-24 26-Dec-24 23-Jan-25 SAR487,950.13 SAR0.00 0% 0% 23-Jan-25, UTILITY CULVERT WA
TOP SLAB
SLA 37 13-Apr-24 25-May-24 25-Jan-25 08-Mar-25 SAR1,083,984.64 SAR0.00 0% 0% 08-Mar-25, TOP SLAB
FINISHING WORK
FINISHIN 24 26-May-24 26-Jun-24 09-Mar-25 09-Apr-25 SAR643,728.75 SAR0.00 0% 0% 09-Apr-25, FINISHING WORK
STA. 2+092.088~
2+092. 2+112.088 175 18-Dec-23 16-Jul-24 03-Oct-24 29-Apr-25 SAR5,551,165.68 SAR0.00 0% 0% 29-Apr-25, STA. 2+092.088~ 2+
BASE SLAB
SL 27 18-Dec-23 17-Jan-24 03-Oct-24 03-Nov-24 SAR1,574,876.86 SAR0.00 0% 0% 03-Nov-24, BASE SLAB
COLUMNS
COLUMN 23 18-Jan-24 13-Feb-24 04-Nov-24 30-Nov-24 SAR341,405.59 SAR0.00 0% 0% 30-Nov-24, COLUMNS
TUNNEL WALLS 37 18-Jan-24 29-Feb-24 04-Nov-24 16-Dec-24 SAR575,336.09 SAR0.00 0% 0% 16-Dec-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 17-Feb-24 21-Mar-24 03-Dec-24 06-Jan-25 SAR843,883.63 SAR0.00 0% 0% 06-Jan-25, MIDDLE SLAB FOR UT
UTILITY C
CULVERT WALLS 25 23-Mar-24 23-Apr-24 07-Jan-25 04-Feb-25 SAR487,950.13 SAR0.00 0% 0% 04-Feb-25, UTILITY CULVERT WA
TOP SLAB
SLA 37 24-Apr-24 05-Jun-24 05-Feb-25 19-Mar-25 SAR1,083,984.64 SAR0.00 0% 0% 19-Mar-25, TOP SLAB
FINISHING WORK
FINISHIN 31 06-Jun-24 16-Jul-24 20-Mar-25 29-Apr-25 SAR643,728.75 SAR0.00 0% 0% 29-Apr-25, FINISHING WORK
STA. 2+112.088~
2+112. 2+132.088 237 30-Dec-23 09-Oct-24 15-Oct-24 26-Jul-25 SAR5,381,157.69 SAR0.00 0% 0% 26-Jul-25, STA. 2+112.088~ 2
BASE SLAB
SL 27 30-Dec-23 29-Jan-24 15-Oct-24 14-Nov-24 SAR1,404,868.87 SAR0.00 0% 0% 14-Nov-24, BASE SLAB
COLUMNS
COLUMN 23 30-Jan-24 25-Feb-24 16-Nov-24 12-Dec-24 SAR341,405.59 SAR0.00 0% 0% 12-Dec-24, COLUMNS
TUNNEL WALLS 37 30-Jan-24 12-Mar-24 16-Nov-24 28-Dec-24 SAR575,336.09 SAR0.00 0% 0% 28-Dec-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 28-Feb-24 02-Apr-24 15-Dec-24 18-Jan-25 SAR843,883.63 SAR0.00 0% 0% 18-Jan-25, MIDDLE SLAB FOR UT
UTILITY C
CULVERT WALLS 25 03-Apr-24 05-May-24 19-Jan-25 16-Feb-25 SAR487,950.13 SAR0.00 0% 0% 16-Feb-25, UTILITY CULVERT WA
TOP SLAB
SLA 106 06-May-24 10-Sep-24 17-Feb-25 28-Jun-25 SAR1,083,984.64 SAR0.00 0% 0% 28-Jun-25, TOP SLAB
FINISHING WORK
FINISHIN 24 11-Sep-24 09-Oct-24 29-Jun-25 26-Jul-25 SAR643,728.75 SAR0.00 0% 0% 26-Jul-25, FINISHING WOR
STA. 2+132.088~
2+132. 2+157.088 235 10-Jan-24 19-Oct-24 27-Oct-24 04-Aug-25 SAR5,381,157.69 SAR0.00 0% 0% 04-Aug-25, STA. 2+132.088~
BASE SLAB
SL 27 10-Jan-24 10-Feb-24 27-Oct-24 26-Nov-24 SAR1,404,868.87 SAR0.00 0% 0% 26-Nov-24, BASE SLAB
COLUMNS
COLUMN 23 11-Feb-24 07-Mar-24 27-Nov-24 23-Dec-24 SAR341,405.59 SAR0.00 0% 0% 23-Dec-24, COLUMNS
TUNNEL WALLS 37 11-Feb-24 24-Mar-24 27-Nov-24 08-Jan-25 SAR575,336.09 SAR0.00 0% 0% 08-Jan-25, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 30 11-Mar-24 17-Apr-24 26-Dec-24 29-Jan-25 SAR843,883.63 SAR0.00 0% 0% 29-Jan-25, MIDDLE SLAB FOR UT
UTILITY C
CULVERT WALLS 25 18-Apr-24 16-May-24 30-Jan-25 27-Feb-25 SAR487,950.13 SAR0.00 0% 0% 27-Feb-25, UTILITY CULVERT W
TOP SLAB
SLA 37 18-May-24 03-Jul-24 01-Mar-25 16-Apr-25 SAR1,083,984.64 SAR0.00 0% 0% 16-Apr-25, TOP SLAB
FINISHING WORK
FINISHIN 91 04-Jul-24 19-Oct-24 17-Apr-25 04-Aug-25 SAR643,728.75 SAR0.00 0% 0% 04-Aug-25, FINISHING WO
EGRESS STAIR-8
STAIR (ZONE-5) 236 17-Jun-23 21-Mar-24 06-Mar-24 16-Dec-24 SAR2,352,338.08 SAR0.00 56.55% 0% 16-Dec-24, EGRESS STAIR-8 (ZONE
WALL AND 11ST FLIGHT 31 17-Jun-23 25-Jul-23 06-Mar-24 15-Apr-24 SAR544,958.40 SAR0.00 100% 0% 15-Apr-24, WALL AND 1ST FLIGHT
WALL AND 22ND FLIGHT 17 26-Jul-23 14-Aug-23 15-Apr-24 05-May-24 SAR111,087.10 SAR0.00 100% 0% 05-May-24, WALL AND 2ND FLIGHT
WALL AND 33RD FLIGHT 17 15-Aug-23 03-Sep-23 05-May-24 25-May-24 SAR111,087.10 SAR0.00 100% 0% 25-May-24, WALL AND 3RD FLIGHT
WALL AND 44TH FLIGHT 17 04-Sep-23 24-Sep-23 25-May-24 13-Jun-24 SAR111,087.10 SAR0.00 100% 0% 13-Jun-24, WALL AND 4TH FLIGHT
WALL AND 55TH FLIGHT 17 25-Sep-23 14-Oct-23 13-Jun-24 08-Jul-24 SAR111,087.10 SAR0.00 100% 0% 08-Jul-24, WALL AND 5TH FLIGHT

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
25 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
WALL AND 6 6TH FLIGHT 17 15-Oct-23 02-Nov-23 08-Jul-24 28-Jul-24 SAR111,087.10 SAR0.00 100% 0% 28-Jul-24, WALL AND 6TH FLIGHT
WALL AND 7 7TH FLIGHT 17 04-Nov-23 22-Nov-23 28-Jul-24 17-Aug-24 SAR111,087.10 SAR0.00 100% 0% 17-Aug-24, WALL AND 7TH FLIGHT
WALL AND 8 8TH FLIGHT 17 23-Nov-23 12-Dec-23 17-Aug-24 05-Sep-24 SAR111,087.10 SAR0.00 100% 0% 05-Sep-24, WALL AND 8TH FLIGHT
WALL AND 9 9TH FLIGHT 17 13-Dec-23 01-Jan-24 05-Sep-24 26-Sep-24 SAR111,087.10 SAR0.00 6.93% 0% 26-Sep-24, WALL AND 9TH FLIGHT
WALL AND 1 10TH FLIGHT 17 02-Jan-24 21-Jan-24 26-Sep-24 16-Oct-24 SAR111,087.10 SAR0.00 0% 0% 16-Oct-24, WALL AND 10TH FLIGHT
WALL AND 1 11TH FLIGHT 17 22-Jan-24 10-Feb-24 16-Oct-24 05-Nov-24 SAR111,087.10 SAR0.00 0% 0% 05-Nov-24, WALL AND 11TH FLIGHT
TOP SLAB 35 11-Feb-24 21-Mar-24 05-Nov-24 16-Dec-24 SAR696,508.72 SAR0.00 0% 0% 16-Dec-24, TOP SLAB
EGRESS STAIR-9
STAIR (ZONE-5) 236 02-Jul-23 02-Apr-24 18-Mar-24 28-Dec-24 SAR2,352,338.08 SAR0.00 55.06% 0% 28-Dec-24, EGRESS STAIR-9 (ZONE
WALL AND 1 1ST FLIGHT 31 02-Jul-23 06-Aug-23 18-Mar-24 27-Apr-24 SAR544,958.40 SAR0.00 100% 0% 27-Apr-24, WALL AND 1ST FLIGHT
WALL AND 2 2ND FLIGHT 17 07-Aug-23 26-Aug-23 27-Apr-24 16-May-24 SAR111,087.10 SAR0.00 100% 0% 16-May-24, WALL AND 2ND FLIGHT
WALL AND 3 3RD FLIGHT 17 27-Aug-23 14-Sep-23 16-May-24 05-Jun-24 SAR111,087.10 SAR0.00 100% 0% 05-Jun-24, WALL AND 3RD FLIGHT
WALL AND 4 4TH FLIGHT 17 16-Sep-23 05-Oct-23 05-Jun-24 30-Jun-24 SAR111,087.10 SAR0.00 100% 0% 30-Jun-24, WALL AND 4TH FLIGHT
WALL AND 5 5TH FLIGHT 17 07-Oct-23 25-Oct-23 30-Jun-24 20-Jul-24 SAR111,087.10 SAR0.00 100% 0% 20-Jul-24, WALL AND 5TH FLIGHT
WALL AND 6 6TH FLIGHT 17 26-Oct-23 14-Nov-23 20-Jul-24 08-Aug-24 SAR111,087.10 SAR0.00 100% 0% 08-Aug-24, WALL AND 6TH FLIGHT
WALL AND 7 7TH FLIGHT 17 15-Nov-23 04-Dec-23 08-Aug-24 28-Aug-24 SAR111,087.10 SAR0.00 100% 0% 28-Aug-24, WALL AND 7TH FLIGHT
WALL AND 8 8TH FLIGHT 17 05-Dec-23 24-Dec-23 28-Aug-24 17-Sep-24 SAR111,087.10 SAR0.00 75.45% 0% 17-Sep-24, WALL AND 8TH FLIGHT
WALL AND 9 9TH FLIGHT 17 25-Dec-23 13-Jan-24 17-Sep-24 08-Oct-24 SAR111,087.10 SAR0.00 0% 0% 08-Oct-24, WALL AND 9TH FLIGHT
WALL AND 1 10TH FLIGHT 17 14-Jan-24 01-Feb-24 08-Oct-24 28-Oct-24 SAR111,087.10 SAR0.00 0% 0% 28-Oct-24, WALL AND 10TH FLIGHT
WALL AND 1 11TH FLIGHT 17 03-Feb-24 21-Feb-24 28-Oct-24 17-Nov-24 SAR111,087.10 SAR0.00 0% 0% 17-Nov-24, WALL AND 11TH FLIGH
TOP SLAB 35 22-Feb-24 02-Apr-24 17-Nov-24 28-Dec-24 SAR696,508.72 SAR0.00 0% 0% 28-Dec-24, TOP SLAB
EGRESS STAIR-10
STAIR (ZONE-5) 236 31-Oct-23 08-Aug-24 15-Aug-24 22-May-25 SAR2,352,338.08 SAR0.00 26.57% 0% 22-May-25, EGRESS STAIR-10
WALL AND 1 1ST FLIGHT 31 31-Oct-23 05-Dec-23 15-Aug-24 19-Sep-24 SAR544,958.40 SAR0.00 100% 0% 19-Sep-24, WALL AND 1ST FLIGHT
WALL AND 2 2ND FLIGHT 17 06-Dec-23 25-Dec-23 21-Sep-24 10-Oct-24 SAR111,087.10 SAR0.00 71.98% 0% 10-Oct-24, WALL AND 2ND FLIGHT
WALL AND 3 3RD FLIGHT 17 26-Dec-23 14-Jan-24 12-Oct-24 30-Oct-24 SAR111,087.10 SAR0.00 0% 0% 30-Oct-24, WALL AND 3RD FLIGHT
WALL AND 4 4TH FLIGHT 17 15-Jan-24 03-Feb-24 31-Oct-24 19-Nov-24 SAR111,087.10 SAR0.00 0% 0% 19-Nov-24, WALL AND 4TH FLIGHT
WALL AND 5 5TH FLIGHT 17 04-Feb-24 22-Feb-24 20-Nov-24 09-Dec-24 SAR111,087.10 SAR0.00 0% 0% 09-Dec-24, WALL AND 5TH FLIGHT
WALL AND 6 6TH FLIGHT 17 24-Feb-24 13-Mar-24 10-Dec-24 29-Dec-24 SAR111,087.10 SAR0.00 0% 0% 29-Dec-24, WALL AND 6TH FLIGH
WALL AND 7 7TH FLIGHT 17 14-Mar-24 02-Apr-24 30-Dec-24 18-Jan-25 SAR111,087.10 SAR0.00 0% 0% 18-Jan-25, WALL AND 7TH FLIGH
WALL AND 8 8TH FLIGHT 17 03-Apr-24 25-Apr-24 19-Jan-25 06-Feb-25 SAR111,087.10 SAR0.00 0% 0% 06-Feb-25, WALL AND 8TH FLIGH
WALL AND 9 9TH FLIGHT 17 27-Apr-24 15-May-24 08-Feb-25 26-Feb-25 SAR111,087.10 SAR0.00 0% 0% 26-Feb-25, WALL AND 9TH FLIG
WALL AND 1 10TH FLIGHT 17 16-May-24 04-Jun-24 27-Feb-25 18-Mar-25 SAR111,087.10 SAR0.00 0% 0% 18-Mar-25, WALL AND 10TH FL
WALL AND 1 11TH FLIGHT 17 05-Jun-24 29-Jun-24 19-Mar-25 12-Apr-25 SAR111,087.10 SAR0.00 0% 0% 12-Apr-25, WALL AND 11TH FL
TOP SLAB 35 30-Jun-24 08-Aug-24 13-Apr-25 22-May-25 SAR696,508.72 SAR0.00 0% 0% 22-May-25, TOP SLAB
EGRESS STAIR-11
STAIR (ZONE-5) 236 05-Dec-23 12-Sep-24 19-Sep-24 30-Jun-25 SAR2,352,338.08 SAR0.00 10.45% 0% 30-Jun-25, EGRESS STAIR-1
WALL AND 1 1ST FLIGHT 31 05-Dec-23 09-Jan-24 19-Sep-24 26-Oct-24 SAR544,958.40 SAR0.00 45.1% 0% 26-Oct-24, WALL AND 1ST FLIGHT
WALL AND 2 2ND FLIGHT 17 10-Jan-24 29-Jan-24 27-Oct-24 14-Nov-24 SAR111,087.10 SAR0.00 0% 0% 14-Nov-24, WALL AND 2ND FLIGHT
WALL AND 3 3RD FLIGHT 17 30-Jan-24 18-Feb-24 16-Nov-24 04-Dec-24 SAR111,087.10 SAR0.00 0% 0% 04-Dec-24, WALL AND 3RD FLIGHT
WALL AND 4 4TH FLIGHT 17 19-Feb-24 09-Mar-24 05-Dec-24 24-Dec-24 SAR111,087.10 SAR0.00 0% 0% 24-Dec-24, WALL AND 4TH FLIGHT
WALL AND 5 5TH FLIGHT 17 10-Mar-24 28-Mar-24 25-Dec-24 13-Jan-25 SAR111,087.10 SAR0.00 0% 0% 13-Jan-25, WALL AND 5TH FLIGH
WALL AND 6 6TH FLIGHT 17 30-Mar-24 21-Apr-24 14-Jan-25 02-Feb-25 SAR111,087.10 SAR0.00 0% 0% 02-Feb-25, WALL AND 6TH FLIGH
WALL AND 7 7TH FLIGHT 17 22-Apr-24 11-May-24 03-Feb-25 22-Feb-25 SAR111,087.10 SAR0.00 0% 0% 22-Feb-25, WALL AND 7TH FLIG
WALL AND 8 8TH FLIGHT 17 12-May-24 30-May-24 23-Feb-25 13-Mar-25 SAR111,087.10 SAR0.00 0% 0% 13-Mar-25, WALL AND 8TH FLIG
WALL AND 9 9TH FLIGHT 17 01-Jun-24 24-Jun-24 15-Mar-25 07-Apr-25 SAR111,087.10 SAR0.00 0% 0% 07-Apr-25, WALL AND 9TH FLI
WALL AND 1 10TH FLIGHT 17 25-Jun-24 14-Jul-24 08-Apr-25 27-Apr-25 SAR111,087.10 SAR0.00 0% 0% 27-Apr-25, WALL AND 10TH FL
WALL AND 1 11TH FLIGHT 17 15-Jul-24 03-Aug-24 28-Apr-25 17-May-25 SAR111,087.10 SAR0.00 0% 0% 17-May-25, WALL AND 11TH F
TOP SLAB 35 04-Aug-24 12-Sep-24 18-May-25 30-Jun-25 SAR696,508.72 SAR0.00 0% 0% 30-Jun-25, TOP SLAB
BACKFILLING UPTO TUNNEL WALL 193 26-Sep-23 20-Apr-24 19-Jun-24 01-Feb-25 SAR8,310,867.91 SAR0.00 25% 0% 01-Feb-25, BACKFILLING UPTO T
STRUCTURAL FILL 234 25-Feb-24 11-Nov-24 19-Nov-24 27-Aug-25 SAR8,310,867.91 SAR0.00 0% 0% 27-Aug-25, STRUCTURAL
WET & DRY UTILITIES
UT 112 20-Oct-24 26-Feb-25 05-Aug-25 14-Dec-25 SAR5,627,491.21 SAR0.00 0% 0% 14-Dec-25, WET & DRY
INSIDE WET CULVERT 112 20-Oct-24 26-Feb-25 05-Aug-25 14-Dec-25 SAR3,840,377.51 SAR0.00 0% 0% 14-Dec-25, INSIDE WE
POTABLE WATER NETWORK 59 20-Oct-24 26-Dec-24 05-Aug-25 13-Oct-25 SAR427,352.76 SAR0.00 0% 0% 13-Oct-25, POTABLE WA
GREY WA
WATER DISTRIBUTION SYSTEM 49 18-Nov-24 13-Jan-25 03-Sep-25 30-Oct-25 SAR197,230.15 SAR0.00 0% 0% 30-Oct-25, GREY WATER
IRRIGATION NETWORK
IRRIGATI 78 20-Oct-24 18-Jan-25 05-Aug-25 04-Nov-25 SAR391,076.73 SAR0.00 0% 0% 04-Nov-25, IRRIGATION
CHILLED WATER SUPPLY NETWORK 59 11-Dec-24 17-Feb-25 28-Sep-25 04-Dec-25 SAR1,043,588.20 SAR0.00 0% 0% 04-Dec-25, CHILLED W
CHILLED WATER RETURN NETWORK 63 11-Dec-24 22-Feb-25 28-Sep-25 09-Dec-25 SAR1,043,588.20 SAR0.00 0% 0% 09-Dec-25, CHILLED W
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 87 18-Nov-24 26-Feb-25 03-Sep-25 14-Dec-25 SAR737,541.47 SAR0.00 0% 0% 14-Dec-25, AUTOMATI
INSIDE DRY CULVERT 95 20-Oct-24 05-Feb-25 05-Aug-25 25-Nov-25 SAR1,787,113.70 SAR0.00 0% 0% 25-Nov-25, INSIDE DRY
POWER 95 20-Oct-24 05-Feb-25 05-Aug-25 25-Nov-25 SAR1,661,187.78 SAR0.00 0% 0% 25-Nov-25, POWER
HIGH VOLTAGE
V 110 KV NETWORK 30 20-Oct-24 23-Nov-24 05-Aug-25 08-Sep-25 SAR108,118.10 SAR0.00 0% 0% 08-Sep-25, HIGH VOLTAG
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 32 03-Nov-24 09-Dec-24 19-Aug-25 25-Sep-25 SAR1,382,859.12 SAR0.00 0% 0% 25-Sep-25, MEDIUM VOL
LOW VVOLTAGE NETWORK 34 24-Nov-24 01-Jan-25 09-Sep-25 19-Oct-25 SAR170,210.56 SAR0.00 0% 0% 19-Oct-25, LOW VOLTAG
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 71 17-Nov-24 05-Feb-25 02-Sep-25 25-Nov-25 SAR0.00 SAR0.00 0% 0% 25-Nov-25, ELECTRICA

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
26 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
LIGHTING SYSTEM
LIGHT 36 28-Nov-24 07-Jan-25 14-Sep-25 26-Oct-25 SAR0.00 SAR0.00 0% 0% 26-Oct-25, LIGHTING SY
TELECOM SERVICES 30 02-Jan-25 05-Feb-25 20-Oct-25 23-Nov-25 SAR125,925.93 SAR0.00 0% 0% 23-Nov-25, TELECOM S
MEP VEHICULAR
VEHICULA TUNNEL/ DRY & WET CULVERTS 162 20-Oct-24 30-Apr-25 05-Aug-25 10-Feb-26 SAR7,521,676.34 SAR0.00 0% 0% 10-Feb-26, MEP VEH
TUNNEL MECHANICAL
ME WORKS 86 12-Nov-24 19-Feb-25 28-Aug-25 07-Dec-25 SAR2,163,850.77 SAR0.00 0% 0% 07-Dec-25, TUNNEL M
FIRE FIG
FIGHTING SYSTEM 56 12-Nov-24 15-Jan-25 28-Aug-25 02-Nov-25 SAR1,573,805.75 SAR0.00 0% 0% 02-Nov-25, FIRE FIGHTI
VENTILATION SYSTEM
VENTILA 57 05-Dec-24 09-Feb-25 21-Sep-25 26-Nov-25 SAR176,473.45 SAR0.00 0% 0% 26-Nov-25, VENTILATI
PUMPS INSTALLATION
I 22 17-Dec-24 09-Jan-25 04-Oct-25 28-Oct-25 SAR331,608.78 SAR0.00 0% 0% 28-Oct-25, PUMPS INSTA
DUCTING SYSTEM 66 05-Dec-24 19-Feb-25 21-Sep-25 07-Dec-25 SAR81,962.79 SAR0.00 0% 0% 07-Dec-25, DUCTING S
TUNNEL ELECTRICAL
EL WORKS 134 20-Oct-24 24-Mar-25 05-Aug-25 08-Jan-26 SAR4,548,718.94 SAR0.00 0% 0% 08-Jan-26, TUNNEL EL
CABLE TRAYS
T 101 20-Oct-24 13-Feb-25 05-Aug-25 01-Dec-25 SAR1,032,116.32 SAR0.00 0% 0% 01-Dec-25, CABLE TRA
POWER CABLES 113 13-Nov-24 24-Mar-25 30-Aug-25 08-Jan-26 SAR1,395,474.25 SAR0.00 0% 0% 08-Jan-26, POWER CA
ELECTRICAL INSTALLATIONS
ELECTRI 86 07-Dec-24 16-Mar-25 22-Sep-25 31-Dec-25 SAR1,141,842.70 SAR0.00 0% 0% 31-Dec-25, ELECTRICA
LOW CUR
CURRENT 110 20-Oct-24 24-Feb-25 05-Aug-25 11-Dec-25 SAR979,285.68 SAR0.00 0% 0% 11-Dec-25, LOW CURR
FIRE D
DETECTION AND ALARM SYSTEM 82 20-Oct-24 22-Jan-25 05-Aug-25 09-Nov-25 SAR167,385.38 SAR0.00 0% 0% 09-Nov-25, FIRE DETEC
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 28 03-Nov-24 04-Dec-24 19-Aug-25 20-Sep-25 SAR139,471.52 SAR0.00 0% 0% 20-Sep-25, COMMUNICA
PUBLIC ADDRESS
PUBLI 28 11-Nov-24 12-Dec-24 27-Aug-25 30-Sep-25 SAR108,186.32 SAR0.00 0% 0% 30-Sep-25, PUBLIC ADDR
VIDEO SURVEILLANCE 49 19-Nov-24 14-Jan-25 04-Sep-25 01-Nov-25 SAR130,180.21 SAR0.00 0% 0% 01-Nov-25, VIDEO SURV
SACADA SYSTEM
SACA 35 15-Jan-25 24-Feb-25 02-Nov-25 11-Dec-25 SAR347,541.21 SAR0.00 0% 0% 11-Dec-25, SACADA SY
RADIO RE-BROADCASTING SYSTEM 28 19-Nov-24 21-Dec-24 04-Sep-25 07-Oct-25 SAR86,521.04 SAR0.00 0% 0% 07-Oct-25, RADIO RE-BR
TUNNEL PLUMBING
PL WORKS 35 17-Mar-25 30-Apr-25 01-Jan-26 10-Feb-26 SAR809,106.62 SAR0.00 0% 0% 10-Feb-26, TUNNEL
DRAINAGE SYSTEM
DRAINAG 35 17-Mar-25 30-Apr-25 01-Jan-26 10-Feb-26 SAR809,106.62 SAR0.00 0% 0% 10-Feb-26, DRAINAG
TUNNEL INTERNAL
INTER ROAD WORK 42 01-May-25 22-Jun-25 11-Feb-26 05-Apr-26 SAR850,146.02 SAR0.00 0% 0% 05-Apr-26, TUNNE
TUNNEL INTERNAL
INTER DECORATIVE WORKS 40 04-Jun-25 23-Jul-25 17-Mar-26 06-May-26 SAR2,760,476.87 SAR0.00 0% 0% 06-May-26, TUNN
ZONE 6 - FROM S
STA. 2+157 ~ 2+826.33 1234 27-Jun-22 20-Apr-25 27-Jun-22 A 13-Jul-26 SAR249,876,460.06 SAR39,004,628.12 84.38% 15.61% 13-Jul-26, ZON
ENGINEERING 687 27-Jun-22 25-Sep-23 27-Jun-22 A 25-Sep-24 SAR0.00 SAR0.00 0% 0% 25-Sep-24, ENGINEERING
SITE SURVEY 10 27-Jun-22 07-Jul-22 27-Jun-22 A 04-Oct-22 A SAR0.00 SAR0.00 0% 0% 04-Oct-22 A, SITE SURVEY
SHOP DRAWINGS
DRAWIN 473 28-Jun-22 03-Jan-23 28-Jun-22 A 11-Jan-24 SAR0.00 SAR0.00 0% 0% 11-Jan-24, SHOP DRAWINGS
CIVIL/STRUCTURAL 2+157 ~2+258
CIVIL/STRU 466 28-Jun-22 01-Sep-22 28-Jun-22 A 04-Jan-24 SAR0.00 SAR0.00 0% 0% 04-Jan-24, CIVIL/STRUCTURAL 2+157 ~2+258
CIVIL/STRUCTURAL 2+258 ~2+358
CIVIL/STRU 436 06-Aug-22 06-Oct-22 06-Aug-22 A 04-Jan-24 SAR0.00 SAR0.00 0% 0% 04-Jan-24, CIVIL/STRUCTURAL 2+258 ~2+358
CIVIL/STRUCTURAL 2+358 ~2+469
CIVIL/STRU 412 10-Sep-22 10-Nov-22 28-Aug-22 A 10-Jan-24 SAR0.00 SAR0.00 0% 0% 10-Jan-24, CIVIL/STRUCTURAL 2+358 ~2+469
CIVIL/STRUCTURAL 2+469 ~2+518
CIVIL/STRU 127 08-Oct-22 08-Dec-22 09-Aug-22 A 19-Dec-23 SAR0.00 SAR0.00 0% 0% 19-Dec-23, CIVIL/STRUCTURAL 2+469 ~2+518
ARCHITECTURAL
ARCHITECT 22 10-Dec-22 03-Jan-23 17-Dec-23 11-Jan-24 SAR0.00 SAR0.00 0% 0% 11-Jan-24, ARCHITECTURAL
UTILITIES 386 10-Dec-22 25-Sep-23 01-Nov-22 A 25-Sep-24 SAR0.00 SAR0.00 0% 0% 25-Sep-24, UTILITIES
WET UTILITIES
UTILIT 153 10-Dec-22 25-Apr-23 17-Dec-23 20-Jun-24 SAR0.00 SAR0.00 0% 0% 20-Jun-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 61 10-Dec-22 03-Jan-23 17-Dec-23 26-Feb-24 SAR0.00 SAR0.00 0% 0% 26-Feb-24, POTABLE WATER NETWORK BRA
GREY WAWATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 25 04-Jan-23 01-Feb-23 26-Feb-24 26-Mar-24 SAR0.00 SAR0.00 0% 0% 26-Mar-24, GREY WATER DISTRIBUTION NE
IRR & FF NETWORK BRANCHES & TIE IN POINTS 22 02-Feb-23 27-Feb-23 26-Mar-24 24-Apr-24 SAR0.00 SAR0.00 0% 0% 24-Apr-24, IRR & FF NETWORK BRANCHE
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 27 28-Feb-23 30-Mar-23 24-Apr-24 26-May-24 SAR0.00 SAR0.00 0% 0% 26-May-24, CHILLED WATER SUPPLY & R
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 19 01-Apr-23 25-Apr-23 26-May-24 20-Jun-24 SAR0.00 SAR0.00 0% 0% 20-Jun-24, AUTOMATIC WASTE COLLECT
DRY UTILITI
UTILITIES 386 26-Apr-23 25-Sep-23 01-Nov-22 A 25-Sep-24 SAR0.00 SAR0.00 0% 0% 25-Sep-24, DRY UTILITIES
POWER 350 26-Apr-23 04-Sep-23 01-Nov-22 A 04-Sep-24 SAR0.00 SAR0.00 0% 0% 04-Sep-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 21 26-Apr-23 21-May-23 22-Jun-24 16-Jul-24 SAR0.00 SAR0.00 0% 0% 16-Jul-24, HIGH VOLTAGE 110 KV NETW
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 25 22-May-23 19-Jun-23 16-Jul-24 13-Aug-24 SAR0.00 SAR0.00 0% 0% 13-Aug-24, MEDIUM VOLTAGE 13.8 KV
LOW V VOLTAGE NETWORK 19 20-Jun-23 15-Jul-23 27-Nov-22 A 04-Sep-24 SAR0.00 SAR0.00 0% 0% 04-Sep-24, LOW VOLTAGE NETWORK
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 22 16-Jul-23 09-Aug-23 01-Nov-22 A 12-Nov-22 A SAR0.00 SAR0.00 0% 0% 12-Nov-22 A, ELECTRICAL DISTRIBUTION SYSTEM
LIGHTING SYSTEM
LIGHT 22 10-Aug-23 04-Sep-23 26-Nov-22 A 27-Dec-23 A SAR0.00 SAR0.00 0% 0% 27-Dec-23 A, LIGHTING SYSTEM
LOW CUR
CURRENT 17 05-Sep-23 25-Sep-23 04-Sep-24 25-Sep-24 SAR0.00 SAR0.00 0% 0% 25-Sep-24, LOW CURRENT
TELECOM SERVICES
TELEC 17 05-Sep-23 25-Sep-23 04-Sep-24 25-Sep-24 SAR0.00 SAR0.00 0% 0% 25-Sep-24, TELECOM SERVICES
MEP 220 10-Dec-22 29-Aug-23 17-Dec-23 07-Sep-24 SAR0.00 SAR0.00 0% 0% 07-Sep-24, MEP
TUNNEL MECHANICAL
ME WORKS 176 10-Dec-22 09-Jul-23 17-Dec-23 17-Jul-24 SAR0.00 SAR0.00 0% 0% 17-Jul-24, TUNNEL MECHANICAL WOR
FIRE FIG
FIGHTING SYSTEM 88 10-Dec-22 21-Mar-23 17-Dec-23 28-Mar-24 SAR0.00 SAR0.00 0% 0% 28-Mar-24, FIRE FIGHTING SYSTEM
VENTILATION SYSTEM
VENTILA 44 08-Mar-23 01-May-23 14-Mar-24 08-May-24 SAR0.00 SAR0.00 0% 0% 08-May-24, VENTILATION SYSTEM
PUMPS INSTALLATION
I 22 02-May-23 27-May-23 08-May-24 03-Jun-24 SAR0.00 SAR0.00 0% 0% 03-Jun-24, PUMPS INSTALLATION
DUCTING SYSTEM 88 22-Mar-23 09-Jul-23 28-Mar-24 17-Jul-24 SAR0.00 SAR0.00 0% 0% 17-Jul-24, DUCTING SYSTEM
TUNNEL ELECTRICAL
EL WORKS 210 21-Dec-22 29-Aug-23 28-Dec-23 07-Sep-24 SAR0.00 SAR0.00 0% 0% 07-Sep-24, TUNNEL ELECTRICAL WOR
CABLE TRAYS
T 110 21-Dec-22 01-May-23 28-Dec-23 08-May-24 SAR0.00 SAR0.00 0% 0% 08-May-24, CABLE TRAYS
POWER CABLES 44 22-Feb-23 13-Apr-23 29-Feb-24 24-Apr-24 SAR0.00 SAR0.00 0% 0% 24-Apr-24, POWER CABLES
ELECTRICAL INSTALLATIONS
ELECTRI 110 06-Mar-23 18-Jul-23 12-Mar-24 27-Jul-24 SAR0.00 SAR0.00 0% 0% 27-Jul-24, ELECTRICAL INSTALLATION
LOW CUR
CURRENT 132 22-Mar-23 29-Aug-23 28-Mar-24 07-Sep-24 SAR0.00 SAR0.00 0% 0% 07-Sep-24, LOW CURRENT
FIRE D
DETECTION AND ALARM SYSTEM 132 22-Mar-23 29-Aug-23 28-Mar-24 07-Sep-24 SAR0.00 SAR0.00 0% 0% 07-Sep-24, FIRE DETECTION AND ALA
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 110 03-Apr-23 15-Aug-23 13-Apr-24 24-Aug-24 SAR0.00 SAR0.00 0% 0% 24-Aug-24, COMMUNICATION SYSTEM
PUBLIC ADDRESS
PUBLI 66 19-Apr-23 11-Jul-23 29-Apr-24 20-Jul-24 SAR0.00 SAR0.00 0% 0% 20-Jul-24, PUBLIC ADDRESS

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
27 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
VIDEO SURVEILLANCE 44 04-May-23 24-Jun-23 11-May-24 06-Jul-24 SAR0.00 SAR0.00 0% 0% 06-Jul-24, VIDEO SURVEILLANCE
SACADA SYSTEM
SACA 44 16-May-23 09-Jul-23 22-May-24 17-Jul-24 SAR0.00 SAR0.00 0% 0% 17-Jul-24, SACADA SYSTEM
RADIO RE-BROADCASTING SYSTEM 44 28-May-23 20-Jul-23 03-Jun-24 29-Jul-24 SAR0.00 SAR0.00 0% 0% 29-Jul-24, RADIO RE-BROADCASTING
TUNNEL PLUMBING
PL WORKS 21 02-Jan-23 25-Jan-23 09-Jan-24 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, TUNNEL PLUMBING WORKS
PROCUREMENT 651 07-Nov-22 12-Mar-24 20-Nov-22 A 13-Mar-25 SAR21,271,221.83 SAR7,280,257.34 99.85% 34.23% 13-Mar-25, PROCUREMENT
CIVIL/STRUCTU
CIVIL/STRUCTURAL 162 26-Jan-23 05-Apr-23 01-Dec-22 A 02-Mar-24 SAR15,976,688.34 SAR7,280,257.34 100% 45.57% 02-Mar-24, CIVIL/STRUCTURAL
UTILITIES 412 07-Nov-22 12-Mar-24 20-Nov-22 A 13-Mar-25 SAR824,813.15 SAR0.00 96.04% 0% 13-Mar-25, UTILITIES
WET UTILITIES
UTILIT 330 07-Nov-22 24-Oct-23 20-Nov-22 A 08-Dec-24 SAR541,082.58 SAR0.00 100% 0% 08-Dec-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 238 07-Nov-22 25-Jun-23 20-Nov-22 A 21-Aug-24 SAR75,415.19 SAR0.00 100% 0% 21-Aug-24, POTABLE WATER NETWOR
DI PIPES
PIP 228 04-Jan-23 25-Jun-23 20-Nov-22 A 10-Aug-24 SAR8,295.67 SAR0.00 100% 0% 10-Aug-24, DI PIPES
HDPE PIPES 145 04-Jan-23 25-Jun-23 26-Feb-24 21-Aug-24 SAR9,803.98 SAR0.00 100% 0% 21-Aug-24, HDPE PIPES
GRP PPIPES 145 04-Jan-23 25-Jun-23 26-Feb-24 21-Aug-24 SAR7,541.52 SAR0.00 100% 0% 21-Aug-24, GRP PIPES
DI & G
GRP FITTING 145 04-Jan-23 25-Jun-23 26-Feb-24 21-Aug-24 SAR7,541.52 SAR0.00 100% 0% 21-Aug-24, DI & GRP FITTING
GATE VALVE 145 04-Jan-23 25-Jun-23 26-Feb-24 21-Aug-24 SAR7,541.52 SAR0.00 100% 0% 21-Aug-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 145 04-Jan-23 25-Jun-23 26-Feb-24 21-Aug-24 SAR6,787.37 SAR0.00 100% 0% 21-Aug-24, BUTTERFLAY VALVE
WATER METER
WATE 144 07-Nov-22 27-Apr-23 01-Feb-24 27-Jul-24 SAR11,312.28 SAR0.00 100% 0% 27-Jul-24, WATER METER
AIR RELASE
RE VALVE 145 04-Jan-23 25-Jun-23 26-Feb-24 21-Aug-24 SAR7,541.52 SAR0.00 100% 0% 21-Aug-24, AIR RELASE VALVE
WASHOUT VALVE
WASH 145 04-Jan-23 25-Jun-23 26-Feb-24 21-Aug-24 SAR9,049.82 SAR0.00 100% 0% 21-Aug-24, WASHOUT VALVE
GREY WAWATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 145 02-Feb-23 27-Jul-23 26-Mar-24 19-Sep-24 SAR30,938.06 SAR0.00 100% 0% 19-Sep-24, GREY WATER DISTRIBUTI
DI PIPES
PIP 145 02-Feb-23 27-Jul-23 26-Mar-24 19-Sep-24 SAR5,259.47 SAR0.00 100% 0% 19-Sep-24, DI PIPES
HDPE PIPES 145 02-Feb-23 27-Jul-23 26-Mar-24 19-Sep-24 SAR5,568.85 SAR0.00 100% 0% 19-Sep-24, HDPE PIPES
GRP PPIPES 145 02-Feb-23 27-Jul-23 26-Mar-24 19-Sep-24 SAR4,021.95 SAR0.00 100% 0% 19-Sep-24, GRP PIPES
DI & G
GRP FITTING 145 02-Feb-23 27-Jul-23 26-Mar-24 19-Sep-24 SAR3,712.57 SAR0.00 100% 0% 19-Sep-24, DI & GRP FITTING
GATE VALVE 145 02-Feb-23 27-Jul-23 26-Mar-24 19-Sep-24 SAR2,165.66 SAR0.00 100% 0% 19-Sep-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 145 02-Feb-23 27-Jul-23 26-Mar-24 19-Sep-24 SAR3,093.81 SAR0.00 100% 0% 19-Sep-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 145 02-Feb-23 27-Jul-23 26-Mar-24 19-Sep-24 SAR3,403.19 SAR0.00 100% 0% 19-Sep-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 145 02-Feb-23 27-Jul-23 26-Mar-24 19-Sep-24 SAR3,712.57 SAR0.00 100% 0% 19-Sep-24, WASEHOUT VALVE
IRR & FF NETWORK BRANCHES & TIE IN POINTS 145 28-Feb-23 22-Aug-23 24-Apr-24 16-Oct-24 SAR41,022.03 SAR0.00 100% 0% 16-Oct-24, IRR & FF NETWORK BRAN
HDPE PIPES 145 28-Feb-23 22-Aug-23 24-Apr-24 16-Oct-24 SAR10,255.51 SAR0.00 100% 0% 16-Oct-24, HDPE PIPES
GATE VALVE 145 28-Feb-23 22-Aug-23 24-Apr-24 16-Oct-24 SAR4,102.20 SAR0.00 100% 0% 16-Oct-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 145 28-Feb-23 22-Aug-23 24-Apr-24 16-Oct-24 SAR4,102.20 SAR0.00 100% 0% 16-Oct-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 145 28-Feb-23 22-Aug-23 24-Apr-24 16-Oct-24 SAR4,102.20 SAR0.00 100% 0% 16-Oct-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 145 28-Feb-23 22-Aug-23 24-Apr-24 16-Oct-24 SAR4,102.20 SAR0.00 100% 0% 16-Oct-24, WASEHOUT VALVE
FIRE H
HYDRANT 145 28-Feb-23 22-Aug-23 24-Apr-24 16-Oct-24 SAR14,357.71 SAR0.00 100% 0% 16-Oct-24, FIRE HYDRANT
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 145 01-Apr-23 24-Sep-23 26-May-24 16-Nov-24 SAR306,937.71 SAR0.00 100% 0% 16-Nov-24, CHILLED WATER SUPPL
MILD STEEL PIPE 145 01-Apr-23 24-Sep-23 26-May-24 16-Nov-24 SAR122,775.08 SAR0.00 100% 0% 16-Nov-24, MILD STEEL PIPE
MILD STEEL FITTING 145 01-Apr-23 24-Sep-23 26-May-24 16-Nov-24 SAR122,775.08 SAR0.00 100% 0% 16-Nov-24, MILD STEEL FITTING
GATE VALVE 145 01-Apr-23 24-Sep-23 26-May-24 16-Nov-24 SAR61,387.54 SAR0.00 100% 0% 16-Nov-24, GATE VALVE
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 144 04-May-23 24-Oct-23 22-Jun-24 08-Dec-24 SAR86,769.59 SAR0.00 100% 0% 08-Dec-24, AUTOMATIC WASTE CO
AUTOMATIC WASTE
AUTO 144 04-May-23 24-Oct-23 22-Jun-24 08-Dec-24 SAR86,769.59 SAR0.00 100% 0% 08-Dec-24, AUTOMATIC WASTE
DRY UTILITI
UTILITIES 205 22-May-23 12-Mar-24 16-Jul-24 13-Mar-25 SAR283,730.57 SAR0.00 88.48% 0% 13-Mar-25, DRY UTILITIES
POWER 189 22-May-23 21-Feb-24 16-Jul-24 22-Feb-25 SAR239,286.13 SAR0.00 98.88% 0% 22-Feb-25, POWER
HIGH VOLTAGE
V 110 KV NETWORK 145 22-May-23 11-Nov-23 16-Jul-24 02-Jan-25 SAR15,899.72 SAR0.00 100% 0% 02-Jan-25, HIGH VOLTAGE 110 KV
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 145 20-Jun-23 10-Dec-23 14-Aug-24 30-Jan-25 SAR203,361.64 SAR0.00 100% 0% 30-Jan-25, MEDIUM VOLTAGE 13
LOW V VOLTAGE NETWORK 145 16-Jul-23 01-Jan-24 04-Sep-24 22-Feb-25 SAR20,024.77 SAR0.00 86.67% 0% 22-Feb-25, LOW VOLTAGE NETW
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 145 10-Aug-23 27-Jan-24 04-Sep-24 22-Feb-25 SAR0.00 SAR0.00 0% 0% 22-Feb-25, ELECTRICAL DISTRIB
LIGHTING SYSTEM
LIGHT 145 05-Sep-23 21-Feb-24 04-Sep-24 22-Feb-25 SAR0.00 SAR0.00 0% 0% 22-Feb-25, LIGHTING SYSTEM
LOW CUR
CURRENT 145 26-Sep-23 12-Mar-24 25-Sep-24 13-Mar-25 SAR44,444.44 SAR0.00 32.44% 0% 13-Mar-25, LOW CURRENT
TELECOM SERVICES
TELEC 145 26-Sep-23 12-Mar-24 25-Sep-24 13-Mar-25 SAR44,444.44 SAR0.00 32.44% 0% 13-Mar-25, TELECOM SERVICES
MEP 235 19-Feb-23 27-Nov-23 03-Feb-24 12-Nov-24 SAR4,469,720.33 SAR0.00 100% 0% 12-Nov-24, MEP
ARCHITECTURAL
ARCHITECTUR 114 20-Mar-23 07-Aug-23 03-Mar-24 23-Jul-24 SAR0.00 SAR0.00 0% 0% 23-Jul-24, ARCHITECTURAL
CONSTRUCTION 1224 12-Jul-22 20-Apr-25 03-Jul-22 A 13-Jul-26 SAR228,605,238.23 SAR31,724,370.78 82.94% 13.88% 13-Jul-26, CON
GENERAL SITE ARRANGEMENT 251 12-Jul-22 15-Aug-22 03-Jul-22 A 17-Dec-23 SAR1,625,710.87 SAR1,559,956.51 100% 95.96% 17-Dec-23, GENERAL SITE ARRANGEMENT
SITE PREPARATION
PREPA 251 12-Jul-22 15-Aug-22 03-Jul-22 A 17-Dec-23 SAR1,625,710.87 SAR1,559,956.51 100% 95.96% 17-Dec-23, SITE PREPARATION
GEO-TECHNICAL INVESTIGATION
GEO-TECHNICA 39 18-Jul-22 31-Aug-22 13-Jul-22 A 01-Oct-22 A SAR191,414.12 SAR191,414.12 100% 100% 01-Oct-22 A, GEO-TECHNICAL INVESTIGATION
EXCAVATION & DEWATERING 458 13-Aug-22 05-Feb-24 02-Aug-22 A 10-Aug-24 SAR23,754,348.18 SAR20,943,318.00 99.27% 88.17% 10-Aug-24, EXCAVATION & DEWATERI
SOIL IMPROVEMENT
IMPROVE 226 17-Sep-22 04-Jan-23 08-Mar-23 A 04-Jan-24 SAR6,766,142.69 SAR3,772,124.55 100% 55.75% 04-Jan-24, SOIL IMPROVEMENT
STRUCTURAL WORKS 401 04-Oct-22 22-Jan-24 23-Dec-23 16-Apr-25 SAR86,121,638.66 SAR0.00 98.88% 0% 16-Apr-25, STRUCTURAL WOR
STA. 2+157.088~
2+157. 2+182.088 188 04-Oct-22 14-May-23 23-Dec-23 05-Aug-24 SAR15,555,111.62 SAR0.00 100% 0% 05-Aug-24, STA. 2+157.088~ 2+182.088
BASE SLAB
SL 28 04-Oct-22 05-Nov-22 23-Dec-23 23-Jan-24 SAR1,412,243.76 SAR0.00 100% 0% 23-Jan-24, BASE SLAB
COLUMNS
COLUMN 23 06-Nov-22 01-Dec-22 24-Jan-24 19-Feb-24 SAR369,157.84 SAR0.00 100% 0% 19-Feb-24, COLUMNS
TUNNEL WALLS 45 06-Nov-22 27-Dec-22 24-Jan-24 16-Mar-24 SAR578,347.72 SAR0.00 100% 0% 16-Mar-24, TUNNEL WALLS

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
28 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
MIDDLE SLAB FOR UTILITY CULVERT 38 14-Dec-22 26-Jan-23 03-Mar-24 18-Apr-24 SAR6,767,057.17 SAR0.00 100% 0% 18-Apr-24, MIDDLE SLAB FOR UTILITY CU
UTILITY CCULVERT WALLS 25 28-Jan-23 25-Feb-23 20-Apr-24 18-May-24 SAR3,904,611.73 SAR0.00 100% 0% 18-May-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 40 26-Feb-23 12-Apr-23 19-May-24 08-Jul-24 SAR1,583,716.95 SAR0.00 100% 0% 08-Jul-24, TOP SLAB
FINISHING WORK
FINISHIN 24 13-Apr-23 14-May-23 09-Jul-24 05-Aug-24 SAR939,976.46 SAR0.00 100% 0% 05-Aug-24, FINISHING WORK
STA. 2+182.088~
2+182. 2+198.227 194 24-Nov-22 15-Jul-23 12-Feb-24 03-Oct-24 SAR15,555,111.62 SAR0.00 100% 0% 03-Oct-24, STA. 2+182.088~ 2+198.227
BASE SLAB
SL 27 24-Nov-22 25-Dec-22 12-Feb-24 13-Mar-24 SAR1,412,243.76 SAR0.00 100% 0% 13-Mar-24, BASE SLAB
COLUMNS
COLUMN 23 26-Dec-22 21-Jan-23 14-Mar-24 13-Apr-24 SAR369,157.84 SAR0.00 100% 0% 13-Apr-24, COLUMNS
TUNNEL WALLS 45 04-Jan-23 25-Feb-23 24-Mar-24 18-May-24 SAR578,347.72 SAR0.00 100% 0% 18-May-24, TUNNEL WALLS
MIDDLE SLAB FOR UTILITY CULVERT 37 12-Feb-23 26-Mar-23 05-May-24 20-Jun-24 SAR6,767,057.17 SAR0.00 100% 0% 20-Jun-24, MIDDLE SLAB FOR UTILITY C
UTILITY CCULVERT WALLS 25 27-Mar-23 27-Apr-23 22-Jun-24 20-Jul-24 SAR3,904,611.73 SAR0.00 100% 0% 20-Jul-24, UTILITY CULVERT WALLS
TOP SLAB
SLA 40 29-Apr-23 13-Jun-23 21-Jul-24 04-Sep-24 SAR1,583,716.95 SAR0.00 100% 0% 04-Sep-24, TOP SLAB
FINISHING WORK
FINISHIN 24 14-Jun-23 15-Jul-23 05-Sep-24 03-Oct-24 SAR939,976.46 SAR0.00 100% 0% 03-Oct-24, FINISHING WORK
STA. 2+198.227~
2+198 2+218.227 138 12-Feb-23 29-Jul-23 05-May-24 17-Oct-24 SAR4,883,442.72 SAR0.00 100% 0% 17-Oct-24, STA. 2+198.227~ 2+218.227
BASE SLAB
SL 27 12-Feb-23 14-Mar-23 05-May-24 04-Jun-24 SAR1,412,243.76 SAR0.00 100% 0% 04-Jun-24, BASE SLAB
COLUMNS
COLUMN 23 15-Mar-23 10-Apr-23 05-Jun-24 06-Jul-24 SAR369,157.84 SAR0.00 100% 0% 06-Jul-24, COLUMNS
TUNNEL WALLS 45 25-Mar-23 18-May-23 19-Jun-24 10-Aug-24 SAR578,347.72 SAR0.00 100% 0% 10-Aug-24, TUNNEL WALLS
TOP SLAB
SLA 40 06-May-23 20-Jun-23 28-Jul-24 11-Sep-24 SAR1,583,716.95 SAR0.00 100% 0% 11-Sep-24, TOP SLAB
FINISHING WORK
FINISHIN 30 21-Jun-23 29-Jul-23 12-Sep-24 17-Oct-24 SAR939,976.46 SAR0.00 100% 0% 17-Oct-24, FINISHING WORK
STA.2+218.227 ~ 2+238.227
STA.2+218.2 136 04-Mar-23 15-Aug-23 25-May-24 04-Nov-24 SAR4,883,442.72 SAR0.00 100% 0% 04-Nov-24, STA.2+218.227 ~ 2+238.22
BASE SLAB
SL 27 04-Mar-23 03-Apr-23 25-May-24 29-Jun-24 SAR1,412,243.76 SAR0.00 100% 0% 29-Jun-24, BASE SLAB
COLUMNS
COLUMN 23 04-Apr-23 03-May-23 30-Jun-24 25-Jul-24 SAR369,157.84 SAR0.00 100% 0% 25-Jul-24, COLUMNS
TUNNEL WALLS 45 13-Apr-23 07-Jun-23 09-Jul-24 29-Aug-24 SAR578,347.72 SAR0.00 100% 0% 29-Aug-24, TUNNEL WALLS
TOP SLAB
SLA 40 25-May-23 13-Jul-23 17-Aug-24 02-Oct-24 SAR1,583,716.95 SAR0.00 100% 0% 02-Oct-24, TOP SLAB
FINISHING WORK
FINISHIN 28 15-Jul-23 15-Aug-23 03-Oct-24 04-Nov-24 SAR939,976.46 SAR0.00 100% 0% 04-Nov-24, FINISHING WORK
STA. 2+238.227~
2+238. 2+258.227 136 23-Mar-23 04-Sep-23 13-Jun-24 24-Nov-24 SAR4,883,442.72 SAR0.00 100% 0% 24-Nov-24, STA. 2+238.227~ 2+258.2
BASE SLAB
SL 27 23-Mar-23 26-Apr-23 13-Jun-24 18-Jul-24 SAR1,412,243.76 SAR0.00 100% 0% 18-Jul-24, BASE SLAB
COLUMNS
COLUMN 23 27-Apr-23 23-May-23 20-Jul-24 14-Aug-24 SAR369,157.84 SAR0.00 100% 0% 14-Aug-24, COLUMNS
TUNNEL WALLS 45 07-May-23 01-Jul-23 29-Jul-24 18-Sep-24 SAR578,347.72 SAR0.00 100% 0% 18-Sep-24, TUNNEL WALLS
TOP SLAB
SLA 40 14-Jun-23 02-Aug-23 05-Sep-24 22-Oct-24 SAR1,583,716.95 SAR0.00 100% 0% 22-Oct-24, TOP SLAB
FINISHING WORK
FINISHIN 28 03-Aug-23 04-Sep-23 23-Oct-24 24-Nov-24 SAR939,976.46 SAR0.00 100% 0% 24-Nov-24, FINISHING WORK
STA. 2+258.227~
2+258. 2+278.227 136 25-Apr-23 04-Oct-23 17-Jul-24 23-Dec-24 SAR4,883,442.72 SAR0.00 100% 0% 23-Dec-24, STA. 2+258.227~ 2+278.2
BASE SLAB
SL 27 25-Apr-23 25-May-23 17-Jul-24 17-Aug-24 SAR1,412,243.76 SAR0.00 100% 0% 17-Aug-24, BASE SLAB
COLUMNS
COLUMN 23 27-May-23 21-Jun-23 18-Aug-24 12-Sep-24 SAR369,157.84 SAR0.00 100% 0% 12-Sep-24, COLUMNS
TUNNEL WALLS 45 05-Jun-23 30-Jul-23 27-Aug-24 19-Oct-24 SAR578,347.72 SAR0.00 100% 0% 19-Oct-24, TUNNEL WALLS
TOP SLAB
SLA 40 17-Jul-23 31-Aug-23 06-Oct-24 20-Nov-24 SAR1,583,716.95 SAR0.00 100% 0% 20-Nov-24, TOP SLAB
FINISHING WORK
FINISHIN 28 02-Sep-23 04-Oct-23 21-Nov-24 23-Dec-24 SAR939,976.46 SAR0.00 100% 0% 23-Dec-24, FINISHING WORK
STA.2+278.227 ~ 2+298.227
STA.2+278.2 138 07-May-23 18-Oct-23 29-Jul-24 06-Jan-25 SAR4,883,442.72 SAR0.00 100% 0% 06-Jan-25, STA.2+278.227 ~ 2+298.2
BASE SLAB
SL 27 07-May-23 06-Jun-23 29-Jul-24 28-Aug-24 SAR1,412,243.76 SAR0.00 100% 0% 28-Aug-24, BASE SLAB
COLUMNS
COLUMN 23 07-Jun-23 06-Jul-23 29-Aug-24 25-Sep-24 SAR369,157.84 SAR0.00 100% 0% 25-Sep-24, COLUMNS
TUNNEL WALLS 45 17-Jun-23 10-Aug-23 08-Sep-24 30-Oct-24 SAR578,347.72 SAR0.00 100% 0% 30-Oct-24, TUNNEL WALLS
TOP SLAB
SLA 40 29-Jul-23 12-Sep-23 17-Oct-24 02-Dec-24 SAR1,583,716.95 SAR0.00 100% 0% 02-Dec-24, TOP SLAB
FINISHING WORK
FINISHIN 30 13-Sep-23 18-Oct-23 03-Dec-24 06-Jan-25 SAR939,976.46 SAR0.00 100% 0% 06-Jan-25, FINISHING WORK
STA. 2+298.227~
2+298. 2+318.227 133 27-May-23 01-Nov-23 18-Aug-24 20-Jan-25 SAR4,883,442.72 SAR0.00 100% 0% 20-Jan-25, STA. 2+298.227~ 2+318.
BASE SLAB
SL 27 27-May-23 26-Jun-23 18-Aug-24 17-Sep-24 SAR1,412,243.76 SAR0.00 100% 0% 17-Sep-24, BASE SLAB
COLUMNS
COLUMN 23 01-Jul-23 26-Jul-23 18-Sep-24 15-Oct-24 SAR369,157.84 SAR0.00 100% 0% 15-Oct-24, COLUMNS
TUNNEL WALLS 45 01-Jul-23 21-Aug-23 18-Sep-24 10-Nov-24 SAR578,347.72 SAR0.00 100% 0% 10-Nov-24, TUNNEL WALLS
TOP SLAB
SLA 40 08-Aug-23 24-Sep-23 28-Oct-24 12-Dec-24 SAR1,583,716.95 SAR0.00 100% 0% 12-Dec-24, TOP SLAB
FINISHING WORK
FINISHIN 33 25-Sep-23 01-Nov-23 14-Dec-24 20-Jan-25 SAR939,976.46 SAR0.00 100% 0% 20-Jan-25, FINISHING WORK
STA. 2+318.227~
2+318. 2+338.227 128 15-Jun-23 15-Nov-23 07-Sep-24 03-Feb-25 SAR4,883,442.72 SAR0.00 100% 0% 03-Feb-25, STA. 2+318.227~ 2+338
BASE SLAB
SL 27 15-Jun-23 19-Jul-23 07-Sep-24 08-Oct-24 SAR1,412,243.76 SAR0.00 100% 0% 08-Oct-24, BASE SLAB
COLUMNS
COLUMN 23 20-Jul-23 15-Aug-23 09-Oct-24 04-Nov-24 SAR369,157.84 SAR0.00 100% 0% 04-Nov-24, COLUMNS
TUNNEL WALLS 45 20-Jul-23 10-Sep-23 09-Oct-24 30-Nov-24 SAR578,347.72 SAR0.00 100% 0% 30-Nov-24, TUNNEL WALLS
TOP SLAB
SLA 40 28-Aug-23 14-Oct-23 17-Nov-24 01-Jan-25 SAR1,583,716.95 SAR0.00 100% 0% 01-Jan-25, TOP SLAB
FINISHING WORK
FINISHIN 28 15-Oct-23 15-Nov-23 02-Jan-25 03-Feb-25 SAR939,976.46 SAR0.00 100% 0% 03-Feb-25, FINISHING WORK
STA. 2+338.227~
2+338. 2+358.227 136 01-Jul-23 06-Dec-23 18-Sep-24 24-Feb-25 SAR4,883,442.72 SAR0.00 100% 0% 24-Feb-25, STA. 2+338.227~ 2+358
BASE SLAB
SL 27 01-Jul-23 31-Jul-23 18-Sep-24 20-Oct-24 SAR1,412,243.76 SAR0.00 100% 0% 20-Oct-24, BASE SLAB
COLUMNS
COLUMN 23 01-Aug-23 27-Aug-23 21-Oct-24 16-Nov-24 SAR369,157.84 SAR0.00 100% 0% 16-Nov-24, COLUMNS
TUNNEL WALLS 45 10-Aug-23 02-Oct-23 30-Oct-24 21-Dec-24 SAR578,347.72 SAR0.00 100% 0% 21-Dec-24, TUNNEL WALLS
TOP SLAB
SLA 40 18-Sep-23 04-Nov-23 08-Dec-24 22-Jan-25 SAR1,583,716.95 SAR0.00 100% 0% 22-Jan-25, TOP SLAB
FINISHING WORK
FINISHIN 28 05-Nov-23 06-Dec-23 23-Jan-25 24-Feb-25 SAR939,976.46 SAR0.00 100% 0% 24-Feb-25, FINISHING WORK
STA. 2+358.227~
2+358. 2+378.227 129 30-Jul-23 27-Dec-23 19-Oct-24 17-Mar-25 SAR4,883,442.72 SAR0.00 96.72% 0% 17-Mar-25, STA. 2+358.227~ 2+37
BASE SLAB
SL 27 30-Jul-23 29-Aug-23 19-Oct-24 18-Nov-24 SAR1,412,243.76 SAR0.00 100% 0% 18-Nov-24, BASE SLAB

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
29 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
COLUMN
COLUMNS 23 30-Aug-23 26-Sep-23 19-Nov-24 15-Dec-24 SAR369,157.84 SAR0.00 100% 0% 15-Dec-24, COLUMNS
TUNNEL WALLS 38 09-Sep-23 23-Oct-23 28-Nov-24 11-Jan-25 SAR578,347.72 SAR0.00 100% 0% 11-Jan-25, TUNNEL WALLS
TOP SLAB
SLA 40 10-Oct-23 25-Nov-23 29-Dec-24 12-Feb-25 SAR1,583,716.95 SAR0.00 100% 0% 12-Feb-25, TOP SLAB
FINISHING WORK
FINISHIN 28 26-Nov-23 27-Dec-23 13-Feb-25 17-Mar-25 SAR939,976.46 SAR0.00 82.97% 0% 17-Mar-25, FINISHING WORK
STA. 2+378.227~
2+378. 2+398.227 80 28-Aug-23 29-Nov-23 17-Nov-24 17-Feb-25 SAR2,359,749.31 SAR0.00 100% 0% 17-Feb-25, STA. 2+378.227~ 2+398
BASE SLAB
SL 27 28-Aug-23 28-Sep-23 17-Nov-24 17-Dec-24 SAR1,412,243.76 SAR0.00 100% 0% 17-Dec-24, BASE SLAB
COLUMNS
COLUMN 23 30-Sep-23 25-Oct-23 18-Dec-24 13-Jan-25 SAR369,157.84 SAR0.00 100% 0% 13-Jan-25, COLUMNS
TUNNEL WALLS 45 09-Oct-23 29-Nov-23 28-Dec-24 17-Feb-25 SAR578,347.72 SAR0.00 100% 0% 17-Feb-25, TUNNEL WALLS
STA. 2+398.227~
2+398. 2+424.749 79 17-Sep-23 18-Dec-23 07-Dec-24 08-Mar-25 SAR2,359,749.31 SAR0.00 99.33% 0% 08-Mar-25, STA. 2+398.227~ 2+42
BASE SLAB
SL 27 17-Sep-23 18-Oct-23 07-Dec-24 06-Jan-25 SAR1,412,243.76 SAR0.00 100% 0% 06-Jan-25, BASE SLAB
COLUMNS
COLUMN 23 19-Oct-23 14-Nov-23 07-Jan-25 02-Feb-25 SAR369,157.84 SAR0.00 100% 0% 02-Feb-25, COLUMNS
TUNNEL WALLS 52 19-Oct-23 18-Dec-23 07-Jan-25 08-Mar-25 SAR578,347.72 SAR0.00 97.25% 0% 08-Mar-25, TUNNEL WALLS
STA. 2+424.749~
2+424 2+469.749 80 17-Oct-23 17-Jan-24 05-Jan-25 12-Apr-25 SAR2,359,749.31 SAR0.00 88.87% 0% 12-Apr-25, STA. 2+424.749~ 2+
BASE SLAB
SL 27 17-Oct-23 16-Nov-23 05-Jan-25 04-Feb-25 SAR1,412,243.76 SAR0.00 100% 0% 04-Feb-25, BASE SLAB
COLUMNS
COLUMN 23 18-Nov-23 13-Dec-23 05-Feb-25 03-Mar-25 SAR369,157.84 SAR0.00 100% 0% 03-Mar-25, COLUMNS
TUNNEL WALLS 45 27-Nov-23 17-Jan-24 15-Feb-25 12-Apr-25 SAR578,347.72 SAR0.00 54.57% 0% 12-Apr-25, TUNNEL WALLS
STA. 2+469.749~
2+469. 2+498.227 67 06-Nov-23 22-Jan-24 25-Jan-25 16-Apr-25 SAR1,990,591.48 SAR0.00 86.8% 0% 16-Apr-25, STA. 2+469.749~ 2+4
BASE SLAB
SL 27 06-Nov-23 06-Dec-23 25-Jan-25 24-Feb-25 SAR1,412,243.76 SAR0.00 100% 0% 24-Feb-25, BASE SLAB
TUNNEL WALLS 49 27-Nov-23 22-Jan-24 15-Feb-25 16-Apr-25 SAR578,347.72 SAR0.00 54.57% 0% 16-Apr-25, TUNNEL WALLS
STA. 2+498.227~
2+498. 2+518.227 63 07-Nov-23 18-Jan-24 26-Jan-25 13-Apr-25 SAR1,990,591.48 SAR0.00 86.65% 0% 13-Apr-25, STA. 2+498.227~ 2+5
BASE SLAB
SL 27 07-Nov-23 07-Dec-23 26-Jan-25 25-Feb-25 SAR1,412,243.76 SAR0.00 100% 0% 25-Feb-25, BASE SLAB
TUNNEL WALLS 45 28-Nov-23 18-Jan-24 16-Feb-25 13-Apr-25 SAR578,347.72 SAR0.00 54.04% 0% 13-Apr-25, TUNNEL WALLS
WET CULVERT ZONE 6 435 02-Apr-23 20-Jan-24 08-May-23 A 02-Mar-25 SAR31,028,354.31 SAR5,115,403.49 92.24% 16.49% 02-Mar-25, WET CULVERT ZONE
Sta 2+095.2
2+095.286-Sta2+939.115 - @ZONE 6 435 02-Apr-23 20-Jan-24 08-May-23 A 02-Mar-25 SAR31,028,354.31 SAR5,115,403.49 92.24% 16.49% 02-Mar-25, Sta 2+095.286-Sta2+93
1st 2+09
2+095.286-Sta2+299.115 178 02-Apr-23 02-Nov-23 27-Jun-24 21-Jan-25 SAR6,205,670.86 SAR0.00 100% 0% 21-Jan-25, 1st 2+095.286-Sta2+299.1
BASE SLAB 99 02-Apr-23 01-Aug-23 27-Jun-24 21-Oct-24 SAR1,686,955.32 SAR0.00 100% 0% 21-Oct-24, BASE SLAB
CULVERT WALL
CULVE 65 17-Jun-23 03-Sep-23 08-Sep-24 23-Nov-24 SAR1,691,387.68 SAR0.00 100% 0% 23-Nov-24, CULVERT WALL
TOP SSLAB 65 07-Aug-23 22-Oct-23 27-Oct-24 09-Jan-25 SAR1,791,808.63 SAR0.00 100% 0% 09-Jan-25, TOP SLAB
PLAIN CONCRETE 10 11-Oct-23 22-Oct-23 30-Dec-24 09-Jan-25 SAR961,727.06 SAR0.00 100% 0% 09-Jan-25, PLAIN CONCRETE
FINISHING
FINISH 10 23-Oct-23 02-Nov-23 11-Jan-25 21-Jan-25 SAR73,792.17 SAR0.00 100% 0% 21-Jan-25, FINISHING
2nd 2+29
2+299.115-Sta2+499.115 316 04-May-23 22-Nov-23 08-May-23 A 02-Feb-25 SAR6,205,670.86 SAR3,542,604.72 100% 57.09% 02-Feb-25, 2nd 2+299.115-Sta2+499
BASE SLAB 106 04-May-23 26-Aug-23 08-May-23 A 06-Oct-24 SAR1,686,955.32 SAR1,518,259.79 100% 90% 06-Oct-24, BASE SLAB
CULVERT WALL
CULVE 173 17-Jul-23 28-Sep-23 07-Jun-23 A 03-Nov-24 SAR1,691,387.68 SAR989,553.93 100% 58.51% 03-Nov-24, CULVERT WALL
TOP SSLAB 200 31-Aug-23 12-Nov-23 11-Jul-23 A 21-Jan-25 SAR1,791,808.63 SAR1,034,791.00 100% 57.75% 21-Jan-25, TOP SLAB
PLAIN CONCRETE 9 01-Nov-23 11-Nov-23 09-Nov-24 18-Nov-24 SAR961,727.06 SAR0.00 100% 0% 18-Nov-24, PLAIN CONCRETE
FINISHING
FINISH 10 12-Nov-23 22-Nov-23 22-Jan-25 02-Feb-25 SAR73,792.17 SAR0.00 100% 0% 02-Feb-25, FINISHING
3rd 2+49
2+499.115-Sta2+699.115 385 03-Jun-23 21-Dec-23 17-Jun-23 A 13-Feb-25 SAR6,205,670.86 SAR1,226,034.66 99.29% 19.76% 13-Feb-25, 3rd 2+499.115-Sta2+699
BASE SLAB 190 03-Jun-23 25-Sep-23 17-Jun-23 A 14-Nov-24 SAR1,686,955.32 SAR925,382.92 100% 54.86% 14-Nov-24, BASE SLAB
CULVERT WALL
CULVE 147 15-Aug-23 28-Oct-23 29-Jul-23 A 17-Dec-24 SAR1,691,387.68 SAR116,418.11 100% 6.88% 17-Dec-24, CULVERT WALL
TOP SSLAB 375 01-Oct-23 11-Dec-23 14-Nov-23 A 02-Feb-25 SAR1,791,808.63 SAR184,233.62 100% 10.28% 02-Feb-25, TOP SLAB
PLAIN CONCRETE 9 30-Nov-23 10-Dec-23 20-Jan-25 29-Jan-25 SAR961,727.06 SAR0.00 100% 0% 29-Jan-25, PLAIN CONCRETE
FINISHING
FINISH 10 11-Dec-23 21-Dec-23 03-Feb-25 13-Feb-25 SAR73,792.17 SAR0.00 40% 0% 13-Feb-25, FINISHING
4th 2+69
2+699.115-Sta2+899.115 435 05-Jul-23 20-Jan-24 10-Sep-23 A 02-Mar-25 SAR6,205,670.86 SAR346,764.12 70.42% 5.59% 02-Mar-25, 4th 2+699.115-Sta2+89
BASE SLAB 360 05-Jul-23 24-Oct-23 10-Sep-23 A 04-Dec-24 SAR1,686,955.32 SAR169,844.25 100% 10.07% 04-Dec-24, BASE SLAB
CULVERT WALL
CULVE 373 13-Sep-23 26-Nov-23 16-Oct-23 A 06-Jan-25 SAR1,691,387.68 SAR116,418.11 100% 6.88% 06-Jan-25, CULVERT WALL
TOP SSLAB 392 30-Oct-23 09-Jan-24 12-Nov-23 A 19-Feb-25 SAR1,791,808.63 SAR60,501.76 55.35% 3.38% 19-Feb-25, TOP SLAB
PLAIN CONCRETE 9 30-Dec-23 08-Jan-24 09-Feb-25 18-Feb-25 SAR961,727.06 SAR0.00 0% 0% 18-Feb-25, PLAIN CONCRETE
FINISHING
FINISH 10 09-Jan-24 20-Jan-24 19-Feb-25 02-Mar-25 SAR73,792.17 SAR0.00 0% 0% 02-Mar-25, FINISHING
5th 2+89
2+899.115-Sta2+939.115 144 03-Aug-23 18-Jan-24 14-Sep-24 01-Mar-25 SAR6,205,670.86 SAR0.00 91.5% 0% 01-Mar-25, 5th 2+899.115-Sta2+93
BASE SLAB 57 03-Aug-23 09-Oct-23 14-Sep-24 19-Nov-24 SAR1,686,955.32 SAR0.00 100% 0% 19-Nov-24, BASE SLAB
CULVERT WALL
CULVE 36 14-Sep-23 26-Oct-23 27-Oct-24 07-Dec-24 SAR1,691,387.68 SAR0.00 100% 0% 07-Dec-24, CULVERT WALL
TOP SSLAB 86 11-Oct-23 18-Jan-24 21-Nov-24 01-Mar-25 SAR1,791,808.63 SAR0.00 70.58% 0% 01-Mar-25, TOP SLAB
PLAIN CONCRETE 7 15-Nov-23 22-Nov-23 26-Dec-24 02-Jan-25 SAR961,727.06 SAR0.00 100% 0% 02-Jan-25, PLAIN CONCRETE
FINISHING
FINISH 10 23-Nov-23 04-Dec-23 04-Jan-25 14-Jan-25 SAR73,792.17 SAR0.00 100% 0% 14-Jan-25, FINISHING
DRY CULVERT ZONE 6 442 02-Apr-23 09-Jan-24 23-Oct-23 A 03-Apr-25 SAR41,805,078.96 SAR142,154.12 89.03% 0.34% 03-Apr-25, DRY CULVERT ZON
DRY CULVE
CULVERT STA. 1+870.827 ~ 2+725.508 - @ZONE 6 442 02-Apr-23 09-Jan-24 23-Oct-23 A 03-Apr-25 SAR41,805,078.96 SAR142,154.12 89.03% 0.34% 03-Apr-25, DRY CULVERT STA.
1ST STA. 1+870.827-Sta2+065.508 180 02-Apr-23 05-Nov-23 27-Jun-24 23-Jan-25 SAR10,451,269.74 SAR0.00 100% 0% 23-Jan-25, 1ST STA. 1+870.827-Sta2
BASE SLAB 99 02-Apr-23 01-Aug-23 27-Jun-24 21-Oct-24 SAR2,440,011.46 SAR0.00 100% 0% 21-Oct-24, BASE SLAB
CULVERT WALL
CULVE 65 17-Jun-23 03-Sep-23 08-Sep-24 23-Nov-24 SAR2,820,942.93 SAR0.00 100% 0% 23-Nov-24, CULVERT WALL
TOP SSLAB 67 07-Aug-23 24-Oct-23 27-Oct-24 12-Jan-25 SAR2,250,823.23 SAR0.00 100% 0% 12-Jan-25, TOP SLAB
PLAIN CONCRETE 10 14-Oct-23 24-Oct-23 01-Jan-25 12-Jan-25 SAR1,309,350.24 SAR0.00 100% 0% 12-Jan-25, PLAIN CONCRETE
FINISHING
FINISH 10 25-Oct-23 05-Nov-23 13-Jan-25 23-Jan-25 SAR1,630,141.88 SAR0.00 100% 0% 23-Jan-25, FINISHING

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
30 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
2ND STA
STA. 2+065.508-Sta2+265.508 418 04-May-23 12-Dec-23 23-Oct-23 A 02-Mar-25 SAR10,451,269.74 SAR142,154.12 100% 1.36% 02-Mar-25, 2ND STA. 2+065.508-S
BASE SLAB 324 04-May-23 30-Aug-23 23-Oct-23 A 19-Nov-24 SAR2,440,011.46 SAR142,154.12 100% 5.83% 19-Nov-24, BASE SLAB
CULVERT WALL
CULVE 65 19-Jul-23 03-Oct-23 08-Oct-24 22-Dec-24 SAR2,820,942.93 SAR0.00 100% 0% 22-Dec-24, CULVERT WALL
TOP SSLAB 72 05-Sep-23 28-Nov-23 25-Nov-24 16-Feb-25 SAR2,250,823.23 SAR0.00 100% 0% 16-Feb-25, TOP SLAB
PLAIN CONCRETE 9 16-Nov-23 26-Nov-23 04-Feb-25 13-Feb-25 SAR1,309,350.24 SAR0.00 100% 0% 13-Feb-25, PLAIN CONCRETE
FINISHING
FINISH 14 27-Nov-23 12-Dec-23 15-Feb-25 02-Mar-25 SAR1,630,141.88 SAR0.00 100% 0% 02-Mar-25, FINISHING
3RD STA
STA. 2+265.508-Sta2+465.508 191 16-May-23 28-Dec-23 07-Aug-24 18-Mar-25 SAR10,451,269.74 SAR0.00 86.63% 0% 18-Mar-25, 3RD STA. 2+265.508-
BASE SLAB 99 16-May-23 11-Sep-23 07-Aug-24 01-Dec-24 SAR2,440,011.46 SAR0.00 100% 0% 01-Dec-24, BASE SLAB
CULVERT WALL
CULVE 68 31-Jul-23 18-Oct-23 20-Oct-24 06-Jan-25 SAR2,820,942.93 SAR0.00 100% 0% 06-Jan-25, CULVERT WALL
TOP SSLAB 74 17-Sep-23 12-Dec-23 07-Dec-24 02-Mar-25 SAR2,250,823.23 SAR0.00 100% 0% 02-Mar-25, TOP SLAB
PLAIN CONCRETE 7 30-Nov-23 07-Dec-23 18-Feb-25 25-Feb-25 SAR1,309,350.24 SAR0.00 100% 0% 25-Feb-25, PLAIN CONCRETE
FINISHING
FINISH 14 13-Dec-23 28-Dec-23 03-Mar-25 18-Mar-25 SAR1,630,141.88 SAR0.00 14.29% 0% 18-Mar-25, FINISHING
4TH STA. 2+465.508-Sta2+725.508 191 28-May-23 09-Jan-24 19-Aug-24 03-Apr-25 SAR10,451,269.74 SAR0.00 69.5% 0% 03-Apr-25, 4TH STA. 2+465.508-
BASE SLAB 109 28-May-23 05-Oct-23 19-Aug-24 24-Dec-24 SAR2,440,011.46 SAR0.00 100% 0% 24-Dec-24, BASE SLAB
CULVERT WALL
CULVE 79 19-Aug-23 19-Nov-23 07-Nov-24 06-Feb-25 SAR2,820,942.93 SAR0.00 100% 0% 06-Feb-25, CULVERT WALL
TOP SSLAB 68 19-Oct-23 06-Jan-24 07-Jan-25 26-Mar-25 SAR2,250,823.23 SAR0.00 88.96% 0% 26-Mar-25, TOP SLAB
PLAIN CONCRETE 6 25-Dec-23 31-Dec-23 15-Mar-25 20-Mar-25 SAR1,309,350.24 SAR0.00 0% 0% 20-Mar-25, PLAIN CONCRETE
FINISHING
FINISH 8 01-Jan-24 09-Jan-24 22-Mar-25 03-Apr-25 SAR1,630,141.88 SAR0.00 0% 0% 03-Apr-25, FINISHING
BACKFILLING UPTO TUNNEL WALL 187 02-Jul-23 05-Feb-24 19-Sep-24 30-Apr-25 SAR7,426,295.34 SAR0.00 50% 0% 30-Apr-25, BACKFILLING UPT
STRUCTURAL FILL 100 25-Oct-23 18-Feb-24 13-Jan-25 13-May-25 SAR7,426,295.34 SAR0.00 36.67% 0% 13-May-25, STRUCTURAL FIL
WET & DRY UTILITIES
UT 336 10-Jan-24 13-Feb-25 05-Apr-25 10-May-26 SAR7,010,911.79 SAR0.00 0% 0% 10-May-26, WET
INSIDE WET CULVERT 336 10-Jan-24 13-Feb-25 05-Apr-25 10-May-26 SAR4,599,201.93 SAR0.00 0% 0% 10-May-26, INSID
POTABLE WATER NETWORK 66 10-Jan-24 26-Mar-24 05-Apr-25 23-Jun-25 SAR641,029.14 SAR0.00 0% 0% 23-Jun-25, POTABLE WATER
GREY WAWATER DISTRIBUTION SYSTEM 66 27-Mar-24 19-Jun-24 24-Jun-25 08-Sep-25 SAR262,973.54 SAR0.00 0% 0% 08-Sep-25, GREY WATER D
IRRIGATION NETWORK
IRRIGATI 66 20-Jun-24 04-Sep-24 09-Sep-25 25-Nov-25 SAR348,687.29 SAR0.00 0% 0% 25-Nov-25, IRRIGATION
CHILLED WATER SUPPLY NETWORK 66 05-Sep-24 21-Nov-24 26-Nov-25 10-Feb-26 SAR1,304,485.25 SAR0.00 0% 0% 10-Feb-26, CHILLED
CHILLED WATER RETURN NETWORK 78 29-Aug-24 28-Nov-24 19-Nov-25 17-Feb-26 SAR1,304,485.25 SAR0.00 0% 0% 17-Feb-26, CHILLED
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 66 30-Nov-24 13-Feb-25 18-Feb-26 10-May-26 SAR737,541.47 SAR0.00 0% 0% 10-May-26, AUTO
INSIDE DRY CULVERT 330 10-Jan-24 06-Feb-25 05-Apr-25 04-May-26 SAR2,411,709.86 SAR0.00 0% 0% 04-May-26, INSID
POWER 270 10-Jan-24 28-Nov-24 05-Apr-25 18-Feb-26 SAR2,033,932.08 SAR0.00 0% 0% 18-Feb-26, POWER
HIGH VOLTAGE
V 110 KV NETWORK 40 10-Jan-24 25-Feb-24 05-Apr-25 20-May-25 SAR135,147.62 SAR0.00 0% 0% 20-May-25, HIGH VOLTAGE 1
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 40 26-Feb-24 15-Apr-24 21-May-25 09-Jul-25 SAR1,728,573.90 SAR0.00 0% 0% 09-Jul-25, MEDIUM VOLTAG
LOW V VOLTAGE NETWORK 35 16-Apr-24 26-May-24 10-Jul-25 19-Aug-25 SAR170,210.56 SAR0.00 0% 0% 19-Aug-25, LOW VOLTAGE
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 120 27-May-24 19-Oct-24 20-Aug-25 08-Jan-26 SAR0.00 SAR0.00 0% 0% 08-Jan-26, ELECTRICA
LIGHTING SYSTEM
LIGHT 35 20-Oct-24 28-Nov-24 08-Jan-26 18-Feb-26 SAR0.00 SAR0.00 0% 0% 18-Feb-26, LIGHTIN
TELECOM SERVICES 60 30-Nov-24 06-Feb-25 18-Feb-26 04-May-26 SAR377,777.78 SAR0.00 0% 0% 04-May-26, TELEC
MEP VEHICULAR
VEHICULA TUNNEL/ DRY & WET CULVERTS 186 25-Jul-24 27-Feb-25 15-Oct-25 24-May-26 SAR12,222,724.06 SAR0.00 0% 0% 24-May-26, MEP
TUNNEL MECHANICAL
ME WORKS 160 25-Jul-24 28-Jan-25 15-Oct-25 23-Apr-26 SAR3,516,257.51 SAR0.00 0% 0% 23-Apr-26, TUNNE
FIRE FIG
FIGHTING SYSTEM 56 25-Jul-24 29-Sep-24 15-Oct-25 18-Dec-25 SAR2,557,434.34 SAR0.00 0% 0% 18-Dec-25, FIRE FIGHT
VENTILATION SYSTEM
VENTILA 23 30-Sep-24 26-Oct-24 20-Dec-25 14-Jan-26 SAR286,769.36 SAR0.00 0% 0% 14-Jan-26, VENTILAT
PUMPS INSTALLATION
I 15 27-Oct-24 12-Nov-24 15-Jan-26 01-Feb-26 SAR538,864.27 SAR0.00 0% 0% 01-Feb-26, PUMPS IN
DUCTING SYSTEM 66 13-Nov-24 28-Jan-25 02-Feb-26 23-Apr-26 SAR133,189.53 SAR0.00 0% 0% 23-Apr-26, DUCTI
TUNNEL ELECTRICAL
EL WORKS 186 25-Jul-24 27-Feb-25 15-Oct-25 24-May-26 SAR7,391,668.28 SAR0.00 0% 0% 24-May-26, TUNN
CABLE TRAYS
T 101 18-Aug-24 14-Dec-24 08-Nov-25 04-Mar-26 SAR1,677,189.02 SAR0.00 0% 0% 04-Mar-26, CABLE T
POWER CABLES 128 11-Sep-24 08-Feb-25 02-Dec-25 04-May-26 SAR2,267,645.66 SAR0.00 0% 0% 04-May-26, POWE
ELECTRICAL INSTALLATIONS
ELECTRI 86 20-Nov-24 27-Feb-25 09-Feb-26 24-May-26 SAR1,855,494.38 SAR0.00 0% 0% 24-May-26, ELEC
LOW CUR
CURRENT 180 25-Jul-24 20-Feb-25 15-Oct-25 17-May-26 SAR1,591,339.22 SAR0.00 0% 0% 17-May-26, LOW
FIRE D
DETECTION AND ALARM SYSTEM 82 25-Jul-24 29-Oct-24 15-Oct-25 18-Jan-26 SAR272,001.24 SAR0.00 0% 0% 18-Jan-26, FIRE DETE
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 28 08-Aug-24 09-Sep-24 29-Oct-25 30-Nov-25 SAR226,641.22 SAR0.00 0% 0% 30-Nov-25, COMMUNI
PUBLIC ADDRESS
PUBLI 28 10-Sep-24 13-Oct-24 01-Dec-25 01-Jan-26 SAR175,802.76 SAR0.00 0% 0% 01-Jan-26, PUBLIC AD
VIDEO SURVEILLANCE 49 14-Oct-24 09-Dec-24 03-Jan-26 28-Feb-26 SAR211,542.84 SAR0.00 0% 0% 28-Feb-26, VIDEO S
SACADA SYSTEM
SACA 35 10-Dec-24 19-Jan-25 01-Mar-26 14-Apr-26 SAR564,754.47 SAR0.00 0% 0% 14-Apr-26, SACAD
RADIO RE-BROADCASTING SYSTEM 28 20-Jan-25 20-Feb-25 15-Apr-26 17-May-26 SAR140,596.69 SAR0.00 0% 0% 17-May-26, RADI
TUNNEL PLUMBING
PL WORKS 35 16-Dec-24 25-Jan-25 07-Mar-26 20-Apr-26 SAR1,314,798.26 SAR0.00 0% 0% 20-Apr-26, TUNNE
DRAINAGE SYSTEM
DRAINAG 35 16-Dec-24 25-Jan-25 07-Mar-26 20-Apr-26 SAR1,314,798.26 SAR0.00 0% 0% 20-Apr-26, DRAIN
TUNNEL INTERNAL
INTER ROAD WORK 42 26-Jan-25 15-Mar-25 21-Apr-26 11-Jun-26 SAR759,660.18 SAR0.00 0% 0% 11-Jun-26, TUNN
TUNNEL INTERNAL
INTER DECORATIVE WORKS 40 01-Mar-25 20-Apr-25 25-May-26 13-Jul-26 SAR2,466,663.74 SAR0.00 0% 0% 13-Jul-26, TUNN
AIRPORT ROAD TUNNEL
TU 989 07-Nov-22 28-Aug-25 18-Oct-22 A 29-Jul-26 SAR108,305,004.50 SAR1,604,398.31 19.78% 1.48% 29-Jul-26, AIRP
ZONE 7 - FROM S
STA. 0+040 ~ 0+389.63 989 07-Nov-22 28-Aug-25 18-Oct-22 A 29-Jul-26 SAR108,305,004.50 SAR1,604,398.31 19.78% 1.48% 29-Jul-26, ZON
ENGINEERING 505 01-Dec-22 06-Mar-24 18-Oct-22 A 24-Dec-24 SAR0.00 SAR0.00 0% 0% 24-Dec-24, ENGINEERING
SITE SURVEY 10 01-Dec-22 12-Dec-22 06-Jun-23 A 25-Jun-23 A SAR0.00 SAR0.00 0% 0% 25-Jun-23 A, SITE SURVEY
SHOP DRAWINGS
DRAWIN 312 08-Apr-23 15-Aug-23 18-Oct-22 A 08-May-24 SAR0.00 SAR0.00 0% 0% 08-May-24, SHOP DRAWINGS

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
31 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
CIVIL/STRU
CIVIL/STRUCTURAL CROSSING 41 08-Apr-23 29-May-23 19-Feb-24 07-Apr-24 SAR0.00 SAR0.00 0% 0% 07-Apr-24, CIVIL/STRUCTURAL CROSSING
CIVIL/STRUCTURAL 0+40 ~0+140
CIVIL/STRU 303 02-May-23 19-Jun-23 26-Oct-22 A 27-Apr-24 SAR0.00 SAR0.00 0% 0% 27-Apr-24, CIVIL/STRUCTURAL 0+40 ~0+14
CIVIL/STRUCTURAL 0+140 ~0+240
CIVIL/STRU 285 23-May-23 13-Jul-23 19-Oct-22 A 27-Apr-24 SAR0.00 SAR0.00 0% 0% 27-Apr-24, CIVIL/STRUCTURAL 0+140 ~0+2
CIVIL/STRUCTURAL 0+240 ~0+360
CIVIL/STRU 267 13-Jun-23 03-Aug-23 18-Oct-22 A 27-Apr-24 SAR0.00 SAR0.00 0% 0% 27-Apr-24, CIVIL/STRUCTURAL 0+240 ~0+3
ARCHITECTURAL
ARCHITECT 22 22-Jul-23 15-Aug-23 13-Apr-24 08-May-24 SAR0.00 SAR0.00 0% 0% 08-May-24, ARCHITECTURAL
UTILITIES 369 20-Jun-23 27-Dec-23 01-Nov-22 A 14-Oct-24 SAR0.00 SAR0.00 0% 0% 14-Oct-24, UTILITIES
WET UTILITIES
UTILIT 159 20-Jun-23 27-Dec-23 02-Apr-24 14-Oct-24 SAR0.00 SAR0.00 0% 0% 14-Oct-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 32 20-Jun-23 30-Jul-23 02-Apr-24 13-May-24 SAR0.00 SAR0.00 0% 0% 13-May-24, POTABLE WATER NETWORK B
GREY WAWATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 32 31-Jul-23 05-Sep-23 13-May-24 24-Jun-24 SAR0.00 SAR0.00 0% 0% 24-Jun-24, GREY WATER DISTRIBUTION
IRR & FF NETWORK BRANCHES & TIE IN POINTS 31 06-Sep-23 14-Oct-23 24-Jun-24 30-Jul-24 SAR0.00 SAR0.00 0% 0% 30-Jul-24, IRR & FF NETWORK BRANCH
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 32 15-Oct-23 20-Nov-23 30-Jul-24 05-Sep-24 SAR0.00 SAR0.00 0% 0% 05-Sep-24, CHILLED WATER SUPPLY &
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 32 21-Nov-23 27-Dec-23 05-Sep-24 14-Oct-24 SAR0.00 SAR0.00 0% 0% 14-Oct-24, AUTOMATIC WASTE COLL
DRY UTILITI
UTILITIES 305 31-Jul-23 27-Dec-23 01-Nov-22 A 30-Jul-24 SAR0.00 SAR0.00 0% 0% 30-Jul-24, DRY UTILITIES
POWER 274 31-Jul-23 20-Nov-23 01-Nov-22 A 24-Jun-24 SAR0.00 SAR0.00 0% 0% 24-Jun-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 32 31-Jul-23 05-Sep-23 13-May-24 24-Jun-24 SAR0.00 SAR0.00 0% 0% 24-Jun-24, HIGH VOLTAGE 110 KV NETW
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 32 31-Jul-23 05-Sep-23 13-May-24 24-Jun-24 SAR0.00 SAR0.00 0% 0% 24-Jun-24, MEDIUM VOLTAGE 13.8 KV N
LOW V VOLTAGE NETWORK 32 31-Jul-23 05-Sep-23 27-Nov-22 A 24-Jun-24 SAR0.00 SAR0.00 0% 0% 24-Jun-24, LOW VOLTAGE NETWORK
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 32 06-Sep-23 14-Oct-23 01-Nov-22 A 12-Nov-22 A SAR0.00 SAR0.00 0% 0% 12-Nov-22 A, ELECTRICAL DISTRIBUTION SYSTEM
LIGHTING SYSTEM
LIGHT 32 15-Oct-23 20-Nov-23 26-Nov-22 A 27-Dec-22 A SAR0.00 SAR0.00 0% 0% 27-Dec-22 A, LIGHTING SYSTEM
LOW CUR
CURRENT 31 21-Nov-23 27-Dec-23 24-Jun-24 30-Jul-24 SAR0.00 SAR0.00 0% 0% 30-Jul-24, LOW CURRENT
TELECOM SERVICES
TELEC 31 21-Nov-23 27-Dec-23 24-Jun-24 30-Jul-24 SAR0.00 SAR0.00 0% 0% 30-Jul-24, TELECOM SERVICES
MEP 220 20-Jun-23 06-Mar-24 02-Apr-24 24-Dec-24 SAR0.00 SAR0.00 0% 0% 24-Dec-24, MEP
TUNNEL MECHANICAL
ME WORKS 176 20-Jun-23 15-Jan-24 02-Apr-24 03-Nov-24 SAR0.00 SAR0.00 0% 0% 03-Nov-24, TUNNEL MECHANICAL
FIRE FIG
FIGHTING SYSTEM 88 20-Jun-23 04-Oct-23 02-Apr-24 22-Jul-24 SAR0.00 SAR0.00 0% 0% 22-Jul-24, FIRE FIGHTING SYSTEM
VENTILATION SYSTEM
VENTILA 44 20-Sep-23 11-Nov-23 08-Jul-24 28-Aug-24 SAR0.00 SAR0.00 0% 0% 28-Aug-24, VENTILATION SYSTEM
PUMPS INSTALLATION
I 22 12-Nov-23 06-Dec-23 28-Aug-24 24-Sep-24 SAR0.00 SAR0.00 0% 0% 24-Sep-24, PUMPS INSTALLATION
DUCTING SYSTEM 88 05-Oct-23 15-Jan-24 22-Jul-24 03-Nov-24 SAR0.00 SAR0.00 0% 0% 03-Nov-24, DUCTING SYSTEM
TUNNEL ELECTRICAL
EL WORKS 210 05-Jul-23 06-Mar-24 17-Apr-24 24-Dec-24 SAR0.00 SAR0.00 0% 0% 24-Dec-24, TUNNEL ELECTRICAL W
CABLE TRAYS
T 110 05-Jul-23 11-Nov-23 17-Apr-24 28-Aug-24 SAR0.00 SAR0.00 0% 0% 28-Aug-24, CABLE TRAYS
POWER CABLES 44 06-Sep-23 28-Oct-23 24-Jun-24 14-Aug-24 SAR0.00 SAR0.00 0% 0% 14-Aug-24, POWER CABLES
ELECTRICAL INSTALLATIONS
ELECTRI 110 18-Sep-23 24-Jan-24 06-Jul-24 12-Nov-24 SAR0.00 SAR0.00 0% 0% 12-Nov-24, ELECTRICAL INSTALLAT
LOW CUR
CURRENT 132 05-Oct-23 06-Mar-24 22-Jul-24 24-Dec-24 SAR0.00 SAR0.00 0% 0% 24-Dec-24, LOW CURRENT
FIRE D
DETECTION AND ALARM SYSTEM 132 05-Oct-23 06-Mar-24 22-Jul-24 24-Dec-24 SAR0.00 SAR0.00 0% 0% 24-Dec-24, FIRE DETECTION AND
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 110 17-Oct-23 21-Feb-24 03-Aug-24 11-Dec-24 SAR0.00 SAR0.00 0% 0% 11-Dec-24, COMMUNICATION SYS
PUBLIC ADDRESS
PUBLI 66 02-Nov-23 17-Jan-24 19-Aug-24 05-Nov-24 SAR0.00 SAR0.00 0% 0% 05-Nov-24, PUBLIC ADDRESS
VIDEO SURVEILLANCE 44 14-Nov-23 03-Jan-24 31-Aug-24 22-Oct-24 SAR0.00 SAR0.00 0% 0% 22-Oct-24, VIDEO SURVEILLANCE
SACADA SYSTEM
SACA 44 26-Nov-23 15-Jan-24 11-Sep-24 03-Nov-24 SAR0.00 SAR0.00 0% 0% 03-Nov-24, SACADA SYSTEM
RADIO RE-BROADCASTING SYSTEM 44 07-Dec-23 27-Jan-24 24-Sep-24 14-Nov-24 SAR0.00 SAR0.00 0% 0% 14-Nov-24, RADIO RE-BROADCAST
TUNNEL PLUMBING
PL WORKS 21 17-Jul-23 09-Aug-23 29-Apr-24 23-May-24 SAR0.00 SAR0.00 0% 0% 23-May-24, TUNNEL PLUMBING WORKS
PROCUREMENT 366 07-Nov-22 22-Jun-24 07-Jan-24 18-Mar-25 SAR12,042,801.30 SAR0.00 92.05% 0% 18-Mar-25, PROCUREMENT
CIVIL/STRUCTU
CIVIL/STRUCTURAL 145 30-May-23 19-Nov-23 07-Apr-24 02-Oct-24 SAR7,014,800.40 SAR0.00 100% 0% 02-Oct-24, CIVIL/STRUCTURAL
UTILITIES 366 07-Nov-22 22-Jun-24 07-Jan-24 18-Mar-25 SAR558,280.57 SAR0.00 31.84% 0% 18-Mar-25, UTILITIES
WET UTILITIES
UTILIT 366 07-Nov-22 03-Jun-24 07-Jan-24 18-Mar-25 SAR396,890.36 SAR0.00 27.56% 0% 18-Mar-25, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 250 07-Nov-22 16-Jan-24 07-Jan-24 03-Nov-24 SAR75,415.19 SAR0.00 84.32% 0% 03-Nov-24, POTABLE WATER NETW
DI PIPES
PIP 145 31-Jul-23 16-Jan-24 13-May-24 03-Nov-24 SAR8,295.67 SAR0.00 75.11% 0% 03-Nov-24, DI PIPES
HDPE PIPES 145 31-Jul-23 16-Jan-24 13-May-24 03-Nov-24 SAR9,803.98 SAR0.00 75.11% 0% 03-Nov-24, HDPE PIPES
GRP PPIPES 145 31-Jul-23 16-Jan-24 13-May-24 03-Nov-24 SAR7,541.52 SAR0.00 75.11% 0% 03-Nov-24, GRP PIPES
DI & G
GRP FITTING 145 31-Jul-23 16-Jan-24 13-May-24 03-Nov-24 SAR7,541.52 SAR0.00 75.11% 0% 03-Nov-24, DI & GRP FITTING
GATE VALVE 145 31-Jul-23 16-Jan-24 13-May-24 03-Nov-24 SAR7,541.52 SAR0.00 75.11% 0% 03-Nov-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 145 31-Jul-23 16-Jan-24 13-May-24 03-Nov-24 SAR6,787.37 SAR0.00 75.11% 0% 03-Nov-24, BUTTERFLAY VALVE
WATER METER
WATE 174 07-Nov-22 13-Nov-23 01-Feb-24 31-Aug-24 SAR11,312.28 SAR0.00 100% 0% 31-Aug-24, WATER METER
AIR RELASE
RE VALVE 196 24-Dec-22 13-Nov-23 07-Jan-24 31-Aug-24 SAR7,541.52 SAR0.00 100% 0% 31-Aug-24, AIR RELASE VALVE
WASHOUT VALVE
WASH 196 24-Dec-22 13-Nov-23 07-Jan-24 31-Aug-24 SAR9,049.82 SAR0.00 100% 0% 31-Aug-24, WASHOUT VALVE
GREY WA
WATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 144 06-Sep-23 22-Feb-24 24-Jun-24 10-Dec-24 SAR23,203.55 SAR0.00 46.67% 0% 10-Dec-24, GREY WATER DISTRIBU
DI PIPES
PIP 144 06-Sep-23 22-Feb-24 24-Jun-24 10-Dec-24 SAR3,944.60 SAR0.00 46.67% 0% 10-Dec-24, DI PIPES
HDPE PIPES 144 06-Sep-23 22-Feb-24 24-Jun-24 10-Dec-24 SAR4,176.64 SAR0.00 46.67% 0% 10-Dec-24, HDPE PIPES
GRP PPIPES 144 06-Sep-23 22-Feb-24 24-Jun-24 10-Dec-24 SAR3,016.46 SAR0.00 46.67% 0% 10-Dec-24, GRP PIPES
DI & G
GRP FITTING 144 06-Sep-23 22-Feb-24 24-Jun-24 10-Dec-24 SAR2,784.43 SAR0.00 46.67% 0% 10-Dec-24, DI & GRP FITTING
GATE VALVE 144 06-Sep-23 22-Feb-24 24-Jun-24 10-Dec-24 SAR1,624.25 SAR0.00 46.67% 0% 10-Dec-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 144 06-Sep-23 22-Feb-24 24-Jun-24 10-Dec-24 SAR2,320.35 SAR0.00 46.67% 0% 10-Dec-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 144 06-Sep-23 22-Feb-24 24-Jun-24 10-Dec-24 SAR2,552.39 SAR0.00 46.67% 0% 10-Dec-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 144 06-Sep-23 22-Feb-24 24-Jun-24 10-Dec-24 SAR2,784.43 SAR0.00 46.67% 0% 10-Dec-24, WASEHOUT VALVE

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
32 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
IRR & FF NETWORK BRANCHES & TIE IN POINTS 145 15-Oct-23 31-Mar-24 30-Jul-24 16-Jan-25 SAR39,735.07 SAR0.00 20% 0% 16-Jan-25, IRR & FF NETWORK BR
HDPE PIPES 145 15-Oct-23 31-Mar-24 30-Jul-24 16-Jan-25 SAR9,933.77 SAR0.00 20% 0% 16-Jan-25, HDPE PIPES
GATE VALVE 145 15-Oct-23 31-Mar-24 30-Jul-24 16-Jan-25 SAR3,973.51 SAR0.00 20% 0% 16-Jan-25, GATE VALVE
BUTTERFLAY VALVE
BUTTE 145 15-Oct-23 31-Mar-24 30-Jul-24 16-Jan-25 SAR3,973.51 SAR0.00 20% 0% 16-Jan-25, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 145 15-Oct-23 31-Mar-24 30-Jul-24 16-Jan-25 SAR3,973.51 SAR0.00 20% 0% 16-Jan-25, AIR RELASE VALVE
WASEHOUT VALVE
WASE 145 15-Oct-23 31-Mar-24 30-Jul-24 16-Jan-25 SAR3,973.51 SAR0.00 20% 0% 16-Jan-25, WASEHOUT VALVE
FIRE H
HYDRANT 145 15-Oct-23 31-Mar-24 30-Jul-24 16-Jan-25 SAR13,907.27 SAR0.00 20% 0% 16-Jan-25, FIRE HYDRANT
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 145 21-Nov-23 11-May-24 05-Sep-24 23-Feb-25 SAR184,162.62 SAR0.00 14.67% 0% 23-Feb-25, CHILLED WATER SUP
MILD STEEL PIPE 145 21-Nov-23 11-May-24 05-Sep-24 23-Feb-25 SAR73,665.05 SAR0.00 14.67% 0% 23-Feb-25, MILD STEEL PIPE
MILD STEEL FITTING 145 21-Nov-23 11-May-24 05-Sep-24 23-Feb-25 SAR73,665.05 SAR0.00 14.67% 0% 23-Feb-25, MILD STEEL FITTING
GATE VALVE 145 21-Nov-23 11-May-24 05-Sep-24 23-Feb-25 SAR36,832.52 SAR0.00 14.67% 0% 23-Feb-25, GATE VALVE
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 145 14-Dec-23 03-Jun-24 30-Sep-24 18-Mar-25 SAR74,373.93 SAR0.00 0% 0% 18-Mar-25, AUTOMATIC WASTE
AUTOMATIC WASTE
AUTO 145 14-Dec-23 03-Jun-24 30-Sep-24 18-Mar-25 SAR74,373.93 SAR0.00 0% 0% 18-Mar-25, AUTOMATIC WASTE
DRY UTILITI
UTILITIES 176 06-Sep-23 22-Jun-24 24-Jun-24 16-Jan-25 SAR161,390.21 SAR0.00 42.38% 0% 16-Jan-25, DRY UTILITIES
POWER 144 06-Sep-23 11-May-24 24-Jun-24 10-Dec-24 SAR146,575.39 SAR0.00 46.67% 0% 10-Dec-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 144 06-Sep-23 22-Feb-24 24-Jun-24 10-Dec-24 SAR9,539.83 SAR0.00 46.67% 0% 10-Dec-24, HIGH VOLTAGE 110 KV
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 144 06-Sep-23 22-Feb-24 24-Jun-24 10-Dec-24 SAR122,016.98 SAR0.00 46.67% 0% 10-Dec-24, MEDIUM VOLTAGE 13.8
LOW VVOLTAGE NETWORK 144 06-Sep-23 22-Feb-24 24-Jun-24 10-Dec-24 SAR15,018.58 SAR0.00 46.67% 0% 10-Dec-24, LOW VOLTAGE NETWO
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 144 15-Oct-23 31-Mar-24 24-Jun-24 10-Dec-24 SAR0.00 SAR0.00 0% 0% 10-Dec-24, ELECTRICAL DISTRIBU
LIGHTING SYSTEM
LIGHT 144 21-Nov-23 11-May-24 24-Jun-24 10-Dec-24 SAR0.00 SAR0.00 0% 0% 10-Dec-24, LIGHTING SYSTEM
LOW CUR
CURRENT 145 28-Dec-23 22-Jun-24 30-Jul-24 16-Jan-25 SAR14,814.81 SAR0.00 0% 0% 16-Jan-25, LOW CURRENT
TELECOM SERVICES
TELEC 145 28-Dec-23 22-Jun-24 30-Jul-24 16-Jan-25 SAR14,814.81 SAR0.00 0% 0% 16-Jan-25, TELECOM SERVICES
MEP 235 02-Jul-23 01-Apr-24 09-May-24 13-Feb-25 SAR4,469,720.33 SAR0.00 87.08% 0% 13-Feb-25, MEP
ARCHITECTURAL
ARCHITECTUR 114 16-Aug-23 28-Dec-23 08-May-24 24-Sep-24 SAR0.00 SAR0.00 0% 0% 24-Sep-24, ARCHITECTURAL
CONSTRUCTION 910 13-Dec-22 28-Aug-25 19-Jul-23 A 29-Jul-26 SAR96,262,203.20 SAR1,604,398.31 10.74% 1.67% 29-Jul-26, CON
GENERAL SITE ARRANGEMENT 90 13-Dec-22 29-Apr-23 19-Jul-23 A 24-Mar-24 SAR672,518.98 SAR150,242.90 100% 22.34% 24-Mar-24, GENERAL SITE ARRANGEMENT
SITE PREPARATION
PREPA 90 13-Dec-22 29-Apr-23 19-Jul-23 A 24-Mar-24 SAR672,518.98 SAR150,242.90 100% 22.34% 24-Mar-24, SITE PREPARATION
GEO-TECHNICAL INVESTIGATION
GEO-TECHNICA 65 30-Apr-23 17-Jul-23 25-Mar-24 11-Jun-24 SAR133,421.30 SAR0.00 100% 0% 11-Jun-24, GEO-TECHNICAL INVESTIGAT
EXCAVATION & DEWATERING 347 18-Jul-23 14-Nov-24 26-Jul-23 A 04-Aug-25 SAR22,964,729.95 SAR1,454,155.41 23.46% 6.33% 04-Aug-25, EXCAVATION &
SOIL IMPROVEMENT
IMPROVE 148 27-Aug-23 22-Apr-24 27-Jul-24 15-Jan-25 SAR6,541,229.36 SAR0.00 25% 0% 15-Jan-25, SOIL IMPROVEMENT
STRUCTURAL WORKS 361 04-Sep-23 07-Nov-24 04-Aug-24 08-Oct-25 SAR38,143,743.22 SAR0.00 6.57% 0% 08-Oct-25, STRUCTURAL
1ST CROSSING
CROSS 113 04-Sep-23 14-Jan-24 04-Aug-24 14-Dec-24 SAR2,800,082.14 SAR0.00 89.55% 0% 14-Dec-24, 1ST CROSSING
BASE SLAB
SL 27 04-Sep-23 05-Oct-23 04-Aug-24 03-Sep-24 SAR770,559.49 SAR0.00 100% 0% 03-Sep-24, BASE SLAB
COLUMNS
COLUMN 23 07-Oct-23 01-Nov-23 04-Sep-24 01-Oct-24 SAR70,047.58 SAR0.00 100% 0% 01-Oct-24, COLUMNS
TUNNEL WALLS 37 07-Oct-23 18-Nov-23 04-Sep-24 17-Oct-24 SAR559,826.44 SAR0.00 100% 0% 17-Oct-24, TUNNEL WALLS
TOP SLAB
SLA 37 05-Nov-23 17-Dec-23 05-Oct-24 16-Nov-24 SAR1,112,159.05 SAR0.00 99.55% 0% 16-Nov-24, TOP SLAB
FINISHING WORK
FINISHIN 24 18-Dec-23 14-Jan-24 17-Nov-24 14-Dec-24 SAR287,489.57 SAR0.00 0% 0% 14-Dec-24, FINISHING WORK
2nd Sta 0+0
0+040.507- Sta 0+060.507 113 18-Dec-23 30-Apr-24 17-Nov-24 27-Mar-25 SAR2,800,082.14 SAR0.00 0% 0% 27-Mar-25, 2nd Sta 0+040.507- St
BASE SLAB
SL 27 18-Dec-23 17-Jan-24 17-Nov-24 17-Dec-24 SAR770,559.49 SAR0.00 0% 0% 17-Dec-24, BASE SLAB
COLUMNS
COLUMN 23 18-Jan-24 13-Feb-24 18-Dec-24 13-Jan-25 SAR70,047.58 SAR0.00 0% 0% 13-Jan-25, COLUMNS
TUNNEL WALLS 37 18-Jan-24 29-Feb-24 18-Dec-24 29-Jan-25 SAR559,826.44 SAR0.00 0% 0% 29-Jan-25, TUNNEL WALLS
TOP SLAB
SLA 37 17-Feb-24 30-Mar-24 16-Jan-25 27-Feb-25 SAR1,112,159.05 SAR0.00 0% 0% 27-Feb-25, TOP SLAB
FINISHING WORK
FINISHIN 24 31-Mar-24 30-Apr-24 01-Mar-25 27-Mar-25 SAR287,489.57 SAR0.00 0% 0% 27-Mar-25, FINISHING WORK
3rd Sta 0+060.507-
0+0 Sta 0+080.507 113 30-Dec-23 12-May-24 28-Nov-24 13-Apr-25 SAR2,800,082.14 SAR0.00 0% 0% 13-Apr-25, 3rd Sta 0+060.507- St
BASE SLAB
SL 27 30-Dec-23 29-Jan-24 28-Nov-24 29-Dec-24 SAR770,559.49 SAR0.00 0% 0% 29-Dec-24, BASE SLAB
COLUMNS
COLUMN 23 30-Jan-24 25-Feb-24 30-Dec-24 25-Jan-25 SAR70,047.58 SAR0.00 0% 0% 25-Jan-25, COLUMNS
TUNNEL WALLS 37 30-Jan-24 12-Mar-24 30-Dec-24 10-Feb-25 SAR559,826.44 SAR0.00 0% 0% 10-Feb-25, TUNNEL WALLS
TOP SLAB
SLA 37 28-Feb-24 14-Apr-24 28-Jan-25 11-Mar-25 SAR1,112,159.05 SAR0.00 0% 0% 11-Mar-25, TOP SLAB
FINISHING WORK
FINISHIN 24 15-Apr-24 12-May-24 12-Mar-25 13-Apr-25 SAR287,489.57 SAR0.00 0% 0% 13-Apr-25, FINISHING WORK
4th Sta 0+080.507-
0+08 Sta 0+100.507 113 10-Jan-24 23-May-24 10-Dec-24 24-Apr-25 SAR2,800,082.14 SAR0.00 0% 0% 24-Apr-25, 4th Sta 0+080.507- St
BASE SLAB
SL 27 10-Jan-24 10-Feb-24 10-Dec-24 09-Jan-25 SAR770,559.49 SAR0.00 0% 0% 09-Jan-25, BASE SLAB
COLUMNS
COLUMN 23 11-Feb-24 07-Mar-24 11-Jan-25 05-Feb-25 SAR70,047.58 SAR0.00 0% 0% 05-Feb-25, COLUMNS
TUNNEL WALLS 37 11-Feb-24 24-Mar-24 11-Jan-25 22-Feb-25 SAR559,826.44 SAR0.00 0% 0% 22-Feb-25, TUNNEL WALLS
TOP SLAB
SLA 37 11-Mar-24 25-Apr-24 09-Feb-25 23-Mar-25 SAR1,112,159.05 SAR0.00 0% 0% 23-Mar-25, TOP SLAB
FINISHING WORK
FINISHIN 24 27-Apr-24 23-May-24 24-Mar-25 24-Apr-25 SAR287,489.57 SAR0.00 0% 0% 24-Apr-25, FINISHING WORK
5th Sta 0+100.507-
0+10 Sta 0+120.507 113 22-Jan-24 04-Jun-24 22-Dec-24 06-May-25 SAR2,800,082.14 SAR0.00 0% 0% 06-May-25, 5th Sta 0+100.507- S
BASE SLAB
SL 27 22-Jan-24 21-Feb-24 22-Dec-24 21-Jan-25 SAR770,559.49 SAR0.00 0% 0% 21-Jan-25, BASE SLAB
COLUMNS
COLUMN 23 22-Feb-24 19-Mar-24 22-Jan-25 17-Feb-25 SAR70,047.58 SAR0.00 0% 0% 17-Feb-25, COLUMNS
TUNNEL WALLS 37 22-Feb-24 04-Apr-24 22-Jan-25 05-Mar-25 SAR559,826.44 SAR0.00 0% 0% 05-Mar-25, TUNNEL WALLS
TOP SLAB
SLA 37 23-Mar-24 07-May-24 20-Feb-25 08-Apr-25 SAR1,112,159.05 SAR0.00 0% 0% 08-Apr-25, TOP SLAB
FINISHING WORK
FINISHIN 24 08-May-24 04-Jun-24 09-Apr-25 06-May-25 SAR287,489.57 SAR0.00 0% 0% 06-May-25, FINISHING WORK
6th Sta 0+120.507-
0+12 Sta 0+140.507 106 03-Feb-24 08-Jun-24 02-Jan-25 10-May-25 SAR2,800,082.14 SAR0.00 0% 0% 10-May-25, 6th Sta 0+120.507- S

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
33 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
BASE SLAB
SL 27 03-Feb-24 04-Mar-24 02-Jan-25 02-Feb-25 SAR770,559.49 SAR0.00 0% 0% 02-Feb-25, BASE SLAB
COLUMNS
COLUMN 23 05-Mar-24 31-Mar-24 03-Feb-25 01-Mar-25 SAR70,047.58 SAR0.00 0% 0% 01-Mar-25, COLUMNS
TUNNEL WALLS 30 05-Mar-24 08-Apr-24 03-Feb-25 09-Mar-25 SAR559,826.44 SAR0.00 0% 0% 09-Mar-25, TUNNEL WALLS
TOP SLAB
SLA 37 26-Mar-24 11-May-24 24-Feb-25 12-Apr-25 SAR1,112,159.05 SAR0.00 0% 0% 12-Apr-25, TOP SLAB
FINISHING WORK
FINISHIN 24 12-May-24 08-Jun-24 13-Apr-25 10-May-25 SAR287,489.57 SAR0.00 0% 0% 10-May-25, FINISHING WORK
7th Sta 0+140.507-
0+14 Sta 0+160.507 113 14-Feb-24 02-Jul-24 14-Jan-25 29-May-25 SAR2,800,082.14 SAR0.00 0% 0% 29-May-25, 7th Sta 0+140.507-
BASE SLAB
SL 27 14-Feb-24 16-Mar-24 14-Jan-25 13-Feb-25 SAR770,559.49 SAR0.00 0% 0% 13-Feb-25, BASE SLAB
COLUMNS
COLUMN 23 17-Mar-24 15-Apr-24 15-Feb-25 12-Mar-25 SAR70,047.58 SAR0.00 0% 0% 12-Mar-25, COLUMNS
TUNNEL WALLS 37 17-Mar-24 01-May-24 15-Feb-25 29-Mar-25 SAR559,826.44 SAR0.00 0% 0% 29-Mar-25, TUNNEL WALLS
TOP SLAB
SLA 37 18-Apr-24 30-May-24 16-Mar-25 01-May-25 SAR1,112,159.05 SAR0.00 0% 0% 01-May-25, TOP SLAB
FINISHING WORK
FINISHIN 24 01-Jun-24 02-Jul-24 03-May-25 29-May-25 SAR287,489.57 SAR0.00 0% 0% 29-May-25, FINISHING WORK
8th Sta 0+160.507-
0+16 Sta 0+180.507 113 26-Feb-24 14-Jul-24 26-Jan-25 14-Jun-25 SAR2,800,082.14 SAR0.00 0% 0% 14-Jun-25, 8th Sta 0+160.507- S
BASE SLAB
SL 27 26-Feb-24 27-Mar-24 26-Jan-25 25-Feb-25 SAR770,559.49 SAR0.00 0% 0% 25-Feb-25, BASE SLAB
COLUMNS
COLUMN 23 28-Mar-24 27-Apr-24 26-Feb-25 24-Mar-25 SAR70,047.58 SAR0.00 0% 0% 24-Mar-25, COLUMNS
TUNNEL WALLS 37 28-Mar-24 13-May-24 26-Feb-25 14-Apr-25 SAR559,826.44 SAR0.00 0% 0% 14-Apr-25, TUNNEL WALLS
TOP SLAB
SLA 37 30-Apr-24 11-Jun-24 27-Mar-25 13-May-25 SAR1,112,159.05 SAR0.00 0% 0% 13-May-25, TOP SLAB
FINISHING WORK
FINISHIN 24 12-Jun-24 14-Jul-24 14-May-25 14-Jun-25 SAR287,489.57 SAR0.00 0% 0% 14-Jun-25, FINISHING WORK
9th Sta 0+180.507-
0+18 Sta 0+200.507 113 09-Mar-24 25-Jul-24 06-Feb-25 25-Jun-25 SAR2,800,082.14 SAR0.00 0% 0% 25-Jun-25, 9th Sta 0+180.507-
BASE SLAB
SL 27 09-Mar-24 08-Apr-24 06-Feb-25 09-Mar-25 SAR770,559.49 SAR0.00 0% 0% 09-Mar-25, BASE SLAB
COLUMNS
COLUMN 23 13-Apr-24 08-May-24 10-Mar-25 09-Apr-25 SAR70,047.58 SAR0.00 0% 0% 09-Apr-25, COLUMNS
TUNNEL WALLS 37 13-Apr-24 25-May-24 10-Mar-25 26-Apr-25 SAR559,826.44 SAR0.00 0% 0% 26-Apr-25, TUNNEL WALLS
TOP SLAB
SLA 37 12-May-24 27-Jun-24 13-Apr-25 25-May-25 SAR1,112,159.05 SAR0.00 0% 0% 25-May-25, TOP SLAB
FINISHING WORK
FINISHIN 24 29-Jun-24 25-Jul-24 26-May-25 25-Jun-25 SAR287,489.57 SAR0.00 0% 0% 25-Jun-25, FINISHING WOR
10th Sta 0+200.507-
0+2 Sta 0+220.507 76 20-Mar-24 24-Jun-24 18-Feb-25 21-May-25 SAR1,617,875.50 SAR0.00 0% 0% 21-May-25, 10th Sta 0+200.507-
BASE SLAB
SL 27 20-Mar-24 23-Apr-24 18-Feb-25 20-Mar-25 SAR770,559.49 SAR0.00 0% 0% 20-Mar-25, BASE SLAB
TUNNEL WALLS 37 24-Apr-24 05-Jun-24 22-Mar-25 07-May-25 SAR559,826.44 SAR0.00 0% 0% 07-May-25, TUNNEL WALLS
FINISHING WORK
FINISHIN 24 23-May-24 24-Jun-24 24-Apr-25 21-May-25 SAR287,489.57 SAR0.00 0% 0% 21-May-25, FINISHING WORK
11th Sta 0+2
0+220.507- Sta 0+240.507 76 01-Apr-24 06-Jul-24 02-Mar-25 02-Jun-25 SAR1,617,875.50 SAR0.00 0% 0% 02-Jun-25, 11th Sta 0+220.507-
BASE SLAB
SL 27 01-Apr-24 05-May-24 02-Mar-25 06-Apr-25 SAR770,559.49 SAR0.00 0% 0% 06-Apr-25, BASE SLAB
TUNNEL WALLS 37 06-May-24 22-Jun-24 07-Apr-25 19-May-25 SAR559,826.44 SAR0.00 0% 0% 19-May-25, TUNNEL WALLS
FINISHING WORK
FINISHIN 24 04-Jun-24 06-Jul-24 06-May-25 02-Jun-25 SAR287,489.57 SAR0.00 0% 0% 02-Jun-25, FINISHING WORK
12th Sta 0+240.507-
0+2 Sta 0+260.507 76 24-Apr-24 25-Jul-24 22-Mar-25 25-Jun-25 SAR1,617,875.50 SAR0.00 0% 0% 25-Jun-25, 12th Sta 0+240.507
BASE SLAB
SL 27 24-Apr-24 25-May-24 22-Mar-25 26-Apr-25 SAR770,559.49 SAR0.00 0% 0% 26-Apr-25, BASE SLAB
TUNNEL WALLS 37 26-May-24 11-Jul-24 27-Apr-25 11-Jun-25 SAR559,826.44 SAR0.00 0% 0% 11-Jun-25, TUNNEL WALLS
FINISHING WORK
FINISHIN 24 29-Jun-24 25-Jul-24 26-May-25 25-Jun-25 SAR287,489.57 SAR0.00 0% 0% 25-Jun-25, FINISHING WOR
13th Sta 0+260.507-
0+2 Sta 0+280.507 76 14-May-24 14-Aug-24 15-Apr-25 15-Jul-25 SAR1,617,875.50 SAR0.00 0% 0% 15-Jul-25, 13th Sta 0+260.507
BASE SLAB
SL 27 14-May-24 13-Jun-24 15-Apr-25 15-May-25 SAR770,559.49 SAR0.00 0% 0% 15-May-25, BASE SLAB
TUNNEL WALLS 37 19-Jun-24 31-Jul-24 17-May-25 01-Jul-25 SAR559,826.44 SAR0.00 0% 0% 01-Jul-25, TUNNEL WALLS
FINISHING WORK
FINISHIN 24 18-Jul-24 14-Aug-24 18-Jun-25 15-Jul-25 SAR287,489.57 SAR0.00 0% 0% 15-Jul-25, FINISHING WOR
14th Sta 0+280.507-
0+2 Sta 0+300.507 76 03-Jun-24 03-Sep-24 05-May-25 04-Aug-25 SAR1,617,875.50 SAR0.00 0% 0% 04-Aug-25, 14th Sta 0+280.50
BASE SLAB
SL 27 03-Jun-24 08-Jul-24 05-May-25 04-Jun-25 SAR770,559.49 SAR0.00 0% 0% 04-Jun-25, BASE SLAB
TUNNEL WALLS 37 09-Jul-24 20-Aug-24 09-Jun-25 21-Jul-25 SAR559,826.44 SAR0.00 0% 0% 21-Jul-25, TUNNEL WALLS
FINISHING WORK
FINISHIN 24 07-Aug-24 03-Sep-24 08-Jul-25 04-Aug-25 SAR287,489.57 SAR0.00 0% 0% 04-Aug-25, FINISHING WO
15th Sta 0+300.507-
0+3 Sta 0+320.507 76 27-Jun-24 24-Sep-24 25-May-25 24-Aug-25 SAR1,617,875.50 SAR0.00 0% 0% 24-Aug-25, 15th Sta 0+300.5
BASE SLAB
SL 27 27-Jun-24 28-Jul-24 25-May-25 28-Jun-25 SAR770,559.49 SAR0.00 0% 0% 28-Jun-25, BASE SLAB
TUNNEL WALLS 37 29-Jul-24 09-Sep-24 29-Jun-25 10-Aug-25 SAR559,826.44 SAR0.00 0% 0% 10-Aug-25, TUNNEL WALL
FINISHING WORK
FINISHIN 24 27-Aug-24 24-Sep-24 28-Jul-25 24-Aug-25 SAR287,489.57 SAR0.00 0% 0% 24-Aug-25, FINISHING WO
16th Sta 0+320.507-
0+3 Sta 0+340.507 76 17-Jul-24 14-Oct-24 17-Jun-25 13-Sep-25 SAR1,617,875.50 SAR0.00 0% 0% 13-Sep-25, 16th Sta 0+320.5
BASE SLAB
SL 27 17-Jul-24 17-Aug-24 17-Jun-25 17-Jul-25 SAR770,559.49 SAR0.00 0% 0% 17-Jul-25, BASE SLAB
TUNNEL WALLS 37 18-Aug-24 30-Sep-24 19-Jul-25 30-Aug-25 SAR559,826.44 SAR0.00 0% 0% 30-Aug-25, TUNNEL WALL
FINISHING WORK
FINISHIN 24 16-Sep-24 14-Oct-24 17-Aug-25 13-Sep-25 SAR287,489.57 SAR0.00 0% 0% 13-Sep-25, FINISHING WO
17th Sta 0+340.507-
0+3 Sta 0+360.507 80 06-Aug-24 07-Nov-24 07-Jul-25 08-Oct-25 SAR1,617,875.50 SAR0.00 0% 0% 08-Oct-25, 17th Sta 0+340.
BASE SLAB
SL 31 06-Aug-24 10-Sep-24 07-Jul-25 11-Aug-25 SAR770,559.49 SAR0.00 0% 0% 11-Aug-25, BASE SLAB
TUNNEL WALLS 37 11-Sep-24 24-Oct-24 12-Aug-25 24-Sep-25 SAR559,826.44 SAR0.00 0% 0% 24-Sep-25, TUNNEL WAL
FINISHING WORK
FINISHIN 24 12-Oct-24 07-Nov-24 10-Sep-25 08-Oct-25 SAR287,489.57 SAR0.00 0% 0% 08-Oct-25, FINISHING W
BACKFILLING UPTO TUNNEL WALL 181 13-Apr-24 14-Nov-24 10-Mar-25 15-Oct-25 SAR7,179,437.88 SAR0.00 0% 0% 15-Oct-25, BACKFILLING
STRUCTURAL FILL 144 09-Jun-24 28-Nov-24 11-May-25 29-Oct-25 SAR7,179,437.88 SAR0.00 0% 0% 29-Oct-25, STRUCTURA
WET & DRY UTILITIES
UT 125 26-Oct-24 19-Mar-25 25-Sep-25 17-Feb-26 SAR4,745,384.83 SAR0.00 0% 0% 17-Feb-26, WET & D
INSIDE WET CULVERT 88 26-Oct-24 04-Feb-25 25-Sep-25 05-Jan-26 SAR3,373,568.08 SAR0.00 0% 0% 05-Jan-26, INSIDE WE
POTABLE WATER NETWORK 59 26-Oct-24 01-Jan-25 25-Sep-25 02-Dec-25 SAR641,029.14 SAR0.00 0% 0% 02-Dec-25, POTABLE W
GREY WAWATER DISTRIBUTION SYSTEM 47 24-Nov-24 16-Jan-25 25-Oct-25 17-Dec-25 SAR197,230.15 SAR0.00 0% 0% 17-Dec-25, GREY WAT
IRRIGATION NETWORK
IRRIGATI 51 24-Nov-24 21-Jan-25 25-Oct-25 22-Dec-25 SAR337,748.09 SAR0.00 0% 0% 22-Dec-25, IRRIGATIO

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
34 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
CHILLED WATER SUPPLY NETWORK 55 24-Nov-24 26-Jan-25 25-Oct-25 27-Dec-25 SAR782,691.15 SAR0.00 0% 0% 27-Dec-25, CHILLED W
CHILLED WATER RETURN NETWORK 64 24-Nov-24 30-Jan-25 19-Oct-25 31-Dec-25 SAR782,691.15 SAR0.00 0% 0% 31-Dec-25, CHILLED W
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 63 24-Nov-24 04-Feb-25 25-Oct-25 05-Jan-26 SAR632,178.41 SAR0.00 0% 0% 05-Jan-26, AUTOMAT
INSIDE DRY CULVERT 100 24-Nov-24 19-Mar-25 25-Oct-25 17-Feb-26 SAR1,371,816.76 SAR0.00 0% 0% 17-Feb-26, INSIDE D
POWER 100 24-Nov-24 19-Mar-25 25-Oct-25 17-Feb-26 SAR1,245,890.83 SAR0.00 0% 0% 17-Feb-26, POWER
HIGH VOLTAGE
V 110 KV NETWORK 30 24-Nov-24 28-Dec-24 25-Oct-25 27-Nov-25 SAR81,088.57 SAR0.00 0% 0% 27-Nov-25, HIGH VOLT
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 32 29-Dec-24 03-Feb-25 29-Nov-25 04-Jan-26 SAR1,037,144.34 SAR0.00 0% 0% 04-Jan-26, MEDIUM V
LOW VVOLTAGE NETWORK 32 04-Feb-25 12-Mar-25 05-Jan-26 10-Feb-26 SAR127,657.92 SAR0.00 0% 0% 10-Feb-26, LOW VOL
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 70 29-Dec-24 19-Mar-25 29-Nov-25 17-Feb-26 SAR0.00 SAR0.00 0% 0% 17-Feb-26, ELECTRIC
LIGHTING SYSTEM
LIGHT 35 09-Jan-25 18-Feb-25 10-Dec-25 19-Jan-26 SAR0.00 SAR0.00 0% 0% 19-Jan-26, LIGHTING
TELECOM SERVICES 30 15-Jan-25 18-Feb-25 16-Dec-25 19-Jan-26 SAR125,925.93 SAR0.00 0% 0% 19-Jan-26, TELECOM
MEP VEHICULAR
VEHICULA TUNNEL/ DRY & WET CULVERTS 183 26-Oct-24 31-May-25 25-Sep-25 30-Apr-26 SAR6,581,466.80 SAR0.00 0% 0% 30-Apr-26, MEP V
TUNNEL MECHANICAL
ME WORKS 122 26-Oct-24 16-Mar-25 25-Sep-25 15-Feb-26 SAR1,893,369.43 SAR0.00 0% 0% 15-Feb-26, TUNNEL
FIRE FIG
FIGHTING SYSTEM 56 26-Oct-24 29-Dec-24 25-Sep-25 30-Nov-25 SAR1,377,080.03 SAR0.00 0% 0% 30-Nov-25, FIRE FIGHT
VENTILATION SYSTEM
VENTILA 23 12-Dec-24 07-Jan-25 12-Nov-25 08-Dec-25 SAR154,414.27 SAR0.00 0% 0% 08-Dec-25, VENTILATI
PUMPS INSTALLATION
I 15 08-Jan-25 25-Jan-25 09-Dec-25 27-Dec-25 SAR290,157.69 SAR0.00 0% 0% 27-Dec-25, PUMPS INS
DUCTING SYSTEM 66 30-Dec-24 16-Mar-25 30-Nov-25 15-Feb-26 SAR71,717.44 SAR0.00 0% 0% 15-Feb-26, DUCTING
TUNNEL ELECTRICAL
EL WORKS 183 26-Oct-24 31-May-25 25-Sep-25 30-Apr-26 SAR3,980,129.08 SAR0.00 0% 0% 30-Apr-26, TUNN
CABLE TRAYS
T 101 24-Nov-24 20-Mar-25 25-Oct-25 18-Feb-26 SAR903,101.78 SAR0.00 0% 0% 18-Feb-26, CABLE T
POWER CABLES 107 18-Dec-24 26-Apr-25 18-Nov-25 26-Mar-26 SAR1,221,039.97 SAR0.00 0% 0% 26-Mar-26, POWER
ELECTRICAL INSTALLATIONS
ELECTRI 86 16-Feb-25 31-May-25 17-Jan-26 30-Apr-26 SAR999,112.36 SAR0.00 0% 0% 30-Apr-26, ELECT
LOW CUR
CURRENT 180 26-Oct-24 27-May-25 25-Sep-25 27-Apr-26 SAR856,874.97 SAR0.00 0% 0% 27-Apr-26, LOW C
FIRE D
DETECTION AND ALARM SYSTEM 82 26-Oct-24 28-Jan-25 25-Sep-25 29-Dec-25 SAR146,462.21 SAR0.00 0% 0% 29-Dec-25, FIRE DETE
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 28 09-Nov-24 10-Dec-24 09-Oct-25 10-Nov-25 SAR122,037.58 SAR0.00 0% 0% 10-Nov-25, COMMUNIC
PUBLIC ADDRESS
PUBLI 28 11-Dec-24 12-Jan-25 11-Nov-25 13-Dec-25 SAR94,663.03 SAR0.00 0% 0% 13-Dec-25, PUBLIC AD
VIDEO SURVEILLANCE 49 13-Jan-25 10-Mar-25 14-Dec-25 08-Feb-26 SAR113,907.68 SAR0.00 0% 0% 08-Feb-26, VIDEO SU
SACADA SYSTEM
SACA 35 11-Mar-25 24-Apr-25 09-Feb-26 25-Mar-26 SAR304,098.56 SAR0.00 0% 0% 25-Mar-26, SACAD
RADIO RE-BROADCASTING SYSTEM 28 26-Apr-25 27-May-25 26-Mar-26 27-Apr-26 SAR75,705.91 SAR0.00 0% 0% 27-Apr-26, RADIO
TUNNEL PLUMBING
PL WORKS 35 21-Apr-25 31-May-25 17-Mar-26 30-Apr-26 SAR707,968.30 SAR0.00 0% 0% 30-Apr-26, TUNN
DRAINAGE SYSTEM
DRAINAG 35 21-Apr-25 31-May-25 17-Mar-26 30-Apr-26 SAR707,968.30 SAR0.00 0% 0% 30-Apr-26, DRAIN
TUNNEL INTERNAL
INTER ROAD WORK 42 01-Jun-25 22-Jul-25 02-May-26 22-Jun-26 SAR894,081.00 SAR0.00 0% 0% 22-Jun-26, TUNN
TUNNEL INTERNAL
INTER DECORATIVE WORKS 40 14-Jul-25 28-Aug-25 14-Jun-26 29-Jul-26 SAR1,226,752.00 SAR0.00 0% 0% 29-Jul-26, TUN
KAAR TUNNEL (KING
(KIN ABDULAZIZ ROAD TUNNEL EAST) 1015 28-Jun-22 19-Jul-25 28-Jun-22 A 23-Oct-25 SAR201,569,037.71 SAR38,079,272.87 73.9% 18.89% 23-Oct-25, KAAR TUNN
ZONE 8 - FROM S
STA. 0+015.13 ~ 0+553 1015 28-Jun-22 19-Jul-25 28-Jun-22 A 23-Oct-25 SAR201,569,037.71 SAR38,079,272.87 73.9% 18.89% 23-Oct-25, ZONE 8 - FRO
ENGINEERING 737 28-Jun-22 07-Sep-23 28-Jun-22 A 25-Nov-24 SAR0.00 SAR0.00 0% 0% 25-Nov-24, ENGINEERING
SITE SURVEY 14 24-Jul-22 08-Aug-22 24-Jan-23 A 04-Feb-23 A SAR0.00 SAR0.00 0% 0% 04-Feb-23 A, SITE SURVEY
SHOP DRAWINGS
DRAWIN 531 28-Jun-22 08-Dec-22 28-Jun-22 A 19-Mar-24 SAR0.00 SAR0.00 0% 0% 19-Mar-24, SHOP DRAWINGS
CIVIL/STRUCTURAL 0+15 ~0+115
CIVIL/STRU 472 28-Jun-22 18-Aug-22 28-Jun-22 A 10-Jan-24 SAR0.00 SAR0.00 0% 0% 10-Jan-24, CIVIL/STRUCTURAL 0+15 ~0+115
CIVIL/STRUCTURAL 0+115 ~0+218
CIVIL/STRU 381 30-Jul-22 15-Sep-22 30-Jul-22 A 10-Jan-24 SAR0.00 SAR0.00 0% 0% 10-Jan-24, CIVIL/STRUCTURAL 0+115 ~0+218
CIVIL/STRUCTURAL 0+218 ~0+313
CIVIL/STRU 436 10-Sep-22 27-Oct-22 10-Sep-22 A 07-Feb-24 SAR0.00 SAR0.00 0% 0% 07-Feb-24, CIVIL/STRUCTURAL 0+218 ~0+313
CIVIL/STRUCTURAL 0+313 ~0+413
CIVIL/STRU 41 22-Oct-22 08-Dec-22 31-Jan-24 19-Mar-24 SAR0.00 SAR0.00 0% 0% 19-Mar-24, CIVIL/STRUCTURAL 0+313 ~0+41
CIVIL/STRUCTURAL 0+413 ~0+553
CIVIL/STRU 475 05-Jul-22 25-Aug-22 03-Oct-22 A 21-Jan-24 SAR0.00 SAR0.00 0% 0% 21-Jan-24, CIVIL/STRUCTURAL 0+413 ~0+553
ARCHITECTURAL
ARCHITECT 22 29-Oct-22 22-Nov-22 07-Feb-24 04-Mar-24 SAR0.00 SAR0.00 0% 0% 04-Mar-24, ARCHITECTURAL
UTILITIES 480 23-Nov-22 24-May-23 25-Oct-22 A 22-Jun-24 SAR0.00 SAR0.00 0% 0% 22-Jun-24, UTILITIES
WET UTILITIES
UTILIT 469 23-Nov-22 30-Mar-23 25-Oct-22 A 04-Jun-24 SAR0.00 SAR0.00 0% 0% 04-Jun-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 22 23-Nov-22 18-Dec-22 25-Oct-22 A 13-Nov-22 A SAR0.00 SAR0.00 0% 0% 13-Nov-22 A, POTABLE WATER NETWORK BRANCH, HOUSE
GREY WA
WATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 22 19-Dec-22 12-Jan-23 13-Dec-22 A 16-Mar-24 SAR0.00 SAR0.00 0% 0% 16-Mar-24, GREY WATER DISTRIBUTION NE
IRR & FF NETWORK BRANCHES & TIE IN POINTS 22 14-Jan-23 07-Feb-23 16-Mar-24 14-Apr-24 SAR0.00 SAR0.00 0% 0% 14-Apr-24, IRR & FF NETWORK BRANCHE
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 22 08-Feb-23 05-Mar-23 14-Apr-24 09-May-24 SAR0.00 SAR0.00 0% 0% 09-May-24, CHILLED WATER SUPPLY & RE
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 22 06-Mar-23 30-Mar-23 09-May-24 04-Jun-24 SAR0.00 SAR0.00 0% 0% 04-Jun-24, AUTOMATIC WASTE COLLECT
DRY UTILITI
UTILITIES 414 19-Dec-22 24-May-23 01-Nov-22 A 22-Jun-24 SAR0.00 SAR0.00 0% 0% 22-Jun-24, DRY UTILITIES
POWER 371 19-Dec-22 29-Apr-23 01-Nov-22 A 22-May-24 SAR0.00 SAR0.00 0% 0% 22-May-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 22 19-Dec-22 12-Jan-23 04-Mar-24 28-Mar-24 SAR0.00 SAR0.00 0% 0% 28-Mar-24, HIGH VOLTAGE 110 KV NETWO
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 22 14-Jan-23 07-Feb-23 28-Mar-24 27-Apr-24 SAR0.00 SAR0.00 0% 0% 27-Apr-24, MEDIUM VOLTAGE 13.8 KV NE
LOW VVOLTAGE NETWORK 22 08-Feb-23 05-Mar-23 27-Nov-22 A 22-May-24 SAR0.00 SAR0.00 0% 0% 22-May-24, LOW VOLTAGE NETWORK
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 22 06-Mar-23 30-Mar-23 01-Nov-22 A 12-Nov-22 A SAR0.00 SAR0.00 0% 0% 12-Nov-22 A, ELECTRICAL DISTRIBUTION SYSTEM
LIGHTING SYSTEM
LIGHT 22 01-Apr-23 29-Apr-23 26-Nov-22 A 27-Dec-22 A SAR0.00 SAR0.00 0% 0% 27-Dec-22 A, LIGHTING SYSTEM
LOW CUR
CURRENT 22 30-Apr-23 24-May-23 22-May-24 22-Jun-24 SAR0.00 SAR0.00 0% 0% 22-Jun-24, LOW CURRENT
TELECOM SERVICES
TELEC 22 30-Apr-23 24-May-23 22-May-24 22-Jun-24 SAR0.00 SAR0.00 0% 0% 22-Jun-24, TELECOM SERVICES
MEP 220 19-Dec-22 07-Sep-23 04-Mar-24 25-Nov-24 SAR0.00 SAR0.00 0% 0% 25-Nov-24, MEP
TUNNEL MECHANICAL
ME WORKS 176 19-Dec-22 18-Jul-23 04-Mar-24 05-Oct-24 SAR0.00 SAR0.00 0% 0% 05-Oct-24, TUNNEL MECHANICAL W
FIRE FIG
FIGHTING SYSTEM 88 19-Dec-22 30-Mar-23 04-Mar-24 23-Jun-24 SAR0.00 SAR0.00 0% 0% 23-Jun-24, FIRE FIGHTING SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
35 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
VENTILA
VENTILATION SYSTEM 44 18-Mar-23 10-May-23 04-Jun-24 30-Jul-24 SAR0.00 SAR0.00 0% 0% 30-Jul-24, VENTILATION SYSTEM
PUMPS INSTALLATION
I 22 11-May-23 05-Jun-23 30-Jul-24 25-Aug-24 SAR0.00 SAR0.00 0% 0% 25-Aug-24, PUMPS INSTALLATION
DUCTING SYSTEM 88 01-Apr-23 18-Jul-23 23-Jun-24 05-Oct-24 SAR0.00 SAR0.00 0% 0% 05-Oct-24, DUCTING SYSTEM
TUNNEL ELECTRICAL
EL WORKS 210 31-Dec-22 07-Sep-23 16-Mar-24 25-Nov-24 SAR0.00 SAR0.00 0% 0% 25-Nov-24, TUNNEL ELECTRICAL W
CABLE TRAYS
T 110 31-Dec-22 10-May-23 16-Mar-24 30-Jul-24 SAR0.00 SAR0.00 0% 0% 30-Jul-24, CABLE TRAYS
POWER CABLES 44 04-Mar-23 26-Apr-23 21-May-24 16-Jul-24 SAR0.00 SAR0.00 0% 0% 16-Jul-24, POWER CABLES
ELECTRICAL INSTALLATIONS
ELECTRI 110 15-Mar-23 27-Jul-23 02-Jun-24 14-Oct-24 SAR0.00 SAR0.00 0% 0% 14-Oct-24, ELECTRICAL INSTALLATI
LOW CUR
CURRENT 132 01-Apr-23 07-Sep-23 23-Jun-24 25-Nov-24 SAR0.00 SAR0.00 0% 0% 25-Nov-24, LOW CURRENT
FIRE D
DETECTION AND ALARM SYSTEM 132 01-Apr-23 07-Sep-23 23-Jun-24 25-Nov-24 SAR0.00 SAR0.00 0% 0% 25-Nov-24, FIRE DETECTION AND A
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 110 12-Apr-23 24-Aug-23 04-Jul-24 11-Nov-24 SAR0.00 SAR0.00 0% 0% 11-Nov-24, COMMUNICATION SYST
PUBLIC ADDRESS
PUBLI 66 02-May-23 20-Jul-23 21-Jul-24 07-Oct-24 SAR0.00 SAR0.00 0% 0% 07-Oct-24, PUBLIC ADDRESS
VIDEO SURVEILLANCE 44 14-May-23 06-Jul-23 01-Aug-24 22-Sep-24 SAR0.00 SAR0.00 0% 0% 22-Sep-24, VIDEO SURVEILLANCE
SACADA SYSTEM
SACA 44 25-May-23 18-Jul-23 13-Aug-24 05-Oct-24 SAR0.00 SAR0.00 0% 0% 05-Oct-24, SACADA SYSTEM
RADIO RE-BROADCASTING SYSTEM 44 06-Jun-23 30-Jul-23 25-Aug-24 16-Oct-24 SAR0.00 SAR0.00 0% 0% 16-Oct-24, RADIO RE-BROADCASTIN
TUNNEL PLUMBING
PL WORKS 21 31-Dec-22 23-Jan-23 16-Mar-24 13-Apr-24 SAR0.00 SAR0.00 0% 0% 13-Apr-24, TUNNEL PLUMBING WORKS
PROCUREMENT 659 15-Oct-22 14-Nov-23 15-Oct-22 A 08-Dec-24 SAR37,437,767.98 SAR13,215,620.43 100% 35.3% 08-Dec-24, PROCUREMENT
CIVIL/STRUCTU
CIVIL/STRUCTURAL 421 15-Oct-22 17-Dec-22 15-Oct-22 A 17-Mar-24 SAR32,067,408.60 SAR13,215,620.43 100% 41.21% 17-Mar-24, CIVIL/STRUCTURAL
UTILITIES 280 07-Nov-22 14-Nov-23 07-Jan-24 08-Dec-24 SAR900,639.05 SAR0.00 100% 0% 08-Dec-24, UTILITIES
WET UTILITIES
UTILIT 269 07-Nov-22 24-Sep-23 07-Jan-24 25-Nov-24 SAR494,956.52 SAR0.00 100% 0% 25-Nov-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 145 19-Dec-22 13-Jun-23 04-Mar-24 27-Aug-24 SAR50,276.79 SAR0.00 100% 0% 27-Aug-24, POTABLE WATER NETWOR
DI PIPES
PIP 145 19-Dec-22 08-Jun-23 04-Mar-24 27-Aug-24 SAR5,530.45 SAR0.00 100% 0% 27-Aug-24, DI PIPES
HDPE PIPES 145 19-Dec-22 08-Jun-23 04-Mar-24 27-Aug-24 SAR6,535.98 SAR0.00 100% 0% 27-Aug-24, HDPE PIPES
GRP PPIPES 145 19-Dec-22 08-Jun-23 04-Mar-24 27-Aug-24 SAR5,027.68 SAR0.00 100% 0% 27-Aug-24, GRP PIPES
DI & G
GRP FITTING 145 19-Dec-22 08-Jun-23 04-Mar-24 27-Aug-24 SAR5,027.68 SAR0.00 100% 0% 27-Aug-24, DI & GRP FITTING
GATE VALVE 145 24-Dec-22 13-Jun-23 04-Mar-24 27-Aug-24 SAR5,027.68 SAR0.00 100% 0% 27-Aug-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 145 24-Dec-22 13-Jun-23 04-Mar-24 27-Aug-24 SAR4,524.91 SAR0.00 100% 0% 27-Aug-24, BUTTERFLAY VALVE
WATER METER
WATE 145 19-Dec-22 08-Jun-23 04-Mar-24 27-Aug-24 SAR7,541.52 SAR0.00 100% 0% 27-Aug-24, WATER METER
AIR RELASE
RE VALVE 145 24-Dec-22 13-Jun-23 04-Mar-24 27-Aug-24 SAR5,027.68 SAR0.00 100% 0% 27-Aug-24, AIR RELASE VALVE
WASHOUT VALVE
WASH 145 24-Dec-22 13-Jun-23 04-Mar-24 27-Aug-24 SAR6,033.22 SAR0.00 100% 0% 27-Aug-24, WASHOUT VALVE
GREY WAWATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 204 07-Nov-22 08-Jul-23 07-Jan-24 09-Sep-24 SAR38,672.58 SAR0.00 100% 0% 09-Sep-24, GREY WATER DISTRIBUTIO
DI PIPES
PIP 145 14-Jan-23 08-Jul-23 16-Mar-24 09-Sep-24 SAR6,574.34 SAR0.00 100% 0% 09-Sep-24, DI PIPES
HDPE PIPES 145 14-Jan-23 08-Jul-23 16-Mar-24 09-Sep-24 SAR6,961.06 SAR0.00 100% 0% 09-Sep-24, HDPE PIPES
GRP PPIPES 145 14-Jan-23 08-Jul-23 16-Mar-24 09-Sep-24 SAR5,027.44 SAR0.00 100% 0% 09-Sep-24, GRP PIPES
DI & G
GRP FITTING 145 07-Nov-22 27-Apr-23 07-Jan-24 02-Jul-24 SAR4,640.71 SAR0.00 100% 0% 02-Jul-24, DI & GRP FITTING
GATE VALVE 145 14-Jan-23 08-Jul-23 16-Mar-24 09-Sep-24 SAR2,707.08 SAR0.00 100% 0% 09-Sep-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 145 14-Jan-23 08-Jul-23 16-Mar-24 09-Sep-24 SAR3,867.26 SAR0.00 100% 0% 09-Sep-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 145 14-Jan-23 08-Jul-23 16-Mar-24 09-Sep-24 SAR4,253.98 SAR0.00 100% 0% 09-Sep-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 145 14-Jan-23 08-Jul-23 16-Mar-24 09-Sep-24 SAR4,640.71 SAR0.00 100% 0% 09-Sep-24, WASEHOUT VALVE
IRR & FF NETWORK BRANCHES & TIE IN POINTS 145 08-Feb-23 07-Aug-23 14-Apr-24 06-Oct-24 SAR61,291.75 SAR0.00 100% 0% 06-Oct-24, IRR & FF NETWORK BRAN
HDPE PIPES 145 08-Feb-23 02-Aug-23 14-Apr-24 06-Oct-24 SAR15,322.94 SAR0.00 100% 0% 06-Oct-24, HDPE PIPES
GATE VALVE 145 08-Feb-23 02-Aug-23 14-Apr-24 06-Oct-24 SAR6,129.17 SAR0.00 100% 0% 06-Oct-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 145 08-Feb-23 02-Aug-23 14-Apr-24 06-Oct-24 SAR6,129.17 SAR0.00 100% 0% 06-Oct-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 145 08-Feb-23 02-Aug-23 14-Apr-24 06-Oct-24 SAR6,129.17 SAR0.00 100% 0% 06-Oct-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 145 08-Feb-23 02-Aug-23 14-Apr-24 06-Oct-24 SAR6,129.17 SAR0.00 100% 0% 06-Oct-24, WASEHOUT VALVE
FIRE H
HYDRANT 145 13-Feb-23 07-Aug-23 14-Apr-24 06-Oct-24 SAR21,452.11 SAR0.00 100% 0% 06-Oct-24, FIRE HYDRANT
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 145 06-Mar-23 28-Aug-23 09-May-24 31-Oct-24 SAR245,550.16 SAR0.00 100% 0% 31-Oct-24, CHILLED WATER SUPPLY
MILD STEEL PIPE 145 06-Mar-23 28-Aug-23 09-May-24 31-Oct-24 SAR98,220.07 SAR0.00 100% 0% 31-Oct-24, MILD STEEL PIPE
MILD STEEL FITTING 145 06-Mar-23 28-Aug-23 09-May-24 31-Oct-24 SAR98,220.07 SAR0.00 100% 0% 31-Oct-24, MILD STEEL FITTING
GATE VALVE 145 06-Mar-23 28-Aug-23 09-May-24 31-Oct-24 SAR49,110.03 SAR0.00 100% 0% 31-Oct-24, GATE VALVE
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 144 01-Apr-23 24-Sep-23 04-Jun-24 25-Nov-24 SAR99,165.24 SAR0.00 100% 0% 25-Nov-24, AUTOMATIC WASTE CO
AUTOMATIC WASTE
AUTO 144 01-Apr-23 24-Sep-23 04-Jun-24 25-Nov-24 SAR99,165.24 SAR0.00 100% 0% 25-Nov-24, AUTOMATIC WASTE
DRY UTILITI
UTILITIES 210 14-Jan-23 14-Nov-23 28-Mar-24 08-Dec-24 SAR405,682.53 SAR0.00 100% 0% 08-Dec-24, DRY UTILITIES
POWER 189 14-Jan-23 19-Oct-23 28-Mar-24 13-Nov-24 SAR390,867.71 SAR0.00 100% 0% 13-Nov-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 145 14-Jan-23 08-Jul-23 28-Mar-24 22-Sep-24 SAR25,439.55 SAR0.00 100% 0% 22-Sep-24, HIGH VOLTAGE 110 KV NE
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 145 08-Feb-23 02-Aug-23 27-Apr-24 19-Oct-24 SAR325,378.62 SAR0.00 100% 0% 19-Oct-24, MEDIUM VOLTAGE 13.8 K
LOW V VOLTAGE NETWORK 145 06-Mar-23 28-Aug-23 22-May-24 13-Nov-24 SAR40,049.54 SAR0.00 100% 0% 13-Nov-24, LOW VOLTAGE NETWOR
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 144 01-Apr-23 24-Sep-23 22-May-24 12-Nov-24 SAR0.00 SAR0.00 0% 0% 12-Nov-24, ELECTRICAL DISTRIBUT
LIGHTING SYSTEM
LIGHT 144 30-Apr-23 19-Oct-23 22-May-24 12-Nov-24 SAR0.00 SAR0.00 0% 0% 12-Nov-24, LIGHTING SYSTEM
LOW CUR
CURRENT 144 25-May-23 14-Nov-23 22-Jun-24 08-Dec-24 SAR14,814.81 SAR0.00 100% 0% 08-Dec-24, LOW CURRENT
TELECOM SERVICES
TELEC 144 25-May-23 14-Nov-23 22-Jun-24 08-Dec-24 SAR14,814.81 SAR0.00 100% 0% 08-Dec-24, TELECOM SERVICES
MEP 235 26-Oct-22 02-Aug-23 24-Jan-24 03-Nov-24 SAR4,469,720.33 SAR0.00 100% 0% 03-Nov-24, MEP
ARCHITECTURAL
ARCHITECTUR 115 23-Nov-22 05-Apr-23 04-Mar-24 23-Jul-24 SAR0.00 SAR0.00 0% 0% 23-Jul-24, ARCHITECTURAL

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
36 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
CONSTRUCTION 1012 02-Jul-22 19-Jul-25 02-Jul-22 A 23-Oct-25 SAR164,131,269.72 SAR24,863,652.43 67.94% 15.15% 23-Oct-25, CONSTRUCT
GENERAL SITE ARRANGEMENT 43 09-Aug-22 25-Sep-22 28-Mar-23 A 17-Dec-23 SAR1,455,185.35 SAR1,434,345.99 100% 98.57% 17-Dec-23, GENERAL SITE ARRANGEMENT
SITE PREPARATION
PREPA 43 09-Aug-22 25-Sep-22 28-Mar-23 A 17-Dec-23 SAR1,455,185.35 SAR1,434,345.99 100% 98.57% 17-Dec-23, SITE PREPARATION
GEO-TECHNICAL INVESTIGATION
GEO-TECHNICA 53 02-Jul-22 04-Sep-22 02-Jul-22 A 01-Oct-22 A SAR88,306.54 SAR88,306.54 100% 100% 01-Oct-22 A, GEO-TECHNICAL INVESTIGATION
EXCAVATION & DEWATERING 720 26-Sep-22 29-Jul-24 05-Feb-23 A 30-Jul-25 SAR35,401,216.95 SAR21,462,568.36 98.07% 60.63% 30-Jul-25, EXCAVATION &
SOIL IMPROVEMENT
IMPROVE 127 25-Oct-22 29-Apr-23 26-Nov-23 A 25-Apr-24 SAR10,083,614.31 SAR605,016.86 100% 6% 25-Apr-24, SOIL IMPROVEMENT
STRUCTURAL WORKS 590 17-Nov-22 30-Jul-24 24-Oct-23 A 30-Sep-25 SAR74,111,316.17 SAR1,273,414.69 72.04% 1.72% 30-Sep-25, STRUCTURAL
1st Sta 0+15.13-Sta0+035.13
0+15 85 03-Jun-23 12-Sep-23 26-Aug-24 04-Dec-24 SAR2,034,686.86 SAR0.00 100% 0% 04-Dec-24, 1st Sta 0+15.13-Sta0+035.1
BASE SLAB
SL 27 03-Jun-23 06-Jul-23 26-Aug-24 28-Sep-24 SAR1,273,024.96 SAR0.00 100% 0% 28-Sep-24, BASE SLAB
TUNNEL WALLS 37 08-Jul-23 19-Aug-23 28-Sep-24 10-Nov-24 SAR496,018.83 SAR0.00 100% 0% 10-Nov-24, TUNNEL WALLS
BARRIER 33 06-Aug-23 12-Sep-23 27-Oct-24 04-Dec-24 SAR14,420.25 SAR0.00 100% 0% 04-Dec-24, BARRIER
PLAIN CO
CONCRETE 8 06-Aug-23 14-Aug-23 27-Oct-24 05-Nov-24 SAR172,279.74 SAR0.00 100% 0% 05-Nov-24, PLAIN CONCRETE
FINISHING
FINISHIN 8 15-Aug-23 23-Aug-23 05-Nov-24 14-Nov-24 SAR78,943.09 SAR0.00 100% 0% 14-Nov-24, FINISHING
2nd Sta 0+0
0+035.13-Sta 0+055.13 323 14-Jun-23 25-Sep-23 25-Nov-23 A 15-Dec-24 SAR2,034,686.86 SAR22,615.19 100% 1.11% 15-Dec-24, 2nd Sta 0+035.13-Sta 0+05
BASE SLAB
SL 265 14-Jun-23 18-Jul-23 25-Nov-23 A 08-Oct-24 SAR1,273,024.96 SAR22,615.19 100% 1.78% 08-Oct-24, BASE SLAB
TUNNEL WALLS 37 19-Jul-23 30-Aug-23 08-Oct-24 20-Nov-24 SAR496,018.83 SAR0.00 100% 0% 20-Nov-24, TUNNEL WALLS
BARRIER 33 17-Aug-23 25-Sep-23 06-Nov-24 15-Dec-24 SAR14,420.25 SAR0.00 100% 0% 15-Dec-24, BARRIER
PLAIN CO
CONCRETE 8 17-Aug-23 26-Aug-23 06-Nov-24 16-Nov-24 SAR172,279.74 SAR0.00 100% 0% 16-Nov-24, PLAIN CONCRETE
FINISHING
FINISHIN 8 27-Aug-23 04-Sep-23 16-Nov-24 25-Nov-24 SAR78,943.09 SAR0.00 100% 0% 25-Nov-24, FINISHING
3rd Sta 0+055.13-Sta
0+0 0+075.13 332 26-Jun-23 07-Oct-23 25-Nov-23 A 25-Dec-24 SAR2,034,686.86 SAR22,615.19 100% 1.11% 25-Dec-24, 3rd Sta 0+055.13-Sta 0+07
BASE SLAB
SL 274 26-Jun-23 30-Jul-23 25-Nov-23 A 19-Oct-24 SAR1,273,024.96 SAR22,615.19 100% 1.78% 19-Oct-24, BASE SLAB
TUNNEL WALLS 37 31-Jul-23 11-Sep-23 19-Oct-24 01-Dec-24 SAR496,018.83 SAR0.00 100% 0% 01-Dec-24, TUNNEL WALLS
BARRIER 33 29-Aug-23 07-Oct-23 17-Nov-24 25-Dec-24 SAR14,420.25 SAR0.00 100% 0% 25-Dec-24, BARRIER
PLAIN CO
CONCRETE 8 29-Aug-23 06-Sep-23 17-Nov-24 26-Nov-24 SAR172,279.74 SAR0.00 100% 0% 26-Nov-24, PLAIN CONCRETE
FINISHING
FINISHIN 8 07-Sep-23 16-Sep-23 26-Nov-24 05-Dec-24 SAR78,943.09 SAR0.00 100% 0% 05-Dec-24, FINISHING
4th Sta 0+075.13-Sta
0+07 0+095.13 85 11-Jul-23 18-Oct-23 09-Dec-23 A 05-Jan-25 SAR2,034,686.86 SAR22,615.19 100% 1.11% 05-Jan-25, 4th Sta 0+075.13-Sta 0+09
BASE SLAB
SL 27 11-Jul-23 10-Aug-23 09-Dec-23 A 29-Oct-24 SAR1,273,024.96 SAR22,615.19 100% 1.78% 29-Oct-24, BASE SLAB
TUNNEL WALLS 37 12-Aug-23 24-Sep-23 29-Oct-24 11-Dec-24 SAR496,018.83 SAR0.00 100% 0% 11-Dec-24, TUNNEL WALLS
BARRIER 33 10-Sep-23 18-Oct-23 27-Nov-24 05-Jan-25 SAR14,420.25 SAR0.00 100% 0% 05-Jan-25, BARRIER
PLAIN CO
CONCRETE 8 10-Sep-23 18-Sep-23 27-Nov-24 07-Dec-24 SAR172,279.74 SAR0.00 100% 0% 07-Dec-24, PLAIN CONCRETE
FINISHING
FINISHIN 8 19-Sep-23 28-Sep-23 07-Dec-24 16-Dec-24 SAR78,943.09 SAR0.00 100% 0% 16-Dec-24, FINISHING
5th Sta 0+095.13-Sta
0+09 0+115.13 85 31-Jul-23 07-Nov-23 17-Oct-24 25-Jan-25 SAR2,034,686.86 SAR0.00 100% 0% 25-Jan-25, 5th Sta 0+095.13-Sta 0+1
BASE SLAB
SL 27 31-Jul-23 30-Aug-23 17-Oct-24 18-Nov-24 SAR1,273,024.96 SAR0.00 100% 0% 18-Nov-24, BASE SLAB
TUNNEL WALLS 37 31-Aug-23 14-Oct-23 18-Nov-24 31-Dec-24 SAR496,018.83 SAR0.00 100% 0% 31-Dec-24, TUNNEL WALLS
BARRIER 33 01-Oct-23 07-Nov-23 17-Dec-24 25-Jan-25 SAR14,420.25 SAR0.00 100% 0% 25-Jan-25, BARRIER
PLAIN CO
CONCRETE 8 01-Oct-23 09-Oct-23 17-Dec-24 26-Dec-24 SAR172,279.74 SAR0.00 100% 0% 26-Dec-24, PLAIN CONCRETE
FINISHING
FINISHIN 8 10-Oct-23 18-Oct-23 26-Dec-24 05-Jan-25 SAR78,943.09 SAR0.00 100% 0% 05-Jan-25, FINISHING
6th Sta 0+115.13-Sta
0+11 0+135.13 88 01-Aug-23 12-Nov-23 19-Oct-24 29-Jan-25 SAR2,034,686.86 SAR0.00 100% 0% 29-Jan-25, 6th Sta 0+115.13-Sta 0+1
BASE SLAB
SL 27 01-Aug-23 31-Aug-23 19-Oct-24 19-Nov-24 SAR1,273,024.96 SAR0.00 100% 0% 19-Nov-24, BASE SLAB
TUNNEL WALLS 37 02-Sep-23 15-Oct-23 19-Nov-24 01-Jan-25 SAR496,018.83 SAR0.00 100% 0% 01-Jan-25, TUNNEL WALLS
BARRIER 36 02-Oct-23 12-Nov-23 18-Dec-24 29-Jan-25 SAR14,420.25 SAR0.00 100% 0% 29-Jan-25, BARRIER
PLAIN CO
CONCRETE 8 02-Oct-23 10-Oct-23 18-Dec-24 28-Dec-24 SAR172,279.74 SAR0.00 100% 0% 28-Dec-24, PLAIN CONCRETE
FINISHING
FINISHIN 8 19-Oct-23 28-Oct-23 05-Jan-25 14-Jan-25 SAR78,943.09 SAR0.00 100% 0% 14-Jan-25, FINISHING
7th Sta 0+135.13-Sta
0+13 0+155.13 85 21-Aug-23 28-Nov-23 07-Nov-24 15-Feb-25 SAR2,034,686.86 SAR0.00 100% 0% 15-Feb-25, 7th Sta 0+135.13-Sta 0+
BASE SLAB
SL 27 21-Aug-23 20-Sep-23 07-Nov-24 09-Dec-24 SAR1,273,024.96 SAR0.00 100% 0% 09-Dec-24, BASE SLAB
TUNNEL WALLS 37 21-Sep-23 04-Nov-23 09-Dec-24 21-Jan-25 SAR496,018.83 SAR0.00 100% 0% 21-Jan-25, TUNNEL WALLS
BARRIER 33 22-Oct-23 28-Nov-23 07-Jan-25 15-Feb-25 SAR14,420.25 SAR0.00 100% 0% 15-Feb-25, BARRIER
PLAIN CO
CONCRETE 8 22-Oct-23 30-Oct-23 07-Jan-25 16-Jan-25 SAR172,279.74 SAR0.00 100% 0% 16-Jan-25, PLAIN CONCRETE
FINISHING
FINISHIN 8 31-Oct-23 08-Nov-23 16-Jan-25 26-Jan-25 SAR78,943.09 SAR0.00 100% 0% 26-Jan-25, FINISHING
8th Sta 0+155.13-Sta
0+15 0+175.13 85 10-Sep-23 18-Dec-23 27-Nov-24 06-Mar-25 SAR2,034,686.86 SAR0.00 99.99% 0% 06-Mar-25, 8th Sta 0+155.13-Sta 0+
BASE SLAB
SL 27 10-Sep-23 11-Oct-23 27-Nov-24 29-Dec-24 SAR1,273,024.96 SAR0.00 100% 0% 29-Dec-24, BASE SLAB
TUNNEL WALLS 37 12-Oct-23 23-Nov-23 29-Dec-24 10-Feb-25 SAR496,018.83 SAR0.00 100% 0% 10-Feb-25, TUNNEL WALLS
BARRIER 33 11-Nov-23 18-Dec-23 27-Jan-25 06-Mar-25 SAR14,420.25 SAR0.00 98.46% 0% 06-Mar-25, BARRIER
PLAIN CO
CONCRETE 8 11-Nov-23 19-Nov-23 27-Jan-25 05-Feb-25 SAR172,279.74 SAR0.00 100% 0% 05-Feb-25, PLAIN CONCRETE
FINISHING
FINISHIN 8 20-Nov-23 28-Nov-23 05-Feb-25 15-Feb-25 SAR78,943.09 SAR0.00 100% 0% 15-Feb-25, FINISHING
9th Sta 0+175.13-Sta
0+17 0+195.13 85 01-Oct-23 07-Jan-24 17-Dec-24 26-Mar-25 SAR2,034,686.86 SAR0.00 98.38% 0% 26-Mar-25, 9th Sta 0+175.13-Sta 0
BASE SLAB
SL 27 01-Oct-23 31-Oct-23 17-Dec-24 18-Jan-25 SAR1,273,024.96 SAR0.00 100% 0% 18-Jan-25, BASE SLAB
TUNNEL WALLS 37 01-Nov-23 13-Dec-23 18-Jan-25 02-Mar-25 SAR496,018.83 SAR0.00 100% 0% 02-Mar-25, TUNNEL WALLS
BARRIER 33 30-Nov-23 07-Jan-24 16-Feb-25 26-Mar-25 SAR14,420.25 SAR0.00 76.03% 0% 26-Mar-25, BARRIER
PLAIN CO
CONCRETE 8 30-Nov-23 09-Dec-23 16-Feb-25 25-Feb-25 SAR172,279.74 SAR0.00 100% 0% 25-Feb-25, PLAIN CONCRETE
FINISHING
FINISHIN 8 10-Dec-23 18-Dec-23 25-Feb-25 06-Mar-25 SAR78,943.09 SAR0.00 62.5% 0% 06-Mar-25, FINISHING
10th Sta 0+195.13-Sta
0+1 0+218.94 441 21-Oct-23 27-Jan-24 24-Oct-23 A 05-Apr-25 SAR2,034,686.86 SAR1,205,569.13 83.18% 59.25% 05-Apr-25, 10th Sta 0+195.13-Sta

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
37 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
BASE SLAB
SL 378 21-Oct-23 20-Nov-23 24-Oct-23 A 16-Jan-25 SAR1,273,024.96 SAR1,205,569.13 100% 94.7% 16-Jan-25, BASE SLAB
TUNNEL WALLS 37 21-Nov-23 02-Jan-24 16-Jan-25 01-Mar-25 SAR496,018.83 SAR0.00 84.56% 0% 01-Mar-25, TUNNEL WALLS
BARRIER 38 20-Dec-23 27-Jan-24 15-Feb-25 05-Apr-25 SAR14,420.25 SAR0.00 0% 0% 05-Apr-25, BARRIER
PLAIN CO
CONCRETE 8 20-Dec-23 28-Dec-23 15-Feb-25 24-Feb-25 SAR172,279.74 SAR0.00 0% 0% 24-Feb-25, PLAIN CONCRETE
FINISHING
FINISHIN 8 30-Dec-23 07-Jan-24 06-Mar-25 16-Mar-25 SAR78,943.09 SAR0.00 0% 0% 16-Mar-25, FINISHING
11th Sta 0+2
0+218.94-Sta 0+233 85 08-Nov-23 14-Feb-24 06-Jan-25 20-Apr-25 SAR2,034,686.86 SAR0.00 69.63% 0% 20-Apr-25, 11th Sta 0+218.94-Sta
BASE SLAB
SL 27 08-Nov-23 09-Dec-23 06-Jan-25 06-Feb-25 SAR1,273,024.96 SAR0.00 100% 0% 06-Feb-25, BASE SLAB
TUNNEL WALLS 37 10-Dec-23 21-Jan-24 06-Feb-25 22-Mar-25 SAR496,018.83 SAR0.00 28.98% 0% 22-Mar-25, TUNNEL WALLS
BARRIER 33 08-Jan-24 14-Feb-24 08-Mar-25 20-Apr-25 SAR14,420.25 SAR0.00 0% 0% 20-Apr-25, BARRIER
PLAIN CO
CONCRETE 8 08-Jan-24 16-Jan-24 08-Mar-25 17-Mar-25 SAR172,279.74 SAR0.00 0% 0% 17-Mar-25, PLAIN CONCRETE
FINISHING
FINISHIN 8 17-Jan-24 25-Jan-24 17-Mar-25 26-Mar-25 SAR78,943.09 SAR0.00 0% 0% 26-Mar-25, FINISHING
12th Sta 0+2
0+233-Sta 0+253 85 20-Nov-23 26-Feb-24 18-Jan-25 01-May-25 SAR2,034,686.86 SAR0.00 59.34% 0% 01-May-25, 12th Sta 0+233-Sta 0
BASE SLAB
SL 27 20-Nov-23 20-Dec-23 18-Jan-25 18-Feb-25 SAR1,273,024.96 SAR0.00 94.84% 0% 18-Feb-25, BASE SLAB
TUNNEL WALLS 37 21-Dec-23 01-Feb-24 18-Feb-25 07-Apr-25 SAR496,018.83 SAR0.00 0% 0% 07-Apr-25, TUNNEL WALLS
BARRIER 33 20-Jan-24 26-Feb-24 19-Mar-25 01-May-25 SAR14,420.25 SAR0.00 0% 0% 01-May-25, BARRIER
PLAIN CO
CONCRETE 8 20-Jan-24 28-Jan-24 19-Mar-25 29-Mar-25 SAR172,279.74 SAR0.00 0% 0% 29-Mar-25, PLAIN CONCRETE
FINISHING
FINISHIN 8 29-Jan-24 06-Feb-24 29-Mar-25 12-Apr-25 SAR78,943.09 SAR0.00 0% 0% 12-Apr-25, FINISHING
13th Sta 0+2
0+253-Sta 0+273 85 21-Nov-23 27-Feb-24 19-Jan-25 03-May-25 SAR2,034,686.86 SAR0.00 59.31% 0% 03-May-25, 13th Sta 0+253-Sta 0
BASE SLAB
SL 27 21-Nov-23 21-Dec-23 19-Jan-25 19-Feb-25 SAR1,273,024.96 SAR0.00 94.8% 0% 19-Feb-25, BASE SLAB
TUNNEL WALLS 37 23-Dec-23 03-Feb-24 19-Feb-25 08-Apr-25 SAR496,018.83 SAR0.00 0% 0% 08-Apr-25, TUNNEL WALLS
BARRIER 33 21-Jan-24 27-Feb-24 20-Mar-25 03-May-25 SAR14,420.25 SAR0.00 0% 0% 03-May-25, BARRIER
PLAIN CO
CONCRETE 8 21-Jan-24 29-Jan-24 20-Mar-25 03-Apr-25 SAR172,279.74 SAR0.00 0% 0% 03-Apr-25, PLAIN CONCRETE
FINISHING
FINISHIN 8 30-Jan-24 07-Feb-24 03-Apr-25 13-Apr-25 SAR78,943.09 SAR0.00 0% 0% 13-Apr-25, FINISHING
14th Sta 0+2
0+273-Sta 0+293 85 11-Dec-23 18-Mar-24 08-Feb-25 22-May-25 SAR2,034,686.86 SAR0.00 11.93% 0% 22-May-25, 14th Sta 0+273-Sta 0
BASE SLAB
SL 27 11-Dec-23 10-Jan-24 08-Feb-25 11-Mar-25 SAR1,273,024.96 SAR0.00 19.06% 0% 11-Mar-25, BASE SLAB
TUNNEL WALLS 37 11-Jan-24 22-Feb-24 11-Mar-25 28-Apr-25 SAR496,018.83 SAR0.00 0% 0% 28-Apr-25, TUNNEL WALLS
BARRIER 33 10-Feb-24 18-Mar-24 14-Apr-25 22-May-25 SAR14,420.25 SAR0.00 0% 0% 22-May-25, BARRIER
PLAIN CO
CONCRETE 8 10-Feb-24 18-Feb-24 14-Apr-25 23-Apr-25 SAR172,279.74 SAR0.00 0% 0% 23-Apr-25, PLAIN CONCRETE
FINISHING
FINISHIN 8 19-Feb-24 27-Feb-24 23-Apr-25 03-May-25 SAR78,943.09 SAR0.00 0% 0% 03-May-25, FINISHING
15th Sta 0+2
0+293-Sta 0+313 85 31-Dec-23 07-Apr-24 27-Feb-25 15-Jun-25 SAR2,034,686.86 SAR0.00 0% 0% 15-Jun-25, 15th Sta 0+293-Sta 0
BASE SLAB
SL 27 31-Dec-23 30-Jan-24 27-Feb-25 05-Apr-25 SAR1,273,024.96 SAR0.00 0% 0% 05-Apr-25, BASE SLAB
TUNNEL WALLS 37 31-Jan-24 13-Mar-24 05-Apr-25 18-May-25 SAR496,018.83 SAR0.00 0% 0% 18-May-25, TUNNEL WALLS
BARRIER 33 29-Feb-24 07-Apr-24 04-May-25 15-Jun-25 SAR14,420.25 SAR0.00 0% 0% 15-Jun-25, BARRIER
PLAIN CO
CONCRETE 8 29-Feb-24 09-Mar-24 04-May-25 13-May-25 SAR172,279.74 SAR0.00 0% 0% 13-May-25, PLAIN CONCRETE
FINISHING
FINISHIN 8 10-Mar-24 18-Mar-24 13-May-25 22-May-25 SAR78,943.09 SAR0.00 0% 0% 22-May-25, FINISHING
16th Sta 0+3
0+313-Sta 0+333 85 20-Jan-24 30-Apr-24 19-Mar-25 05-Jul-25 SAR2,034,686.86 SAR0.00 0% 0% 05-Jul-25, 16th Sta 0+313-Sta 0
BASE SLAB
SL 27 20-Jan-24 19-Feb-24 19-Mar-25 24-Apr-25 SAR1,273,024.96 SAR0.00 0% 0% 24-Apr-25, BASE SLAB
TUNNEL WALLS 37 20-Feb-24 02-Apr-24 24-Apr-25 10-Jun-25 SAR496,018.83 SAR0.00 0% 0% 10-Jun-25, TUNNEL WALLS
BARRIER 33 20-Mar-24 30-Apr-24 24-May-25 05-Jul-25 SAR14,420.25 SAR0.00 0% 0% 05-Jul-25, BARRIER
PLAIN CO
CONCRETE 8 20-Mar-24 28-Mar-24 24-May-25 02-Jun-25 SAR172,279.74 SAR0.00 0% 0% 02-Jun-25, PLAIN CONCRETE
FINISHING
FINISHIN 8 30-Mar-24 07-Apr-24 02-Jun-25 15-Jun-25 SAR78,943.09 SAR0.00 0% 0% 15-Jun-25, FINISHING
17th Sta 0+3
0+333-Sta 0+353 85 31-Jan-24 12-May-24 05-Apr-25 16-Jul-25 SAR2,034,686.86 SAR0.00 0% 0% 16-Jul-25, 17th Sta 0+333-Sta
BASE SLAB
SL 27 31-Jan-24 02-Mar-24 05-Apr-25 06-May-25 SAR1,273,024.96 SAR0.00 0% 0% 06-May-25, BASE SLAB
TUNNEL WALLS 37 03-Mar-24 17-Apr-24 06-May-25 22-Jun-25 SAR496,018.83 SAR0.00 0% 0% 22-Jun-25, TUNNEL WALLS
BARRIER 33 01-Apr-24 12-May-24 04-Jun-25 16-Jul-25 SAR14,420.25 SAR0.00 0% 0% 16-Jul-25, BARRIER
PLAIN CO
CONCRETE 8 01-Apr-24 13-Apr-24 04-Jun-25 17-Jun-25 SAR172,279.74 SAR0.00 0% 0% 17-Jun-25, PLAIN CONCRETE
FINISHING
FINISHIN 8 14-Apr-24 22-Apr-24 17-Jun-25 26-Jun-25 SAR78,943.09 SAR0.00 0% 0% 26-Jun-25, FINISHING
18th Sta 0+3
0+353-Sta 0+373 85 20-Feb-24 01-Jun-24 24-Apr-25 05-Aug-25 SAR2,034,686.86 SAR0.00 0% 0% 05-Aug-25, 18th Sta 0+353-S
BASE SLAB
SL 27 20-Feb-24 21-Mar-24 24-Apr-25 26-May-25 SAR1,273,024.96 SAR0.00 0% 0% 26-May-25, BASE SLAB
TUNNEL WALLS 37 23-Mar-24 07-May-24 26-May-25 12-Jul-25 SAR496,018.83 SAR0.00 0% 0% 12-Jul-25, TUNNEL WALLS
BARRIER 33 24-Apr-24 01-Jun-24 28-Jun-25 05-Aug-25 SAR14,420.25 SAR0.00 0% 0% 05-Aug-25, BARRIER
PLAIN CO
CONCRETE 8 24-Apr-24 02-May-24 28-Jun-25 07-Jul-25 SAR172,279.74 SAR0.00 0% 0% 07-Jul-25, PLAIN CONCRET
FINISHING
FINISHIN 8 04-May-24 12-May-24 07-Jul-25 16-Jul-25 SAR78,943.09 SAR0.00 0% 0% 16-Jul-25, FINISHING
19th Sta0+373-Sta
Sta0+3 0+393 85 11-Mar-24 25-Jun-24 14-May-25 25-Aug-25 SAR2,034,686.86 SAR0.00 0% 0% 25-Aug-25, 19th Sta0+373-S
BASE SLAB
SL 27 11-Mar-24 14-Apr-24 14-May-25 18-Jun-25 SAR1,273,024.96 SAR0.00 0% 0% 18-Jun-25, BASE SLAB
TUNNEL WALLS 37 15-Apr-24 27-May-24 18-Jun-25 31-Jul-25 SAR496,018.83 SAR0.00 0% 0% 31-Jul-25, TUNNEL WALLS
BARRIER 33 14-May-24 25-Jun-24 17-Jul-25 25-Aug-25 SAR14,420.25 SAR0.00 0% 0% 25-Aug-25, BARRIER
PLAIN CO
CONCRETE 8 14-May-24 22-May-24 17-Jul-25 27-Jul-25 SAR172,279.74 SAR0.00 0% 0% 27-Jul-25, PLAIN CONCRET
FINISHING
FINISHIN 8 23-May-24 01-Jun-24 27-Jul-25 05-Aug-25 SAR78,943.09 SAR0.00 0% 0% 05-Aug-25, FINISHING
20th Sta0+393-Sta
Sta0+3 0+413 93 23-Mar-24 16-Jul-24 26-May-25 15-Sep-25 SAR2,034,686.86 SAR0.00 0% 0% 15-Sep-25, 20th Sta0+393-S
BASE SLAB
SL 27 23-Mar-24 25-Apr-24 26-May-25 30-Jun-25 SAR1,273,024.96 SAR0.00 0% 0% 30-Jun-25, BASE SLAB
TUNNEL WALLS 45 27-Apr-24 22-Jun-24 30-Jun-25 21-Aug-25 SAR496,018.83 SAR0.00 0% 0% 21-Aug-25, TUNNEL WALL

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
38 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
BARRIER 33 04-Jun-24 16-Jul-24 07-Aug-25 15-Sep-25 SAR14,420.25 SAR0.00 0% 0% 15-Sep-25, BARRIER
PLAIN CO
CONCRETE 8 04-Jun-24 12-Jun-24 07-Aug-25 17-Aug-25 SAR172,279.74 SAR0.00 0% 0% 17-Aug-25, PLAIN CONCR
FINISHING
FINISHIN 8 13-Jun-24 26-Jun-24 17-Aug-25 26-Aug-25 SAR78,943.09 SAR0.00 0% 0% 26-Aug-25, FINISHING
21th Sta0+413-Sta
Sta0+4 0+433 78 03-Apr-24 10-Jul-24 10-Jun-25 09-Sep-25 SAR2,034,686.86 SAR0.00 0% 0% 09-Sep-25, 21th Sta0+413-S
BASE SLAB
SL 27 03-Apr-24 07-May-24 10-Jun-25 12-Jul-25 SAR1,273,024.96 SAR0.00 0% 0% 12-Jul-25, BASE SLAB
TUNNEL WALLS 37 08-May-24 24-Jun-24 12-Jul-25 24-Aug-25 SAR496,018.83 SAR0.00 0% 0% 24-Aug-25, TUNNEL WALL
BARRIER 26 06-Jun-24 10-Jul-24 10-Aug-25 09-Sep-25 SAR14,420.25 SAR0.00 0% 0% 09-Sep-25, BARRIER
PLAIN CO
CONCRETE 8 06-Jun-24 19-Jun-24 10-Aug-25 19-Aug-25 SAR172,279.74 SAR0.00 0% 0% 19-Aug-25, PLAIN CONCR
FINISHING
FINISHIN 8 27-Jun-24 06-Jul-24 26-Aug-25 04-Sep-25 SAR78,943.09 SAR0.00 0% 0% 04-Sep-25, FINISHING
22th Sta 0+433-
0+4 Sta 0+453 85 18-Apr-24 30-Jul-24 22-Jun-25 30-Sep-25 SAR2,034,686.86 SAR0.00 0% 0% 30-Sep-25, 22th Sta 0+433-
BASE SLAB
SL 27 18-Apr-24 19-May-24 22-Jun-25 23-Jul-25 SAR1,273,024.96 SAR0.00 0% 0% 23-Jul-25, BASE SLAB
TUNNEL WALLS 37 20-May-24 06-Jul-24 23-Jul-25 04-Sep-25 SAR496,018.83 SAR0.00 0% 0% 04-Sep-25, TUNNEL WALL
BARRIER 33 23-Jun-24 30-Jul-24 21-Aug-25 30-Sep-25 SAR14,420.25 SAR0.00 0% 0% 30-Sep-25, BARRIER
PLAIN CO
CONCRETE 8 23-Jun-24 01-Jul-24 21-Aug-25 31-Aug-25 SAR172,279.74 SAR0.00 0% 0% 31-Aug-25, PLAIN CONCR
FINISHING
FINISHIN 8 02-Jul-24 10-Jul-24 31-Aug-25 09-Sep-25 SAR78,943.09 SAR0.00 0% 0% 09-Sep-25, FINISHING
23th Sta 0+453-
0+4 Sta 0+473 113 17-Nov-22 28-Mar-23 06-Feb-24 25-Jun-24 SAR5,869,641.04 SAR0.00 100% 0% 25-Jun-24, 23th Sta 0+453- Sta 0+473
BASE SLAB
SL 27 17-Nov-22 18-Dec-22 06-Feb-24 09-Mar-24 SAR1,273,024.96 SAR0.00 100% 0% 09-Mar-24, BASE SLAB
COLUMNS
COLUMN 23 19-Dec-22 14-Jan-23 09-Mar-24 04-Apr-24 SAR230,319.13 SAR0.00 100% 0% 04-Apr-24, COLUMNS
TUNNEL WALLS 37 19-Dec-22 30-Jan-23 09-Mar-24 24-Apr-24 SAR496,018.83 SAR0.00 100% 0% 24-Apr-24, TUNNEL WALLS
TOP SLAB
SLA 37 17-Jan-23 28-Feb-23 07-Apr-24 23-May-24 SAR3,468,207.12 SAR0.00 100% 0% 23-May-24, TOP SLAB
PLAIN CO
CONCRETE 16 01-Mar-23 19-Mar-23 23-May-24 11-Jun-24 SAR323,127.91 SAR0.00 100% 0% 11-Jun-24, PLAIN CONCRETE
FINISHING
FINISHIN 8 20-Mar-23 28-Mar-23 11-Jun-24 25-Jun-24 SAR78,943.09 SAR0.00 100% 0% 25-Jun-24, FINISHING
24th Sta 0+473-
0+4 Sta 0+493 113 07-Dec-22 17-Apr-23 26-Feb-24 15-Jul-24 SAR5,869,641.04 SAR0.00 100% 0% 15-Jul-24, 24th Sta 0+473- Sta 0+493
BASE SLAB
SL 27 07-Dec-22 07-Jan-23 26-Feb-24 28-Mar-24 SAR1,273,024.96 SAR0.00 100% 0% 28-Mar-24, BASE SLAB
COLUMNS
COLUMN 23 08-Jan-23 02-Feb-23 28-Mar-24 28-Apr-24 SAR230,319.13 SAR0.00 100% 0% 28-Apr-24, COLUMNS
TUNNEL WALLS 37 08-Jan-23 19-Feb-23 28-Mar-24 14-May-24 SAR496,018.83 SAR0.00 100% 0% 14-May-24, TUNNEL WALLS
TOP SLAB
SLA 37 06-Feb-23 20-Mar-23 30-Apr-24 12-Jun-24 SAR3,468,207.12 SAR0.00 100% 0% 12-Jun-24, TOP SLAB
PLAIN CO
CONCRETE 16 21-Mar-23 08-Apr-23 12-Jun-24 06-Jul-24 SAR323,127.91 SAR0.00 100% 0% 06-Jul-24, PLAIN CONCRETE
FINISHING
FINISHIN 8 09-Apr-23 17-Apr-23 06-Jul-24 15-Jul-24 SAR78,943.09 SAR0.00 100% 0% 15-Jul-24, FINISHING
25th Sta 0+493-
0+4 Sta 0+513 113 27-Dec-22 10-May-23 17-Mar-24 04-Aug-24 SAR5,869,641.04 SAR0.00 100% 0% 04-Aug-24, 25th Sta 0+493- Sta 0+513
BASE SLAB
SL 27 27-Dec-22 26-Jan-23 17-Mar-24 21-Apr-24 SAR1,273,024.96 SAR0.00 100% 0% 21-Apr-24, BASE SLAB
COLUMNS
COLUMN 23 28-Jan-23 22-Feb-23 21-Apr-24 18-May-24 SAR230,319.13 SAR0.00 100% 0% 18-May-24, COLUMNS
TUNNEL WALLS 37 28-Jan-23 11-Mar-23 21-Apr-24 03-Jun-24 SAR496,018.83 SAR0.00 100% 0% 03-Jun-24, TUNNEL WALLS
TOP SLAB
SLA 37 26-Feb-23 09-Apr-23 20-May-24 07-Jul-24 SAR3,468,207.12 SAR0.00 100% 0% 07-Jul-24, TOP SLAB
PLAIN CO
CONCRETE 16 10-Apr-23 01-May-23 07-Jul-24 25-Jul-24 SAR323,127.91 SAR0.00 100% 0% 25-Jul-24, PLAIN CONCRETE
FINISHING
FINISHIN 8 02-May-23 10-May-23 25-Jul-24 04-Aug-24 SAR78,943.09 SAR0.00 100% 0% 04-Aug-24, FINISHING
26th Sta 0+513-
0+5 Sta 0+533 122 16-Jan-23 10-Jun-23 06-Apr-24 03-Sep-24 SAR5,869,641.04 SAR0.00 100% 0% 03-Sep-24, 26th Sta 0+513- Sta 0+533
BASE SLAB
SL 27 16-Jan-23 15-Feb-23 06-Apr-24 11-May-24 SAR1,273,024.96 SAR0.00 100% 0% 11-May-24, BASE SLAB
COLUMNS
COLUMN 23 16-Feb-23 14-Mar-23 11-May-24 06-Jun-24 SAR230,319.13 SAR0.00 100% 0% 06-Jun-24, COLUMNS
TUNNEL WALLS 37 16-Feb-23 30-Mar-23 11-May-24 27-Jun-24 SAR496,018.83 SAR0.00 100% 0% 27-Jun-24, TUNNEL WALLS
TOP SLAB
SLA 46 15-Mar-23 10-May-23 06-Jun-24 04-Aug-24 SAR3,468,207.12 SAR0.00 100% 0% 04-Aug-24, TOP SLAB
PLAIN CO
CONCRETE 16 11-May-23 29-May-23 04-Aug-24 22-Aug-24 SAR323,127.91 SAR0.00 100% 0% 22-Aug-24, PLAIN CONCRETE
FINISHING
FINISHIN 10 30-May-23 10-Jun-23 22-Aug-24 03-Sep-24 SAR78,943.09 SAR0.00 100% 0% 03-Sep-24, FINISHING
27th Sta 0+533-
0+5 Sta 0+553 116 05-Feb-23 22-Jun-23 29-Apr-24 16-Sep-24 SAR5,869,641.04 SAR0.00 100% 0% 16-Sep-24, 27th Sta 0+533- Sta 0+553
BASE SLAB
SL 27 05-Feb-23 07-Mar-23 29-Apr-24 30-May-24 SAR1,273,024.96 SAR0.00 100% 0% 30-May-24, BASE SLAB
COLUMNS
COLUMN 23 08-Mar-23 03-Apr-23 30-May-24 01-Jul-24 SAR230,319.13 SAR0.00 100% 0% 01-Jul-24, COLUMNS
TUNNEL WALLS 37 08-Mar-23 19-Apr-23 30-May-24 17-Jul-24 SAR496,018.83 SAR0.00 100% 0% 17-Jul-24, TUNNEL WALLS
TOP SLAB
SLA 37 06-Apr-23 22-May-23 03-Jul-24 15-Aug-24 SAR3,468,207.12 SAR0.00 100% 0% 15-Aug-24, TOP SLAB
PLAIN CO
CONCRETE 16 23-May-23 10-Jun-23 15-Aug-24 03-Sep-24 SAR323,127.91 SAR0.00 100% 0% 03-Sep-24, PLAIN CONCRETE
FINISHING
FINISHIN 11 11-Jun-23 22-Jun-23 03-Sep-24 16-Sep-24 SAR78,943.09 SAR0.00 100% 0% 16-Sep-24, FINISHING
BACKFILLING UPTO TUNNEL WALL 342 20-Apr-23 29-Jul-24 15-Aug-24 29-Sep-25 SAR11,067,442.92 SAR0.00 40% 0% 29-Sep-25, BACKFILLING
STRUCTURAL FILL 363 23-May-23 22-Aug-24 15-Aug-24 23-Oct-25 SAR11,067,442.92 SAR0.00 40% 0% 23-Oct-25, STRUCTURA
WET & DRY UTILITIES
UT 244 07-Jul-24 22-Apr-25 16-Sep-24 07-Jul-25 SAR7,655,431.93 SAR0.00 0% 0% 07-Jul-25, WET & DRY UTIL
INSIDE WET CULVERT 244 07-Jul-24 22-Apr-25 16-Sep-24 07-Jul-25 SAR4,207,130.45 SAR0.00 0% 0% 07-Jul-25, INSIDE WET CULV
POTABLE WATER NETWORK 59 07-Jul-24 12-Sep-24 16-Sep-24 25-Nov-24 SAR427,352.76 SAR0.00 0% 0% 25-Nov-24, POTABLE WATER NETW
GREY WAWATER DISTRIBUTION SYSTEM 49 09-Sep-24 05-Nov-24 20-Nov-24 16-Jan-25 SAR328,716.92 SAR0.00 0% 0% 16-Jan-25, GREY WATER DISTRIB
IRRIGATION NETWORK
IRRIGATI 44 02-Nov-24 22-Dec-24 12-Jan-25 04-Mar-25 SAR520,979.84 SAR0.00 0% 0% 04-Mar-25, IRRIGATION NETWO
CHILLED WATER SUPPLY NETWORK 54 18-Dec-24 18-Feb-25 27-Feb-25 06-May-25 SAR1,043,588.20 SAR0.00 0% 0% 06-May-25, CHILLED WATER S
CHILLED WATER RETURN NETWORK 58 18-Dec-24 23-Feb-25 27-Feb-25 11-May-25 SAR1,043,588.20 SAR0.00 0% 0% 11-May-25, CHILLED WATER R
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 54 15-Feb-25 22-Apr-25 01-May-25 07-Jul-25 SAR842,904.54 SAR0.00 0% 0% 07-Jul-25, AUTOMATIC WAS
INSIDE DRY CULVERT 184 05-Aug-24 08-Mar-25 16-Oct-24 24-May-25 SAR3,448,301.48 SAR0.00 0% 0% 24-May-25, INSIDE DRY CULV
POWER 169 05-Aug-24 18-Feb-25 16-Oct-24 06-May-25 SAR3,322,375.55 SAR0.00 0% 0% 06-May-25, POWER

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
39 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
HIGH VOLTAGE
V 110 KV NETWORK 37 05-Aug-24 16-Sep-24 16-Oct-24 28-Nov-24 SAR216,236.19 SAR0.00 0% 0% 28-Nov-24, HIGH VOLTAGE 110 KV
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 37 17-Sep-24 30-Oct-24 28-Nov-24 11-Jan-25 SAR2,765,718.24 SAR0.00 0% 0% 11-Jan-25, MEDIUM VOLTAGE 13.
LOW VVOLTAGE NETWORK 62 17-Sep-24 28-Nov-24 28-Nov-24 09-Feb-25 SAR340,421.12 SAR0.00 0% 0% 09-Feb-25, LOW VOLTAGE NETW
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 70 30-Nov-24 18-Feb-25 09-Feb-25 06-May-25 SAR0.00 SAR0.00 0% 0% 06-May-25, ELECTRICAL DIST
LIGHTING SYSTEM
LIGHT 50 11-Dec-24 06-Feb-25 20-Feb-25 24-Apr-25 SAR0.00 SAR0.00 0% 0% 24-Apr-25, LIGHTING SYSTEM
TELECOM SERVICES 60 29-Dec-24 08-Mar-25 10-Mar-25 24-May-25 SAR125,925.93 SAR0.00 0% 0% 24-May-25, TELECOM SERVIC
MEP VEHICULAR
VEHICULA TUNNEL/ DRY & WET CULVERTS 215 03-Aug-23 20-Apr-25 06-Oct-24 22-Jun-25 SAR10,342,304.97 SAR0.00 28.27% 0% 22-Jun-25, MEP VEHICULAR
TUNNEL MECHANICAL
ME WORKS 171 19-Aug-24 06-Mar-25 03-Nov-24 26-May-25 SAR2,975,294.82 SAR0.00 0% 0% 26-May-25, TUNNEL MECHAN
FIRE FIG
FIGHTING SYSTEM 56 19-Aug-24 23-Oct-24 03-Nov-24 07-Jan-25 SAR2,163,982.91 SAR0.00 0% 0% 07-Jan-25, FIRE FIGHTING SYSTE
VENTILATION SYSTEM
VENTILA 23 24-Oct-24 19-Nov-24 07-Jan-25 03-Feb-25 SAR242,651.00 SAR0.00 0% 0% 03-Feb-25, VENTILATION SYSTEM
PUMPS INSTALLATION
I 26 20-Nov-24 19-Dec-24 03-Feb-25 05-Mar-25 SAR455,962.08 SAR0.00 0% 0% 05-Mar-25, PUMPS INSTALLATIO
DUCTING SYSTEM 66 21-Dec-24 06-Mar-25 05-Mar-25 26-May-25 SAR112,698.83 SAR0.00 0% 0% 26-May-25, DUCTING SYSTE
TUNNEL ELECTRICAL
EL WORKS 215 03-Aug-23 03-Apr-25 06-Oct-24 22-Jun-25 SAR6,254,488.55 SAR0.00 46.75% 0% 22-Jun-25, TUNNEL ELECTRI
CABLE TRAYS
T 101 11-Sep-24 07-Jan-25 26-Nov-24 24-Mar-25 SAR1,419,159.94 SAR0.00 0% 0% 24-Mar-25, CABLE TRAYS
POWER CABLES 114 03-Aug-23 14-Dec-23 06-Oct-24 16-Feb-25 SAR1,918,777.09 SAR0.00 100% 0% 16-Feb-25, POWER CABLES
ELECTRICAL INSTALLATIONS
ELECTRI 86 12-Oct-23 20-Jan-24 14-Dec-24 24-Mar-25 SAR1,570,033.71 SAR0.00 64.04% 0% 24-Mar-25, ELECTRICAL INSTA
LOW CUR
CURRENT 191 19-Aug-24 03-Apr-25 03-Nov-24 22-Jun-25 SAR1,346,517.80 SAR0.00 0% 0% 22-Jun-25, LOW CURRENT
FIRE D
DETECTION AND ALARM SYSTEM 82 19-Aug-24 23-Nov-24 03-Nov-24 06-Feb-25 SAR230,154.90 SAR0.00 0% 0% 06-Feb-25, FIRE DETECTION AND
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 28 02-Sep-24 05-Oct-24 17-Nov-24 19-Dec-24 SAR191,773.34 SAR0.00 0% 0% 19-Dec-24, COMMUNICATION SYS
PUBLIC ADDRESS
PUBLI 28 06-Oct-24 06-Nov-24 19-Dec-24 21-Jan-25 SAR148,756.18 SAR0.00 0% 0% 21-Jan-25, PUBLIC ADDRESS
VIDEO SURVEILLANCE 60 07-Nov-24 15-Jan-25 21-Jan-25 06-Apr-25 SAR178,997.79 SAR0.00 0% 0% 06-Apr-25, VIDEO SURVEILLAN
SACADA SYSTEM
SACA 35 16-Jan-25 25-Feb-25 06-Apr-25 17-May-25 SAR477,869.17 SAR0.00 0% 0% 17-May-25, SACADA SYSTEM
RADIO RE-BROADCASTING SYSTEM 28 26-Feb-25 03-Apr-25 17-May-25 22-Jun-25 SAR118,966.43 SAR0.00 0% 0% 22-Jun-25, RADIO RE-BROA
TUNNEL PLUMBING
PL WORKS 35 06-Mar-25 20-Apr-25 15-Feb-25 27-Mar-25 SAR1,112,521.61 SAR0.00 0% 0% 27-Mar-25, TUNNEL PLUMBING
DRAINAGE SYSTEM
DRAINAG 35 06-Mar-25 20-Apr-25 15-Feb-25 27-Mar-25 SAR1,112,521.61 SAR0.00 0% 0% 27-Mar-25, DRAINAGE SYSTEM
TUNNEL INTERNAL
INTER ROAD WORK 42 21-Apr-25 11-Jun-25 27-Mar-25 20-May-25 SAR807,038.28 SAR0.00 0% 0% 20-May-25, TUNNEL INTERNA
TUNNEL INTERNAL
INTER DECORATIVE WORKS 45 25-May-25 19-Jul-25 05-May-25 30-Jun-25 SAR2,051,969.38 SAR0.00 0% 0% 30-Jun-25, TUNNEL INTERN
KAAR TUNNEL (KING
(KIN ABDULAZIZ ROAD TUNNEL WEST) 1255 27-Jun-22 27-May-25 27-Jun-22 A 08-Aug-26 SAR205,141,249.22 SAR22,981,621.21 94.72% 11.2% 08-Aug-26, KA
ZONE 9 - STA. 0+000~
0+ 0+461-1 1255 27-Jun-22 27-May-25 27-Jun-22 A 08-Aug-26 SAR205,141,249.22 SAR22,981,621.21 94.72% 11.2% 08-Aug-26, ZO
ENGINEERING 790 27-Jun-22 07-Nov-23 27-Jun-22 A 25-Jan-25 SAR0.00 SAR0.00 0% 0% 25-Jan-25, ENGINEERING
SITE SURVEY 10 27-Jun-22 07-Jul-22 27-Jun-22 A 04-Oct-22 A SAR0.00 SAR0.00 0% 0% 04-Oct-22 A, SITE SURVEY
SHOP DRAWINGS
DRAWIN 544 27-Jun-22 11-Jan-23 27-Jun-22 A 02-Apr-24 SAR0.00 SAR0.00 0% 0% 02-Apr-24, SHOP DRAWINGS
CIVIL/STRUCTURAL 0+00 ~0+101
CIVIL/STRU 479 27-Jun-22 31-Aug-22 27-Jun-22 A 17-Jan-24 SAR0.00 SAR0.00 0% 0% 17-Jan-24, CIVIL/STRUCTURAL 0+00 ~0+101
CIVIL/STRUCTURAL 0+101 ~0+201
CIVIL/STRU 461 11-Aug-22 12-Oct-22 11-Aug-22 A 07-Feb-24 SAR0.00 SAR0.00 0% 0% 07-Feb-24, CIVIL/STRUCTURAL 0+101 ~0+201
CIVIL/STRUCTURAL 0+201 ~0+301
CIVIL/STRU 442 22-Sep-22 23-Nov-22 22-Sep-22 A 28-Feb-24 SAR0.00 SAR0.00 0% 0% 28-Feb-24, CIVIL/STRUCTURAL 0+201 ~0+30
CIVIL/STRUCTURAL 0+301 ~0+401
CIVIL/STRU 424 13-Oct-22 14-Dec-22 03-Oct-22 A 28-Feb-24 SAR0.00 SAR0.00 0% 0% 28-Feb-24, CIVIL/STRUCTURAL 0+301 ~0+40
CIVIL/STRUCTURAL 0+401 ~0+461
CIVIL/STRU 418 24-Nov-22 11-Jan-23 03-Oct-22 A 02-Apr-24 SAR0.00 SAR0.00 0% 0% 02-Apr-24, CIVIL/STRUCTURAL 0+401 ~0+46
ARCHITECTURAL
ARCHITECT 21 10-Nov-22 05-Dec-22 21-Feb-24 17-Mar-24 SAR0.00 SAR0.00 0% 0% 17-Mar-24, ARCHITECTURAL
UTILITIES 470 22-Nov-22 18-May-23 25-Oct-22 A 04-Jun-24 SAR0.00 SAR0.00 0% 0% 04-Jun-24, UTILITIES
WET UTILITIES
UTILIT 470 22-Nov-22 29-Mar-23 25-Oct-22 A 04-Jun-24 SAR0.00 SAR0.00 0% 0% 04-Jun-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 22 22-Nov-22 17-Dec-22 25-Oct-22 A 13-Nov-22 A SAR0.00 SAR0.00 0% 0% 13-Nov-22 A, POTABLE WATER NETWORK BRANCH, HOUSE
GREY WA
WATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 22 18-Dec-22 11-Jan-23 13-Dec-22 A 16-Mar-24 SAR0.00 SAR0.00 0% 0% 16-Mar-24, GREY WATER DISTRIBUTION NE
IRR & FF NETWORK BRANCHES & TIE IN POINTS 22 12-Jan-23 06-Feb-23 16-Mar-24 14-Apr-24 SAR0.00 SAR0.00 0% 0% 14-Apr-24, IRR & FF NETWORK BRANCHE
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 22 07-Feb-23 04-Mar-23 14-Apr-24 09-May-24 SAR0.00 SAR0.00 0% 0% 09-May-24, CHILLED WATER SUPPLY & RE
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 22 05-Mar-23 29-Mar-23 09-May-24 04-Jun-24 SAR0.00 SAR0.00 0% 0% 04-Jun-24, AUTOMATIC WASTE COLLECT
DRY UTILITI
UTILITIES 436 18-Dec-22 18-May-23 01-Nov-22 A 20-May-24 SAR0.00 SAR0.00 0% 0% 20-May-24, DRY UTILITIES
POWER 404 18-Dec-22 08-Apr-23 01-Nov-22 A 13-Apr-24 SAR0.00 SAR0.00 0% 0% 13-Apr-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 32 18-Dec-22 23-Jan-23 04-Mar-24 13-Apr-24 SAR0.00 SAR0.00 0% 0% 13-Apr-24, HIGH VOLTAGE 110 KV NETWO
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 32 18-Dec-22 23-Jan-23 04-Mar-24 13-Apr-24 SAR0.00 SAR0.00 0% 0% 13-Apr-24, MEDIUM VOLTAGE 13.8 KV NET
LOW VVOLTAGE NETWORK 32 18-Dec-22 23-Jan-23 27-Nov-22 A 13-Apr-24 SAR0.00 SAR0.00 0% 0% 13-Apr-24, LOW VOLTAGE NETWORK
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 32 24-Jan-23 01-Mar-23 01-Nov-22 A 12-Nov-22 A SAR0.00 SAR0.00 0% 0% 12-Nov-22 A, ELECTRICAL DISTRIBUTION SYSTEM
LIGHTING SYSTEM
LIGHT 32 02-Mar-23 08-Apr-23 26-Nov-22 A 27-Dec-22 A SAR0.00 SAR0.00 0% 0% 27-Dec-22 A, LIGHTING SYSTEM
LOW CUR
CURRENT 32 09-Apr-23 18-May-23 13-Apr-24 20-May-24 SAR0.00 SAR0.00 0% 0% 20-May-24, LOW CURRENT
TELECOM SERVICES
TELEC 32 09-Apr-23 18-May-23 13-Apr-24 20-May-24 SAR0.00 SAR0.00 0% 0% 20-May-24, TELECOM SERVICES
MEP 272 18-Dec-22 07-Nov-23 04-Mar-24 25-Jan-25 SAR0.00 SAR0.00 0% 0% 25-Jan-25, MEP
TUNNEL MECHANICAL
ME WORKS 176 18-Dec-22 17-Jul-23 04-Mar-24 05-Oct-24 SAR0.00 SAR0.00 0% 0% 05-Oct-24, TUNNEL MECHANICAL W
FIRE FIG
FIGHTING SYSTEM 88 18-Dec-22 29-Mar-23 04-Mar-24 23-Jun-24 SAR0.00 SAR0.00 0% 0% 23-Jun-24, FIRE FIGHTING SYSTEM
VENTILATION SYSTEM
VENTILA 44 16-Mar-23 09-May-23 04-Jun-24 30-Jul-24 SAR0.00 SAR0.00 0% 0% 30-Jul-24, VENTILATION SYSTEM
PUMPS INSTALLATION
I 22 10-May-23 04-Jun-23 30-Jul-24 25-Aug-24 SAR0.00 SAR0.00 0% 0% 25-Aug-24, PUMPS INSTALLATION
DUCTING SYSTEM 88 30-Mar-23 17-Jul-23 23-Jun-24 05-Oct-24 SAR0.00 SAR0.00 0% 0% 05-Oct-24, DUCTING SYSTEM
TUNNEL ELECTRICAL
EL WORKS 184 30-Mar-23 07-Nov-23 23-Jun-24 25-Jan-25 SAR0.00 SAR0.00 0% 0% 25-Jan-25, TUNNEL ELECTRICAL
CABLE TRAYS
T 110 11-Apr-23 23-Aug-23 04-Jul-24 11-Nov-24 SAR0.00 SAR0.00 0% 0% 11-Nov-24, CABLE TRAYS

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
40 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
POWER CABLES 44 17-Jun-23 09-Aug-23 05-Sep-24 28-Oct-24 SAR0.00 SAR0.00 0% 0% 28-Oct-24, POWER CABLES
ELECTRICAL INSTALLATIONS
ELECTRI 110 02-Jul-23 07-Nov-23 17-Sep-24 25-Jan-25 SAR0.00 SAR0.00 0% 0% 25-Jan-25, ELECTRICAL INSTALL
LOW CUR
CURRENT 132 30-Mar-23 06-Sep-23 23-Jun-24 25-Nov-24 SAR0.00 SAR0.00 0% 0% 25-Nov-24, LOW CURRENT
FIRE D
DETECTION AND ALARM SYSTEM 132 30-Mar-23 06-Sep-23 23-Jun-24 25-Nov-24 SAR0.00 SAR0.00 0% 0% 25-Nov-24, FIRE DETECTION AND A
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 110 11-Apr-23 23-Aug-23 04-Jul-24 11-Nov-24 SAR0.00 SAR0.00 0% 0% 11-Nov-24, COMMUNICATION SYST
PUBLIC ADDRESS
PUBLI 66 01-May-23 19-Jul-23 21-Jul-24 07-Oct-24 SAR0.00 SAR0.00 0% 0% 07-Oct-24, PUBLIC ADDRESS
VIDEO SURVEILLANCE 44 13-May-23 05-Jul-23 01-Aug-24 22-Sep-24 SAR0.00 SAR0.00 0% 0% 22-Sep-24, VIDEO SURVEILLANCE
SACADA SYSTEM
SACA 44 24-May-23 17-Jul-23 13-Aug-24 05-Oct-24 SAR0.00 SAR0.00 0% 0% 05-Oct-24, SACADA SYSTEM
RADIO RE-BROADCASTING SYSTEM 44 05-Jun-23 29-Jul-23 25-Aug-24 16-Oct-24 SAR0.00 SAR0.00 0% 0% 16-Oct-24, RADIO RE-BROADCASTIN
TUNNEL PLUMBING
PL WORKS 21 26-Apr-23 20-May-23 16-Jul-24 10-Aug-24 SAR0.00 SAR0.00 0% 0% 10-Aug-24, TUNNEL PLUMBING WORK
PROCUREMENT 748 18-Aug-22 08-Nov-23 18-Aug-22 A 25-Jan-25 SAR6,628,322.08 SAR767,210.97 100% 11.57% 25-Jan-25, PROCUREMENT
CIVIL/STRUCTU
CIVIL/STRUCTURAL 464 18-Aug-22 30-Oct-22 18-Aug-22 A 18-Feb-24 SAR1,534,421.93 SAR767,210.97 100% 50% 18-Feb-24, CIVIL/STRUCTURAL
UTILITIES 221 18-Dec-22 08-Nov-23 04-Mar-24 25-Nov-24 SAR624,179.82 SAR0.00 100% 0% 25-Nov-24, UTILITIES
WET UTILITIES
UTILIT 221 18-Dec-22 24-Oct-23 04-Mar-24 25-Nov-24 SAR401,517.55 SAR0.00 100% 0% 25-Nov-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 145 18-Dec-22 13-Jun-23 04-Mar-24 27-Aug-24 SAR50,276.79 SAR0.00 100% 0% 27-Aug-24, POTABLE WATER NETWOR
DI PIPES
PIP 145 18-Dec-22 07-Jun-23 04-Mar-24 27-Aug-24 SAR5,530.45 SAR0.00 100% 0% 27-Aug-24, DI PIPES
HDPE PIPES 145 18-Dec-22 07-Jun-23 04-Mar-24 27-Aug-24 SAR6,535.98 SAR0.00 100% 0% 27-Aug-24, HDPE PIPES
GRP PPIPES 145 18-Dec-22 07-Jun-23 04-Mar-24 27-Aug-24 SAR5,027.68 SAR0.00 100% 0% 27-Aug-24, GRP PIPES
DI & G
GRP FITTING 145 18-Dec-22 07-Jun-23 04-Mar-24 27-Aug-24 SAR5,027.68 SAR0.00 100% 0% 27-Aug-24, DI & GRP FITTING
GATE VALVE 145 24-Dec-22 13-Jun-23 04-Mar-24 27-Aug-24 SAR5,027.68 SAR0.00 100% 0% 27-Aug-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 145 24-Dec-22 13-Jun-23 04-Mar-24 27-Aug-24 SAR4,524.91 SAR0.00 100% 0% 27-Aug-24, BUTTERFLAY VALVE
WATER METER
WATE 145 18-Dec-22 07-Jun-23 04-Mar-24 27-Aug-24 SAR7,541.52 SAR0.00 100% 0% 27-Aug-24, WATER METER
AIR RELASE
RE VALVE 145 24-Dec-22 13-Jun-23 04-Mar-24 27-Aug-24 SAR5,027.68 SAR0.00 100% 0% 27-Aug-24, AIR RELASE VALVE
WASHOUT VALVE
WASH 145 24-Dec-22 13-Jun-23 04-Mar-24 27-Aug-24 SAR6,033.22 SAR0.00 100% 0% 27-Aug-24, WASHOUT VALVE
GREY WAWATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 145 12-Jan-23 06-Jul-23 16-Mar-24 09-Sep-24 SAR15,469.03 SAR0.00 100% 0% 09-Sep-24, GREY WATER DISTRIBUTIO
DI PIPES
PIP 145 12-Jan-23 06-Jul-23 16-Mar-24 09-Sep-24 SAR2,629.74 SAR0.00 100% 0% 09-Sep-24, DI PIPES
HDPE PIPES 145 12-Jan-23 06-Jul-23 16-Mar-24 09-Sep-24 SAR2,784.43 SAR0.00 100% 0% 09-Sep-24, HDPE PIPES
GRP PPIPES 145 12-Jan-23 06-Jul-23 16-Mar-24 09-Sep-24 SAR2,010.97 SAR0.00 100% 0% 09-Sep-24, GRP PIPES
DI & G
GRP FITTING 145 12-Jan-23 06-Jul-23 16-Mar-24 09-Sep-24 SAR1,856.28 SAR0.00 100% 0% 09-Sep-24, DI & GRP FITTING
GATE VALVE 145 12-Jan-23 06-Jul-23 16-Mar-24 09-Sep-24 SAR1,082.83 SAR0.00 100% 0% 09-Sep-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 145 12-Jan-23 06-Jul-23 16-Mar-24 09-Sep-24 SAR1,546.90 SAR0.00 100% 0% 09-Sep-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 145 12-Jan-23 06-Jul-23 16-Mar-24 09-Sep-24 SAR1,701.59 SAR0.00 100% 0% 09-Sep-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 145 12-Jan-23 06-Jul-23 16-Mar-24 09-Sep-24 SAR1,856.28 SAR0.00 100% 0% 09-Sep-24, WASEHOUT VALVE
IRR & FF NETWORK BRANCHES & TIE IN POINTS 145 07-Feb-23 07-Aug-23 14-Apr-24 06-Oct-24 SAR52,443.86 SAR0.00 100% 0% 06-Oct-24, IRR & FF NETWORK BRAN
HDPE PIPES 145 07-Feb-23 01-Aug-23 14-Apr-24 06-Oct-24 SAR13,110.96 SAR0.00 100% 0% 06-Oct-24, HDPE PIPES
GATE VALVE 145 07-Feb-23 01-Aug-23 14-Apr-24 06-Oct-24 SAR5,244.39 SAR0.00 100% 0% 06-Oct-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 145 07-Feb-23 01-Aug-23 14-Apr-24 06-Oct-24 SAR5,244.39 SAR0.00 100% 0% 06-Oct-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 145 07-Feb-23 01-Aug-23 14-Apr-24 06-Oct-24 SAR5,244.39 SAR0.00 100% 0% 06-Oct-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 145 07-Feb-23 01-Aug-23 14-Apr-24 06-Oct-24 SAR5,244.39 SAR0.00 100% 0% 06-Oct-24, WASEHOUT VALVE
FIRE H
HYDRANT 145 13-Feb-23 07-Aug-23 14-Apr-24 06-Oct-24 SAR18,355.35 SAR0.00 100% 0% 06-Oct-24, FIRE HYDRANT
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 145 05-Mar-23 27-Aug-23 09-May-24 31-Oct-24 SAR184,162.62 SAR0.00 100% 0% 31-Oct-24, CHILLED WATER SUPPLY
MILD STEEL PIPE 145 05-Mar-23 27-Aug-23 09-May-24 31-Oct-24 SAR73,665.05 SAR0.00 100% 0% 31-Oct-24, MILD STEEL PIPE
MILD STEEL FITTING 145 05-Mar-23 27-Aug-23 09-May-24 31-Oct-24 SAR73,665.05 SAR0.00 100% 0% 31-Oct-24, MILD STEEL FITTING
GATE VALVE 145 05-Mar-23 27-Aug-23 09-May-24 31-Oct-24 SAR36,832.52 SAR0.00 100% 0% 31-Oct-24, GATE VALVE
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 144 04-May-23 24-Oct-23 04-Jun-24 25-Nov-24 SAR99,165.24 SAR0.00 100% 0% 25-Nov-24, AUTOMATIC WASTE CO
AUTOMATIC WASTE
AUTO 144 04-May-23 24-Oct-23 04-Jun-24 25-Nov-24 SAR99,165.24 SAR0.00 100% 0% 25-Nov-24, AUTOMATIC WASTE
DRY UTILITI
UTILITIES 177 24-Jan-23 08-Nov-23 13-Apr-24 11-Nov-24 SAR222,662.27 SAR0.00 100% 0% 11-Nov-24, DRY UTILITIES
POWER 145 24-Jan-23 02-Oct-23 13-Apr-24 05-Oct-24 SAR200,440.05 SAR0.00 100% 0% 05-Oct-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 145 24-Jan-23 18-Jul-23 13-Apr-24 05-Oct-24 SAR12,719.78 SAR0.00 100% 0% 05-Oct-24, HIGH VOLTAGE 110 KV NE
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 145 24-Jan-23 18-Jul-23 13-Apr-24 05-Oct-24 SAR162,689.31 SAR0.00 100% 0% 05-Oct-24, MEDIUM VOLTAGE 13.8 K
LOW V VOLTAGE NETWORK 145 24-Jan-23 18-Jul-23 13-Apr-24 05-Oct-24 SAR25,030.97 SAR0.00 100% 0% 05-Oct-24, LOW VOLTAGE NETWORK
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 145 15-Mar-23 06-Sep-23 13-Apr-24 05-Oct-24 SAR0.00 SAR0.00 0% 0% 05-Oct-24, ELECTRICAL DISTRIBUTIO
LIGHTING SYSTEM
LIGHT 145 09-Apr-23 02-Oct-23 13-Apr-24 05-Oct-24 SAR0.00 SAR0.00 0% 0% 05-Oct-24, LIGHTING SYSTEM
LOW CUR
CURRENT 145 20-May-23 08-Nov-23 20-May-24 11-Nov-24 SAR22,222.22 SAR0.00 100% 0% 11-Nov-24, LOW CURRENT
TELECOM SERVICES
TELEC 145 20-May-23 08-Nov-23 20-May-24 11-Nov-24 SAR22,222.22 SAR0.00 100% 0% 11-Nov-24, TELECOM SERVICES
MEP 235 08-Sep-22 12-Jun-23 28-Dec-23 07-Oct-24 SAR4,469,720.33 SAR0.00 100% 0% 07-Oct-24, MEP
ARCHITECTURAL
ARCHITECTUR 115 06-Dec-22 18-Apr-23 17-Mar-24 06-Aug-24 SAR0.00 SAR0.00 0% 0% 06-Aug-24, ARCHITECTURAL
CONSTRUCTION 1220 12-Jul-22 27-May-25 02-Jul-22 A 08-Aug-26 SAR198,512,927.14 SAR22,214,410.25 94.54% 11.19% 08-Aug-26, CO
GENERAL SITE ARRANGEMENT 28 12-Jul-22 09-Aug-22 27-Mar-23 A 02-Sep-23 A SAR1,017,053.41 SAR1,017,053.41 100% 100% 02-Sep-23 A, GENERAL SITE ARRANGEMENT
SITE PREPARATION
PREPA 28 12-Jul-22 09-Aug-22 27-Mar-23 A 02-Sep-23 A SAR1,017,053.41 SAR1,017,053.41 100% 100% 02-Sep-23 A, SITE PREPARATION
GEO-TECHNICAL INVESTIGATION
GEO-TECHNICA 43 10-Aug-22 28-Sep-22 02-Jul-22 A 01-Oct-22 A SAR146,518.20 SAR146,518.20 100% 100% 01-Oct-22 A, GEO-TECHNICAL INVESTIGATION
EXCAVATION & DEWATERING 458 19-Sep-22 03-Aug-23 13-Mar-23 A 17-Oct-24 SAR30,334,500.03 SAR21,050,838.63 100% 69.4% 17-Oct-24, EXCAVATION & DEWATER

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
41 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
SOIL IMPROVEMENT
IMPROVE 78 12-Oct-22 07-Jan-23 18-Dec-23 17-Mar-24 SAR8,640,420.44 SAR0.00 100% 0% 17-Mar-24, SOIL IMPROVEMENT
STRUCTURAL WORKS 270 24-Oct-22 10-Sep-23 30-Dec-23 17-Nov-24 SAR107,665,259.05 SAR0.00 100% 0% 17-Nov-24, STRUCTURAL WORKS
1st Sta 0+000
0+00 - Sta 0+020 103 24-Oct-22 20-Feb-23 30-Dec-23 30-Apr-24 SAR4,681,098.22 SAR0.00 100% 0% 30-Apr-24, 1st Sta 0+000 - Sta 0+020
BASE SLAB
SL 22 24-Oct-22 17-Nov-22 30-Dec-23 23-Jan-24 SAR1,235,322.66 SAR0.00 100% 0% 23-Jan-24, BASE SLAB
COLUMNS
COLUMN 23 16-Nov-22 12-Dec-22 22-Jan-24 17-Feb-24 SAR90,819.57 SAR0.00 100% 0% 17-Feb-24, COLUMNS
TUNNEL WALLS 37 16-Nov-22 28-Dec-22 22-Jan-24 04-Mar-24 SAR709,809.17 SAR0.00 100% 0% 04-Mar-24, TUNNEL WALLS
TOP SALB
SAL 37 13-Dec-22 24-Jan-23 18-Feb-24 31-Mar-24 SAR1,482,161.28 SAR0.00 100% 0% 31-Mar-24, TOP SALB
FINISHING
FINISHIN 23 25-Jan-23 20-Feb-23 01-Apr-24 30-Apr-24 SAR1,162,985.54 SAR0.00 100% 0% 30-Apr-24, FINISHING
2nd Sta 0+0
0+020 - Sta 0+041.36 108 26-Oct-22 28-Feb-23 01-Jan-24 08-May-24 SAR4,681,098.22 SAR0.00 100% 0% 08-May-24, 2nd Sta 0+020 - Sta 0+041.36
BASE SLAB
SL 22 26-Oct-22 20-Nov-22 01-Jan-24 25-Jan-24 SAR1,235,322.66 SAR0.00 100% 0% 25-Jan-24, BASE SLAB
COLUMNS
COLUMN 23 19-Nov-22 14-Dec-22 24-Jan-24 19-Feb-24 SAR90,819.57 SAR0.00 100% 0% 19-Feb-24, COLUMNS
TUNNEL WALLS 37 19-Nov-22 31-Dec-22 24-Jan-24 06-Mar-24 SAR709,809.17 SAR0.00 100% 0% 06-Mar-24, TUNNEL WALLS
TOP SALB
SAL 37 15-Dec-22 26-Jan-23 20-Feb-24 02-Apr-24 SAR1,482,161.28 SAR0.00 100% 0% 02-Apr-24, TOP SALB
FINISHING
FINISHIN 28 28-Jan-23 28-Feb-23 03-Apr-24 08-May-24 SAR1,162,985.54 SAR0.00 100% 0% 08-May-24, FINISHING
3rd Sta 0+041.036-
0+0 Sta 0+061.036 107 05-Nov-22 08-Mar-23 10-Jan-24 16-May-24 SAR4,681,098.22 SAR0.00 100% 0% 16-May-24, 3rd Sta 0+041.036- Sta 0+061.036
BASE SLAB
SL 22 05-Nov-22 29-Nov-22 10-Jan-24 04-Feb-24 SAR1,235,322.66 SAR0.00 100% 0% 04-Feb-24, BASE SLAB
COLUMNS
COLUMN 23 28-Nov-22 24-Dec-22 03-Feb-24 28-Feb-24 SAR90,819.57 SAR0.00 100% 0% 28-Feb-24, COLUMNS
TUNNEL WALLS 37 28-Nov-22 09-Jan-23 03-Feb-24 16-Mar-24 SAR709,809.17 SAR0.00 100% 0% 16-Mar-24, TUNNEL WALLS
TOP SALB
SAL 37 25-Dec-22 05-Feb-23 29-Feb-24 15-Apr-24 SAR1,482,161.28 SAR0.00 100% 0% 15-Apr-24, TOP SALB
FINISHING
FINISHIN 27 06-Feb-23 08-Mar-23 16-Apr-24 16-May-24 SAR1,162,985.54 SAR0.00 100% 0% 16-May-24, FINISHING
4th Sta 0+061.036-
0+06 Sta 0+081.036 106 14-Nov-22 16-Mar-23 20-Jan-24 25-May-24 SAR4,681,098.22 SAR0.00 100% 0% 25-May-24, 4th Sta 0+061.036- Sta 0+081.036
BASE SLAB
SL 22 14-Nov-22 08-Dec-22 20-Jan-24 13-Feb-24 SAR1,235,322.66 SAR0.00 100% 0% 13-Feb-24, BASE SLAB
COLUMNS
COLUMN 23 07-Dec-22 02-Jan-23 12-Feb-24 09-Mar-24 SAR90,819.57 SAR0.00 100% 0% 09-Mar-24, COLUMNS
TUNNEL WALLS 37 07-Dec-22 18-Jan-23 12-Feb-24 25-Mar-24 SAR709,809.17 SAR0.00 100% 0% 25-Mar-24, TUNNEL WALLS
TOP SALB
SAL 37 03-Jan-23 14-Feb-23 10-Mar-24 24-Apr-24 SAR1,482,161.28 SAR0.00 100% 0% 24-Apr-24, TOP SALB
FINISHING
FINISHIN 26 15-Feb-23 16-Mar-23 25-Apr-24 25-May-24 SAR1,162,985.54 SAR0.00 100% 0% 25-May-24, FINISHING
5th Sta 0+081.036-
0+08 Sta 0+101.036 105 23-Nov-22 25-Mar-23 29-Jan-24 02-Jun-24 SAR4,681,098.22 SAR0.00 100% 0% 02-Jun-24, 5th Sta 0+081.036- Sta 0+101.036
BASE SLAB
SL 22 23-Nov-22 18-Dec-22 29-Jan-24 22-Feb-24 SAR1,235,322.66 SAR0.00 100% 0% 22-Feb-24, BASE SLAB
COLUMNS
COLUMN 23 17-Dec-22 11-Jan-23 21-Feb-24 18-Mar-24 SAR90,819.57 SAR0.00 100% 0% 18-Mar-24, COLUMNS
TUNNEL WALLS 37 17-Dec-22 28-Jan-23 21-Feb-24 03-Apr-24 SAR709,809.17 SAR0.00 100% 0% 03-Apr-24, TUNNEL WALLS
TOP SALB
SAL 37 12-Jan-23 23-Feb-23 19-Mar-24 04-May-24 SAR1,482,161.28 SAR0.00 100% 0% 04-May-24, TOP SALB
FINISHING
FINISHIN 25 25-Feb-23 25-Mar-23 05-May-24 02-Jun-24 SAR1,162,985.54 SAR0.00 100% 0% 02-Jun-24, FINISHING
6th Sta 0+101.036-
0+10 Sta 0+121.036 103 07-Dec-22 05-Apr-23 12-Feb-24 13-Jun-24 SAR4,681,098.22 SAR0.00 100% 0% 13-Jun-24, 6th Sta 0+101.036- Sta 0+121.036
BASE SLAB
SL 22 07-Dec-22 01-Jan-23 12-Feb-24 07-Mar-24 SAR1,235,322.66 SAR0.00 100% 0% 07-Mar-24, BASE SLAB
COLUMNS
COLUMN 23 31-Dec-22 25-Jan-23 06-Mar-24 01-Apr-24 SAR90,819.57 SAR0.00 100% 0% 01-Apr-24, COLUMNS
TUNNEL WALLS 37 31-Dec-22 11-Feb-23 06-Mar-24 21-Apr-24 SAR709,809.17 SAR0.00 100% 0% 21-Apr-24, TUNNEL WALLS
TOP SALB
SAL 37 26-Jan-23 09-Mar-23 02-Apr-24 18-May-24 SAR1,482,161.28 SAR0.00 100% 0% 18-May-24, TOP SALB
FINISHING
FINISHIN 23 11-Mar-23 05-Apr-23 19-May-24 13-Jun-24 SAR1,162,985.54 SAR0.00 100% 0% 13-Jun-24, FINISHING
7th Sta 0+121.036-
0+12 Sta 0+141.036 103 21-Dec-22 19-Apr-23 26-Feb-24 02-Jul-24 SAR4,681,098.22 SAR0.00 100% 0% 02-Jul-24, 7th Sta 0+121.036- Sta 0+141.036
BASE SLAB
SL 22 21-Dec-22 15-Jan-23 26-Feb-24 21-Mar-24 SAR1,235,322.66 SAR0.00 100% 0% 21-Mar-24, BASE SLAB
COLUMNS
COLUMN 23 14-Jan-23 08-Feb-23 20-Mar-24 18-Apr-24 SAR90,819.57 SAR0.00 100% 0% 18-Apr-24, COLUMNS
TUNNEL WALLS 37 14-Jan-23 25-Feb-23 20-Mar-24 05-May-24 SAR709,809.17 SAR0.00 100% 0% 05-May-24, TUNNEL WALLS
TOP SALB
SAL 37 09-Feb-23 23-Mar-23 20-Apr-24 01-Jun-24 SAR1,482,161.28 SAR0.00 100% 0% 01-Jun-24, TOP SALB
FINISHING
FINISHIN 23 25-Mar-23 19-Apr-23 02-Jun-24 02-Jul-24 SAR1,162,985.54 SAR0.00 100% 0% 02-Jul-24, FINISHING
8th Sta 0+141.036-
0+14 Sta 0+161.036 103 04-Jan-23 07-May-23 11-Mar-24 16-Jul-24 SAR4,681,098.22 SAR0.00 100% 0% 16-Jul-24, 8th Sta 0+141.036- Sta 0+161.036
BASE SLAB
SL 22 04-Jan-23 29-Jan-23 11-Mar-24 04-Apr-24 SAR1,235,322.66 SAR0.00 100% 0% 04-Apr-24, BASE SLAB
COLUMNS
COLUMN 23 28-Jan-23 22-Feb-23 03-Apr-24 02-May-24 SAR90,819.57 SAR0.00 100% 0% 02-May-24, COLUMNS
TUNNEL WALLS 37 28-Jan-23 11-Mar-23 03-Apr-24 19-May-24 SAR709,809.17 SAR0.00 100% 0% 19-May-24, TUNNEL WALLS
TOP SALB
SAL 37 23-Feb-23 06-Apr-23 04-May-24 19-Jun-24 SAR1,482,161.28 SAR0.00 100% 0% 19-Jun-24, TOP SALB
FINISHING
FINISHIN 23 08-Apr-23 07-May-23 20-Jun-24 16-Jul-24 SAR1,162,985.54 SAR0.00 100% 0% 16-Jul-24, FINISHING
9th Sta 0+161.036-
0+16 Sta 0+181.036 103 18-Jan-23 21-May-23 25-Mar-24 30-Jul-24 SAR4,681,098.22 SAR0.00 100% 0% 30-Jul-24, 9th Sta 0+161.036- Sta 0+181.03
BASE SLAB
SL 22 18-Jan-23 12-Feb-23 25-Mar-24 22-Apr-24 SAR1,235,322.66 SAR0.00 100% 0% 22-Apr-24, BASE SLAB
COLUMNS
COLUMN 23 11-Feb-23 08-Mar-23 21-Apr-24 16-May-24 SAR90,819.57 SAR0.00 100% 0% 16-May-24, COLUMNS
TUNNEL WALLS 37 11-Feb-23 25-Mar-23 21-Apr-24 02-Jun-24 SAR709,809.17 SAR0.00 100% 0% 02-Jun-24, TUNNEL WALLS
TOP SALB
SAL 37 09-Mar-23 20-Apr-23 18-May-24 03-Jul-24 SAR1,482,161.28 SAR0.00 100% 0% 03-Jul-24, TOP SALB
FINISHING
FINISHIN 23 25-Apr-23 21-May-23 04-Jul-24 30-Jul-24 SAR1,162,985.54 SAR0.00 100% 0% 30-Jul-24, FINISHING
10th Sta 0+181.036-
0+1 Sta 0+201.036 103 28-Jan-23 30-May-23 03-Apr-24 08-Aug-24 SAR4,681,098.22 SAR0.00 100% 0% 08-Aug-24, 10th Sta 0+181.036- Sta 0+201.
BASE SLAB
SL 22 28-Jan-23 21-Feb-23 03-Apr-24 01-May-24 SAR1,235,322.66 SAR0.00 100% 0% 01-May-24, BASE SLAB
COLUMNS
COLUMN 23 20-Feb-23 18-Mar-23 30-Apr-24 26-May-24 SAR90,819.57 SAR0.00 100% 0% 26-May-24, COLUMNS
TUNNEL WALLS 37 20-Feb-23 03-Apr-23 30-Apr-24 11-Jun-24 SAR709,809.17 SAR0.00 100% 0% 11-Jun-24, TUNNEL WALLS
TOP SALB
SAL 37 19-Mar-23 03-May-23 27-May-24 13-Jul-24 SAR1,482,161.28 SAR0.00 100% 0% 13-Jul-24, TOP SALB
FINISHING
FINISHIN 23 04-May-23 30-May-23 14-Jul-24 08-Aug-24 SAR1,162,985.54 SAR0.00 100% 0% 08-Aug-24, FINISHING

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
42 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
11th Sta 0+2
0+201.036- Sta 0+221.036 103 11-Feb-23 13-Jun-23 21-Apr-24 22-Aug-24 SAR4,681,098.22 SAR0.00 100% 0% 22-Aug-24, 11th Sta 0+201.036- Sta 0+221
BASE SLAB
SL 22 11-Feb-23 07-Mar-23 21-Apr-24 15-May-24 SAR1,235,322.66 SAR0.00 100% 0% 15-May-24, BASE SLAB
COLUMNS
COLUMN 23 06-Mar-23 01-Apr-23 14-May-24 09-Jun-24 SAR90,819.57 SAR0.00 100% 0% 09-Jun-24, COLUMNS
TUNNEL WALLS 37 06-Mar-23 17-Apr-23 14-May-24 30-Jun-24 SAR709,809.17 SAR0.00 100% 0% 30-Jun-24, TUNNEL WALLS
TOP SALB
SAL 37 02-Apr-23 17-May-23 10-Jun-24 27-Jul-24 SAR1,482,161.28 SAR0.00 100% 0% 27-Jul-24, TOP SALB
FINISHING
FINISHIN 23 18-May-23 13-Jun-23 28-Jul-24 22-Aug-24 SAR1,162,985.54 SAR0.00 100% 0% 22-Aug-24, FINISHING
12th Sta 0+221.036-
0+2 Sta 0+241.036 103 25-Feb-23 01-Jul-23 05-May-24 05-Sep-24 SAR4,681,098.22 SAR0.00 100% 0% 05-Sep-24, 12th Sta 0+221.036- Sta 0+241
BASE SLAB
SL 22 25-Feb-23 21-Mar-23 05-May-24 29-May-24 SAR1,235,322.66 SAR0.00 100% 0% 29-May-24, BASE SLAB
COLUMNS
COLUMN 23 20-Mar-23 15-Apr-23 28-May-24 27-Jun-24 SAR90,819.57 SAR0.00 100% 0% 27-Jun-24, COLUMNS
TUNNEL WALLS 33 20-Mar-23 30-Apr-23 28-May-24 09-Jul-24 SAR709,809.17 SAR0.00 100% 0% 09-Jul-24, TUNNEL WALLS
TOP SALB
SAL 37 16-Apr-23 31-May-23 29-Jun-24 10-Aug-24 SAR1,482,161.28 SAR0.00 100% 0% 10-Aug-24, TOP SALB
FINISHING
FINISHIN 23 01-Jun-23 01-Jul-23 11-Aug-24 05-Sep-24 SAR1,162,985.54 SAR0.00 100% 0% 05-Sep-24, FINISHING
13th Sta 0+241.036-
0+2 Sta 0+261.036 103 06-Mar-23 10-Jul-23 14-May-24 15-Sep-24 SAR4,681,098.22 SAR0.00 100% 0% 15-Sep-24, 13th Sta 0+241.036- Sta 0+261
BASE SLAB
SL 22 06-Mar-23 30-Mar-23 14-May-24 08-Jun-24 SAR1,235,322.66 SAR0.00 100% 0% 08-Jun-24, BASE SLAB
COLUMNS
COLUMN 23 29-Mar-23 27-Apr-23 06-Jun-24 07-Jul-24 SAR90,819.57 SAR0.00 100% 0% 07-Jul-24, COLUMNS
TUNNEL WALLS 33 29-Mar-23 09-May-23 06-Jun-24 18-Jul-24 SAR709,809.17 SAR0.00 100% 0% 18-Jul-24, TUNNEL WALLS
TOP SALB
SAL 37 29-Apr-23 10-Jun-23 08-Jul-24 19-Aug-24 SAR1,482,161.28 SAR0.00 100% 0% 19-Aug-24, TOP SALB
FINISHING
FINISHIN 23 11-Jun-23 10-Jul-23 20-Aug-24 15-Sep-24 SAR1,162,985.54 SAR0.00 100% 0% 15-Sep-24, FINISHING
14th Sta 0+261.036-
0+2 Sta 0+281.036 103 15-Mar-23 19-Jul-23 23-May-24 25-Sep-24 SAR4,681,098.22 SAR0.00 100% 0% 25-Sep-24, 14th Sta 0+261.036- Sta 0+28
BASE SLAB
SL 22 15-Mar-23 09-Apr-23 23-May-24 22-Jun-24 SAR1,235,322.66 SAR0.00 100% 0% 22-Jun-24, BASE SLAB
COLUMNS
COLUMN 23 08-Apr-23 07-May-23 20-Jun-24 16-Jul-24 SAR90,819.57 SAR0.00 100% 0% 16-Jul-24, COLUMNS
TUNNEL WALLS 33 08-Apr-23 18-May-23 20-Jun-24 28-Jul-24 SAR709,809.17 SAR0.00 100% 0% 28-Jul-24, TUNNEL WALLS
TOP SALB
SAL 37 08-May-23 19-Jun-23 17-Jul-24 28-Aug-24 SAR1,482,161.28 SAR0.00 100% 0% 28-Aug-24, TOP SALB
FINISHING
FINISHIN 23 20-Jun-23 19-Jul-23 29-Aug-24 25-Sep-24 SAR1,162,985.54 SAR0.00 100% 0% 25-Sep-24, FINISHING
15th Sta 0+281.036-
0+2 Sta 0+301.036 103 25-Mar-23 29-Jul-23 02-Jun-24 05-Oct-24 SAR4,681,098.22 SAR0.00 100% 0% 05-Oct-24, 15th Sta 0+281.036- Sta 0+30
BASE SLAB
SL 22 25-Mar-23 18-Apr-23 02-Jun-24 01-Jul-24 SAR1,235,322.66 SAR0.00 100% 0% 01-Jul-24, BASE SLAB
COLUMNS
COLUMN 23 17-Apr-23 16-May-23 30-Jun-24 25-Jul-24 SAR90,819.57 SAR0.00 100% 0% 25-Jul-24, COLUMNS
TUNNEL WALLS 37 17-Apr-23 01-Jun-23 30-Jun-24 11-Aug-24 SAR709,809.17 SAR0.00 100% 0% 11-Aug-24, TUNNEL WALLS
TOP SALB
SAL 37 17-May-23 02-Jul-23 27-Jul-24 07-Sep-24 SAR1,482,161.28 SAR0.00 100% 0% 07-Sep-24, TOP SALB
FINISHING
FINISHIN 23 03-Jul-23 29-Jul-23 08-Sep-24 05-Oct-24 SAR1,162,985.54 SAR0.00 100% 0% 05-Oct-24, FINISHING
16th Sta 0+301.036-
0+3 Sta 0+321.036 103 03-Apr-23 07-Aug-23 11-Jun-24 14-Oct-24 SAR4,681,098.22 SAR0.00 100% 0% 14-Oct-24, 16th Sta 0+301.036- Sta 0+32
BASE SLAB
SL 22 03-Apr-23 01-May-23 11-Jun-24 10-Jul-24 SAR1,235,322.66 SAR0.00 100% 0% 10-Jul-24, BASE SLAB
COLUMNS
COLUMN 23 30-Apr-23 25-May-23 09-Jul-24 04-Aug-24 SAR90,819.57 SAR0.00 100% 0% 04-Aug-24, COLUMNS
TUNNEL WALLS 37 30-Apr-23 11-Jun-23 09-Jul-24 20-Aug-24 SAR709,809.17 SAR0.00 100% 0% 20-Aug-24, TUNNEL WALLS
TOP SALB
SAL 37 27-May-23 11-Jul-23 05-Aug-24 16-Sep-24 SAR1,482,161.28 SAR0.00 100% 0% 16-Sep-24, TOP SALB
FINISHING
FINISHIN 23 12-Jul-23 07-Aug-23 17-Sep-24 14-Oct-24 SAR1,162,985.54 SAR0.00 100% 0% 14-Oct-24, FINISHING
17th Sta 0+321.036-
0+3 Sta 0+341.036 103 12-Apr-23 16-Aug-23 25-Jun-24 23-Oct-24 SAR4,681,098.22 SAR0.00 100% 0% 23-Oct-24, 17th Sta 0+321.036- Sta 0+34
BASE SLAB
SL 22 12-Apr-23 10-May-23 25-Jun-24 20-Jul-24 SAR1,235,322.66 SAR0.00 100% 0% 20-Jul-24, BASE SLAB
COLUMNS
COLUMN 23 09-May-23 04-Jun-23 18-Jul-24 13-Aug-24 SAR90,819.57 SAR0.00 100% 0% 13-Aug-24, COLUMNS
TUNNEL WALLS 37 09-May-23 20-Jun-23 18-Jul-24 29-Aug-24 SAR709,809.17 SAR0.00 100% 0% 29-Aug-24, TUNNEL WALLS
TOP SALB
SAL 37 05-Jun-23 20-Jul-23 14-Aug-24 26-Sep-24 SAR1,482,161.28 SAR0.00 100% 0% 26-Sep-24, TOP SALB
FINISHING
FINISHIN 23 22-Jul-23 16-Aug-23 28-Sep-24 23-Oct-24 SAR1,162,985.54 SAR0.00 100% 0% 23-Oct-24, FINISHING
18th Sta 0+341.036-
0+3 Sta 0+361.036 108 15-Apr-23 24-Aug-23 27-Jun-24 31-Oct-24 SAR4,681,098.22 SAR0.00 100% 0% 31-Oct-24, 18th Sta 0+341.036- Sta 0+36
BASE SLAB
SL 22 15-Apr-23 13-May-23 27-Jun-24 22-Jul-24 SAR1,235,322.66 SAR0.00 100% 0% 22-Jul-24, BASE SLAB
COLUMNS
COLUMN 23 11-May-23 06-Jun-23 21-Jul-24 15-Aug-24 SAR90,819.57 SAR0.00 100% 0% 15-Aug-24, COLUMNS
TUNNEL WALLS 37 11-May-23 22-Jun-23 21-Jul-24 01-Sep-24 SAR709,809.17 SAR0.00 100% 0% 01-Sep-24, TUNNEL WALLS
TOP SALB
SAL 37 07-Jun-23 23-Jul-23 17-Aug-24 29-Sep-24 SAR1,482,161.28 SAR0.00 100% 0% 29-Sep-24, TOP SALB
FINISHING
FINISHIN 28 24-Jul-23 24-Aug-23 30-Sep-24 31-Oct-24 SAR1,162,985.54 SAR0.00 100% 0% 31-Oct-24, FINISHING
19th Sta 0+361.036-
0+3 Sta 0+381.036 114 16-Apr-23 02-Sep-23 29-Jun-24 09-Nov-24 SAR4,681,098.22 SAR0.00 100% 0% 09-Nov-24, 19th Sta 0+361.036- Sta 0+3
BASE SLAB
SL 22 16-Apr-23 14-May-23 29-Jun-24 23-Jul-24 SAR1,235,322.66 SAR0.00 100% 0% 23-Jul-24, BASE SLAB
COLUMNS
COLUMN 23 13-May-23 07-Jun-23 22-Jul-24 17-Aug-24 SAR90,819.57 SAR0.00 100% 0% 17-Aug-24, COLUMNS
TUNNEL WALLS 37 13-May-23 24-Jun-23 22-Jul-24 02-Sep-24 SAR709,809.17 SAR0.00 100% 0% 02-Sep-24, TUNNEL WALLS
TOP SALB
SAL 37 08-Jun-23 24-Jul-23 18-Aug-24 30-Sep-24 SAR1,482,161.28 SAR0.00 100% 0% 30-Sep-24, TOP SALB
FINISHING
FINISHIN 34 25-Jul-23 02-Sep-23 01-Oct-24 09-Nov-24 SAR1,162,985.54 SAR0.00 100% 0% 09-Nov-24, FINISHING
20th Sta 0+381.036-
0+3 Sta 0+401.036 113 29-Apr-23 10-Sep-23 08-Jul-24 17-Nov-24 SAR4,681,098.22 SAR0.00 100% 0% 17-Nov-24, 20th Sta 0+381.036- Sta 0+
BASE SLAB
SL 22 29-Apr-23 23-May-23 08-Jul-24 01-Aug-24 SAR1,235,322.66 SAR0.00 100% 0% 01-Aug-24, BASE SLAB
COLUMNS
COLUMN 23 22-May-23 17-Jun-23 31-Jul-24 26-Aug-24 SAR90,819.57 SAR0.00 100% 0% 26-Aug-24, COLUMNS
TUNNEL WALLS 37 22-May-23 06-Jul-23 31-Jul-24 11-Sep-24 SAR709,809.17 SAR0.00 100% 0% 11-Sep-24, TUNNEL WALLS
TOP SALB
SAL 37 18-Jun-23 02-Aug-23 27-Aug-24 09-Oct-24 SAR1,482,161.28 SAR0.00 100% 0% 09-Oct-24, TOP SALB
FINISHING
FINISHIN 33 03-Aug-23 10-Sep-23 10-Oct-24 17-Nov-24 SAR1,162,985.54 SAR0.00 100% 0% 17-Nov-24, FINISHING
21th Sta 0+401.036-
0+4 Sta 0+421.036 109 01-May-23 07-Sep-23 10-Jul-24 14-Nov-24 SAR4,681,098.22 SAR0.00 100% 0% 14-Nov-24, 21th Sta 0+401.036- Sta 0+
BASE SLAB
SL 22 01-May-23 25-May-23 10-Jul-24 04-Aug-24 SAR1,235,322.66 SAR0.00 100% 0% 04-Aug-24, BASE SLAB

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
43 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
COLUMN
COLUMNS 23 24-May-23 19-Jun-23 03-Aug-24 28-Aug-24 SAR90,819.57 SAR0.00 100% 0% 28-Aug-24, COLUMNS
TUNNEL WALLS 37 24-May-23 09-Jul-23 03-Aug-24 14-Sep-24 SAR709,809.17 SAR0.00 100% 0% 14-Sep-24, TUNNEL WALLS
TOP SALB
SAL 37 20-Jun-23 05-Aug-23 29-Aug-24 12-Oct-24 SAR1,482,161.28 SAR0.00 100% 0% 12-Oct-24, TOP SALB
FINISHING
FINISHIN 29 06-Aug-23 07-Sep-23 13-Oct-24 14-Nov-24 SAR1,162,985.54 SAR0.00 100% 0% 14-Nov-24, FINISHING
22th Sta 0+421.036-
0+4 Sta 0+441.036 93 02-May-23 21-Aug-23 11-Jul-24 28-Oct-24 SAR4,681,098.22 SAR0.00 100% 0% 28-Oct-24, 22th Sta 0+421.036- Sta 0+44
BASE SLAB
SL 22 02-May-23 27-May-23 11-Jul-24 05-Aug-24 SAR1,235,322.66 SAR0.00 100% 0% 05-Aug-24, BASE SLAB
COLUMNS
COLUMN 23 25-May-23 20-Jun-23 04-Aug-24 29-Aug-24 SAR90,819.57 SAR0.00 100% 0% 29-Aug-24, COLUMNS
TUNNEL WALLS 37 25-May-23 10-Jul-23 04-Aug-24 15-Sep-24 SAR709,809.17 SAR0.00 100% 0% 15-Sep-24, TUNNEL WALLS
TOP SALB
SAL 37 13-Jun-23 29-Jul-23 22-Aug-24 05-Oct-24 SAR1,482,161.28 SAR0.00 100% 0% 05-Oct-24, TOP SALB
FINISHING
FINISHIN 20 30-Jul-23 21-Aug-23 06-Oct-24 28-Oct-24 SAR1,162,985.54 SAR0.00 100% 0% 28-Oct-24, FINISHING
23th Sta 0+441.036-
0+4 Sta 0+461.036 91 04-May-23 21-Aug-23 14-Jul-24 28-Oct-24 SAR4,681,098.22 SAR0.00 100% 0% 28-Oct-24, 23th Sta 0+441.036- Sta 0+46
BASE SLAB
SL 22 04-May-23 29-May-23 14-Jul-24 07-Aug-24 SAR1,235,322.66 SAR0.00 100% 0% 07-Aug-24, BASE SLAB
COLUMNS
COLUMN 23 28-May-23 22-Jun-23 06-Aug-24 01-Sep-24 SAR90,819.57 SAR0.00 100% 0% 01-Sep-24, COLUMNS
TUNNEL WALLS 35 28-May-23 10-Jul-23 06-Aug-24 15-Sep-24 SAR709,809.17 SAR0.00 100% 0% 15-Sep-24, TUNNEL WALLS
TOP SALB
SAL 30 24-Jun-23 31-Jul-23 02-Sep-24 07-Oct-24 SAR1,482,161.28 SAR0.00 100% 0% 07-Oct-24, TOP SALB
FINISHING
FINISHIN 23 26-Jul-23 21-Aug-23 02-Oct-24 28-Oct-24 SAR1,162,985.54 SAR0.00 100% 0% 28-Oct-24, FINISHING
EGRESS STAIR-3
STAIR (ZONE-9) 243 27-Oct-22 14-Aug-23 02-Jan-24 20-Oct-24 SAR2,352,338.08 SAR0.00 100% 0% 20-Oct-24, EGRESS STAIR-3 (ZONE-9
WALL AND 1 1ST FLIGHT 31 27-Oct-22 01-Dec-22 02-Jan-24 06-Feb-24 SAR544,958.40 SAR0.00 100% 0% 06-Feb-24, WALL AND 1ST FLIGHT
WALL AND 2 2ND FLIGHT 17 03-Dec-22 21-Dec-22 06-Feb-24 26-Feb-24 SAR111,087.10 SAR0.00 100% 0% 26-Feb-24, WALL AND 2ND FLIGHT
WALL AND 3 3RD FLIGHT 17 22-Dec-22 10-Jan-23 26-Feb-24 17-Mar-24 SAR111,087.10 SAR0.00 100% 0% 17-Mar-24, WALL AND 3RD FLIGHT
WALL AND 4 4TH FLIGHT 17 11-Jan-23 30-Jan-23 17-Mar-24 06-Apr-24 SAR111,087.10 SAR0.00 100% 0% 06-Apr-24, WALL AND 4TH FLIGHT
WALL AND 5 5TH FLIGHT 17 31-Jan-23 19-Feb-23 06-Apr-24 29-Apr-24 SAR111,087.10 SAR0.00 100% 0% 29-Apr-24, WALL AND 5TH FLIGHT
WALL AND 6 6TH FLIGHT 17 20-Feb-23 11-Mar-23 29-Apr-24 19-May-24 SAR111,087.10 SAR0.00 100% 0% 19-May-24, WALL AND 6TH FLIGHT
WALL AND 7 7TH FLIGHT 17 12-Mar-23 30-Mar-23 19-May-24 08-Jun-24 SAR111,087.10 SAR0.00 100% 0% 08-Jun-24, WALL AND 7TH FLIGHT
WALL AND 8 8TH FLIGHT 17 01-Apr-23 19-Apr-23 08-Jun-24 02-Jul-24 SAR111,087.10 SAR0.00 100% 0% 02-Jul-24, WALL AND 8TH FLIGHT
WALL AND 9 9TH FLIGHT 17 20-Apr-23 13-May-23 02-Jul-24 22-Jul-24 SAR111,087.10 SAR0.00 100% 0% 22-Jul-24, WALL AND 9TH FLIGHT
WALL AND 1 10TH FLIGHT 17 14-May-23 01-Jun-23 22-Jul-24 11-Aug-24 SAR111,087.10 SAR0.00 100% 0% 11-Aug-24, WALL AND 10TH FLIGHT
WALL AND 1 11TH FLIGHT 17 03-Jun-23 21-Jun-23 11-Aug-24 31-Aug-24 SAR111,087.10 SAR0.00 100% 0% 31-Aug-24, WALL AND 11TH FLIGHT
TOP SLAB 42 22-Jun-23 14-Aug-23 31-Aug-24 20-Oct-24 SAR696,508.72 SAR0.00 100% 0% 20-Oct-24, TOP SLAB
EGRESS STAIR-4
STAIR (ZONE-9) 236 08-Nov-22 16-Aug-23 13-Jan-24 23-Oct-24 SAR2,352,338.08 SAR0.00 100% 0% 23-Oct-24, EGRESS STAIR-4 (ZONE-9
WALL AND 1 1ST FLIGHT 31 08-Nov-22 13-Dec-22 13-Jan-24 18-Feb-24 SAR544,958.40 SAR0.00 100% 0% 18-Feb-24, WALL AND 1ST FLIGHT
WALL AND 2 2ND FLIGHT 17 14-Dec-22 02-Jan-23 18-Feb-24 09-Mar-24 SAR111,087.10 SAR0.00 100% 0% 09-Mar-24, WALL AND 2ND FLIGHT
WALL AND 3 3RD FLIGHT 17 03-Jan-23 22-Jan-23 09-Mar-24 28-Mar-24 SAR111,087.10 SAR0.00 100% 0% 28-Mar-24, WALL AND 3RD FLIGHT
WALL AND 4 4TH FLIGHT 17 23-Jan-23 11-Feb-23 28-Mar-24 21-Apr-24 SAR111,087.10 SAR0.00 100% 0% 21-Apr-24, WALL AND 4TH FLIGHT
WALL AND 5 5TH FLIGHT 17 12-Feb-23 02-Mar-23 21-Apr-24 11-May-24 SAR111,087.10 SAR0.00 100% 0% 11-May-24, WALL AND 5TH FLIGHT
WALL AND 6 6TH FLIGHT 17 04-Mar-23 22-Mar-23 11-May-24 30-May-24 SAR111,087.10 SAR0.00 100% 0% 30-May-24, WALL AND 6TH FLIGHT
WALL AND 7 7TH FLIGHT 17 23-Mar-23 11-Apr-23 30-May-24 24-Jun-24 SAR111,087.10 SAR0.00 100% 0% 24-Jun-24, WALL AND 7TH FLIGHT
WALL AND 8 8TH FLIGHT 17 12-Apr-23 04-May-23 24-Jun-24 14-Jul-24 SAR111,087.10 SAR0.00 100% 0% 14-Jul-24, WALL AND 8TH FLIGHT
WALL AND 9 9TH FLIGHT 17 06-May-23 24-May-23 14-Jul-24 03-Aug-24 SAR111,087.10 SAR0.00 100% 0% 03-Aug-24, WALL AND 9TH FLIGHT
WALL AND 1 10TH FLIGHT 17 25-May-23 13-Jun-23 03-Aug-24 22-Aug-24 SAR111,087.10 SAR0.00 100% 0% 22-Aug-24, WALL AND 10TH FLIGHT
WALL AND 1 11TH FLIGHT 17 14-Jun-23 06-Jul-23 22-Aug-24 11-Sep-24 SAR111,087.10 SAR0.00 100% 0% 11-Sep-24, WALL AND 11TH FLIGHT
TOP SLAB 35 08-Jul-23 16-Aug-23 11-Sep-24 23-Oct-24 SAR696,508.72 SAR0.00 100% 0% 23-Oct-24, TOP SLAB
DRY CULVERT ZONE 9 163 19-Jan-23 03-Aug-23 26-Mar-24 10-Oct-24 SAR9,426,635.45 SAR0.00 100% 0% 10-Oct-24, DRY CULVERT ZONE 9
TUNNEL 1 S STA. 0+000 ~ 0+338 - @ZONE 9 163 19-Jan-23 03-Aug-23 26-Mar-24 10-Oct-24 SAR9,426,635.45 SAR0.00 100% 0% 10-Oct-24, TUNNEL 1 STA. 0+000 ~ 0+
Sta 0+000-0+200
0+00 137 19-Jan-23 04-Jul-23 26-Mar-24 09-Sep-24 SAR4,713,317.73 SAR0.00 100% 0% 09-Sep-24, Sta 0+000-0+200
BASE SLAB 71 19-Jan-23 11-Apr-23 26-Mar-24 24-Jun-24 SAR1,100,397.32 SAR0.00 100% 0% 24-Jun-24, BASE SLAB
CULVERT WALL
CULVE 56 13-Mar-23 20-May-23 21-May-24 29-Jul-24 SAR1,272,189.95 SAR0.00 100% 0% 29-Jul-24, CULVERT WALL
TOP SSLAB 41 29-Apr-23 14-Jun-23 08-Jul-24 24-Aug-24 SAR1,015,077.14 SAR0.00 100% 0% 24-Aug-24, TOP SLAB
PLAIN CONCRETE 10 08-Jun-23 19-Jun-23 18-Aug-24 28-Aug-24 SAR590,491.28 SAR0.00 100% 0% 28-Aug-24, PLAIN CONCRETE
FINISHING
FINISH 10 20-Jun-23 04-Jul-23 29-Aug-24 09-Sep-24 SAR735,162.02 SAR0.00 100% 0% 09-Sep-24, FINISHING
Sta 0+200-0+338
0+20 146 08-Feb-23 03-Aug-23 18-Apr-24 10-Oct-24 SAR4,713,317.73 SAR0.00 100% 0% 10-Oct-24, Sta 0+200-0+338
BASE SLAB 69 08-Feb-23 02-May-23 18-Apr-24 11-Jul-24 SAR1,100,397.32 SAR0.00 100% 0% 11-Jul-24, BASE SLAB
CULVERT WALL
CULVE 56 30-Mar-23 06-Jun-23 08-Jun-24 15-Aug-24 SAR1,272,189.95 SAR0.00 100% 0% 15-Aug-24, CULVERT WALL
TOP SSLAB 41 29-May-23 18-Jul-23 07-Aug-24 24-Sep-24 SAR1,015,077.14 SAR0.00 100% 0% 24-Sep-24, TOP SLAB
PLAIN CONCRETE 10 12-Jul-23 23-Jul-23 17-Sep-24 29-Sep-24 SAR590,491.28 SAR0.00 100% 0% 29-Sep-24, PLAIN CONCRETE
FINISHING
FINISH 10 24-Jul-23 03-Aug-23 30-Sep-24 10-Oct-24 SAR735,162.02 SAR0.00 100% 0% 10-Oct-24, FINISHING
BACKFILLING UPTO TUNNEL WALL 149 12-Feb-23 03-Aug-23 22-Apr-24 17-Oct-24 SAR9,483,440.86 SAR0.00 100% 0% 17-Oct-24, BACKFILLING UPTO TUN
STRUCTURAL FILL 140 11-Mar-23 27-Aug-23 19-May-24 03-Nov-24 SAR9,483,440.86 SAR0.00 100% 0% 03-Nov-24, STRUCTURAL FILL
WET & DRY UTILITIES
UT 190 05-Jul-23 01-Feb-24 10-Sep-24 24-Apr-25 SAR5,305,528.44 SAR0.00 93.68% 0% 24-Apr-25, WET & DRY UTILIT
INSIDE WET CULVERT 135 05-Jul-23 14-Jan-24 10-Sep-24 15-Feb-25 SAR3,412,899.14 SAR0.00 91.75% 0% 15-Feb-25, INSIDE WET CULVER
POTABLE WATER NETWORK 70 05-Jul-23 25-Sep-23 10-Sep-24 01-Dec-24 SAR427,352.76 SAR0.00 100% 0% 01-Dec-24, POTABLE WATER NETW
GREY WAWATER DISTRIBUTION SYSTEM 80 08-Jul-23 07-Oct-23 10-Sep-24 12-Dec-24 SAR131,486.77 SAR0.00 100% 0% 12-Dec-24, GREY WATER DISTRIBU

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
44 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
IRRIGATI
IRRIGATION NETWORK 65 12-Aug-23 26-Oct-23 16-Oct-24 30-Dec-24 SAR445,772.78 SAR0.00 100% 0% 30-Dec-24, IRRIGATION NETWORK
CHILLED WATER SUPPLY NETWORK 70 28-Aug-23 18-Nov-23 31-Oct-24 21-Jan-25 SAR782,691.15 SAR0.00 100% 0% 21-Jan-25, CHILLED WATER SUPP
CHILLED WATER RETURN NETWORK 80 28-Aug-23 29-Nov-23 31-Oct-24 02-Feb-25 SAR782,691.15 SAR0.00 100% 0% 02-Feb-25, CHILLED WATER RETU
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 70 25-Oct-23 14-Jan-24 25-Nov-24 15-Feb-25 SAR842,904.54 SAR0.00 66.6% 0% 15-Feb-25, AUTOMATIC WASTE C
INSIDE DRY CULVERT 169 19-Jul-23 01-Feb-24 05-Oct-24 24-Apr-25 SAR1,892,629.31 SAR0.00 97.16% 0% 24-Apr-25, INSIDE DRY CULVE
POWER 169 19-Jul-23 01-Feb-24 05-Oct-24 24-Apr-25 SAR1,703,740.42 SAR0.00 100% 0% 24-Apr-25, POWER
HIGH VOLTAGE
V 110 KV NETWORK 30 19-Jul-23 22-Aug-23 05-Oct-24 09-Nov-24 SAR108,118.10 SAR0.00 100% 0% 09-Nov-24, HIGH VOLTAGE 110 KV N
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 27 23-Aug-23 24-Sep-23 09-Nov-24 10-Dec-24 SAR1,382,859.12 SAR0.00 100% 0% 10-Dec-24, MEDIUM VOLTAGE 13.8
LOW VVOLTAGE NETWORK 27 23-Aug-23 24-Sep-23 09-Nov-24 10-Dec-24 SAR212,763.20 SAR0.00 100% 0% 10-Dec-24, LOW VOLTAGE NETWO
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 112 25-Sep-23 01-Feb-24 10-Dec-24 24-Apr-25 SAR0.00 SAR0.00 0% 0% 24-Apr-25, ELECTRICAL DISTR
LIGHTING SYSTEM
LIGHT 58 12-Oct-23 18-Dec-23 28-Dec-24 05-Mar-25 SAR0.00 SAR0.00 0% 0% 05-Mar-25, LIGHTING SYSTEM
TELECOM SERVICES 50 09-Nov-23 06-Jan-24 18-Jan-25 17-Mar-25 SAR188,888.89 SAR0.00 71.5% 0% 17-Mar-25, TELECOM SERVICES
MEP VEHICULAR
VEHICULA TUNNEL/ DRY & WET CULVERTS 467 22-Aug-23 26-Feb-25 29-Oct-24 11-May-26 SAR8,461,885.89 SAR0.00 21.35% 0% 11-May-26, MEP V
TUNNEL MECHANICAL
ME WORKS 251 22-Aug-23 13-Jun-24 29-Oct-24 25-Aug-25 SAR2,434,332.12 SAR0.00 73.95% 0% 25-Aug-25, TUNNEL MECH
FIRE FIG
FIGHTING SYSTEM 88 22-Aug-23 03-Dec-23 29-Oct-24 08-Feb-25 SAR1,770,531.47 SAR0.00 100% 0% 08-Feb-25, FIRE FIGHTING SYST
VENTILATION SYSTEM
VENTILA 45 04-Dec-23 24-Jan-24 09-Feb-25 06-Apr-25 SAR198,532.64 SAR0.00 14.99% 0% 06-Apr-25, VENTILATION SYST
PUMPS INSTALLATION
I 26 25-Jan-24 24-Feb-24 07-Apr-25 06-May-25 SAR373,059.88 SAR0.00 0% 0% 06-May-25, PUMPS INSTALLA
DUCTING SYSTEM 92 25-Feb-24 13-Jun-24 07-May-25 25-Aug-25 SAR92,208.14 SAR0.00 0% 0% 25-Aug-25, DUCTING SYS
TUNNEL ELECTRICAL
EL WORKS 372 04-Dec-23 18-Feb-25 09-Feb-25 03-May-26 SAR5,117,308.81 SAR0.00 0.12% 0% 03-May-26, TUNN
CABLE TRAYS
T 135 04-Dec-23 12-May-24 09-Feb-25 23-Jul-25 SAR1,161,130.86 SAR0.00 0.54% 0% 23-Jul-25, CABLE TRAYS
POWER CABLES 179 12-Mar-24 15-Oct-24 24-May-25 22-Dec-25 SAR1,569,908.53 SAR0.00 0% 0% 22-Dec-25, POWER CA
ELECTRICAL INSTALLATIONS
ELECTRI 87 16-Oct-24 25-Jan-25 23-Dec-25 08-Apr-26 SAR1,284,573.04 SAR0.00 0% 0% 08-Apr-26, ELECTR
LOW CUR
CURRENT 237 13-May-24 18-Feb-25 24-Jul-25 03-May-26 SAR1,101,696.38 SAR0.00 0% 0% 03-May-26, LOW
FIRE D
DETECTION AND ALARM SYSTEM 125 13-May-24 10-Oct-24 24-Jul-25 18-Dec-25 SAR188,308.55 SAR0.00 0% 0% 18-Dec-25, FIRE DETE
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 52 06-Oct-24 04-Dec-24 13-Dec-25 10-Feb-26 SAR156,905.46 SAR0.00 0% 0% 10-Feb-26, COMMUN
PUBLIC ADDRESS
PUBLI 44 05-Dec-24 25-Jan-25 11-Feb-26 08-Apr-26 SAR121,709.61 SAR0.00 0% 0% 08-Apr-26, PUBLIC
VIDEO SURVEILLANCE 49 12-Oct-24 07-Dec-24 18-Dec-25 14-Feb-26 SAR146,452.73 SAR0.00 0% 0% 14-Feb-26, VIDEO SU
SACADA SYSTEM
SACA 35 08-Dec-24 16-Jan-25 14-Feb-26 31-Mar-26 SAR390,983.87 SAR0.00 0% 0% 31-Mar-26, SACAD
RADIO RE-BROADCASTING SYSTEM 28 18-Jan-25 18-Feb-25 31-Mar-26 03-May-26 SAR97,336.17 SAR0.00 0% 0% 03-May-26, RADIO
TUNNEL PLUMBING
PL WORKS 35 18-Jan-25 26-Feb-25 31-Mar-26 11-May-26 SAR910,244.95 SAR0.00 0% 0% 11-May-26, TUNN
DRAINAGE SYSTEM
DRAINAG 35 18-Jan-25 26-Feb-25 31-Mar-26 11-May-26 SAR910,244.95 SAR0.00 0% 0% 11-May-26, DRAI
TUNNEL INTERNAL
INTER ROAD WORK 42 27-Feb-25 21-Apr-25 11-May-26 02-Jul-26 SAR1,434,734.72 SAR0.00 0% 0% 02-Jul-26, TUNN
TUNNEL INTERNAL
INTER DECORATIVE WORKS 44 07-Apr-25 27-May-25 17-Jun-26 08-Aug-26 SAR2,408,833.62 SAR0.00 0% 0% 08-Aug-26, TU
TUNNEL 2 1148 27-Jun-22 25-Jun-25 27-Jun-22 A 31-Mar-26 SAR144,409,966.83 SAR50,094,953.19 90.69% 34.69% 31-Mar-26, TUNNE
ZONE 10 - FROM STA. 0+000 ~ 0+432 1148 27-Jun-22 25-Jun-25 27-Jun-22 A 31-Mar-26 SAR144,409,966.83 SAR50,094,953.19 90.69% 34.69% 31-Mar-26, ZONE 1
ENGINEERING 721 27-Jun-22 13-Sep-23 27-Jun-22 A 04-Nov-24 SAR0.00 SAR0.00 0% 0% 04-Nov-24, ENGINEERING
SITE SURVEY 15 27-Jun-22 17-Jul-22 27-Jun-22 A 11-Sep-22 A SAR0.00 SAR0.00 0% 0% 11-Sep-22 A, SITE SURVEY
SHOP DRAWINGS
DRAWIN 473 27-Jun-22 02-Nov-22 27-Jun-22 A 10-Jan-24 SAR0.00 SAR0.00 0% 0% 10-Jan-24, SHOP DRAWINGS
CIVIL/STRUCTURAL 0+015 ~0+102
CIVIL/STRU 229 27-Jun-22 31-Aug-22 27-Jun-22 A 05-Jul-23 A SAR0.00 SAR0.00 0% 0% 05-Jul-23 A, CIVIL/STRUCTURAL 0+015 ~0+102
CIVIL/STRUCTURAL 0+102 ~0+202
CIVIL/STRU 211 21-Jul-22 21-Sep-22 21-Jul-22 A 26-Jun-23 A SAR0.00 SAR0.00 0% 0% 26-Jun-23 A, CIVIL/STRUCTURAL 0+102 ~0+202
CIVIL/STRUCTURAL 0+202 ~0+302
CIVIL/STRU 319 11-Aug-22 12-Oct-22 11-Aug-22 A 05-Jul-23 A SAR0.00 SAR0.00 0% 0% 05-Jul-23 A, CIVIL/STRUCTURAL 0+202 ~0+302
CIVIL/STRUCTURAL 0+302 ~0+402
CIVIL/STRU 419 01-Sep-22 02-Nov-22 05-Sep-22 A 10-Jan-24 SAR0.00 SAR0.00 0% 0% 10-Jan-24, CIVIL/STRUCTURAL 0+302 ~0+402
ARCHITECTURAL
ARCHITECT 21 29-Sep-22 24-Oct-22 16-Dec-23 09-Jan-24 SAR0.00 SAR0.00 0% 0% 09-Jan-24, ARCHITECTURAL
UTILITIES 468 25-Oct-22 10-May-23 25-Oct-22 A 04-May-24 SAR0.00 SAR0.00 0% 0% 04-May-24, UTILITIES
WET UTILITIES
UTILIT 463 25-Oct-22 22-Mar-23 25-Oct-22 A 28-Apr-24 SAR0.00 SAR0.00 0% 0% 28-Apr-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 22 25-Oct-22 19-Nov-22 25-Oct-22 A 13-Nov-22 A SAR0.00 SAR0.00 0% 0% 13-Nov-22 A, POTABLE WATER NETWORK BRANCH, HOUSE
GREY WA
WATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 25 20-Nov-22 18-Dec-22 13-Dec-22 A 22-Jan-24 SAR0.00 SAR0.00 0% 0% 22-Jan-24, GREY WATER DISTRIBUTION NETW
IRR & FF NETWORK BRANCHES & TIE IN POINTS 27 19-Dec-22 18-Jan-23 22-Jan-24 22-Feb-24 SAR0.00 SAR0.00 0% 0% 22-Feb-24, IRR & FF NETWORK BRANCHES
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 22 19-Jan-23 13-Feb-23 22-Feb-24 19-Mar-24 SAR0.00 SAR0.00 0% 0% 19-Mar-24, CHILLED WATER SUPPLY & RET
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 32 14-Feb-23 22-Mar-23 19-Mar-24 28-Apr-24 SAR0.00 SAR0.00 0% 0% 28-Apr-24, AUTOMATIC WASTE COLLECTI
DRY UTILITI
UTILITIES 407 20-Nov-22 10-May-23 01-Nov-22 A 04-May-24 SAR0.00 SAR0.00 0% 0% 04-May-24, DRY UTILITIES
POWER 349 20-Nov-22 30-Mar-23 01-Nov-22 A 25-Mar-24 SAR0.00 SAR0.00 0% 0% 25-Mar-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 17 20-Nov-22 08-Dec-22 09-Jan-24 28-Jan-24 SAR0.00 SAR0.00 0% 0% 28-Jan-24, HIGH VOLTAGE 110 KV NETWORK
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 22 10-Dec-22 03-Jan-23 28-Jan-24 22-Feb-24 SAR0.00 SAR0.00 0% 0% 22-Feb-24, MEDIUM VOLTAGE 13.8 KV NETW
LOW VVOLTAGE NETWORK 27 04-Jan-23 04-Feb-23 27-Nov-22 A 25-Mar-24 SAR0.00 SAR0.00 0% 0% 25-Mar-24, LOW VOLTAGE NETWORK
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 25 05-Feb-23 05-Mar-23 01-Nov-22 A 12-Nov-22 A SAR0.00 SAR0.00 0% 0% 12-Nov-22 A, ELECTRICAL DISTRIBUTION SYSTEM
LIGHTING SYSTEM
LIGHT 22 06-Mar-23 30-Mar-23 26-Nov-22 A 27-Dec-22 A SAR0.00 SAR0.00 0% 0% 27-Dec-22 A, LIGHTING SYSTEM
LOW CUR
CURRENT 32 01-Apr-23 10-May-23 25-Mar-24 04-May-24 SAR0.00 SAR0.00 0% 0% 04-May-24, LOW CURRENT
TELECOM SERVICES
TELEC 32 01-Apr-23 10-May-23 25-Mar-24 04-May-24 SAR0.00 SAR0.00 0% 0% 04-May-24, TELECOM SERVICES
MEP 621 25-Oct-22 13-Sep-23 01-Dec-22 A 04-Nov-24 SAR0.00 SAR0.00 0% 0% 04-Nov-24, MEP
TUNNEL MECHANICAL
ME WORKS 536 25-Oct-22 21-May-23 01-Dec-22 A 27-Jul-24 SAR0.00 SAR0.00 0% 0% 27-Jul-24, TUNNEL MECHANICAL WOR
FIRE FIG
FIGHTING SYSTEM 448 25-Oct-22 04-Feb-23 01-Dec-22 A 07-Apr-24 SAR0.00 SAR0.00 0% 0% 07-Apr-24, FIRE FIGHTING SYSTEM

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
45 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
VENTILA
VENTILATION SYSTEM 44 22-Jan-23 13-Mar-23 24-Mar-24 18-May-24 SAR0.00 SAR0.00 0% 0% 18-May-24, VENTILATION SYSTEM
PUMPS INSTALLATION
I 22 14-Mar-23 08-Apr-23 18-May-24 12-Jun-24 SAR0.00 SAR0.00 0% 0% 12-Jun-24, PUMPS INSTALLATION
DUCTING SYSTEM 88 05-Feb-23 21-May-23 07-Apr-24 27-Jul-24 SAR0.00 SAR0.00 0% 0% 27-Jul-24, DUCTING SYSTEM
TUNNEL ELECTRICAL
EL WORKS 533 05-Feb-23 13-Sep-23 04-Dec-22 A 04-Nov-24 SAR0.00 SAR0.00 0% 0% 04-Nov-24, TUNNEL ELECTRICAL W
CABLE TRAYS
T 110 16-Feb-23 01-Jul-23 22-Apr-24 02-Sep-24 SAR0.00 SAR0.00 0% 0% 02-Sep-24, CABLE TRAYS
POWER CABLES 44 20-Apr-23 13-Jun-23 29-Jun-24 19-Aug-24 SAR0.00 SAR0.00 0% 0% 19-Aug-24, POWER CABLES
ELECTRICAL INSTALLATIONS
ELECTRI 459 06-May-23 13-Sep-23 04-Dec-22 A 04-Nov-24 SAR0.00 SAR0.00 0% 0% 04-Nov-24, ELECTRICAL INSTALLAT
LOW CUR
CURRENT 481 05-Feb-23 15-Jul-23 04-Dec-22 A 03-Sep-24 SAR0.00 SAR0.00 0% 0% 03-Sep-24, LOW CURRENT
FIRE D
DETECTION AND ALARM SYSTEM 481 05-Feb-23 15-Jul-23 04-Dec-22 A 03-Sep-24 SAR0.00 SAR0.00 0% 0% 03-Sep-24, FIRE DETECTION AND ALA
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 110 16-Feb-23 01-Jul-23 16-Apr-24 27-Aug-24 SAR0.00 SAR0.00 0% 0% 27-Aug-24, COMMUNICATION SYSTEM
PUBLIC ADDRESS
PUBLI 66 05-Mar-23 23-May-23 02-May-24 23-Jul-24 SAR0.00 SAR0.00 0% 0% 23-Jul-24, PUBLIC ADDRESS
VIDEO SURVEILLANCE 44 16-Mar-23 09-May-23 14-May-24 09-Jul-24 SAR0.00 SAR0.00 0% 0% 09-Jul-24, VIDEO SURVEILLANCE
SACADA SYSTEM
SACA 44 28-Mar-23 21-May-23 26-May-24 21-Jul-24 SAR0.00 SAR0.00 0% 0% 21-Jul-24, SACADA SYSTEM
RADIO RE-BROADCASTING SYSTEM 44 09-Apr-23 01-Jun-23 06-Jun-24 01-Aug-24 SAR0.00 SAR0.00 0% 0% 01-Aug-24, RADIO RE-BROADCASTING
TUNNEL PLUMBING
PL WORKS 21 28-Feb-23 23-Mar-23 04-May-24 28-May-24 SAR0.00 SAR0.00 0% 0% 28-May-24, TUNNEL PLUMBING WORKS
PROCUREMENT 643 29-Sep-22 31-Oct-23 29-Sep-22 A 04-Nov-24 SAR14,092,874.52 SAR5,971,388.10 100% 42.37% 04-Nov-24, PROCUREMENT
CIVIL/STRUCTU
CIVIL/STRUCTURAL 208 29-Sep-22 05-Dec-22 29-Sep-22 A 21-Dec-23 SAR8,989,121.93 SAR5,971,388.10 100% 66.43% 21-Dec-23, CIVIL/STRUCTURAL
UTILITIES 241 20-Nov-22 31-Oct-23 09-Jan-24 26-Oct-24 SAR634,032.25 SAR0.00 100% 0% 26-Oct-24, UTILITIES
WET UTILITIES
UTILIT 236 20-Nov-22 24-Oct-23 09-Jan-24 20-Oct-24 SAR418,777.39 SAR0.00 100% 0% 20-Oct-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 164 20-Nov-22 13-Jun-23 09-Jan-24 27-Jul-24 SAR75,415.19 SAR0.00 100% 0% 27-Jul-24, POTABLE WATER NETWORK
DI PIPES
PIP 145 20-Nov-22 10-May-23 09-Jan-24 03-Jul-24 SAR8,295.67 SAR0.00 100% 0% 03-Jul-24, DI PIPES
HDPE PIPES 145 20-Nov-22 10-May-23 09-Jan-24 03-Jul-24 SAR9,803.98 SAR0.00 100% 0% 03-Jul-24, HDPE PIPES
GRP PPIPES 145 20-Nov-22 10-May-23 09-Jan-24 03-Jul-24 SAR7,541.52 SAR0.00 100% 0% 03-Jul-24, GRP PIPES
DI & G
GRP FITTING 145 20-Nov-22 10-May-23 09-Jan-24 03-Jul-24 SAR7,541.52 SAR0.00 100% 0% 03-Jul-24, DI & GRP FITTING
GATE VALVE 145 24-Dec-22 13-Jun-23 09-Jan-24 03-Jul-24 SAR7,541.52 SAR0.00 100% 0% 03-Jul-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 145 24-Dec-22 13-Jun-23 09-Jan-24 03-Jul-24 SAR6,787.37 SAR0.00 100% 0% 03-Jul-24, BUTTERFLAY VALVE
WATER METER
WATE 144 20-Nov-22 10-May-23 01-Feb-24 27-Jul-24 SAR11,312.28 SAR0.00 100% 0% 27-Jul-24, WATER METER
AIR RELASE
RE VALVE 145 24-Dec-22 13-Jun-23 09-Jan-24 03-Jul-24 SAR7,541.52 SAR0.00 100% 0% 03-Jul-24, AIR RELASE VALVE
WASHOUT VALVE
WASH 145 24-Dec-22 13-Jun-23 09-Jan-24 03-Jul-24 SAR9,049.82 SAR0.00 100% 0% 03-Jul-24, WASHOUT VALVE
GREY WAWATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 145 19-Dec-22 13-Jun-23 22-Jan-24 17-Jul-24 SAR23,203.55 SAR0.00 100% 0% 17-Jul-24, GREY WATER DISTRIBUTION
DI PIPES
PIP 145 19-Dec-22 08-Jun-23 22-Jan-24 17-Jul-24 SAR3,944.60 SAR0.00 100% 0% 17-Jul-24, DI PIPES
HDPE PIPES 145 19-Dec-22 08-Jun-23 22-Jan-24 17-Jul-24 SAR4,176.64 SAR0.00 100% 0% 17-Jul-24, HDPE PIPES
GRP PPIPES 145 19-Dec-22 08-Jun-23 22-Jan-24 17-Jul-24 SAR3,016.46 SAR0.00 100% 0% 17-Jul-24, GRP PIPES
DI & G
GRP FITTING 145 19-Dec-22 08-Jun-23 22-Jan-24 17-Jul-24 SAR2,784.43 SAR0.00 100% 0% 17-Jul-24, DI & GRP FITTING
GATE VALVE 145 24-Dec-22 13-Jun-23 22-Jan-24 17-Jul-24 SAR1,624.25 SAR0.00 100% 0% 17-Jul-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 145 24-Dec-22 13-Jun-23 22-Jan-24 17-Jul-24 SAR2,320.35 SAR0.00 100% 0% 17-Jul-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 145 24-Dec-22 13-Jun-23 22-Jan-24 17-Jul-24 SAR2,552.39 SAR0.00 100% 0% 17-Jul-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 145 24-Dec-22 13-Jun-23 22-Jan-24 17-Jul-24 SAR2,784.43 SAR0.00 100% 0% 17-Jul-24, WASEHOUT VALVE
IRR & FF NETWORK BRANCHES & TIE IN POINTS 145 19-Jan-23 07-Aug-23 22-Feb-24 18-Aug-24 SAR49,226.44 SAR0.00 100% 0% 18-Aug-24, IRR & FF NETWORK BRAN
HDPE PIPES 145 19-Jan-23 13-Jul-23 22-Feb-24 18-Aug-24 SAR12,306.61 SAR0.00 100% 0% 18-Aug-24, HDPE PIPES
GATE VALVE 145 19-Jan-23 13-Jul-23 22-Feb-24 18-Aug-24 SAR4,922.64 SAR0.00 100% 0% 18-Aug-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 145 19-Jan-23 13-Jul-23 22-Feb-24 18-Aug-24 SAR4,922.64 SAR0.00 100% 0% 18-Aug-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 145 19-Jan-23 13-Jul-23 22-Feb-24 18-Aug-24 SAR4,922.64 SAR0.00 100% 0% 18-Aug-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 145 19-Jan-23 13-Jul-23 22-Feb-24 18-Aug-24 SAR4,922.64 SAR0.00 100% 0% 18-Aug-24, WASEHOUT VALVE
FIRE H
HYDRANT 145 13-Feb-23 07-Aug-23 22-Feb-24 18-Aug-24 SAR17,229.25 SAR0.00 100% 0% 18-Aug-24, FIRE HYDRANT
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 145 14-Feb-23 08-Aug-23 19-Mar-24 11-Sep-24 SAR184,162.62 SAR0.00 100% 0% 11-Sep-24, CHILLED WATER SUPPLY &
MILD STEEL PIPE 145 14-Feb-23 08-Aug-23 19-Mar-24 11-Sep-24 SAR73,665.05 SAR0.00 100% 0% 11-Sep-24, MILD STEEL PIPE
MILD STEEL FITTING 145 14-Feb-23 08-Aug-23 19-Mar-24 11-Sep-24 SAR73,665.05 SAR0.00 100% 0% 11-Sep-24, MILD STEEL FITTING
GATE VALVE 145 14-Feb-23 08-Aug-23 19-Mar-24 11-Sep-24 SAR36,832.52 SAR0.00 100% 0% 11-Sep-24, GATE VALVE
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 145 04-May-23 24-Oct-23 28-Apr-24 20-Oct-24 SAR86,769.59 SAR0.00 100% 0% 20-Oct-24, AUTOMATIC WASTE COL
AUTOMATIC WASTE
AUTO 145 04-May-23 24-Oct-23 28-Apr-24 20-Oct-24 SAR86,769.59 SAR0.00 100% 0% 20-Oct-24, AUTOMATIC WASTE
DRY UTILITI
UTILITIES 221 10-Dec-22 31-Oct-23 01-Feb-24 26-Oct-24 SAR215,254.86 SAR0.00 100% 0% 26-Oct-24, DRY UTILITIES
POWER 189 10-Dec-22 24-Sep-23 01-Feb-24 17-Sep-24 SAR200,440.05 SAR0.00 100% 0% 17-Sep-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 144 10-Dec-22 30-May-23 01-Feb-24 27-Jul-24 SAR12,719.78 SAR0.00 100% 0% 27-Jul-24, HIGH VOLTAGE 110 KV NETW
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 145 04-Jan-23 25-Jun-23 22-Feb-24 18-Aug-24 SAR162,689.31 SAR0.00 100% 0% 18-Aug-24, MEDIUM VOLTAGE 13.8 KV
LOW V VOLTAGE NETWORK 145 05-Feb-23 30-Jul-23 25-Mar-24 17-Sep-24 SAR25,030.97 SAR0.00 100% 0% 17-Sep-24, LOW VOLTAGE NETWORK
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 145 15-Mar-23 06-Sep-23 25-Mar-24 17-Sep-24 SAR0.00 SAR0.00 0% 0% 17-Sep-24, ELECTRICAL DISTRIBUTIO
LIGHTING SYSTEM
LIGHT 145 01-Apr-23 24-Sep-23 25-Mar-24 17-Sep-24 SAR0.00 SAR0.00 0% 0% 17-Sep-24, LIGHTING SYSTEM
LOW CUR
CURRENT 145 11-May-23 31-Oct-23 04-May-24 26-Oct-24 SAR14,814.81 SAR0.00 100% 0% 26-Oct-24, LOW CURRENT
TELECOM SERVICES
TELEC 145 11-May-23 31-Oct-23 04-May-24 26-Oct-24 SAR14,814.81 SAR0.00 100% 0% 26-Oct-24, TELECOM SERVICES
MEP 235 20-Oct-22 27-Jul-23 16-Dec-23 22-Sep-24 SAR4,469,720.33 SAR0.00 100% 0% 22-Sep-24, MEP
ARCHITECTURAL
ARCHITECTUR 114 25-Oct-22 07-Mar-23 09-Jan-24 25-May-24 SAR0.00 SAR0.00 0% 0% 25-May-24, ARCHITECTURAL

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
46 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
CONSTRUCTION 1144 02-Jul-22 25-Jun-25 02-Jul-22 A 31-Mar-26 SAR130,317,092.32 SAR44,123,565.09 89.68% 33.86% 31-Mar-26, CONST
GENERAL SITE ARRANGEMENT 357 18-Jul-22 04-Aug-22 18-Jul-22 A 22-Oct-23 A SAR1,115,517.09 SAR1,115,517.09 100% 100% 22-Oct-23 A, GENERAL SITE ARRANGEMENT
SITE PREPARATION
PREPA 357 18-Jul-22 04-Aug-22 18-Jul-22 A 22-Oct-23 A SAR1,115,517.09 SAR1,115,517.09 100% 100% 22-Oct-23 A, SITE PREPARATION
GEO-TECHNICAL INVESTIGATION
GEO-TECHNICA 30 02-Jul-22 08-Aug-22 02-Jul-22 A 01-Oct-22 A SAR146,057.30 SAR146,057.30 100% 100% 01-Oct-22 A, GEO-TECHNICAL INVESTIGATION
EXCAVATION & DEWATERING 568 09-Aug-22 01-Aug-23 08-Oct-22 A 30-Jun-24 SAR28,426,255.99 SAR21,716,010.85 100% 76.39% 30-Jun-24, EXCAVATION & DEWATERING
SOIL IMPROVEMENT
IMPROVE 211 29-Aug-22 21-Nov-22 06-Dec-22 A 23-Jan-24 SAR8,096,879.89 SAR7,084,769.91 100% 87.5% 23-Jan-24, SOIL IMPROVEMENT
STRUCTURAL WORKS 431 10-Sep-22 31-Aug-23 31-Jan-23 A 27-Oct-24 SAR45,188,034.63 SAR14,061,209.94 100% 31.12% 27-Oct-24, STRUCTURAL WORKS
STA. 0+014.665
0+014. ~ 0+042.48 113 10-Sep-22 18-Jan-23 16-Dec-23 28-Apr-24 SAR2,378,317.61 SAR0.00 100% 0% 28-Apr-24, STA. 0+014.665 ~ 0+042.48
BASE SLAB
SL 27 10-Sep-22 10-Oct-22 16-Dec-23 15-Jan-24 SAR657,949.43 SAR0.00 100% 0% 15-Jan-24, BASE SLAB
COLUMNS
COLUMN 23 11-Oct-22 06-Nov-22 16-Jan-24 11-Feb-24 SAR45,543.31 SAR0.00 100% 0% 11-Feb-24, COLUMNS
TUNNEL WALLS 37 11-Oct-22 22-Nov-22 16-Jan-24 27-Feb-24 SAR453,923.47 SAR0.00 100% 0% 27-Feb-24, TUNNEL WALLS
TOP SALB
SAL 37 09-Nov-22 21-Dec-22 14-Feb-24 27-Mar-24 SAR726,878.68 SAR0.00 100% 0% 27-Mar-24, TOP SALB
FINISHING
FINISHIN 24 22-Dec-22 18-Jan-23 28-Mar-24 28-Apr-24 SAR494,022.73 SAR0.00 100% 0% 28-Apr-24, FINISHING
STA. 0+042.48
0+042. ~ 0+062.48 113 29-Sep-22 07-Feb-23 04-Jan-24 18-May-24 SAR2,378,317.61 SAR0.00 100% 0% 18-May-24, STA. 0+042.48 ~ 0+062.48
BASE SLAB
SL 27 29-Sep-22 30-Oct-22 04-Jan-24 04-Feb-24 SAR657,949.43 SAR0.00 100% 0% 04-Feb-24, BASE SLAB
COLUMNS
COLUMN 23 31-Oct-22 26-Nov-22 05-Feb-24 02-Mar-24 SAR45,543.31 SAR0.00 100% 0% 02-Mar-24, COLUMNS
TUNNEL WALLS 37 31-Oct-22 12-Dec-22 05-Feb-24 18-Mar-24 SAR453,923.47 SAR0.00 100% 0% 18-Mar-24, TUNNEL WALLS
TOP SALB
SAL 37 29-Nov-22 10-Jan-23 05-Mar-24 20-Apr-24 SAR726,878.68 SAR0.00 100% 0% 20-Apr-24, TOP SALB
FINISHING
FINISHIN 24 11-Jan-23 07-Feb-23 21-Apr-24 18-May-24 SAR494,022.73 SAR0.00 100% 0% 18-May-24, FINISHING
STA. 0+062.48
0+062. ~ 0+082.48 264 19-Oct-22 27-Feb-23 23-May-23 A 05-Jun-24 SAR2,378,317.61 SAR1,756,745.55 100% 73.87% 05-Jun-24, STA. 0+062.48 ~ 0+082.48
BASE SLAB
SL 66 19-Oct-22 19-Nov-22 23-May-23 A 07-Aug-23 A SAR657,949.43 SAR657,949.43 100% 100% 07-Aug-23 A, BASE SLAB
COLUMNS
COLUMN 15 20-Nov-22 15-Dec-22 03-Sep-23 A 21-Sep-23 A SAR45,543.31 SAR45,543.31 100% 100% 21-Sep-23 A, COLUMNS
TUNNEL WALLS 94 20-Nov-22 01-Jan-23 26-Aug-23 A 06-Feb-24 SAR453,923.47 SAR404,605.50 100% 89.14% 06-Feb-24, TUNNEL WALLS
TOP SALB
SAL 39 19-Dec-22 30-Jan-23 14-Oct-23 A 17-Feb-24 SAR726,878.68 SAR648,647.32 100% 89.24% 17-Feb-24, TOP SALB
FINISHING
FINISHIN 91 31-Jan-23 27-Feb-23 18-Feb-24 05-Jun-24 SAR494,022.73 SAR0.00 100% 0% 05-Jun-24, FINISHING
STA. 0+082.48
0+082. ~ 0+102.48 274 31-Oct-22 11-Mar-23 09-May-23 A 19-Jun-24 SAR2,378,317.61 SAR768,446.71 100% 32.31% 19-Jun-24, STA. 0+082.48 ~ 0+102.48
BASE SLAB
SL 50 31-Oct-22 30-Nov-22 09-May-23 A 26-Jun-23 A SAR657,949.43 SAR657,949.43 100% 100% 26-Jun-23 A, BASE SLAB
COLUMNS
COLUMN 53 01-Dec-22 27-Dec-22 21-Oct-23 A 13-Dec-23 A SAR45,543.31 SAR45,543.31 100% 100% 13-Dec-23 A, COLUMNS
TUNNEL WALLS 73 01-Dec-22 12-Jan-23 21-Oct-23 A 06-Mar-24 SAR453,923.47 SAR64,953.98 100% 14.31% 06-Mar-24, TUNNEL WALLS
TOP SALB
SAL 37 31-Dec-22 11-Feb-23 22-Feb-24 04-Apr-24 SAR726,878.68 SAR0.00 100% 0% 04-Apr-24, TOP SALB
FINISHING
FINISHIN 58 12-Feb-23 11-Mar-23 06-Apr-24 19-Jun-24 SAR494,022.73 SAR0.00 100% 0% 19-Jun-24, FINISHING
STA. 0+102.48
0+102. ~ 0+122.48 273 12-Nov-22 22-Mar-23 08-May-23 A 29-Jun-24 SAR2,378,317.61 SAR1,521,899.53 100% 63.99% 29-Jun-24, STA. 0+102.48 ~ 0+122.48
BASE SLAB
SL 55 12-Nov-22 12-Dec-22 08-May-23 A 25-Jul-23 A SAR657,949.43 SAR657,949.43 100% 100% 25-Jul-23 A, BASE SLAB
COLUMNS
COLUMN 23 13-Dec-22 08-Jan-23 24-Jan-24 19-Feb-24 SAR45,543.31 SAR0.00 100% 0% 19-Feb-24, COLUMNS
TUNNEL WALLS 129 13-Dec-22 24-Jan-23 09-Sep-23 A 06-Feb-24 SAR453,923.47 SAR404,605.50 100% 89.14% 06-Feb-24, TUNNEL WALLS
TOP SALB
SAL 91 11-Jan-23 22-Feb-23 25-Nov-23 A 17-Mar-24 SAR726,878.68 SAR459,344.61 100% 63.19% 17-Mar-24, TOP SALB
FINISHING
FINISHIN 82 23-Feb-23 22-Mar-23 18-Mar-24 29-Jun-24 SAR494,022.73 SAR0.00 100% 0% 29-Jun-24, FINISHING
STA. 0+122.48
0+122. ~ 0+142.48 272 23-Nov-22 03-Apr-23 07-May-23 A 08-Jul-24 SAR2,378,317.61 SAR1,756,745.55 100% 73.87% 08-Jul-24, STA. 0+122.48 ~ 0+142.48
BASE SLAB
SL 30 23-Nov-22 24-Dec-22 07-May-23 A 15-Jun-23 A SAR657,949.43 SAR657,949.43 100% 100% 15-Jun-23 A, BASE SLAB
COLUMNS
COLUMN 18 25-Dec-22 19-Jan-23 13-Jun-23 A 02-Jul-23 A SAR45,543.31 SAR45,543.31 100% 100% 02-Jul-23 A, COLUMNS
TUNNEL WALLS 120 25-Dec-22 05-Feb-23 24-Jun-23 A 06-Feb-24 SAR453,923.47 SAR404,605.50 100% 89.14% 06-Feb-24, TUNNEL WALLS
TOP SALB
SAL 51 23-Jan-23 06-Mar-23 18-Oct-23 A 17-Feb-24 SAR726,878.68 SAR648,647.32 100% 89.24% 17-Feb-24, TOP SALB
FINISHING
FINISHIN 115 07-Mar-23 03-Apr-23 18-Feb-24 08-Jul-24 SAR494,022.73 SAR0.00 100% 0% 08-Jul-24, FINISHING
STA. 0+142.48
0+142. ~ 0+162.48 327 05-Dec-22 15-Apr-23 19-Feb-23 A 17-Jul-24 SAR2,378,317.61 SAR1,808,682.65 100% 76.05% 17-Jul-24, STA. 0+142.48 ~ 0+162.48
BASE SLAB
SL 66 05-Dec-22 04-Jan-23 19-Feb-23 A 18-Apr-23 A SAR657,949.43 SAR657,949.43 100% 100% 18-Apr-23 A, BASE SLAB
COLUMNS
COLUMN 23 05-Jan-23 31-Jan-23 18-Apr-23 A 09-May-23 A SAR45,543.31 SAR45,543.31 100% 100% 09-May-23 A, COLUMNS
TUNNEL WALLS 89 05-Jan-23 16-Feb-23 24-Aug-23 A 06-Feb-24 SAR453,923.47 SAR404,605.50 100% 89.14% 06-Feb-24, TUNNEL WALLS
TOP SALB
SAL 81 04-Feb-23 18-Mar-23 05-Nov-23 A 06-Feb-24 SAR726,878.68 SAR700,584.41 100% 96.38% 06-Feb-24, TOP SALB
FINISHING
FINISHIN 132 19-Mar-23 15-Apr-23 07-Feb-24 17-Jul-24 SAR494,022.73 SAR0.00 100% 0% 17-Jul-24, FINISHING
STA. 0+162.48
0+162. ~ 0+182.48 353 17-Dec-22 30-Apr-23 31-Jan-23 A 27-Jul-24 SAR2,378,317.61 SAR1,759,145.49 100% 73.97% 27-Jul-24, STA. 0+162.48 ~ 0+182.48
BASE SLAB
SL 86 17-Dec-22 16-Jan-23 31-Jan-23 A 23-May-23 A SAR657,949.43 SAR657,949.43 100% 100% 23-May-23 A, BASE SLAB
COLUMNS
COLUMN 49 17-Jan-23 12-Feb-23 06-Jun-23 A 31-Aug-23 A SAR45,543.31 SAR45,543.31 100% 100% 31-Aug-23 A, COLUMNS
TUNNEL WALLS 125 17-Jan-23 28-Feb-23 07-Jun-23 A 06-Feb-24 SAR453,923.47 SAR404,605.50 100% 89.14% 06-Feb-24, TUNNEL WALLS
TOP SALB
SAL 112 15-Feb-23 29-Mar-23 26-Aug-23 A 08-Feb-24 SAR726,878.68 SAR651,047.26 100% 89.57% 08-Feb-24, TOP SALB
FINISHING
FINISHIN 138 30-Mar-23 30-Apr-23 10-Feb-24 27-Jul-24 SAR494,022.73 SAR0.00 100% 0% 27-Jul-24, FINISHING
STA. 0+182.48
0+182. ~ 0+202.48 351 28-Dec-22 11-May-23 31-Jan-23 A 05-Aug-24 SAR2,378,317.61 SAR703,492.74 100% 29.58% 05-Aug-24, STA. 0+182.48 ~ 0+202.48
BASE SLAB
SL 101 28-Dec-22 28-Jan-23 31-Jan-23 A 13-Jul-23 A SAR657,949.43 SAR657,949.43 100% 100% 13-Jul-23 A, BASE SLAB
COLUMNS
COLUMN 23 29-Jan-23 23-Feb-23 15-Jul-23 A 08-Aug-23 A SAR45,543.31 SAR45,543.31 100% 100% 08-Aug-23 A, COLUMNS
TUNNEL WALLS 37 29-Jan-23 12-Mar-23 24-Jan-24 06-Mar-24 SAR453,923.47 SAR0.00 100% 0% 06-Mar-24, TUNNEL WALLS
TOP SALB
SAL 37 27-Feb-23 10-Apr-23 22-Feb-24 04-Apr-24 SAR726,878.68 SAR0.00 100% 0% 04-Apr-24, TOP SALB
FINISHING
FINISHIN 98 11-Apr-23 11-May-23 06-Apr-24 05-Aug-24 SAR494,022.73 SAR0.00 100% 0% 05-Aug-24, FINISHING
STA. 0+202.48
0+202. ~ 0+222.48 268 09-Jan-23 23-May-23 29-Jul-23 A 14-Aug-24 SAR2,378,317.61 SAR1,328,962.36 100% 55.88% 14-Aug-24, STA. 0+202.48 ~ 0+222.48

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
47 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
BASE SLAB
SL 31 09-Jan-23 08-Feb-23 29-Jul-23 A 24-Aug-23 A SAR657,949.43 SAR657,949.43 100% 100% 24-Aug-23 A, BASE SLAB
COLUMNS
COLUMN 105 09-Feb-23 07-Mar-23 11-Oct-23 A 10-Feb-24 SAR45,543.31 SAR22,887.24 100% 50.25% 10-Feb-24, COLUMNS
TUNNEL WALLS 73 09-Feb-23 23-Mar-23 04-Nov-23 A 06-Feb-24 SAR453,923.47 SAR404,605.50 100% 89.14% 06-Feb-24, TUNNEL WALLS
TOP SALB
SAL 87 11-Mar-23 25-Apr-23 05-Dec-23 A 14-Mar-24 SAR726,878.68 SAR243,520.20 100% 33.5% 14-Mar-24, TOP SALB
FINISHING
FINISHIN 124 26-Apr-23 23-May-23 16-Mar-24 14-Aug-24 SAR494,022.73 SAR0.00 100% 0% 14-Aug-24, FINISHING
STA. 0+222.48
0+222. ~ 0+242.48 285 21-Jan-23 04-Jun-23 20-May-23 A 24-Aug-24 SAR2,378,317.61 SAR1,108,098.24 100% 46.59% 24-Aug-24, STA. 0+222.48 ~ 0+242.48
BASE SLAB
SL 34 21-Jan-23 20-Feb-23 20-May-23 A 02-Aug-23 A SAR657,949.43 SAR657,949.43 100% 100% 02-Aug-23 A, BASE SLAB
COLUMNS
COLUMN 16 21-Feb-23 19-Mar-23 05-Aug-23 A 21-Aug-23 A SAR45,543.31 SAR45,543.31 100% 100% 21-Aug-23 A, COLUMNS
TUNNEL WALLS 49 21-Feb-23 04-Apr-23 04-Nov-23 A 06-Feb-24 SAR453,923.47 SAR404,605.50 100% 89.14% 06-Feb-24, TUNNEL WALLS
TOP SALB
SAL 37 22-Mar-23 07-May-23 24-Jan-24 06-Mar-24 SAR726,878.68 SAR0.00 100% 0% 06-Mar-24, TOP SALB
FINISHING
FINISHIN 139 08-May-23 04-Jun-23 07-Mar-24 24-Aug-24 SAR494,022.73 SAR0.00 100% 0% 24-Aug-24, FINISHING
STA. 0+242.48
0+242. ~ 0+262.48 280 01-Feb-23 15-Jun-23 22-May-23 A 02-Sep-24 SAR2,378,317.61 SAR657,949.43 100% 27.66% 02-Sep-24, STA. 0+242.48 ~ 0+262.48
BASE SLAB
SL 21 01-Feb-23 04-Mar-23 22-May-23 A 13-Aug-23 A SAR657,949.43 SAR657,949.43 100% 100% 13-Aug-23 A, BASE SLAB
COLUMNS
COLUMN 23 05-Mar-23 30-Mar-23 24-Jan-24 19-Feb-24 SAR45,543.31 SAR0.00 100% 0% 19-Feb-24, COLUMNS
TUNNEL WALLS 37 05-Mar-23 16-Apr-23 24-Jan-24 06-Mar-24 SAR453,923.47 SAR0.00 100% 0% 06-Mar-24, TUNNEL WALLS
TOP SALB
SAL 37 03-Apr-23 18-May-23 22-Feb-24 04-Apr-24 SAR726,878.68 SAR0.00 100% 0% 04-Apr-24, TOP SALB
FINISHING
FINISHIN 122 20-May-23 15-Jun-23 06-Apr-24 02-Sep-24 SAR494,022.73 SAR0.00 100% 0% 02-Sep-24, FINISHING
STA. 0+262.48
0+262. ~ 0+282.48 278 13-Feb-23 01-Jul-23 23-May-23 A 11-Sep-24 SAR2,378,317.61 SAR891,041.70 100% 37.47% 11-Sep-24, STA. 0+262.48 ~ 0+282.48
BASE SLAB
SL 25 13-Feb-23 15-Mar-23 23-May-23 A 29-Aug-23 A SAR657,949.43 SAR657,949.43 100% 100% 29-Aug-23 A, BASE SLAB
COLUMNS
COLUMN 23 16-Mar-23 11-Apr-23 25-Nov-23 A 10-Dec-23 A SAR45,543.31 SAR45,543.31 100% 100% 10-Dec-23 A, COLUMNS
TUNNEL WALLS 99 16-Mar-23 01-May-23 13-Nov-23 A 06-Mar-24 SAR453,923.47 SAR187,548.96 100% 41.32% 06-Mar-24, TUNNEL WALLS
TOP SALB
SAL 37 15-Apr-23 30-May-23 22-Feb-24 04-Apr-24 SAR726,878.68 SAR0.00 100% 0% 04-Apr-24, TOP SALB
FINISHING
FINISHIN 130 31-May-23 01-Jul-23 06-Apr-24 11-Sep-24 SAR494,022.73 SAR0.00 100% 0% 11-Sep-24, FINISHING
STA. 0+282.48
0+282. ~ 0+302.48 200 25-Feb-23 12-Jul-23 24-Jan-24 21-Sep-24 SAR2,378,317.61 SAR0.00 100% 0% 21-Sep-24, STA. 0+282.48 ~ 0+302.48
BASE SLAB
SL 27 25-Feb-23 27-Mar-23 24-Jan-24 24-Feb-24 SAR657,949.43 SAR0.00 100% 0% 24-Feb-24, BASE SLAB
COLUMNS
COLUMN 23 28-Mar-23 26-Apr-23 25-Feb-24 21-Mar-24 SAR45,543.31 SAR0.00 100% 0% 21-Mar-24, COLUMNS
TUNNEL WALLS 37 28-Mar-23 13-May-23 25-Feb-24 07-Apr-24 SAR453,923.47 SAR0.00 100% 0% 07-Apr-24, TUNNEL WALLS
TOP SALB
SAL 37 30-Apr-23 11-Jun-23 25-Mar-24 09-May-24 SAR726,878.68 SAR0.00 100% 0% 09-May-24, TOP SALB
FINISHING
FINISHIN 111 12-Jun-23 12-Jul-23 11-May-24 21-Sep-24 SAR494,022.73 SAR0.00 100% 0% 21-Sep-24, FINISHING
STA. 0+302.48
0+302. ~ 0+322.48 198 08-Mar-23 24-Jul-23 05-Feb-24 01-Oct-24 SAR2,378,317.61 SAR0.00 100% 0% 01-Oct-24, STA. 0+302.48 ~ 0+322.48
BASE SLAB
SL 27 08-Mar-23 08-Apr-23 05-Feb-24 06-Mar-24 SAR657,949.43 SAR0.00 100% 0% 06-Mar-24, BASE SLAB
COLUMNS
COLUMN 23 09-Apr-23 08-May-23 07-Mar-24 02-Apr-24 SAR45,543.31 SAR0.00 100% 0% 02-Apr-24, COLUMNS
TUNNEL WALLS 37 09-Apr-23 24-May-23 07-Mar-24 22-Apr-24 SAR453,923.47 SAR0.00 100% 0% 22-Apr-24, TUNNEL WALLS
TOP SALB
SAL 37 11-May-23 22-Jun-23 06-Apr-24 21-May-24 SAR726,878.68 SAR0.00 100% 0% 21-May-24, TOP SALB
FINISHING
FINISHIN 109 24-Jun-23 24-Jul-23 22-May-24 01-Oct-24 SAR494,022.73 SAR0.00 100% 0% 01-Oct-24, FINISHING
STA. 0+322.48
0+322. ~ 0+342.48 196 20-Mar-23 05-Aug-23 17-Feb-24 10-Oct-24 SAR2,378,317.61 SAR0.00 100% 0% 10-Oct-24, STA. 0+322.48 ~ 0+342.48
BASE SLAB
SL 27 20-Mar-23 19-Apr-23 17-Feb-24 18-Mar-24 SAR657,949.43 SAR0.00 100% 0% 18-Mar-24, BASE SLAB
COLUMNS
COLUMN 23 20-Apr-23 20-May-23 19-Mar-24 17-Apr-24 SAR45,543.31 SAR0.00 100% 0% 17-Apr-24, COLUMNS
TUNNEL WALLS 37 20-Apr-23 05-Jun-23 19-Mar-24 04-May-24 SAR453,923.47 SAR0.00 100% 0% 04-May-24, TUNNEL WALLS
TOP SALB
SAL 37 23-May-23 08-Jul-23 21-Apr-24 02-Jun-24 SAR726,878.68 SAR0.00 100% 0% 02-Jun-24, TOP SALB
FINISHING
FINISHIN 107 09-Jul-23 05-Aug-23 03-Jun-24 10-Oct-24 SAR494,022.73 SAR0.00 100% 0% 10-Oct-24, FINISHING
STA. 0+342.48
0+342. ~ 0+362.48 194 01-Apr-23 16-Aug-23 28-Feb-24 20-Oct-24 SAR2,378,317.61 SAR0.00 100% 0% 20-Oct-24, STA. 0+342.48 ~ 0+362.48
BASE SLAB
SL 27 01-Apr-23 04-May-23 28-Feb-24 30-Mar-24 SAR657,949.43 SAR0.00 100% 0% 30-Mar-24, BASE SLAB
COLUMNS
COLUMN 23 06-May-23 31-May-23 31-Mar-24 29-Apr-24 SAR45,543.31 SAR0.00 100% 0% 29-Apr-24, COLUMNS
TUNNEL WALLS 37 06-May-23 17-Jun-23 31-Mar-24 15-May-24 SAR453,923.47 SAR0.00 100% 0% 15-May-24, TUNNEL WALLS
TOP SALB
SAL 37 04-Jun-23 19-Jul-23 02-May-24 13-Jun-24 SAR726,878.68 SAR0.00 100% 0% 13-Jun-24, TOP SALB
FINISHING
FINISHIN 105 20-Jul-23 16-Aug-23 19-Jun-24 20-Oct-24 SAR494,022.73 SAR0.00 100% 0% 20-Oct-24, FINISHING
STA. 0+362.48
0+362. ~ 0+382.48 184 12-Apr-23 24-Aug-23 11-Mar-24 20-Oct-24 SAR2,378,317.61 SAR0.00 100% 0% 20-Oct-24, STA. 0+362.48 ~ 0+382.48
BASE SLAB
SL 24 12-Apr-23 13-May-23 11-Mar-24 07-Apr-24 SAR657,949.43 SAR0.00 100% 0% 07-Apr-24, BASE SLAB
COLUMNS
COLUMN 23 14-May-23 08-Jun-23 08-Apr-24 07-May-24 SAR45,543.31 SAR0.00 100% 0% 07-May-24, COLUMNS
TUNNEL WALLS 37 14-May-23 25-Jun-23 08-Apr-24 23-May-24 SAR453,923.47 SAR0.00 100% 0% 23-May-24, TUNNEL WALLS
TOP SALB
SAL 37 12-Jun-23 27-Jul-23 11-May-24 26-Jun-24 SAR726,878.68 SAR0.00 100% 0% 26-Jun-24, TOP SALB
FINISHING
FINISHIN 98 29-Jul-23 24-Aug-23 27-Jun-24 20-Oct-24 SAR494,022.73 SAR0.00 100% 0% 20-Oct-24, FINISHING
STA. 0+382.48
0+382. ~ 0+402.48 181 26-Apr-23 31-Aug-23 21-Mar-24 27-Oct-24 SAR2,378,317.61 SAR0.00 100% 0% 27-Oct-24, STA. 0+382.48 ~ 0+402.48
BASE SLAB
SL 24 26-Apr-23 23-May-23 21-Mar-24 21-Apr-24 SAR657,949.43 SAR0.00 100% 0% 21-Apr-24, BASE SLAB
COLUMNS
COLUMN 21 24-May-23 17-Jun-23 22-Apr-24 15-May-24 SAR45,543.31 SAR0.00 100% 0% 15-May-24, COLUMNS
TUNNEL WALLS 37 24-May-23 09-Jul-23 22-Apr-24 03-Jun-24 SAR453,923.47 SAR0.00 100% 0% 03-Jun-24, TUNNEL WALLS
TOP SALB
SAL 33 22-Jun-23 02-Aug-23 21-May-24 02-Jul-24 SAR726,878.68 SAR0.00 100% 0% 02-Jul-24, TOP SALB
FINISHING
FINISHIN 99 03-Aug-23 31-Aug-23 03-Jul-24 27-Oct-24 SAR494,022.73 SAR0.00 100% 0% 27-Oct-24, FINISHING
EGRESS STAIR-12
STAIR (ZONE-10) 236 01-Nov-22 09-Aug-23 24-Jan-24 03-Nov-24 SAR2,352,338.08 SAR0.00 100% 0% 03-Nov-24, EGRESS STAIR-12 (ZONE
WALL AND 11ST FLIGHT 31 01-Nov-22 06-Dec-22 24-Jan-24 28-Feb-24 SAR544,958.40 SAR0.00 100% 0% 28-Feb-24, WALL AND 1ST FLIGHT
WALL AND 22ND FLIGHT 17 07-Dec-22 26-Dec-22 29-Feb-24 19-Mar-24 SAR111,087.10 SAR0.00 100% 0% 19-Mar-24, WALL AND 2ND FLIGHT

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
48 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
WALL AND 3 3RD FLIGHT 17 27-Dec-22 15-Jan-23 20-Mar-24 08-Apr-24 SAR111,087.10 SAR0.00 100% 0% 08-Apr-24, WALL AND 3RD FLIGHT
WALL AND 4 4TH FLIGHT 17 16-Jan-23 04-Feb-23 13-Apr-24 01-May-24 SAR111,087.10 SAR0.00 100% 0% 01-May-24, WALL AND 4TH FLIGHT
WALL AND 5 5TH FLIGHT 17 05-Feb-23 23-Feb-23 02-May-24 21-May-24 SAR111,087.10 SAR0.00 100% 0% 21-May-24, WALL AND 5TH FLIGHT
WALL AND 6 6TH FLIGHT 17 25-Feb-23 15-Mar-23 22-May-24 10-Jun-24 SAR111,087.10 SAR0.00 100% 0% 10-Jun-24, WALL AND 6TH FLIGHT
WALL AND 7 7TH FLIGHT 17 16-Mar-23 04-Apr-23 11-Jun-24 04-Jul-24 SAR111,087.10 SAR0.00 100% 0% 04-Jul-24, WALL AND 7TH FLIGHT
WALL AND 8 8TH FLIGHT 17 05-Apr-23 27-Apr-23 06-Jul-24 24-Jul-24 SAR111,087.10 SAR0.00 100% 0% 24-Jul-24, WALL AND 8TH FLIGHT
WALL AND 9 9TH FLIGHT 17 29-Apr-23 17-May-23 25-Jul-24 13-Aug-24 SAR111,087.10 SAR0.00 100% 0% 13-Aug-24, WALL AND 9TH FLIGHT
WALL AND 1 10TH FLIGHT 17 18-May-23 06-Jun-23 14-Aug-24 02-Sep-24 SAR111,087.10 SAR0.00 100% 0% 02-Sep-24, WALL AND 10TH FLIGHT
WALL AND 1 11TH FLIGHT 17 07-Jun-23 26-Jun-23 03-Sep-24 22-Sep-24 SAR111,087.10 SAR0.00 100% 0% 22-Sep-24, WALL AND 11TH FLIGHT
TOP SLAB 35 01-Jul-23 09-Aug-23 24-Sep-24 03-Nov-24 SAR696,508.72 SAR0.00 100% 0% 03-Nov-24, TOP SLAB
DRY CULVERT ZONE 10 224 29-Oct-22 23-Jul-23 03-Feb-24 29-Oct-24 SAR9,426,635.45 SAR0.00 100% 0% 29-Oct-24, DRY CULVERT ZONE 10
TUNNEL 2 STA.
S 0+000 ~ 0+392 - @ZONE 10 224 29-Oct-22 23-Jul-23 03-Feb-24 29-Oct-24 SAR9,426,635.45 SAR0.00 100% 0% 29-Oct-24, TUNNEL 2 STA. 0+000 ~ 0
Sta 0+000-0+200
0+00 136 29-Oct-22 04-Apr-23 03-Feb-24 17-Jul-24 SAR4,713,317.73 SAR0.00 100% 0% 17-Jul-24, Sta 0+000-0+200
BASE SLAB 71 29-Oct-22 18-Jan-23 03-Feb-24 28-Apr-24 SAR1,100,397.32 SAR0.00 100% 0% 28-Apr-24, BASE SLAB
CULVERT WALL
CULVE 56 20-Dec-22 22-Feb-23 26-Mar-24 02-Jun-24 SAR1,272,189.95 SAR0.00 100% 0% 02-Jun-24, CULVERT WALL
TOP SSLAB 41 01-Feb-23 20-Mar-23 12-May-24 02-Jul-24 SAR1,015,077.14 SAR0.00 100% 0% 02-Jul-24, TOP SLAB
PLAIN CONCRETE 9 14-Mar-23 23-Mar-23 26-Jun-24 06-Jul-24 SAR590,491.28 SAR0.00 100% 0% 06-Jul-24, PLAIN CONCRETE
FINISHING
FINISH 10 25-Mar-23 04-Apr-23 07-Jul-24 17-Jul-24 SAR735,162.02 SAR0.00 100% 0% 17-Jul-24, FINISHING
Sta 0+200-0+392
0+20 137 07-Feb-23 23-Jul-23 18-May-24 29-Oct-24 SAR4,713,317.73 SAR0.00 100% 0% 29-Oct-24, Sta 0+200-0+392
BASE SLAB 71 07-Feb-23 03-May-23 18-May-24 12-Aug-24 SAR1,100,397.32 SAR0.00 100% 0% 12-Aug-24, BASE SLAB
CULVERT WALL
CULVE 56 01-Apr-23 07-Jun-23 14-Jul-24 16-Sep-24 SAR1,272,189.95 SAR0.00 100% 0% 16-Sep-24, CULVERT WALL
TOP SSLAB 41 17-May-23 06-Jul-23 26-Aug-24 13-Oct-24 SAR1,015,077.14 SAR0.00 100% 0% 13-Oct-24, TOP SLAB
PLAIN CONCRETE 10 01-Jul-23 11-Jul-23 07-Oct-24 17-Oct-24 SAR590,491.28 SAR0.00 100% 0% 17-Oct-24, PLAIN CONCRETE
FINISHING
FINISH 10 12-Jul-23 23-Jul-23 19-Oct-24 29-Oct-24 SAR735,162.02 SAR0.00 100% 0% 29-Oct-24, FINISHING
BACKFILLING UPTO TUNNEL WALL 93 19-Jan-23 01-Aug-23 07-Mar-24 01-Jul-24 SAR8,886,868.66 SAR0.00 100% 0% 01-Jul-24, BACKFILLING UPTO TUNNEL
STRUCTURAL FILL 81 12-Feb-23 27-Aug-23 21-Apr-24 28-Jul-24 SAR8,886,868.66 SAR0.00 100% 0% 28-Jul-24, STRUCTURAL FILL
WET & DRY UTILITIES
UT 382 24-Jul-23 21-Oct-24 30-Oct-24 27-Jan-26 SAR5,389,274.15 SAR0.00 46.89% 0% 27-Jan-26, WET & DR
INSIDE WET CULVERT 382 24-Jul-23 21-Oct-24 30-Oct-24 27-Jan-26 SAR3,559,607.81 SAR0.00 23.13% 0% 27-Jan-26, INSIDE W
POTABLE WATER NETWORK 70 24-Jul-23 14-Oct-23 30-Oct-24 19-Jan-25 SAR641,029.14 SAR0.00 100% 0% 19-Jan-25, POTABLE WATER NETW
GREY WAWATER DISTRIBUTION SYSTEM 65 15-Oct-23 28-Dec-23 20-Jan-25 09-Apr-25 SAR197,230.15 SAR0.00 92.44% 0% 09-Apr-25, GREY WATER DISTR
IRRIGATION NETWORK
IRRIGATI 59 30-Dec-23 06-Mar-24 10-Apr-25 21-Jun-25 SAR418,424.75 SAR0.00 0% 0% 21-Jun-25, IRRIGATION NET
CHILLED WATER SUPPLY NETWORK 64 07-Mar-24 23-May-24 22-Jun-25 03-Sep-25 SAR782,691.15 SAR0.00 0% 0% 03-Sep-25, CHILLED WATE
CHILLED WATER RETURN NETWORK 64 25-May-24 11-Aug-24 04-Sep-25 18-Nov-25 SAR782,691.15 SAR0.00 0% 0% 18-Nov-25, CHILLED W
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 64 07-Aug-24 21-Oct-24 15-Nov-25 27-Jan-26 SAR737,541.47 SAR0.00 0% 0% 27-Jan-26, AUTOMAT
INSIDE DRY CULVERT 357 24-Jul-23 21-Sep-24 30-Oct-24 30-Dec-25 SAR1,829,666.34 SAR0.00 93.12% 0% 30-Dec-25, INSIDE DR
POWER 312 24-Jul-23 30-Jul-24 30-Oct-24 08-Nov-25 SAR1,703,740.42 SAR0.00 100% 0% 08-Nov-25, POWER
HIGH VOLTAGE
V 110 KV NETWORK 40 24-Jul-23 07-Sep-23 30-Oct-24 15-Dec-24 SAR108,118.10 SAR0.00 100% 0% 15-Dec-24, HIGH VOLTAGE 110 KV
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 35 09-Sep-23 19-Oct-23 16-Dec-24 25-Jan-25 SAR1,382,859.12 SAR0.00 100% 0% 25-Jan-25, MEDIUM VOLTAGE 13
LOW V VOLTAGE NETWORK 37 21-Oct-23 02-Dec-23 26-Jan-25 09-Mar-25 SAR212,763.20 SAR0.00 100% 0% 09-Mar-25, LOW VOLTAGE NETW
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 140 03-Dec-23 16-May-24 10-Mar-25 27-Aug-25 SAR0.00 SAR0.00 0% 0% 27-Aug-25, ELECTRICAL D
LIGHTING SYSTEM
LIGHT 60 18-May-24 30-Jul-24 28-Aug-25 08-Nov-25 SAR0.00 SAR0.00 0% 0% 08-Nov-25, LIGHTING S
TELECOM SERVICES 45 31-Jul-24 21-Sep-24 08-Nov-25 30-Dec-25 SAR125,925.93 SAR0.00 0% 0% 30-Dec-25, TELECOM
MEP VEHICULAR
VEHICULA TUNNEL/ DRY & WET CULVERTS 434 02-Sep-23 18-Jun-25 28-Oct-24 31-Mar-26 SAR8,461,885.89 SAR0.00 21.44% 0% 31-Mar-26, MEP VE
TUNNEL MECHANICAL
ME WORKS 233 02-Sep-23 03-Jun-24 28-Oct-24 03-Aug-25 SAR2,434,332.12 SAR0.00 74.53% 0% 03-Aug-25, TUNNEL MECH
FIRE FIG
FIGHTING SYSTEM 76 02-Sep-23 29-Nov-23 28-Oct-24 23-Jan-25 SAR1,770,531.47 SAR0.00 100% 0% 23-Jan-25, FIRE FIGHTING SYSTE
VENTILATION SYSTEM
VENTILA 46 30-Nov-23 22-Jan-24 25-Jan-25 18-Mar-25 SAR198,532.64 SAR0.00 22.07% 0% 18-Mar-25, VENTILATION SYST
PUMPS INSTALLATION
I 21 23-Jan-24 15-Feb-24 19-Mar-25 16-Apr-25 SAR373,059.88 SAR0.00 0% 0% 16-Apr-25, PUMPS INSTALLAT
DUCTING SYSTEM 90 17-Feb-24 03-Jun-24 17-Apr-25 03-Aug-25 SAR92,208.14 SAR0.00 0% 0% 03-Aug-25, DUCTING SYST
TUNNEL ELECTRICAL
EL WORKS 414 04-Jun-24 18-Jun-25 20-Nov-24 31-Mar-26 SAR5,117,308.81 SAR0.00 0% 0% 31-Mar-26, TUNNE
CABLE TRAYS
T 101 04-Jun-24 05-Oct-24 04-Aug-25 30-Nov-25 SAR1,161,130.86 SAR0.00 0% 0% 30-Nov-25, CABLE TRA
POWER CABLES 137 03-Jul-24 10-Dec-24 28-Aug-25 04-Feb-26 SAR1,569,908.53 SAR0.00 0% 0% 04-Feb-26, POWER C
ELECTRICAL INSTALLATIONS
ELECTRI 121 10-Sep-24 29-Jan-25 06-Nov-25 31-Mar-26 SAR1,284,573.04 SAR0.00 0% 0% 31-Mar-26, ELECTR
LOW CUR
CURRENT 152 16-Dec-24 18-Jun-25 20-Nov-24 20-May-25 SAR1,101,696.38 SAR0.00 0% 0% 20-May-25, LOW CURRENT
FIRE D
DETECTION AND ALARM SYSTEM 82 16-Dec-24 20-Mar-25 20-Nov-24 23-Feb-25 SAR188,308.55 SAR0.00 0% 0% 23-Feb-25, FIRE DETECTION AN
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 28 30-Dec-24 30-Jan-25 04-Dec-24 05-Jan-25 SAR156,905.46 SAR0.00 0% 0% 05-Jan-25, COMMUNICATION SYS
PUBLIC ADDRESS
PUBLI 28 01-Feb-25 04-Mar-25 06-Jan-25 06-Feb-25 SAR121,709.61 SAR0.00 0% 0% 06-Feb-25, PUBLIC ADDRESS
VIDEO SURVEILLANCE 49 05-Mar-25 05-May-25 08-Feb-25 09-Apr-25 SAR146,452.73 SAR0.00 0% 0% 09-Apr-25, VIDEO SURVEILLAN
SACADA SYSTEM
SACA 35 06-May-25 18-Jun-25 10-Apr-25 20-May-25 SAR390,983.87 SAR0.00 0% 0% 20-May-25, SACADA SYSTEM
RADIO RE-BROADCASTING SYSTEM 28 09-Feb-25 12-Mar-25 14-Jan-25 15-Feb-25 SAR97,336.17 SAR0.00 0% 0% 15-Feb-25, RADIO RE-BROADCA
TUNNEL PLUMBING
PL WORKS 35 17-Feb-25 29-Mar-25 22-Jan-25 03-Mar-25 SAR910,244.95 SAR0.00 0% 0% 03-Mar-25, TUNNEL PLUMBING
DRAINAGE SYSTEM
DRAINAG 35 17-Feb-25 29-Mar-25 22-Jan-25 03-Mar-25 SAR910,244.95 SAR0.00 0% 0% 03-Mar-25, DRAINAGE SYSTEM
TUNNEL INTERNAL
INTER ROAD WORK 42 03-Apr-25 21-May-25 04-Mar-25 26-Apr-25 SAR1,459,327.00 SAR0.00 0% 0% 26-Apr-25, TUNNEL INTERNAL

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
49 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
TUNNEL INTERNAL
INTER DECORATIVE WORKS 40 07-May-25 25-Jun-25 12-Apr-25 27-May-25 SAR2,481,149.52 SAR0.00 0% 0% 27-May-25, TUNNEL INTERNA
TUNNEL 3 954 08-Oct-22 20-May-25 30-Jul-22 A 19-Nov-25 SAR134,833,271.69 SAR48,461,065.34 60.33% 35.94% 19-Nov-25, TUNNEL 3
ZONE 11 - FROM STA. 0+020 ~ 0+434.07 954 08-Oct-22 20-May-25 30-Jul-22 A 19-Nov-25 SAR134,833,271.69 SAR48,461,065.34 60.33% 35.94% 19-Nov-25, ZONE 11 - F
ENGINEERING 698 08-Oct-22 21-Apr-24 05-Sep-22 A 15-Jan-25 SAR0.00 SAR0.00 0% 0% 15-Jan-25, ENGINEERING
SITE SURVEY 14 08-Oct-22 23-Oct-22 05-Sep-22 A 21-Sep-22 A SAR0.00 SAR0.00 0% 0% 21-Sep-22 A, SITE SURVEY
SHOP DRAWINGS
DRAWIN 328 07-Jan-23 17-Aug-23 17-Sep-22 A 31-Jan-24 SAR0.00 SAR0.00 0% 0% 31-Jan-24, SHOP DRAWINGS
CIVIL/STRUCTURAL 0+015 ~0+102
CIVIL/STRU 310 07-Jan-23 23-Feb-23 17-Sep-22 A 10-Jan-24 SAR0.00 SAR0.00 0% 0% 10-Jan-24, CIVIL/STRUCTURAL 0+015 ~0+102
CIVIL/STRUCTURAL 0+102 ~0+202
CIVIL/STRU 186 18-Feb-23 06-Apr-23 17-Sep-22 A 01-Aug-23 A SAR0.00 SAR0.00 0% 0% 01-Aug-23 A, CIVIL/STRUCTURAL 0+102 ~0+202
CIVIL/STRUCTURAL 0+202 ~0+302
CIVIL/STRU 168 01-Apr-23 22-May-23 17-Sep-22 A 10-Jul-23 A SAR0.00 SAR0.00 0% 0% 10-Jul-23 A, CIVIL/STRUCTURAL 0+202 ~0+302
CIVIL/STRUCTURAL 0+302 ~0+402
CIVIL/STRU 150 16-May-23 06-Jul-23 17-Sep-22 A 17-Jul-23 A SAR0.00 SAR0.00 0% 0% 17-Jul-23 A, CIVIL/STRUCTURAL 0+302 ~0+402
CIVIL/STRUCTURAL 0+402 ~0+434
CIVIL/STRU 184 01-Jul-23 17-Aug-23 17-Sep-22 A 31-Jan-24 SAR0.00 SAR0.00 0% 0% 31-Jan-24, CIVIL/STRUCTURAL 0+402 ~0+434
ARCHITECTURAL
ARCHITECT 22 08-Apr-23 06-May-23 04-Jan-24 29-Jan-24 SAR0.00 SAR0.00 0% 0% 29-Jan-24, ARCHITECTURAL
UTILITIES 383 07-May-23 29-Jan-24 25-Oct-22 A 08-Aug-24 SAR0.00 SAR0.00 0% 0% 08-Aug-24, UTILITIES
WET UTILITIES
UTILIT 305 07-May-23 05-Sep-23 25-Oct-22 A 04-May-24 SAR0.00 SAR0.00 0% 0% 04-May-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 22 07-May-23 31-May-23 25-Oct-22 A 13-Nov-22 A SAR0.00 SAR0.00 0% 0% 13-Nov-22 A, POTABLE WATER NETWORK BRANCH, HOUSE
GREY WAWATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 25 01-Jun-23 03-Jul-23 29-Jan-24 27-Feb-24 SAR0.00 SAR0.00 0% 0% 27-Feb-24, GREY WATER DISTRIBUTION NET
IRR & FF NETWORK BRANCHES & TIE IN POINTS 19 04-Jul-23 25-Jul-23 27-Feb-24 20-Mar-24 SAR0.00 SAR0.00 0% 0% 20-Mar-24, IRR & FF NETWORK BRANCHES
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 17 26-Jul-23 14-Aug-23 20-Mar-24 08-Apr-24 SAR0.00 SAR0.00 0% 0% 08-Apr-24, CHILLED WATER SUPPLY & RET
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 19 15-Aug-23 05-Sep-23 08-Apr-24 04-May-24 SAR0.00 SAR0.00 0% 0% 04-May-24, AUTOMATIC WASTE COLLECT
DRY UTILITI
UTILITIES 242 06-Sep-23 29-Jan-24 01-Nov-22 A 08-Aug-24 SAR0.00 SAR0.00 0% 0% 08-Aug-24, DRY UTILITIES
POWER 202 06-Sep-23 03-Jan-24 01-Nov-22 A 14-Jul-24 SAR0.00 SAR0.00 0% 0% 14-Jul-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 22 06-Sep-23 02-Oct-23 04-May-24 29-May-24 SAR0.00 SAR0.00 0% 0% 29-May-24, HIGH VOLTAGE 110 KV NETW
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 17 03-Oct-23 22-Oct-23 29-May-24 23-Jun-24 SAR0.00 SAR0.00 0% 0% 23-Jun-24, MEDIUM VOLTAGE 13.8 KV N
LOW V VOLTAGE NETWORK 19 23-Oct-23 13-Nov-23 27-Nov-22 A 14-Jul-24 SAR0.00 SAR0.00 0% 0% 14-Jul-24, LOW VOLTAGE NETWORK
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 22 14-Nov-23 09-Dec-23 01-Nov-22 A 12-Nov-22 A SAR0.00 SAR0.00 0% 0% 12-Nov-22 A, ELECTRICAL DISTRIBUTION SYSTEM
LIGHTING SYSTEM
LIGHT 22 10-Dec-23 03-Jan-24 26-Nov-22 A 27-Dec-22 A SAR0.00 SAR0.00 0% 0% 27-Dec-22 A, LIGHTING SYSTEM
LOW CUR
CURRENT 22 04-Jan-24 29-Jan-24 14-Jul-24 08-Aug-24 SAR0.00 SAR0.00 0% 0% 08-Aug-24, LOW CURRENT
TELECOM SERVICES
TELEC 22 04-Jan-24 29-Jan-24 14-Jul-24 08-Aug-24 SAR0.00 SAR0.00 0% 0% 08-Aug-24, TELECOM SERVICES
MEP 294 07-May-23 21-Apr-24 29-Jan-24 15-Jan-25 SAR0.00 SAR0.00 0% 0% 15-Jan-25, MEP
TUNNEL MECHANICAL
ME WORKS 176 07-May-23 02-Dec-23 29-Jan-24 29-Aug-24 SAR0.00 SAR0.00 0% 0% 29-Aug-24, TUNNEL MECHANICAL WO
FIRE FIG
FIGHTING SYSTEM 88 07-May-23 20-Aug-23 29-Jan-24 14-May-24 SAR0.00 SAR0.00 0% 0% 14-May-24, FIRE FIGHTING SYSTEM
VENTILATION SYSTEM
VENTILA 44 07-Aug-23 27-Sep-23 30-Apr-24 25-Jun-24 SAR0.00 SAR0.00 0% 0% 25-Jun-24, VENTILATION SYSTEM
PUMPS INSTALLATION
I 22 28-Sep-23 23-Oct-23 25-Jun-24 21-Jul-24 SAR0.00 SAR0.00 0% 0% 21-Jul-24, PUMPS INSTALLATION
DUCTING SYSTEM 88 21-Aug-23 02-Dec-23 14-May-24 29-Aug-24 SAR0.00 SAR0.00 0% 0% 29-Aug-24, DUCTING SYSTEM
TUNNEL ELECTRICAL
EL WORKS 206 21-Aug-23 21-Apr-24 14-May-24 15-Jan-25 SAR0.00 SAR0.00 0% 0% 15-Jan-25, TUNNEL ELECTRICAL W
CABLE TRAYS
T 110 28-Sep-23 03-Feb-24 25-Jun-24 02-Nov-24 SAR0.00 SAR0.00 0% 0% 02-Nov-24, CABLE TRAYS
POWER CABLES 44 30-Nov-23 20-Jan-24 27-Aug-24 19-Oct-24 SAR0.00 SAR0.00 0% 0% 19-Oct-24, POWER CABLES
ELECTRICAL INSTALLATIONS
ELECTRI 110 12-Dec-23 21-Apr-24 08-Sep-24 15-Jan-25 SAR0.00 SAR0.00 0% 0% 15-Jan-25, ELECTRICAL INSTALLA
LOW CUR
CURRENT 132 21-Aug-23 22-Jan-24 14-May-24 21-Oct-24 SAR0.00 SAR0.00 0% 0% 21-Oct-24, LOW CURRENT
FIRE D
DETECTION AND ALARM SYSTEM 132 21-Aug-23 22-Jan-24 14-May-24 21-Oct-24 SAR0.00 SAR0.00 0% 0% 21-Oct-24, FIRE DETECTION AND AL
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 110 02-Sep-23 08-Jan-24 26-May-24 07-Oct-24 SAR0.00 SAR0.00 0% 0% 07-Oct-24, COMMUNICATION SYSTE
PUBLIC ADDRESS
PUBLI 66 18-Sep-23 04-Dec-23 11-Jun-24 01-Sep-24 SAR0.00 SAR0.00 0% 0% 01-Sep-24, PUBLIC ADDRESS
VIDEO SURVEILLANCE 44 01-Oct-23 20-Nov-23 27-Jun-24 18-Aug-24 SAR0.00 SAR0.00 0% 0% 18-Aug-24, VIDEO SURVEILLANCE
SACADA SYSTEM
SACA 44 12-Oct-23 02-Dec-23 09-Jul-24 29-Aug-24 SAR0.00 SAR0.00 0% 0% 29-Aug-24, SACADA SYSTEM
RADIO RE-BROADCASTING SYSTEM 44 24-Oct-23 13-Dec-23 21-Jul-24 10-Sep-24 SAR0.00 SAR0.00 0% 0% 10-Sep-24, RADIO RE-BROADCASTIN
TUNNEL PLUMBING
PL WORKS 21 18-May-23 11-Jun-23 10-Feb-24 05-Mar-24 SAR0.00 SAR0.00 0% 0% 05-Mar-24, TUNNEL PLUMBING WORKS
PROCUREMENT 622 14-Jan-23 24-Jul-24 01-Dec-22 A 26-Jan-25 SAR13,166,778.89 SAR5,599,347.28 93.68% 42.53% 26-Jan-25, PROCUREMENT
CIVIL/STRUCTU
CIVIL/STRUCTURAL 195 14-Jan-23 21-Mar-23 01-Dec-22 A 28-Dec-23 SAR8,031,422.70 SAR5,599,347.28 100% 69.72% 28-Dec-23, CIVIL/STRUCTURAL
UTILITIES 302 01-Jun-23 24-Jul-24 29-Jan-24 26-Jan-25 SAR665,635.86 SAR0.00 48.72% 0% 26-Jan-25, UTILITIES
WET UTILITIES
UTILIT 224 01-Jun-23 22-Feb-24 29-Jan-24 26-Oct-24 SAR399,121.32 SAR0.00 68.73% 0% 26-Oct-24, WET UTILITIES
POTABLE WATER NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 147 01-Jun-23 21-Nov-23 29-Jan-24 27-Jul-24 SAR50,276.79 SAR0.00 100% 0% 27-Jul-24, POTABLE WATER NETWORK
DI PIPES
PIP 145 01-Jun-23 21-Nov-23 29-Jan-24 24-Jul-24 SAR5,530.45 SAR0.00 100% 0% 24-Jul-24, DI PIPES
HDPE PIPES 145 01-Jun-23 21-Nov-23 29-Jan-24 24-Jul-24 SAR6,535.98 SAR0.00 100% 0% 24-Jul-24, HDPE PIPES
GRP PPIPES 145 01-Jun-23 21-Nov-23 29-Jan-24 24-Jul-24 SAR5,027.68 SAR0.00 100% 0% 24-Jul-24, GRP PIPES
DI & G
GRP FITTING 145 01-Jun-23 21-Nov-23 29-Jan-24 24-Jul-24 SAR5,027.68 SAR0.00 100% 0% 24-Jul-24, DI & GRP FITTING
GATE VALVE 145 01-Jun-23 21-Nov-23 29-Jan-24 24-Jul-24 SAR5,027.68 SAR0.00 100% 0% 24-Jul-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 145 01-Jun-23 21-Nov-23 29-Jan-24 24-Jul-24 SAR4,524.91 SAR0.00 100% 0% 24-Jul-24, BUTTERFLAY VALVE
WATER METER
WATE 144 01-Jun-23 21-Nov-23 01-Feb-24 27-Jul-24 SAR7,541.52 SAR0.00 100% 0% 27-Jul-24, WATER METER
AIR RELASE
RE VALVE 145 01-Jun-23 21-Nov-23 29-Jan-24 24-Jul-24 SAR5,027.68 SAR0.00 100% 0% 24-Jul-24, AIR RELASE VALVE
WASHOUT VALVE
WASH 145 01-Jun-23 21-Nov-23 29-Jan-24 24-Jul-24 SAR6,033.22 SAR0.00 100% 0% 24-Jul-24, WASHOUT VALVE
GREY WA
WATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 145 04-Jul-23 20-Dec-23 27-Feb-24 22-Aug-24 SAR30,938.06 SAR0.00 95.56% 0% 22-Aug-24, GREY WATER DISTRIBUTIO

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
50 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
DI PIPES
PIP 145 04-Jul-23 20-Dec-23 27-Feb-24 22-Aug-24 SAR5,259.47 SAR0.00 95.56% 0% 22-Aug-24, DI PIPES
HDPE PIPES 145 04-Jul-23 20-Dec-23 27-Feb-24 22-Aug-24 SAR5,568.85 SAR0.00 95.56% 0% 22-Aug-24, HDPE PIPES
GRP PPIPES 145 04-Jul-23 20-Dec-23 27-Feb-24 22-Aug-24 SAR4,021.95 SAR0.00 95.56% 0% 22-Aug-24, GRP PIPES
DI & G
GRP FITTING 145 04-Jul-23 20-Dec-23 27-Feb-24 22-Aug-24 SAR3,712.57 SAR0.00 95.56% 0% 22-Aug-24, DI & GRP FITTING
GATE VALVE 145 04-Jul-23 20-Dec-23 27-Feb-24 22-Aug-24 SAR2,165.66 SAR0.00 95.56% 0% 22-Aug-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 145 04-Jul-23 20-Dec-23 27-Feb-24 22-Aug-24 SAR3,093.81 SAR0.00 95.56% 0% 22-Aug-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 145 04-Jul-23 20-Dec-23 27-Feb-24 22-Aug-24 SAR3,403.19 SAR0.00 95.56% 0% 22-Aug-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 145 04-Jul-23 20-Dec-23 27-Feb-24 22-Aug-24 SAR3,712.57 SAR0.00 95.56% 0% 22-Aug-24, WASEHOUT VALVE
IRR & FF NETWORK BRANCHES & TIE IN POINTS 145 26-Jul-23 11-Jan-24 20-Mar-24 12-Sep-24 SAR46,974.25 SAR0.00 78.67% 0% 12-Sep-24, IRR & FF NETWORK BRAN
HDPE PIPES 145 26-Jul-23 11-Jan-24 20-Mar-24 12-Sep-24 SAR11,743.56 SAR0.00 78.67% 0% 12-Sep-24, HDPE PIPES
GATE VALVE 145 26-Jul-23 11-Jan-24 20-Mar-24 12-Sep-24 SAR4,697.43 SAR0.00 78.67% 0% 12-Sep-24, GATE VALVE
BUTTERFLAY VALVE
BUTTE 145 26-Jul-23 11-Jan-24 20-Mar-24 12-Sep-24 SAR4,697.43 SAR0.00 78.67% 0% 12-Sep-24, BUTTERFLAY VALVE
AIR RELASE
RE VALVE 145 26-Jul-23 11-Jan-24 20-Mar-24 12-Sep-24 SAR4,697.43 SAR0.00 78.67% 0% 12-Sep-24, AIR RELASE VALVE
WASEHOUT VALVE
WASE 145 26-Jul-23 11-Jan-24 20-Mar-24 12-Sep-24 SAR4,697.43 SAR0.00 78.67% 0% 12-Sep-24, WASEHOUT VALVE
FIRE H
HYDRANT 145 26-Jul-23 11-Jan-24 20-Mar-24 12-Sep-24 SAR16,440.99 SAR0.00 78.67% 0% 12-Sep-24, FIRE HYDRANT
CHILLED WATER SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 145 15-Aug-23 31-Jan-24 08-Apr-24 03-Oct-24 SAR184,162.62 SAR0.00 63.56% 0% 03-Oct-24, CHILLED WATER SUPPLY
MILD STEEL PIPE 145 15-Aug-23 31-Jan-24 08-Apr-24 03-Oct-24 SAR73,665.05 SAR0.00 63.56% 0% 03-Oct-24, MILD STEEL PIPE
MILD STEEL FITTING 145 15-Aug-23 31-Jan-24 08-Apr-24 03-Oct-24 SAR73,665.05 SAR0.00 63.56% 0% 03-Oct-24, MILD STEEL FITTING
GATE VALVE 145 15-Aug-23 31-Jan-24 08-Apr-24 03-Oct-24 SAR36,832.52 SAR0.00 63.56% 0% 03-Oct-24, GATE VALVE
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 145 06-Sep-23 22-Feb-24 04-May-24 26-Oct-24 SAR86,769.59 SAR0.00 46.67% 0% 26-Oct-24, AUTOMATIC WASTE COL
AUTOMATIC WASTE
AUTO 145 06-Sep-23 22-Feb-24 04-May-24 26-Oct-24 SAR86,769.59 SAR0.00 46.67% 0% 26-Oct-24, AUTOMATIC WASTE
DRY UTILITI
UTILITIES 202 03-Oct-23 24-Jul-24 29-May-24 26-Jan-25 SAR266,514.54 SAR0.00 18.76% 0% 26-Jan-25, DRY UTILITIES
POWER 180 03-Oct-23 29-Jun-24 29-May-24 31-Dec-24 SAR244,292.32 SAR0.00 20.46% 0% 31-Dec-24, POWER
HIGH VOLTAGE
V 110 KV NETWORK 145 03-Oct-23 19-Mar-24 29-May-24 20-Nov-24 SAR15,899.72 SAR0.00 27.11% 0% 20-Nov-24, HIGH VOLTAGE 110 KV
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 144 23-Oct-23 08-Apr-24 23-Jun-24 09-Dec-24 SAR203,361.64 SAR0.00 20% 0% 09-Dec-24, MEDIUM VOLTAGE 13.8
LOW V VOLTAGE NETWORK 145 14-Nov-23 04-May-24 14-Jul-24 31-Dec-24 SAR25,030.97 SAR0.00 20% 0% 31-Dec-24, LOW VOLTAGE NETWO
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 145 10-Dec-23 29-May-24 14-Jul-24 31-Dec-24 SAR0.00 SAR0.00 0% 0% 31-Dec-24, ELECTRICAL DISTRIBU
LIGHTING SYSTEM
LIGHT 145 04-Jan-24 29-Jun-24 14-Jul-24 31-Dec-24 SAR0.00 SAR0.00 0% 0% 31-Dec-24, LIGHTING SYSTEM
LOW CUR
CURRENT 145 30-Jan-24 24-Jul-24 08-Aug-24 26-Jan-25 SAR22,222.22 SAR0.00 0% 0% 26-Jan-25, LOW CURRENT
TELECOM SERVICES
TELEC 145 30-Jan-24 24-Jul-24 08-Aug-24 26-Jan-25 SAR22,222.22 SAR0.00 0% 0% 26-Jan-25, TELECOM SERVICES
MEP 235 12-Jun-23 16-Mar-24 05-Mar-24 14-Dec-24 SAR4,469,720.33 SAR0.00 89.03% 0% 14-Dec-24, MEP
ARCHITECTURAL
ARCHITECTUR 114 07-May-23 20-Sep-23 29-Jan-24 19-Jun-24 SAR0.00 SAR0.00 0% 0% 19-Jun-24, ARCHITECTURAL
CONSTRUCTION 870 14-Jan-23 20-May-25 30-Jul-22 A 19-Nov-25 SAR121,666,492.80 SAR42,861,718.06 56.72% 35.23% 19-Nov-25, CONSTRUC
GENERAL SITE ARRANGEMENT 260 14-Jan-23 09-Mar-23 14-Sep-22 A 23-Oct-23 A SAR1,346,913.14 SAR1,346,913.14 100% 100% 23-Oct-23 A, GENERAL SITE ARRANGEMENT
SITE PREPARATION
PREPA 260 14-Jan-23 09-Mar-23 14-Sep-22 A 23-Oct-23 A SAR1,346,913.14 SAR1,346,913.14 100% 100% 23-Oct-23 A, SITE PREPARATION
GEO-TECHNICAL INVESTIGATION
GEO-TECHNICA 37 09-Feb-23 23-Mar-23 30-Jul-22 A 01-Oct-22 A SAR179,335.44 SAR179,335.44 100% 100% 01-Oct-22 A, GEO-TECHNICAL INVESTIGATION
EXCAVATION & DEWATERING 382 25-Mar-23 09-May-24 06-Oct-22 A 06-Jul-24 SAR27,110,225.62 SAR21,566,326.81 97.35% 79.55% 06-Jul-24, EXCAVATION & DEWATERING
SOIL IMPROVEMENT
IMPROVE 152 11-May-23 19-Sep-23 31-Jan-23 A 09-Jan-24 SAR7,722,024.34 SAR6,867,582.35 100% 88.94% 09-Jan-24, SOIL IMPROVEMENT
STRUCTURAL WORKS 332 04-Jun-23 12-Jun-24 07-May-23 A 12-Sep-24 SAR48,500,280.57 SAR12,901,560.32 55.9% 26.6% 12-Sep-24, STRUCTURAL WORKS
STA. 0+014.665
0+014. ~ 0+042.48 121 04-Jun-23 26-Oct-23 11-Jan-24 03-Jun-24 SAR2,309,537.17 SAR0.00 100% 0% 03-Jun-24, STA. 0+014.665 ~ 0+042.48
BASE SLAB
SL 31 04-Jun-23 12-Jul-23 11-Jan-24 15-Feb-24 SAR648,888.92 SAR0.00 100% 0% 15-Feb-24, BASE SLAB
COLUMNS
COLUMN 25 06-Jul-23 03-Aug-23 10-Feb-24 09-Mar-24 SAR44,691.49 SAR0.00 100% 0% 09-Mar-24, COLUMNS
TUNNEL WALLS 39 13-Jul-23 27-Aug-23 17-Feb-24 01-Apr-24 SAR452,451.71 SAR0.00 100% 0% 01-Apr-24, TUNNEL WALLS
TOP SALB
SAL 39 14-Aug-23 28-Sep-23 19-Mar-24 06-May-24 SAR680,866.86 SAR0.00 100% 0% 06-May-24, TOP SALB
FINISHING
FINISHIN 24 30-Sep-23 26-Oct-23 07-May-24 03-Jun-24 SAR482,638.19 SAR0.00 100% 0% 03-Jun-24, FINISHING
STA. 0+042.48
0+042. ~ 0+062.48 113 18-Jun-23 31-Oct-23 25-Jan-24 08-Jun-24 SAR2,309,537.17 SAR0.00 100% 0% 08-Jun-24, STA. 0+042.48 ~ 0+062.48
BASE SLAB
SL 27 18-Jun-23 22-Jul-23 25-Jan-24 25-Feb-24 SAR648,888.92 SAR0.00 100% 0% 25-Feb-24, BASE SLAB
COLUMNS
COLUMN 23 23-Jul-23 17-Aug-23 26-Feb-24 23-Mar-24 SAR44,691.49 SAR0.00 100% 0% 23-Mar-24, COLUMNS
TUNNEL WALLS 37 23-Jul-23 03-Sep-23 26-Feb-24 08-Apr-24 SAR452,451.71 SAR0.00 100% 0% 08-Apr-24, TUNNEL WALLS
TOP SALB
SAL 37 21-Aug-23 03-Oct-23 26-Mar-24 11-May-24 SAR680,866.86 SAR0.00 100% 0% 11-May-24, TOP SALB
FINISHING
FINISHIN 24 04-Oct-23 31-Oct-23 12-May-24 08-Jun-24 SAR482,638.19 SAR0.00 100% 0% 08-Jun-24, FINISHING
STA. 0+062.48
0+062. ~ 0+082.48 113 03-Jul-23 12-Nov-23 06-Feb-24 24-Jun-24 SAR2,309,537.17 SAR0.00 100% 0% 24-Jun-24, STA. 0+062.48 ~ 0+082.48
BASE SLAB
SL 27 03-Jul-23 02-Aug-23 06-Feb-24 07-Mar-24 SAR648,888.92 SAR0.00 100% 0% 07-Mar-24, BASE SLAB
COLUMNS
COLUMN 23 03-Aug-23 29-Aug-23 09-Mar-24 03-Apr-24 SAR44,691.49 SAR0.00 100% 0% 03-Apr-24, COLUMNS
TUNNEL WALLS 37 03-Aug-23 14-Sep-23 09-Mar-24 23-Apr-24 SAR452,451.71 SAR0.00 100% 0% 23-Apr-24, TUNNEL WALLS
TOP SALB
SAL 37 02-Sep-23 15-Oct-23 07-Apr-24 22-May-24 SAR680,866.86 SAR0.00 100% 0% 22-May-24, TOP SALB
FINISHING
FINISHIN 24 16-Oct-23 12-Nov-23 23-May-24 24-Jun-24 SAR482,638.19 SAR0.00 100% 0% 24-Jun-24, FINISHING
STA. 0+082.48
0+082. ~ 0+102.48 113 15-Jul-23 23-Nov-23 18-Feb-24 06-Jul-24 SAR2,309,537.17 SAR0.00 100% 0% 06-Jul-24, STA. 0+082.48 ~ 0+102.48
BASE SLAB
SL 27 15-Jul-23 14-Aug-23 18-Feb-24 19-Mar-24 SAR648,888.92 SAR0.00 100% 0% 19-Mar-24, BASE SLAB
COLUMNS
COLUMN 23 15-Aug-23 10-Sep-23 20-Mar-24 18-Apr-24 SAR44,691.49 SAR0.00 100% 0% 18-Apr-24, COLUMNS
TUNNEL WALLS 37 15-Aug-23 27-Sep-23 20-Mar-24 05-May-24 SAR452,451.71 SAR0.00 100% 0% 05-May-24, TUNNEL WALLS
TOP SALB
SAL 37 13-Sep-23 26-Oct-23 22-Apr-24 03-Jun-24 SAR680,866.86 SAR0.00 100% 0% 03-Jun-24, TOP SALB

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
51 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
FINISHING
FINISHIN 24 28-Oct-23 23-Nov-23 04-Jun-24 06-Jul-24 SAR482,638.19 SAR0.00 100% 0% 06-Jul-24, FINISHING
STA. 0+102.48
0+102. ~ 0+122.48 200 26-Jul-23 05-Dec-23 09-Oct-23 A 03-Jun-24 SAR2,309,537.17 SAR945,196.63 100% 40.93% 03-Jun-24, STA. 0+102.48 ~ 0+122.48
BASE SLAB
SL 108 26-Jul-23 26-Aug-23 09-Oct-23 A 21-Oct-23 A SAR648,888.92 SAR648,888.92 100% 100% 21-Oct-23 A, BASE SLAB
COLUMNS
COLUMN 122 27-Aug-23 21-Sep-23 04-Nov-23 A 26-Mar-24 SAR44,691.49 SAR29,496.38 100% 66% 26-Mar-24, COLUMNS
TUNNEL WALLS 131 27-Aug-23 09-Oct-23 04-Nov-23 A 03-Apr-24 SAR452,451.71 SAR266,811.33 100% 58.97% 03-Apr-24, TUNNEL WALLS
TOP SALB
SAL 37 26-Sep-23 07-Nov-23 21-Mar-24 06-May-24 SAR680,866.86 SAR0.00 100% 0% 06-May-24, TOP SALB
FINISHING
FINISHIN 24 08-Nov-23 05-Dec-23 07-May-24 03-Jun-24 SAR482,638.19 SAR0.00 100% 0% 03-Jun-24, FINISHING
STA. 0+122.48
0+122. ~ 0+142.48 145 07-Aug-23 17-Dec-23 03-Sep-23 A 26-Jun-24 SAR2,309,537.17 SAR612,077.57 98.88% 26.5% 26-Jun-24, STA. 0+122.48 ~ 0+142.48
BASE SLAB
SL 59 07-Aug-23 06-Sep-23 03-Sep-23 A 10-Mar-24 SAR648,888.92 SAR612,077.57 100% 94.33% 10-Mar-24, BASE SLAB
COLUMNS
COLUMN 23 07-Sep-23 04-Oct-23 11-Mar-24 06-Apr-24 SAR44,691.49 SAR0.00 100% 0% 06-Apr-24, COLUMNS
TUNNEL WALLS 37 07-Sep-23 21-Oct-23 11-Mar-24 25-Apr-24 SAR452,451.71 SAR0.00 100% 0% 25-Apr-24, TUNNEL WALLS
TOP SALB
SAL 37 08-Oct-23 19-Nov-23 13-Apr-24 25-May-24 SAR680,866.86 SAR0.00 100% 0% 25-May-24, TOP SALB
FINISHING
FINISHIN 24 20-Nov-23 17-Dec-23 26-May-24 26-Jun-24 SAR482,638.19 SAR0.00 94.62% 0% 26-Jun-24, FINISHING
STA. 0+142.48
0+142. ~ 0+162.48 187 19-Aug-23 28-Dec-23 23-Aug-23 A 11-Jun-24 SAR2,309,537.17 SAR908,657.03 95.45% 39.34% 11-Jun-24, STA. 0+142.48 ~ 0+162.48
BASE SLAB
SL 45 19-Aug-23 18-Sep-23 23-Aug-23 A 24-Sep-23 A SAR648,888.92 SAR648,888.92 100% 100% 24-Sep-23 A, BASE SLAB
COLUMNS
COLUMN 124 19-Sep-23 16-Oct-23 04-Nov-23 A 26-Mar-24 SAR44,691.49 SAR7,362.14 100% 16.47% 26-Mar-24, COLUMNS
TUNNEL WALLS 138 19-Sep-23 01-Nov-23 04-Nov-23 A 15-Apr-24 SAR452,451.71 SAR252,405.98 100% 55.79% 15-Apr-24, TUNNEL WALLS
TOP SALB
SAL 37 19-Oct-23 30-Nov-23 30-Mar-24 14-May-24 SAR680,866.86 SAR0.00 100% 0% 14-May-24, TOP SALB
FINISHING
FINISHIN 24 02-Dec-23 28-Dec-23 15-May-24 11-Jun-24 SAR482,638.19 SAR0.00 78.21% 0% 11-Jun-24, FINISHING
STA. 0+162.48
0+162. ~ 0+182.48 175 30-Aug-23 01-Jan-24 10-Jul-23 A 30-May-24 SAR2,309,537.17 SAR1,271,781.67 95.4% 55.07% 30-May-24, STA. 0+162.48 ~ 0+182.48
BASE SLAB
SL 64 30-Aug-23 01-Oct-23 10-Jul-23 A 24-Aug-23 A SAR648,888.92 SAR648,888.92 100% 100% 24-Aug-23 A, BASE SLAB
COLUMNS
COLUMN 23 02-Oct-23 28-Oct-23 29-Feb-24 26-Mar-24 SAR44,691.49 SAR0.00 100% 0% 26-Mar-24, COLUMNS
TUNNEL WALLS 111 02-Oct-23 05-Nov-23 19-Oct-23 A 13-Mar-24 SAR452,451.71 SAR404,259.59 100% 89.35% 13-Mar-24, TUNNEL WALLS
TOP SALB
SAL 129 23-Oct-23 04-Dec-23 10-Dec-23 A 02-May-24 SAR680,866.86 SAR218,633.17 100% 32.11% 02-May-24, TOP SALB
FINISHING
FINISHIN 24 05-Dec-23 01-Jan-24 04-May-24 30-May-24 SAR482,638.19 SAR0.00 78.01% 0% 30-May-24, FINISHING
STA. 0+182.48
0+182. ~ 0+202.48 200 11-Sep-23 21-Jan-24 10-Jul-23 A 13-May-24 SAR2,309,537.17 SAR1,097,839.99 78.37% 47.54% 13-May-24, STA. 0+182.48 ~ 0+202.48
BASE SLAB
SL 56 11-Sep-23 12-Oct-23 10-Jul-23 A 17-Aug-23 A SAR648,888.92 SAR648,888.92 100% 100% 17-Aug-23 A, BASE SLAB
COLUMNS
COLUMN 108 14-Oct-23 08-Nov-23 19-Sep-23 A 26-Oct-23 A SAR44,691.49 SAR44,691.49 100% 100% 26-Oct-23 A, COLUMNS
TUNNEL WALLS 151 14-Oct-23 25-Nov-23 19-Sep-23 A 13-Mar-24 SAR452,451.71 SAR404,259.59 100% 89.35% 13-Mar-24, TUNNEL WALLS
TOP SALB
SAL 37 12-Nov-23 24-Dec-23 29-Feb-24 15-Apr-24 SAR680,866.86 SAR0.00 97.52% 0% 15-Apr-24, TOP SALB
FINISHING
FINISHIN 24 25-Dec-23 21-Jan-24 16-Apr-24 13-May-24 SAR482,638.19 SAR0.00 0% 0% 13-May-24, FINISHING
STA. 0+202.48
0+202. ~ 0+222.48 184 24-Sep-23 01-Feb-24 09-Jul-23 A 04-May-24 SAR2,309,537.17 SAR1,506,573.77 75.86% 65.23% 04-May-24, STA. 0+202.48 ~ 0+222.48
BASE SLAB
SL 54 24-Sep-23 24-Oct-23 09-Jul-23 A 27-Aug-23 A SAR648,888.92 SAR648,888.92 100% 100% 27-Aug-23 A, BASE SLAB
COLUMNS
COLUMN 19 25-Oct-23 20-Nov-23 30-Sep-23 A 21-Oct-23 A SAR44,691.49 SAR44,691.49 100% 100% 21-Oct-23 A, COLUMNS
TUNNEL WALLS 143 25-Oct-23 06-Dec-23 30-Sep-23 A 13-Mar-24 SAR452,451.71 SAR404,259.59 100% 89.35% 13-Mar-24, TUNNEL WALLS
TOP SALB
SAL 121 23-Nov-23 04-Jan-24 14-Nov-23 A 02-Apr-24 SAR680,866.86 SAR408,733.77 89% 60.03% 02-Apr-24, TOP SALB
FINISHING
FINISHIN 24 06-Jan-24 01-Feb-24 03-Apr-24 04-May-24 SAR482,638.19 SAR0.00 0% 0% 04-May-24, FINISHING
STA. 0+222.48
0+222. ~ 0+242.48 231 05-Oct-23 13-Feb-24 09-Jul-23 A 13-May-24 SAR2,309,537.17 SAR1,097,839.99 63.37% 47.54% 13-May-24, STA. 0+222.48 ~ 0+242.48
BASE SLAB
SL 60 05-Oct-23 05-Nov-23 09-Jul-23 A 17-Aug-23 A SAR648,888.92 SAR648,888.92 100% 100% 17-Aug-23 A, BASE SLAB
COLUMNS
COLUMN 39 06-Nov-23 02-Dec-23 14-Aug-23 A 27-Sep-23 A SAR44,691.49 SAR44,691.49 100% 100% 27-Sep-23 A, COLUMNS
TUNNEL WALLS 182 06-Nov-23 18-Dec-23 14-Aug-23 A 13-Mar-24 SAR452,451.71 SAR404,259.59 97.34% 89.35% 13-Mar-24, TUNNEL WALLS
TOP SALB
SAL 37 05-Dec-23 16-Jan-24 29-Feb-24 15-Apr-24 SAR680,866.86 SAR0.00 48.4% 0% 15-Apr-24, TOP SALB
FINISHING
FINISHIN 24 17-Jan-24 13-Feb-24 16-Apr-24 13-May-24 SAR482,638.19 SAR0.00 0% 0% 13-May-24, FINISHING
STA. 0+242.48
0+242. ~ 0+262.48 141 17-Oct-23 25-Feb-24 14-May-23 A 24-Apr-24 SAR2,309,537.17 SAR1,702,817.98 46.96% 73.73% 24-Apr-24, STA. 0+242.48 ~ 0+262.48
BASE SLAB
SL 47 17-Oct-23 16-Nov-23 14-May-23 A 22-Jun-23 A SAR648,888.92 SAR648,888.92 100% 100% 22-Jun-23 A, BASE SLAB
COLUMNS
COLUMN 64 18-Nov-23 13-Dec-23 08-Jul-23 A 04-Sep-23 A SAR44,691.49 SAR44,691.49 100% 100% 04-Sep-23 A, COLUMNS
TUNNEL WALLS 69 18-Nov-23 30-Dec-23 08-Jul-23 A 13-Mar-24 SAR452,451.71 SAR404,259.59 86.42% 89.35% 13-Mar-24, TUNNEL WALLS
TOP SALB
SAL 117 17-Dec-23 28-Jan-24 30-Oct-23 A 24-Mar-24 SAR680,866.86 SAR604,977.99 0% 88.85% 24-Mar-24, TOP SALB
FINISHING
FINISHIN 24 29-Jan-24 25-Feb-24 25-Mar-24 24-Apr-24 SAR482,638.19 SAR0.00 0% 0% 24-Apr-24, FINISHING
STA. 0+262.48
0+262. ~ 0+282.48 149 29-Oct-23 07-Mar-24 10-May-23 A 02-May-24 SAR2,309,537.17 SAR1,422,223.18 41.1% 61.58% 02-May-24, STA. 0+262.48 ~ 0+282.48
BASE SLAB
SL 58 29-Oct-23 28-Nov-23 10-May-23 A 20-Jul-23 A SAR648,888.92 SAR648,888.92 100% 100% 20-Jul-23 A, BASE SLAB
COLUMNS
COLUMN 80 29-Nov-23 25-Dec-23 14-Aug-23 A 11-Nov-23 A SAR44,691.49 SAR44,691.49 64.94% 100% 11-Nov-23 A, COLUMNS
TUNNEL WALLS 108 29-Nov-23 10-Jan-24 14-Aug-23 A 13-Mar-24 SAR452,451.71 SAR404,259.59 59.95% 89.35% 13-Mar-24, TUNNEL WALLS
TOP SALB
SAL 107 28-Dec-23 08-Feb-24 29-Nov-23 A 01-Apr-24 SAR680,866.86 SAR324,383.19 0% 47.64% 01-Apr-24, TOP SALB
FINISHING
FINISHIN 24 10-Feb-24 07-Mar-24 02-Apr-24 02-May-24 SAR482,638.19 SAR0.00 0% 0% 02-May-24, FINISHING
STA. 0+282.48
0+282. ~ 0+302.48 164 09-Nov-23 19-Mar-24 07-May-23 A 16-Apr-24 SAR2,309,537.17 SAR1,704,666.48 33.22% 73.81% 16-Apr-24, STA. 0+282.48 ~ 0+302.48
BASE SLAB
SL 26 09-Nov-23 10-Dec-23 07-May-23 A 13-Jun-23 A SAR648,888.92 SAR648,888.92 100% 100% 13-Jun-23 A, BASE SLAB
COLUMNS
COLUMN 55 11-Dec-23 06-Jan-24 07-Jun-23 A 12-Aug-23 A SAR44,691.49 SAR44,691.49 24.96% 100% 12-Aug-23 A, COLUMNS
TUNNEL WALLS 61 11-Dec-23 22-Jan-24 07-Jun-23 A 13-Mar-24 SAR452,451.71 SAR404,259.59 23.69% 89.35% 13-Mar-24, TUNNEL WALLS
TOP SALB
SAL 140 09-Jan-24 20-Feb-24 04-Oct-23 A 16-Mar-24 SAR680,866.86 SAR606,826.49 0% 89.13% 16-Mar-24, TOP SALB
FINISHING
FINISHIN 24 21-Feb-24 19-Mar-24 17-Mar-24 16-Apr-24 SAR482,638.19 SAR0.00 0% 0% 16-Apr-24, FINISHING
STA. 0+302.48
0+302. ~ 0+322.48 189 21-Nov-23 31-Mar-24 02-Dec-23 A 16-Jul-24 SAR2,309,537.17 SAR19,808.44 26.55% 0.86% 16-Jul-24, STA. 0+302.48 ~ 0+322.48

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
52 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
BASE SLAB
SL 103 21-Nov-23 21-Dec-23 02-Dec-23 A 30-Mar-24 SAR648,888.92 SAR19,808.44 94.48% 3.05% 30-Mar-24, BASE SLAB
COLUMNS
COLUMN 23 23-Dec-23 17-Jan-24 31-Mar-24 29-Apr-24 SAR44,691.49 SAR0.00 0% 0% 29-Apr-24, COLUMNS
TUNNEL WALLS 37 23-Dec-23 03-Feb-24 31-Mar-24 15-May-24 SAR452,451.71 SAR0.00 0% 0% 15-May-24, TUNNEL WALLS
TOP SALB
SAL 37 21-Jan-24 03-Mar-24 02-May-24 13-Jun-24 SAR680,866.86 SAR0.00 0% 0% 13-Jun-24, TOP SALB
FINISHING
FINISHIN 24 04-Mar-24 31-Mar-24 19-Jun-24 16-Jul-24 SAR482,638.19 SAR0.00 0% 0% 16-Jul-24, FINISHING
STA. 0+322.48
0+322. ~ 0+342.48 200 03-Dec-23 15-Apr-24 02-Nov-23 A 07-Jul-24 SAR2,309,537.17 SAR612,077.57 17.97% 26.5% 07-Jul-24, STA. 0+322.48 ~ 0+342.48
BASE SLAB
SL 114 03-Dec-23 02-Jan-24 02-Nov-23 A 20-Mar-24 SAR648,888.92 SAR612,077.57 63.94% 94.33% 20-Mar-24, BASE SLAB
COLUMNS
COLUMN 23 03-Jan-24 29-Jan-24 21-Mar-24 20-Apr-24 SAR44,691.49 SAR0.00 0% 0% 20-Apr-24, COLUMNS
TUNNEL WALLS 37 03-Jan-24 14-Feb-24 21-Mar-24 06-May-24 SAR452,451.71 SAR0.00 0% 0% 06-May-24, TUNNEL WALLS
TOP SALB
SAL 37 01-Feb-24 14-Mar-24 23-Apr-24 04-Jun-24 SAR680,866.86 SAR0.00 0% 0% 04-Jun-24, TOP SALB
FINISHING
FINISHIN 24 16-Mar-24 15-Apr-24 05-Jun-24 07-Jul-24 SAR482,638.19 SAR0.00 0% 0% 07-Jul-24, FINISHING
STA. 0+342.48
0+342. ~ 0+362.48 113 14-Dec-23 27-Apr-24 11-Mar-24 28-Jul-24 SAR2,309,537.17 SAR0.00 0.86% 0% 28-Jul-24, STA. 0+342.48 ~ 0+362.48
BASE SLAB
SL 27 14-Dec-23 14-Jan-24 11-Mar-24 14-Apr-24 SAR648,888.92 SAR0.00 3.05% 0% 14-Apr-24, BASE SLAB
COLUMNS
COLUMN 23 15-Jan-24 10-Feb-24 15-Apr-24 11-May-24 SAR44,691.49 SAR0.00 0% 0% 11-May-24, COLUMNS
TUNNEL WALLS 37 15-Jan-24 26-Feb-24 15-Apr-24 27-May-24 SAR452,451.71 SAR0.00 0% 0% 27-May-24, TUNNEL WALLS
TOP SALB
SAL 37 13-Feb-24 26-Mar-24 14-May-24 30-Jun-24 SAR680,866.86 SAR0.00 0% 0% 30-Jun-24, TOP SALB
FINISHING
FINISHIN 24 27-Mar-24 27-Apr-24 01-Jul-24 28-Jul-24 SAR482,638.19 SAR0.00 0% 0% 28-Jul-24, FINISHING
STA. 0+362.48
0+362. ~ 0+382.48 113 26-Dec-23 08-May-24 23-Mar-24 08-Aug-24 SAR2,309,537.17 SAR0.00 0% 0% 08-Aug-24, STA. 0+362.48 ~ 0+382.48
BASE SLAB
SL 27 26-Dec-23 25-Jan-24 23-Mar-24 25-Apr-24 SAR648,888.92 SAR0.00 0% 0% 25-Apr-24, BASE SLAB
COLUMNS
COLUMN 23 27-Jan-24 21-Feb-24 27-Apr-24 22-May-24 SAR44,691.49 SAR0.00 0% 0% 22-May-24, COLUMNS
TUNNEL WALLS 37 27-Jan-24 09-Mar-24 27-Apr-24 08-Jun-24 SAR452,451.71 SAR0.00 0% 0% 08-Jun-24, TUNNEL WALLS
TOP SALB
SAL 37 25-Feb-24 07-Apr-24 26-May-24 11-Jul-24 SAR680,866.86 SAR0.00 0% 0% 11-Jul-24, TOP SALB
FINISHING
FINISHIN 24 08-Apr-24 08-May-24 13-Jul-24 08-Aug-24 SAR482,638.19 SAR0.00 0% 0% 08-Aug-24, FINISHING
STA. 0+382.48
0+382. ~ 0+402.48 113 07-Jan-24 20-May-24 03-Apr-24 20-Aug-24 SAR2,309,537.17 SAR0.00 0% 0% 20-Aug-24, STA. 0+382.48 ~ 0+402.48
BASE SLAB
SL 27 07-Jan-24 06-Feb-24 03-Apr-24 07-May-24 SAR648,888.92 SAR0.00 0% 0% 07-May-24, BASE SLAB
COLUMNS
COLUMN 23 07-Feb-24 04-Mar-24 08-May-24 03-Jun-24 SAR44,691.49 SAR0.00 0% 0% 03-Jun-24, COLUMNS
TUNNEL WALLS 37 07-Feb-24 20-Mar-24 08-May-24 24-Jun-24 SAR452,451.71 SAR0.00 0% 0% 24-Jun-24, TUNNEL WALLS
TOP SALB
SAL 37 07-Mar-24 22-Apr-24 06-Jun-24 23-Jul-24 SAR680,866.86 SAR0.00 0% 0% 23-Jul-24, TOP SALB
FINISHING
FINISHIN 24 23-Apr-24 20-May-24 24-Jul-24 20-Aug-24 SAR482,638.19 SAR0.00 0% 0% 20-Aug-24, FINISHING
STA. 0+402.48
0+402. ~ 0+422.48 106 18-Jan-24 23-May-24 18-Apr-24 24-Aug-24 SAR2,309,537.17 SAR0.00 0% 0% 24-Aug-24, STA. 0+402.48 ~ 0+422.48
BASE SLAB
SL 27 18-Jan-24 18-Feb-24 18-Apr-24 19-May-24 SAR648,888.92 SAR0.00 0% 0% 19-May-24, BASE SLAB
COLUMNS
COLUMN 23 19-Feb-24 16-Mar-24 20-May-24 19-Jun-24 SAR44,691.49 SAR0.00 0% 0% 19-Jun-24, COLUMNS
TUNNEL WALLS 30 19-Feb-24 24-Mar-24 20-May-24 27-Jun-24 SAR452,451.71 SAR0.00 0% 0% 27-Jun-24, TUNNEL WALLS
TOP SALB
SAL 37 11-Mar-24 25-Apr-24 10-Jun-24 27-Jul-24 SAR680,866.86 SAR0.00 0% 0% 27-Jul-24, TOP SALB
FINISHING
FINISHIN 24 27-Apr-24 23-May-24 28-Jul-24 24-Aug-24 SAR482,638.19 SAR0.00 0% 0% 24-Aug-24, FINISHING
STA. 0+422.48
0+422. ~ 0+434.48 113 30-Jan-24 12-Jun-24 30-Apr-24 12-Sep-24 SAR2,309,537.17 SAR0.00 0% 0% 12-Sep-24, STA. 0+422.48 ~ 0+434.48
BASE SLAB
SL 27 30-Jan-24 29-Feb-24 30-Apr-24 30-May-24 SAR648,888.92 SAR0.00 0% 0% 30-May-24, BASE SLAB
COLUMNS
COLUMN 23 02-Mar-24 27-Mar-24 01-Jun-24 01-Jul-24 SAR44,691.49 SAR0.00 0% 0% 01-Jul-24, COLUMNS
TUNNEL WALLS 37 02-Mar-24 16-Apr-24 01-Jun-24 17-Jul-24 SAR452,451.71 SAR0.00 0% 0% 17-Jul-24, TUNNEL WALLS
TOP SALB
SAL 37 31-Mar-24 15-May-24 04-Jul-24 15-Aug-24 SAR680,866.86 SAR0.00 0% 0% 15-Aug-24, TOP SALB
FINISHING
FINISHIN 24 16-May-24 12-Jun-24 17-Aug-24 12-Sep-24 SAR482,638.19 SAR0.00 0% 0% 12-Sep-24, FINISHING
EGRESS STAIR-13
STAIR (ZONE-11) 236 31-Aug-23 05-Jun-24 29-Feb-24 09-Dec-24 SAR2,340,795.49 SAR0.00 40.93% 0% 09-Dec-24, EGRESS STAIR-13 (ZON
WALL AND 1 1ST FLIGHT 31 31-Aug-23 07-Oct-23 29-Feb-24 04-Apr-24 SAR544,958.40 SAR0.00 100% 0% 04-Apr-24, WALL AND 1ST FLIGHT
WALL AND 2 2ND FLIGHT 17 08-Oct-23 26-Oct-23 04-Apr-24 28-Apr-24 SAR111,087.10 SAR0.00 100% 0% 28-Apr-24, WALL AND 2ND FLIGHT
WALL AND 3 3RD FLIGHT 17 28-Oct-23 15-Nov-23 28-Apr-24 18-May-24 SAR111,087.10 SAR0.00 100% 0% 18-May-24, WALL AND 3RD FLIGHT
WALL AND 4 4TH FLIGHT 17 16-Nov-23 05-Dec-23 18-May-24 06-Jun-24 SAR111,087.10 SAR0.00 100% 0% 06-Jun-24, WALL AND 4TH FLIGHT
WALL AND 5 5TH FLIGHT 17 06-Dec-23 25-Dec-23 06-Jun-24 01-Jul-24 SAR111,087.10 SAR0.00 71.98% 0% 01-Jul-24, WALL AND 5TH FLIGHT
WALL AND 6 6TH FLIGHT 17 26-Dec-23 14-Jan-24 01-Jul-24 21-Jul-24 SAR111,087.10 SAR0.00 0% 0% 21-Jul-24, WALL AND 6TH FLIGHT
WALL AND 7 7TH FLIGHT 17 15-Jan-24 03-Feb-24 21-Jul-24 10-Aug-24 SAR111,087.10 SAR0.00 0% 0% 10-Aug-24, WALL AND 7TH FLIGHT
WALL AND 8 8TH FLIGHT 17 04-Feb-24 22-Feb-24 10-Aug-24 29-Aug-24 SAR111,087.10 SAR0.00 0% 0% 29-Aug-24, WALL AND 8TH FLIGHT
WALL AND 9 9TH FLIGHT 17 24-Feb-24 13-Mar-24 29-Aug-24 18-Sep-24 SAR111,087.10 SAR0.00 0% 0% 18-Sep-24, WALL AND 9TH FLIGHT
WALL AND 1 10TH FLIGHT 17 14-Mar-24 02-Apr-24 18-Sep-24 09-Oct-24 SAR111,087.10 SAR0.00 0% 0% 09-Oct-24, WALL AND 10TH FLIGHT
WALL AND 1 11TH FLIGHT 17 03-Apr-24 25-Apr-24 09-Oct-24 29-Oct-24 SAR99,544.51 SAR0.00 0% 0% 29-Oct-24, WALL AND 11TH FLIGHT
TOP SLAB 35 27-Apr-24 05-Jun-24 29-Oct-24 09-Dec-24 SAR696,508.72 SAR0.00 0% 0% 09-Dec-24, TOP SLAB
BACKFILLING UPTO TUNNEL WALL 116 04-Oct-23 09-May-24 20-Mar-24 10-Aug-24 SAR8,475,439.56 SAR0.00 40% 0% 10-Aug-24, BACKFILLING UPTO TUNN
STRUCTURAL FILL 89 25-Nov-23 10-Jul-24 07-Jul-24 20-Oct-24 SAR8,475,439.56 SAR0.00 22.5% 0% 20-Oct-24, STRUCTURAL FILL
WET & DRY UTILITIES
UT 221 13-Jun-24 26-Dec-24 14-Sep-24 04-Jun-25 SAR5,657,904.81 SAR0.00 0% 0% 04-Jun-25, WET & DRY UTILI
INSIDE WET CULVERT 112 13-Jun-24 27-Oct-24 14-Sep-24 22-Jan-25 SAR3,392,531.20 SAR0.00 0% 0% 22-Jan-25, INSIDE WET CULVERT
POTABLE WATER NETWORK 59 13-Jun-24 25-Aug-24 14-Sep-24 21-Nov-24 SAR427,352.76 SAR0.00 0% 0% 21-Nov-24, POTABLE WATER NETW
GREY WA
WATER DISTRIBUTION SYSTEM 49 17-Jul-24 11-Sep-24 14-Oct-24 09-Dec-24 SAR262,973.54 SAR0.00 0% 0% 09-Dec-24, GREY WATER DISTRIBU
IRRIGATION NETWORK
IRRIGATI 53 17-Jul-24 16-Sep-24 14-Oct-24 14-Dec-24 SAR399,281.14 SAR0.00 0% 0% 14-Dec-24, IRRIGATION NETWORK
CHILLED WATER SUPPLY NETWORK 59 10-Aug-24 17-Oct-24 06-Nov-24 13-Jan-25 SAR782,691.15 SAR0.00 0% 0% 13-Jan-25, CHILLED WATER SUPP

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
53 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
CHILLED WATER RETURN NETWORK 63 10-Aug-24 22-Oct-24 06-Nov-24 18-Jan-25 SAR782,691.15 SAR0.00 0% 0% 18-Jan-25, CHILLED WATER RETU
AUTOMATIC WASTE COLLECTION NETWORK
AUTOMA 77 17-Jul-24 27-Oct-24 26-Oct-24 22-Jan-25 SAR737,541.47 SAR0.00 0% 0% 22-Jan-25, AUTOMATIC WASTE C
INSIDE DRY CULVERT 164 13-Jun-24 26-Dec-24 20-Nov-24 04-Jun-25 SAR2,265,373.61 SAR0.00 0% 0% 04-Jun-25, INSIDE DRY CULV
POWER 164 13-Jun-24 26-Dec-24 20-Nov-24 04-Jun-25 SAR2,076,484.72 SAR0.00 0% 0% 04-Jun-25, POWER
HIGH VOLTAGE
V 110 KV NETWORK 30 13-Jun-24 22-Jul-24 20-Nov-24 25-Dec-24 SAR135,147.62 SAR0.00 0% 0% 25-Dec-24, HIGH VOLTAGE 110 KV
MEDIUM VOLTAGE 13.8 KV NETWORK
MEDIU 32 23-Jul-24 28-Aug-24 25-Dec-24 01-Feb-25 SAR1,728,573.90 SAR0.00 0% 0% 01-Feb-25, MEDIUM VOLTAGE 13
LOW VVOLTAGE NETWORK 32 29-Aug-24 06-Oct-24 01-Feb-25 10-Mar-25 SAR212,763.20 SAR0.00 0% 0% 10-Mar-25, LOW VOLTAGE NETW
ELECTRICAL DISTRIBUTION SYSTEM
ELECT 70 07-Oct-24 26-Dec-24 10-Mar-25 04-Jun-25 SAR0.00 SAR0.00 0% 0% 04-Jun-25, ELECTRICAL DIST
LIGHTING SYSTEM
LIGHT 35 19-Oct-24 27-Nov-24 22-Mar-25 06-May-25 SAR0.00 SAR0.00 0% 0% 06-May-25, LIGHTING SYSTEM
TELECOM SERVICES 30 07-Oct-24 10-Nov-24 10-Mar-25 19-Apr-25 SAR188,888.89 SAR0.00 0% 0% 19-Apr-25, TELECOM SERVICE
MEP VEHICULAR
VEHICULA TUNNEL/ DRY & WET CULVERTS 215 13-Jun-24 24-Feb-25 14-Dec-24 30-Aug-25 SAR7,521,676.34 SAR0.00 0% 0% 30-Aug-25, MEP VEHICUL
TUNNEL MECHANICAL
ME WORKS 171 13-Jun-24 28-Jan-25 14-Dec-24 10-Jul-25 SAR2,163,850.77 SAR0.00 0% 0% 10-Jul-25, TUNNEL MECHAN
FIRE FIG
FIGHTING SYSTEM 56 13-Jun-24 21-Aug-24 14-Dec-24 17-Feb-25 SAR1,573,805.75 SAR0.00 0% 0% 17-Feb-25, FIRE FIGHTING SYST
VENTILATION SYSTEM
VENTILA 23 27-Jul-24 21-Aug-24 21-Jan-25 17-Feb-25 SAR176,473.45 SAR0.00 0% 0% 17-Feb-25, VENTILATION SYSTE
PUMPS INSTALLATION
I 62 07-Aug-24 12-Nov-24 02-Feb-25 21-Apr-25 SAR331,608.78 SAR0.00 0% 0% 21-Apr-25, PUMPS INSTALLAT
DUCTING SYSTEM 66 13-Nov-24 28-Jan-25 21-Apr-25 10-Jul-25 SAR81,962.79 SAR0.00 0% 0% 10-Jul-25, DUCTING SYSTE
TUNNEL ELECTRICAL
EL WORKS 180 13-Jun-24 14-Jan-25 14-Dec-24 20-Jul-25 SAR4,548,718.94 SAR0.00 0% 0% 20-Jul-25, TUNNEL ELECTR
CABLE TRAYS
T 101 13-Jun-24 14-Oct-24 14-Dec-24 15-Apr-25 SAR1,032,116.32 SAR0.00 0% 0% 15-Apr-25, CABLE TRAYS
POWER CABLES 106 13-Jul-24 13-Nov-24 07-Jan-25 15-May-25 SAR1,395,474.25 SAR0.00 0% 0% 15-May-25, POWER CABLES
ELECTRICAL INSTALLATIONS
ELECTRI 86 10-Sep-24 19-Dec-24 08-Mar-25 24-Jun-25 SAR1,141,842.70 SAR0.00 0% 0% 24-Jun-25, ELECTRICAL INS
LOW CUR
CURRENT 180 13-Jun-24 14-Jan-25 14-Dec-24 20-Jul-25 SAR979,285.68 SAR0.00 0% 0% 20-Jul-25, LOW CURRENT
FIRE D
DETECTION AND ALARM SYSTEM 82 13-Jun-24 21-Sep-24 14-Dec-24 19-Mar-25 SAR167,385.38 SAR0.00 0% 0% 19-Mar-25, FIRE DETECTION AN
COMMUNICATION SYSTEM/ EMERGENCY TELEPHONE
COMM 28 02-Jul-24 03-Aug-24 28-Dec-24 29-Jan-25 SAR139,471.52 SAR0.00 0% 0% 29-Jan-25, COMMUNICATION SY
PUBLIC ADDRESS
PUBLI 28 04-Aug-24 04-Sep-24 29-Jan-25 03-Mar-25 SAR108,186.32 SAR0.00 0% 0% 03-Mar-25, PUBLIC ADDRESS
VIDEO SURVEILLANCE 49 05-Sep-24 02-Nov-24 03-Mar-25 04-May-25 SAR130,180.21 SAR0.00 0% 0% 04-May-25, VIDEO SURVEILLA
SACADA SYSTEM
SACA 35 03-Nov-24 12-Dec-24 04-May-25 17-Jun-25 SAR347,541.21 SAR0.00 0% 0% 17-Jun-25, SACADA SYSTEM
RADIO RE-BROADCASTING SYSTEM 28 14-Dec-24 14-Jan-25 17-Jun-25 20-Jul-25 SAR86,521.04 SAR0.00 0% 0% 20-Jul-25, RADIO RE-BROA
TUNNEL PLUMBING
PL WORKS 35 15-Jan-25 24-Feb-25 20-Jul-25 30-Aug-25 SAR809,106.62 SAR0.00 0% 0% 30-Aug-25, TUNNEL PLUM
DRAINAGE SYSTEM
DRAINAG 35 15-Jan-25 24-Feb-25 20-Jul-25 30-Aug-25 SAR809,106.62 SAR0.00 0% 0% 30-Aug-25, DRAINAGE SY
TUNNEL INTERNAL
INTER ROAD WORK 42 25-Feb-25 19-Apr-25 30-Aug-25 19-Oct-25 SAR1,428,277.00 SAR0.00 0% 0% 19-Oct-25, TUNNEL INTE
TUNNEL INTERNAL
INTER DECORATIVE WORKS 40 05-Apr-25 20-May-25 04-Oct-25 19-Nov-25 SAR2,908,180.92 SAR0.00 0% 0% 19-Nov-25, TUNNEL IN
MEP ROOMS 866 08-Sep-22 31-Jul-25 01-Feb-23 A 02-Mar-26 SAR341,553,055.95 SAR213,195.46 31.51% 0.06% 02-Mar-26, MEP RO
ENGINEERING 53 08-Sep-22 09-Nov-22 16-Dec-23 15-Feb-24 SAR0.00 SAR0.00 0% 0% 15-Feb-24, ENGINEERING
SHOP DRAWING
DRAWINGS 32 08-Sep-22 15-Oct-22 16-Dec-23 21-Jan-24 SAR0.00 SAR0.00 0% 0% 21-Jan-24, SHOP DRAWINGS
METHOD STATEMENT
STATEM 44 20-Sep-22 09-Nov-22 26-Dec-23 15-Feb-24 SAR0.00 SAR0.00 0% 0% 15-Feb-24, METHOD STATEMENT
PROCUREMENT 150 04-Oct-22 19-Mar-24 09-Jan-24 10-Jul-24 SAR65,307,655.63 SAR0.00 53.46% 0% 10-Jul-24, PROCUREMENT
CIVIL/STRUCTURAL/MECHANICAL/ELECTRICAL
CIVIL/STRUCTUR 150 04-Oct-22 19-Mar-24 09-Jan-24 10-Jul-24 SAR65,307,655.63 SAR0.00 53.46% 0% 10-Jul-24, CIVIL/STRUCTURAL/MECHAN
CONSTRUCTION 866 06-Nov-22 31-Jul-25 01-Feb-23 A 02-Mar-26 SAR276,245,400.32 SAR213,195.46 26.32% 0.08% 02-Mar-26, CONSTR
GEO-TECHNICAL INVESTIGATION 25 06-Nov-22 04-Dec-22 01-Feb-23 A 23-Feb-23 A SAR213,195.46 SAR213,195.46 100% 100% 23-Feb-23 A, GEO-TECHNICAL INVESTIGATION
ELECTRIC SUB S
STATION (12 NOS) 506 24-Dec-22 09-Jun-25 17-Feb-24 19-Oct-25 SAR92,697,758.33 SAR0.00 28.7% 0% 19-Oct-25, ELECTRIC SU
ELECTRIC SUB STATION NO.1 (ZONE-1) 293 16-Jan-24 04-Mar-25 30-Oct-24 16-Oct-25 SAR7,724,990.83 SAR0.00 0% 0% 16-Oct-25, ELECTRIC SU
STRUCTURAL WORKS 246 16-Jan-24 08-Jan-25 30-Oct-24 21-Aug-25 SAR3,728,117.27 SAR0.00 0% 0% 21-Aug-25, STRUCTURAL
MEP WORKS 175 12-Aug-24 04-Mar-25 17-Mar-25 16-Oct-25 SAR3,996,873.55 SAR0.00 0% 0% 16-Oct-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 12-Aug-24 25-Aug-24 17-Mar-25 05-Apr-25 SAR135,549.74 SAR0.00 0% 0% 05-Apr-25, Domestic Hot and Cold
Soil and Waste
Wa Drainage System 10 26-Aug-24 05-Sep-24 05-Apr-25 16-Apr-25 SAR38,628.89 SAR0.00 0% 0% 16-Apr-25, Soil and Waste Drainag
Air Conditio
Conditioning Works 10 24-Dec-24 04-Jan-25 05-Aug-25 17-Aug-25 SAR264,787.87 SAR0.00 0% 0% 17-Aug-25, Air Conditioning
Fire Fighting Installation 14 05-Jan-25 20-Jan-25 17-Aug-25 02-Sep-25 SAR249,692.49 SAR0.00 0% 0% 02-Sep-25, Fire Fighting Inst
Electrical Installation
In 46 29-Dec-24 19-Feb-25 10-Aug-25 04-Oct-25 SAR2,082,506.26 SAR0.00 0% 0% 04-Oct-25, Electrical Install
Fire Detection
Detecti and Alarm System 18 04-Jan-25 23-Jan-25 16-Aug-25 06-Sep-25 SAR39,483.58 SAR0.00 0% 0% 06-Sep-25, Fire Detection an
Voice Evacu
Evacuation / Public Address System 9 07-Jan-25 16-Jan-25 19-Aug-25 30-Aug-25 SAR14,952.62 SAR0.00 0% 0% 30-Aug-25, Voice Evacuation
Earthing Sy
System 4 10-Feb-25 13-Feb-25 22-Sep-25 28-Sep-25 SAR112,825.33 SAR0.00 0% 0% 28-Sep-25, Earthing System
Lightning Pr
Protection System 5 15-Feb-25 19-Feb-25 28-Sep-25 04-Oct-25 SAR73,387.90 SAR0.00 0% 0% 04-Oct-25, Lightning Protec
SCADA System
Sys 8 18-Feb-25 26-Feb-25 01-Oct-25 11-Oct-25 SAR8,343.38 SAR0.00 0% 0% 11-Oct-25, SCADA System
Video Surve
Surveillance and Access Control System 5 27-Feb-25 04-Mar-25 11-Oct-25 16-Oct-25 SAR59,080.35 SAR0.00 0% 0% 16-Oct-25, Video Surveilla
Transformer Installation 33 04-Jan-25 10-Feb-25 16-Aug-25 24-Sep-25 SAR917,635.14 SAR0.00 0% 0% 24-Sep-25, Transformer Ins
ELECTRIC SUB STATION NO.2 (ZONE-2) 291 26-Feb-24 02-Mar-25 31-Oct-24 15-Oct-25 SAR7,724,797.05 SAR0.00 0% 0% 15-Oct-25, ELECTRIC SU
STRUCTURAL WORKS 246 26-Feb-24 08-Jan-25 31-Oct-24 23-Aug-25 SAR3,727,923.49 SAR0.00 0% 0% 23-Aug-25, STRUCTURAL
MEP WORKS 173 12-Aug-24 02-Mar-25 18-Mar-25 15-Oct-25 SAR3,996,873.55 SAR0.00 0% 0% 15-Oct-25, MEP WORKS
Domestic HHot and Cold Water Services 12 12-Aug-24 25-Aug-24 18-Mar-25 06-Apr-25 SAR135,549.74 SAR0.00 0% 0% 06-Apr-25, Domestic Hot and Cold
Soil and Waste
Wa Drainage System 10 26-Aug-24 05-Sep-24 06-Apr-25 17-Apr-25 SAR38,628.89 SAR0.00 0% 0% 17-Apr-25, Soil and Waste Draina

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
54 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
Air Conditio
Conditioning Works 16 24-Dec-24 11-Jan-25 06-Aug-25 25-Aug-25 SAR264,787.87 SAR0.00 0% 0% 25-Aug-25, Air Conditioning
Fire Fighting Installation 14 12-Jan-25 27-Jan-25 25-Aug-25 10-Sep-25 SAR249,692.49 SAR0.00 0% 0% 10-Sep-25, Fire Fighting Ins
Electrical Installation
In 50 29-Dec-24 24-Feb-25 11-Aug-25 09-Oct-25 SAR2,082,506.26 SAR0.00 0% 0% 09-Oct-25, Electrical Install
Fire Detection
Detecti and Alarm System 18 04-Jan-25 23-Jan-25 17-Aug-25 07-Sep-25 SAR39,483.58 SAR0.00 0% 0% 07-Sep-25, Fire Detection an
Voice Evacu
Evacuation / Public Address System 9 07-Jan-25 16-Jan-25 20-Aug-25 31-Aug-25 SAR14,952.62 SAR0.00 0% 0% 31-Aug-25, Voice Evacuation
Earthing Sy
System 4 08-Feb-25 11-Feb-25 21-Sep-25 27-Sep-25 SAR112,825.33 SAR0.00 0% 0% 27-Sep-25, Earthing System
Lightning Pr
Protection System 5 12-Feb-25 17-Feb-25 27-Sep-25 02-Oct-25 SAR73,387.90 SAR0.00 0% 0% 02-Oct-25, Lightning Protec
SCADA System
Sys 8 16-Feb-25 24-Feb-25 30-Sep-25 09-Oct-25 SAR8,343.38 SAR0.00 0% 0% 09-Oct-25, SCADA System
Video Surve
Surveillance and Access Control System 5 25-Feb-25 02-Mar-25 09-Oct-25 15-Oct-25 SAR59,080.35 SAR0.00 0% 0% 15-Oct-25, Video Surveilla
Transformer Installation 33 04-Jan-25 10-Feb-25 17-Aug-25 25-Sep-25 SAR917,635.14 SAR0.00 0% 0% 25-Sep-25, Transformer Ins
ELECTRIC SUB STATION NO.3 (ZONE-9) 293 30-Jan-23 14-Jan-24 06-Apr-24 22-Mar-25 SAR7,724,797.05 SAR0.00 87.08% 0% 22-Mar-25, ELECTRIC SUB STAT
STRUCTURAL WORKS 246 30-Jan-23 20-Nov-23 06-Apr-24 26-Jan-25 SAR3,727,923.49 SAR0.00 100% 0% 26-Jan-25, STRUCTURAL WORKS
MEP WORKS 175 20-Jun-23 14-Jan-24 29-Aug-24 22-Mar-25 SAR3,996,873.55 SAR0.00 75.03% 0% 22-Mar-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 20-Jun-23 06-Jul-23 29-Aug-24 11-Sep-24 SAR135,549.74 SAR0.00 100% 0% 11-Sep-24, Domestic Hot and Cold Water S
Soil and Waste
Wa Drainage System 10 08-Jul-23 18-Jul-23 12-Sep-24 24-Sep-24 SAR38,628.89 SAR0.00 100% 0% 24-Sep-24, Soil and Waste Drainage Syste
Air Conditio
Conditioning Works 20 05-Nov-23 27-Nov-23 11-Jan-25 02-Feb-25 SAR264,787.87 SAR0.00 100% 0% 02-Feb-25, Air Conditioning Works
Fire Fighting Installation 14 28-Nov-23 13-Dec-23 03-Feb-25 18-Feb-25 SAR249,692.49 SAR0.00 100% 0% 18-Feb-25, Fire Fighting Installation
Electrical Installation
In 46 09-Nov-23 01-Jan-24 15-Jan-25 09-Mar-25 SAR2,082,506.26 SAR0.00 71.14% 0% 09-Mar-25, Electrical Installation
Fire Detection
Detecti and Alarm System 18 15-Nov-23 05-Dec-23 21-Jan-25 10-Feb-25 SAR39,483.58 SAR0.00 100% 0% 10-Feb-25, Fire Detection and Alarm
Voice Evacu
Evacuation / Public Address System 9 19-Nov-23 28-Nov-23 25-Jan-25 03-Feb-25 SAR14,952.62 SAR0.00 100% 0% 03-Feb-25, Voice Evacuation / Public
Earthing Sy
System 4 23-Dec-23 26-Dec-23 27-Feb-25 03-Mar-25 SAR112,825.33 SAR0.00 0% 0% 03-Mar-25, Earthing System
Lightning Pr
Protection System 5 27-Dec-23 01-Jan-24 04-Mar-25 09-Mar-25 SAR73,387.90 SAR0.00 0% 0% 09-Mar-25, Lightning Protection Sy
SCADA System
Sys 8 31-Dec-23 08-Jan-24 08-Mar-25 16-Mar-25 SAR8,343.38 SAR0.00 0% 0% 16-Mar-25, SCADA System
Video Surve
Surveillance and Access Control System 5 09-Jan-24 14-Jan-24 17-Mar-25 22-Mar-25 SAR59,080.35 SAR0.00 0% 0% 22-Mar-25, Video Surveillance and
Transformer Installation 33 15-Nov-23 23-Dec-23 21-Jan-25 27-Feb-25 SAR917,635.14 SAR0.00 84.37% 0% 27-Feb-25, Transformer Installation
ELECTRIC SUB STATION NO.4 (ZONE-3) 506 24-Dec-22 06-Mar-25 17-Feb-24 19-Oct-25 SAR7,724,797.05 SAR0.00 80.03% 0% 19-Oct-25, ELECTRIC SU
STRUCTURAL WORKS 291 24-Dec-22 05-Dec-23 17-Feb-24 30-Jan-25 SAR3,727,923.49 SAR0.00 100% 0% 30-Jan-25, STRUCTURAL WORKS
MEP WORKS 388 14-May-23 06-Mar-25 11-Jul-24 19-Oct-25 SAR3,996,873.55 SAR0.00 61.41% 0% 19-Oct-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 14-May-23 27-May-23 11-Jul-24 25-Jul-24 SAR135,549.74 SAR0.00 100% 0% 25-Jul-24, Domestic Hot and Cold Water Ser
Soil and Waste
Wa Drainage System 10 28-May-23 07-Jun-23 25-Jul-24 06-Aug-24 SAR38,628.89 SAR0.00 100% 0% 06-Aug-24, Soil and Waste Drainage System
Air Conditio
Conditioning Works 21 14-Nov-23 07-Dec-23 08-Jan-25 02-Feb-25 SAR264,787.87 SAR0.00 100% 0% 02-Feb-25, Air Conditioning Works
Fire Fighting Installation 14 09-Dec-23 24-Dec-23 02-Feb-25 18-Feb-25 SAR249,692.49 SAR0.00 47.37% 0% 18-Feb-25, Fire Fighting Installation
Electrical Installation
In 44 19-Nov-23 11-Jan-24 21-Jan-25 12-Mar-25 SAR2,082,506.26 SAR0.00 62.63% 0% 12-Mar-25, Electrical Installation
Fire Detection
Detecti and Alarm System 18 25-Nov-23 14-Dec-23 27-Jan-25 16-Feb-25 SAR39,483.58 SAR0.00 100% 0% 16-Feb-25, Fire Detection and Alarm
Voice Evacu
Evacuation / Public Address System 9 28-Nov-23 07-Dec-23 30-Jan-25 09-Feb-25 SAR14,952.62 SAR0.00 100% 0% 09-Feb-25, Voice Evacuation / Public
Earthing Sy
System 4 02-Jan-24 06-Jan-24 03-Mar-25 06-Mar-25 SAR112,825.33 SAR0.00 0% 0% 06-Mar-25, Earthing System
Lightning Pr
Protection System 5 07-Jan-24 11-Jan-24 08-Mar-25 13-Mar-25 SAR73,387.90 SAR0.00 0% 0% 13-Mar-25, Lightning Protection Sy
SCADA System
Sys 8 10-Jan-24 18-Jan-24 11-Mar-25 19-Mar-25 SAR8,343.38 SAR0.00 0% 0% 19-Mar-25, SCADA System
Video Surve
Surveillance and Access Control System 174 20-Jan-24 06-Mar-25 20-Mar-25 19-Oct-25 SAR59,080.35 SAR0.00 0% 0% 19-Oct-25, Video Surveilla
Transformer Installation 33 25-Nov-23 01-Jan-24 27-Jan-25 05-Mar-25 SAR917,635.14 SAR0.00 58.67% 0% 05-Mar-25, Transformer Installation
ELECTRIC SUB STATION NO.5 (ZONE-3) 310 08-Feb-23 12-Feb-24 03-Apr-24 14-Apr-25 SAR7,724,797.05 SAR0.00 58.84% 0% 14-Apr-25, ELECTRIC SUB STA
STRUCTURAL WORKS 264 08-Feb-23 20-Dec-23 03-Apr-24 15-Feb-25 SAR3,727,923.49 SAR0.00 99.85% 0% 15-Feb-25, STRUCTURAL WORK
MEP WORKS 192 03-Jul-23 12-Feb-24 27-Aug-24 14-Apr-25 SAR3,996,873.55 SAR0.00 20.59% 0% 14-Apr-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 03-Jul-23 16-Jul-23 27-Aug-24 10-Sep-24 SAR135,549.74 SAR0.00 100% 0% 10-Sep-24, Domestic Hot and Cold Water S
Soil and Waste
Wa Drainage System 10 17-Jul-23 27-Jul-23 10-Sep-24 22-Sep-24 SAR38,628.89 SAR0.00 100% 0% 22-Sep-24, Soil and Waste Drainage Syste
Air Conditio
Conditioning Works 10 05-Dec-23 16-Dec-23 29-Jan-25 10-Feb-25 SAR264,787.87 SAR0.00 100% 0% 10-Feb-25, Air Conditioning Works
Fire Fighting Installation 14 17-Dec-23 01-Jan-24 10-Feb-25 26-Feb-25 SAR249,692.49 SAR0.00 0% 0% 26-Feb-25, Fire Fighting Installation
Electrical Installation
In 44 10-Dec-23 29-Jan-24 03-Feb-25 26-Mar-25 SAR2,082,506.26 SAR0.00 18.44% 0% 26-Mar-25, Electrical Installation
Fire Detection
Detecti and Alarm System 18 16-Dec-23 04-Jan-24 09-Feb-25 02-Mar-25 SAR39,483.58 SAR0.00 0% 0% 02-Mar-25, Fire Detection and Alarm
Voice Evacu
Evacuation / Public Address System 9 19-Dec-23 28-Dec-23 12-Feb-25 23-Feb-25 SAR14,952.62 SAR0.00 0% 0% 23-Feb-25, Voice Evacuation / Public
Earthing Sy
System 4 20-Jan-24 23-Jan-24 16-Mar-25 20-Mar-25 SAR112,825.33 SAR0.00 0% 0% 20-Mar-25, Earthing System
Lightning Pr
Protection System 7 24-Jan-24 31-Jan-24 20-Mar-25 29-Mar-25 SAR73,387.90 SAR0.00 0% 0% 29-Mar-25, Lightning Protection Sy
SCADA System
Sys 9 28-Jan-24 06-Feb-24 24-Mar-25 08-Apr-25 SAR8,343.38 SAR0.00 0% 0% 08-Apr-25, SCADA System
Video Surve
Surveillance and Access Control System 5 07-Feb-24 12-Feb-24 08-Apr-25 14-Apr-25 SAR59,080.35 SAR0.00 0% 0% 14-Apr-25, Video Surveillance and
Transformer Installation 33 16-Dec-23 22-Jan-24 09-Feb-25 19-Mar-25 SAR917,635.14 SAR0.00 0% 0% 19-Mar-25, Transformer Installation
ELECTRIC SUB STATION NO.6 (ZONE-10) 347 01-Jan-23 14-Feb-24 24-Feb-24 16-Apr-25 SAR7,724,797.05 SAR0.00 74.24% 0% 16-Apr-25, ELECTRIC SUB STA
STRUCTURAL WORKS 318 01-Jan-23 11-Jan-24 24-Feb-24 09-Mar-25 SAR3,727,923.49 SAR0.00 99.59% 0% 09-Mar-25, STRUCTURAL WORK
MEP WORKS 229 22-May-23 14-Feb-24 18-Jul-24 16-Apr-25 SAR3,996,873.55 SAR0.00 50.6% 0% 16-Apr-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 22-May-23 04-Jun-23 18-Jul-24 31-Jul-24 SAR135,549.74 SAR0.00 100% 0% 31-Jul-24, Domestic Hot and Cold Water Se
Soil and Waste
Wa Drainage System 10 05-Jun-23 15-Jun-23 01-Aug-24 12-Aug-24 SAR38,628.89 SAR0.00 100% 0% 12-Aug-24, Soil and Waste Drainage System
Air Conditio
Conditioning Works 10 22-Nov-23 03-Dec-23 15-Jan-25 26-Jan-25 SAR264,787.87 SAR0.00 100% 0% 26-Jan-25, Air Conditioning Works
Fire Fighting Installation 14 04-Dec-23 19-Dec-23 27-Jan-25 11-Feb-25 SAR249,692.49 SAR0.00 84.21% 0% 11-Feb-25, Fire Fighting Installation

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
55 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
Electrical Installation
In 44 27-Nov-23 16-Jan-24 20-Jan-25 11-Mar-25 SAR2,082,506.26 SAR0.00 44.8% 0% 11-Mar-25, Electrical Installation
Fire Detection
Detecti and Alarm System 18 03-Dec-23 23-Dec-23 26-Jan-25 15-Feb-25 SAR39,483.58 SAR0.00 53.89% 0% 15-Feb-25, Fire Detection and Alarm
Voice Evacu
Evacuation / Public Address System 9 06-Dec-23 16-Dec-23 29-Jan-25 08-Feb-25 SAR14,952.62 SAR0.00 92.55% 0% 08-Feb-25, Voice Evacuation / Public
Earthing Sy
System 4 07-Jan-24 10-Jan-24 02-Mar-25 05-Mar-25 SAR112,825.33 SAR0.00 0% 0% 05-Mar-25, Earthing System
Lightning Pr
Protection System 5 11-Jan-24 16-Jan-24 06-Mar-25 11-Mar-25 SAR73,387.90 SAR0.00 0% 0% 11-Mar-25, Lightning Protection Sy
SCADA System
Sys 8 15-Jan-24 23-Jan-24 10-Mar-25 19-Mar-25 SAR8,343.38 SAR0.00 0% 0% 19-Mar-25, SCADA System
Video Surve
Surveillance and Access Control System 21 24-Jan-24 14-Feb-24 19-Mar-25 16-Apr-25 SAR59,080.35 SAR0.00 0% 0% 16-Apr-25, Video Surveillance and
Transformer Installation 33 03-Dec-23 09-Jan-24 26-Jan-25 04-Mar-25 SAR917,635.14 SAR0.00 44.15% 0% 04-Mar-25, Transformer Installation
ELECTRIC SUB STATION NO.7 (ZONE-4) 364 05-Mar-24 22-Apr-25 27-May-24 07-Aug-25 SAR7,724,797.05 SAR0.00 0% 0% 07-Aug-25, ELECTRIC SUB
STRUCTURAL WORKS 324 05-Mar-24 02-Mar-25 27-May-24 23-Jun-25 SAR3,727,923.49 SAR0.00 0% 0% 23-Jun-25, STRUCTURAL WO
MEP WORKS 213 12-Aug-24 22-Apr-25 25-Nov-24 07-Aug-25 SAR3,996,873.55 SAR0.00 0% 0% 07-Aug-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 12-Aug-24 25-Aug-24 25-Nov-24 09-Dec-24 SAR135,549.74 SAR0.00 0% 0% 09-Dec-24, Domestic Hot and Cold Wa
Soil and Waste
Wa Drainage System 10 26-Aug-24 05-Sep-24 09-Dec-24 21-Dec-24 SAR38,628.89 SAR0.00 0% 0% 21-Dec-24, Soil and Waste Drainage S
Air Conditio
Conditioning Works 10 09-Feb-25 19-Feb-25 28-May-25 12-Jun-25 SAR264,787.87 SAR0.00 0% 0% 12-Jun-25, Air Conditioning Wo
Fire Fighting Installation 14 20-Feb-25 08-Mar-25 12-Jun-25 29-Jun-25 SAR249,692.49 SAR0.00 0% 0% 29-Jun-25, Fire Fighting Install
Electrical Installation
In 44 13-Feb-25 09-Apr-25 02-Jun-25 27-Jul-25 SAR2,082,506.26 SAR0.00 0% 0% 27-Jul-25, Electrical Installatio
Fire Detection
Detecti and Alarm System 18 19-Feb-25 11-Mar-25 11-Jun-25 02-Jul-25 SAR39,483.58 SAR0.00 0% 0% 02-Jul-25, Fire Detection and A
Voice Evacu
Evacuation / Public Address System 9 23-Feb-25 04-Mar-25 15-Jun-25 25-Jun-25 SAR14,952.62 SAR0.00 0% 0% 25-Jun-25, Voice Evacuation / P
Earthing Sy
System 4 26-Mar-25 03-Apr-25 16-Jul-25 21-Jul-25 SAR112,825.33 SAR0.00 0% 0% 21-Jul-25, Earthing System
Lightning Pr
Protection System 5 05-Apr-25 09-Apr-25 21-Jul-25 27-Jul-25 SAR73,387.90 SAR0.00 0% 0% 27-Jul-25, Lightning Protectio
SCADA System
Sys 8 08-Apr-25 16-Apr-25 24-Jul-25 03-Aug-25 SAR8,343.38 SAR0.00 0% 0% 03-Aug-25, SCADA System
Video Surve
Surveillance and Access Control System 5 17-Apr-25 22-Apr-25 03-Aug-25 07-Aug-25 SAR59,080.35 SAR0.00 0% 0% 07-Aug-25, Video Surveillanc
Transformer Installation 33 19-Feb-25 29-Mar-25 11-Jun-25 20-Jul-25 SAR917,635.14 SAR0.00 0% 0% 20-Jul-25, Transformer Installa
ELECTRIC SUB STATION NO.8 (ZONE-4) 345 30-Mar-24 24-Apr-25 25-Jun-24 10-Aug-25 SAR7,724,797.05 SAR0.00 0% 0% 10-Aug-25, ELECTRIC SUB
STRUCTURAL WORKS 321 30-Mar-24 23-Mar-25 25-Jun-24 14-Jul-25 SAR3,727,923.49 SAR0.00 0% 0% 14-Jul-25, STRUCTURAL WO
MEP WORKS 214 22-Aug-24 24-Apr-25 25-Nov-24 10-Aug-25 SAR3,996,873.55 SAR0.00 0% 0% 10-Aug-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 22-Aug-24 04-Sep-24 25-Nov-24 09-Dec-24 SAR135,549.74 SAR0.00 0% 0% 09-Dec-24, Domestic Hot and Cold Wa
Soil and Waste
Wa Drainage System 10 05-Sep-24 16-Sep-24 09-Dec-24 21-Dec-24 SAR38,628.89 SAR0.00 0% 0% 21-Dec-24, Soil and Waste Drainage S
Air Conditio
Conditioning Works 10 10-Feb-25 20-Feb-25 19-May-25 31-May-25 SAR264,787.87 SAR0.00 0% 0% 31-May-25, Air Conditioning W
Fire Fighting Installation 14 22-Feb-25 09-Mar-25 31-May-25 19-Jun-25 SAR249,692.49 SAR0.00 0% 0% 19-Jun-25, Fire Fighting Installa
Electrical Installation
In 44 15-Feb-25 10-Apr-25 24-May-25 17-Jul-25 SAR2,082,506.26 SAR0.00 0% 0% 17-Jul-25, Electrical Installation
Fire Detection
Detecti and Alarm System 18 20-Feb-25 12-Mar-25 29-May-25 23-Jun-25 SAR39,483.58 SAR0.00 0% 0% 23-Jun-25, Fire Detection and A
Voice Evacu
Evacuation / Public Address System 9 24-Feb-25 05-Mar-25 02-Jun-25 16-Jun-25 SAR14,952.62 SAR0.00 0% 0% 16-Jun-25, Voice Evacuation / P
Earthing Sy
System 4 27-Mar-25 05-Apr-25 07-Jul-25 12-Jul-25 SAR112,825.33 SAR0.00 0% 0% 12-Jul-25, Earthing System
Lightning Pr
Protection System 5 06-Apr-25 10-Apr-25 12-Jul-25 17-Jul-25 SAR73,387.90 SAR0.00 0% 0% 17-Jul-25, Lightning Protection
SCADA System
Sys 8 09-Apr-25 17-Apr-25 15-Jul-25 24-Jul-25 SAR8,343.38 SAR0.00 0% 0% 24-Jul-25, SCADA System
Video Surve
Surveillance and Access Control System 14 19-Apr-25 24-Apr-25 24-Jul-25 10-Aug-25 SAR59,080.35 SAR0.00 0% 0% 10-Aug-25, Video Surveillanc
Transformer Installation 33 20-Feb-25 03-Apr-25 29-May-25 10-Jul-25 SAR917,635.14 SAR0.00 0% 0% 10-Jul-25, Transformer Installa
ELECTRIC SUB STATION NO.9 (ZONE-11) 427 19-Dec-23 27-Apr-25 14-Mar-24 12-Aug-25 SAR7,724,797.05 SAR0.00 0% 0% 12-Aug-25, ELECTRIC SUB
STRUCTURAL WORKS 417 19-Dec-23 14-Apr-25 14-Mar-24 31-Jul-25 SAR3,727,923.49 SAR0.00 0% 0% 31-Jul-25, STRUCTURAL W
MEP WORKS 309 08-May-24 27-Apr-25 07-Aug-24 12-Aug-25 SAR3,996,873.55 SAR0.00 0% 0% 12-Aug-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 08-May-24 21-May-24 07-Aug-24 20-Aug-24 SAR135,549.74 SAR0.00 0% 0% 20-Aug-24, Domestic Hot and Cold Water S
Soil and Waste
Wa Drainage System 10 22-May-24 02-Jun-24 21-Aug-24 01-Sep-24 SAR38,628.89 SAR0.00 0% 0% 01-Sep-24, Soil and Waste Drainage System
Air Conditio
Conditioning Works 10 03-Oct-24 14-Oct-24 29-Dec-24 08-Jan-25 SAR264,787.87 SAR0.00 0% 0% 08-Jan-25, Air Conditioning Works
Fire Fighting Installation 14 15-Oct-24 30-Oct-24 09-Jan-25 25-Jan-25 SAR249,692.49 SAR0.00 0% 0% 25-Jan-25, Fire Fighting Installation
Electrical Installation
In 44 08-Oct-24 27-Nov-24 02-Jan-25 22-Feb-25 SAR2,082,506.26 SAR0.00 0% 0% 22-Feb-25, Electrical Installation
Fire Detection
Detecti and Alarm System 18 14-Oct-24 03-Nov-24 08-Jan-25 28-Jan-25 SAR39,483.58 SAR0.00 0% 0% 28-Jan-25, Fire Detection and Alarm
Voice Evacu
Evacuation / Public Address System 9 17-Oct-24 27-Oct-24 12-Jan-25 21-Jan-25 SAR14,952.62 SAR0.00 0% 0% 21-Jan-25, Voice Evacuation / Public A
Earthing Sy
System 4 18-Nov-24 21-Nov-24 12-Feb-25 16-Feb-25 SAR112,825.33 SAR0.00 0% 0% 16-Feb-25, Earthing System
Lightning Pr
Protection System 5 23-Nov-24 27-Nov-24 17-Feb-25 22-Feb-25 SAR73,387.90 SAR0.00 0% 0% 22-Feb-25, Lightning Protection Sys
SCADA System
Sys 8 26-Nov-24 04-Dec-24 20-Feb-25 01-Mar-25 SAR8,343.38 SAR0.00 0% 0% 01-Mar-25, SCADA System
Video Surve
Surveillance and Access Control System 133 05-Dec-24 27-Apr-25 02-Mar-25 12-Aug-25 SAR59,080.35 SAR0.00 0% 0% 12-Aug-25, Video Surveillanc
Transformer Installation 33 14-Oct-24 20-Nov-24 08-Jan-25 15-Feb-25 SAR917,635.14 SAR0.00 0% 0% 15-Feb-25, Transformer Installation
ELECTRIC SUB STATION NO.10 (ZONE-4) 356 25-Mar-24 03-May-25 20-Jun-24 19-Aug-25 SAR7,724,797.05 SAR0.00 0% 0% 19-Aug-25, ELECTRIC SUB
STRUCTURAL WORKS 356 25-Mar-24 03-May-25 20-Jun-24 19-Aug-25 SAR3,727,923.49 SAR0.00 0% 0% 19-Aug-25, STRUCTURAL
MEP WORKS 218 18-Aug-24 29-Apr-25 25-Nov-24 14-Aug-25 SAR3,996,873.55 SAR0.00 0% 0% 14-Aug-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 18-Aug-24 31-Aug-24 25-Nov-24 09-Dec-24 SAR135,549.74 SAR0.00 0% 0% 09-Dec-24, Domestic Hot and Cold Wa
Soil and Waste
Wa Drainage System 10 01-Sep-24 11-Sep-24 09-Dec-24 21-Dec-24 SAR38,628.89 SAR0.00 0% 0% 21-Dec-24, Soil and Waste Drainage S
Air Conditio
Conditioning Works 10 18-Jan-25 28-Jan-25 30-Apr-25 12-May-25 SAR264,787.87 SAR0.00 0% 0% 12-May-25, Air Conditioning Wo
Fire Fighting Installation 14 29-Jan-25 13-Feb-25 12-May-25 28-May-25 SAR249,692.49 SAR0.00 0% 0% 28-May-25, Fire Fighting Installa
Electrical Installation
In 44 22-Jan-25 13-Mar-25 05-May-25 29-Jun-25 SAR2,082,506.26 SAR0.00 0% 0% 29-Jun-25, Electrical Installation
Fire Detection
Detecti and Alarm System 18 28-Jan-25 17-Feb-25 11-May-25 01-Jun-25 SAR39,483.58 SAR0.00 0% 0% 01-Jun-25, Fire Detection and Al

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
56 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
Voice Evacu
Evacuation / Public Address System 9 01-Feb-25 10-Feb-25 14-May-25 25-May-25 SAR14,952.62 SAR0.00 0% 0% 25-May-25, Voice Evacuation / P
Earthing Sy
System 4 04-Mar-25 08-Mar-25 18-Jun-25 23-Jun-25 SAR112,825.33 SAR0.00 0% 0% 23-Jun-25, Earthing System
Lightning Pr
Protection System 5 09-Mar-25 13-Mar-25 23-Jun-25 29-Jun-25 SAR73,387.90 SAR0.00 0% 0% 29-Jun-25, Lightning Protection
SCADA System
Sys 8 12-Mar-25 20-Mar-25 26-Jun-25 06-Jul-25 SAR8,343.38 SAR0.00 0% 0% 06-Jul-25, SCADA System
Video Surve
Surveillance and Access Control System 34 22-Mar-25 29-Apr-25 06-Jul-25 14-Aug-25 SAR59,080.35 SAR0.00 0% 0% 14-Aug-25, Video Surveillanc
Transformer Installation 33 28-Jan-25 06-Mar-25 11-May-25 22-Jun-25 SAR917,635.14 SAR0.00 0% 0% 22-Jun-25, Transformer Installa
ELECTRIC SUB STATION NO.11 (ZONE-4) 360 06-Apr-24 19-May-25 02-Jul-24 04-Sep-25 SAR7,724,797.05 SAR0.00 0% 0% 04-Sep-25, ELECTRIC SUB
STRUCTURAL WORKS 360 06-Apr-24 19-May-25 02-Jul-24 04-Sep-25 SAR3,727,923.49 SAR0.00 0% 0% 04-Sep-25, STRUCTURAL
MEP WORKS 220 29-Aug-24 01-May-25 25-Nov-24 17-Aug-25 SAR3,996,873.55 SAR0.00 0% 0% 17-Aug-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 29-Aug-24 11-Sep-24 25-Nov-24 09-Dec-24 SAR135,549.74 SAR0.00 0% 0% 09-Dec-24, Domestic Hot and Cold Wa
Soil and Waste
Wa Drainage System 10 12-Sep-24 24-Sep-24 09-Dec-24 21-Dec-24 SAR38,628.89 SAR0.00 0% 0% 21-Dec-24, Soil and Waste Drainage S
Air Conditio
Conditioning Works 10 11-Jan-25 21-Jan-25 12-Apr-25 23-Apr-25 SAR264,787.87 SAR0.00 0% 0% 23-Apr-25, Air Conditioning Wor
Fire Fighting Installation 14 22-Jan-25 06-Feb-25 23-Apr-25 10-May-25 SAR249,692.49 SAR0.00 0% 0% 10-May-25, Fire Fighting Installa
Electrical Installation
In 44 15-Jan-25 06-Mar-25 16-Apr-25 10-Jun-25 SAR2,082,506.26 SAR0.00 0% 0% 10-Jun-25, Electrical Installation
Fire Detection
Detecti and Alarm System 18 21-Jan-25 10-Feb-25 22-Apr-25 13-May-25 SAR39,483.58 SAR0.00 0% 0% 13-May-25, Fire Detection and A
Voice Evacu
Evacuation / Public Address System 9 25-Jan-25 03-Feb-25 26-Apr-25 06-May-25 SAR14,952.62 SAR0.00 0% 0% 06-May-25, Voice Evacuation / Pu
Earthing Sy
System 4 25-Feb-25 01-Mar-25 27-May-25 01-Jun-25 SAR112,825.33 SAR0.00 0% 0% 01-Jun-25, Earthing System
Lightning Pr
Protection System 5 02-Mar-25 06-Mar-25 01-Jun-25 10-Jun-25 SAR73,387.90 SAR0.00 0% 0% 10-Jun-25, Lightning Protection
SCADA System
Sys 8 05-Mar-25 13-Mar-25 04-Jun-25 17-Jun-25 SAR8,343.38 SAR0.00 0% 0% 17-Jun-25, SCADA System
Video Surve
Surveillance and Access Control System 52 15-Mar-25 01-May-25 17-Jun-25 17-Aug-25 SAR59,080.35 SAR0.00 0% 0% 17-Aug-25, Video Surveillanc
Transformer Installation 33 21-Jan-25 27-Feb-25 22-Apr-25 31-May-25 SAR917,635.14 SAR0.00 0% 0% 31-May-25, Transformer Installa
ELECTRIC SUB STATION NO.12 (ZONE-6) 408 27-Feb-23 09-Jun-25 20-May-24 22-Sep-25 SAR7,724,797.05 SAR0.00 44.21% 0% 22-Sep-25, ELECTRIC SUB
STRUCTURAL WORKS 307 27-Feb-23 27-Feb-24 20-May-24 22-May-25 SAR3,727,923.49 SAR0.00 86.94% 0% 22-May-25, STRUCTURAL WO
MEP WORKS 290 22-Jul-23 09-Jun-25 10-Oct-24 22-Sep-25 SAR3,996,873.55 SAR0.00 4.36% 0% 22-Sep-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 22-Jul-23 03-Aug-23 10-Oct-24 23-Oct-24 SAR135,549.74 SAR0.00 100% 0% 23-Oct-24, Domestic Hot and Cold Water
Soil and Waste
Wa Drainage System 10 05-Aug-23 15-Aug-23 24-Oct-24 04-Nov-24 SAR38,628.89 SAR0.00 100% 0% 04-Nov-24, Soil and Waste Drainage Sys
Air Conditio
Conditioning Works 10 05-Feb-24 15-Feb-24 30-Apr-25 11-May-25 SAR264,787.87 SAR0.00 0% 0% 11-May-25, Air Conditioning Wo
Fire Fighting Installation 14 17-Feb-24 03-Mar-24 12-May-25 27-May-25 SAR249,692.49 SAR0.00 0% 0% 27-May-25, Fire Fighting Installa
Electrical Installation
In 44 10-Feb-24 31-Mar-24 05-May-25 28-Jun-25 SAR2,082,506.26 SAR0.00 0% 0% 28-Jun-25, Electrical Installation
Fire Detection
Detecti and Alarm System 55 15-Jan-25 09-Jun-25 20-Jul-25 22-Sep-25 SAR39,483.58 SAR0.00 0% 0% 22-Sep-25, Fire Detection an
Voice Evacu
Evacuation / Public Address System 9 20-May-25 29-May-25 04-Sep-25 15-Sep-25 SAR14,952.62 SAR0.00 0% 0% 15-Sep-25, Voice Evacuation
Earthing Sy
System 4 21-Mar-24 25-Mar-24 18-Jun-25 22-Jun-25 SAR112,825.33 SAR0.00 0% 0% 22-Jun-25, Earthing System
Lightning Pr
Protection System 5 26-Mar-24 31-Mar-24 23-Jun-25 28-Jun-25 SAR73,387.90 SAR0.00 0% 0% 28-Jun-25, Lightning Protection
SCADA System
Sys 49 30-Mar-24 07-May-25 26-Jun-25 23-Aug-25 SAR8,343.38 SAR0.00 0% 0% 23-Aug-25, SCADA System
Video Surve
Surveillance and Access Control System 5 08-May-25 13-May-25 23-Aug-25 28-Aug-25 SAR59,080.35 SAR0.00 0% 0% 28-Aug-25, Video Surveillan
Transformer Installation 33 15-Feb-24 24-Mar-24 11-May-25 21-Jun-25 SAR917,635.14 SAR0.00 0% 0% 21-Jun-25, Transformer Installa
ELECTRIC ROOM (9 NOS) 608 07-Dec-22 18-Jun-25 31-Jan-24 28-Jan-26 SAR48,360,682.93 SAR0.00 29.92% 0% 28-Jan-26, ELECTRIC
ELECTRIC ROO
ROOM NO.1 (ZONE-6) 339 05-Jun-23 16-Jul-24 27-Aug-24 07-Oct-25 SAR5,373,409.21 SAR0.00 42.75% 0% 07-Oct-25, ELECTRIC RO
STRUCTURAL WORKS 300 05-Jun-23 27-May-24 27-Aug-24 20-Aug-25 SAR2,939,050.02 SAR0.00 73.47% 0% 20-Aug-25, STRUCTURAL
MEP WORKS 221 25-Oct-23 16-Jul-24 13-Jan-25 07-Oct-25 SAR2,434,359.19 SAR0.00 5.66% 0% 07-Oct-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 25-Oct-23 07-Nov-23 13-Jan-25 26-Jan-25 SAR107,310.21 SAR0.00 100% 0% 26-Jan-25, Domestic Hot and Cold W
Soil and Waste
Wa Drainage System 10 08-Nov-23 19-Nov-23 27-Jan-25 08-Feb-25 SAR30,581.21 SAR0.00 100% 0% 08-Feb-25, Soil and Waste Drainage
Air Conditio
Conditioning Works 10 05-May-24 15-May-24 29-Jul-25 09-Aug-25 SAR209,623.73 SAR0.00 0% 0% 09-Aug-25, Air Conditioning
Fire Fighting Installation 14 16-May-24 01-Jun-24 10-Aug-25 25-Aug-25 SAR197,673.22 SAR0.00 0% 0% 25-Aug-25, Fire Fighting Ins
Electrical Installation
In 44 09-May-24 03-Jul-24 03-Aug-25 22-Sep-25 SAR1,648,650.79 SAR0.00 0% 0% 22-Sep-25, Electrical Installa
Fire Detection
Detecti and Alarm System 18 15-May-24 04-Jun-24 09-Aug-25 28-Aug-25 SAR31,257.83 SAR0.00 0% 0% 28-Aug-25, Fire Detection an
Voice Evacu
Evacuation / Public Address System 9 19-May-24 28-May-24 12-Aug-25 21-Aug-25 SAR11,837.49 SAR0.00 0% 0% 21-Aug-25, Voice Evacuation
Earthing Sy
System 4 24-Jun-24 27-Jun-24 13-Sep-25 16-Sep-25 SAR89,320.05 SAR0.00 0% 0% 16-Sep-25, Earthing System
Lightning Pr
Protection System 5 29-Jun-24 03-Jul-24 17-Sep-25 22-Sep-25 SAR58,098.76 SAR0.00 0% 0% 22-Sep-25, Lightning Protec
SCADA System
Sys 8 02-Jul-24 10-Jul-24 21-Sep-25 01-Oct-25 SAR3,233.96 SAR0.00 0% 0% 01-Oct-25, SCADA System
Video Surve
Surveillance and Access Control System 5 11-Jul-24 16-Jul-24 01-Oct-25 07-Oct-25 SAR46,771.94 SAR0.00 0% 0% 07-Oct-25, Video Surveillan
ELECTRIC ROO
ROOM NO.2 (ZONE-6) 336 03-Jul-23 06-Aug-24 21-Sep-24 27-Oct-25 SAR5,373,409.21 SAR0.00 42.57% 0% 27-Oct-25, ELECTRIC RO
STRUCTURAL WORKS 293 03-Jul-23 12-Jun-24 21-Sep-24 06-Sep-25 SAR2,939,050.02 SAR0.00 73.14% 0% 06-Sep-25, STRUCTURAL
MEP WORKS 218 19-Nov-23 06-Aug-24 06-Feb-25 27-Oct-25 SAR2,434,359.19 SAR0.00 5.66% 0% 27-Oct-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 19-Nov-23 02-Dec-23 06-Feb-25 19-Feb-25 SAR107,310.21 SAR0.00 100% 0% 19-Feb-25, Domestic Hot and Cold W
Soil and Waste
Wa Drainage System 10 03-Dec-23 13-Dec-23 20-Feb-25 03-Mar-25 SAR30,581.21 SAR0.00 100% 0% 03-Mar-25, Soil and Waste Drainage
Air Conditio
Conditioning Works 10 26-May-24 05-Jun-24 19-Aug-25 30-Aug-25 SAR209,623.73 SAR0.00 0% 0% 30-Aug-25, Air Conditioning
Fire Fighting Installation 14 06-Jun-24 26-Jun-24 31-Aug-25 15-Sep-25 SAR197,673.22 SAR0.00 0% 0% 15-Sep-25, Fire Fighting Ins
Electrical Installation
In 44 30-May-24 24-Jul-24 24-Aug-25 14-Oct-25 SAR1,648,650.79 SAR0.00 0% 0% 14-Oct-25, Electrical Install
Fire Detection
Detecti and Alarm System 18 05-Jun-24 30-Jun-24 30-Aug-25 18-Sep-25 SAR31,257.83 SAR0.00 0% 0% 18-Sep-25, Fire Detection an
Voice Evacu
Evacuation / Public Address System 9 09-Jun-24 23-Jun-24 02-Sep-25 11-Sep-25 SAR11,837.49 SAR0.00 0% 0% 11-Sep-25, Voice Evacuation

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
57 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
Earthing Sy
System 4 15-Jul-24 18-Jul-24 05-Oct-25 08-Oct-25 SAR89,320.05 SAR0.00 0% 0% 08-Oct-25, Earthing System
Lightning Pr
Protection System 5 20-Jul-24 24-Jul-24 09-Oct-25 14-Oct-25 SAR58,098.76 SAR0.00 0% 0% 14-Oct-25, Lightning Prote
SCADA System
Sys 8 23-Jul-24 31-Jul-24 13-Oct-25 21-Oct-25 SAR3,233.96 SAR0.00 0% 0% 21-Oct-25, SCADA System
Video Surve
Surveillance and Access Control System 5 01-Aug-24 06-Aug-24 22-Oct-25 27-Oct-25 SAR46,771.94 SAR0.00 0% 0% 27-Oct-25, Video Surveilla
ELECTRIC ROO
ROOM NO.3 (ZONE-6) 339 04-Jul-23 11-Aug-24 22-Sep-24 01-Nov-25 SAR5,373,409.21 SAR0.00 42.57% 0% 01-Nov-25, ELECTRIC R
STRUCTURAL WORKS 300 04-Jul-23 26-Jun-24 22-Sep-24 16-Sep-25 SAR2,939,050.02 SAR0.00 73.14% 0% 16-Sep-25, STRUCTURAL
MEP WORKS 221 20-Nov-23 11-Aug-24 08-Feb-25 01-Nov-25 SAR2,434,359.19 SAR0.00 5.66% 0% 01-Nov-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 20-Nov-23 03-Dec-23 08-Feb-25 20-Feb-25 SAR107,310.21 SAR0.00 100% 0% 20-Feb-25, Domestic Hot and Cold W
Soil and Waste
Wa Drainage System 10 04-Dec-23 14-Dec-23 22-Feb-25 04-Mar-25 SAR30,581.21 SAR0.00 100% 0% 04-Mar-25, Soil and Waste Drainage
Air Conditio
Conditioning Works 10 30-May-24 10-Jun-24 24-Aug-25 04-Sep-25 SAR209,623.73 SAR0.00 0% 0% 04-Sep-25, Air Conditioning
Fire Fighting Installation 14 11-Jun-24 01-Jul-24 04-Sep-25 21-Sep-25 SAR197,673.22 SAR0.00 0% 0% 21-Sep-25, Fire Fighting Ins
Electrical Installation
In 44 04-Jun-24 29-Jul-24 28-Aug-25 20-Oct-25 SAR1,648,650.79 SAR0.00 0% 0% 20-Oct-25, Electrical Instal
Fire Detection
Detecti and Alarm System 18 10-Jun-24 04-Jul-24 03-Sep-25 25-Sep-25 SAR31,257.83 SAR0.00 0% 0% 25-Sep-25, Fire Detection an
Voice Evacu
Evacuation / Public Address System 18 13-Jun-24 08-Jul-24 07-Sep-25 29-Sep-25 SAR11,837.49 SAR0.00 0% 0% 29-Sep-25, Voice Evacuatio
Earthing Sy
System 4 20-Jul-24 23-Jul-24 09-Oct-25 14-Oct-25 SAR89,320.05 SAR0.00 0% 0% 14-Oct-25, Earthing System
Lightning Pr
Protection System 5 24-Jul-24 29-Jul-24 14-Oct-25 20-Oct-25 SAR58,098.76 SAR0.00 0% 0% 20-Oct-25, Lightning Prote
SCADA System
Sys 8 28-Jul-24 05-Aug-24 18-Oct-25 27-Oct-25 SAR3,233.96 SAR0.00 0% 0% 27-Oct-25, SCADA System
Video Surve
Surveillance and Access Control System 5 06-Aug-24 11-Aug-24 27-Oct-25 01-Nov-25 SAR46,771.94 SAR0.00 0% 0% 01-Nov-25, Video Surveill
ELECTRIC ROO
ROOM NO.4 (ZONE-6) 340 05-Jul-23 19-May-25 24-Sep-24 04-Nov-25 SAR5,373,409.21 SAR0.00 42.57% 0% 04-Nov-25, ELECTRIC R
STRUCTURAL WORKS 317 05-Jul-23 17-Jul-24 24-Sep-24 08-Oct-25 SAR2,939,050.02 SAR0.00 73.14% 0% 08-Oct-25, STRUCTURAL
MEP WORKS 222 21-Nov-23 19-May-25 09-Feb-25 04-Nov-25 SAR2,434,359.19 SAR0.00 5.66% 0% 04-Nov-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 21-Nov-23 04-Dec-23 09-Feb-25 22-Feb-25 SAR107,310.21 SAR0.00 100% 0% 22-Feb-25, Domestic Hot and Cold W
Soil and Waste
Wa Drainage System 10 05-Dec-23 16-Dec-23 23-Feb-25 05-Mar-25 SAR30,581.21 SAR0.00 100% 0% 05-Mar-25, Soil and Waste Drainage
Air Conditio
Conditioning Works 10 13-May-24 23-May-24 06-Aug-25 17-Aug-25 SAR209,623.73 SAR0.00 0% 0% 17-Aug-25, Air Conditioning
Fire Fighting Installation 14 25-May-24 09-Jun-24 18-Aug-25 02-Sep-25 SAR197,673.22 SAR0.00 0% 0% 02-Sep-25, Fire Fighting Ins
Electrical Installation
In 44 18-May-24 11-Jul-24 11-Aug-25 01-Oct-25 SAR1,648,650.79 SAR0.00 0% 0% 01-Oct-25, Electrical Installa
Fire Detection
Detecti and Alarm System 18 23-May-24 12-Jun-24 17-Aug-25 06-Sep-25 SAR31,257.83 SAR0.00 0% 0% 06-Sep-25, Fire Detection an
Voice Evacu
Evacuation / Public Address System 36 27-May-24 11-Jul-24 20-Aug-25 02-Oct-25 SAR11,837.49 SAR0.00 0% 0% 02-Oct-25, Voice Evacuation
Earthing Sy
System 4 02-Jul-24 06-Jul-24 21-Sep-25 25-Sep-25 SAR89,320.05 SAR0.00 0% 0% 25-Sep-25, Earthing System
Lightning Pr
Protection System 5 07-Jul-24 11-Jul-24 27-Sep-25 01-Oct-25 SAR58,098.76 SAR0.00 0% 0% 01-Oct-25, Lightning Protec
SCADA System
Sys 8 10-Jul-24 18-Jul-24 30-Sep-25 08-Oct-25 SAR3,233.96 SAR0.00 0% 0% 08-Oct-25, SCADA System
Video Surve
Surveillance and Access Control System 22 14-May-25 19-May-25 09-Oct-25 04-Nov-25 SAR46,771.94 SAR0.00 0% 0% 04-Nov-25, Video Surveill
ELECTRIC ROO
ROOM NO.5 (ZONE-4) 352 24-Apr-24 03-Jun-25 25-Sep-24 18-Nov-25 SAR5,373,409.21 SAR0.00 0% 0% 18-Nov-25, ELECTRIC R
STRUCTURAL WORKS 332 24-Apr-24 03-Mar-25 25-Sep-24 27-Oct-25 SAR2,939,050.02 SAR0.00 0% 0% 27-Oct-25, STRUCTURA
MEP WORKS 234 14-Sep-24 03-Jun-25 10-Feb-25 18-Nov-25 SAR2,434,359.19 SAR0.00 0% 0% 18-Nov-25, MEP WORK
Domestic H Hot and Cold Water Services 12 14-Sep-24 28-Sep-24 10-Feb-25 23-Feb-25 SAR107,310.21 SAR0.00 0% 0% 23-Feb-25, Domestic Hot and Cold
Soil and Waste
Wa Drainage System 10 29-Sep-24 09-Oct-24 24-Feb-25 06-Mar-25 SAR30,581.21 SAR0.00 0% 0% 06-Mar-25, Soil and Waste Drainage
Air Conditio
Conditioning Works 10 13-Feb-25 24-Feb-25 30-Aug-25 09-Sep-25 SAR209,623.73 SAR0.00 0% 0% 09-Sep-25, Air Conditioning
Fire Fighting Installation 14 25-Feb-25 12-Mar-25 10-Sep-25 27-Sep-25 SAR197,673.22 SAR0.00 0% 0% 27-Sep-25, Fire Fighting Ins
Electrical Installation
In 44 18-Feb-25 14-Apr-25 03-Sep-25 25-Oct-25 SAR1,648,650.79 SAR0.00 0% 0% 25-Oct-25, Electrical Instal
Fire Detection
Detecti and Alarm System 18 24-Feb-25 16-Mar-25 09-Sep-25 30-Sep-25 SAR31,257.83 SAR0.00 0% 0% 30-Sep-25, Fire Detection a
Voice Evacu
Evacuation / Public Address System 19 27-Feb-25 19-Mar-25 13-Sep-25 06-Oct-25 SAR11,837.49 SAR0.00 0% 0% 06-Oct-25, Voice Evacuatio
Earthing Sy
System 4 05-Apr-25 08-Apr-25 15-Oct-25 19-Oct-25 SAR89,320.05 SAR0.00 0% 0% 19-Oct-25, Earthing System
Lightning Pr
Protection System 5 09-Apr-25 14-Apr-25 20-Oct-25 25-Oct-25 SAR58,098.76 SAR0.00 0% 0% 25-Oct-25, Lightning Prote
SCADA System
Sys 8 20-May-25 28-May-25 04-Nov-25 13-Nov-25 SAR3,233.96 SAR0.00 0% 0% 13-Nov-25, SCADA Syst
Video Surve
Surveillance and Access Control System 5 29-May-25 03-Jun-25 13-Nov-25 18-Nov-25 SAR46,771.94 SAR0.00 0% 0% 18-Nov-25, Video Surveil
ELECTRIC ROO
ROOM NO.6 (ZONE-4) 365 06-May-24 10-May-25 26-Sep-24 04-Dec-25 SAR5,373,409.21 SAR0.00 0% 0% 04-Dec-25, ELECTRIC R
STRUCTURAL WORKS 264 06-May-24 15-Mar-25 26-Sep-24 07-Aug-25 SAR2,939,050.02 SAR0.00 0% 0% 07-Aug-25, STRUCTURAL W
MEP WORKS 247 26-Sep-24 10-May-25 11-Feb-25 04-Dec-25 SAR2,434,359.19 SAR0.00 0% 0% 04-Dec-25, MEP WORK
Domestic H Hot and Cold Water Services 12 26-Sep-24 09-Oct-24 11-Feb-25 24-Feb-25 SAR107,310.21 SAR0.00 0% 0% 24-Feb-25, Domestic Hot and Cold
Soil and Waste
Wa Drainage System 10 10-Oct-24 21-Oct-24 25-Feb-25 08-Mar-25 SAR30,581.21 SAR0.00 0% 0% 08-Mar-25, Soil and Waste Drainage
Air Conditio
Conditioning Works 10 25-Feb-25 08-Mar-25 21-Jul-25 31-Jul-25 SAR209,623.73 SAR0.00 0% 0% 31-Jul-25, Air Conditioning W
Fire Fighting Installation 79 09-Mar-25 24-Mar-25 02-Aug-25 03-Nov-25 SAR197,673.22 SAR0.00 0% 0% 03-Nov-25, Fire Fighting I
Electrical Installation
In 101 02-Mar-25 26-Apr-25 26-Jul-25 22-Nov-25 SAR1,648,650.79 SAR0.00 0% 0% 22-Nov-25, Electrical Inst
Fire Detection
Detecti and Alarm System 18 08-Mar-25 27-Mar-25 31-Jul-25 20-Aug-25 SAR31,257.83 SAR0.00 0% 0% 20-Aug-25, Fire Detection an
Voice Evacu
Evacuation / Public Address System 56 11-Mar-25 23-Mar-25 04-Aug-25 09-Oct-25 SAR11,837.49 SAR0.00 0% 0% 09-Oct-25, Voice Evacuatio
Earthing Sy
System 4 16-Apr-25 20-Apr-25 11-Nov-25 16-Nov-25 SAR89,320.05 SAR0.00 0% 0% 16-Nov-25, Earthing Syst
Lightning Pr
Protection System 7 21-Apr-25 28-Apr-25 16-Nov-25 24-Nov-25 SAR58,098.76 SAR0.00 0% 0% 24-Nov-25, Lightning Pro
SCADA System
Sys 9 24-Apr-25 04-May-25 19-Nov-25 30-Nov-25 SAR3,233.96 SAR0.00 0% 0% 30-Nov-25, SCADA Sys
Video Surve
Surveillance and Access Control System 5 05-May-25 10-May-25 30-Nov-25 04-Dec-25 SAR46,771.94 SAR0.00 0% 0% 04-Dec-25, Video Survei
ELECTRIC ROO
ROOM NO.7 (ZONE-3) 566 07-Dec-22 12-Jun-25 31-Jan-24 10-Dec-25 SAR5,373,409.21 SAR0.00 98.8% 0% 10-Dec-25, ELECTRIC R
STRUCTURAL WORKS 282 07-Dec-22 08-Nov-23 31-Jan-24 04-Jan-25 SAR2,939,050.02 SAR0.00 100% 0% 04-Jan-25, STRUCTURAL WORKS

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
58 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
MEP WORKS 448 27-Apr-23 12-Jun-25 25-Jun-24 10-Dec-25 SAR2,434,359.19 SAR0.00 97.35% 0% 10-Dec-25, MEP WORK
Domestic H Hot and Cold Water Services 12 27-Apr-23 10-May-23 25-Jun-24 09-Jul-24 SAR107,310.21 SAR0.00 100% 0% 09-Jul-24, Domestic Hot and Cold Water Ser
Soil and Waste
Wa Drainage System 10 11-May-23 22-May-23 09-Jul-24 21-Jul-24 SAR30,581.21 SAR0.00 100% 0% 21-Jul-24, Soil and Waste Drainage System
Air Conditio
Conditioning Works 10 19-Oct-23 30-Oct-23 14-Dec-24 25-Dec-24 SAR209,623.73 SAR0.00 100% 0% 25-Dec-24, Air Conditioning Works
Fire Fighting Installation 14 31-Oct-23 15-Nov-23 25-Dec-24 11-Jan-25 SAR197,673.22 SAR0.00 100% 0% 11-Jan-25, Fire Fighting Installation
Electrical Installation
In 46 24-Oct-23 16-Dec-23 18-Dec-24 10-Feb-25 SAR1,648,650.79 SAR0.00 99.23% 0% 10-Feb-25, Electrical Installation
Fire Detection
Detecti and Alarm System 18 30-Oct-23 19-Nov-23 24-Dec-24 14-Jan-25 SAR31,257.83 SAR0.00 100% 0% 14-Jan-25, Fire Detection and Alarm S
Voice Evacu
Evacuation / Public Address System 240 02-Nov-23 26-Mar-25 28-Dec-24 13-Oct-25 SAR11,837.49 SAR0.00 77.64% 0% 13-Oct-25, Voice Evacuatio
Earthing Sy
System 4 06-Dec-23 10-Dec-23 01-Feb-25 04-Feb-25 SAR89,320.05 SAR0.00 100% 0% 04-Feb-25, Earthing System
Lightning Pr
Protection System 5 11-Dec-23 16-Dec-23 05-Feb-25 11-Feb-25 SAR58,098.76 SAR0.00 100% 0% 11-Feb-25, Lightning Protection Syst
SCADA System
Sys 8 14-Dec-23 23-Dec-23 09-Feb-25 17-Feb-25 SAR3,233.96 SAR0.00 28.96% 0% 17-Feb-25, SCADA System
Video Surve
Surveillance and Access Control System 5 04-Jun-25 12-Jun-25 06-Dec-25 10-Dec-25 SAR46,771.94 SAR0.00 0% 0% 10-Dec-25, Video Survei
ELECTRIC ROO
ROOM NO.8 (ZONE-1) 323 17-Apr-24 18-Jun-25 28-Dec-24 18-Jan-26 SAR5,373,409.21 SAR0.00 0% 0% 18-Jan-26, ELECTRIC
STRUCTURAL WORKS 282 17-Apr-24 17-Mar-25 28-Dec-24 01-Dec-25 SAR2,939,050.02 SAR0.00 0% 0% 01-Dec-25, STRUCTUR
MEP WORKS 205 07-Sep-24 18-Jun-25 19-May-25 18-Jan-26 SAR2,434,359.19 SAR0.00 0% 0% 18-Jan-26, MEP WORK
Domestic H Hot and Cold Water Services 12 07-Sep-24 19-Sep-24 19-May-25 02-Jun-25 SAR107,310.21 SAR0.00 0% 0% 02-Jun-25, Domestic Hot and Co
Soil and Waste
Wa Drainage System 10 21-Sep-24 02-Oct-24 02-Jun-25 17-Jun-25 SAR30,581.21 SAR0.00 0% 0% 17-Jun-25, Soil and Waste Drain
Air Conditio
Conditioning Works 10 25-Feb-25 08-Mar-25 10-Nov-25 22-Nov-25 SAR209,623.73 SAR0.00 0% 0% 22-Nov-25, Air Condition
Fire Fighting Installation 14 09-Mar-25 24-Mar-25 22-Nov-25 08-Dec-25 SAR197,673.22 SAR0.00 0% 0% 08-Dec-25, Fire Fighting
Electrical Installation
In 44 02-Mar-25 26-Apr-25 15-Nov-25 05-Jan-26 SAR1,648,650.79 SAR0.00 0% 0% 05-Jan-26, Electrical Ins
Fire Detection
Detecti and Alarm System 18 08-Mar-25 27-Mar-25 20-Nov-25 11-Dec-25 SAR31,257.83 SAR0.00 0% 0% 11-Dec-25, Fire Detectio
Voice Evacu
Evacuation / Public Address System 18 11-Mar-25 05-Apr-25 24-Nov-25 15-Dec-25 SAR11,837.49 SAR0.00 0% 0% 15-Dec-25, Voice Evacua
Earthing Sy
System 4 16-Apr-25 20-Apr-25 25-Dec-25 30-Dec-25 SAR89,320.05 SAR0.00 0% 0% 30-Dec-25, Earthing Sys
Lightning Pr
Protection System 5 21-Apr-25 26-Apr-25 30-Dec-25 05-Jan-26 SAR58,098.76 SAR0.00 0% 0% 05-Jan-26, Lightning Pr
SCADA System
Sys 8 24-Apr-25 03-May-25 03-Jan-26 12-Jan-26 SAR3,233.96 SAR0.00 0% 0% 12-Jan-26, SCADA Sys
Video Surve
Surveillance and Access Control System 5 14-Jun-25 18-Jun-25 12-Jan-26 18-Jan-26 SAR46,771.94 SAR0.00 0% 0% 18-Jan-26, Video Surve
ELECTRIC ROO
ROOM NO.9 (ZONE-1) 332 18-Apr-24 20-May-25 29-Dec-24 28-Jan-26 SAR5,373,409.21 SAR0.00 0% 0% 28-Jan-26, ELECTRIC
STRUCTURAL WORKS 291 18-Apr-24 29-Mar-25 29-Dec-24 13-Dec-25 SAR2,939,050.02 SAR0.00 0% 0% 13-Dec-25, STRUCTUR
MEP WORKS 214 08-Sep-24 20-May-25 20-May-25 28-Jan-26 SAR2,434,359.19 SAR0.00 0% 0% 28-Jan-26, MEP WOR
Domestic H Hot and Cold Water Services 12 08-Sep-24 21-Sep-24 20-May-25 03-Jun-25 SAR107,310.21 SAR0.00 0% 0% 03-Jun-25, Domestic Hot and Co
Soil and Waste
Wa Drainage System 10 22-Sep-24 03-Oct-24 03-Jun-25 18-Jun-25 SAR30,581.21 SAR0.00 0% 0% 18-Jun-25, Soil and Waste Drain
Air Conditio
Conditioning Works 10 08-Mar-25 18-Mar-25 20-Nov-25 02-Dec-25 SAR209,623.73 SAR0.00 0% 0% 02-Dec-25, Air Condition
Fire Fighting Installation 14 03-Apr-25 19-Apr-25 13-Dec-25 29-Dec-25 SAR197,673.22 SAR0.00 0% 0% 29-Dec-25, Fire Fighting
Electrical Installation
In 45 12-Mar-25 07-May-25 25-Nov-25 17-Jan-26 SAR1,648,650.79 SAR0.00 0% 0% 17-Jan-26, Electrical Ins
Fire Detection
Detecti and Alarm System 18 18-Mar-25 12-Apr-25 01-Dec-25 22-Dec-25 SAR31,257.83 SAR0.00 0% 0% 22-Dec-25, Fire Detectio
Voice Evacu
Evacuation / Public Address System 40 22-Mar-25 11-May-25 04-Dec-25 20-Jan-26 SAR11,837.49 SAR0.00 0% 0% 20-Jan-26, Voice Evacu
Earthing Sy
System 4 28-Apr-25 01-May-25 06-Jan-26 11-Jan-26 SAR89,320.05 SAR0.00 0% 0% 11-Jan-26, Earthing Sys
Lightning Pr
Protection System 5 03-May-25 07-May-25 11-Jan-26 17-Jan-26 SAR58,098.76 SAR0.00 0% 0% 17-Jan-26, Lightning Pr
SCADA System
Sys 8 06-May-25 14-May-25 14-Jan-26 24-Jan-26 SAR3,233.96 SAR0.00 0% 0% 24-Jan-26, SCADA Sy
Video Surve
Surveillance and Access Control System 5 15-May-25 20-May-25 24-Jan-26 28-Jan-26 SAR46,771.94 SAR0.00 0% 0% 28-Jan-26, Video Surve
COMBINED FAN STATION (12 NOS) 596 31-Dec-22 28-May-25 22-Feb-24 05-Feb-26 SAR61,087,178.44 SAR0.00 25.57% 0% 05-Feb-26, COMBINE
COMBINED FAN STATION NO.1 (ZONE-1) 383 18-Jan-24 22-May-25 02-Nov-24 31-Jan-26 SAR5,090,598.20 SAR0.00 0% 0% 31-Jan-26, COMBINE
STRUCTURAL WORKS 264 18-Jan-24 29-Jan-25 02-Nov-24 14-Sep-25 SAR2,784,363.18 SAR0.00 0% 0% 14-Sep-25, STRUCTURAL
MEP WORKS 265 12-Aug-24 22-May-25 19-Mar-25 31-Jan-26 SAR2,306,235.03 SAR0.00 0% 0% 31-Jan-26, MEP WOR
Domestic H Hot and Cold Water Services 12 12-Aug-24 25-Aug-24 19-Mar-25 07-Apr-25 SAR101,662.31 SAR0.00 0% 0% 07-Apr-25, Domestic Hot and Col
Soil and Waste
Wa Drainage System 10 26-Aug-24 05-Sep-24 07-Apr-25 19-Apr-25 SAR28,971.67 SAR0.00 0% 0% 19-Apr-25, Soil and Waste Draina
Air Conditio
Conditioning Works 10 12-Jan-25 22-Jan-25 26-Aug-25 07-Sep-25 SAR198,590.90 SAR0.00 0% 0% 07-Sep-25, Air Conditioning
Fire Fighting Installation 14 23-Jan-25 08-Feb-25 07-Sep-25 24-Sep-25 SAR187,269.36 SAR0.00 0% 0% 24-Sep-25, Fire Fighting Ins
Electrical Installation
In 44 16-Jan-25 08-Mar-25 31-Aug-25 22-Oct-25 SAR1,561,879.70 SAR0.00 0% 0% 22-Oct-25, Electrical Instal
Fire Detection
Detecti and Alarm System 18 22-Jan-25 11-Feb-25 06-Sep-25 28-Sep-25 SAR29,612.68 SAR0.00 0% 0% 28-Sep-25, Fire Detection an
Voice Evacu
Evacuation / Public Address System 9 26-Jan-25 04-Feb-25 09-Sep-25 20-Sep-25 SAR11,214.47 SAR0.00 0% 0% 20-Sep-25, Voice Evacuation
Earthing Sy
System 4 26-Feb-25 02-Mar-25 12-Oct-25 16-Oct-25 SAR84,619.00 SAR0.00 0% 0% 16-Oct-25, Earthing System
Lightning Pr
Protection System 5 03-Mar-25 08-Mar-25 16-Oct-25 22-Oct-25 SAR55,040.93 SAR0.00 0% 0% 22-Oct-25, Lightning Prote
SCADA System
Sys 8 06-Mar-25 15-Mar-25 20-Oct-25 29-Oct-25 SAR3,063.75 SAR0.00 0% 0% 29-Oct-25, SCADA System
Video Surve
Surveillance and Access Control System 81 16-Mar-25 22-May-25 29-Oct-25 31-Jan-26 SAR44,310.26 SAR0.00 0% 0% 31-Jan-26, Video Surv
COMBINED FAN STATION NO.2 (ZONE-2) 386 26-Feb-24 28-May-25 03-Nov-24 05-Feb-26 SAR5,090,598.20 SAR0.00 0% 0% 05-Feb-26, COMBINE
STRUCTURAL WORKS 281 26-Feb-24 19-Feb-25 03-Nov-24 06-Oct-25 SAR2,784,363.18 SAR0.00 0% 0% 06-Oct-25, STRUCTURAL
MEP WORKS 268 12-Aug-24 28-May-25 20-Mar-25 05-Feb-26 SAR2,306,235.03 SAR0.00 0% 0% 05-Feb-26, MEP WOR
Domestic HHot and Cold Water Services 12 12-Aug-24 25-Aug-24 20-Mar-25 08-Apr-25 SAR101,662.31 SAR0.00 0% 0% 08-Apr-25, Domestic Hot and Col
Soil and Waste
Wa Drainage System 10 26-Aug-24 05-Sep-24 08-Apr-25 20-Apr-25 SAR28,971.67 SAR0.00 0% 0% 20-Apr-25, Soil and Waste Draina
Air Conditio
Conditioning Works 10 03-Feb-25 13-Feb-25 17-Sep-25 30-Sep-25 SAR198,590.90 SAR0.00 0% 0% 30-Sep-25, Air Conditioning

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
59 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
Fire Fighting Installation 14 15-Feb-25 02-Mar-25 30-Sep-25 16-Oct-25 SAR187,269.36 SAR0.00 0% 0% 16-Oct-25, Fire Fighting In
Electrical Installation
In 45 08-Feb-25 05-Apr-25 22-Sep-25 15-Nov-25 SAR1,561,879.70 SAR0.00 0% 0% 15-Nov-25, Electrical Inst
Fire Detection
Detecti and Alarm System 18 13-Feb-25 05-Mar-25 29-Sep-25 20-Oct-25 SAR29,612.68 SAR0.00 0% 0% 20-Oct-25, Fire Detection a
Voice Evacu
Evacuation / Public Address System 9 17-Feb-25 26-Feb-25 02-Oct-25 13-Oct-25 SAR11,214.47 SAR0.00 0% 0% 13-Oct-25, Voice Evacuatio
Earthing Sy
System 4 22-Mar-25 25-Mar-25 04-Nov-25 09-Nov-25 SAR84,619.00 SAR0.00 0% 0% 09-Nov-25, Earthing Syste
Lightning Pr
Protection System 5 26-Mar-25 05-Apr-25 09-Nov-25 15-Nov-25 SAR55,040.93 SAR0.00 0% 0% 15-Nov-25, Lightning Pro
SCADA System
Sys 8 03-Apr-25 12-Apr-25 12-Nov-25 22-Nov-25 SAR3,063.75 SAR0.00 0% 0% 22-Nov-25, SCADA Sys
Video Surve
Surveillance and Access Control System 5 24-May-25 28-May-25 31-Jan-26 05-Feb-26 SAR44,310.26 SAR0.00 0% 0% 05-Feb-26, Video Surv
COMBINED FAN STATION NO.3 (ZONE-9) 325 29-Jan-23 19-Feb-24 04-Apr-24 01-May-25 SAR5,090,598.20 SAR0.00 59.11% 0% 01-May-25, COMBINED FAN S
STRUCTURAL WORKS 282 29-Jan-23 31-Dec-23 04-Apr-24 08-Mar-25 SAR2,784,363.18 SAR0.00 100% 0% 08-Mar-25, STRUCTURAL WORK
MEP WORKS 207 19-Jun-23 19-Feb-24 28-Aug-24 01-May-25 SAR2,306,235.03 SAR0.00 9.74% 0% 01-May-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 19-Jun-23 05-Jul-23 28-Aug-24 10-Sep-24 SAR101,662.31 SAR0.00 100% 0% 10-Sep-24, Domestic Hot and Cold Water S
Soil and Waste
Wa Drainage System 10 06-Jul-23 17-Jul-23 11-Sep-24 24-Sep-24 SAR28,971.67 SAR0.00 100% 0% 24-Sep-24, Soil and Waste Drainage Syste
Air Conditio
Conditioning Works 10 11-Dec-23 21-Dec-23 16-Feb-25 26-Feb-25 SAR198,590.90 SAR0.00 47.37% 0% 26-Feb-25, Air Conditioning Works
Fire Fighting Installation 14 23-Dec-23 07-Jan-24 27-Feb-25 15-Mar-25 SAR187,269.36 SAR0.00 0% 0% 15-Mar-25, Fire Fighting Installatio
Electrical Installation
In 46 16-Dec-23 06-Feb-24 20-Feb-25 19-Apr-25 SAR1,561,879.70 SAR0.00 0% 0% 19-Apr-25, Electrical Installation
Fire Detection
Detecti and Alarm System 18 21-Dec-23 10-Jan-24 26-Feb-25 18-Mar-25 SAR29,612.68 SAR0.00 0% 0% 18-Mar-25, Fire Detection and Alar
Voice Evacu
Evacuation / Public Address System 9 25-Dec-23 03-Jan-24 02-Mar-25 11-Mar-25 SAR11,214.47 SAR0.00 0% 0% 11-Mar-25, Voice Evacuation / Publ
Earthing Sy
System 4 28-Jan-24 31-Jan-24 09-Apr-25 13-Apr-25 SAR84,619.00 SAR0.00 0% 0% 13-Apr-25, Earthing System
Lightning Pr
Protection System 5 01-Feb-24 06-Feb-24 14-Apr-25 20-Apr-25 SAR55,040.93 SAR0.00 0% 0% 20-Apr-25, Lightning Protection S
SCADA System
Sys 8 05-Feb-24 13-Feb-24 17-Apr-25 26-Apr-25 SAR3,063.75 SAR0.00 0% 0% 26-Apr-25, SCADA System
Video Surve
Surveillance and Access Control System 5 14-Feb-24 19-Feb-24 27-Apr-25 01-May-25 SAR44,310.26 SAR0.00 0% 0% 01-May-25, Video Surveillance an
COMBINED FAN STATION NO.4 (ZONE-3) 344 13-Mar-23 13-Mar-24 03-Apr-24 24-May-25 SAR5,090,598.20 SAR0.00 53.66% 0% 24-May-25, COMBINED FAN
STRUCTURAL WORKS 300 13-Mar-23 22-Jan-24 03-Apr-24 29-Mar-25 SAR2,784,363.18 SAR0.00 93.42% 0% 29-Mar-25, STRUCTURAL WOR
MEP WORKS 226 05-Aug-23 13-Mar-24 27-Aug-24 24-May-25 SAR2,306,235.03 SAR0.00 5.66% 0% 24-May-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 05-Aug-23 17-Aug-23 27-Aug-24 10-Sep-24 SAR101,662.31 SAR0.00 100% 0% 10-Sep-24, Domestic Hot and Cold Water S
Soil and Waste
Wa Drainage System 10 19-Aug-23 29-Aug-23 10-Sep-24 22-Sep-24 SAR28,971.67 SAR0.00 100% 0% 22-Sep-24, Soil and Waste Drainage Syste
Air Conditio
Conditioning Works 10 04-Jan-24 15-Jan-24 11-Mar-25 22-Mar-25 SAR198,590.90 SAR0.00 0% 0% 22-Mar-25, Air Conditioning Work
Fire Fighting Installation 14 16-Jan-24 31-Jan-24 23-Mar-25 13-Apr-25 SAR187,269.36 SAR0.00 0% 0% 13-Apr-25, Fire Fighting Installatio
Electrical Installation
In 44 09-Jan-24 28-Feb-24 16-Mar-25 10-May-25 SAR1,561,879.70 SAR0.00 0% 0% 10-May-25, Electrical Installation
Fire Detection
Detecti and Alarm System 18 15-Jan-24 04-Feb-24 22-Mar-25 15-Apr-25 SAR29,612.68 SAR0.00 0% 0% 15-Apr-25, Fire Detection and Ala
Voice Evacu
Evacuation / Public Address System 9 18-Jan-24 28-Jan-24 25-Mar-25 08-Apr-25 SAR11,214.47 SAR0.00 0% 0% 08-Apr-25, Voice Evacuation / Pub
Earthing Sy
System 4 19-Feb-24 22-Feb-24 30-Apr-25 04-May-25 SAR84,619.00 SAR0.00 0% 0% 04-May-25, Earthing System
Lightning Pr
Protection System 7 24-Feb-24 02-Mar-24 05-May-25 12-May-25 SAR55,040.93 SAR0.00 0% 0% 12-May-25, Lightning Protection
SCADA System
Sys 9 27-Feb-24 07-Mar-24 08-May-25 18-May-25 SAR3,063.75 SAR0.00 0% 0% 18-May-25, SCADA System
Video Surve
Surveillance and Access Control System 5 09-Mar-24 13-Mar-24 19-May-25 24-May-25 SAR44,310.26 SAR0.00 0% 0% 24-May-25, Video Surveillance a
COMBINED FAN STATION NO.5 (ZONE-3) 331 29-Mar-23 29-Apr-24 08-Apr-24 13-May-25 SAR5,090,598.20 SAR0.00 45.66% 0% 13-May-25, COMBINED FAN S
STRUCTURAL WORKS 291 29-Mar-23 10-Mar-24 08-Apr-24 23-Mar-25 SAR2,784,363.18 SAR0.00 78.78% 0% 23-Mar-25, STRUCTURAL WOR
MEP WORKS 213 21-Aug-23 29-Apr-24 01-Sep-24 13-May-25 SAR2,306,235.03 SAR0.00 5.66% 0% 13-May-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 21-Aug-23 03-Sep-23 01-Sep-24 15-Sep-24 SAR101,662.31 SAR0.00 100% 0% 15-Sep-24, Domestic Hot and Cold Water
Soil and Waste
Wa Drainage System 10 04-Sep-23 14-Sep-23 15-Sep-24 28-Sep-24 SAR28,971.67 SAR0.00 100% 0% 28-Sep-24, Soil and Waste Drainage Syste
Air Conditio
Conditioning Works 10 18-Feb-24 28-Feb-24 01-Mar-25 12-Mar-25 SAR198,590.90 SAR0.00 0% 0% 12-Mar-25, Air Conditioning Works
Fire Fighting Installation 14 29-Feb-24 16-Mar-24 12-Mar-25 29-Mar-25 SAR187,269.36 SAR0.00 0% 0% 29-Mar-25, Fire Fighting Installatio
Electrical Installation
In 44 22-Feb-24 16-Apr-24 05-Mar-25 30-Apr-25 SAR1,561,879.70 SAR0.00 0% 0% 30-Apr-25, Electrical Installation
Fire Detection
Detecti and Alarm System 18 28-Feb-24 19-Mar-24 11-Mar-25 06-Apr-25 SAR29,612.68 SAR0.00 0% 0% 06-Apr-25, Fire Detection and Alar
Voice Evacu
Evacuation / Public Address System 20 03-Mar-24 12-Mar-24 15-Mar-25 12-Apr-25 SAR11,214.47 SAR0.00 0% 0% 12-Apr-25, Voice Evacuation / Pub
Earthing Sy
System 4 03-Apr-24 07-Apr-24 20-Apr-25 24-Apr-25 SAR84,619.00 SAR0.00 0% 0% 24-Apr-25, Earthing System
Lightning Pr
Protection System 5 08-Apr-24 16-Apr-24 24-Apr-25 30-Apr-25 SAR55,040.93 SAR0.00 0% 0% 30-Apr-25, Lightning Protection S
SCADA System
Sys 8 15-Apr-24 23-Apr-24 28-Apr-25 07-May-25 SAR3,063.75 SAR0.00 0% 0% 07-May-25, SCADA System
Video Surve
Surveillance and Access Control System 5 24-Apr-24 29-Apr-24 07-May-25 13-May-25 SAR44,310.26 SAR0.00 0% 0% 13-May-25, Video Surveillance an
COMBINED FAN STATION NO.6 (ZONE-10) 382 31-Dec-22 01-May-24 22-Feb-24 26-May-25 SAR5,090,598.20 SAR0.00 96.33% 0% 26-May-25, COMBINED FAN
STRUCTURAL WORKS 345 31-Dec-22 26-Mar-24 22-Feb-24 13-Apr-25 SAR2,784,363.18 SAR0.00 100% 0% 13-Apr-25, STRUCTURAL WOR
MEP WORKS 264 21-May-23 01-May-24 17-Jul-24 26-May-25 SAR2,306,235.03 SAR0.00 91.89% 0% 26-May-25, MEP WORKS
Domestic H Hot and Cold Water Services 49 21-May-23 19-Aug-23 17-Jul-24 11-Sep-24 SAR101,662.31 SAR0.00 100% 0% 11-Sep-24, Domestic Hot and Cold Water S
Soil and Waste
Wa Drainage System 10 20-Aug-23 30-Aug-23 11-Sep-24 24-Sep-24 SAR28,971.67 SAR0.00 100% 0% 24-Sep-24, Soil and Waste Drainage Syste
Air Conditio
Conditioning Works 10 05-Oct-23 16-Oct-23 28-Nov-24 09-Dec-24 SAR198,590.90 SAR0.00 100% 0% 09-Dec-24, Air Conditioning Works
Fire Fighting Installation 14 17-Oct-23 01-Nov-23 10-Dec-24 25-Dec-24 SAR187,269.36 SAR0.00 100% 0% 25-Dec-24, Fire Fighting Installation
Electrical Installation
In 44 10-Oct-23 29-Nov-23 03-Dec-24 22-Jan-25 SAR1,561,879.70 SAR0.00 100% 0% 22-Jan-25, Electrical Installation
Fire Detection
Detecti and Alarm System 18 16-Oct-23 05-Nov-23 09-Dec-24 29-Dec-24 SAR29,612.68 SAR0.00 100% 0% 29-Dec-24, Fire Detection and Alarm S
Voice Evacu
Evacuation / Public Address System 9 19-Oct-23 29-Oct-23 12-Dec-24 22-Dec-24 SAR11,214.47 SAR0.00 100% 0% 22-Dec-24, Voice Evacuation / Public A
Earthing Sy
System 4 01-Jan-24 04-Jan-24 09-Mar-25 12-Mar-25 SAR84,619.00 SAR0.00 0% 0% 12-Mar-25, Earthing System
Lightning Pr
Protection System 5 06-Jan-24 10-Jan-24 13-Mar-25 19-Mar-25 SAR55,040.93 SAR0.00 0% 0% 19-Mar-25, Lightning Protection Sy

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
60 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
SCADA System
Sys 8 09-Jan-24 17-Jan-24 17-Mar-25 25-Mar-25 SAR3,063.75 SAR0.00 0% 0% 25-Mar-25, SCADA System
Video Surve
Surveillance and Access Control System 49 18-Jan-24 01-May-24 26-Mar-25 26-May-25 SAR44,310.26 SAR0.00 0% 0% 26-May-25, Video Surveillance a
COMBINED FAN STATION NO.7 (ZONE-4) 322 04-Mar-24 23-Mar-25 26-May-24 18-Jun-25 SAR5,090,598.20 SAR0.00 0% 0% 18-Jun-25, COMBINED FAN S
STRUCTURAL WORKS 282 04-Mar-24 04-Feb-25 26-May-24 29-Apr-25 SAR2,784,363.18 SAR0.00 0% 0% 29-Apr-25, STRUCTURAL WOR
MEP WORKS 204 28-Jul-24 23-Mar-25 16-Oct-24 18-Jun-25 SAR2,306,235.03 SAR0.00 0% 0% 18-Jun-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 28-Jul-24 10-Aug-24 16-Oct-24 30-Oct-24 SAR101,662.31 SAR0.00 0% 0% 30-Oct-24, Domestic Hot and Cold Wate
Soil and Waste
Wa Drainage System 10 11-Aug-24 21-Aug-24 30-Oct-24 11-Nov-24 SAR28,971.67 SAR0.00 0% 0% 11-Nov-24, Soil and Waste Drainage Sys
Air Conditio
Conditioning Works 10 15-Jan-25 26-Jan-25 09-Apr-25 20-Apr-25 SAR198,590.90 SAR0.00 0% 0% 20-Apr-25, Air Conditioning Work
Fire Fighting Installation 14 27-Jan-25 11-Feb-25 21-Apr-25 06-May-25 SAR187,269.36 SAR0.00 0% 0% 06-May-25, Fire Fighting Installa
Electrical Installation
In 44 20-Jan-25 11-Mar-25 14-Apr-25 03-Jun-25 SAR1,561,879.70 SAR0.00 0% 0% 03-Jun-25, Electrical Installation
Fire Detection
Detecti and Alarm System 18 26-Jan-25 15-Feb-25 20-Apr-25 10-May-25 SAR29,612.68 SAR0.00 0% 0% 10-May-25, Fire Detection and A
Voice Evacu
Evacuation / Public Address System 9 29-Jan-25 08-Feb-25 23-Apr-25 03-May-25 SAR11,214.47 SAR0.00 0% 0% 03-May-25, Voice Evacuation / Pu
Earthing Sy
System 4 02-Mar-25 05-Mar-25 25-May-25 28-May-25 SAR84,619.00 SAR0.00 0% 0% 28-May-25, Earthing System
Lightning Pr
Protection System 5 05-Mar-25 10-Mar-25 28-May-25 02-Jun-25 SAR55,040.93 SAR0.00 0% 0% 02-Jun-25, Lightning Protection
SCADA System
Sys 8 09-Mar-25 17-Mar-25 01-Jun-25 12-Jun-25 SAR3,063.75 SAR0.00 0% 0% 12-Jun-25, SCADA System
Video Surve
Surveillance and Access Control System 5 18-Mar-25 23-Mar-25 14-Jun-25 18-Jun-25 SAR44,310.26 SAR0.00 0% 0% 18-Jun-25, Video Surveillance a
COMBINED FAN STATION NO.8 (ZONE-4) 351 28-Mar-24 10-May-25 24-Jun-24 17-Aug-25 SAR5,090,598.20 SAR0.00 0% 0% 17-Aug-25, COMBINED FA
STRUCTURAL WORKS 313 28-Mar-24 22-Mar-25 24-Jun-24 03-Jul-25 SAR2,784,363.18 SAR0.00 0% 0% 03-Jul-25, STRUCTURAL WO
MEP WORKS 220 21-Aug-24 10-May-25 25-Nov-24 17-Aug-25 SAR2,306,235.03 SAR0.00 0% 0% 17-Aug-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 21-Aug-24 03-Sep-24 25-Nov-24 09-Dec-24 SAR101,662.31 SAR0.00 0% 0% 09-Dec-24, Domestic Hot and Cold Wa
Soil and Waste
Wa Drainage System 10 04-Sep-24 15-Sep-24 09-Dec-24 21-Dec-24 SAR28,971.67 SAR0.00 0% 0% 21-Dec-24, Soil and Waste Drainage S
Air Conditio
Conditioning Works 10 27-Feb-25 10-Mar-25 10-Jun-25 22-Jun-25 SAR198,590.90 SAR0.00 0% 0% 22-Jun-25, Air Conditioning Wo
Fire Fighting Installation 14 11-Mar-25 26-Mar-25 22-Jun-25 08-Jul-25 SAR187,269.36 SAR0.00 0% 0% 08-Jul-25, Fire Fighting Installa
Electrical Installation
In 44 04-Mar-25 28-Apr-25 15-Jun-25 05-Aug-25 SAR1,561,879.70 SAR0.00 0% 0% 05-Aug-25, Electrical Installat
Fire Detection
Detecti and Alarm System 18 10-Mar-25 03-Apr-25 21-Jun-25 12-Jul-25 SAR29,612.68 SAR0.00 0% 0% 12-Jul-25, Fire Detection and A
Voice Evacu
Evacuation / Public Address System 9 13-Mar-25 23-Mar-25 24-Jun-25 05-Jul-25 SAR11,214.47 SAR0.00 0% 0% 05-Jul-25, Voice Evacuation / P
Earthing Sy
System 4 19-Apr-25 22-Apr-25 26-Jul-25 30-Jul-25 SAR84,619.00 SAR0.00 0% 0% 30-Jul-25, Earthing System
Lightning Pr
Protection System 5 22-Apr-25 27-Apr-25 29-Jul-25 04-Aug-25 SAR55,040.93 SAR0.00 0% 0% 04-Aug-25, Lightning Protecti
SCADA System
Sys 8 26-Apr-25 04-May-25 02-Aug-25 11-Aug-25 SAR3,063.75 SAR0.00 0% 0% 11-Aug-25, SCADA System
Video Surve
Surveillance and Access Control System 5 05-May-25 10-May-25 11-Aug-25 17-Aug-25 SAR44,310.26 SAR0.00 0% 0% 17-Aug-25, Video Surveillanc
COMBINED FAN STATION NO.9 (ZONE-11) 423 20-Dec-23 22-Apr-25 16-Mar-24 09-Aug-25 SAR5,090,598.20 SAR0.00 0% 0% 09-Aug-25, COMBINED FA
STRUCTURAL WORKS 383 20-Dec-23 02-Mar-25 16-Mar-24 23-Jun-25 SAR2,784,363.18 SAR0.00 0% 0% 23-Jun-25, STRUCTURAL WO
MEP WORKS 213 12-Aug-24 22-Apr-25 25-Nov-24 09-Aug-25 SAR2,306,235.03 SAR0.00 0% 0% 09-Aug-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 12-Aug-24 25-Aug-24 25-Nov-24 09-Dec-24 SAR101,662.31 SAR0.00 0% 0% 09-Dec-24, Domestic Hot and Cold Wa
Soil and Waste
Wa Drainage System 10 26-Aug-24 05-Sep-24 09-Dec-24 21-Dec-24 SAR28,971.67 SAR0.00 0% 0% 21-Dec-24, Soil and Waste Drainage S
Air Conditio
Conditioning Works 10 09-Feb-25 19-Feb-25 28-May-25 12-Jun-25 SAR198,590.90 SAR0.00 0% 0% 12-Jun-25, Air Conditioning Wo
Fire Fighting Installation 14 03-Mar-25 18-Mar-25 23-Jun-25 09-Jul-25 SAR187,269.36 SAR0.00 0% 0% 09-Jul-25, Fire Fighting Installa
Electrical Installation
In 41 13-Feb-25 06-Apr-25 02-Jun-25 23-Jul-25 SAR1,513,711.98 SAR0.00 0% 0% 23-Jul-25, Electrical Installatio
Fire Detection
Detecti and Alarm System 18 19-Feb-25 11-Mar-25 11-Jun-25 02-Jul-25 SAR74,035.59 SAR0.00 0% 0% 02-Jul-25, Fire Detection and A
Voice Evacu
Evacuation / Public Address System 9 23-Feb-25 04-Mar-25 15-Jun-25 25-Jun-25 SAR12,451.57 SAR0.00 0% 0% 25-Jun-25, Voice Evacuation / P
Earthing Sy
System 4 27-Mar-25 05-Apr-25 17-Jul-25 22-Jul-25 SAR87,126.71 SAR0.00 0% 0% 22-Jul-25, Earthing System
Lightning Pr
Protection System 5 05-Apr-25 09-Apr-25 21-Jul-25 27-Jul-25 SAR55,040.93 SAR0.00 0% 0% 27-Jul-25, Lightning Protectio
SCADA System
Sys 8 08-Apr-25 16-Apr-25 24-Jul-25 03-Aug-25 SAR3,063.75 SAR0.00 0% 0% 03-Aug-25, SCADA System
Video Surve
Surveillance and Access Control System 5 17-Apr-25 22-Apr-25 03-Aug-25 09-Aug-25 SAR44,310.26 SAR0.00 0% 0% 09-Aug-25, Video Surveillanc
COMBINED FAN STATION NO.10 (ZONE-4) 359 24-Mar-24 10-May-25 19-Jun-24 21-Aug-25 SAR5,090,598.20 SAR0.00 0% 0% 21-Aug-25, COMBINED FA
STRUCTURAL WORKS 318 24-Mar-24 17-Mar-25 19-Jun-24 03-Jul-25 SAR2,784,363.18 SAR0.00 0% 0% 03-Jul-25, STRUCTURAL WO
MEP WORKS 224 17-Aug-24 10-May-25 25-Nov-24 21-Aug-25 SAR2,306,235.03 SAR0.00 0% 0% 21-Aug-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 17-Aug-24 29-Aug-24 25-Nov-24 09-Dec-24 SAR101,662.31 SAR0.00 0% 0% 09-Dec-24, Domestic Hot and Cold Wa
Soil and Waste
Wa Drainage System 10 31-Aug-24 10-Sep-24 09-Dec-24 21-Dec-24 SAR28,971.67 SAR0.00 0% 0% 21-Dec-24, Soil and Waste Drainage S
Air Conditio
Conditioning Works 22 23-Feb-25 19-Mar-25 10-Jun-25 06-Jul-25 SAR198,590.90 SAR0.00 0% 0% 06-Jul-25, Air Conditioning Wo
Fire Fighting Installation 14 20-Mar-25 09-Apr-25 06-Jul-25 22-Jul-25 SAR187,269.36 SAR0.00 0% 0% 22-Jul-25, Fire Fighting Install
Electrical Installation
In 48 27-Feb-25 28-Apr-25 15-Jun-25 10-Aug-25 SAR1,561,879.70 SAR0.00 0% 0% 10-Aug-25, Electrical Installat
Fire Detection
Detecti and Alarm System 18 05-Mar-25 25-Mar-25 21-Jun-25 12-Jul-25 SAR29,612.68 SAR0.00 0% 0% 12-Jul-25, Fire Detection and A
Voice Evacu
Evacuation / Public Address System 9 09-Mar-25 18-Mar-25 24-Jun-25 05-Jul-25 SAR11,214.47 SAR0.00 0% 0% 05-Jul-25, Voice Evacuation / P
Earthing Sy
System 4 19-Apr-25 22-Apr-25 30-Jul-25 04-Aug-25 SAR84,619.00 SAR0.00 0% 0% 04-Aug-25, Earthing System
Lightning Pr
Protection System 5 22-Apr-25 27-Apr-25 03-Aug-25 09-Aug-25 SAR55,040.93 SAR0.00 0% 0% 09-Aug-25, Lightning Protect
SCADA System
Sys 8 26-Apr-25 04-May-25 06-Aug-25 16-Aug-25 SAR3,063.75 SAR0.00 0% 0% 16-Aug-25, SCADA System
Video Surve
Surveillance and Access Control System 5 05-May-25 10-May-25 16-Aug-25 21-Aug-25 SAR44,310.26 SAR0.00 0% 0% 21-Aug-25, Video Surveillanc
COMBINED FAN STATION NO.11 (ZONE-4) 351 04-Apr-24 21-May-25 01-Jul-24 24-Aug-25 SAR5,090,598.20 SAR0.00 0% 0% 24-Aug-25, COMBINED FA
STRUCTURAL WORKS 308 04-Apr-24 29-Mar-25 01-Jul-24 03-Jul-25 SAR2,784,363.18 SAR0.00 0% 0% 03-Jul-25, STRUCTURAL WO
MEP WORKS 226 28-Aug-24 21-May-25 25-Nov-24 24-Aug-25 SAR2,306,235.03 SAR0.00 0% 0% 24-Aug-25, MEP WORKS
Domestic H
Hot and Cold Water Services 12 28-Aug-24 10-Sep-24 25-Nov-24 09-Dec-24 SAR101,662.31 SAR0.00 0% 0% 09-Dec-24, Domestic Hot and Cold Wa

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
61 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
Soil and Waste
Wa Drainage System 10 11-Sep-24 22-Sep-24 09-Dec-24 21-Dec-24 SAR28,971.67 SAR0.00 0% 0% 21-Dec-24, Soil and Waste Drainage S
Air Conditio
Conditioning Works 22 06-Mar-25 05-Apr-25 10-Jun-25 06-Jul-25 SAR198,590.90 SAR0.00 0% 0% 06-Jul-25, Air Conditioning Wo
Fire Fighting Installation 14 06-Apr-25 21-Apr-25 06-Jul-25 22-Jul-25 SAR187,269.36 SAR0.00 0% 0% 22-Jul-25, Fire Fighting Install
Electrical Installation
In 52 11-Mar-25 10-May-25 15-Jun-25 14-Aug-25 SAR1,561,879.70 SAR0.00 0% 0% 14-Aug-25, Electrical Installat
Fire Detection
Detecti and Alarm System 18 17-Mar-25 10-Apr-25 21-Jun-25 12-Jul-25 SAR29,612.68 SAR0.00 0% 0% 12-Jul-25, Fire Detection and A
Voice Evacu
Evacuation / Public Address System 12 20-Mar-25 03-Apr-25 24-Jun-25 08-Jul-25 SAR11,214.47 SAR0.00 0% 0% 08-Jul-25, Voice Evacuation / P
Earthing Sy
System 4 30-Apr-25 04-May-25 30-Jul-25 04-Aug-25 SAR84,619.00 SAR0.00 0% 0% 04-Aug-25, Earthing System
Lightning Pr
Protection System 5 04-May-25 08-May-25 03-Aug-25 09-Aug-25 SAR55,040.93 SAR0.00 0% 0% 09-Aug-25, Lightning Protect
SCADA System
Sys 8 07-May-25 15-May-25 06-Aug-25 16-Aug-25 SAR3,063.75 SAR0.00 0% 0% 16-Aug-25, SCADA System
Video Surve
Surveillance and Access Control System 7 17-May-25 21-May-25 16-Aug-25 24-Aug-25 SAR44,310.26 SAR0.00 0% 0% 24-Aug-25, Video Surveillan
COMBINED FAN STATION NO.12 (ZONE-6) 351 26-Feb-23 21-Apr-24 19-May-24 16-Jul-25 SAR5,090,598.20 SAR0.00 52.09% 0% 16-Jul-25, COMBINED FAN
STRUCTURAL WORKS 300 26-Feb-23 18-Feb-24 19-May-24 14-May-25 SAR2,784,363.18 SAR0.00 90.54% 0% 14-May-25, STRUCTURAL WO
MEP WORKS 233 20-Jul-23 21-Apr-24 09-Oct-24 16-Jul-25 SAR2,306,235.03 SAR0.00 5.66% 0% 16-Jul-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 20-Jul-23 02-Aug-23 09-Oct-24 22-Oct-24 SAR101,662.31 SAR0.00 100% 0% 22-Oct-24, Domestic Hot and Cold Water
Soil and Waste
Wa Drainage System 10 03-Aug-23 14-Aug-23 23-Oct-24 03-Nov-24 SAR28,971.67 SAR0.00 100% 0% 03-Nov-24, Soil and Waste Drainage Sys
Air Conditio
Conditioning Works 22 27-Jan-24 20-Feb-24 21-Apr-25 17-May-25 SAR198,590.90 SAR0.00 0% 0% 17-May-25, Air Conditioning Wo
Fire Fighting Installation 14 21-Feb-24 07-Mar-24 17-May-25 02-Jun-25 SAR187,269.36 SAR0.00 0% 0% 02-Jun-25, Fire Fighting Installa
Electrical Installation
In 48 31-Jan-24 26-Mar-24 26-Apr-25 24-Jun-25 SAR1,561,879.70 SAR0.00 0% 0% 24-Jun-25, Electrical Installation
Fire Detection
Detecti and Alarm System 18 06-Feb-24 26-Feb-24 01-May-25 21-May-25 SAR29,612.68 SAR0.00 0% 0% 21-May-25, Fire Detection and A
Voice Evacu
Evacuation / Public Address System 9 10-Feb-24 19-Feb-24 05-May-25 14-May-25 SAR11,214.47 SAR0.00 0% 0% 14-May-25, Voice Evacuation / P
Earthing Sy
System 4 27-Mar-24 31-Mar-24 24-Jun-25 29-Jun-25 SAR84,619.00 SAR0.00 0% 0% 29-Jun-25, Earthing System
Lightning Pr
Protection System 5 31-Mar-24 04-Apr-24 28-Jun-25 03-Jul-25 SAR55,040.93 SAR0.00 0% 0% 03-Jul-25, Lightning Protection
SCADA System
Sys 8 03-Apr-24 15-Apr-24 01-Jul-25 10-Jul-25 SAR3,063.75 SAR0.00 0% 0% 10-Jul-25, SCADA System
Video Surve
Surveillance and Access Control System 5 16-Apr-24 21-Apr-24 10-Jul-25 16-Jul-25 SAR44,310.26 SAR0.00 0% 0% 16-Jul-25, Video Surveillance a
LIFTING STATION ( 6 NOS) 552 21-Jan-23 02-Jun-25 24-Jan-24 17-Nov-25 SAR0.00 SAR0.00 0% 0% 17-Nov-25, LIFTING ST
LIFTING STATIO
STATION NO.1 (ZONE-1) 306 01-Feb-24 02-Jun-25 16-Nov-24 17-Nov-25 SAR0.00 SAR0.00 0% 0% 17-Nov-25, LIFTING ST
STRUCTURAL WORKS 264 01-Feb-24 14-Apr-25 16-Nov-24 29-Sep-25 SAR0.00 SAR0.00 0% 0% 29-Sep-25, STRUCTURAL
MEP WORKS 188 12-Aug-24 02-Jun-25 07-Apr-25 17-Nov-25 SAR0.00 SAR0.00 0% 0% 17-Nov-25, MEP WORK
Domestic H Hot and Cold Water Services 12 12-Aug-24 25-Aug-24 07-Apr-25 21-Apr-25 SAR0.00 SAR0.00 0% 0% 21-Apr-25, Domestic Hot and Col
Soil and Waste
Wa Drainage System 10 26-Aug-24 05-Sep-24 21-Apr-25 03-May-25 SAR0.00 SAR0.00 0% 0% 03-May-25, Soil and Waste Drain
Air Conditio
Conditioning Works 18 12-Jan-25 16-Apr-25 09-Sep-25 01-Oct-25 SAR0.00 SAR0.00 0% 0% 01-Oct-25, Air Conditioning
Fire Fighting Installation 14 17-Apr-25 03-May-25 01-Oct-25 18-Oct-25 SAR0.00 SAR0.00 0% 0% 18-Oct-25, Fire Fighting In
Electrical Installation
In 44 16-Jan-25 21-May-25 14-Sep-25 05-Nov-25 SAR0.00 SAR0.00 0% 0% 05-Nov-25, Electrical Insta
Fire Detection
Detecti and Alarm System 18 22-Jan-25 11-Feb-25 20-Sep-25 12-Oct-25 SAR0.00 SAR0.00 0% 0% 12-Oct-25, Fire Detection a
Voice Evacu
Evacuation / Public Address System 9 26-Jan-25 04-Feb-25 24-Sep-25 05-Oct-25 SAR0.00 SAR0.00 0% 0% 05-Oct-25, Voice Evacuatio
Earthing Sy
System 4 12-May-25 15-May-25 26-Oct-25 30-Oct-25 SAR0.00 SAR0.00 0% 0% 30-Oct-25, Earthing System
Lightning Pr
Protection System 5 15-May-25 20-May-25 29-Oct-25 04-Nov-25 SAR0.00 SAR0.00 0% 0% 04-Nov-25, Lightning Pro
SCADA System
Sys 8 19-May-25 27-May-25 02-Nov-25 11-Nov-25 SAR0.00 SAR0.00 0% 0% 11-Nov-25, SCADA Syst
Video Surve
Surveillance and Access Control System 5 28-May-25 02-Jun-25 11-Nov-25 17-Nov-25 SAR0.00 SAR0.00 0% 0% 17-Nov-25, Video Surveil
LIFTING STATIO
STATION NO.2 (ZONE-9) 344 28-Feb-23 13-Apr-24 08-May-24 26-Jun-25 SAR0.00 SAR0.00 0% 0% 26-Jun-25, LIFTING STATION
STRUCTURAL WORKS 301 28-Feb-23 20-Feb-24 08-May-24 04-May-25 SAR0.00 SAR0.00 0% 0% 04-May-25, STRUCTURAL WO
MEP WORKS 225 23-Jul-23 13-Apr-24 29-Sep-24 26-Jun-25 SAR0.00 SAR0.00 0% 0% 26-Jun-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 23-Jul-23 05-Aug-23 29-Sep-24 13-Oct-24 SAR0.00 SAR0.00 0% 0% 13-Oct-24, Domestic Hot and Cold Water
Soil and Waste
Wa Drainage System 10 06-Aug-23 16-Aug-23 13-Oct-24 24-Oct-24 SAR0.00 SAR0.00 0% 0% 24-Oct-24, Soil and Waste Drainage Syst
Air Conditio
Conditioning Works 22 29-Jan-24 22-Feb-24 10-Apr-25 06-May-25 SAR0.00 SAR0.00 0% 0% 06-May-25, Air Conditioning Wo
Fire Fighting Installation 14 24-Feb-24 10-Mar-24 07-May-25 24-May-25 SAR0.00 SAR0.00 0% 0% 24-May-25, Fire Fighting Installa
Electrical Installation
In 49 03-Feb-24 28-Mar-24 15-Apr-25 15-Jun-25 SAR0.00 SAR0.00 0% 0% 15-Jun-25, Electrical Installation
Fire Detection
Detecti and Alarm System 18 08-Feb-24 28-Feb-24 21-Apr-25 13-May-25 SAR0.00 SAR0.00 0% 0% 13-May-25, Fire Detection and A
Voice Evacu
Evacuation / Public Address System 9 12-Feb-24 21-Feb-24 26-Apr-25 05-May-25 SAR0.00 SAR0.00 0% 0% 05-May-25, Voice Evacuation / Pu
Earthing Sy
System 4 19-Mar-24 23-Mar-24 01-Jun-25 09-Jun-25 SAR0.00 SAR0.00 0% 0% 09-Jun-25, Earthing System
Lightning Pr
Protection System 5 23-Mar-24 27-Mar-24 04-Jun-25 14-Jun-25 SAR0.00 SAR0.00 0% 0% 14-Jun-25, Lightning Protection
SCADA System
Sys 8 26-Mar-24 03-Apr-24 11-Jun-25 21-Jun-25 SAR0.00 SAR0.00 0% 0% 21-Jun-25, SCADA System
Video Surve
Surveillance and Access Control System 5 04-Apr-24 13-Apr-24 21-Jun-25 26-Jun-25 SAR0.00 SAR0.00 0% 0% 26-Jun-25, Video Surveillance a
LIFTING STATIO
STATION NO.3 (ZONE-4) 368 16-Mar-24 06-May-25 06-Jun-24 23-Aug-25 SAR0.00 SAR0.00 0% 0% 23-Aug-25, LIFTING STATI
STRUCTURAL WORKS 325 16-Mar-24 12-Mar-25 06-Jun-24 03-Jul-25 SAR0.00 SAR0.00 0% 0% 03-Jul-25, STRUCTURAL WO
MEP WORKS 225 12-Aug-24 06-May-25 25-Nov-24 23-Aug-25 SAR0.00 SAR0.00 0% 0% 23-Aug-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 12-Aug-24 25-Aug-24 25-Nov-24 09-Dec-24 SAR0.00 SAR0.00 0% 0% 09-Dec-24, Domestic Hot and Cold Wa
Soil and Waste
Wa Drainage System 10 26-Aug-24 05-Sep-24 09-Dec-24 21-Dec-24 SAR0.00 SAR0.00 0% 0% 21-Dec-24, Soil and Waste Drainage S
Air Conditio
Conditioning Works 22 18-Feb-25 15-Mar-25 10-Jun-25 06-Jul-25 SAR0.00 SAR0.00 0% 0% 06-Jul-25, Air Conditioning Wo
Fire Fighting Installation 14 16-Mar-25 05-Apr-25 06-Jul-25 22-Jul-25 SAR0.00 SAR0.00 0% 0% 22-Jul-25, Fire Fighting Install
Electrical Installation
In 48 23-Feb-25 23-Apr-25 15-Jun-25 10-Aug-25 SAR0.00 SAR0.00 0% 0% 10-Aug-25, Electrical Installat

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
62 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
Fire Detection
Detecti and Alarm System 18 01-Mar-25 20-Mar-25 21-Jun-25 12-Jul-25 SAR0.00 SAR0.00 0% 0% 12-Jul-25, Fire Detection and A
Voice Evacu
Evacuation / Public Address System 9 04-Mar-25 13-Mar-25 24-Jun-25 05-Jul-25 SAR0.00 SAR0.00 0% 0% 05-Jul-25, Voice Evacuation / P
Earthing Sy
System 4 14-Apr-25 17-Apr-25 30-Jul-25 04-Aug-25 SAR0.00 SAR0.00 0% 0% 04-Aug-25, Earthing System
Lightning Pr
Protection System 5 19-Apr-25 23-Apr-25 04-Aug-25 10-Aug-25 SAR0.00 SAR0.00 0% 0% 10-Aug-25, Lightning Protect
SCADA System
Sys 8 22-Apr-25 30-Apr-25 07-Aug-25 17-Aug-25 SAR0.00 SAR0.00 0% 0% 17-Aug-25, SCADA System
Video Surve
Surveillance and Access Control System 5 01-May-25 06-May-25 17-Aug-25 23-Aug-25 SAR0.00 SAR0.00 0% 0% 23-Aug-25, Video Surveillan
LIFTING STATIO
STATION NO.4 (ZONE-6) 341 03-May-23 02-Dec-24 25-Jul-24 06-Sep-25 SAR0.00 SAR0.00 0% 0% 06-Sep-25, LIFTING STATI
STRUCTURAL WORKS 300 03-May-23 24-Apr-24 25-Jul-24 20-Jul-25 SAR0.00 SAR0.00 0% 0% 20-Jul-25, STRUCTURAL W
MEP WORKS 223 21-Sep-23 02-Dec-24 11-Dec-24 06-Sep-25 SAR0.00 SAR0.00 0% 0% 06-Sep-25, MEP WORKS
Domestic H Hot and Cold Water Services 14 21-Sep-23 11-Sep-24 11-Dec-24 26-Dec-24 SAR0.00 SAR0.00 0% 0% 26-Dec-24, Domestic Hot and Cold W
Soil and Waste
Wa Drainage System 10 12-Sep-24 24-Sep-24 26-Dec-24 07-Jan-25 SAR0.00 SAR0.00 0% 0% 07-Jan-25, Soil and Waste Drainage S
Air Conditio
Conditioning Works 10 25-Sep-24 06-Oct-24 26-Jun-25 08-Jul-25 SAR0.00 SAR0.00 0% 0% 08-Jul-25, Air Conditioning Wo
Fire Fighting Installation 14 07-Oct-24 22-Oct-24 20-Jul-25 05-Aug-25 SAR0.00 SAR0.00 0% 0% 05-Aug-25, Fire Fighting Inst
Electrical Installation
In 46 30-Sep-24 19-Nov-24 01-Jul-25 24-Aug-25 SAR0.00 SAR0.00 0% 0% 24-Aug-25, Electrical Installa
Fire Detection
Detecti and Alarm System 18 06-Oct-24 26-Oct-24 07-Jul-25 28-Jul-25 SAR0.00 SAR0.00 0% 0% 28-Jul-25, Fire Detection and A
Voice Evacu
Evacuation / Public Address System 9 09-Oct-24 19-Oct-24 10-Jul-25 21-Jul-25 SAR0.00 SAR0.00 0% 0% 21-Jul-25, Voice Evacuation / P
Earthing Sy
System 4 10-Nov-24 13-Nov-24 13-Aug-25 18-Aug-25 SAR0.00 SAR0.00 0% 0% 18-Aug-25, Earthing System
Lightning Pr
Protection System 5 14-Nov-24 19-Nov-24 18-Aug-25 24-Aug-25 SAR0.00 SAR0.00 0% 0% 24-Aug-25, Lightning Protec
SCADA System
Sys 8 18-Nov-24 26-Nov-24 21-Aug-25 31-Aug-25 SAR0.00 SAR0.00 0% 0% 31-Aug-25, SCADA System
Video Surve
Surveillance and Access Control System 5 27-Nov-24 02-Dec-24 31-Aug-25 06-Sep-25 SAR0.00 SAR0.00 0% 0% 06-Sep-25, Video Surveillanc
LIFTING STATIO
STATION NO.5 (ZONE-10) 510 21-Jan-23 07-Jul-24 24-Jan-24 28-Sep-25 SAR0.00 SAR0.00 0% 0% 28-Sep-25, LIFTING STAT
STRUCTURAL WORKS 468 21-Jan-23 14-May-24 24-Jan-24 09-Aug-25 SAR0.00 SAR0.00 0% 0% 09-Aug-25, STRUCTURAL W
MEP WORKS 225 12-Oct-23 07-Jul-24 31-Dec-24 28-Sep-25 SAR0.00 SAR0.00 0% 0% 28-Sep-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 12-Oct-23 25-Oct-23 31-Dec-24 14-Jan-25 SAR0.00 SAR0.00 0% 0% 14-Jan-25, Domestic Hot and Cold W
Soil and Waste
Wa Drainage System 10 26-Oct-23 06-Nov-23 14-Jan-25 26-Jan-25 SAR0.00 SAR0.00 0% 0% 26-Jan-25, Soil and Waste Drainage S
Air Conditio
Conditioning Works 22 22-Apr-24 16-May-24 16-Jul-25 11-Aug-25 SAR0.00 SAR0.00 0% 0% 11-Aug-25, Air Conditioning
Fire Fighting Installation 14 18-May-24 02-Jun-24 11-Aug-25 27-Aug-25 SAR0.00 SAR0.00 0% 0% 27-Aug-25, Fire Fighting Ins
Electrical Installation
In 48 27-Apr-24 25-Jun-24 21-Jul-25 15-Sep-25 SAR0.00 SAR0.00 0% 0% 15-Sep-25, Electrical Installa
Fire Detection
Detecti and Alarm System 18 02-May-24 22-May-24 27-Jul-25 17-Aug-25 SAR0.00 SAR0.00 0% 0% 17-Aug-25, Fire Detection an
Voice Evacu
Evacuation / Public Address System 9 06-May-24 15-May-24 30-Jul-25 10-Aug-25 SAR0.00 SAR0.00 0% 0% 10-Aug-25, Voice Evacuation
Earthing Sy
System 4 11-Jun-24 19-Jun-24 04-Sep-25 09-Sep-25 SAR0.00 SAR0.00 0% 0% 09-Sep-25, Earthing System
Lightning Pr
Protection System 5 19-Jun-24 24-Jun-24 08-Sep-25 14-Sep-25 SAR0.00 SAR0.00 0% 0% 14-Sep-25, Lightning Protec
SCADA System
Sys 8 23-Jun-24 01-Jul-24 11-Sep-25 21-Sep-25 SAR0.00 SAR0.00 0% 0% 21-Sep-25, SCADA System
Video Surve
Surveillance and Access Control System 5 02-Jul-24 07-Jul-24 21-Sep-25 28-Sep-25 SAR0.00 SAR0.00 0% 0% 28-Sep-25, Video Surveillan
LIFTING STATIO
STATION NO.6 (ZONE-11) 501 03-Dec-23 11-Jan-25 29-Feb-24 25-Oct-25 SAR0.00 SAR0.00 0% 0% 25-Oct-25, LIFTING STAT
STRUCTURAL WORKS 461 03-Dec-23 25-Nov-24 29-Feb-24 06-Sep-25 SAR0.00 SAR0.00 0% 0% 06-Sep-25, STRUCTURAL
MEP WORKS 230 22-Apr-24 11-Jan-25 20-Jan-25 25-Oct-25 SAR0.00 SAR0.00 0% 0% 25-Oct-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 22-Apr-24 05-May-24 20-Jan-25 03-Feb-25 SAR0.00 SAR0.00 0% 0% 03-Feb-25, Domestic Hot and Cold W
Soil and Waste
Wa Drainage System 10 06-May-24 16-May-24 03-Feb-25 15-Feb-25 SAR0.00 SAR0.00 0% 0% 15-Feb-25, Soil and Waste Drainage
Air Conditio
Conditioning Works 10 03-Nov-24 13-Nov-24 13-Aug-25 25-Aug-25 SAR0.00 SAR0.00 0% 0% 25-Aug-25, Air Conditioning
Fire Fighting Installation 14 26-Nov-24 11-Dec-24 06-Sep-25 22-Sep-25 SAR0.00 SAR0.00 0% 0% 22-Sep-25, Fire Fighting Ins
Electrical Installation
In 47 07-Nov-24 30-Dec-24 18-Aug-25 13-Oct-25 SAR0.00 SAR0.00 0% 0% 13-Oct-25, Electrical Install
Fire Detection
Detecti and Alarm System 18 13-Nov-24 03-Dec-24 24-Aug-25 14-Sep-25 SAR0.00 SAR0.00 0% 0% 14-Sep-25, Fire Detection an
Voice Evacu
Evacuation / Public Address System 9 17-Nov-24 26-Nov-24 27-Aug-25 07-Sep-25 SAR0.00 SAR0.00 0% 0% 07-Sep-25, Voice Evacuation
Earthing Sy
System 4 21-Dec-24 24-Dec-24 01-Oct-25 07-Oct-25 SAR0.00 SAR0.00 0% 0% 07-Oct-25, Earthing System
Lightning Pr
Protection System 5 24-Dec-24 29-Dec-24 05-Oct-25 12-Oct-25 SAR0.00 SAR0.00 0% 0% 12-Oct-25, Lightning Prote
SCADA System
Sys 8 28-Dec-24 05-Jan-25 09-Oct-25 19-Oct-25 SAR0.00 SAR0.00 0% 0% 19-Oct-25, SCADA System
Video Surve
Surveillance and Access Control System 5 06-Jan-25 11-Jan-25 19-Oct-25 25-Oct-25 SAR0.00 SAR0.00 0% 0% 25-Oct-25, Video Surveilla
FAN STATION (22NOS)
(22 627 06-Dec-22 31-Jul-25 30-Jan-24 18-Feb-26 SAR64,299,595.87 SAR0.00 24.58% 0% 18-Feb-26, FAN STAT
EXHAUST FAN S
STATION NO.1 (ZONE-6) 340 23-May-23 30-Nov-24 14-Aug-24 25-Sep-25 SAR2,922,708.90 SAR0.00 44.73% 0% 25-Sep-25, EXHAUST FAN
STRUCTURAL WORKS 300 23-May-23 14-May-24 14-Aug-24 07-Aug-25 SAR1,622,779.90 SAR0.00 75.98% 0% 07-Aug-25, STRUCTURAL W
MEP WORKS 222 12-Oct-23 30-Nov-24 31-Dec-24 25-Sep-25 SAR1,299,929.00 SAR0.00 5.71% 0% 25-Sep-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 12-Oct-23 25-Oct-23 31-Dec-24 13-Jan-25 SAR57,762.67 SAR0.00 100% 0% 13-Jan-25, Domestic Hot and Cold W
Soil and Waste
Wa Drainage System 10 26-Oct-23 06-Nov-23 14-Jan-25 25-Jan-25 SAR16,461.18 SAR0.00 100% 0% 25-Jan-25, Soil and Waste Drainage S
Air Conditio
Conditioning Works 22 22-Apr-24 16-May-24 16-Jul-25 10-Aug-25 SAR112,835.74 SAR0.00 0% 0% 10-Aug-25, Air Conditioning
Fire Fighting Installation 14 18-May-24 02-Jun-24 11-Aug-25 27-Aug-25 SAR106,403.05 SAR0.00 0% 0% 27-Aug-25, Fire Fighting Ins
Electrical Installation
In 48 27-Apr-24 25-Jun-24 21-Jul-25 15-Sep-25 SAR876,999.84 SAR0.00 0% 0% 15-Sep-25, Electrical Installa
Fire Detection
Detecti and Alarm System 18 02-May-24 22-May-24 27-Jul-25 16-Aug-25 SAR16,825.39 SAR0.00 0% 0% 16-Aug-25, Fire Detection an
Voice Evacu
Evacuation / Public Address System 37 06-May-24 30-Nov-24 30-Jul-25 10-Sep-25 SAR6,371.86 SAR0.00 0% 0% 10-Sep-25, Voice Evacuation
Earthing Sy
System 4 11-Jun-24 19-Jun-24 04-Sep-25 09-Sep-25 SAR48,078.97 SAR0.00 0% 0% 09-Sep-25, Earthing System
Lightning Pr
Protection System 5 20-Jun-24 25-Jun-24 09-Sep-25 15-Sep-25 SAR31,273.25 SAR0.00 0% 0% 15-Sep-25, Lightning Protec

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
63 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
SCADA System
Sys 8 24-Jun-24 02-Jul-24 13-Sep-25 22-Sep-25 SAR1,740.77 SAR0.00 0% 0% 22-Sep-25, SCADA System
Video Surve
Surveillance and Access Control System 7 27-Jun-24 04-Jul-24 16-Sep-25 25-Sep-25 SAR25,176.28 SAR0.00 0% 0% 25-Sep-25, Video Surveillan
FRESH AIR FAN STATION NO.2 (ZONE-6) 339 04-Jun-23 03-Dec-24 26-Aug-24 06-Oct-25 SAR2,922,708.90 SAR0.00 43.83% 0% 06-Oct-25, FRESH AIR FA
STRUCTURAL WORKS 300 04-Jun-23 26-May-24 26-Aug-24 20-Aug-25 SAR1,622,779.90 SAR0.00 74.36% 0% 20-Aug-25, STRUCTURAL
MEP WORKS 221 24-Oct-23 03-Dec-24 12-Jan-25 06-Oct-25 SAR1,299,929.00 SAR0.00 5.71% 0% 06-Oct-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 24-Oct-23 06-Nov-23 12-Jan-25 25-Jan-25 SAR57,762.67 SAR0.00 100% 0% 25-Jan-25, Domestic Hot and Cold W
Soil and Waste
Wa Drainage System 10 07-Nov-23 18-Nov-23 26-Jan-25 05-Feb-25 SAR16,461.18 SAR0.00 100% 0% 05-Feb-25, Soil and Waste Drainage
Air Conditio
Conditioning Works 10 04-May-24 14-May-24 28-Jul-25 09-Aug-25 SAR112,835.74 SAR0.00 0% 0% 09-Aug-25, Air Conditioning
Fire Fighting Installation 14 15-May-24 30-May-24 09-Aug-25 25-Aug-25 SAR106,403.05 SAR0.00 0% 0% 25-Aug-25, Fire Fighting Ins
Electrical Installation
In 44 08-May-24 02-Jul-24 02-Aug-25 22-Sep-25 SAR876,999.84 SAR0.00 0% 0% 22-Sep-25, Electrical Installa
Fire Detection
Detecti and Alarm System 18 14-May-24 03-Jun-24 07-Aug-25 28-Aug-25 SAR16,825.39 SAR0.00 0% 0% 28-Aug-25, Fire Detection an
Voice Evacu
Evacuation / Public Address System 39 18-May-24 03-Dec-24 11-Aug-25 27-Sep-25 SAR6,371.86 SAR0.00 0% 0% 27-Sep-25, Voice Evacuation
Earthing Sy
System 4 23-Jun-24 26-Jun-24 11-Sep-25 16-Sep-25 SAR48,078.97 SAR0.00 0% 0% 16-Sep-25, Earthing System
Lightning Pr
Protection System 5 27-Jun-24 02-Jul-24 16-Sep-25 22-Sep-25 SAR31,273.25 SAR0.00 0% 0% 22-Sep-25, Lightning Protec
SCADA System
Sys 8 01-Jul-24 09-Jul-24 20-Sep-25 30-Sep-25 SAR1,740.77 SAR0.00 0% 0% 30-Sep-25, SCADA System
Video Surve
Surveillance and Access Control System 5 10-Jul-24 15-Jul-24 30-Sep-25 06-Oct-25 SAR25,176.28 SAR0.00 0% 0% 06-Oct-25, Video Surveillan
EXHAUST FAN S
STATION NO.3 (ZONE-6) 339 29-Jul-23 30-Dec-24 17-Oct-24 25-Nov-25 SAR2,922,708.90 SAR0.00 40.33% 0% 25-Nov-25, EXHAUST F
STRUCTURAL WORKS 300 29-Jul-23 21-Jul-24 17-Oct-24 12-Oct-25 SAR1,622,779.90 SAR0.00 72.42% 0% 12-Oct-25, STRUCTURAL
MEP WORKS 221 14-Dec-23 30-Dec-24 04-Mar-25 25-Nov-25 SAR1,299,929.00 SAR0.00 0.27% 0% 25-Nov-25, MEP WORK
Domestic H Hot and Cold Water Services 12 14-Dec-23 27-Dec-23 04-Mar-25 17-Mar-25 SAR57,762.67 SAR0.00 6.02% 0% 17-Mar-25, Domestic Hot and Cold
Soil and Waste
Wa Drainage System 10 28-Dec-23 08-Jan-24 18-Mar-25 29-Mar-25 SAR16,461.18 SAR0.00 0% 0% 29-Mar-25, Soil and Waste Drainag
Air Conditio
Conditioning Works 10 29-Jun-24 09-Jul-24 17-Sep-25 29-Sep-25 SAR112,835.74 SAR0.00 0% 0% 29-Sep-25, Air Conditioning
Fire Fighting Installation 14 10-Jul-24 25-Jul-24 30-Sep-25 15-Oct-25 SAR106,403.05 SAR0.00 0% 0% 15-Oct-25, Fire Fighting In
Electrical Installation
In 44 03-Jul-24 22-Aug-24 22-Sep-25 12-Nov-25 SAR876,999.84 SAR0.00 0% 0% 12-Nov-25, Electrical Inst
Fire Detection
Detecti and Alarm System 18 09-Jul-24 29-Jul-24 29-Sep-25 19-Oct-25 SAR16,825.39 SAR0.00 0% 0% 19-Oct-25, Fire Detection a
Voice Evacu
Evacuation / Public Address System 9 13-Jul-24 07-Dec-24 02-Oct-25 12-Oct-25 SAR6,371.86 SAR0.00 0% 0% 12-Oct-25, Voice Evacuatio
Earthing Sy
System 4 08-Dec-24 11-Dec-24 03-Nov-25 06-Nov-25 SAR48,078.97 SAR0.00 0% 0% 06-Nov-25, Earthing Syste
Lightning Pr
Protection System 5 12-Dec-24 17-Dec-24 08-Nov-25 12-Nov-25 SAR31,273.25 SAR0.00 0% 0% 12-Nov-25, Lightning Pro
SCADA System
Sys 8 16-Dec-24 24-Dec-24 11-Nov-25 19-Nov-25 SAR1,740.77 SAR0.00 0% 0% 19-Nov-25, SCADA Syst
Video Surve
Surveillance and Access Control System 5 25-Dec-24 30-Dec-24 20-Nov-25 25-Nov-25 SAR25,176.28 SAR0.00 0% 0% 25-Nov-25, Video Survei
FRESH AIR FAN STATION NO.4 (ZONE-6) 339 26-Aug-23 03-Oct-24 14-Nov-24 23-Dec-25 SAR2,922,708.90 SAR0.00 38.09% 0% 23-Dec-25, FRESH AIR
STRUCTURAL WORKS 300 26-Aug-23 18-Aug-24 14-Nov-24 09-Nov-25 SAR1,622,779.90 SAR0.00 68.61% 0% 09-Nov-25, STRUCTURA
MEP WORKS 221 11-Jan-24 03-Oct-24 06-Apr-25 23-Dec-25 SAR1,299,929.00 SAR0.00 0% 0% 23-Dec-25, MEP WORK
Domestic H Hot and Cold Water Services 12 11-Jan-24 24-Jan-24 06-Apr-25 19-Apr-25 SAR57,762.67 SAR0.00 0% 0% 19-Apr-25, Domestic Hot and Col
Soil and Waste
Wa Drainage System 10 25-Jan-24 05-Feb-24 20-Apr-25 30-Apr-25 SAR16,461.18 SAR0.00 0% 0% 30-Apr-25, Soil and Waste Draina
Air Conditio
Conditioning Works 10 27-Jul-24 06-Aug-24 16-Oct-25 27-Oct-25 SAR112,835.74 SAR0.00 0% 0% 27-Oct-25, Air Conditionin
Fire Fighting Installation 14 07-Aug-24 22-Aug-24 28-Oct-25 12-Nov-25 SAR106,403.05 SAR0.00 0% 0% 12-Nov-25, Fire Fighting
Electrical Installation
In 44 31-Jul-24 19-Sep-24 21-Oct-25 10-Dec-25 SAR876,999.84 SAR0.00 0% 0% 10-Dec-25, Electrical Ins
Fire Detection
Detecti and Alarm System 18 06-Aug-24 26-Aug-24 27-Oct-25 16-Nov-25 SAR16,825.39 SAR0.00 0% 0% 16-Nov-25, Fire Detection
Voice Evacu
Evacuation / Public Address System 9 10-Aug-24 19-Aug-24 30-Oct-25 09-Nov-25 SAR6,371.86 SAR0.00 0% 0% 09-Nov-25, Voice Evacuat
Earthing Sy
System 4 10-Sep-24 14-Sep-24 01-Dec-25 04-Dec-25 SAR48,078.97 SAR0.00 0% 0% 04-Dec-25, Earthing Syst
Lightning Pr
Protection System 5 15-Sep-24 19-Sep-24 06-Dec-25 10-Dec-25 SAR31,273.25 SAR0.00 0% 0% 10-Dec-25, Lightning Pro
SCADA System
Sys 8 18-Sep-24 28-Sep-24 09-Dec-25 17-Dec-25 SAR1,740.77 SAR0.00 0% 0% 17-Dec-25, SCADA Sys
Video Surve
Surveillance and Access Control System 5 29-Sep-24 03-Oct-24 18-Dec-25 23-Dec-25 SAR25,176.28 SAR0.00 0% 0% 23-Dec-25, Video Surve
EXHAUST FAN S
STATION NO.5 (ZONE-6) 399 02-Jul-23 19-Oct-24 19-Sep-24 07-Jan-26 SAR2,922,708.90 SAR0.00 43.56% 0% 07-Jan-26, EXHAUST
STRUCTURAL WORKS 367 02-Jul-23 10-Sep-24 19-Sep-24 02-Dec-25 SAR1,622,779.90 SAR0.00 73.88% 0% 02-Dec-25, STRUCTUR
MEP WORKS 281 18-Nov-23 19-Oct-24 05-Feb-25 07-Jan-26 SAR1,299,929.00 SAR0.00 5.71% 0% 07-Jan-26, MEP WORK
Domestic H Hot and Cold Water Services 12 18-Nov-23 30-Nov-23 05-Feb-25 18-Feb-25 SAR57,762.67 SAR0.00 100% 0% 18-Feb-25, Domestic Hot and Cold W
Soil and Waste
Wa Drainage System 10 02-Dec-23 12-Dec-23 19-Feb-25 03-Mar-25 SAR16,461.18 SAR0.00 100% 0% 03-Mar-25, Soil and Waste Drainage
Air Conditio
Conditioning Works 10 28-May-24 08-Jun-24 21-Aug-25 02-Sep-25 SAR112,835.74 SAR0.00 0% 0% 02-Sep-25, Air Conditioning
Fire Fighting Installation 14 09-Jun-24 29-Jun-24 02-Sep-25 18-Sep-25 SAR106,403.05 SAR0.00 0% 0% 18-Sep-25, Fire Fighting Ins
Electrical Installation
In 44 02-Jun-24 27-Jul-24 26-Aug-25 16-Oct-25 SAR876,999.84 SAR0.00 0% 0% 16-Oct-25, Electrical Install
Fire Detection
Detecti and Alarm System 18 08-Jun-24 02-Jul-24 01-Sep-25 21-Sep-25 SAR16,825.39 SAR0.00 0% 0% 21-Sep-25, Fire Detection an
Voice Evacu
Evacuation / Public Address System 9 11-Jun-24 25-Jun-24 04-Sep-25 14-Sep-25 SAR6,371.86 SAR0.00 0% 0% 14-Sep-25, Voice Evacuation
Earthing Sy
System 4 17-Jul-24 21-Jul-24 07-Oct-25 12-Oct-25 SAR48,078.97 SAR0.00 0% 0% 12-Oct-25, Earthing System
Lightning Pr
Protection System 5 22-Jul-24 27-Jul-24 12-Oct-25 18-Oct-25 SAR31,273.25 SAR0.00 0% 0% 18-Oct-25, Lightning Prote
SCADA System
Sys 8 05-Oct-24 13-Oct-24 24-Dec-25 01-Jan-26 SAR1,740.77 SAR0.00 0% 0% 01-Jan-26, SCADA Sys
Video Surve
Surveillance and Access Control System 5 14-Oct-24 19-Oct-24 03-Jan-26 07-Jan-26 SAR25,176.28 SAR0.00 0% 0% 07-Jan-26, Video Surve
EXHAUST FAN S
STATION NO.6 (ZONE-6) 339 16-Sep-23 01-Jan-25 05-Dec-24 13-Jan-26 SAR2,922,708.90 SAR0.00 35.98% 0% 13-Jan-26, EXHAUST
STRUCTURAL WORKS 322 16-Sep-23 05-Oct-24 05-Dec-24 25-Dec-25 SAR1,622,779.90 SAR0.00 64.81% 0% 25-Dec-25, STRUCTUR
MEP WORKS 221 01-Feb-24 01-Jan-25 27-Apr-25 13-Jan-26 SAR1,299,929.00 SAR0.00 0% 0% 13-Jan-26, MEP WORK
Domestic H
Hot and Cold Water Services 12 01-Feb-24 14-Feb-24 27-Apr-25 10-May-25 SAR57,762.67 SAR0.00 0% 0% 10-May-25, Domestic Hot and C

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
64 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
Soil and Waste
Wa Drainage System 10 15-Feb-24 26-Feb-24 11-May-25 21-May-25 SAR16,461.18 SAR0.00 0% 0% 21-May-25, Soil and Waste Drain
Air Conditio
Conditioning Works 10 17-Aug-24 27-Aug-24 06-Nov-25 17-Nov-25 SAR112,835.74 SAR0.00 0% 0% 17-Nov-25, Air Condition
Fire Fighting Installation 14 28-Aug-24 12-Sep-24 18-Nov-25 04-Dec-25 SAR106,403.05 SAR0.00 0% 0% 04-Dec-25, Fire Fighting
Electrical Installation
In 44 21-Aug-24 12-Oct-24 11-Nov-25 31-Dec-25 SAR876,999.84 SAR0.00 0% 0% 31-Dec-25, Electrical Ins
Fire Detection
Detecti and Alarm System 18 27-Aug-24 16-Sep-24 17-Nov-25 07-Dec-25 SAR16,825.39 SAR0.00 0% 0% 07-Dec-25, Fire Detectio
Voice Evacu
Evacuation / Public Address System 9 31-Aug-24 09-Sep-24 20-Nov-25 30-Nov-25 SAR6,371.86 SAR0.00 0% 0% 30-Nov-25, Voice Evacua
Earthing Sy
System 4 02-Oct-24 06-Oct-24 22-Dec-25 25-Dec-25 SAR48,078.97 SAR0.00 0% 0% 25-Dec-25, Earthing Sys
Lightning Pr
Protection System 5 07-Oct-24 12-Oct-24 27-Dec-25 01-Jan-26 SAR31,273.25 SAR0.00 0% 0% 01-Jan-26, Lightning Pr
SCADA System
Sys 8 10-Oct-24 19-Oct-24 30-Dec-25 07-Jan-26 SAR1,740.77 SAR0.00 0% 0% 07-Jan-26, SCADA Sys
Video Surve
Surveillance and Access Control System 5 20-Oct-24 01-Jan-25 08-Jan-26 13-Jan-26 SAR25,176.28 SAR0.00 0% 0% 13-Jan-26, Video Surve
FRESH AIR FAN STATION NO.7 (ZONE-6) 446 08-Jun-23 04-Jan-25 31-Aug-24 11-Feb-26 SAR2,922,708.90 SAR0.00 43.56% 0% 11-Feb-26, FRESH AI
STRUCTURAL WORKS 300 08-Jun-23 30-May-24 31-Aug-24 25-Aug-25 SAR1,622,779.90 SAR0.00 73.88% 0% 25-Aug-25, STRUCTURAL
MEP WORKS 328 29-Oct-23 04-Jan-25 16-Jan-25 11-Feb-26 SAR1,299,929.00 SAR0.00 5.71% 0% 11-Feb-26, MEP WOR
Domestic H Hot and Cold Water Services 12 29-Oct-23 11-Nov-23 16-Jan-25 29-Jan-25 SAR57,762.67 SAR0.00 100% 0% 29-Jan-25, Domestic Hot and Cold W
Soil and Waste
Wa Drainage System 10 12-Nov-23 22-Nov-23 30-Jan-25 10-Feb-25 SAR16,461.18 SAR0.00 100% 0% 10-Feb-25, Soil and Waste Drainage
Air Conditio
Conditioning Works 10 08-May-24 19-May-24 02-Aug-25 13-Aug-25 SAR112,835.74 SAR0.00 0% 0% 13-Aug-25, Air Conditioning
Fire Fighting Installation 14 06-Oct-24 21-Oct-24 25-Dec-25 11-Jan-26 SAR106,403.05 SAR0.00 0% 0% 11-Jan-26, Fire Fighting
Electrical Installation
In 150 13-May-24 09-Nov-24 06-Aug-25 29-Jan-26 SAR876,999.84 SAR0.00 0% 0% 29-Jan-26, Electrical In
Fire Detection
Detecti and Alarm System 18 19-May-24 08-Jun-24 12-Aug-25 02-Sep-25 SAR16,825.39 SAR0.00 0% 0% 02-Sep-25, Fire Detection an
Voice Evacu
Evacuation / Public Address System 9 22-May-24 01-Jun-24 16-Aug-25 26-Aug-25 SAR6,371.86 SAR0.00 0% 0% 26-Aug-25, Voice Evacuation
Earthing Sy
System 4 30-Oct-24 03-Nov-24 19-Jan-26 24-Jan-26 SAR48,078.97 SAR0.00 0% 0% 24-Jan-26, Earthing Sy
Lightning Pr
Protection System 5 04-Nov-24 09-Nov-24 24-Jan-26 29-Jan-26 SAR31,273.25 SAR0.00 0% 0% 29-Jan-26, Lightning P
SCADA System
Sys 8 07-Nov-24 16-Nov-24 27-Jan-26 05-Feb-26 SAR1,740.77 SAR0.00 0% 0% 05-Feb-26, SCADA S
Video Surve
Surveillance and Access Control System 5 17-Nov-24 04-Jan-25 05-Feb-26 11-Feb-26 SAR25,176.28 SAR0.00 0% 0% 11-Feb-26, Video Surv
EXHAUST FAN S
STATION NO.8 (ZONE-6) 346 10-Oct-23 06-Jan-25 29-Dec-24 14-Feb-26 SAR2,922,708.90 SAR0.00 32.23% 0% 14-Feb-26, EXHAUS
STRUCTURAL WORKS 300 10-Oct-23 02-Oct-24 29-Dec-24 22-Dec-25 SAR1,622,779.90 SAR0.00 58.05% 0% 22-Dec-25, STRUCTUR
MEP WORKS 228 25-Feb-24 06-Jan-25 20-May-25 14-Feb-26 SAR1,299,929.00 SAR0.00 0% 0% 14-Feb-26, MEP WOR
Domestic H Hot and Cold Water Services 12 25-Feb-24 09-Mar-24 20-May-25 02-Jun-25 SAR57,762.67 SAR0.00 0% 0% 02-Jun-25, Domestic Hot and Co
Soil and Waste
Wa Drainage System 10 10-Mar-24 20-Mar-24 03-Jun-25 17-Jun-25 SAR16,461.18 SAR0.00 0% 0% 17-Jun-25, Soil and Waste Drain
Air Conditio
Conditioning Works 10 09-Sep-24 19-Sep-24 30-Nov-25 10-Dec-25 SAR112,835.74 SAR0.00 0% 0% 10-Dec-25, Air Condition
Fire Fighting Installation 14 21-Sep-24 07-Oct-24 11-Dec-25 27-Dec-25 SAR106,403.05 SAR0.00 0% 0% 27-Dec-25, Fire Fighting
Electrical Installation
In 44 14-Sep-24 04-Nov-24 04-Dec-25 24-Jan-26 SAR876,999.84 SAR0.00 0% 0% 24-Jan-26, Electrical In
Fire Detection
Detecti and Alarm System 18 19-Sep-24 10-Oct-24 10-Dec-25 30-Dec-25 SAR16,825.39 SAR0.00 0% 0% 30-Dec-25, Fire Detectio
Voice Evacu
Evacuation / Public Address System 9 24-Sep-24 03-Oct-24 14-Dec-25 23-Dec-25 SAR6,371.86 SAR0.00 0% 0% 23-Dec-25, Voice Evacu
Earthing Sy
System 4 26-Oct-24 29-Oct-24 14-Jan-26 18-Jan-26 SAR48,078.97 SAR0.00 0% 0% 18-Jan-26, Earthing Sy
Lightning Pr
Protection System 5 30-Oct-24 04-Nov-24 19-Jan-26 24-Jan-26 SAR31,273.25 SAR0.00 0% 0% 24-Jan-26, Lightning P
SCADA System
Sys 8 03-Nov-24 11-Nov-24 22-Jan-26 31-Jan-26 SAR1,740.77 SAR0.00 0% 0% 31-Jan-26, SCADA Sy
Video Surve
Surveillance and Access Control System 12 12-Nov-24 06-Jan-25 01-Feb-26 14-Feb-26 SAR25,176.28 SAR0.00 0% 0% 14-Feb-26, Video Surv
FRESH AIR FAN STATION NO.9 (ZONE-6) 351 07-Oct-23 08-Jan-25 25-Dec-24 16-Feb-26 SAR2,922,708.90 SAR0.00 32.92% 0% 16-Feb-26, FRESH A
STRUCTURAL WORKS 300 07-Oct-23 29-Sep-24 25-Dec-24 20-Dec-25 SAR1,622,779.90 SAR0.00 59.29% 0% 20-Dec-25, STRUCTUR
MEP WORKS 233 21-Feb-24 08-Jan-25 17-May-25 16-Feb-26 SAR1,299,929.00 SAR0.00 0% 0% 16-Feb-26, MEP WOR
Domestic H Hot and Cold Water Services 12 21-Feb-24 05-Mar-24 17-May-25 29-May-25 SAR57,762.67 SAR0.00 0% 0% 29-May-25, Domestic Hot and C
Soil and Waste
Wa Drainage System 10 06-Mar-24 17-Mar-24 31-May-25 14-Jun-25 SAR16,461.18 SAR0.00 0% 0% 14-Jun-25, Soil and Waste Drain
Air Conditio
Conditioning Works 165 18-Mar-24 05-Oct-24 15-Jun-25 25-Dec-25 SAR112,835.74 SAR0.00 0% 0% 25-Dec-25, Air Conditio
Fire Fighting Installation 14 06-Oct-24 21-Oct-24 25-Dec-25 11-Jan-26 SAR106,403.05 SAR0.00 0% 0% 11-Jan-26, Fire Fighting
Electrical Installation
In 191 23-Mar-24 09-Nov-24 19-Jun-25 29-Jan-26 SAR876,999.84 SAR0.00 0% 0% 29-Jan-26, Electrical In
Fire Detection
Detecti and Alarm System 18 28-Mar-24 21-Apr-24 25-Jun-25 15-Jul-25 SAR16,825.39 SAR0.00 0% 0% 15-Jul-25, Fire Detection and A
Voice Evacu
Evacuation / Public Address System 9 01-Apr-24 14-Apr-24 29-Jun-25 08-Jul-25 SAR6,371.86 SAR0.00 0% 0% 08-Jul-25, Voice Evacuation / P
Earthing Sy
System 4 30-Oct-24 03-Nov-24 19-Jan-26 24-Jan-26 SAR48,078.97 SAR0.00 0% 0% 24-Jan-26, Earthing Sy
Lightning Pr
Protection System 5 04-Nov-24 09-Nov-24 24-Jan-26 29-Jan-26 SAR31,273.25 SAR0.00 0% 0% 29-Jan-26, Lightning P
SCADA System
Sys 8 07-Nov-24 16-Nov-24 27-Jan-26 05-Feb-26 SAR1,740.77 SAR0.00 0% 0% 05-Feb-26, SCADA S
Video Surve
Surveillance and Access Control System 9 17-Nov-24 08-Jan-25 05-Feb-26 16-Feb-26 SAR25,176.28 SAR0.00 0% 0% 16-Feb-26, Video Surv
EXHAUST FAN S
STATION NO.10 (ZONE-6) 421 18-Jul-23 11-Jan-25 07-Oct-24 18-Feb-26 SAR2,922,708.90 SAR0.00 41.95% 0% 18-Feb-26, EXHAUS
STRUCTURAL WORKS 300 18-Jul-23 10-Jul-24 07-Oct-24 30-Sep-25 SAR1,622,779.90 SAR0.00 73.12% 0% 30-Sep-25, STRUCTURAL
MEP WORKS 303 04-Dec-23 11-Jan-25 22-Feb-25 18-Feb-26 SAR1,299,929.00 SAR0.00 3.04% 0% 18-Feb-26, MEP WOR
Domestic H Hot and Cold Water Services 12 04-Dec-23 17-Dec-23 22-Feb-25 08-Mar-25 SAR57,762.67 SAR0.00 68.42% 0% 08-Mar-25, Domestic Hot and Cold
Soil and Waste
Wa Drainage System 10 18-Dec-23 28-Dec-23 08-Mar-25 19-Mar-25 SAR16,461.18 SAR0.00 0% 0% 19-Mar-25, Soil and Waste Drainag
Air Conditio
Conditioning Works 10 13-Jun-24 29-Jun-24 07-Sep-25 18-Sep-25 SAR112,835.74 SAR0.00 0% 0% 18-Sep-25, Air Conditioning
Fire Fighting Installation 14 30-Jun-24 15-Jul-24 18-Sep-25 06-Oct-25 SAR106,403.05 SAR0.00 0% 0% 06-Oct-25, Fire Fighting In
Electrical Installation
In 44 23-Jun-24 12-Aug-24 11-Sep-25 02-Nov-25 SAR876,999.84 SAR0.00 0% 0% 02-Nov-25, Electrical Insta
Fire Detection
Detecti and Alarm System 18 29-Jun-24 18-Jul-24 17-Sep-25 08-Oct-25 SAR16,825.39 SAR0.00 0% 0% 08-Oct-25, Fire Detection a
Voice Evacu
Evacuation / Public Address System 9 02-Jul-24 11-Jul-24 21-Sep-25 01-Oct-25 SAR6,371.86 SAR0.00 0% 0% 01-Oct-25, Voice Evacuation

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
65 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
Earthing Sy
System 4 03-Aug-24 06-Aug-24 23-Oct-25 27-Oct-25 SAR48,078.97 SAR0.00 0% 0% 27-Oct-25, Earthing System
Lightning Pr
Protection System 5 06-Aug-24 11-Aug-24 27-Oct-25 01-Nov-25 SAR31,273.25 SAR0.00 0% 0% 01-Nov-25, Lightning Pro
SCADA System
Sys 8 10-Aug-24 18-Aug-24 30-Oct-25 08-Nov-25 SAR1,740.77 SAR0.00 0% 0% 08-Nov-25, SCADA Syst
Video Surve
Surveillance and Access Control System 88 19-Aug-24 11-Jan-25 09-Nov-25 18-Feb-26 SAR25,176.28 SAR0.00 0% 0% 18-Feb-26, Video Surv
FRESH AIR FAN STATION NO.11 (ZONE-5) 340 19-Oct-23 27-Nov-24 13-Jul-24 23-Aug-25 SAR2,922,708.90 SAR0.00 30.95% 0% 23-Aug-25, FRESH AIR FA
STRUCTURAL WORKS 300 19-Oct-23 12-Oct-24 13-Jul-24 07-Jul-25 SAR1,622,779.90 SAR0.00 55.75% 0% 07-Jul-25, STRUCTURAL WO
MEP WORKS 222 05-Mar-24 27-Nov-24 28-Nov-24 23-Aug-25 SAR1,299,929.00 SAR0.00 0% 0% 23-Aug-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 05-Mar-24 18-Mar-24 28-Nov-24 12-Dec-24 SAR57,762.67 SAR0.00 0% 0% 12-Dec-24, Domestic Hot and Cold Wa
Soil and Waste
Wa Drainage System 10 19-Mar-24 30-Mar-24 12-Dec-24 24-Dec-24 SAR16,461.18 SAR0.00 0% 0% 24-Dec-24, Soil and Waste Drainage S
Air Conditio
Conditioning Works 10 18-Sep-24 30-Sep-24 14-Jun-25 25-Jun-25 SAR112,835.74 SAR0.00 0% 0% 25-Jun-25, Air Conditioning W
Fire Fighting Installation 14 13-Oct-24 28-Oct-24 07-Jul-25 23-Jul-25 SAR106,403.05 SAR0.00 0% 0% 23-Jul-25, Fire Fighting Install
Electrical Installation
In 46 24-Sep-24 16-Nov-24 18-Jun-25 11-Aug-25 SAR876,999.84 SAR0.00 0% 0% 11-Aug-25, Electrical Installat
Fire Detection
Detecti and Alarm System 18 30-Sep-24 20-Oct-24 24-Jun-25 15-Jul-25 SAR16,825.39 SAR0.00 0% 0% 15-Jul-25, Fire Detection and A
Voice Evacu
Evacuation / Public Address System 9 03-Oct-24 13-Oct-24 28-Jun-25 08-Jul-25 SAR6,371.86 SAR0.00 0% 0% 08-Jul-25, Voice Evacuation / P
Earthing Sy
System 4 06-Nov-24 10-Nov-24 31-Jul-25 05-Aug-25 SAR48,078.97 SAR0.00 0% 0% 05-Aug-25, Earthing System
Lightning Pr
Protection System 5 10-Nov-24 14-Nov-24 04-Aug-25 10-Aug-25 SAR31,273.25 SAR0.00 0% 0% 10-Aug-25, Lightning Protect
SCADA System
Sys 8 13-Nov-24 21-Nov-24 07-Aug-25 17-Aug-25 SAR1,740.77 SAR0.00 0% 0% 17-Aug-25, SCADA System
Video Surve
Surveillance and Access Control System 5 23-Nov-24 27-Nov-24 17-Aug-25 23-Aug-25 SAR25,176.28 SAR0.00 0% 0% 23-Aug-25, Video Surveillan
EXHAUST FAN S
STATION NO.12 (ZONE-4) 343 04-May-24 15-Jun-25 03-Jul-24 17-Aug-25 SAR2,922,708.90 SAR0.00 0% 0% 17-Aug-25, EXHAUST FAN
STRUCTURAL WORKS 305 04-May-24 28-Apr-25 03-Jul-24 03-Jul-25 SAR1,622,779.90 SAR0.00 0% 0% 03-Jul-25, STRUCTURAL WO
MEP WORKS 220 24-Sep-24 15-Jun-25 25-Nov-24 17-Aug-25 SAR1,299,929.00 SAR0.00 0% 0% 17-Aug-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 24-Sep-24 07-Oct-24 25-Nov-24 09-Dec-24 SAR57,762.67 SAR0.00 0% 0% 09-Dec-24, Domestic Hot and Cold Wa
Soil and Waste
Wa Drainage System 10 08-Oct-24 19-Oct-24 09-Dec-24 21-Dec-24 SAR16,461.18 SAR0.00 0% 0% 21-Dec-24, Soil and Waste Drainage S
Air Conditio
Conditioning Works 10 06-Apr-25 16-Apr-25 10-Jun-25 22-Jun-25 SAR112,835.74 SAR0.00 0% 0% 22-Jun-25, Air Conditioning Wo
Fire Fighting Installation 14 29-Apr-25 14-May-25 03-Jul-25 20-Jul-25 SAR106,403.05 SAR0.00 0% 0% 20-Jul-25, Fire Fighting Install
Electrical Installation
In 53 10-Apr-25 31-May-25 15-Jun-25 16-Aug-25 SAR876,999.84 SAR0.00 0% 0% 16-Aug-25, Electrical Installat
Fire Detection
Detecti and Alarm System 28 16-Apr-25 18-May-25 21-Jun-25 23-Jul-25 SAR16,825.39 SAR0.00 0% 0% 23-Jul-25, Fire Detection and A
Voice Evacu
Evacuation / Public Address System 9 20-Apr-25 29-Apr-25 24-Jun-25 05-Jul-25 SAR6,371.86 SAR0.00 0% 0% 05-Jul-25, Voice Evacuation / P
Earthing Sy
System 4 21-May-25 25-May-25 26-Jul-25 30-Jul-25 SAR48,078.97 SAR0.00 0% 0% 30-Jul-25, Earthing System
Lightning Pr
Protection System 5 25-May-25 29-May-25 29-Jul-25 04-Aug-25 SAR31,273.25 SAR0.00 0% 0% 04-Aug-25, Lightning Protecti
SCADA System
Sys 8 28-May-25 09-Jun-25 02-Aug-25 11-Aug-25 SAR1,740.77 SAR0.00 0% 0% 11-Aug-25, SCADA System
Video Surve
Surveillance and Access Control System 5 10-Jun-25 15-Jun-25 11-Aug-25 17-Aug-25 SAR25,176.28 SAR0.00 0% 0% 17-Aug-25, Video Surveillanc
FRESH AIR FAN STATION NO.13 (ZONE-4) 338 18-May-24 29-Jun-25 17-Jul-24 25-Aug-25 SAR2,922,708.90 SAR0.00 0% 0% 25-Aug-25, FRESH AIR FAN
STRUCTURAL WORKS 300 18-May-24 12-May-25 17-Jul-24 10-Jul-25 SAR1,622,779.90 SAR0.00 0% 0% 10-Jul-25, STRUCTURAL WO
MEP WORKS 220 08-Oct-24 29-Jun-25 03-Dec-24 25-Aug-25 SAR1,299,929.00 SAR0.00 0% 0% 25-Aug-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 08-Oct-24 21-Oct-24 03-Dec-24 16-Dec-24 SAR57,762.67 SAR0.00 0% 0% 16-Dec-24, Domestic Hot and Cold Wa
Soil and Waste
Wa Drainage System 10 22-Oct-24 02-Nov-24 17-Dec-24 28-Dec-24 SAR16,461.18 SAR0.00 0% 0% 28-Dec-24, Soil and Waste Drainage S
Air Conditio
Conditioning Works 10 20-Apr-25 30-Apr-25 18-Jun-25 29-Jun-25 SAR112,835.74 SAR0.00 0% 0% 29-Jun-25, Air Conditioning W
Fire Fighting Installation 18 01-May-25 21-May-25 30-Jun-25 20-Jul-25 SAR106,403.05 SAR0.00 0% 0% 20-Jul-25, Fire Fighting Install
Electrical Installation
In 51 24-Apr-25 17-Jun-25 23-Jun-25 20-Aug-25 SAR876,999.84 SAR0.00 0% 0% 20-Aug-25, Electrical Installa
Fire Detection
Detecti and Alarm System 18 30-Apr-25 20-May-25 29-Jun-25 19-Jul-25 SAR16,825.39 SAR0.00 0% 0% 19-Jul-25, Fire Detection and A
Voice Evacu
Evacuation / Public Address System 9 04-May-25 13-May-25 02-Jul-25 12-Jul-25 SAR6,371.86 SAR0.00 0% 0% 12-Jul-25, Voice Evacuation / P
Earthing Sy
System 4 04-Jun-25 11-Jun-25 03-Aug-25 06-Aug-25 SAR48,078.97 SAR0.00 0% 0% 06-Aug-25, Earthing System
Lightning Pr
Protection System 5 11-Jun-25 16-Jun-25 06-Aug-25 11-Aug-25 SAR31,273.25 SAR0.00 0% 0% 11-Aug-25, Lightning Protecti
SCADA System
Sys 8 15-Jun-25 23-Jun-25 10-Aug-25 18-Aug-25 SAR1,740.77 SAR0.00 0% 0% 18-Aug-25, SCADA System
Video Surve
Surveillance and Access Control System 5 24-Jun-25 29-Jun-25 19-Aug-25 25-Aug-25 SAR25,176.28 SAR0.00 0% 0% 25-Aug-25, Video Surveillan
EXHAUST FAN S
STATION NO.14 (ZONE-4) 340 19-May-24 02-Jul-25 18-Jul-24 27-Aug-25 SAR2,922,708.90 SAR0.00 0% 0% 27-Aug-25, EXHAUST FAN
STRUCTURAL WORKS 300 19-May-24 13-May-25 18-Jul-24 12-Jul-25 SAR1,622,779.90 SAR0.00 0% 0% 12-Jul-25, STRUCTURAL WO
MEP WORKS 222 09-Oct-24 02-Jul-25 04-Dec-24 27-Aug-25 SAR1,299,929.00 SAR0.00 0% 0% 27-Aug-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 09-Oct-24 22-Oct-24 04-Dec-24 17-Dec-24 SAR57,762.67 SAR0.00 0% 0% 17-Dec-24, Domestic Hot and Cold Wa
Soil and Waste
Wa Drainage System 10 23-Oct-24 03-Nov-24 18-Dec-24 29-Dec-24 SAR16,461.18 SAR0.00 0% 0% 29-Dec-24, Soil and Waste Drainage S
Air Conditio
Conditioning Works 10 21-Apr-25 01-May-25 19-Jun-25 30-Jun-25 SAR112,835.74 SAR0.00 0% 0% 30-Jun-25, Air Conditioning W
Fire Fighting Installation 14 14-May-25 29-May-25 13-Jul-25 28-Jul-25 SAR106,403.05 SAR0.00 0% 0% 28-Jul-25, Fire Fighting Instal
Electrical Installation
In 46 26-Apr-25 21-Jun-25 24-Jun-25 16-Aug-25 SAR876,999.84 SAR0.00 0% 0% 16-Aug-25, Electrical Installat
Fire Detection
Detecti and Alarm System 18 01-May-25 21-May-25 30-Jun-25 20-Jul-25 SAR16,825.39 SAR0.00 0% 0% 20-Jul-25, Fire Detection and A
Voice Evacu
Evacuation / Public Address System 9 05-May-25 14-May-25 03-Jul-25 13-Jul-25 SAR6,371.86 SAR0.00 0% 0% 13-Jul-25, Voice Evacuation / P
Earthing Sy
System 4 11-Jun-25 15-Jun-25 06-Aug-25 10-Aug-25 SAR48,078.97 SAR0.00 0% 0% 10-Aug-25, Earthing System
Lightning Pr
Protection System 5 15-Jun-25 19-Jun-25 10-Aug-25 14-Aug-25 SAR31,273.25 SAR0.00 0% 0% 14-Aug-25, Lightning Protect
SCADA System
Sys 8 18-Jun-25 26-Jun-25 13-Aug-25 21-Aug-25 SAR1,740.77 SAR0.00 0% 0% 21-Aug-25, SCADA System
Video Surve
Surveillance and Access Control System 5 28-Jun-25 02-Jul-25 23-Aug-25 27-Aug-25 SAR25,176.28 SAR0.00 0% 0% 27-Aug-25, Video Surveillan
FRESH AIR FAN STATION NO.15 (ZONE-3) 446 15-Jan-23 05-Jul-25 10-Mar-24 30-Aug-25 SAR2,922,708.90 SAR0.00 58.06% 0% 30-Aug-25, FRESH AIR FA
STRUCTURAL WORKS 300 15-Jan-23 07-Jan-24 10-Mar-24 04-Mar-25 SAR1,622,779.90 SAR0.00 100% 0% 04-Mar-25, STRUCTURAL WORK

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
66 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
MEP WORKS 328 05-Jun-23 05-Jul-25 03-Aug-24 30-Aug-25 SAR1,299,929.00 SAR0.00 5.71% 0% 30-Aug-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 05-Jun-23 18-Jun-23 03-Aug-24 17-Aug-24 SAR57,762.67 SAR0.00 100% 0% 17-Aug-24, Domestic Hot and Cold Water S
Soil and Waste
Wa Drainage System 10 19-Jun-23 03-Jul-23 17-Aug-24 28-Aug-24 SAR16,461.18 SAR0.00 100% 0% 28-Aug-24, Soil and Waste Drainage System
Air Conditio
Conditioning Works 10 16-Dec-23 26-Dec-23 09-Feb-25 20-Feb-25 SAR112,835.74 SAR0.00 0% 0% 20-Feb-25, Air Conditioning Works
Fire Fighting Installation 18 27-Dec-23 16-Jan-24 20-Feb-25 13-Mar-25 SAR106,403.05 SAR0.00 0% 0% 13-Mar-25, Fire Fighting Installatio
Electrical Installation
In 44 20-Dec-23 08-Feb-24 13-Feb-25 10-Apr-25 SAR876,999.84 SAR0.00 0% 0% 10-Apr-25, Electrical Installation
Fire Detection
Detecti and Alarm System 18 26-Dec-23 15-Jan-24 19-Feb-25 12-Mar-25 SAR16,825.39 SAR0.00 0% 0% 12-Mar-25, Fire Detection and Alarm
Voice Evacu
Evacuation / Public Address System 9 30-Dec-23 08-Jan-24 23-Feb-25 05-Mar-25 SAR6,371.86 SAR0.00 0% 0% 05-Mar-25, Voice Evacuation / Publi
Earthing Sy
System 4 30-Jan-24 03-Feb-24 26-Mar-25 05-Apr-25 SAR48,078.97 SAR0.00 0% 0% 05-Apr-25, Earthing System
Lightning Pr
Protection System 5 03-Feb-24 07-Feb-24 03-Apr-25 09-Apr-25 SAR31,273.25 SAR0.00 0% 0% 09-Apr-25, Lightning Protection S
SCADA System
Sys 8 06-Feb-24 14-Feb-24 07-Apr-25 16-Apr-25 SAR1,740.77 SAR0.00 0% 0% 16-Apr-25, SCADA System
Video Surve
Surveillance and Access Control System 113 15-Feb-24 05-Jul-25 16-Apr-25 30-Aug-25 SAR25,176.28 SAR0.00 0% 0% 30-Aug-25, Video Surveillan
EXHAUST FAN S
STATION NO.16 (ZONE-3) 387 06-Dec-22 09-Mar-24 30-Jan-24 10-May-25 SAR2,922,708.90 SAR0.00 54.63% 0% 10-May-25, EXHAUST FAN ST
STRUCTURAL WORKS 346 06-Dec-22 21-Jan-24 30-Jan-24 18-Mar-25 SAR1,622,779.90 SAR0.00 93.82% 0% 18-Mar-25, STRUCTURAL WOR
MEP WORKS 269 26-Apr-23 09-Mar-24 24-Jun-24 10-May-25 SAR1,299,929.00 SAR0.00 5.71% 0% 10-May-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 26-Apr-23 09-May-23 24-Jun-24 08-Jul-24 SAR57,762.67 SAR0.00 100% 0% 08-Jul-24, Domestic Hot and Cold Water Serv
Soil and Waste
Wa Drainage System 10 10-May-23 21-May-23 08-Jul-24 20-Jul-24 SAR16,461.18 SAR0.00 100% 0% 20-Jul-24, Soil and Waste Drainage System
Air Conditio
Conditioning Works 10 06-Jan-24 16-Jan-24 02-Mar-25 13-Mar-25 SAR112,835.74 SAR0.00 0% 0% 13-Mar-25, Air Conditioning Works
Fire Fighting Installation 14 17-Jan-24 01-Feb-24 13-Mar-25 03-Apr-25 SAR106,403.05 SAR0.00 0% 0% 03-Apr-25, Fire Fighting Installatio
Electrical Installation
In 44 10-Jan-24 29-Feb-24 06-Mar-25 01-May-25 SAR876,999.84 SAR0.00 0% 0% 01-May-25, Electrical Installation
Fire Detection
Detecti and Alarm System 18 16-Jan-24 05-Feb-24 12-Mar-25 07-Apr-25 SAR16,825.39 SAR0.00 0% 0% 07-Apr-25, Fire Detection and Alar
Voice Evacu
Evacuation / Public Address System 9 20-Jan-24 29-Jan-24 16-Mar-25 26-Mar-25 SAR6,371.86 SAR0.00 0% 0% 26-Mar-25, Voice Evacuation / Pub
Earthing Sy
System 4 20-Feb-24 24-Feb-24 21-Apr-25 26-Apr-25 SAR48,078.97 SAR0.00 0% 0% 26-Apr-25, Earthing System
Lightning Pr
Protection System 5 24-Feb-24 28-Feb-24 24-Apr-25 30-Apr-25 SAR31,273.25 SAR0.00 0% 0% 30-Apr-25, Lightning Protection S
SCADA System
Sys 38 20-Jan-24 03-Mar-24 16-Mar-25 04-May-25 SAR1,740.77 SAR0.00 0% 0% 04-May-25, SCADA System
Video Surve
Surveillance and Access Control System 5 04-Mar-24 09-Mar-24 04-May-25 10-May-25 SAR25,176.28 SAR0.00 0% 0% 10-May-25, Video Surveillance an
FRESH AIR FAN STATION NO.17 (ZONE-2) 401 26-Feb-24 12-Apr-25 31-Mar-24 29-Jul-25 SAR2,922,708.90 SAR0.00 0% 0% 29-Jul-25, FRESH AIR FAN
STRUCTURAL WORKS 361 26-Feb-24 19-Feb-25 31-Mar-24 12-Jun-25 SAR1,622,779.90 SAR0.00 0% 0% 12-Jun-25, STRUCTURAL WO
MEP WORKS 204 12-Aug-24 12-Apr-25 25-Nov-24 29-Jul-25 SAR1,299,929.00 SAR0.00 0% 0% 29-Jul-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 12-Aug-24 25-Aug-24 25-Nov-24 09-Dec-24 SAR57,762.67 SAR0.00 0% 0% 09-Dec-24, Domestic Hot and Cold Wa
Soil and Waste
Wa Drainage System 10 26-Aug-24 05-Sep-24 09-Dec-24 21-Dec-24 SAR16,461.18 SAR0.00 0% 0% 21-Dec-24, Soil and Waste Drainage S
Air Conditio
Conditioning Works 10 30-Jan-25 10-Feb-25 19-May-25 31-May-25 SAR112,835.74 SAR0.00 0% 0% 31-May-25, Air Conditioning W
Fire Fighting Installation 14 20-Feb-25 08-Mar-25 12-Jun-25 29-Jun-25 SAR106,403.05 SAR0.00 0% 0% 29-Jun-25, Fire Fighting Install
Electrical Installation
In 44 04-Feb-25 26-Mar-25 24-May-25 17-Jul-25 SAR876,999.84 SAR0.00 0% 0% 17-Jul-25, Electrical Installation
Fire Detection
Detecti and Alarm System 18 10-Feb-25 02-Mar-25 29-May-25 23-Jun-25 SAR16,825.39 SAR0.00 0% 0% 23-Jun-25, Fire Detection and A
Voice Evacu
Evacuation / Public Address System 9 13-Feb-25 23-Feb-25 02-Jun-25 16-Jun-25 SAR6,371.86 SAR0.00 0% 0% 16-Jun-25, Voice Evacuation / P
Earthing Sy
System 4 17-Mar-25 20-Mar-25 07-Jul-25 12-Jul-25 SAR48,078.97 SAR0.00 0% 0% 12-Jul-25, Earthing System
Lightning Pr
Protection System 5 20-Mar-25 25-Mar-25 10-Jul-25 16-Jul-25 SAR31,273.25 SAR0.00 0% 0% 16-Jul-25, Lightning Protection
SCADA System
Sys 8 24-Mar-25 06-Apr-25 14-Jul-25 23-Jul-25 SAR1,740.77 SAR0.00 0% 0% 23-Jul-25, SCADA System
Video Surve
Surveillance and Access Control System 5 07-Apr-25 12-Apr-25 23-Jul-25 29-Jul-25 SAR25,176.28 SAR0.00 0% 0% 29-Jul-25, Video Surveillance
EXHAUST FAN S
STATION NO.18 (ZONE-2) 447 01-Apr-24 15-May-25 08-May-24 27-Oct-25 SAR2,922,708.90 SAR0.00 0% 0% 27-Oct-25, EXHAUST FA
STRUCTURAL WORKS 349 01-Apr-24 25-Mar-25 08-May-24 03-Jul-25 SAR1,622,779.90 SAR0.00 0% 0% 03-Jul-25, STRUCTURAL WO
MEP WORKS 280 25-Aug-24 15-May-25 25-Nov-24 27-Oct-25 SAR1,299,929.00 SAR0.00 0% 0% 27-Oct-25, MEP WORKS
Domestic H Hot and Cold Water Services 12 25-Aug-24 07-Sep-24 25-Nov-24 09-Dec-24 SAR57,762.67 SAR0.00 0% 0% 09-Dec-24, Domestic Hot and Cold Wa
Soil and Waste
Wa Drainage System 10 08-Sep-24 18-Sep-24 09-Dec-24 21-Dec-24 SAR16,461.18 SAR0.00 0% 0% 21-Dec-24, Soil and Waste Drainage S
Air Conditio
Conditioning Works 10 03-Mar-25 13-Mar-25 10-Jun-25 22-Jun-25 SAR112,835.74 SAR0.00 0% 0% 22-Jun-25, Air Conditioning Wo
Fire Fighting Installation 14 26-Mar-25 15-Apr-25 03-Jul-25 20-Jul-25 SAR106,403.05 SAR0.00 0% 0% 20-Jul-25, Fire Fighting Install
Electrical Installation
In 46 08-Mar-25 04-May-25 15-Jun-25 07-Aug-25 SAR876,999.84 SAR0.00 0% 0% 07-Aug-25, Electrical Installat
Fire Detection
Detecti and Alarm System 18 13-Mar-25 07-Apr-25 21-Jun-25 12-Jul-25 SAR16,825.39 SAR0.00 0% 0% 12-Jul-25, Fire Detection and A
Voice Evacu
Evacuation / Public Address System 9 17-Mar-25 26-Mar-25 24-Jun-25 05-Jul-25 SAR6,371.86 SAR0.00 0% 0% 05-Jul-25, Voice Evacuation / P
Earthing Sy
System 4 24-Apr-25 28-Apr-25 28-Jul-25 02-Aug-25 SAR48,078.97 SAR0.00 0% 0% 02-Aug-25, Earthing System
Lightning Pr
Protection System 5 28-Apr-25 03-May-25 31-Jul-25 06-Aug-25 SAR31,273.25 SAR0.00 0% 0% 06-Aug-25, Lightning Protecti
SCADA System
Sys 8 01-May-25 10-May-25 04-Aug-25 13-Aug-25 SAR1,740.77 SAR0.00 0% 0% 13-Aug-25, SCADA System
Video Surve
Surveillance and Access Control System 63 11-May-25 15-May-25 13-Aug-25 27-Oct-25 SAR25,176.28 SAR0.00 0% 0% 27-Oct-25, Video Surveilla
FRESH AIR FAN STATION NO.19 (ZONE-2) 338 14-Apr-24 22-May-25 23-Nov-24 31-Dec-25 SAR2,922,708.90 SAR0.00 0% 0% 31-Dec-25, FRESH AIR
STRUCTURAL WORKS 300 14-Apr-24 08-Apr-25 23-Nov-24 17-Nov-25 SAR1,622,779.90 SAR0.00 0% 0% 17-Nov-25, STRUCTUR
MEP WORKS 220 03-Sep-24 22-May-25 14-Apr-25 31-Dec-25 SAR1,299,929.00 SAR0.00 0% 0% 31-Dec-25, MEP WORK
Domestic H Hot and Cold Water Services 12 03-Sep-24 16-Sep-24 14-Apr-25 28-Apr-25 SAR57,762.67 SAR0.00 0% 0% 28-Apr-25, Domestic Hot and Co
Soil and Waste
Wa Drainage System 10 17-Sep-24 29-Sep-24 28-Apr-25 10-May-25 SAR16,461.18 SAR0.00 0% 0% 10-May-25, Soil and Waste Drain
Air Conditio
Conditioning Works 10 12-Mar-25 23-Mar-25 25-Oct-25 05-Nov-25 SAR112,835.74 SAR0.00 0% 0% 05-Nov-25, Air Condition
Fire Fighting Installation 14 24-Mar-25 13-Apr-25 05-Nov-25 22-Nov-25 SAR106,403.05 SAR0.00 0% 0% 22-Nov-25, Fire Fighting
Electrical Installation
In 44 17-Mar-25 11-May-25 29-Oct-25 20-Dec-25 SAR876,999.84 SAR0.00 0% 0% 20-Dec-25, Electrical Ins

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
67 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
Fire Detection
Detecti and Alarm System 18 09-Apr-25 29-Apr-25 17-Nov-25 08-Dec-25 SAR16,825.39 SAR0.00 0% 0% 08-Dec-25, Fire Detectio
Voice Evacu
Evacuation / Public Address System 9 13-Apr-25 22-Apr-25 20-Nov-25 01-Dec-25 SAR6,371.86 SAR0.00 0% 0% 01-Dec-25, Voice Evacua
Earthing Sy
System 4 01-May-25 05-May-25 09-Dec-25 14-Dec-25 SAR48,078.97 SAR0.00 0% 0% 14-Dec-25, Earthing Sys
Lightning Pr
Protection System 5 05-May-25 10-May-25 13-Dec-25 18-Dec-25 SAR31,273.25 SAR0.00 0% 0% 18-Dec-25, Lightning Pr
SCADA System
Sys 8 08-May-25 17-May-25 16-Dec-25 25-Dec-25 SAR1,740.77 SAR0.00 0% 0% 25-Dec-25, SCADA Sys
Video Surve
Surveillance and Access Control System 5 18-May-25 22-May-25 25-Dec-25 31-Dec-25 SAR25,176.28 SAR0.00 0% 0% 31-Dec-25, Video Surve
EXHAUST FAN S
STATION NO.20 (ZONE-1) 340 15-Apr-24 26-May-25 23-Dec-24 02-Feb-26 SAR2,922,708.90 SAR0.00 0% 0% 02-Feb-26, EXHAUST
STRUCTURAL WORKS 300 15-Apr-24 09-Apr-25 23-Dec-24 17-Dec-25 SAR1,622,779.90 SAR0.00 0% 0% 17-Dec-25, STRUCTUR
MEP WORKS 222 04-Sep-24 26-May-25 14-May-25 02-Feb-26 SAR1,299,929.00 SAR0.00 0% 0% 02-Feb-26, MEP WOR
Domestic H Hot and Cold Water Services 12 04-Sep-24 17-Sep-24 14-May-25 28-May-25 SAR57,762.67 SAR0.00 0% 0% 28-May-25, Domestic Hot and C
Soil and Waste
Wa Drainage System 10 18-Sep-24 30-Sep-24 28-May-25 12-Jun-25 SAR16,461.18 SAR0.00 0% 0% 12-Jun-25, Soil and Waste Drain
Air Conditio
Conditioning Works 10 13-Mar-25 24-Mar-25 24-Nov-25 06-Dec-25 SAR112,835.74 SAR0.00 0% 0% 06-Dec-25, Air Condition
Fire Fighting Installation 14 10-Apr-25 26-Apr-25 17-Dec-25 03-Jan-26 SAR106,403.05 SAR0.00 0% 0% 03-Jan-26, Fire Fighting
Electrical Installation
In 46 18-Mar-25 14-May-25 29-Nov-25 21-Jan-26 SAR876,999.84 SAR0.00 0% 0% 21-Jan-26, Electrical In
Fire Detection
Detecti and Alarm System 18 24-Mar-25 17-Apr-25 04-Dec-25 25-Dec-25 SAR16,825.39 SAR0.00 0% 0% 25-Dec-25, Fire Detectio
Voice Evacu
Evacuation / Public Address System 9 27-Mar-25 10-Apr-25 08-Dec-25 18-Dec-25 SAR6,371.86 SAR0.00 0% 0% 18-Dec-25, Voice Evacua
Earthing Sy
System 4 05-May-25 08-May-25 11-Jan-26 15-Jan-26 SAR48,078.97 SAR0.00 0% 0% 15-Jan-26, Earthing Sys
Lightning Pr
Protection System 5 08-May-25 13-May-25 14-Jan-26 20-Jan-26 SAR31,273.25 SAR0.00 0% 0% 20-Jan-26, Lightning P
SCADA System
Sys 8 12-May-25 20-May-25 18-Jan-26 27-Jan-26 SAR1,740.77 SAR0.00 0% 0% 27-Jan-26, SCADA Sy
Video Surve
Surveillance and Access Control System 5 21-May-25 26-May-25 27-Jan-26 02-Feb-26 SAR25,176.28 SAR0.00 0% 0% 02-Feb-26, Video Surv
EXHAUST FAN S
STATION NO.21 (ZONE-1) 342 16-Apr-24 24-Jun-25 26-Dec-24 07-Feb-26 SAR2,922,708.90 SAR0.00 0% 0% 07-Feb-26, EXHAUST
STRUCTURAL WORKS 300 16-Apr-24 07-May-25 26-Dec-24 21-Dec-25 SAR1,622,779.90 SAR0.00 0% 0% 21-Dec-25, STRUCTUR
MEP WORKS 224 05-Sep-24 24-Jun-25 18-May-25 07-Feb-26 SAR1,299,929.00 SAR0.00 0% 0% 07-Feb-26, MEP WOR
Domestic H Hot and Cold Water Services 12 05-Sep-24 18-Sep-24 18-May-25 01-Jun-25 SAR57,762.67 SAR0.00 0% 0% 01-Jun-25, Domestic Hot and Co
Soil and Waste
Wa Drainage System 10 19-Sep-24 01-Oct-24 01-Jun-25 16-Jun-25 SAR16,461.18 SAR0.00 0% 0% 16-Jun-25, Soil and Waste Drain
Air Conditio
Conditioning Works 10 15-Apr-25 26-Apr-25 27-Nov-25 09-Dec-25 SAR112,835.74 SAR0.00 0% 0% 09-Dec-25, Air Condition
Fire Fighting Installation 14 27-Apr-25 12-May-25 09-Dec-25 25-Dec-25 SAR106,403.05 SAR0.00 0% 0% 25-Dec-25, Fire Fighting
Electrical Installation
In 44 20-Apr-25 12-Jun-25 02-Dec-25 22-Jan-26 SAR876,999.84 SAR0.00 0% 0% 22-Jan-26, Electrical In
Fire Detection
Detecti and Alarm System 18 26-Apr-25 15-May-25 08-Dec-25 29-Dec-25 SAR16,825.39 SAR0.00 0% 0% 29-Dec-25, Fire Detectio
Voice Evacu
Evacuation / Public Address System 14 29-Apr-25 14-May-25 11-Dec-25 28-Dec-25 SAR6,371.86 SAR0.00 0% 0% 28-Dec-25, Voice Evacu
Earthing Sy
System 4 31-May-25 03-Jun-25 12-Jan-26 17-Jan-26 SAR48,078.97 SAR0.00 0% 0% 17-Jan-26, Earthing Sys
Lightning Pr
Protection System 5 03-Jun-25 11-Jun-25 15-Jan-26 21-Jan-26 SAR31,273.25 SAR0.00 0% 0% 21-Jan-26, Lightning P
SCADA System
Sys 8 10-Jun-25 18-Jun-25 19-Jan-26 28-Jan-26 SAR1,740.77 SAR0.00 0% 0% 28-Jan-26, SCADA Sy
Video Surve
Surveillance and Access Control System 5 19-Jun-25 24-Jun-25 02-Feb-26 07-Feb-26 SAR25,176.28 SAR0.00 0% 0% 07-Feb-26, Video Surv
FRESH AIR FAN STATION NO.22 (ZONE-1) 341 17-Apr-24 31-Jul-25 28-Dec-24 08-Feb-26 SAR2,922,708.90 SAR0.00 0% 0% 08-Feb-26, FRESH AI
STRUCTURAL WORKS 300 17-Apr-24 04-Jun-25 28-Dec-24 22-Dec-25 SAR1,622,779.90 SAR0.00 0% 0% 22-Dec-25, STRUCTUR
MEP WORKS 223 07-Sep-24 31-Jul-25 19-May-25 08-Feb-26 SAR1,299,929.00 SAR0.00 0% 0% 08-Feb-26, MEP WOR
Domestic H Hot and Cold Water Services 12 07-Sep-24 19-Sep-24 19-May-25 02-Jun-25 SAR57,762.67 SAR0.00 0% 0% 02-Jun-25, Domestic Hot and Co
Soil and Waste
Wa Drainage System 10 21-Sep-24 02-Oct-24 02-Jun-25 17-Jun-25 SAR16,461.18 SAR0.00 0% 0% 17-Jun-25, Soil and Waste Drain
Air Conditio
Conditioning Works 10 13-May-25 24-May-25 29-Nov-25 10-Dec-25 SAR112,835.74 SAR0.00 0% 0% 10-Dec-25, Air Condition
Fire Fighting Installation 14 25-May-25 12-Jun-25 10-Dec-25 27-Dec-25 SAR106,403.05 SAR0.00 0% 0% 27-Dec-25, Fire Fighting
Electrical Installation
In 44 18-May-25 10-Jul-25 03-Dec-25 24-Jan-26 SAR876,999.84 SAR0.00 0% 0% 24-Jan-26, Electrical In
Fire Detection
Detecti and Alarm System 18 09-Jun-25 29-Jun-25 22-Dec-25 12-Jan-26 SAR16,825.39 SAR0.00 0% 0% 12-Jan-26, Fire Detectio
Voice Evacu
Evacuation / Public Address System 9 30-Jun-25 09-Jul-25 12-Jan-26 22-Jan-26 SAR6,371.86 SAR0.00 0% 0% 22-Jan-26, Voice Evacu
Earthing Sy
System 4 10-Jul-25 14-Jul-25 22-Jan-26 27-Jan-26 SAR48,078.97 SAR0.00 0% 0% 27-Jan-26, Earthing Sy
Lightning Pr
Protection System 5 14-Jul-25 19-Jul-25 26-Jan-26 01-Feb-26 SAR31,273.25 SAR0.00 0% 0% 01-Feb-26, Lightning P
SCADA System
Sys 8 17-Jul-25 26-Jul-25 29-Jan-26 08-Feb-26 SAR1,740.77 SAR0.00 0% 0% 08-Feb-26, SCADA S
Video Surve
Surveillance and Access Control System 5 27-Jul-25 31-Jul-25 02-Feb-26 08-Feb-26 SAR25,176.28 SAR0.00 0% 0% 08-Feb-26, Video Surv
IRRIGATION & FIRE
FIR FIGHTING PUMP STATION ( 2 NOS) 359 18-Apr-24 24-Jun-25 29-Dec-24 02-Mar-26 SAR9,586,989.28 SAR0.00 0% 0% 02-Mar-26, IRRIGAT
IRRIGATION & F
FIRE FIGHTING PUMP STATION SOUTH STATION 338 18-Apr-24 27-May-25 29-Dec-24 05-Feb-26 SAR4,793,494.65 SAR0.00 0% 0% 05-Feb-26, IRRIGATI
STRUCTURAL WORKS 300 18-Apr-24 13-Apr-25 29-Dec-24 23-Dec-25 SAR3,027,109.25 SAR0.00 0% 0% 23-Dec-25, STRUCTUR
MEP WORKS 220 08-Sep-24 27-May-25 20-May-25 05-Feb-26 SAR1,766,385.40 SAR0.00 0% 0% 05-Feb-26, MEP WOR
Domestic H Hot and Cold Water Services 12 08-Sep-24 21-Sep-24 20-May-25 03-Jun-25 SAR77,791.40 SAR0.00 0% 0% 03-Jun-25, Domestic Hot and Co
Soil and Waste
Wa Drainage System 10 22-Sep-24 03-Oct-24 03-Jun-25 18-Jun-25 SAR22,168.95 SAR0.00 0% 0% 18-Jun-25, Soil and Waste Drain
Air Conditio
Conditioning Works 10 17-Mar-25 27-Mar-25 30-Nov-25 11-Dec-25 SAR151,960.59 SAR0.00 0% 0% 11-Dec-25, Air Condition
Fire Fighting Installation 14 29-Mar-25 17-Apr-25 11-Dec-25 28-Dec-25 SAR143,297.41 SAR0.00 0% 0% 28-Dec-25, Fire Fighting
Electrical Installation
In 44 22-Mar-25 15-May-25 04-Dec-25 25-Jan-26 SAR1,195,141.13 SAR0.00 0% 0% 25-Jan-26, Electrical In
Fire Detection
Detecti and Alarm System 18 14-Apr-25 04-May-25 23-Dec-25 13-Jan-26 SAR22,659.45 SAR0.00 0% 0% 13-Jan-26, Fire Detectio
Voice Evacu
Evacuation / Public Address System 9 17-Apr-25 27-Apr-25 27-Dec-25 06-Jan-26 SAR8,581.24 SAR0.00 0% 0% 06-Jan-26, Voice Evacua
Earthing Sy
System 4 06-May-25 10-May-25 14-Jan-26 19-Jan-26 SAR64,749.96 SAR0.00 0% 0% 19-Jan-26, Earthing Sy
Lightning Pr
Protection System 5 10-May-25 14-May-25 18-Jan-26 24-Jan-26 SAR42,116.99 SAR0.00 0% 0% 24-Jan-26, Lightning P

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
68 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
SCADA System
Sys 8 13-May-25 21-May-25 21-Jan-26 31-Jan-26 SAR4,788.23 SAR0.00 0% 0% 31-Jan-26, SCADA Sy
Video Surve
Surveillance and Access Control System 5 22-May-25 27-May-25 31-Jan-26 05-Feb-26 SAR33,130.06 SAR0.00 0% 0% 05-Feb-26, Video Surv
IRRIGATION & F
FIRE FIGHTING PUMP STATION NORTH STATION 358 20-Apr-24 24-Jun-25 30-Dec-24 02-Mar-26 SAR4,793,494.63 SAR0.00 0% 0% 02-Mar-26, IRRIGAT
STRUCTURAL WORKS 316 20-Apr-24 03-May-25 30-Dec-24 12-Jan-26 SAR3,027,109.25 SAR0.00 0% 0% 12-Jan-26, STRUCTUR
MEP WORKS 224 29-Sep-24 24-Jun-25 12-Jun-25 02-Mar-26 SAR1,766,385.38 SAR0.00 0% 0% 02-Mar-26, MEP WO
Domestic H Hot and Cold Water Services 12 29-Sep-24 12-Oct-24 12-Jun-25 26-Jun-25 SAR77,791.40 SAR0.00 0% 0% 26-Jun-25, Domestic Hot and C
Soil and Waste
Wa Drainage System 10 13-Oct-24 23-Oct-24 26-Jun-25 08-Jul-25 SAR22,168.95 SAR0.00 0% 0% 08-Jul-25, Soil and Waste Drai
Air Conditio
Conditioning Works 22 10-Apr-25 05-May-25 20-Dec-25 14-Jan-26 SAR151,960.59 SAR0.00 0% 0% 14-Jan-26, Air Conditio
Fire Fighting Installation 14 06-May-25 21-May-25 14-Jan-26 31-Jan-26 SAR143,297.41 SAR0.00 0% 0% 31-Jan-26, Fire Fightin
Electrical Installation
In 48 15-Apr-25 12-Jun-25 24-Dec-25 18-Feb-26 SAR1,195,141.13 SAR0.00 0% 0% 18-Feb-26, Electrical I
Fire Detection
Detecti and Alarm System 18 21-Apr-25 11-May-25 30-Dec-25 20-Jan-26 SAR22,659.45 SAR0.00 0% 0% 20-Jan-26, Fire Detectio
Voice Evacu
Evacuation / Public Address System 9 24-Apr-25 04-May-25 03-Jan-26 13-Jan-26 SAR8,581.24 SAR0.00 0% 0% 13-Jan-26, Voice Evacu
Earthing Sy
System 4 31-May-25 03-Jun-25 08-Feb-26 12-Feb-26 SAR64,749.96 SAR0.00 0% 0% 12-Feb-26, Earthing S
Lightning Pr
Protection System 5 03-Jun-25 11-Jun-25 11-Feb-26 17-Feb-26 SAR42,116.99 SAR0.00 0% 0% 17-Feb-26, Lightning
SCADA System
Sys 8 10-Jun-25 18-Jun-25 15-Feb-26 24-Feb-26 SAR4,788.21 SAR0.00 0% 0% 24-Feb-26, SCADA S
Video Surve
Surveillance and Access Control System 5 19-Jun-25 24-Jun-25 24-Feb-26 02-Mar-26 SAR33,130.06 SAR0.00 0% 0% 02-Mar-26, Video Su
PEDESTRIAN BRIDGES
BRID 687 07-Mar-23 19-Oct-25 27-Apr-24 30-Jul-26 SAR124,263,952.90 SAR0.00 14.38% 0% 30-Jul-26, PED
ENGINEERING 116 07-Mar-23 30-Jul-23 27-Apr-24 14-Sep-24 SAR0.00 SAR0.00 0% 0% 14-Sep-24, ENGINEERING
GEO-TECHNICAL INVESTIGATION 38 07-Mar-23 20-Apr-23 27-Apr-24 09-Jun-24 SAR0.00 SAR0.00 0% 0% 09-Jun-24, GEO-TECHNICAL INVESTIGAT
CIVIL/STRUCTURAL/MECHANICAL/ELECTRICAL
CIVIL/STRUCTUR 65 25-Mar-23 12-Jun-23 14-May-24 01-Aug-24 SAR0.00 SAR0.00 0% 0% 01-Aug-24, CIVIL/STRUCTURAL/MECH
ARCHITECTURAL
ARCHITECTURA 22 13-Jun-23 11-Jul-23 21-Jul-24 15-Aug-24 SAR0.00 SAR0.00 0% 0% 15-Aug-24, ARCHITECTURAL
ELEVATOR 37 13-Jun-23 30-Jul-23 01-Aug-24 14-Sep-24 SAR0.00 SAR0.00 0% 0% 14-Sep-24, ELEVATOR
METHOD STATEMENT
STATEM 71 19-Apr-23 30-Jul-23 08-Jun-24 03-Sep-24 SAR0.00 SAR0.00 0% 0% 03-Sep-24, METHOD STATEMENT
PROCUREMENT 323 18-May-23 23-Jun-24 08-Jul-24 28-Jul-25 SAR9,339,579.89 SAR0.00 100% 0% 28-Jul-25, PROCUREMENT
CIVIL/STRUCTURAL
CIVIL/STRUCTUR 170 18-May-23 06-Dec-23 08-Jul-24 22-Jan-25 SAR9,339,579.89 SAR0.00 100% 0% 22-Jan-25, CIVIL/STRUCTURAL
ARCHITECTURAL
ARCHITECTURA 150 12-Jul-23 03-Jan-24 15-Aug-24 08-Feb-25 SAR0.00 SAR0.00 0% 0% 08-Feb-25, ARCHITECTURAL
PLUMBING 85 12-Jul-23 19-Oct-23 15-Aug-24 24-Nov-24 SAR0.00 SAR0.00 0% 0% 24-Nov-24, PLUMBING
ELEVATOR 205 21-Oct-23 23-Jun-24 24-Nov-24 28-Jul-25 SAR0.00 SAR0.00 0% 0% 28-Jul-25, ELEVATOR
CONSTRUCTION 608 25-Jun-23 19-Oct-25 01-Aug-24 30-Jul-26 SAR114,924,373.01 SAR0.00 7.42% 0% 30-Jul-26, CON
BRIDGE NO.01 517 25-Jun-23 03-Mar-25 01-Aug-24 12-Apr-26 SAR39,276,063.16 SAR0.00 21.33% 0% 12-Apr-26, BRIDG
GEO-TECHNICAL INVESTIGATION
GEO-TECHNICA 23 25-Jun-23 24-Jul-23 01-Aug-24 28-Aug-24 SAR77,449.00 SAR0.00 100% 0% 28-Aug-24, GEO-TECHNICAL INVESTI
FOUNDATION 75 27-Jul-23 23-Oct-23 28-Aug-24 25-Nov-24 SAR3,803,513.85 SAR0.00 100% 0% 25-Nov-24, FOUNDATION
PIER 75 10-Oct-23 04-Jan-24 11-Nov-24 06-Feb-25 SAR455,258.88 SAR0.00 94.16% 0% 06-Feb-25, PIER
ABUTMENT AND WING WALL 82 10-Oct-23 13-Jan-24 11-Nov-24 15-Feb-25 SAR2,259,366.71 SAR0.00 94.15% 0% 15-Feb-25, ABUTMENT AND WIN
BOX GIRDER 142 20-Dec-23 05-Jun-24 23-Jan-25 15-Jul-25 SAR9,790,841.15 SAR0.00 0% 0% 15-Jul-25, BOX GIRDER
BARRIER 65 13-May-24 31-Jul-24 22-Jun-25 04-Sep-25 SAR364,375.22 SAR0.00 0% 0% 04-Sep-25, BARRIER
POST TENSION 20 08-Jul-24 30-Jul-24 12-Aug-25 03-Sep-25 SAR1,224,969.36 SAR0.00 0% 0% 03-Sep-25, POST TENSION
APPROACH 52 01-Aug-24 01-Oct-24 06-Sep-25 05-Nov-25 SAR2,284,633.94 SAR0.00 0% 0% 05-Nov-25, APPROACH
DECK WATER PROOFING
P 20 31-Jul-24 22-Aug-24 04-Sep-25 28-Sep-25 SAR2,373,121.14 SAR0.00 0% 0% 28-Sep-25, DECK WATER
EXPANSION JOINTS
JO 8 15-Sep-24 24-Sep-24 21-Oct-25 29-Oct-25 SAR1,128,891.00 SAR0.00 0% 0% 29-Oct-25, EXPANSION
MSE WALL 119 01-Aug-24 18-Dec-24 06-Sep-25 22-Jan-26 SAR5,962,218.05 SAR0.00 0% 0% 22-Jan-26, MSE WALL
BASE PAD 19 01-Aug-24 22-Aug-24 06-Sep-25 28-Sep-25 SAR806,693.76 SAR0.00 0% 0% 28-Sep-25, BASE PAD
MSE WALL CONSTRUCTION
CO 46 24-Aug-24 16-Oct-24 29-Sep-25 20-Nov-25 SAR2,761,261.54 SAR0.00 0% 0% 20-Nov-25, MSE WALL
RETAINING WALL
WA 63 10-Aug-24 22-Oct-24 14-Sep-25 26-Nov-25 SAR1,473,998.63 SAR0.00 0% 0% 26-Nov-25, RETAINING
FRICTION SLAB
SLA 24 17-Oct-24 13-Nov-24 22-Nov-25 18-Dec-25 SAR253,115.64 SAR0.00 0% 0% 18-Dec-25, FRICTION
BARRIER 37 06-Nov-24 18-Dec-24 11-Dec-25 22-Jan-26 SAR667,148.48 SAR0.00 0% 0% 22-Jan-26, BARRIER
RAMP 1& 2 411 28-Aug-23 30-Dec-24 08-Sep-24 11-Jan-26 SAR4,524,284.94 SAR0.00 42.86% 0% 11-Jan-26, RAMP 1& 2
RAMP-1 209 28-Aug-23 01-May-24 08-Sep-24 15-May-25 SAR1,809,713.98 SAR0.00 64.66% 0% 15-May-25, RAMP-1
PART-A RAMP
RAM STA 0+000 ~ STA 0+096 142 28-Aug-23 10-Feb-24 08-Sep-24 22-Feb-25 SAR904,856.99 SAR0.00 83.93% 0% 22-Feb-25, PART-A RAMP STA 0+
FOUNDATION
FOUNDAT 42 28-Aug-23 17-Oct-23 08-Sep-24 28-Oct-24 SAR325,748.52 SAR0.00 100% 0% 28-Oct-24, FOUNDATION
PIERS 31 09-Oct-23 14-Nov-23 20-Oct-24 25-Nov-24 SAR81,437.13 SAR0.00 100% 0% 25-Nov-24, PIERS
RAMP SLAB
SL 75 06-Nov-23 01-Feb-24 17-Nov-24 13-Feb-25 SAR461,477.06 SAR0.00 76.34% 0% 13-Feb-25, RAMP SLAB
MSE WWALL STA 0+000 ~ STA 0+024 68 14-Nov-23 01-Feb-24 26-Nov-24 13-Feb-25 SAR122,155.69 SAR0.00 50.12% 0% 13-Feb-25, MSE WALL STA 0+000
BASE PAD
BA 39 14-Nov-23 30-Dec-23 26-Nov-24 11-Jan-25 SAR95,009.98 SAR0.00 64.44% 0% 11-Jan-25, BASE PAD
MSE WALL CONSTRUCTION
MS 29 30-Dec-23 01-Feb-24 11-Jan-25 13-Feb-25 SAR27,145.71 SAR0.00 0% 0% 13-Feb-25, MSE WALL CONSTRU
FINISHING WORK
FINISHIN 7 01-Feb-24 10-Feb-24 13-Feb-25 22-Feb-25 SAR36,194.28 SAR0.00 0% 0% 22-Feb-25, FINISHING WORK
PART-B RAMP
RAM STA 0+096 ~ STA 0+0145 181 01-Oct-23 01-May-24 12-Oct-24 15-May-25 SAR904,856.99 SAR0.00 45.39% 0% 15-May-25, PART-B RAMP STA

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
69 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
FOUNDAT
FOUNDATION 42 01-Oct-23 19-Nov-23 12-Oct-24 30-Nov-24 SAR325,748.52 SAR0.00 100% 0% 30-Nov-24, FOUNDATION
PIERS 35 11-Nov-23 21-Dec-23 21-Nov-24 01-Jan-25 SAR81,437.13 SAR0.00 91.98% 0% 01-Jan-25, PIERS
RAMP SLAB
SL 111 13-Dec-23 23-Apr-24 24-Dec-24 07-May-25 SAR461,477.06 SAR0.00 2.18% 0% 07-May-25, RAMP SLAB
MSE WWALL STA 0+000 ~ STA 0+024 104 21-Dec-23 23-Apr-24 02-Jan-25 07-May-25 SAR122,155.69 SAR0.00 0% 0% 07-May-25, MSE WALL STA 0+
BASE PAD
BA 39 21-Dec-23 05-Feb-24 02-Jan-25 17-Feb-25 SAR95,009.98 SAR0.00 0% 0% 17-Feb-25, BASE PAD
MSE WALL CONSTRUCTION
MS 29 17-Mar-24 23-Apr-24 03-Apr-25 07-May-25 SAR27,145.71 SAR0.00 0% 0% 07-May-25, MSE WALL CONST
FINISHING WORK
FINISHIN 7 23-Apr-24 01-May-24 07-May-25 15-May-25 SAR36,194.28 SAR0.00 0% 0% 15-May-25, FINISHING WORK
RAMP-2 383 01-Oct-23 30-Dec-24 12-Oct-24 11-Jan-26 SAR2,714,570.96 SAR0.00 28.32% 0% 11-Jan-26, RAMP-2
PART-A RAMP
RAM STA 0+000 ~ STA 0+055 248 01-Oct-23 24-Jul-24 12-Oct-24 06-Aug-25 SAR904,856.99 SAR0.00 49.12% 0% 06-Aug-25, PART-A RAMP S
FOUNDATION
FOUNDAT 42 01-Oct-23 19-Nov-23 12-Oct-24 30-Nov-24 SAR325,748.52 SAR0.00 100% 0% 30-Nov-24, FOUNDATION
PIERS 31 11-Nov-23 17-Dec-23 21-Nov-24 28-Dec-24 SAR81,437.13 SAR0.00 98.15% 0% 28-Dec-24, PIERS
RAMP SLAB
SL 182 09-Dec-23 16-Jul-24 19-Dec-24 28-Jul-25 SAR461,477.06 SAR0.00 8.4% 0% 28-Jul-25, RAMP SLAB
MSE WWALL STA 0+000 ~ STA 0+024 175 17-Dec-23 16-Jul-24 29-Dec-24 28-Jul-25 SAR122,155.69 SAR0.00 0% 0% 28-Jul-25, MSE WALL STA 0
BASE PAD
BA 39 17-Dec-23 31-Jan-24 29-Dec-24 12-Feb-25 SAR95,009.98 SAR0.00 0% 0% 12-Feb-25, BASE PAD
MSE WALL CONSTRUCTION
MS 29 08-Jun-24 16-Jul-24 25-Jun-25 28-Jul-25 SAR27,145.71 SAR0.00 0% 0% 28-Jul-25, MSE WALL CONS
FINISHING WORK
FINISHIN 7 16-Jul-24 24-Jul-24 29-Jul-25 06-Aug-25 SAR36,194.28 SAR0.00 0% 0% 06-Aug-25, FINISHING WO
PART-B RAMP
RAM STA 0+055 ~ STA 0+096 289 01-Nov-23 12-Oct-24 12-Nov-24 25-Oct-25 SAR904,856.99 SAR0.00 35.85% 0% 25-Oct-25, PART-B RAMP
FOUNDATION
FOUNDAT 42 01-Nov-23 20-Dec-23 12-Nov-24 31-Dec-24 SAR325,748.52 SAR0.00 98.38% 0% 31-Dec-24, FOUNDATION
PIERS 35 12-Dec-23 22-Jan-24 23-Dec-24 02-Feb-25 SAR81,437.13 SAR0.00 4.76% 0% 02-Feb-25, PIERS
RAMP SLAB
SL 219 14-Jan-24 03-Oct-24 25-Jan-25 16-Oct-25 SAR461,477.06 SAR0.00 0% 0% 16-Oct-25, RAMP SLAB
MSE WWALL STA 0+000 ~ STA 0+024 211 22-Jan-24 03-Oct-24 03-Feb-25 16-Oct-25 SAR122,155.69 SAR0.00 0% 0% 16-Oct-25, MSE WALL ST
BASE PAD
BA 39 22-Jan-24 07-Mar-24 03-Feb-25 20-Mar-25 SAR95,009.98 SAR0.00 0% 0% 20-Mar-25, BASE PAD
MSE WALL CONSTRUCTION
MS 29 29-Aug-24 03-Oct-24 11-Sep-25 16-Oct-25 SAR27,145.71 SAR0.00 0% 0% 16-Oct-25, MSE WALL CO
FINISHING WORK
FINISHIN 7 03-Oct-24 12-Oct-24 16-Oct-25 25-Oct-25 SAR36,194.28 SAR0.00 0% 0% 25-Oct-25, FINISHING W
PART-C RAMP
RAM STA 0+096 ~ STA 0+145 275 04-Feb-24 30-Dec-24 15-Feb-25 11-Jan-26 SAR904,856.99 SAR0.00 0% 0% 11-Jan-26, PART-C RA
FOUNDATION
FOUNDAT 42 04-Feb-24 24-Mar-24 15-Feb-25 09-Apr-25 SAR325,748.52 SAR0.00 0% 0% 09-Apr-25, FOUNDATION
PIERS 35 16-Mar-24 29-Apr-24 27-Mar-25 12-May-25 SAR81,437.13 SAR0.00 0% 0% 12-May-25, PIERS
RAMP SLAB
SL 205 21-Apr-24 21-Dec-24 04-May-25 03-Jan-26 SAR461,477.06 SAR0.00 0% 0% 03-Jan-26, RAMP SLA
MSE WWALL STA 0+000 ~ STA 0+024 198 29-Apr-24 21-Dec-24 13-May-25 03-Jan-26 SAR122,155.69 SAR0.00 0% 0% 03-Jan-26, MSE WALL
BASE PAD
BA 39 29-Apr-24 13-Jun-24 13-May-25 01-Jul-25 SAR95,009.98 SAR0.00 0% 0% 01-Jul-25, BASE PAD
MSE WALL CONSTRUCTION
MS 29 18-Nov-24 21-Dec-24 30-Nov-25 03-Jan-26 SAR27,145.71 SAR0.00 0% 0% 03-Jan-26, MSE WALL
FINISHING WORK
FINISHIN 7 22-Dec-24 30-Dec-24 03-Jan-26 11-Jan-26 SAR36,194.28 SAR0.00 0% 0% 11-Jan-26, FINISHING
ROAD WORK 27 19-Dec-24 19-Jan-25 24-Jan-26 23-Feb-26 SAR1,968,297.00 SAR0.00 0% 0% 23-Feb-26, ROAD W
ELEVATOR 94 14-Nov-24 03-Mar-25 20-Dec-25 12-Apr-26 SAR3,058,842.91 SAR0.00 0% 0% 12-Apr-26, ELEVAT
BRIDGE NO.02 522 25-Jul-23 19-Oct-25 28-Aug-24 14-May-26 SAR37,366,395.36 SAR0.00 0.17% 0% 14-May-26, BRID
GEO-TECHNICAL INVESTIGATION
GEO-TECHNICA 56 25-Jul-23 28-Sep-23 28-Aug-24 03-Nov-24 SAR65,180.00 SAR0.00 100% 0% 03-Nov-24, GEO-TECHNICAL INVES
FOUNDATION 89 06-Apr-24 25-Jul-24 03-Nov-24 15-Feb-25 SAR3,820,377.01 SAR0.00 0% 0% 15-Feb-25, FOUNDATION
PIER 84 29-Jun-24 05-Oct-24 18-Jan-25 30-Apr-25 SAR411,956.38 SAR0.00 0% 0% 30-Apr-25, PIER
ABUTMENT AND WING WALL 66 05-Sep-24 21-Nov-24 27-Mar-25 21-Jun-25 SAR2,114,147.21 SAR0.00 0% 0% 21-Jun-25, ABUTMENT AND
BOX GIRDER 125 02-Nov-24 26-Mar-25 27-May-25 25-Oct-25 SAR9,124,422.96 SAR0.00 0% 0% 25-Oct-25, BOX GIRDER
BARRIER 48 05-Mar-25 04-May-25 02-Oct-25 27-Nov-25 SAR360,400.48 SAR0.00 0% 0% 27-Nov-25, BARRIER
POST TENSION 20 27-Apr-25 19-May-25 19-Nov-25 13-Dec-25 SAR1,136,683.28 SAR0.00 0% 0% 13-Dec-25, POST TENS
APPROACH 147 23-Nov-24 17-May-25 21-Jun-25 10-Dec-25 SAR2,539,019.95 SAR0.00 0% 0% 10-Dec-25, APPROACH
DECK WATER PROOFING
P 19 20-May-25 14-Jun-25 13-Dec-25 04-Jan-26 SAR2,211,290.84 SAR0.00 0% 0% 04-Jan-26, DECK WAT
MSE WALL 119 20-May-25 09-Oct-25 13-Dec-25 05-May-26 SAR5,598,824.58 SAR0.00 0% 0% 05-May-26, MSE W
BASE PAD 26 20-May-25 22-Jun-25 13-Dec-25 12-Jan-26 SAR746,205.69 SAR0.00 0% 0% 12-Jan-26, BASE PAD
MSE WALL CONSTRUCTION
CO 46 15-Jun-25 06-Aug-25 04-Jan-26 26-Feb-26 SAR2,644,283.39 SAR0.00 0% 0% 26-Feb-26, MSE WA
RETAINING WALL
WA 63 28-May-25 12-Aug-25 21-Dec-25 04-Mar-26 SAR1,363,205.15 SAR0.00 0% 0% 04-Mar-26, RETAINI
FRICTION SLAB
SLA 24 07-Aug-25 03-Sep-25 26-Feb-26 31-Mar-26 SAR235,047.41 SAR0.00 0% 0% 31-Mar-26, FRICTIO
BARRIER 37 27-Aug-25 09-Oct-25 18-Mar-26 05-May-26 SAR610,082.93 SAR0.00 0% 0% 05-May-26, BARR
EXPANSION JOINTS
JO 8 11-Oct-25 19-Oct-25 05-May-26 14-May-26 SAR1,041,120.60 SAR0.00 0% 0% 14-May-26, EXPA
RAMP 3 & 4 409 12-Jun-24 16-Oct-25 12-Dec-24 18-Apr-26 SAR4,289,133.17 SAR0.00 0% 0% 18-Apr-26, RAMP
RAMP-3 206 12-Jun-24 13-Feb-25 12-Dec-24 18-Aug-25 SAR1,715,653.27 SAR0.00 0% 0% 18-Aug-25, RAMP-3
PART-A RAMP
RAM STA 0+000 ~ STA 0+086 139 12-Jun-24 26-Nov-24 12-Dec-24 28-May-25 SAR857,826.63 SAR0.00 0% 0% 28-May-25, PART-A RAMP STA
FOUNDATION
FOUNDAT 42 12-Jun-24 05-Aug-24 12-Dec-24 30-Jan-25 SAR308,817.59 SAR0.00 0% 0% 30-Jan-25, FOUNDATION
PIERS 35 20-Jul-24 29-Aug-24 14-Jan-25 25-Feb-25 SAR77,204.40 SAR0.00 0% 0% 25-Feb-25, PIERS
RAMP SLAB
SL 75 21-Aug-24 18-Nov-24 17-Feb-25 20-May-25 SAR437,491.58 SAR0.00 0% 0% 20-May-25, RAMP SLAB
MSE WWALL STA 0+000 ~ STA 0+024 68 29-Aug-24 18-Nov-24 25-Feb-25 20-May-25 SAR115,806.60 SAR0.00 0% 0% 20-May-25, MSE WALL STA 0+
BASE PAD
BA 39 29-Aug-24 15-Oct-24 25-Feb-25 16-Apr-25 SAR90,071.80 SAR0.00 0% 0% 16-Apr-25, BASE PAD
MSE WALL CONSTRUCTION
MS 29 15-Oct-24 18-Nov-24 16-Apr-25 20-May-25 SAR25,734.80 SAR0.00 0% 0% 20-May-25, MSE WALL CONS

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
70 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
FINISHING WORK
FINISHIN 7 18-Nov-24 26-Nov-24 20-May-25 28-May-25 SAR34,313.07 SAR0.00 0% 0% 28-May-25, FINISHING WORK
PART-B RAMP
RAM STA 0+086 ~ STA 0+0142 168 31-Jul-24 13-Feb-25 26-Jan-25 18-Aug-25 SAR857,826.63 SAR0.00 0% 0% 18-Aug-25, PART-B RAMP
FOUNDATION
FOUNDAT 42 31-Jul-24 18-Sep-24 26-Jan-25 16-Mar-25 SAR308,817.59 SAR0.00 0% 0% 16-Mar-25, FOUNDATION
PIERS 35 10-Sep-24 22-Oct-24 08-Mar-25 22-Apr-25 SAR77,204.40 SAR0.00 0% 0% 22-Apr-25, PIERS
RAMP SLAB
SL 98 14-Oct-24 04-Feb-25 14-Apr-25 10-Aug-25 SAR437,491.58 SAR0.00 0% 0% 10-Aug-25, RAMP SLAB
MSE WWALL STA 0+000 ~ STA 0+024 91 22-Oct-24 04-Feb-25 23-Apr-25 10-Aug-25 SAR115,806.60 SAR0.00 0% 0% 10-Aug-25, MSE WALL STA
BASE PAD
BA 39 22-Oct-24 07-Dec-24 23-Apr-25 11-Jun-25 SAR90,071.80 SAR0.00 0% 0% 11-Jun-25, BASE PAD
MSE WALL CONSTRUCTION
MS 29 02-Jan-25 04-Feb-25 07-Jul-25 10-Aug-25 SAR25,734.80 SAR0.00 0% 0% 10-Aug-25, MSE WALL CON
FINISHING WORK
FINISHIN 7 05-Feb-25 13-Feb-25 10-Aug-25 18-Aug-25 SAR34,313.07 SAR0.00 0% 0% 18-Aug-25, FINISHING WO
RAMP-4 316 05-Oct-24 16-Oct-25 05-Apr-25 18-Apr-26 SAR2,573,479.90 SAR0.00 0% 0% 18-Apr-26, RAMP-
PART-A RAMP
RAM STA 0+000 ~ STA 0+075 181 05-Oct-24 07-May-25 05-Apr-25 06-Nov-25 SAR857,826.63 SAR0.00 0% 0% 06-Nov-25, PART-A RAM
FOUNDATION
FOUNDAT 42 05-Oct-24 23-Nov-24 05-Apr-25 24-May-25 SAR308,817.59 SAR0.00 0% 0% 24-May-25, FOUNDATION
PIERS 31 14-Nov-24 21-Dec-24 15-May-25 24-Jun-25 SAR77,204.40 SAR0.00 0% 0% 24-Jun-25, PIERS
RAMP SLAB
SL 114 12-Dec-24 29-Apr-25 16-Jun-25 29-Oct-25 SAR437,491.58 SAR0.00 0% 0% 29-Oct-25, RAMP SLAB
MSE WWALL STA 0+000 ~ STA 0+024 107 21-Dec-24 29-Apr-25 25-Jun-25 29-Oct-25 SAR115,806.60 SAR0.00 0% 0% 29-Oct-25, MSE WALL S
BASE PAD
BA 39 21-Dec-24 04-Feb-25 25-Jun-25 10-Aug-25 SAR90,071.80 SAR0.00 0% 0% 10-Aug-25, BASE PAD
MSE WALL CONSTRUCTION
MS 29 22-Mar-25 29-Apr-25 25-Sep-25 29-Oct-25 SAR25,734.80 SAR0.00 0% 0% 29-Oct-25, MSE WALL C
FINISHING WORK
FINISHIN 7 29-Apr-25 07-May-25 29-Oct-25 06-Nov-25 SAR34,313.07 SAR0.00 0% 0% 06-Nov-25, FINISHING
PART-B RAMP
RAM STA 0+075 ~ STA 0+116 175 29-Dec-24 28-Jul-25 02-Jul-25 24-Jan-26 SAR857,826.63 SAR0.00 0% 0% 24-Jan-26, PART-B RA
FOUNDATION
FOUNDAT 42 29-Dec-24 16-Feb-25 02-Jul-25 20-Aug-25 SAR308,817.59 SAR0.00 0% 0% 20-Aug-25, FOUNDATION
PIERS 35 08-Feb-25 20-Mar-25 12-Aug-25 22-Sep-25 SAR77,204.40 SAR0.00 0% 0% 22-Sep-25, PIERS
RAMP SLAB
SL 105 12-Mar-25 20-Jul-25 14-Sep-25 15-Jan-26 SAR437,491.58 SAR0.00 0% 0% 15-Jan-26, RAMP SLA
MSE WWALL STA 0+000 ~ STA 0+024 98 20-Mar-25 20-Jul-25 24-Sep-25 15-Jan-26 SAR115,806.60 SAR0.00 0% 0% 15-Jan-26, MSE WALL
BASE PAD
BA 39 20-Mar-25 10-May-25 24-Sep-25 09-Nov-25 SAR90,071.80 SAR0.00 0% 0% 09-Nov-25, BASE PAD
MSE WALL CONSTRUCTION
MS 29 16-Jun-25 20-Jul-25 13-Dec-25 15-Jan-26 SAR25,734.80 SAR0.00 0% 0% 15-Jan-26, MSE WALL
FINISHING WORK
FINISHIN 7 20-Jul-25 28-Jul-25 15-Jan-26 24-Jan-26 SAR34,313.07 SAR0.00 0% 0% 24-Jan-26, FINISHING
PART-C RAMP
RAM STA 0+117 ~ STA 0+143 162 07-Apr-25 16-Oct-25 06-Oct-25 18-Apr-26 SAR857,826.63 SAR0.00 0% 0% 18-Apr-26, PART-C
FOUNDATION
FOUNDAT 42 07-Apr-25 26-May-25 06-Oct-25 24-Nov-25 SAR308,817.59 SAR0.00 0% 0% 24-Nov-25, FOUNDATI
PIERS 35 18-May-25 01-Jul-25 16-Nov-25 27-Dec-25 SAR77,204.40 SAR0.00 0% 0% 27-Dec-25, PIERS
RAMP SLAB
SL 91 23-Jun-25 08-Oct-25 18-Dec-25 09-Apr-26 SAR437,491.58 SAR0.00 0% 0% 09-Apr-26, RAMP S
MSE WWALL STA 0+000 ~ STA 0+024 84 01-Jul-25 08-Oct-25 28-Dec-25 09-Apr-26 SAR115,806.60 SAR0.00 0% 0% 09-Apr-26, MSE W
BASE PAD
BA 39 01-Jul-25 16-Aug-25 28-Dec-25 11-Feb-26 SAR90,071.80 SAR0.00 0% 0% 11-Feb-26, BASE PAD
MSE WALL CONSTRUCTION
MS 29 03-Sep-25 08-Oct-25 02-Mar-26 09-Apr-26 SAR25,734.80 SAR0.00 0% 0% 09-Apr-26, MSE W
FINISHING WORK
FINISHIN 7 08-Oct-25 16-Oct-25 09-Apr-26 18-Apr-26 SAR34,313.07 SAR0.00 0% 0% 18-Apr-26, FINISH
ROAD WORK 27 04-Sep-25 06-Oct-25 31-Mar-26 02-May-26 SAR1,594,996.00 SAR0.00 0% 0% 02-May-26, ROAD
ELEVATOR 107 15-Jun-25 18-Oct-25 04-Jan-26 13-May-26 SAR3,058,842.91 SAR0.00 0% 0% 13-May-26, ELEVA
BRIDGE NO.03 522 30-Sep-23 05-Oct-25 03-Nov-24 22-Jul-26 SAR19,703,704.84 SAR0.00 0.22% 0% 22-Jul-26, BRID
GEO-TECHNICA INVESTIGATION
GEO-TECHNICAL 56 30-Sep-23 03-Dec-23 03-Nov-24 07-Jan-25 SAR43,718.00 SAR0.00 100% 0% 07-Jan-25, GEO-TECHNICAL INVE
FOUNDATION 88 26-May-24 09-Sep-24 09-Mar-25 26-Jun-25 SAR2,299,866.17 SAR0.00 0% 0% 26-Jun-25, FOUNDATION
PIER 72 27-Aug-24 19-Nov-24 14-Jun-25 04-Sep-25 SAR188,595.95 SAR0.00 0% 0% 04-Sep-25, PIER
ABUTMENT AND WING WALL 79 27-Aug-24 27-Nov-24 14-Jun-25 13-Sep-25 SAR1,338,247.08 SAR0.00 0% 0% 13-Sep-25, ABUTMENT AN
BOX GIRDER 139 04-Nov-24 19-Apr-25 20-Aug-25 29-Jan-26 SAR5,710,464.92 SAR0.00 0% 0% 29-Jan-26, BOX GIRD
BARRIER 47 20-Mar-25 18-May-25 05-Jan-26 01-Mar-26 SAR345,721.42 SAR0.00 0% 0% 01-Mar-26, BARRIER
POST TENSION 20 11-May-25 02-Jun-25 21-Feb-26 16-Mar-26 SAR717,324.40 SAR0.00 0% 0% 16-Mar-26, POST TE
APPROACH 45 19-May-25 13-Jul-25 01-Mar-26 27-Apr-26 SAR1,702,386.85 SAR0.00 0% 0% 27-Apr-26, APPRO
DECK WATER PROOFING
P 18 03-Jun-25 26-Jun-25 16-Mar-26 11-Apr-26 SAR1,346,143.97 SAR0.00 0% 0% 11-Apr-26, DECK W
EXPANSION JOINTS
JO 8 14-Jul-25 22-Jul-25 27-Apr-26 06-May-26 SAR820,771.26 SAR0.00 0% 0% 06-May-26, EXPA
MSE WALL 113 19-May-25 01-Oct-25 01-Mar-26 19-Jul-26 SAR3,235,553.22 SAR0.00 0% 0% 19-Jul-26, MSE
BASE PAD 26 19-May-25 21-Jun-25 01-Mar-26 05-Apr-26 SAR466,554.63 SAR0.00 0% 0% 05-Apr-26, BASE P
MSE WALL CONSTRUCTION
CO 46 14-Jun-25 05-Aug-25 28-Mar-26 20-May-26 SAR1,576,480.41 SAR0.00 0% 0% 20-May-26, MSE
RETAINING WALL
WA 59 27-May-25 06-Aug-25 09-Mar-26 21-May-26 SAR834,400.06 SAR0.00 0% 0% 21-May-26, RETA
FRICTION SLAB
SLA 24 06-Aug-25 02-Sep-25 20-May-26 21-Jun-26 SAR140,131.59 SAR0.00 0% 0% 21-Jun-26, FRIC
BARRIER 31 26-Aug-25 01-Oct-25 13-Jun-26 19-Jul-26 SAR217,986.54 SAR0.00 0% 0% 19-Jul-26, BAR
ROAD WORK 27 03-Sep-25 05-Oct-25 21-Jun-26 22-Jul-26 SAR1,069,814.00 SAR0.00 0% 0% 22-Jul-26, ROA
ELEVATOR 94 03-Jun-25 24-Sep-25 16-Mar-26 12-Jul-26 SAR885,097.60 SAR0.00 0% 0% 12-Jul-26, ELEV
BRIDGE NO.04 529 30-Sep-23 27-Sep-25 03-Nov-24 30-Jul-26 SAR18,578,209.65 SAR0.00 0.21% 0% 30-Jul-26, BRID
GEO-TECHNICAL INVESTIGATION
GEO-TECHNICA 56 30-Sep-23 03-Dec-23 03-Nov-24 07-Jan-25 SAR39,744.00 SAR0.00 100% 0% 07-Jan-25, GEO-TECHNICAL INVE
FOUNDATION 95 23-Jan-24 15-May-24 07-Jan-25 03-May-25 SAR2,408,139.88 SAR0.00 0% 0% 03-May-25, FOUNDATION
PIER 75 02-May-24 01-Aug-24 19-Apr-25 19-Jul-25 SAR315,650.73 SAR0.00 0% 0% 19-Jul-25, PIER

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
71 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
ABUTMENT AND WING WALL 82 02-May-24 10-Aug-24 19-Apr-25 27-Jul-25 SAR1,126,101.73 SAR0.00 0% 0% 27-Jul-25, ABUTMENT AND
BOX GIRDER 132 15-Jul-24 16-Dec-24 30-Jun-25 02-Dec-25 SAR5,982,724.40 SAR0.00 0% 0% 02-Dec-25, BOX GIRDE
BARRIER 48 21-Nov-24 15-Jan-25 06-Nov-25 01-Jan-26 SAR346,582.87 SAR0.00 0% 0% 01-Jan-26, BARRIER
POST TENSION 20 16-Jan-25 08-Feb-25 01-Jan-26 25-Jan-26 SAR717,324.40 SAR0.00 0% 0% 25-Jan-26, POST TEN
APPROACH 45 09-Feb-25 06-Apr-25 25-Jan-26 18-Mar-26 SAR1,572,195.41 SAR0.00 0% 0% 18-Mar-26, APPROA
DECK WATER PROOFING
P 19 07-Apr-25 28-Apr-25 18-Mar-26 14-Apr-26 SAR1,327,264.59 SAR0.00 0% 0% 14-Apr-26, DECK W
EXPANSION JOINTS
JO 8 14-Jul-25 22-Jul-25 29-Jun-26 08-Jul-26 SAR707,883.86 SAR0.00 0% 0% 08-Jul-26, EXPA
MSE WALL 126 09-Feb-25 13-Jul-25 25-Jan-26 29-Jun-26 SAR2,176,942.19 SAR0.00 0% 0% 29-Jun-26, MSE
BASE PAD 26 09-Feb-25 10-Mar-25 25-Jan-26 24-Feb-26 SAR347,912.40 SAR0.00 0% 0% 24-Feb-26, BASE PA
MSE WALL CONSTRUCTION
CO 46 11-Mar-25 07-May-25 24-Feb-26 23-Apr-26 SAR990,548.13 SAR0.00 0% 0% 23-Apr-26, MSE W
RETAINING WALL
WA 63 17-Feb-25 05-May-25 02-Feb-26 21-Apr-26 SAR579,040.30 SAR0.00 0% 0% 21-Apr-26, RETAIN
FRICTION SLAB
SLA 24 08-May-25 04-Jun-25 23-Apr-26 21-May-26 SAR88,048.72 SAR0.00 0% 0% 21-May-26, FRIC
BARRIER 37 28-May-25 13-Jul-25 13-May-26 29-Jun-26 SAR171,392.64 SAR0.00 0% 0% 29-Jun-26, BAR
ELEVATOR 133 09-Jun-25 27-Sep-25 17-Feb-26 30-Jul-26 SAR1,857,655.60 SAR0.00 0% 0% 30-Jul-26, ELEV
ROAD WORK 27 14-Jul-25 13-Aug-25 29-Jun-26 30-Jul-26 SAR972,558.00 SAR0.00 0% 0% 30-Jul-26, ROA
EXTERNAL SURROUNDING
SURRO UTILITIES 1028 12-Nov-22 22-Apr-25 28-Sep-22 A 26-Mar-26 SAR310,278,273.88 SAR5,445,793.59 61.95% 1.76% 26-Mar-26, EXTERN
BESIDE ZONE 1 278 29-Nov-23 24-Nov-24 11-Sep-24 11-Aug-25 SAR5,409,130.15 SAR0.00 6.79% 0% 11-Aug-25, BESIDE ZONE 1
STATION 01 74 29-Nov-23 22-Feb-24 11-Sep-24 08-Dec-24 SAR1,081,826.03 SAR0.00 33.95% 0% 08-Dec-24, STATION 01
OUTSIDE WET C
CULVERT 52 29-Nov-23 28-Jan-24 11-Sep-24 12-Nov-24 SAR799,961.46 SAR0.00 45.91% 0% 12-Nov-24, OUTSIDE WET CULVERT
SEWER NETWORK
NETW 20 29-Nov-23 21-Dec-23 11-Sep-24 06-Oct-24 SAR453,406.62 SAR0.00 81% 0% 06-Oct-24, SEWER NETWORK
GREY WATER COLLECTION SYSTEM 28 23-Dec-23 23-Jan-24 06-Oct-24 07-Nov-24 SAR199,531.05 SAR0.00 0% 0% 07-Nov-24, GREY WATER COLLECTI
STORMWATER NETWORK 29 26-Dec-23 28-Jan-24 09-Oct-24 12-Nov-24 SAR147,023.79 SAR0.00 0% 0% 12-Nov-24, STORMWATER NETWOR
OUTSIDE DRY C
CULVERT 26 24-Jan-24 22-Feb-24 07-Nov-24 08-Dec-24 SAR281,864.57 SAR0.00 0% 0% 08-Dec-24, OUTSIDE DRY CULVERT
STREET LIGHTING
LIGHT 22 24-Jan-24 18-Feb-24 07-Nov-24 03-Dec-24 SAR136,157.30 SAR0.00 0% 0% 03-Dec-24, STREET LIGHTING
ELV NETWORK 22 29-Jan-24 22-Feb-24 12-Nov-24 08-Dec-24 SAR145,707.28 SAR0.00 0% 0% 08-Dec-24, ELV NETWORK
STATION 02 86 28-Feb-24 10-Jun-24 12-Dec-24 23-Mar-25 SAR1,081,826.03 SAR0.00 0% 0% 23-Mar-25, STATION 02
OUTSIDE WET C
CULVERT 64 28-Feb-24 15-May-24 12-Dec-24 25-Feb-25 SAR799,961.46 SAR0.00 0% 0% 25-Feb-25, OUTSIDE WET CULVE
SEWER NETWORK
NETW 20 28-Feb-24 21-Mar-24 12-Dec-24 05-Jan-25 SAR453,406.62 SAR0.00 0% 0% 05-Jan-25, SEWER NETWORK
GREY WATER COLLECTION SYSTEM 28 06-Apr-24 11-May-24 19-Jan-25 20-Feb-25 SAR199,531.05 SAR0.00 0% 0% 20-Feb-25, GREY WATER COLLE
STORMWATER NETWORK 29 13-Apr-24 15-May-24 22-Jan-25 25-Feb-25 SAR147,023.79 SAR0.00 0% 0% 25-Feb-25, STORMWATER NETW
OUTSIDE DRY C
CULVERT 26 12-May-24 10-Jun-24 20-Feb-25 23-Mar-25 SAR281,864.57 SAR0.00 0% 0% 23-Mar-25, OUTSIDE DRY CULV
STREET LIGHTING
LIGHT 22 12-May-24 05-Jun-24 20-Feb-25 18-Mar-25 SAR136,157.30 SAR0.00 0% 0% 18-Mar-25, STREET LIGHTING
ELV NETWORK 22 16-May-24 10-Jun-24 25-Feb-25 23-Mar-25 SAR145,707.28 SAR0.00 0% 0% 23-Mar-25, ELV NETWORK
STATION 03 95 02-Jun-24 04-Sep-24 09-Feb-25 04-Jun-25 SAR1,081,826.03 SAR0.00 0% 0% 04-Jun-25, STATION 03
OUTSIDE WET C
CULVERT 73 02-Jun-24 10-Aug-24 09-Feb-25 10-May-25 SAR799,961.46 SAR0.00 0% 0% 10-May-25, OUTSIDE WET CU
SEWER NETWORK
NETW 20 02-Jun-24 29-Jun-24 09-Feb-25 04-Mar-25 SAR453,406.62 SAR0.00 0% 0% 04-Mar-25, SEWER NETWORK
GREY WATER COLLECTION SYSTEM 28 04-Jul-24 05-Aug-24 29-Mar-25 05-May-25 SAR199,531.05 SAR0.00 0% 0% 05-May-25, GREY WATER COL
STORMWATER NETWORK 29 08-Jul-24 10-Aug-24 06-Apr-25 10-May-25 SAR147,023.79 SAR0.00 0% 0% 10-May-25, STORMWATER NE
OUTSIDE DRY C
CULVERT 26 06-Aug-24 04-Sep-24 05-May-25 04-Jun-25 SAR281,864.57 SAR0.00 0% 0% 04-Jun-25, OUTSIDE DRY CU
STREET LIGHTING
LIGHT 22 06-Aug-24 31-Aug-24 05-May-25 31-May-25 SAR136,157.30 SAR0.00 0% 0% 31-May-25, STREET LIGHTIN
ELV NETWORK 22 11-Aug-24 04-Sep-24 10-May-25 04-Jun-25 SAR145,707.28 SAR0.00 0% 0% 04-Jun-25, ELV NETWORK
STATION 04 95 31-Jul-24 19-Nov-24 14-Apr-25 06-Aug-25 SAR1,081,826.03 SAR0.00 0% 0% 06-Aug-25, STATION 04
OUTSIDE WET C
CULVERT 73 31-Jul-24 24-Oct-24 14-Apr-25 12-Jul-25 SAR799,961.46 SAR0.00 0% 0% 12-Jul-25, OUTSIDE WET CU
SEWER NETWORK
NETW 29 31-Jul-24 02-Sep-24 14-Apr-25 18-May-25 SAR453,406.62 SAR0.00 0% 0% 18-May-25, SEWER NETWORK
GREY WATER COLLECTION SYSTEM 28 17-Sep-24 20-Oct-24 01-Jun-25 07-Jul-25 SAR199,531.05 SAR0.00 0% 0% 07-Jul-25, GREY WATER CO
STORMWATER NETWORK 29 21-Sep-24 24-Oct-24 04-Jun-25 12-Jul-25 SAR147,023.79 SAR0.00 0% 0% 12-Jul-25, STORMWATER N
OUTSIDE DRY C
CULVERT 26 21-Oct-24 19-Nov-24 07-Jul-25 06-Aug-25 SAR281,864.57 SAR0.00 0% 0% 06-Aug-25, OUTSIDE DRY
STREET LIGHTING
LIGHT 22 21-Oct-24 14-Nov-24 07-Jul-25 02-Aug-25 SAR136,157.30 SAR0.00 0% 0% 02-Aug-25, STREET LIGHTI
ELV NETWORK 22 26-Oct-24 19-Nov-24 12-Jul-25 06-Aug-25 SAR145,707.28 SAR0.00 0% 0% 06-Aug-25, ELV NETWORK
STATION 05 101 29-Jul-24 24-Nov-24 12-Apr-25 11-Aug-25 SAR1,081,826.03 SAR0.00 0% 0% 11-Aug-25, STATION 05
OUTSIDE WET C
CULVERT 75 29-Jul-24 24-Oct-24 12-Apr-25 12-Jul-25 SAR799,961.46 SAR0.00 0% 0% 12-Jul-25, OUTSIDE WET CU
SEWER NETWORK
NETW 29 29-Jul-24 31-Aug-24 12-Apr-25 15-May-25 SAR453,406.62 SAR0.00 0% 0% 15-May-25, SEWER NETWORK
GREY WATER COLLECTION SYSTEM 28 17-Sep-24 20-Oct-24 01-Jun-25 07-Jul-25 SAR199,531.05 SAR0.00 0% 0% 07-Jul-25, GREY WATER CO
STORMWATER NETWORK 29 21-Sep-24 24-Oct-24 04-Jun-25 12-Jul-25 SAR147,023.79 SAR0.00 0% 0% 12-Jul-25, STORMWATER N
OUTSIDE DRY C
CULVERT 30 21-Oct-24 24-Nov-24 07-Jul-25 11-Aug-25 SAR281,864.57 SAR0.00 0% 0% 11-Aug-25, OUTSIDE DRY
STREET LIGHTING
LIGHT 26 21-Oct-24 19-Nov-24 07-Jul-25 06-Aug-25 SAR136,157.30 SAR0.00 0% 0% 06-Aug-25, STREET LIGHTI
ELV NETWORK 26 26-Oct-24 24-Nov-24 12-Jul-25 11-Aug-25 SAR145,707.28 SAR0.00 0% 0% 11-Aug-25, ELV NETWORK
BESIDE ZONE 2 334 02-Dec-23 24-Sep-24 08-Feb-24 13-Mar-25 SAR5,630,650.09 SAR0.00 6.04% 0% 13-Mar-25, BESIDE ZONE 2

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
72 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
STATION 01 83 02-Dec-23 06-Mar-24 12-Feb-24 22-May-24 SAR1,126,130.02 SAR0.00 30.2% 0% 22-May-24, STATION 01
OUTSIDE WET C
CULVERT 61 02-Dec-23 10-Feb-24 12-Feb-24 27-Apr-24 SAR873,406.90 SAR0.00 38.93% 0% 27-Apr-24, OUTSIDE WET CULVERT
SEWER NETWORK
NETW 29 02-Dec-23 03-Jan-24 12-Feb-24 17-Mar-24 SAR566,758.27 SAR0.00 60% 0% 17-Mar-24, SEWER NETWORK
GREY WATER COLLECTION SYSTEM 28 04-Jan-24 05-Feb-24 17-Mar-24 22-Apr-24 SAR159,624.84 SAR0.00 0% 0% 22-Apr-24, GREY WATER COLLECTION SYS
STORMWATER NETWORK 29 08-Jan-24 10-Feb-24 20-Mar-24 27-Apr-24 SAR147,023.79 SAR0.00 0% 0% 27-Apr-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 26 06-Feb-24 06-Mar-24 22-Apr-24 22-May-24 SAR252,723.12 SAR0.00 0% 0% 22-May-24, OUTSIDE DRY CULVERT
STREET LIGHTING
LIGHT 22 06-Feb-24 02-Mar-24 22-Apr-24 18-May-24 SAR136,157.30 SAR0.00 0% 0% 18-May-24, STREET LIGHTING
ELV NETWORK 22 11-Feb-24 06-Mar-24 27-Apr-24 22-May-24 SAR116,565.82 SAR0.00 0% 0% 22-May-24, ELV NETWORK
STATION 02 91 25-Jan-24 04-May-24 08-Feb-24 28-May-24 SAR1,126,130.02 SAR0.00 0% 0% 28-May-24, STATION 02
OUTSIDE WET C
CULVERT 69 25-Jan-24 04-Apr-24 08-Feb-24 02-May-24 SAR873,406.90 SAR0.00 0% 0% 02-May-24, OUTSIDE WET CULVERT
SEWER NETWORK
NETW 29 25-Jan-24 27-Feb-24 08-Feb-24 13-Mar-24 SAR566,758.27 SAR0.00 0% 0% 13-Mar-24, SEWER NETWORK
GREY WATER COLLECTION SYSTEM 28 28-Feb-24 31-Mar-24 23-Mar-24 28-Apr-24 SAR159,624.84 SAR0.00 0% 0% 28-Apr-24, GREY WATER COLLECTION SY
STORMWATER NETWORK 29 03-Mar-24 04-Apr-24 26-Mar-24 02-May-24 SAR147,023.79 SAR0.00 0% 0% 02-May-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 26 01-Apr-24 04-May-24 28-Apr-24 28-May-24 SAR252,723.12 SAR0.00 0% 0% 28-May-24, OUTSIDE DRY CULVERT
STREET LIGHTING
LIGHT 22 01-Apr-24 29-Apr-24 28-Apr-24 23-May-24 SAR136,157.30 SAR0.00 0% 0% 23-May-24, STREET LIGHTING
ELV NETWORK 22 06-Apr-24 04-May-24 02-May-24 28-May-24 SAR116,565.82 SAR0.00 0% 0% 28-May-24, ELV NETWORK
STATION 03 218 26-Mar-24 08-Jul-24 02-May-24 18-Jan-25 SAR1,126,130.02 SAR0.00 0% 0% 18-Jan-25, STATION 03
OUTSIDE WET C
CULVERT 196 26-Mar-24 08-Jun-24 02-May-24 23-Dec-24 SAR873,406.90 SAR0.00 0% 0% 23-Dec-24, OUTSIDE WET CULVER
SEWER NETWORK
NETW 29 26-Mar-24 01-May-24 02-May-24 05-Jun-24 SAR566,758.27 SAR0.00 0% 0% 05-Jun-24, SEWER NETWORK
GREY WATER COLLECTION SYSTEM 28 02-May-24 03-Jun-24 16-Nov-24 18-Dec-24 SAR159,624.84 SAR0.00 0% 0% 18-Dec-24, GREY WATER COLLECT
STORMWATER NETWORK 29 06-May-24 08-Jun-24 19-Nov-24 23-Dec-24 SAR147,023.79 SAR0.00 0% 0% 23-Dec-24, STORMWATER NETWO
OUTSIDE DRY C
CULVERT 26 04-Jun-24 08-Jul-24 18-Dec-24 18-Jan-25 SAR252,723.12 SAR0.00 0% 0% 18-Jan-25, OUTSIDE DRY CULVER
STREET LIGHTING
LIGHT 22 04-Jun-24 03-Jul-24 18-Dec-24 13-Jan-25 SAR136,157.30 SAR0.00 0% 0% 13-Jan-25, STREET LIGHTING
ELV NETWORK 22 09-Jun-24 08-Jul-24 23-Dec-24 18-Jan-25 SAR116,565.82 SAR0.00 0% 0% 18-Jan-25, ELV NETWORK
STATION 04 200 28-May-24 05-Sep-24 06-Jul-24 24-Feb-25 SAR1,126,130.02 SAR0.00 0% 0% 24-Feb-25, STATION 04
OUTSIDE WET C
CULVERT 178 28-May-24 11-Aug-24 06-Jul-24 29-Jan-25 SAR873,406.90 SAR0.00 0% 0% 29-Jan-25, OUTSIDE WET CULVER
SEWER NETWORK
NETW 29 28-May-24 04-Jul-24 06-Jul-24 08-Aug-24 SAR566,758.27 SAR0.00 0% 0% 08-Aug-24, SEWER NETWORK
GREY WATER COLLECTION SYSTEM 28 06-Jul-24 06-Aug-24 23-Dec-24 25-Jan-25 SAR159,624.84 SAR0.00 0% 0% 25-Jan-25, GREY WATER COLLEC
STORMWATER NETWORK 29 09-Jul-24 11-Aug-24 26-Dec-24 29-Jan-25 SAR147,023.79 SAR0.00 0% 0% 29-Jan-25, STORMWATER NETWO
OUTSIDE DRY C
CULVERT 26 07-Aug-24 05-Sep-24 25-Jan-25 24-Feb-25 SAR252,723.12 SAR0.00 0% 0% 24-Feb-25, OUTSIDE DRY CULVE
STREET LIGHTING
LIGHT 22 07-Aug-24 01-Sep-24 25-Jan-25 19-Feb-25 SAR136,157.30 SAR0.00 0% 0% 19-Feb-25, STREET LIGHTING
ELV NETWORK 22 12-Aug-24 05-Sep-24 29-Jan-25 24-Feb-25 SAR116,565.82 SAR0.00 0% 0% 24-Feb-25, ELV NETWORK
STATION 05 204 09-Jun-24 24-Sep-24 17-Jul-24 13-Mar-25 SAR1,126,130.02 SAR0.00 0% 0% 13-Mar-25, STATION 05
OUTSIDE WET C
CULVERT 182 09-Jun-24 28-Aug-24 17-Jul-24 16-Feb-25 SAR873,406.90 SAR0.00 0% 0% 16-Feb-25, OUTSIDE WET CULVE
SEWER NETWORK
NETW 29 09-Jun-24 16-Jul-24 17-Jul-24 20-Aug-24 SAR566,758.27 SAR0.00 0% 0% 20-Aug-24, SEWER NETWORK
GREY WATER COLLECTION SYSTEM 28 23-Jul-24 24-Aug-24 09-Jan-25 11-Feb-25 SAR159,624.84 SAR0.00 0% 0% 11-Feb-25, GREY WATER COLLEC
STORMWATER NETWORK 29 27-Jul-24 28-Aug-24 13-Jan-25 16-Feb-25 SAR147,023.79 SAR0.00 0% 0% 16-Feb-25, STORMWATER NETW
OUTSIDE DRY C
CULVERT 26 25-Aug-24 24-Sep-24 11-Feb-25 13-Mar-25 SAR252,723.12 SAR0.00 0% 0% 13-Mar-25, OUTSIDE DRY CULV
STREET LIGHTING
LIGHT 22 25-Aug-24 18-Sep-24 11-Feb-25 09-Mar-25 SAR136,157.30 SAR0.00 0% 0% 09-Mar-25, STREET LIGHTING
ELV NETWORK 22 29-Aug-24 24-Sep-24 16-Feb-25 13-Mar-25 SAR116,565.82 SAR0.00 0% 0% 13-Mar-25, ELV NETWORK
BESIDE ZONE 3 125 08-Feb-23 21-Aug-23 25-Feb-24 28-Jul-24 SAR6,207,254.34 SAR0.00 100% 0% 28-Jul-24, BESIDE ZONE 3
STATION 01 84 08-Feb-23 20-May-23 03-Apr-24 18-Jul-24 SAR2,069,084.78 SAR0.00 100% 0% 18-Jul-24, STATION 01
OUTSIDE WET C
CULVERT 62 08-Feb-23 20-Apr-23 03-Apr-24 23-Jun-24 SAR1,599,310.49 SAR0.00 100% 0% 23-Jun-24, OUTSIDE WET CULVERT
SEWER NETWORK
NETW 29 08-Feb-23 13-Mar-23 03-Apr-24 11-May-24 SAR755,677.70 SAR0.00 100% 0% 11-May-24, SEWER NETWORK
GREY WATER COLLECTION SYSTEM 28 15-Mar-23 16-Apr-23 12-May-24 13-Jun-24 SAR598,593.15 SAR0.00 100% 0% 13-Jun-24, GREY WATER COLLECTION SY
STORMWATER NETWORK 29 19-Mar-23 20-Apr-23 15-May-24 23-Jun-24 SAR245,039.65 SAR0.00 100% 0% 23-Jun-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 26 17-Apr-23 20-May-23 13-Jun-24 18-Jul-24 SAR469,774.29 SAR0.00 100% 0% 18-Jul-24, OUTSIDE DRY CULVERT
STREET LIGHTING
LIGHT 22 17-Apr-23 15-May-23 13-Jun-24 14-Jul-24 SAR226,928.83 SAR0.00 100% 0% 14-Jul-24, STREET LIGHTING
ELV NETWORK 22 25-Apr-23 20-May-23 23-Jun-24 18-Jul-24 SAR242,845.46 SAR0.00 100% 0% 18-Jul-24, ELV NETWORK
STATION 02 98 03-Apr-23 16-Jul-23 23-Mar-24 23-Jul-24 SAR2,069,084.78 SAR0.00 100% 0% 23-Jul-24, STATION 02
OUTSIDE WET C
CULVERT 62 03-Apr-23 17-Jun-23 23-Mar-24 06-Jun-24 SAR1,599,310.49 SAR0.00 100% 0% 06-Jun-24, OUTSIDE WET CULVERT
SEWER NETWORK
NETW 29 03-Apr-23 09-May-23 23-Mar-24 29-Apr-24 SAR755,677.70 SAR0.00 100% 0% 29-Apr-24, SEWER NETWORK
GREY WATER COLLECTION SYSTEM 28 11-May-23 12-Jun-23 30-Apr-24 02-Jun-24 SAR598,593.15 SAR0.00 100% 0% 02-Jun-24, GREY WATER COLLECTION SY
STORMWATER NETWORK 29 15-May-23 17-Jun-23 04-May-24 06-Jun-24 SAR245,039.65 SAR0.00 100% 0% 06-Jun-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 40 13-Jun-23 16-Jul-23 02-Jun-24 23-Jul-24 SAR469,774.29 SAR0.00 100% 0% 23-Jul-24, OUTSIDE DRY CULVERT
STREET LIGHTING
LIGHT 36 13-Jun-23 11-Jul-23 02-Jun-24 18-Jul-24 SAR226,928.83 SAR0.00 100% 0% 18-Jul-24, STREET LIGHTING
ELV NETWORK 36 18-Jun-23 16-Jul-23 06-Jun-24 23-Jul-24 SAR242,845.46 SAR0.00 100% 0% 23-Jul-24, ELV NETWORK
STATION 03 125 09-Apr-23 21-Aug-23 25-Feb-24 28-Jul-24 SAR2,069,084.78 SAR0.00 100% 0% 28-Jul-24, STATION 03

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
73 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
OUTSIDE WET C
CULVERT 88 09-Apr-23 26-Jul-23 25-Feb-24 10-Jun-24 SAR1,599,310.49 SAR0.00 100% 0% 10-Jun-24, OUTSIDE WET CULVERT
SEWER NETWORK
NETW 29 09-Apr-23 15-May-23 25-Feb-24 30-Mar-24 SAR755,677.70 SAR0.00 100% 0% 30-Mar-24, SEWER NETWORK
GREY WATER COLLECTION SYSTEM 28 17-Jun-23 22-Jul-23 04-May-24 05-Jun-24 SAR598,593.15 SAR0.00 100% 0% 05-Jun-24, GREY WATER COLLECTION SY
STORMWATER NETWORK 29 20-Jun-23 26-Jul-23 07-May-24 10-Jun-24 SAR245,039.65 SAR0.00 100% 0% 10-Jun-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 41 23-Jul-23 21-Aug-23 05-Jun-24 28-Jul-24 SAR469,774.29 SAR0.00 100% 0% 28-Jul-24, OUTSIDE DRY CULVERT
STREET LIGHTING
LIGHT 37 23-Jul-23 16-Aug-23 05-Jun-24 23-Jul-24 SAR226,928.83 SAR0.00 100% 0% 23-Jul-24, STREET LIGHTING
ELV NETWORK 37 27-Jul-23 21-Aug-23 10-Jun-24 28-Jul-24 SAR242,845.46 SAR0.00 100% 0% 28-Jul-24, ELV NETWORK
BESIDE ZONE 4 259 28-Sep-23 15-Aug-24 06-Mar-24 11-Jan-25 SAR5,031,367.06 SAR0.00 21.64% 0% 11-Jan-25, BESIDE ZONE 4
STATION 01 103 28-Sep-23 25-Jan-24 02-Apr-24 07-Aug-24 SAR1,006,273.41 SAR0.00 71.89% 0% 07-Aug-24, STATION 01
OUTSIDE WET C
CULVERT 81 28-Sep-23 31-Dec-23 02-Apr-24 13-Jul-24 SAR816,731.07 SAR0.00 88.57% 0% 13-Jul-24, OUTSIDE WET CULVERT
SEWER NETWORK
NETW 29 28-Sep-23 31-Oct-23 02-Apr-24 08-May-24 SAR510,082.44 SAR0.00 100% 0% 08-May-24, SEWER NETWORK
GREY WATER COLLECTION SYSTEM 28 25-Nov-23 26-Dec-23 02-Jun-24 08-Jul-24 SAR159,624.84 SAR0.00 74.67% 0% 08-Jul-24, GREY WATER COLLECTION SY
STORMWATER NETWORK 29 28-Nov-23 31-Dec-23 05-Jun-24 13-Jul-24 SAR147,023.79 SAR0.00 64% 0% 13-Jul-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 26 27-Dec-23 25-Jan-24 09-Jul-24 07-Aug-24 SAR189,542.34 SAR0.00 0% 0% 07-Aug-24, OUTSIDE DRY CULVERT
STREET LIGHTING
LIGHT 22 27-Dec-23 21-Jan-24 09-Jul-24 03-Aug-24 SAR102,117.97 SAR0.00 0% 0% 03-Aug-24, STREET LIGHTING
ELV NETWORK 22 01-Jan-24 25-Jan-24 14-Jul-24 07-Aug-24 SAR87,424.37 SAR0.00 0% 0% 07-Aug-24, ELV NETWORK
STATION 02 130 26-Nov-23 24-Mar-24 06-Mar-24 12-Aug-24 SAR1,006,273.41 SAR0.00 36.33% 0% 12-Aug-24, STATION 02
OUTSIDE WET C
CULVERT 81 26-Nov-23 27-Feb-24 06-Mar-24 11-Jun-24 SAR816,731.07 SAR0.00 44.76% 0% 11-Jun-24, OUTSIDE WET CULVERT
SEWER NETWORK
NETW 29 26-Nov-23 28-Dec-23 06-Mar-24 08-Apr-24 SAR510,082.44 SAR0.00 71.67% 0% 08-Apr-24, SEWER NETWORK
GREY WATER COLLECTION SYSTEM 28 22-Jan-24 22-Feb-24 06-May-24 06-Jun-24 SAR159,624.84 SAR0.00 0% 0% 06-Jun-24, GREY WATER COLLECTION SY
STORMWATER NETWORK 29 25-Jan-24 27-Feb-24 09-May-24 11-Jun-24 SAR147,023.79 SAR0.00 0% 0% 11-Jun-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 53 24-Feb-24 24-Mar-24 08-Jun-24 12-Aug-24 SAR189,542.34 SAR0.00 0% 0% 12-Aug-24, OUTSIDE DRY CULVERT
STREET LIGHTING
LIGHT 49 24-Feb-24 19-Mar-24 08-Jun-24 07-Aug-24 SAR102,117.97 SAR0.00 0% 0% 07-Aug-24, STREET LIGHTING
ELV NETWORK 49 28-Feb-24 24-Mar-24 12-Jun-24 12-Aug-24 SAR87,424.37 SAR0.00 0% 0% 12-Aug-24, ELV NETWORK
STATION 03 118 14-Jan-24 28-Apr-24 25-Mar-24 17-Aug-24 SAR1,006,273.41 SAR0.00 0% 0% 17-Aug-24, STATION 03
OUTSIDE WET C
CULVERT 66 14-Jan-24 30-Mar-24 25-Mar-24 12-Jun-24 SAR816,731.07 SAR0.00 0% 0% 12-Jun-24, OUTSIDE WET CULVERT
SEWER NETWORK
NETW 29 14-Jan-24 15-Feb-24 25-Mar-24 30-Apr-24 SAR510,082.44 SAR0.00 0% 0% 30-Apr-24, SEWER NETWORK
GREY WATER COLLECTION SYSTEM 28 22-Feb-24 25-Mar-24 07-May-24 08-Jun-24 SAR159,624.84 SAR0.00 0% 0% 08-Jun-24, GREY WATER COLLECTION SY
STORMWATER NETWORK 29 26-Feb-24 30-Mar-24 11-May-24 12-Jun-24 SAR147,023.79 SAR0.00 0% 0% 12-Jun-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 56 26-Mar-24 28-Apr-24 09-Jun-24 17-Aug-24 SAR189,542.34 SAR0.00 0% 0% 17-Aug-24, OUTSIDE DRY CULVERT
STREET LIGHTING
LIGHT 52 26-Mar-24 23-Apr-24 09-Jun-24 12-Aug-24 SAR102,117.97 SAR0.00 0% 0% 12-Aug-24, STREET LIGHTING
ELV NETWORK 52 31-Mar-24 28-Apr-24 13-Jun-24 17-Aug-24 SAR87,424.37 SAR0.00 0% 0% 17-Aug-24, ELV NETWORK
STATION 04 83 12-Mar-24 24-Jun-24 03-Jun-24 11-Sep-24 SAR1,006,273.41 SAR0.00 0% 0% 11-Sep-24, STATION 04
OUTSIDE WET C
CULVERT 61 12-Mar-24 25-May-24 03-Jun-24 17-Aug-24 SAR816,731.07 SAR0.00 0% 0% 17-Aug-24, OUTSIDE WET CULVERT
SEWER NETWORK
NETW 29 12-Mar-24 17-Apr-24 03-Jun-24 10-Jul-24 SAR510,082.44 SAR0.00 0% 0% 10-Jul-24, SEWER NETWORK
GREY WATER COLLECTION SYSTEM 28 18-Apr-24 20-May-24 11-Jul-24 12-Aug-24 SAR159,624.84 SAR0.00 0% 0% 12-Aug-24, GREY WATER COLLECTION
STORMWATER NETWORK 29 22-Apr-24 25-May-24 15-Jul-24 17-Aug-24 SAR147,023.79 SAR0.00 0% 0% 17-Aug-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 26 21-May-24 24-Jun-24 13-Aug-24 11-Sep-24 SAR189,542.34 SAR0.00 0% 0% 11-Sep-24, OUTSIDE DRY CULVERT
STREET LIGHTING
LIGHT 22 21-May-24 19-Jun-24 13-Aug-24 07-Sep-24 SAR102,117.97 SAR0.00 0% 0% 07-Sep-24, STREET LIGHTING
ELV NETWORK 22 26-May-24 24-Jun-24 18-Aug-24 11-Sep-24 SAR87,424.37 SAR0.00 0% 0% 11-Sep-24, ELV NETWORK
STATION 05 166 01-May-24 15-Aug-24 01-Jul-24 11-Jan-25 SAR1,006,273.41 SAR0.00 0% 0% 11-Jan-25, STATION 05
OUTSIDE WET C
CULVERT 144 01-May-24 21-Jul-24 01-Jul-24 16-Dec-24 SAR816,731.07 SAR0.00 0% 0% 16-Dec-24, OUTSIDE WET CULVER
SEWER NETWORK
NETW 29 01-May-24 03-Jun-24 01-Jul-24 03-Aug-24 SAR510,082.44 SAR0.00 0% 0% 03-Aug-24, SEWER NETWORK
GREY WATER COLLECTION SYSTEM 28 10-Jun-24 16-Jul-24 09-Nov-24 11-Dec-24 SAR159,624.84 SAR0.00 0% 0% 11-Dec-24, GREY WATER COLLECT
STORMWATER NETWORK 29 13-Jun-24 21-Jul-24 12-Nov-24 16-Dec-24 SAR147,023.79 SAR0.00 0% 0% 16-Dec-24, STORMWATER NETWO
OUTSIDE DRY C
CULVERT 26 17-Jul-24 15-Aug-24 11-Dec-24 11-Jan-25 SAR189,542.34 SAR0.00 0% 0% 11-Jan-25, OUTSIDE DRY CULVER
STREET LIGHTING
LIGHT 22 17-Jul-24 11-Aug-24 11-Dec-24 06-Jan-25 SAR102,117.97 SAR0.00 0% 0% 06-Jan-25, STREET LIGHTING
ELV NETWORK 22 22-Jul-24 15-Aug-24 16-Dec-24 11-Jan-25 SAR87,424.37 SAR0.00 0% 0% 11-Jan-25, ELV NETWORK
BESIDE ZONE 5 258 09-Sep-23 23-Jun-24 29-May-24 06-Apr-25 SAR4,349,947.97 SAR0.00 24.64% 0% 06-Apr-25, BESIDE ZONE 5
STATION 01 85 09-Sep-23 17-Dec-23 29-May-24 10-Sep-24 SAR1,087,486.99 SAR0.00 98.55% 0% 10-Sep-24, STATION 01
OUTSIDE WET C
CULVERT 63 09-Sep-23 21-Nov-23 29-May-24 15-Aug-24 SAR771,583.09 SAR0.00 100% 0% 15-Aug-24, OUTSIDE WET CULVERT
SEWER NETWORK
NETW 29 09-Sep-23 12-Oct-23 29-May-24 07-Jul-24 SAR495,913.49 SAR0.00 100% 0% 07-Jul-24, SEWER NETWORK
STORMWATER NETWORK 29 19-Oct-23 21-Nov-23 13-Jul-24 15-Aug-24 SAR275,669.61 SAR0.00 100% 0% 15-Aug-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 22 22-Nov-23 17-Dec-23 15-Aug-24 10-Sep-24 SAR315,903.90 SAR0.00 95% 0% 10-Sep-24, OUTSIDE DRY CULVERT
STREET LIGHTING
LIGHT 22 22-Nov-23 17-Dec-23 15-Aug-24 10-Sep-24 SAR170,196.62 SAR0.00 95% 0% 10-Sep-24, STREET LIGHTING
ELV NETWORK 22 22-Nov-23 17-Dec-23 15-Aug-24 10-Sep-24 SAR145,707.28 SAR0.00 95% 0% 10-Sep-24, ELV NETWORK
STATION 02 85 27-Dec-23 03-Apr-24 13-Oct-24 19-Jan-25 SAR1,087,486.99 SAR0.00 0% 0% 19-Jan-25, STATION 02
OUTSIDE WET C
CULVERT 63 27-Dec-23 09-Mar-24 13-Oct-24 24-Dec-24 SAR771,583.09 SAR0.00 0% 0% 24-Dec-24, OUTSIDE WET CULVER

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
74 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
SEWER NETWORK
NETW 29 27-Dec-23 29-Jan-24 13-Oct-24 14-Nov-24 SAR495,913.49 SAR0.00 0% 0% 14-Nov-24, SEWER NETWORK
STORMWATER NETWORK 29 05-Feb-24 09-Mar-24 21-Nov-24 24-Dec-24 SAR275,669.61 SAR0.00 0% 0% 24-Dec-24, STORMWATER NETWO
OUTSIDE DRY C
CULVERT 22 10-Mar-24 03-Apr-24 25-Dec-24 19-Jan-25 SAR315,903.90 SAR0.00 0% 0% 19-Jan-25, OUTSIDE DRY CULVER
STREET LIGHTING
LIGHT 22 10-Mar-24 03-Apr-24 25-Dec-24 19-Jan-25 SAR170,196.62 SAR0.00 0% 0% 19-Jan-25, STREET LIGHTING
ELV NETWORK 22 10-Mar-24 03-Apr-24 25-Dec-24 19-Jan-25 SAR145,707.28 SAR0.00 0% 0% 19-Jan-25, ELV NETWORK
STATION 03 83 03-Feb-24 12-May-24 19-Nov-24 23-Feb-25 SAR1,087,486.99 SAR0.00 0% 0% 23-Feb-25, STATION 03
OUTSIDE WET C
CULVERT 61 03-Feb-24 16-Apr-24 19-Nov-24 28-Jan-25 SAR771,583.09 SAR0.00 0% 0% 28-Jan-25, OUTSIDE WET CULVER
SEWER NETWORK
NETW 29 03-Feb-24 06-Mar-24 19-Nov-24 22-Dec-24 SAR495,913.49 SAR0.00 0% 0% 22-Dec-24, SEWER NETWORK
STORMWATER NETWORK 29 11-Mar-24 16-Apr-24 26-Dec-24 28-Jan-25 SAR275,669.61 SAR0.00 0% 0% 28-Jan-25, STORMWATER NETWO
OUTSIDE DRY C
CULVERT 22 17-Apr-24 12-May-24 29-Jan-25 23-Feb-25 SAR315,903.90 SAR0.00 0% 0% 23-Feb-25, OUTSIDE DRY CULVE
STREET LIGHTING
LIGHT 22 17-Apr-24 12-May-24 29-Jan-25 23-Feb-25 SAR170,196.62 SAR0.00 0% 0% 23-Feb-25, STREET LIGHTING
ELV NETWORK 22 17-Apr-24 12-May-24 29-Jan-25 23-Feb-25 SAR145,707.28 SAR0.00 0% 0% 23-Feb-25, ELV NETWORK
STATION 04 85 09-Mar-24 23-Jun-24 24-Dec-24 06-Apr-25 SAR1,087,486.99 SAR0.00 0% 0% 06-Apr-25, STATION 04
OUTSIDE WET C
CULVERT 63 09-Mar-24 23-May-24 24-Dec-24 06-Mar-25 SAR771,583.09 SAR0.00 0% 0% 06-Mar-25, OUTSIDE WET CULV
SEWER NETWORK
NETW 29 09-Mar-24 14-Apr-24 24-Dec-24 26-Jan-25 SAR495,913.49 SAR0.00 0% 0% 26-Jan-25, SEWER NETWORK
STORMWATER NETWORK 29 21-Apr-24 23-May-24 02-Feb-25 06-Mar-25 SAR275,669.61 SAR0.00 0% 0% 06-Mar-25, STORMWATER NETW
OUTSIDE DRY C
CULVERT 22 25-May-24 23-Jun-24 08-Mar-25 06-Apr-25 SAR315,903.90 SAR0.00 0% 0% 06-Apr-25, OUTSIDE DRY CULV
STREET LIGHTING
LIGHT 22 25-May-24 23-Jun-24 08-Mar-25 06-Apr-25 SAR170,196.62 SAR0.00 0% 0% 06-Apr-25, STREET LIGHTING
ELV NETWORK 22 25-May-24 23-Jun-24 08-Mar-25 06-Apr-25 SAR145,707.28 SAR0.00 0% 0% 06-Apr-25, ELV NETWORK
BESIDE ZONE 6 266 12-Jun-23 24-Apr-24 03-Sep-24 19-Jul-25 SAR8,412,905.73 SAR0.00 45.78% 0% 19-Jul-25, BESIDE ZONE 6
STATION 01 91 12-Jun-23 30-Sep-23 03-Sep-24 18-Dec-24 SAR2,103,226.43 SAR0.00 100% 0% 18-Dec-24, STATION 01
OUTSIDE WET C
CULVERT 74 12-Jun-23 09-Sep-23 03-Sep-24 28-Nov-24 SAR1,787,322.54 SAR0.00 100% 0% 28-Nov-24, OUTSIDE WET CULVER
POTABLE WATER
WAT NETWORK 25 27-Jul-23 24-Aug-23 16-Oct-24 13-Nov-24 SAR160,257.28 SAR0.00 100% 0% 13-Nov-24, POTABLE WATER NETW
IRRIGATION NETWORK
NE 26 31-Jul-23 29-Aug-23 20-Oct-24 18-Nov-24 SAR125,459.06 SAR0.00 100% 0% 18-Nov-24, IRRIGATION NETWORK
GREY WATER COLLECTION SYSTEM 30 31-Jul-23 03-Sep-23 20-Oct-24 23-Nov-24 SAR249,413.81 SAR0.00 100% 0% 23-Nov-24, GREY WATER COLLECT
GREY WATER DISTRIBUTION SYSTEM 25 03-Aug-23 31-Aug-23 23-Oct-24 20-Nov-24 SAR197,230.15 SAR0.00 100% 0% 20-Nov-24, GREY WATER DISTRIBU
SEWER NETWORK
NETW 29 12-Jun-23 18-Jul-23 03-Sep-24 07-Oct-24 SAR779,292.62 SAR0.00 100% 0% 07-Oct-24, SEWER NETWORK
STORMWATER NETWORK 29 07-Aug-23 09-Sep-23 27-Oct-24 28-Nov-24 SAR275,669.61 SAR0.00 100% 0% 28-Nov-24, STORMWATER NETWOR
OUTSIDE DRY C
CULVERT 24 02-Sep-23 30-Sep-23 21-Nov-24 18-Dec-24 SAR315,903.90 SAR0.00 100% 0% 18-Dec-24, OUTSIDE DRY CULVER
STREET LIGHTING
LIGHT 22 04-Sep-23 30-Sep-23 24-Nov-24 18-Dec-24 SAR170,196.62 SAR0.00 100% 0% 18-Dec-24, STREET LIGHTING
ELV NETWORK 22 02-Sep-23 27-Sep-23 21-Nov-24 16-Dec-24 SAR145,707.28 SAR0.00 100% 0% 16-Dec-24, ELV NETWORK
STATION 02 100 16-Sep-23 10-Jan-24 05-Dec-24 05-Apr-25 SAR2,103,226.43 SAR0.00 83.13% 0% 05-Apr-25, STATION 02
OUTSIDE WET C
CULVERT 82 16-Sep-23 20-Dec-23 05-Dec-24 10-Mar-25 SAR1,787,322.54 SAR0.00 97.82% 0% 10-Mar-25, OUTSIDE WET CULV
POTABLE WATER
WAT NETWORK 25 07-Nov-23 05-Dec-23 26-Jan-25 23-Feb-25 SAR160,257.28 SAR0.00 100% 0% 23-Feb-25, POTABLE WATER NET
IRRIGATION NETWORK
NE 26 11-Nov-23 10-Dec-23 29-Jan-25 27-Feb-25 SAR125,459.06 SAR0.00 100% 0% 27-Feb-25, IRRIGATION NETWO
GREY WATER COLLECTION SYSTEM 30 11-Nov-23 14-Dec-23 29-Jan-25 04-Mar-25 SAR249,413.81 SAR0.00 100% 0% 04-Mar-25, GREY WATER COLLE
GREY WATER DISTRIBUTION SYSTEM 28 14-Nov-23 16-Dec-23 02-Feb-25 05-Mar-25 SAR197,230.15 SAR0.00 97% 0% 05-Mar-25, GREY WATER DISTR
SEWER NETWORK
NETW 29 16-Sep-23 19-Oct-23 05-Dec-24 07-Jan-25 SAR779,292.62 SAR0.00 100% 0% 07-Jan-25, SEWER NETWORK
STORMWATER NETWORK 31 15-Nov-23 20-Dec-23 03-Feb-25 10-Mar-25 SAR275,669.61 SAR0.00 88% 0% 10-Mar-25, STORMWATER NETW
OUTSIDE DRY C
CULVERT 23 16-Dec-23 10-Jan-24 05-Mar-25 05-Apr-25 SAR315,903.90 SAR0.00 0% 0% 05-Apr-25, OUTSIDE DRY CULV
STREET LIGHTING
LIGHT 22 16-Dec-23 09-Jan-24 05-Mar-25 03-Apr-25 SAR170,196.62 SAR0.00 0% 0% 03-Apr-25, STREET LIGHTING
ELV NETWORK 22 17-Dec-23 10-Jan-24 06-Mar-25 05-Apr-25 SAR145,707.28 SAR0.00 0% 0% 05-Apr-25, ELV NETWORK
STATION 03 94 30-Dec-23 20-Apr-24 19-Mar-25 14-Jul-25 SAR2,103,226.43 SAR0.00 0% 0% 14-Jul-25, STATION 03
OUTSIDE WET C
CULVERT 72 30-Dec-23 21-Mar-24 19-Mar-25 18-Jun-25 SAR1,787,322.54 SAR0.00 0% 0% 18-Jun-25, OUTSIDE WET CU
POTABLE WATER
WAT NETWORK 25 01-Feb-24 29-Feb-24 27-Apr-25 25-May-25 SAR160,257.28 SAR0.00 0% 0% 25-May-25, POTABLE WATER
IRRIGATION NETWORK
NE 26 05-Feb-24 05-Mar-24 30-Apr-25 29-May-25 SAR125,459.06 SAR0.00 0% 0% 29-May-25, IRRIGATION NET
GREY WATER COLLECTION SYSTEM 30 05-Feb-24 10-Mar-24 30-Apr-25 03-Jun-25 SAR249,413.81 SAR0.00 0% 0% 03-Jun-25, GREY WATER COL
GREY WATER DISTRIBUTION SYSTEM 31 08-Feb-24 14-Mar-24 04-May-25 11-Jun-25 SAR197,230.15 SAR0.00 0% 0% 11-Jun-25, GREY WATER DIS
SEWER NETWORK
NETW 29 30-Dec-23 31-Jan-24 19-Mar-25 26-Apr-25 SAR779,292.62 SAR0.00 0% 0% 26-Apr-25, SEWER NETWORK
STORMWATER NETWORK 36 10-Feb-24 21-Mar-24 05-May-25 18-Jun-25 SAR275,669.61 SAR0.00 0% 0% 18-Jun-25, STORMWATER NE
OUTSIDE DRY C
CULVERT 32 11-Mar-24 20-Apr-24 04-Jun-25 14-Jul-25 SAR315,903.90 SAR0.00 0% 0% 14-Jul-25, OUTSIDE DRY CU
STREET LIGHTING
LIGHT 22 11-Mar-24 04-Apr-24 04-Jun-25 02-Jul-25 SAR170,196.62 SAR0.00 0% 0% 02-Jul-25, STREET LIGHTING
ELV NETWORK 22 23-Mar-24 20-Apr-24 19-Jun-25 14-Jul-25 SAR145,707.28 SAR0.00 0% 0% 14-Jul-25, ELV NETWORK
STATION 04 94 03-Jan-24 24-Apr-24 24-Mar-25 19-Jul-25 SAR2,103,226.43 SAR0.00 0% 0% 19-Jul-25, STATION 04
OUTSIDE WET C
CULVERT 70 03-Jan-24 24-Mar-24 24-Mar-25 21-Jun-25 SAR1,787,322.54 SAR0.00 0% 0% 21-Jun-25, OUTSIDE WET CU
POTABLE WATER
WAT NETWORK 25 06-Feb-24 05-Mar-24 01-May-25 29-May-25 SAR160,257.28 SAR0.00 0% 0% 29-May-25, POTABLE WATER
IRRIGATION NETWORK
NE 26 10-Feb-24 10-Mar-24 05-May-25 03-Jun-25 SAR125,459.06 SAR0.00 0% 0% 03-Jun-25, IRRIGATION NETW
GREY WATER COLLECTION SYSTEM 30 10-Feb-24 14-Mar-24 05-May-25 11-Jun-25 SAR249,413.81 SAR0.00 0% 0% 11-Jun-25, GREY WATER COL
GREY WATER DISTRIBUTION SYSTEM 31 13-Feb-24 19-Mar-24 08-May-25 16-Jun-25 SAR197,230.15 SAR0.00 0% 0% 16-Jun-25, GREY WATER DIS

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
75 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
SEWER NETWORK
NETW 29 03-Jan-24 05-Feb-24 24-Mar-25 30-Apr-25 SAR779,292.62 SAR0.00 0% 0% 30-Apr-25, SEWER NETWORK
STORMWATER NETWORK 34 14-Feb-24 24-Mar-24 10-May-25 21-Jun-25 SAR275,669.61 SAR0.00 0% 0% 21-Jun-25, STORMWATER NE
OUTSIDE DRY C
CULVERT 32 16-Mar-24 24-Apr-24 12-Jun-25 19-Jul-25 SAR315,903.90 SAR0.00 0% 0% 19-Jul-25, OUTSIDE DRY CU
STREET LIGHTING
LIGHT 22 16-Mar-24 13-Apr-24 12-Jun-25 07-Jul-25 SAR170,196.62 SAR0.00 0% 0% 07-Jul-25, STREET LIGHTIN
ELV NETWORK 28 20-Mar-24 24-Apr-24 17-Jun-25 19-Jul-25 SAR145,707.28 SAR0.00 0% 0% 19-Jul-25, ELV NETWORK
BESIDE ZONE 7 449 02-Nov-23 22-Apr-25 02-Oct-24 18-Mar-26 SAR8,669,522.03 SAR0.00 7.35% 0% 18-Mar-26, BESIDE
STATION 01 313 02-Nov-23 10-Nov-24 02-Oct-24 11-Oct-25 SAR2,167,380.51 SAR0.00 29.42% 0% 11-Oct-25, STATION 01
OUTSIDE WET C
CULVERT 191 02-Nov-23 19-Jun-24 02-Oct-24 17-May-25 SAR1,543,644.51 SAR0.00 41.31% 0% 17-May-25, OUTSIDE WET CU
POTABLE WATER
WAT NETWORK 25 06-May-24 03-Jun-24 07-Apr-25 05-May-25 SAR160,257.28 SAR0.00 0% 0% 05-May-25, POTABLE WATER N
IRRIGATION NETWORK
NE 26 09-May-24 08-Jun-24 10-Apr-25 10-May-25 SAR102,555.09 SAR0.00 0% 0% 10-May-25, IRRIGATION NETW
SEWER NETWORK
NETW 29 02-Nov-23 05-Dec-23 02-Oct-24 04-Nov-24 SAR637,603.06 SAR0.00 100% 0% 04-Nov-24, SEWER NETWORK
STORMWATER NETWORK 29 13-May-24 19-Jun-24 14-Apr-25 17-May-25 SAR643,229.08 SAR0.00 0% 0% 17-May-25, STORMWATER NE
OUTSIDE DRY C
CULVERT 132 04-Jun-24 10-Nov-24 06-May-25 11-Oct-25 SAR623,736.00 SAR0.00 0% 0% 11-Oct-25, OUTSIDE DRY
HIGH VOLTAGE NETWORK 107 04-Jun-24 12-Oct-24 06-May-25 10-Sep-25 SAR74,331.19 SAR0.00 0% 0% 10-Sep-25, HIGH VOLTAG
STREET LIGHTING
LIGHT 22 09-Jun-24 08-Jul-24 11-May-25 04-Jun-25 SAR127,647.47 SAR0.00 0% 0% 04-Jun-25, STREET LIGHTING
MEDIUM VOLTAGE
VOLTA NETWORK 107 20-Jun-24 23-Oct-24 18-May-25 22-Sep-25 SAR259,286.08 SAR0.00 0% 0% 22-Sep-25, MEDIUM VOL
LOW VOLTAGE NETWORK 107 08-Jul-24 10-Nov-24 04-Jun-25 11-Oct-25 SAR53,190.80 SAR0.00 0% 0% 11-Oct-25, LOW VOLTAG
ELV NETWORK 22 12-Jun-24 11-Jul-24 14-May-25 11-Jun-25 SAR109,280.46 SAR0.00 0% 0% 11-Jun-25, ELV NETWORK
STATION 02 245 01-Apr-24 20-Jan-25 02-Mar-25 21-Dec-25 SAR2,167,380.51 SAR0.00 0% 0% 21-Dec-25, STATION 0
OUTSIDE WET C
CULVERT 119 01-Apr-24 25-Aug-24 02-Mar-25 26-Jul-25 SAR1,543,644.51 SAR0.00 0% 0% 26-Jul-25, OUTSIDE WET C
POTABLE WATER
WAT NETWORK 25 16-Jul-24 13-Aug-24 16-Jun-25 14-Jul-25 SAR160,257.28 SAR0.00 0% 0% 14-Jul-25, POTABLE WATER
IRRIGATION NETWORK
NE 26 20-Jul-24 18-Aug-24 19-Jun-25 19-Jul-25 SAR102,555.09 SAR0.00 0% 0% 19-Jul-25, IRRIGATION NET
SEWER NETWORK
NETW 29 01-Apr-24 07-May-24 02-Mar-25 08-Apr-25 SAR637,603.06 SAR0.00 0% 0% 08-Apr-25, SEWER NETWORK
STORMWATER NETWORK 29 23-Jul-24 25-Aug-24 23-Jun-25 26-Jul-25 SAR643,229.08 SAR0.00 0% 0% 26-Jul-25, STORMWATER N
OUTSIDE DRY C
CULVERT 155 23-Jul-24 20-Jan-25 23-Jun-25 21-Dec-25 SAR623,736.00 SAR0.00 0% 0% 21-Dec-25, OUTSIDE D
HIGH VOLTAGE NETWORK 107 19-Aug-24 22-Dec-24 20-Jul-25 22-Nov-25 SAR74,331.19 SAR0.00 0% 0% 22-Nov-25, HIGH VOLT
STREET LIGHTING
LIGHT 22 23-Jul-24 17-Aug-24 23-Jun-25 17-Jul-25 SAR127,647.47 SAR0.00 0% 0% 17-Jul-25, STREET LIGHTIN
MEDIUM VOLTAGE
VOLTA NETWORK 107 28-Jul-24 30-Nov-24 28-Jun-25 30-Oct-25 SAR259,286.08 SAR0.00 0% 0% 30-Oct-25, MEDIUM VO
LOW VOLTAGE NETWORK 107 17-Sep-24 20-Jan-25 18-Aug-25 21-Dec-25 SAR53,190.80 SAR0.00 0% 0% 21-Dec-25, LOW VOLT
ELV NETWORK 40 27-Jul-24 10-Sep-24 26-Jun-25 11-Aug-25 SAR109,280.46 SAR0.00 0% 0% 11-Aug-25, ELV NETWORK
STATION 03 261 02-Jun-24 12-Apr-25 04-May-25 08-Mar-26 SAR2,167,380.51 SAR0.00 0% 0% 08-Mar-26, STATION
OUTSIDE WET C
CULVERT 154 02-Jun-24 03-Dec-24 04-May-25 03-Nov-25 SAR1,543,644.51 SAR0.00 0% 0% 03-Nov-25, OUTSIDE W
POTABLE WATER
WAT NETWORK 25 24-Oct-24 21-Nov-24 24-Sep-25 22-Oct-25 SAR160,257.28 SAR0.00 0% 0% 22-Oct-25, POTABLE WA
IRRIGATION NETWORK
NE 26 28-Oct-24 26-Nov-24 28-Sep-25 27-Oct-25 SAR102,555.09 SAR0.00 0% 0% 27-Oct-25, IRRIGATION
SEWER NETWORK
NETW 29 02-Jun-24 09-Jul-24 04-May-25 09-Jun-25 SAR637,603.06 SAR0.00 0% 0% 09-Jun-25, SEWER NETWORK
STORMWATER NETWORK 29 31-Oct-24 03-Dec-24 01-Oct-25 03-Nov-25 SAR643,229.08 SAR0.00 0% 0% 03-Nov-25, STORMWAT
OUTSIDE DRY C
CULVERT 117 23-Nov-24 12-Apr-25 23-Oct-25 08-Mar-26 SAR623,736.00 SAR0.00 0% 0% 08-Mar-26, OUTSID
HIGH VOLTAGE NETWORK 107 23-Nov-24 26-Mar-25 23-Oct-25 24-Feb-26 SAR74,331.19 SAR0.00 0% 0% 24-Feb-26, HIGH VO
STREET LIGHTING
LIGHT 22 27-Nov-24 22-Dec-24 28-Oct-25 22-Nov-25 SAR127,647.47 SAR0.00 0% 0% 22-Nov-25, STREET LIG
MEDIUM VOLTAGE
VOLTA NETWORK 107 04-Dec-24 12-Apr-25 04-Nov-25 08-Mar-26 SAR259,286.08 SAR0.00 0% 0% 08-Mar-26, MEDIUM
LOW VOLTAGE NETWORK 107 04-Dec-24 12-Apr-25 04-Nov-25 08-Mar-26 SAR53,190.80 SAR0.00 0% 0% 08-Mar-26, LOW VO
ELV NETWORK 22 22-Dec-24 15-Jan-25 22-Nov-25 16-Dec-25 SAR109,280.46 SAR0.00 0% 0% 16-Dec-25, ELV NETW
STATION 04 185 14-Sep-24 22-Apr-25 14-Aug-25 18-Mar-26 SAR2,167,380.51 SAR0.00 0% 0% 18-Mar-26, STATION
OUTSIDE WET C
CULVERT 88 14-Sep-24 25-Dec-24 14-Aug-25 25-Nov-25 SAR1,543,644.51 SAR0.00 0% 0% 25-Nov-25, OUTSIDE W
POTABLE WATER
WAT NETWORK 25 16-Nov-24 14-Dec-24 16-Oct-25 13-Nov-25 SAR160,257.28 SAR0.00 0% 0% 13-Nov-25, POTABLE W
IRRIGATION NETWORK
NE 26 19-Nov-24 18-Dec-24 20-Oct-25 18-Nov-25 SAR102,555.09 SAR0.00 0% 0% 18-Nov-25, IRRIGATION
SEWER NETWORK
NETW 29 14-Sep-24 17-Oct-24 14-Aug-25 16-Sep-25 SAR637,603.06 SAR0.00 0% 0% 16-Sep-25, SEWER NETW
STORMWATER NETWORK 29 23-Nov-24 25-Dec-24 23-Oct-25 25-Nov-25 SAR643,229.08 SAR0.00 0% 0% 25-Nov-25, STORMWAT
OUTSIDE DRY C
CULVERT 126 23-Nov-24 22-Apr-25 23-Oct-25 18-Mar-26 SAR623,736.00 SAR0.00 0% 0% 18-Mar-26, OUTSID
HIGH VOLTAGE NETWORK 107 15-Dec-24 22-Apr-25 15-Nov-25 18-Mar-26 SAR74,331.19 SAR0.00 0% 0% 18-Mar-26, HIGH V
STREET LIGHTING
LIGHT 30 23-Nov-24 26-Dec-24 23-Oct-25 26-Nov-25 SAR127,647.47 SAR0.00 0% 0% 26-Nov-25, STREET LIG
MEDIUM VOLTAGE
VOLTA NETWORK 92 26-Dec-24 16-Apr-25 26-Nov-25 12-Mar-26 SAR259,286.08 SAR0.00 0% 0% 12-Mar-26, MEDIUM
LOW VOLTAGE NETWORK 77 13-Jan-25 16-Apr-25 14-Dec-25 12-Mar-26 SAR53,190.80 SAR0.00 0% 0% 12-Mar-26, LOW VO
ELV NETWORK 48 26-Nov-24 20-Jan-25 27-Oct-25 21-Dec-25 SAR109,280.46 SAR0.00 0% 0% 21-Dec-25, ELV NETW
BESIDE ZONE 8 537 15-Mar-23 08-Jan-25 06-Jun-24 10-Mar-26 SAR8,374,830.13 SAR0.00 33.79% 0% 10-Mar-26, BESIDE
STATION 01 186 19-Sep-23 27-Apr-24 07-Dec-24 20-Jul-25 SAR1,674,966.03 SAR0.00 71.81% 0% 20-Jul-25, STATION 01
OUTSIDE WET C
CULVERT 64 19-Sep-23 03-Dec-23 07-Dec-24 19-Feb-25 SAR896,152.97 SAR0.00 100% 0% 19-Feb-25, OUTSIDE WET CULVE
POTABLE WATER
WAT NETWORK 25 24-Oct-23 21-Nov-23 09-Jan-25 08-Feb-25 SAR85,470.55 SAR0.00 100% 0% 08-Feb-25, POTABLE WATER NET
IRRIGATION NETWORK
NE 26 28-Oct-23 26-Nov-23 13-Jan-25 12-Feb-25 SAR136,740.12 SAR0.00 100% 0% 12-Feb-25, IRRIGATION NETWOR

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
76 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
SEWER NETWORK
NETW 29 19-Sep-23 23-Oct-23 07-Dec-24 09-Jan-25 SAR453,406.62 SAR0.00 100% 0% 09-Jan-25, SEWER NETWORK
STORMWATER NETWORK 29 31-Oct-23 03-Dec-23 16-Jan-25 19-Feb-25 SAR220,535.69 SAR0.00 100% 0% 19-Feb-25, STORMWATER NETW
OUTSIDE DRY C
CULVERT 132 22-Nov-23 27-Apr-24 08-Feb-25 20-Jul-25 SAR778,813.06 SAR0.00 39.37% 0% 20-Jul-25, OUTSIDE DRY CU
HIGH VOLTAGE NETWORK 107 22-Nov-23 25-Mar-24 08-Feb-25 21-Jun-25 SAR64,870.86 SAR0.00 8% 0% 21-Jun-25, HIGH VOLTAGE N
STREET LIGHTING
LIGHT 22 27-Nov-23 21-Dec-23 12-Feb-25 10-Mar-25 SAR170,196.62 SAR0.00 85% 0% 10-Mar-25, STREET LIGHTING
MEDIUM VOLTAGE
VOLTA NETWORK 107 04-Dec-23 06-Apr-24 19-Feb-25 02-Jul-25 SAR276,571.82 SAR0.00 4% 0% 02-Jul-25, MEDIUM VOLTAG
LOW VOLTAGE NETWORK 107 21-Dec-23 27-Apr-24 09-Mar-25 20-Jul-25 SAR34,042.11 SAR0.00 0% 0% 20-Jul-25, LOW VOLTAGE N
ELV NETWORK 22 30-Nov-23 25-Dec-23 16-Feb-25 13-Mar-25 SAR233,131.64 SAR0.00 62.5% 0% 13-Mar-25, ELV NETWORK
STATION 02 192 18-Dec-23 29-Jul-24 12-Feb-25 04-Oct-25 SAR1,674,966.03 SAR0.00 0% 0% 04-Oct-25, STATION 02
OUTSIDE WET C
CULVERT 70 18-Dec-23 29-Feb-24 12-Feb-25 10-May-25 SAR896,152.97 SAR0.00 0% 0% 10-May-25, OUTSIDE WET CU
POTABLE WATER
WAT NETWORK 25 21-Jan-24 18-Feb-24 25-Mar-25 28-Apr-25 SAR85,470.55 SAR0.00 0% 0% 28-Apr-25, POTABLE WATER N
IRRIGATION NETWORK
NE 26 24-Jan-24 22-Feb-24 29-Mar-25 03-May-25 SAR136,740.12 SAR0.00 0% 0% 03-May-25, IRRIGATION NETW
SEWER NETWORK
NETW 29 18-Dec-23 20-Jan-24 12-Feb-25 18-Mar-25 SAR453,406.62 SAR0.00 0% 0% 18-Mar-25, SEWER NETWORK
STORMWATER NETWORK 29 28-Jan-24 29-Feb-24 06-Apr-25 10-May-25 SAR220,535.69 SAR0.00 0% 0% 10-May-25, STORMWATER NE
OUTSIDE DRY C
CULVERT 147 01-Feb-24 29-Jul-24 10-Apr-25 04-Oct-25 SAR778,813.06 SAR0.00 0% 0% 04-Oct-25, OUTSIDE DRY
HIGH VOLTAGE NETWORK 107 19-Feb-24 30-Jun-24 28-Apr-25 03-Sep-25 SAR64,870.86 SAR0.00 0% 0% 03-Sep-25, HIGH VOLTAG
STREET LIGHTING
LIGHT 22 24-Feb-24 19-Mar-24 03-May-25 28-May-25 SAR170,196.62 SAR0.00 0% 0% 28-May-25, STREET LIGHTIN
MEDIUM VOLTAGE
VOLTA NETWORK 107 01-Feb-24 08-Jun-24 10-Apr-25 17-Aug-25 SAR276,571.82 SAR0.00 0% 0% 17-Aug-25, MEDIUM VOLT
LOW VOLTAGE NETWORK 107 19-Mar-24 29-Jul-24 27-May-25 04-Oct-25 SAR34,042.11 SAR0.00 0% 0% 04-Oct-25, LOW VOLTAG
ELV NETWORK 22 27-Feb-24 23-Mar-24 06-May-25 01-Jun-25 SAR233,131.64 SAR0.00 0% 0% 01-Jun-25, ELV NETWORK
STATION 03 229 10-Dec-23 07-Sep-24 04-Feb-25 08-Nov-25 SAR1,674,966.03 SAR0.00 3.25% 0% 08-Nov-25, STATION 03
OUTSIDE WET C
CULVERT 122 10-Dec-23 30-Apr-24 04-Feb-25 05-Jul-25 SAR896,152.97 SAR0.00 6.07% 0% 05-Jul-25, OUTSIDE WET CU
POTABLE WATER
WAT NETWORK 25 18-Mar-24 18-Apr-24 21-May-25 23-Jun-25 SAR85,470.55 SAR0.00 0% 0% 23-Jun-25, POTABLE WATER
IRRIGATION NETWORK
NE 26 21-Mar-24 23-Apr-24 25-May-25 28-Jun-25 SAR136,740.12 SAR0.00 0% 0% 28-Jun-25, IRRIGATION NET
SEWER NETWORK
NETW 29 10-Dec-23 11-Jan-24 04-Feb-25 10-Mar-25 SAR453,406.62 SAR0.00 12% 0% 10-Mar-25, SEWER NETWORK
STORMWATER NETWORK 29 25-Mar-24 30-Apr-24 28-May-25 05-Jul-25 SAR220,535.69 SAR0.00 0% 0% 05-Jul-25, STORMWATER NE
OUTSIDE DRY C
CULVERT 117 20-Apr-24 07-Sep-24 23-Jun-25 08-Nov-25 SAR778,813.06 SAR0.00 0% 0% 08-Nov-25, OUTSIDE DR
HIGH VOLTAGE NETWORK 107 20-Apr-24 26-Aug-24 23-Jun-25 27-Oct-25 SAR64,870.86 SAR0.00 0% 0% 27-Oct-25, HIGH VOLTA
STREET LIGHTING
LIGHT 22 24-Apr-24 19-May-24 28-Jun-25 23-Jul-25 SAR170,196.62 SAR0.00 0% 0% 23-Jul-25, STREET LIGHTIN
MEDIUM VOLTAGE
VOLTA NETWORK 107 01-May-24 07-Sep-24 05-Jul-25 08-Nov-25 SAR276,571.82 SAR0.00 0% 0% 08-Nov-25, MEDIUM VO
LOW VOLTAGE NETWORK 107 01-May-24 07-Sep-24 05-Jul-25 08-Nov-25 SAR34,042.11 SAR0.00 0% 0% 08-Nov-25, LOW VOLTA
ELV NETWORK 22 19-May-24 12-Jun-24 22-Jul-25 17-Aug-25 SAR233,131.64 SAR0.00 0% 0% 17-Aug-25, ELV NETWORK
STATION 04 178 02-Jun-24 31-Dec-24 05-Aug-25 02-Mar-26 SAR1,674,966.03 SAR0.00 0% 0% 02-Mar-26, STATION
OUTSIDE WET C
CULVERT 81 02-Jun-24 08-Sep-24 05-Aug-25 09-Nov-25 SAR896,152.97 SAR0.00 0% 0% 09-Nov-25, OUTSIDE W
POTABLE WATER
WAT NETWORK 25 30-Jul-24 27-Aug-24 29-Sep-25 28-Oct-25 SAR85,470.55 SAR0.00 0% 0% 28-Oct-25, POTABLE WA
IRRIGATION NETWORK
NE 26 03-Aug-24 01-Sep-24 02-Oct-25 02-Nov-25 SAR136,740.12 SAR0.00 0% 0% 02-Nov-25, IRRIGATION
SEWER NETWORK
NETW 29 02-Jun-24 09-Jul-24 05-Aug-25 08-Sep-25 SAR453,406.62 SAR0.00 0% 0% 08-Sep-25, SEWER NETW
STORMWATER NETWORK 29 06-Aug-24 08-Sep-24 06-Oct-25 09-Nov-25 SAR220,535.69 SAR0.00 0% 0% 09-Nov-25, STORMWAT
OUTSIDE DRY C
CULVERT 126 06-Aug-24 31-Dec-24 06-Oct-25 02-Mar-26 SAR778,813.06 SAR0.00 0% 0% 02-Mar-26, OUTSID
HIGH VOLTAGE NETWORK 107 28-Aug-24 31-Dec-24 28-Oct-25 02-Mar-26 SAR64,870.86 SAR0.00 0% 0% 02-Mar-26, HIGH VO
STREET LIGHTING
LIGHT 22 06-Aug-24 31-Aug-24 06-Oct-25 01-Nov-25 SAR170,196.62 SAR0.00 0% 0% 01-Nov-25, STREET LIG
MEDIUM VOLTAGE
VOLTA NETWORK 23 09-Sep-24 06-Oct-24 09-Nov-25 06-Dec-25 SAR276,571.82 SAR0.00 0% 0% 06-Dec-25, MEDIUM V
LOW VOLTAGE NETWORK 23 28-Sep-24 23-Oct-24 26-Nov-25 23-Dec-25 SAR34,042.11 SAR0.00 0% 0% 23-Dec-25, LOW VOLT
ELV NETWORK 22 10-Aug-24 03-Sep-24 09-Oct-25 04-Nov-25 SAR233,131.64 SAR0.00 0% 0% 04-Nov-25, ELV NETWO
STATION 05 537 15-Mar-23 08-Jan-25 06-Jun-24 10-Mar-26 SAR1,674,966.03 SAR0.00 93.91% 0% 10-Mar-26, STATION
OUTSIDE WET C
CULVERT 118 15-Mar-23 08-Jul-23 06-Jun-24 28-Oct-24 SAR896,152.97 SAR0.00 100% 0% 28-Oct-24, OUTSIDE WET CULVERT
POTABLE WATER
WAT NETWORK 25 25-May-23 22-Jun-23 16-Sep-24 16-Oct-24 SAR85,470.55 SAR0.00 100% 0% 16-Oct-24, POTABLE WATER NETWO
IRRIGATION NETWORK
NE 26 29-May-23 01-Jul-23 19-Sep-24 21-Oct-24 SAR136,740.12 SAR0.00 100% 0% 21-Oct-24, IRRIGATION NETWORK
SEWER NETWORK
NETW 29 15-Mar-23 17-Apr-23 06-Jun-24 15-Jul-24 SAR453,406.62 SAR0.00 100% 0% 15-Jul-24, SEWER NETWORK
STORMWATER NETWORK 29 01-Jun-23 08-Jul-23 24-Sep-24 28-Oct-24 SAR220,535.69 SAR0.00 100% 0% 28-Oct-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 429 24-Jun-23 08-Jan-25 16-Oct-24 10-Mar-26 SAR778,813.06 SAR0.00 86.9% 0% 10-Mar-26, OUTSID
HIGH VOLTAGE NETWORK 107 24-Jun-23 30-Oct-23 16-Oct-24 18-Feb-25 SAR64,870.86 SAR0.00 100% 0% 18-Feb-25, HIGH VOLTAGE NETW
STREET LIGHTING
LIGHT 318 02-Jul-23 04-Sep-24 21-Oct-24 05-Nov-25 SAR170,196.62 SAR0.00 90% 0% 05-Nov-25, STREET LIG
MEDIUM VOLTAGE
VOLTA NETWORK 353 09-Jul-23 23-Oct-24 28-Oct-24 23-Dec-25 SAR276,571.82 SAR0.00 90% 0% 23-Dec-25, MEDIUM V
LOW VOLTAGE NETWORK 107 05-Sep-24 08-Jan-25 05-Nov-25 10-Mar-26 SAR34,042.11 SAR0.00 0% 0% 10-Mar-26, LOW VO
ELV NETWORK 318 05-Jul-23 08-Sep-24 24-Oct-24 09-Nov-25 SAR233,131.64 SAR0.00 90% 0% 09-Nov-25, ELV NETWO
BESIDE ZONE 9 310 12-Jan-23 26-Dec-23 19-Mar-24 25-Mar-25 SAR8,409,097.51 SAR0.00 99.57% 0% 25-Mar-25, BESIDE ZONE 9
STATION 01 188 12-Jan-23 26-Aug-23 19-Mar-24 02-Nov-24 SAR2,102,274.38 SAR0.00 100% 0% 02-Nov-24, STATION 01
OUTSIDE WET C
CULVERT 81 12-Jan-23 16-Apr-23 19-Mar-24 29-Jun-24 SAR1,551,573.74 SAR0.00 100% 0% 29-Jun-24, OUTSIDE WET CULVERT

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
77 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
POTABLE WATER
WAT NETWORK 25 07-Mar-23 04-Apr-23 15-May-24 12-Jun-24 SAR160,257.28 SAR0.00 100% 0% 12-Jun-24, POTABLE WATER NETWORK
IRRIGATION NETWORK
NE 26 11-Mar-23 09-Apr-23 19-May-24 22-Jun-24 SAR136,740.12 SAR0.00 100% 0% 22-Jun-24, IRRIGATION NETWORK
GREY WATER COLLECTION SYSTEM 30 11-Mar-23 13-Apr-23 19-May-24 26-Jun-24 SAR249,413.81 SAR0.00 100% 0% 26-Jun-24, GREY WATER COLLECTION S
SEWER NETWORK
NETW 29 12-Jan-23 14-Feb-23 19-Mar-24 24-Apr-24 SAR637,603.06 SAR0.00 100% 0% 24-Apr-24, SEWER NETWORK
STORMWATER NETWORK 29 14-Mar-23 16-Apr-23 22-May-24 29-Jun-24 SAR367,559.48 SAR0.00 100% 0% 29-Jun-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 113 10-Apr-23 26-Aug-23 23-Jun-24 02-Nov-24 SAR550,700.64 SAR0.00 100% 0% 02-Nov-24, OUTSIDE DRY CULVERT
MEDIUM VOLTAGE
VOLTA NETWORK 107 17-Apr-23 26-Aug-23 30-Jun-24 02-Nov-24 SAR259,286.08 SAR0.00 100% 0% 02-Nov-24, MEDIUM VOLTAGE NET
ELV NETWORK 22 10-Apr-23 08-May-23 23-Jun-24 17-Jul-24 SAR291,414.55 SAR0.00 100% 0% 17-Jul-24, ELV NETWORK
STATION 02 196 19-Mar-23 02-Oct-23 27-May-24 15-Jan-25 SAR2,102,274.38 SAR0.00 100% 0% 15-Jan-25, STATION 02
OUTSIDE WET C
CULVERT 114 19-Mar-23 24-Jun-23 27-May-24 12-Oct-24 SAR1,551,573.74 SAR0.00 100% 0% 12-Oct-24, OUTSIDE WET CULVERT
POTABLE WATER
WAT NETWORK 25 15-May-23 12-Jun-23 31-Aug-24 30-Sep-24 SAR160,257.28 SAR0.00 100% 0% 30-Sep-24, POTABLE WATER NETWOR
IRRIGATION NETWORK
NE 26 18-May-23 17-Jun-23 03-Sep-24 05-Oct-24 SAR136,740.12 SAR0.00 100% 0% 05-Oct-24, IRRIGATION NETWORK
GREY WATER COLLECTION SYSTEM 28 18-May-23 19-Jun-23 03-Sep-24 07-Oct-24 SAR249,413.81 SAR0.00 100% 0% 07-Oct-24, GREY WATER COLLECTIO
SEWER NETWORK
NETW 29 19-Mar-23 20-Apr-23 27-May-24 03-Jul-24 SAR637,603.06 SAR0.00 100% 0% 03-Jul-24, SEWER NETWORK
STORMWATER NETWORK 29 22-May-23 24-Jun-23 07-Sep-24 12-Oct-24 SAR367,559.48 SAR0.00 100% 0% 12-Oct-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 107 27-May-23 02-Oct-23 11-Sep-24 15-Jan-25 SAR550,700.64 SAR0.00 100% 0% 15-Jan-25, OUTSIDE DRY CULVER
MEDIUM VOLTAGE
VOLTA NETWORK 107 27-May-23 02-Oct-23 11-Sep-24 15-Jan-25 SAR259,286.08 SAR0.00 100% 0% 15-Jan-25, MEDIUM VOLTAGE NE
ELV NETWORK 22 18-Jun-23 16-Jul-23 05-Oct-24 30-Oct-24 SAR291,414.55 SAR0.00 100% 0% 30-Oct-24, ELV NETWORK
STATION 03 202 17-May-23 21-Dec-23 27-Jul-24 20-Mar-25 SAR2,102,274.38 SAR0.00 99.51% 0% 20-Mar-25, STATION 03
OUTSIDE WET C
CULVERT 95 17-May-23 17-Aug-23 27-Jul-24 16-Nov-24 SAR1,551,573.74 SAR0.00 100% 0% 16-Nov-24, OUTSIDE WET CULVERT
POTABLE WATER
WAT NETWORK 25 09-Jul-23 06-Aug-23 06-Oct-24 04-Nov-24 SAR160,257.28 SAR0.00 100% 0% 04-Nov-24, POTABLE WATER NETW
GREY WATER COLLECTION SYSTEM 28 12-Jul-23 13-Aug-23 09-Oct-24 11-Nov-24 SAR249,413.81 SAR0.00 100% 0% 11-Nov-24, GREY WATER COLLECTI
IRRIGATION NETWORK
NE 26 12-Jul-23 10-Aug-23 09-Oct-24 09-Nov-24 SAR136,740.12 SAR0.00 100% 0% 09-Nov-24, IRRIGATION NETWORK
SEWER NETWORK
NETW 29 17-May-23 19-Jun-23 27-Jul-24 28-Aug-24 SAR637,603.06 SAR0.00 100% 0% 28-Aug-24, SEWER NETWORK
STORMWATER NETWORK 29 16-Jul-23 17-Aug-23 13-Oct-24 16-Nov-24 SAR367,559.48 SAR0.00 100% 0% 16-Nov-24, STORMWATER NETWOR
OUTSIDE DRY C
CULVERT 111 14-Aug-23 21-Dec-23 11-Nov-24 20-Mar-25 SAR550,700.64 SAR0.00 98.12% 0% 20-Mar-25, OUTSIDE DRY CULV
MEDIUM VOLTAGE
VOLTA NETWORK 107 19-Aug-23 21-Dec-23 16-Nov-24 20-Mar-25 SAR259,286.08 SAR0.00 96% 0% 20-Mar-25, MEDIUM VOLTAGE
ELV NETWORK 22 14-Aug-23 07-Sep-23 11-Nov-24 07-Dec-24 SAR291,414.55 SAR0.00 100% 0% 07-Dec-24, ELV NETWORK
STATION 04 177 20-Jun-23 26-Dec-23 29-Aug-24 25-Mar-25 SAR2,102,274.38 SAR0.00 98.77% 0% 25-Mar-25, STATION 04
OUTSIDE WET C
CULVERT 77 20-Jun-23 13-Sep-23 29-Aug-24 27-Nov-24 SAR1,551,573.74 SAR0.00 100% 0% 27-Nov-24, OUTSIDE WET CULVER
POTABLE WATER
WAT NETWORK 25 05-Aug-23 02-Sep-23 17-Oct-24 16-Nov-24 SAR160,257.28 SAR0.00 100% 0% 16-Nov-24, POTABLE WATER NETW
IRRIGATION NETWORK
NE 26 08-Aug-23 06-Sep-23 21-Oct-24 20-Nov-24 SAR136,740.12 SAR0.00 100% 0% 20-Nov-24, IRRIGATION NETWORK
GREY WATER COLLECTION SYSTEM 28 08-Aug-23 09-Sep-23 21-Oct-24 23-Nov-24 SAR249,413.81 SAR0.00 100% 0% 23-Nov-24, GREY WATER COLLECT
SEWER NETWORK
NETW 29 20-Jun-23 26-Jul-23 29-Aug-24 02-Oct-24 SAR637,603.06 SAR0.00 100% 0% 02-Oct-24, SEWER NETWORK
STORMWATER NETWORK 29 12-Aug-23 13-Sep-23 24-Oct-24 27-Nov-24 SAR367,559.48 SAR0.00 100% 0% 27-Nov-24, STORMWATER NETWOR
OUTSIDE DRY C
CULVERT 105 10-Sep-23 26-Dec-23 23-Nov-24 25-Mar-25 SAR550,700.64 SAR0.00 95.29% 0% 25-Mar-25, OUTSIDE DRY CULV
MEDIUM VOLTAGE
VOLTA NETWORK 101 14-Sep-23 26-Dec-23 27-Nov-24 25-Mar-25 SAR259,286.08 SAR0.00 90% 0% 25-Mar-25, MEDIUM VOLTAGE
ELV NETWORK 22 10-Sep-23 05-Oct-23 23-Nov-24 18-Dec-24 SAR291,414.55 SAR0.00 100% 0% 18-Dec-24, ELV NETWORK
CROWD CORRIDOR
CORRIDO NO.01 BESIDE ZONE 10 262 09-Jan-23 03-Jan-24 24-Jan-24 03-Dec-24 SAR11,189,243.75 SAR0.00 99.95% 0% 03-Dec-24, CROWD CORRIDOR NO
STATION 01 193 09-Jan-23 26-Jul-23 24-Jan-24 12-Sep-24 SAR2,797,310.94 SAR0.00 100% 0% 12-Sep-24, STATION 01
OUTSIDE WET C
CULVERT 95 09-Jan-23 27-Mar-23 24-Jan-24 16-May-24 SAR1,911,281.65 SAR0.00 100% 0% 16-May-24, OUTSIDE WET CULVERT
POTABLE WATER
WAT NETWORK 25 12-Feb-23 12-Mar-23 31-Mar-24 01-May-24 SAR160,257.28 SAR0.00 100% 0% 01-May-24, POTABLE WATER NETWORK
IRRIGATION NETWORK
NE 26 15-Feb-23 16-Mar-23 03-Apr-24 06-May-24 SAR205,110.17 SAR0.00 100% 0% 06-May-24, IRRIGATION NETWORK
GREY WATER COLLECTION SYSTEM 28 19-Feb-23 22-Mar-23 07-Apr-24 12-May-24 SAR399,062.10 SAR0.00 100% 0% 12-May-24, GREY WATER COLLECTION SY
SEWER NETWORK
NETW 29 09-Jan-23 11-Feb-23 24-Jan-24 26-Feb-24 SAR779,292.62 SAR0.00 100% 0% 26-Feb-24, SEWER NETWORK
STORMWATER NETWORK 32 19-Feb-23 27-Mar-23 07-Apr-24 16-May-24 SAR367,559.48 SAR0.00 100% 0% 16-May-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 111 13-Mar-23 26-Jul-23 02-May-24 12-Sep-24 SAR886,029.28 SAR0.00 100% 0% 12-Sep-24, OUTSIDE DRY CULVERT
LOW VOLTAGE NETWORK 107 13-Mar-23 22-Jul-23 02-May-24 08-Sep-24 SAR53,190.80 SAR0.00 100% 0% 08-Sep-24, LOW VOLTAGE NETWORK
MEDIUM VOLTAGE
VOLTA NETWORK 107 18-Mar-23 26-Jul-23 07-May-24 12-Sep-24 SAR432,143.47 SAR0.00 100% 0% 12-Sep-24, MEDIUM VOLTAGE NETW
ELV NETWORK 22 23-Mar-23 17-Apr-23 13-May-24 06-Jun-24 SAR400,695.01 SAR0.00 100% 0% 06-Jun-24, ELV NETWORK
STATION 02 208 08-Mar-23 24-Sep-23 24-Jan-24 01-Oct-24 SAR2,797,310.94 SAR0.00 100% 0% 01-Oct-24, STATION 02
OUTSIDE WET C
CULVERT 92 08-Mar-23 24-May-23 24-Jan-24 13-May-24 SAR1,911,281.65 SAR0.00 100% 0% 13-May-24, OUTSIDE WET CULVERT
POTABLE WATER
WAT NETWORK 25 11-Apr-23 13-May-23 31-Mar-24 01-May-24 SAR160,257.28 SAR0.00 100% 0% 01-May-24, POTABLE WATER NETWORK
IRRIGATION NETWORK
NE 26 15-Apr-23 17-May-23 03-Apr-24 06-May-24 SAR205,110.17 SAR0.00 100% 0% 06-May-24, IRRIGATION NETWORK
GREY WATER COLLECTION SYSTEM 28 18-Apr-23 23-May-23 07-Apr-24 12-May-24 SAR399,062.10 SAR0.00 100% 0% 12-May-24, GREY WATER COLLECTION SY
SEWER NETWORK
NETW 29 08-Mar-23 10-Apr-23 24-Jan-24 26-Feb-24 SAR779,292.62 SAR0.00 100% 0% 26-Feb-24, SEWER NETWORK
STORMWATER NETWORK 29 18-Apr-23 24-May-23 07-Apr-24 13-May-24 SAR367,559.48 SAR0.00 100% 0% 13-May-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 126 14-May-23 24-Sep-23 02-May-24 01-Oct-24 SAR886,029.28 SAR0.00 100% 0% 01-Oct-24, OUTSIDE DRY CULVERT
LOW VOLTAGE NETWORK 122 14-May-23 18-Sep-23 02-May-24 26-Sep-24 SAR53,190.80 SAR0.00 100% 0% 26-Sep-24, LOW VOLTAGE NETWORK

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
78 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
MEDIUM VOLTAGE
VOLTA NETWORK 122 18-May-23 24-Sep-23 07-May-24 01-Oct-24 SAR432,143.47 SAR0.00 100% 0% 01-Oct-24, MEDIUM VOLTAGE NETW
ELV NETWORK 26 24-May-23 18-Jun-23 13-May-24 11-Jun-24 SAR400,695.01 SAR0.00 100% 0% 11-Jun-24, ELV NETWORK
STATION 03 173 01-May-23 22-Nov-23 26-Mar-24 22-Oct-24 SAR2,797,310.94 SAR0.00 100% 0% 22-Oct-24, STATION 03
OUTSIDE WET C
CULVERT 66 01-May-23 19-Jul-23 26-Mar-24 13-Jun-24 SAR1,911,281.65 SAR0.00 100% 0% 13-Jun-24, OUTSIDE WET CULVERT
POTABLE WATER
WAT NETWORK 25 06-Jun-23 08-Jul-23 05-May-24 02-Jun-24 SAR160,257.28 SAR0.00 100% 0% 02-Jun-24, POTABLE WATER NETWORK
GREY WATER COLLECTION SYSTEM 28 14-Jun-23 19-Jul-23 13-May-24 13-Jun-24 SAR399,062.10 SAR0.00 100% 0% 13-Jun-24, GREY WATER COLLECTION SY
IRRIGATION NETWORK
NE 26 10-Jun-23 12-Jul-23 08-May-24 06-Jun-24 SAR205,110.17 SAR0.00 100% 0% 06-Jun-24, IRRIGATION NETWORK
SEWER NETWORK
NETW 29 01-May-23 03-Jun-23 26-Mar-24 01-May-24 SAR779,292.62 SAR0.00 100% 0% 01-May-24, SEWER NETWORK
STORMWATER NETWORK 29 13-Jun-23 19-Jul-23 12-May-24 13-Jun-24 SAR367,559.48 SAR0.00 100% 0% 13-Jun-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 117 09-Jul-23 22-Nov-23 03-Jun-24 22-Oct-24 SAR886,029.28 SAR0.00 100% 0% 22-Oct-24, OUTSIDE DRY CULVERT
LOW VOLTAGE NETWORK 110 09-Jul-23 11-Nov-23 03-Jun-24 14-Oct-24 SAR53,190.80 SAR0.00 100% 0% 14-Oct-24, LOW VOLTAGE NETWORK
MEDIUM VOLTAGE
VOLTA NETWORK 107 20-Jul-23 22-Nov-23 19-Jun-24 22-Oct-24 SAR432,143.47 SAR0.00 100% 0% 22-Oct-24, MEDIUM VOLTAGE NETW
ELV NETWORK 22 13-Jul-23 07-Aug-23 08-Jun-24 07-Jul-24 SAR400,695.01 SAR0.00 100% 0% 07-Jul-24, ELV NETWORK
STATION 04 166 20-Jun-23 03-Jan-24 19-May-24 03-Dec-24 SAR2,797,310.94 SAR0.00 99.79% 0% 03-Dec-24, STATION 04
OUTSIDE WET C
CULVERT 69 20-Jun-23 11-Sep-23 19-May-24 11-Aug-24 SAR1,911,281.65 SAR0.00 100% 0% 11-Aug-24, OUTSIDE WET CULVERT
POTABLE WATER
WAT NETWORK 25 02-Aug-23 30-Aug-23 02-Jul-24 30-Jul-24 SAR160,257.28 SAR0.00 100% 0% 30-Jul-24, POTABLE WATER NETWORK
IRRIGATION NETWORK
NE 26 06-Aug-23 04-Sep-23 06-Jul-24 04-Aug-24 SAR205,110.17 SAR0.00 100% 0% 04-Aug-24, IRRIGATION NETWORK
GREY WATER COLLECTION SYSTEM 28 09-Aug-23 10-Sep-23 09-Jul-24 10-Aug-24 SAR399,062.10 SAR0.00 100% 0% 10-Aug-24, GREY WATER COLLECTION
SEWER NETWORK
NETW 29 20-Jun-23 26-Jul-23 19-May-24 25-Jun-24 SAR779,292.62 SAR0.00 100% 0% 25-Jun-24, SEWER NETWORK
STORMWATER NETWORK 29 09-Aug-23 11-Sep-23 09-Jul-24 11-Aug-24 SAR367,559.48 SAR0.00 100% 0% 11-Aug-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 107 31-Aug-23 03-Jan-24 31-Jul-24 03-Dec-24 SAR886,029.28 SAR0.00 99.35% 0% 03-Dec-24, OUTSIDE DRY CULVERT
LOW VOLTAGE NETWORK 107 31-Aug-23 03-Jan-24 31-Jul-24 03-Dec-24 SAR53,190.80 SAR0.00 89.17% 0% 03-Dec-24, LOW VOLTAGE NETWO
MEDIUM VOLTAGE
VOLTA NETWORK 65 12-Sep-23 27-Nov-23 12-Aug-24 27-Oct-24 SAR432,143.47 SAR0.00 100% 0% 27-Oct-24, MEDIUM VOLTAGE NETW
ELV NETWORK 22 11-Sep-23 07-Oct-23 11-Aug-24 04-Sep-24 SAR400,695.01 SAR0.00 100% 0% 04-Sep-24, ELV NETWORK
CROWD CORRIDOR
CORRIDO NO.02 BESIDE ZONE 11 265 24-Sep-23 16-Oct-24 29-Feb-24 12-Jan-25 SAR11,273,293.05 SAR0.00 25.86% 0% 12-Jan-25, CROWD CORRIDOR NO
STATION 01 194 24-Sep-23 02-Apr-24 19-Mar-24 09-Nov-24 SAR2,818,323.26 SAR0.00 83.08% 0% 09-Nov-24, STATION 01
OUTSIDE WET C
CULVERT 93 24-Sep-23 06-Dec-23 19-Mar-24 13-Jul-24 SAR2,238,645.04 SAR0.00 100% 0% 13-Jul-24, OUTSIDE WET CULVERT
POTABLE WATER
WAT NETWORK 25 28-Oct-23 25-Nov-23 29-May-24 01-Jul-24 SAR106,838.19 SAR0.00 100% 0% 01-Jul-24, POTABLE WATER NETWORK
IRRIGATION NETWORK
NE 26 31-Oct-23 29-Nov-23 02-Jun-24 06-Jul-24 SAR239,295.20 SAR0.00 100% 0% 06-Jul-24, IRRIGATION NETWORK
GREY WATER COLLECTION SYSTEM 28 04-Nov-23 05-Dec-23 05-Jun-24 11-Jul-24 SAR448,944.86 SAR0.00 100% 0% 11-Jul-24, GREY WATER COLLECTION S
SEWER NETWORK
NETW 29 24-Sep-23 26-Oct-23 19-Mar-24 24-Apr-24 SAR708,447.84 SAR0.00 100% 0% 24-Apr-24, SEWER NETWORK
STORMWATER NETWORK 29 04-Nov-23 06-Dec-23 05-Jun-24 13-Jul-24 SAR735,118.95 SAR0.00 100% 0% 13-Jul-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 111 26-Nov-23 02-Apr-24 02-Jul-24 09-Nov-24 SAR579,678.22 SAR0.00 17.76% 0% 09-Nov-24, OUTSIDE DRY CULVERT
LOW VOLTAGE NETWORK 107 26-Nov-23 28-Mar-24 02-Jul-24 04-Nov-24 SAR42,552.64 SAR0.00 6.8% 0% 04-Nov-24, LOW VOLTAGE NETWOR
MEDIUM VOLTAGE
VOLTA NETWORK 107 30-Nov-23 02-Apr-24 07-Jul-24 09-Nov-24 SAR172,857.39 SAR0.00 5.2% 0% 09-Nov-24, MEDIUM VOLTAGE NET
ELV NETWORK 22 06-Dec-23 31-Dec-23 13-Jul-24 06-Aug-24 SAR364,268.19 SAR0.00 25% 0% 06-Aug-24, ELV NETWORK
STATION 02 225 21-Nov-23 03-Jun-24 29-Feb-24 26-Nov-24 SAR2,818,323.26 SAR0.00 20.36% 0% 26-Nov-24, STATION 02
OUTSIDE WET C
CULVERT 72 21-Nov-23 03-Feb-24 29-Feb-24 27-May-24 SAR2,238,645.04 SAR0.00 25.63% 0% 27-May-24, OUTSIDE WET CULVERT
POTABLE WATER
WAT NETWORK 25 25-Dec-23 22-Jan-24 16-Apr-24 15-May-24 SAR106,838.19 SAR0.00 0% 0% 15-May-24, POTABLE WATER NETWORK
IRRIGATION NETWORK
NE 26 28-Dec-23 27-Jan-24 20-Apr-24 20-May-24 SAR239,295.20 SAR0.00 0% 0% 20-May-24, IRRIGATION NETWORK
GREY WATER COLLECTION SYSTEM 28 01-Jan-24 01-Feb-24 23-Apr-24 26-May-24 SAR448,944.86 SAR0.00 0% 0% 26-May-24, GREY WATER COLLECTION SY
SEWER NETWORK
NETW 29 21-Nov-23 24-Dec-23 29-Feb-24 02-Apr-24 SAR708,447.84 SAR0.00 81% 0% 02-Apr-24, SEWER NETWORK
STORMWATER NETWORK 29 01-Jan-24 03-Feb-24 23-Apr-24 27-May-24 SAR735,118.95 SAR0.00 0% 0% 27-May-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 163 23-Jan-24 03-Jun-24 15-May-24 26-Nov-24 SAR579,678.22 SAR0.00 0% 0% 26-Nov-24, OUTSIDE DRY CULVERT
LOW VOLTAGE NETWORK 159 23-Jan-24 29-May-24 15-May-24 21-Nov-24 SAR42,552.64 SAR0.00 0% 0% 21-Nov-24, LOW VOLTAGE NETWO
MEDIUM VOLTAGE
VOLTA NETWORK 159 28-Jan-24 03-Jun-24 20-May-24 26-Nov-24 SAR172,857.39 SAR0.00 0% 0% 26-Nov-24, MEDIUM VOLTAGE NET
ELV NETWORK 63 03-Feb-24 27-Feb-24 26-May-24 11-Aug-24 SAR364,268.19 SAR0.00 0% 0% 11-Aug-24, ELV NETWORK
STATION 03 191 18-Jan-24 12-Aug-24 30-Apr-24 14-Dec-24 SAR2,818,323.26 SAR0.00 0% 0% 14-Dec-24, STATION 03
OUTSIDE WET C
CULVERT 64 18-Jan-24 01-Apr-24 30-Apr-24 17-Jul-24 SAR2,238,645.04 SAR0.00 0% 0% 17-Jul-24, OUTSIDE WET CULVERT
POTABLE WATER
WAT NETWORK 25 21-Feb-24 20-Mar-24 03-Jun-24 06-Jul-24 SAR106,838.19 SAR0.00 0% 0% 06-Jul-24, POTABLE WATER NETWORK
GREY WATER COLLECTION SYSTEM 28 29-Feb-24 01-Apr-24 11-Jun-24 17-Jul-24 SAR448,944.86 SAR0.00 0% 0% 17-Jul-24, GREY WATER COLLECTION S
IRRIGATION NETWORK
NE 26 25-Feb-24 25-Mar-24 06-Jun-24 10-Jul-24 SAR239,295.20 SAR0.00 0% 0% 10-Jul-24, IRRIGATION NETWORK
SEWER NETWORK
NETW 29 18-Jan-24 20-Feb-24 30-Apr-24 02-Jun-24 SAR708,447.84 SAR0.00 0% 0% 02-Jun-24, SEWER NETWORK
STORMWATER NETWORK 29 28-Feb-24 01-Apr-24 10-Jun-24 17-Jul-24 SAR735,118.95 SAR0.00 0% 0% 17-Jul-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 137 21-Mar-24 12-Aug-24 07-Jul-24 14-Dec-24 SAR579,678.22 SAR0.00 0% 0% 14-Dec-24, OUTSIDE DRY CULVER
LOW VOLTAGE NETWORK 133 21-Mar-24 31-Jul-24 07-Jul-24 09-Dec-24 SAR42,552.64 SAR0.00 0% 0% 09-Dec-24, LOW VOLTAGE NETWO
MEDIUM VOLTAGE
VOLTA NETWORK 127 02-Apr-24 12-Aug-24 18-Jul-24 14-Dec-24 SAR172,857.39 SAR0.00 0% 0% 14-Dec-24, MEDIUM VOLTAGE NET
ELV NETWORK 31 26-Mar-24 23-Apr-24 11-Jul-24 15-Aug-24 SAR364,268.19 SAR0.00 0% 0% 15-Aug-24, ELV NETWORK
STATION 04 176 17-Mar-24 16-Oct-24 20-Jun-24 12-Jan-25 SAR2,818,323.26 SAR0.00 0% 0% 12-Jan-25, STATION 04

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
79 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
OUTSIDE WET C
CULVERT 79 17-Mar-24 24-Jun-24 20-Jun-24 19-Sep-24 SAR2,238,645.04 SAR0.00 0% 0% 19-Sep-24, OUTSIDE WET CULVERT
POTABLE WATER
WAT NETWORK 25 11-May-24 08-Jun-24 11-Aug-24 08-Sep-24 SAR106,838.19 SAR0.00 0% 0% 08-Sep-24, POTABLE WATER NETWOR
IRRIGATION NETWORK
NE 26 14-May-24 12-Jun-24 14-Aug-24 12-Sep-24 SAR239,295.20 SAR0.00 0% 0% 12-Sep-24, IRRIGATION NETWORK
GREY WATER COLLECTION SYSTEM 28 18-May-24 23-Jun-24 18-Aug-24 18-Sep-24 SAR448,944.86 SAR0.00 0% 0% 18-Sep-24, GREY WATER COLLECTION
SEWER NETWORK
NETW 29 17-Mar-24 22-Apr-24 20-Jun-24 23-Jul-24 SAR708,447.84 SAR0.00 0% 0% 23-Jul-24, SEWER NETWORK
STORMWATER NETWORK 29 18-May-24 24-Jun-24 18-Aug-24 19-Sep-24 SAR735,118.95 SAR0.00 0% 0% 19-Sep-24, STORMWATER NETWORK
OUTSIDE DRY C
CULVERT 107 09-Jun-24 16-Oct-24 09-Sep-24 12-Jan-25 SAR579,678.22 SAR0.00 0% 0% 12-Jan-25, OUTSIDE DRY CULVER
LOW VOLTAGE NETWORK 107 09-Jun-24 16-Oct-24 09-Sep-24 12-Jan-25 SAR42,552.64 SAR0.00 0% 0% 12-Jan-25, LOW VOLTAGE NETWO
MEDIUM VOLTAGE
VOLTA NETWORK 82 13-Jun-24 17-Aug-24 14-Sep-24 18-Dec-24 SAR172,857.39 SAR0.00 0% 0% 18-Dec-24, MEDIUM VOLTAGE NE
ELV NETWORK 22 25-Jun-24 20-Jul-24 21-Sep-24 16-Oct-24 SAR364,268.19 SAR0.00 0% 0% 16-Oct-24, ELV NETWORK
CROWD CORRIDOR
CORRIDO NO.04 IN SUPERBLOCK 1 418 16-Jul-23 25-Nov-24 04-Sep-24 15-Jan-26 SAR17,333,713.83 SAR0.00 21.33% 0% 15-Jan-26, CROWD C
EXTERNAL WET UTILITIES 418 16-Jul-23 25-Nov-24 04-Sep-24 15-Jan-26 SAR14,934,728.17 SAR0.00 17.34% 0% 15-Jan-26, EXTERNAL
ENGINEERING 71 16-Jul-23 08-Oct-23 04-Sep-24 27-Nov-24 SAR0.00 SAR0.00 0% 0% 27-Nov-24, ENGINEERING
STORM WATER NETWORK 22 16-Jul-23 09-Aug-23 04-Sep-24 01-Oct-24 SAR0.00 SAR0.00 0% 0% 01-Oct-24, STORM WATER NETWORK
POTABLE WATER
WAT NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 22 27-Jul-23 21-Aug-23 16-Sep-24 13-Oct-24 SAR0.00 SAR0.00 0% 0% 13-Oct-24, POTABLE WATER NETWO
GREY WATER COLLECTION NETWORK 22 08-Aug-23 02-Sep-23 29-Sep-24 24-Oct-24 SAR0.00 SAR0.00 0% 0% 24-Oct-24, GREY WATER COLLECTIO
GREY WATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 21 20-Aug-23 13-Sep-23 10-Oct-24 04-Nov-24 SAR0.00 SAR0.00 0% 0% 04-Nov-24, GREY WATER DISTRIBU
IRR & FF NETWORK
NETW BRANCHES & TIE IN POINTS 21 31-Aug-23 26-Sep-23 22-Oct-24 16-Nov-24 SAR0.00 SAR0.00 0% 0% 16-Nov-24, IRR & FF NETWORK BR
CHILLED WATER
WATE SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 22 12-Sep-23 08-Oct-23 03-Nov-24 27-Nov-24 SAR0.00 SAR0.00 0% 0% 27-Nov-24, CHILLED WATER SUPPL
PROCURMENT 184 10-Aug-23 13-Mar-24 01-Oct-24 08-May-25 SAR2,103,634.82 SAR0.00 50.44% 0% 08-May-25, PROCURMENT
STORM WATER NETWORK 145 10-Aug-23 27-Jan-24 01-Oct-24 19-Mar-25 SAR605,392.09 SAR0.00 67.11% 0% 19-Mar-25, STORM WATER NET
RC PIPES 145 10-Aug-23 27-Jan-24 01-Oct-24 19-Mar-25 SAR151,348.02 SAR0.00 67.11% 0% 19-Mar-25, RC PIPES
GRP PIPES 145 10-Aug-23 27-Jan-24 01-Oct-24 19-Mar-25 SAR151,348.02 SAR0.00 67.11% 0% 19-Mar-25, GRP PIPES
PRECAST R.C
R MANHOLE 145 10-Aug-23 27-Jan-24 01-Oct-24 19-Mar-25 SAR151,348.02 SAR0.00 67.11% 0% 19-Mar-25, PRECAST R.C MANH
DI GULLIES 145 10-Aug-23 27-Jan-24 01-Oct-24 19-Mar-25 SAR151,348.02 SAR0.00 67.11% 0% 19-Mar-25, DI GULLIES
POTABLE WATER
WAT NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 144 22-Aug-23 07-Feb-24 13-Oct-24 03-Apr-25 SAR260,433.80 SAR0.00 58.22% 0% 03-Apr-25, POTABLE WATER N
DI PIPES 144 22-Aug-23 07-Feb-24 13-Oct-24 03-Apr-25 SAR28,937.09 SAR0.00 58.22% 0% 03-Apr-25, DI PIPES
HDPE PIPES 144 22-Aug-23 07-Feb-24 13-Oct-24 03-Apr-25 SAR28,937.09 SAR0.00 58.22% 0% 03-Apr-25, HDPE PIPES
GRP PIPES 144 22-Aug-23 07-Feb-24 13-Oct-24 03-Apr-25 SAR28,937.09 SAR0.00 58.22% 0% 03-Apr-25, GRP PIPES
DI & GRP FITTING
FI 144 22-Aug-23 07-Feb-24 13-Oct-24 03-Apr-25 SAR28,937.09 SAR0.00 58.22% 0% 03-Apr-25, DI & GRP FITTING
GATE VALVE
VALV 144 22-Aug-23 07-Feb-24 13-Oct-24 03-Apr-25 SAR28,937.09 SAR0.00 58.22% 0% 03-Apr-25, GATE VALVE
BUTTERFLAY VALVE
BUTTERFLA 144 22-Aug-23 07-Feb-24 13-Oct-24 03-Apr-25 SAR28,937.09 SAR0.00 58.22% 0% 03-Apr-25, BUTTERFLAY VALV
WATER METER
MET 144 22-Aug-23 07-Feb-24 13-Oct-24 03-Apr-25 SAR28,937.09 SAR0.00 58.22% 0% 03-Apr-25, WATER METER
AIR RELASE VALVE 144 22-Aug-23 07-Feb-24 13-Oct-24 03-Apr-25 SAR28,937.09 SAR0.00 58.22% 0% 03-Apr-25, AIR RELASE VALVE
WASHOUT V VALVE 144 22-Aug-23 07-Feb-24 13-Oct-24 03-Apr-25 SAR28,937.09 SAR0.00 58.22% 0% 03-Apr-25, WASHOUT VALVE
GREY WATER COLLECTION NETWORK 144 03-Sep-23 19-Feb-24 24-Oct-24 15-Apr-25 SAR305,165.13 SAR0.00 66.22% 0% 15-Apr-25, GREY WATER COLL
UPVC PIPES 58 03-Sep-23 11-Nov-23 24-Oct-24 31-Dec-24 SAR101,721.71 SAR0.00 100% 0% 31-Dec-24, UPVC PIPES
GRP PIPES 144 03-Sep-23 19-Feb-24 24-Oct-24 15-Apr-25 SAR101,721.71 SAR0.00 49.33% 0% 15-Apr-25, GRP PIPES
PRECAST R.C
R MANHOLE 144 03-Sep-23 19-Feb-24 24-Oct-24 15-Apr-25 SAR101,721.71 SAR0.00 49.33% 0% 15-Apr-25, PRECAST R.C MAN
GREY WATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 145 14-Sep-23 02-Mar-24 04-Nov-24 27-Apr-25 SAR67,290.29 SAR0.00 41.72% 0% 27-Apr-25, GREY WATER DIST
DI PIPES 145 14-Sep-23 02-Mar-24 04-Nov-24 27-Apr-25 SAR8,411.29 SAR0.00 40.44% 0% 27-Apr-25, DI PIPES
HDPE PIPES 145 14-Sep-23 02-Mar-24 04-Nov-24 27-Apr-25 SAR8,411.29 SAR0.00 40.44% 0% 27-Apr-25, HDPE PIPES
GRP PIPES 115 14-Sep-23 27-Jan-24 04-Nov-24 18-Mar-25 SAR8,411.29 SAR0.00 50.67% 0% 18-Mar-25, GRP PIPES
DI & GRP FITTING
FI 145 14-Sep-23 02-Mar-24 04-Nov-24 27-Apr-25 SAR8,411.29 SAR0.00 40.44% 0% 27-Apr-25, DI & GRP FITTING
GATE VALVE
VALV 145 14-Sep-23 02-Mar-24 04-Nov-24 27-Apr-25 SAR8,411.29 SAR0.00 40.44% 0% 27-Apr-25, GATE VALVE
BUTTERFLAY VALVE
BUTTERFLA 145 14-Sep-23 02-Mar-24 04-Nov-24 27-Apr-25 SAR8,411.29 SAR0.00 40.44% 0% 27-Apr-25, BUTTERFLAY VALV
AIR RELASE VALVE 145 14-Sep-23 02-Mar-24 04-Nov-24 27-Apr-25 SAR8,411.29 SAR0.00 40.44% 0% 27-Apr-25, AIR RELASE VALVE
WASEHOUT VALVE 145 14-Sep-23 02-Mar-24 04-Nov-24 27-Apr-25 SAR8,411.29 SAR0.00 40.44% 0% 27-Apr-25, WASEHOUT VALVE
IRR & FF NETWORK
NETW BRANCHES & TIE IN POINTS 145 27-Sep-23 13-Mar-24 16-Nov-24 08-May-25 SAR128,703.01 SAR0.00 31.56% 0% 08-May-25, IRR & FF NETWOR
HDPE PIPES 145 27-Sep-23 13-Mar-24 16-Nov-24 08-May-25 SAR21,450.50 SAR0.00 31.56% 0% 08-May-25, HDPE PIPES
GATE VALVE
VALV 145 27-Sep-23 13-Mar-24 16-Nov-24 08-May-25 SAR21,450.50 SAR0.00 31.56% 0% 08-May-25, GATE VALVE
BUTTERFLAY VALVE
BUTTERFLA 145 27-Sep-23 13-Mar-24 16-Nov-24 08-May-25 SAR21,450.50 SAR0.00 31.56% 0% 08-May-25, BUTTERFLAY VAL
AIR RELASE VALVE 145 27-Sep-23 13-Mar-24 16-Nov-24 08-May-25 SAR21,450.50 SAR0.00 31.56% 0% 08-May-25, AIR RELASE VALV
WASEHOUT VALVE 145 27-Sep-23 13-Mar-24 16-Nov-24 08-May-25 SAR21,450.50 SAR0.00 31.56% 0% 08-May-25, WASEHOUT VALV
FIRE HYDRA
HYDRANT 145 27-Sep-23 13-Mar-24 16-Nov-24 08-May-25 SAR21,450.50 SAR0.00 31.56% 0% 08-May-25, FIRE HYDRANT
CHILLED WATER
WATE SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 145 27-Sep-23 13-Mar-24 16-Nov-24 08-May-25 SAR736,650.49 SAR0.00 31.56% 0% 08-May-25, CHILLED WATER S
MILD STEEL PIPE 145 27-Sep-23 13-Mar-24 16-Nov-24 08-May-25 SAR245,550.16 SAR0.00 31.56% 0% 08-May-25, MILD STEEL PIPE
MILD STEEL FITTING 145 27-Sep-23 13-Mar-24 16-Nov-24 08-May-25 SAR245,550.16 SAR0.00 31.56% 0% 08-May-25, MILD STEEL FITTI
GATE VALVE
VALV 145 27-Sep-23 13-Mar-24 16-Nov-24 08-May-25 SAR245,550.16 SAR0.00 31.56% 0% 08-May-25, GATE VALVE
CONSTRUCTION 396 10-Aug-23 25-Nov-24 01-Oct-24 15-Jan-26 SAR12,831,093.35 SAR0.00 11.91% 0% 15-Jan-26, CONSTRU
STORM WATER NETWORK 354 10-Aug-23 06-Oct-24 01-Oct-24 27-Nov-25 SAR2,940,475.81 SAR0.00 9.5% 0% 27-Nov-25, STORM WA

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
80 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
(MH1-11-1 to MH1-11-4) 237 10-Aug-23 16-May-24 01-Oct-24 13-Jul-25 SAR1,470,237.90 SAR0.00 19% 0% 13-Jul-25, (MH1-11-1 to MH1
(MH1-11-5 to MH1-11-10) 127 06-May-24 06-Oct-24 01-Jul-25 27-Nov-25 SAR1,470,237.90 SAR0.00 0% 0% 27-Nov-25, (MH1-11-5 t
POTABLE WATER
WAT NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 248 22-Aug-23 11-Jun-24 13-Oct-24 06-Aug-25 SAR1,495,734.65 SAR0.00 19% 0% 06-Aug-25, POTABLE WATE
POTABLE W WATER (L-20) 248 22-Aug-23 11-Jun-24 13-Oct-24 06-Aug-25 SAR1,495,734.65 SAR0.00 19% 0% 06-Aug-25, POTABLE WATE
GREY WATER COLLECTION NETWORK 298 03-Sep-23 25-Aug-24 24-Oct-24 16-Oct-25 SAR1,197,186.29 SAR0.00 19% 0% 16-Oct-25, GREY WATER
(MH2-1 to MH2-4)
M 298 03-Sep-23 25-Aug-24 24-Oct-24 16-Oct-25 SAR1,197,186.29 SAR0.00 19% 0% 16-Oct-25, (MH2-1 to MH
GREY WATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 294 14-Sep-23 31-Aug-24 04-Nov-24 22-Oct-25 SAR525,947.08 SAR0.00 19% 0% 22-Oct-25, GREY WATER
GREY WATER
WATE DISTRIBUTION (LINE 15) 294 14-Sep-23 31-Aug-24 04-Nov-24 22-Oct-25 SAR525,947.08 SAR0.00 19% 0% 22-Oct-25, GREY WATER
IRR & FF NETWORK
NETW BRANCHES & TIE IN POINTS 245 26-Oct-23 14-Aug-24 15-Dec-24 06-Oct-25 SAR410,220.35 SAR0.00 10.33% 0% 06-Oct-25, IRR & FF NET
IRR &F.F (SEC
(SE LINE 4) 245 26-Oct-23 14-Aug-24 15-Dec-24 06-Oct-25 SAR410,220.35 SAR0.00 10.33% 0% 06-Oct-25, IRR &F.F (SEC
CHILLED WATER
WATE SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 347 09-Oct-23 25-Nov-24 27-Nov-24 15-Jan-26 SAR6,261,529.18 SAR0.00 9.5% 0% 15-Jan-26, CHILLED W
LINE 01 264 09-Oct-23 19-Aug-24 27-Nov-24 11-Oct-25 SAR3,130,764.59 SAR0.00 19% 0% 11-Oct-25, LINE 01
LINE 02 127 30-Jun-24 25-Nov-24 19-Aug-25 15-Jan-26 SAR3,130,764.59 SAR0.00 0% 0% 15-Jan-26, LINE 02
EXTERNAL DRY UTILITIES
U 281 08-Aug-23 10-Jul-24 29-Sep-24 31-Aug-25 SAR2,398,985.66 SAR0.00 46.18% 0% 31-Aug-25, EXTERNAL DR
ENGINEERING 31 08-Aug-23 13-Sep-23 29-Sep-24 04-Nov-24 SAR0.00 SAR0.00 0% 0% 04-Nov-24, ENGINEERING
POWER 22 08-Aug-23 02-Sep-23 29-Sep-24 24-Oct-24 SAR0.00 SAR0.00 0% 0% 24-Oct-24, POWER
POWER LV HOUSE CONNECTION & TIE IN POINTS 22 08-Aug-23 02-Sep-23 29-Sep-24 24-Oct-24 SAR0.00 SAR0.00 0% 0% 24-Oct-24, POWER LV HOUSE CONN
LOW CURRENT 21 20-Aug-23 13-Sep-23 10-Oct-24 04-Nov-24 SAR0.00 SAR0.00 0% 0% 04-Nov-24, LOW CURRENT
ELV NETWORK
NETWO (ICT&SECURITY) 21 20-Aug-23 13-Sep-23 10-Oct-24 04-Nov-24 SAR0.00 SAR0.00 0% 0% 04-Nov-24, ELV NETWORK (ICT&SE
PROCURMENT 145 03-Sep-23 19-Feb-24 24-Oct-24 15-Apr-25 SAR1,049,387.35 SAR0.00 98.58% 0% 15-Apr-25, PROCURMENT
POWER 145 03-Sep-23 19-Feb-24 24-Oct-24 15-Apr-25 SAR29,436.41 SAR0.00 49.33% 0% 15-Apr-25, POWER
POWER LV HOUSE CONNECTION & TIE IN POINTS 145 03-Sep-23 19-Feb-24 24-Oct-24 15-Apr-25 SAR29,436.41 SAR0.00 49.33% 0% 15-Apr-25, POWER LV HOUSE
LOW CURRENT 115 14-Sep-23 27-Jan-24 04-Nov-24 18-Mar-25 SAR1,019,950.93 SAR0.00 100% 0% 18-Mar-25, LOW CURRENT
ELV NETWORK
NETWO (ICT&SECURITY) 115 14-Sep-23 27-Jan-24 04-Nov-24 18-Mar-25 SAR1,019,950.93 SAR0.00 100% 0% 18-Mar-25, ELV NETWORK (ICT
CONSTRUCTION 259 03-Sep-23 10-Jul-24 24-Oct-24 31-Aug-25 SAR1,349,598.31 SAR0.00 5.44% 0% 31-Aug-25, CONSTRUCTIO
POWER 253 03-Sep-23 02-Jul-24 24-Oct-24 23-Aug-25 SAR127,657.92 SAR0.00 13% 0% 23-Aug-25, POWER
POWER LV HOUSE CONNECTION & TIE IN POINTS 253 03-Sep-23 02-Jul-24 24-Oct-24 23-Aug-25 SAR127,657.92 SAR0.00 13% 0% 23-Aug-25, POWER LV HO
4C x 300 mm2 AI/XPLE/PVC 238 03-Sep-23 10-Jun-24 24-Oct-24 05-Aug-25 SAR42,552.64 SAR0.00 13% 0% 05-Aug-25, 4C x 300 mm2 A
4C x 185 mm2 AI/XPLE/PVC 233 27-Sep-23 02-Jul-24 17-Nov-24 23-Aug-25 SAR42,552.64 SAR0.00 13% 0% 23-Aug-25, 4C x 185 mm2 A
4C x 70 m
mm2 AI/XPLE/PVC 187 27-Sep-23 05-May-24 17-Nov-24 30-Jun-25 SAR42,552.64 SAR0.00 13% 0% 30-Jun-25, 4C x 70 mm2 AI/X
LOW CURRENT 230 09-Oct-23 10-Jul-24 27-Nov-24 31-Aug-25 SAR1,221,940.39 SAR0.00 4.65% 0% 31-Aug-25, LOW CURREN
ELV NETWORK
NETWO (ICT&SECURITY) 230 09-Oct-23 10-Jul-24 27-Nov-24 31-Aug-25 SAR1,221,940.39 SAR0.00 4.65% 0% 31-Aug-25, ELV NETWORK
CABLES & DUCTS 144 09-Oct-23 24-Mar-24 27-Nov-24 19-May-25 SAR437,121.83 SAR0.00 13% 0% 19-May-25, CABLES & DUCTS
UNIT SUBSTATIONS
SUB 115 20-Feb-24 10-Jul-24 15-Apr-25 31-Aug-25 SAR784,818.56 SAR0.00 0% 0% 31-Aug-25, UNIT SUBSTAT
CROWD CORRIDOR
CORRIDO NO.04 IN SUPERBLOCK 2 729 27-Sep-23 11-Feb-25 17-Nov-22 A 26-Mar-26 SAR25,501,125.69 SAR0.00 10.57% 0% 26-Mar-26, CROWD
EXTERNAL WET UTILITIES 349 27-Sep-23 18-Nov-24 16-Nov-24 06-Jan-26 SAR19,741,986.56 SAR0.00 13.61% 0% 06-Jan-26, EXTERNAL
ENGINEERING 83 27-Sep-23 02-Jan-24 16-Nov-24 20-Feb-25 SAR0.00 SAR0.00 0% 0% 20-Feb-25, ENGINEERING
STORM WATER NETWORK 22 27-Sep-23 22-Oct-23 16-Nov-24 11-Dec-24 SAR0.00 SAR0.00 0% 0% 11-Dec-24, STORM WATER NETWO
SEWAGE NETWORK
NETW 21 23-Oct-23 16-Nov-23 11-Dec-24 05-Jan-25 SAR0.00 SAR0.00 0% 0% 05-Jan-25, SEWAGE NETWORK
POTABLE WATER
WAT NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 22 04-Nov-23 28-Nov-23 23-Dec-24 16-Jan-25 SAR0.00 SAR0.00 0% 0% 16-Jan-25, POTABLE WATER NETW
GREY WATER COLLECTION NETWORK 22 15-Nov-23 10-Dec-23 02-Jan-25 28-Jan-25 SAR0.00 SAR0.00 0% 0% 28-Jan-25, GREY WATER COLLEC
GREY WATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 21 27-Nov-23 21-Dec-23 14-Jan-25 08-Feb-25 SAR0.00 SAR0.00 0% 0% 08-Feb-25, GREY WATER DISTRIB
IRR & FF NETWORK
NETW BRANCHES & TIE IN POINTS 22 09-Dec-23 02-Jan-24 26-Jan-25 20-Feb-25 SAR0.00 SAR0.00 0% 0% 20-Feb-25, IRR & FF NETWORK
PROCURMENT 205 23-Oct-23 27-Jun-24 11-Dec-24 16-Aug-25 SAR2,928,300.72 SAR0.00 44.05% 0% 16-Aug-25, PROCURMENT
STORM WATER NETWORK 144 23-Oct-23 08-Apr-24 11-Dec-24 02-Jun-25 SAR691,876.68 SAR0.00 20% 0% 02-Jun-25, STORM WATER NE
RC PIPES 144 23-Oct-23 08-Apr-24 11-Dec-24 02-Jun-25 SAR172,969.17 SAR0.00 20% 0% 02-Jun-25, RC PIPES
GRP PIPES 144 23-Oct-23 08-Apr-24 11-Dec-24 02-Jun-25 SAR172,969.17 SAR0.00 20% 0% 02-Jun-25, GRP PIPES
PRECAST R.C
R MANHOLE 144 23-Oct-23 08-Apr-24 11-Dec-24 02-Jun-25 SAR172,969.17 SAR0.00 20% 0% 02-Jun-25, PRECAST R.C MAN
DI GULLIES 144 23-Oct-23 08-Apr-24 11-Dec-24 02-Jun-25 SAR172,969.17 SAR0.00 20% 0% 02-Jun-25, DI GULLIES
SEWAGE NETWORK
NETW 145 18-Nov-23 07-May-24 05-Jan-25 01-Jul-25 SAR1,425,035.24 SAR0.00 80% 0% 01-Jul-25, SEWAGE NETWO
UPVC PIPES 145 18-Nov-23 07-May-24 05-Jan-25 01-Jul-25 SAR475,011.75 SAR0.00 80% 0% 01-Jul-25, UPVC PIPES
GRP PIPES 145 18-Nov-23 07-May-24 05-Jan-25 01-Jul-25 SAR475,011.75 SAR0.00 80% 0% 01-Jul-25, GRP PIPES
PRECAST R.C
R MANHOLE 145 18-Nov-23 07-May-24 05-Jan-25 01-Jul-25 SAR475,011.75 SAR0.00 80% 0% 01-Jul-25, PRECAST R.C MA
POTABLE WATER
WAT NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 144 29-Nov-23 19-May-24 16-Jan-25 13-Jul-25 SAR241,831.38 SAR0.00 4.74% 0% 13-Jul-25, POTABLE WATER
DI PIPES 144 29-Nov-23 19-May-24 16-Jan-25 13-Jul-25 SAR26,870.15 SAR0.00 5.33% 0% 13-Jul-25, DI PIPES
HDPE PIPES 115 11-Dec-23 25-Apr-24 28-Jan-25 19-Jun-25 SAR26,870.15 SAR0.00 0% 0% 19-Jun-25, HDPE PIPES
GRP PIPES 144 29-Nov-23 19-May-24 16-Jan-25 13-Jul-25 SAR26,870.15 SAR0.00 5.33% 0% 13-Jul-25, GRP PIPES
DI & GRP FITTING
FI 144 29-Nov-23 19-May-24 16-Jan-25 13-Jul-25 SAR26,870.15 SAR0.00 5.33% 0% 13-Jul-25, DI & GRP FITTIN
GATE VALVE
VALV 84 29-Nov-23 06-Mar-24 16-Jan-25 30-Apr-25 SAR26,870.15 SAR0.00 5.33% 0% 30-Apr-25, GATE VALVE
BUTTERFLAY VALVE
BUTTERFLA 144 29-Nov-23 19-May-24 16-Jan-25 13-Jul-25 SAR26,870.15 SAR0.00 5.33% 0% 13-Jul-25, BUTTERFLAY VA
WATER METER
MET 144 29-Nov-23 19-May-24 16-Jan-25 13-Jul-25 SAR26,870.15 SAR0.00 5.33% 0% 13-Jul-25, WATER METER

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
81 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
AIR RELASE VALVE 144 29-Nov-23 19-May-24 16-Jan-25 13-Jul-25 SAR26,870.15 SAR0.00 5.33% 0% 13-Jul-25, AIR RELASE VALV
WASHOUT V VALVE 144 29-Nov-23 19-May-24 16-Jan-25 13-Jul-25 SAR26,870.15 SAR0.00 5.33% 0% 13-Jul-25, WASHOUT VALV
GREY WATER COLLECTION NETWORK 145 11-Dec-23 30-May-24 28-Jan-25 23-Jul-25 SAR352,113.62 SAR0.00 0% 0% 23-Jul-25, GREY WATER CO
UPVC PIPES 145 11-Dec-23 30-May-24 28-Jan-25 23-Jul-25 SAR117,371.21 SAR0.00 0% 0% 23-Jul-25, UPVC PIPES
GRP PIPES 145 11-Dec-23 30-May-24 28-Jan-25 23-Jul-25 SAR117,371.21 SAR0.00 0% 0% 23-Jul-25, GRP PIPES
PRECAST R.C
R MANHOLE 145 11-Dec-23 30-May-24 28-Jan-25 23-Jul-25 SAR117,371.21 SAR0.00 0% 0% 23-Jul-25, PRECAST R.C MA
GREY WATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 145 23-Dec-23 11-Jun-24 09-Feb-25 04-Aug-25 SAR67,290.29 SAR0.00 0% 0% 04-Aug-25, GREY WATER D
DI PIPES 145 23-Dec-23 11-Jun-24 09-Feb-25 04-Aug-25 SAR8,411.29 SAR0.00 0% 0% 04-Aug-25, DI PIPES
HDPE PIPES 145 23-Dec-23 11-Jun-24 09-Feb-25 04-Aug-25 SAR8,411.29 SAR0.00 0% 0% 04-Aug-25, HDPE PIPES
GRP PIPES 145 23-Dec-23 11-Jun-24 09-Feb-25 04-Aug-25 SAR8,411.29 SAR0.00 0% 0% 04-Aug-25, GRP PIPES
DI & GRP FITTING
FI 145 23-Dec-23 11-Jun-24 09-Feb-25 04-Aug-25 SAR8,411.29 SAR0.00 0% 0% 04-Aug-25, DI & GRP FITTI
GATE VALVE
VALV 145 23-Dec-23 11-Jun-24 09-Feb-25 04-Aug-25 SAR8,411.29 SAR0.00 0% 0% 04-Aug-25, GATE VALVE
BUTTERFLAY VALVE
BUTTERFLA 145 23-Dec-23 11-Jun-24 09-Feb-25 04-Aug-25 SAR8,411.29 SAR0.00 0% 0% 04-Aug-25, BUTTERFLAY V
AIR RELASE VALVE 145 23-Dec-23 11-Jun-24 09-Feb-25 04-Aug-25 SAR8,411.29 SAR0.00 0% 0% 04-Aug-25, AIR RELASE VA
WASEHOUT VALVE 145 23-Dec-23 11-Jun-24 09-Feb-25 04-Aug-25 SAR8,411.29 SAR0.00 0% 0% 04-Aug-25, WASEHOUT VA
IRR & FF NETWORK
NETW BRANCHES & TIE IN POINTS 144 03-Jan-24 27-Jun-24 20-Feb-25 16-Aug-25 SAR150,153.52 SAR0.00 0% 0% 16-Aug-25, IRR & FF NETW
HDPE PIPES 144 03-Jan-24 27-Jun-24 20-Feb-25 16-Aug-25 SAR25,025.59 SAR0.00 0% 0% 16-Aug-25, HDPE PIPES
GATE VALVE
VALV 144 03-Jan-24 27-Jun-24 20-Feb-25 16-Aug-25 SAR25,025.59 SAR0.00 0% 0% 16-Aug-25, GATE VALVE
BUTTERFLAY VALVE
BUTTERFLA 144 03-Jan-24 27-Jun-24 20-Feb-25 16-Aug-25 SAR25,025.59 SAR0.00 0% 0% 16-Aug-25, BUTTERFLAY V
AIR RELASE VALVE 144 03-Jan-24 27-Jun-24 20-Feb-25 16-Aug-25 SAR25,025.59 SAR0.00 0% 0% 16-Aug-25, AIR RELASE VA
WASEHOUT VALVE 144 03-Jan-24 27-Jun-24 20-Feb-25 16-Aug-25 SAR25,025.59 SAR0.00 0% 0% 16-Aug-25, WASEHOUT VA
FIRE HYDRA
HYDRANT 144 03-Jan-24 27-Jun-24 20-Feb-25 16-Aug-25 SAR25,025.59 SAR0.00 0% 0% 16-Aug-25, FIRE HYDRAN
CONSTRUCTION 328 23-Oct-23 18-Nov-24 11-Dec-24 06-Jan-26 SAR16,813,685.84 SAR0.00 8.31% 0% 06-Jan-26, CONSTRUC
STORM WATER NETWORK 248 23-Oct-23 17-Aug-24 11-Dec-24 06-Oct-25 SAR3,675,594.76 SAR0.00 10.81% 0% 06-Oct-25, STORM WATE
(MH10-1 to MH10-7)
M 202 23-Oct-23 23-Jun-24 11-Dec-24 12-Aug-25 SAR918,898.69 SAR0.00 19% 0% 12-Aug-25, (MH10-1 to MH
(MH1-2-1 to MH1-2-5) 187 15-Nov-23 29-Jun-24 04-Jan-25 18-Aug-25 SAR918,898.69 SAR0.00 19% 0% 18-Aug-25, (MH1-2-1 to MH
(MH1-1 to MH1-6)
M 172 09-Dec-23 04-Jul-24 27-Jan-25 24-Aug-25 SAR918,898.69 SAR0.00 5.25% 0% 24-Aug-25, (MH1-1 to MH1
(MH2-4-1 to MH2-4-4) 168 24-Jan-24 17-Aug-24 15-Mar-25 06-Oct-25 SAR918,898.69 SAR0.00 0% 0% 06-Oct-25, (MH2-4-1 to M
SEWAGE NETWORK
NETW 279 18-Nov-23 16-Oct-24 05-Jan-25 06-Dec-25 SAR7,862,112.54 SAR0.00 11.32% 0% 06-Dec-25, SEWAGE N
(MH24 toMH3-9)
toMH 279 18-Nov-23 16-Oct-24 05-Jan-25 06-Dec-25 SAR3,931,056.27 SAR0.00 11.32% 0% 06-Dec-25, (MH24 toMH
(EX MH28 to MH4-2) 279 18-Nov-23 16-Oct-24 05-Jan-25 06-Dec-25 SAR3,931,056.27 SAR0.00 11.32% 0% 06-Dec-25, (EX MH28 to
POTABLE WATER
WAT NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 248 29-Nov-23 22-Sep-24 16-Jan-25 12-Nov-25 SAR2,136,763.79 SAR0.00 4.7% 0% 12-Nov-25, POTABLE W
POTABLE W WATER (L-17) 238 29-Nov-23 10-Sep-24 16-Jan-25 01-Nov-25 SAR1,068,381.89 SAR0.00 9.4% 0% 01-Nov-25, POTABLE W
POTABLE W WATER (L-19) 218 03-Jan-24 22-Sep-24 20-Feb-25 12-Nov-25 SAR1,068,381.89 SAR0.00 0% 0% 12-Nov-25, POTABLE W
GREY WATER COLLECTION NETWORK 287 11-Dec-23 18-Nov-24 28-Jan-25 06-Jan-26 SAR1,995,310.49 SAR0.00 0.47% 0% 06-Jan-26, GREY WAT
(MH2-14 to M
MH2-14-9) 249 11-Dec-23 05-Oct-24 28-Jan-25 23-Nov-25 SAR498,827.62 SAR0.00 1.87% 0% 23-Nov-25, (MH2-14 to M
(MH2-14 to M
MH2-2-19) 239 27-Jan-24 09-Nov-24 16-Mar-25 28-Dec-25 SAR498,827.62 SAR0.00 0% 0% 28-Dec-25, (MH2-14 to
(MH2-21-3 to MH2-21-1) 203 13-Mar-24 13-Nov-24 06-May-25 01-Jan-26 SAR498,827.62 SAR0.00 0% 0% 01-Jan-26, (MH2-21-3 t
(MH2-19 to M
MH2-24) 167 02-May-24 18-Nov-24 25-Jun-25 06-Jan-26 SAR498,827.62 SAR0.00 0% 0% 06-Jan-26, (MH2-19 to
GREY WATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 253 23-Dec-23 21-Oct-24 09-Feb-25 09-Dec-25 SAR460,203.69 SAR0.00 0% 0% 09-Dec-25, GREY WAT
GREY WATER
WATE DISTRIBUTION (LINE 12) 249 23-Dec-23 16-Oct-24 09-Feb-25 04-Dec-25 SAR230,101.85 SAR0.00 0% 0% 04-Dec-25, GREY WATE
GREY WATER
WATE DISTRIBUTION (LINE 14) 228 21-Jan-24 21-Oct-24 10-Mar-25 09-Dec-25 SAR230,101.85 SAR0.00 0% 0% 09-Dec-25, GREY WAT
IRR & FF NETWORK
NETW BRANCHES & TIE IN POINTS 235 03-Jan-24 13-Oct-24 20-Feb-25 01-Dec-25 SAR683,700.58 SAR0.00 0% 0% 01-Dec-25, IRR & FF NE
IRR &F.F (SEC
(SE LINE 05) 232 03-Jan-24 09-Oct-24 20-Feb-25 27-Nov-25 SAR341,850.29 SAR0.00 0% 0% 27-Nov-25, IRR &F.F (S
IRR &F.F (SEC
(SE LINE 07) 210 01-Feb-24 13-Oct-24 22-Mar-25 01-Dec-25 SAR341,850.29 SAR0.00 0% 0% 01-Dec-25, IRR &F.F (S
EXTERNAL DRY UTILITIES
U 729 04-Nov-23 11-Feb-25 17-Nov-22 A 26-Mar-26 SAR5,759,139.12 SAR0.00 0.15% 0% 26-Mar-26, EXTERN
ENGINEERING 429 04-Nov-23 18-Feb-24 17-Nov-22 A 27-Mar-25 SAR0.00 SAR0.00 0% 0% 27-Mar-25, ENGINEERING
POWER 32 04-Nov-23 10-Dec-23 17-Nov-22 A 16-Jan-25 SAR0.00 SAR0.00 0% 0% 16-Jan-25, POWER
POWER 110KV
110 CABLE 22 04-Nov-23 28-Nov-23 17-Nov-22 A 30-Nov-22 A SAR0.00 SAR0.00 0% 0% 30-Nov-22 A, POWER 110KV CABLE
POWER LV HOUSE CONNECTION & TIE IN POINTS 22 15-Nov-23 10-Dec-23 27-Nov-22 A 16-Jan-25 SAR0.00 SAR0.00 0% 0% 16-Jan-25, POWER LV HOUSE CON
LOW CURRENT 349 27-Nov-23 18-Feb-24 26-Nov-22 A 27-Mar-25 SAR0.00 SAR0.00 0% 0% 27-Mar-25, LOW CURRENT
TELECOME NETWORK DIRECTLY BURIED 32 27-Nov-23 02-Jan-24 02-Jan-25 09-Feb-25 SAR0.00 SAR0.00 0% 0% 09-Feb-25, TELECOME NETWORK
ELV NETWORK
NETWO (ICT&SECURITY) 31 20-Dec-23 25-Jan-24 26-Jan-25 03-Mar-25 SAR0.00 SAR0.00 0% 0% 03-Mar-25, ELV NETWORK (ICT&
STREET LIGHTING
LIG NET WORK 32 13-Jan-24 18-Feb-24 26-Nov-22 A 27-Mar-25 SAR0.00 SAR0.00 0% 0% 27-Mar-25, STREET LIGHTING N
PROCURMENT 200 13-Jan-24 09-Sep-24 18-Feb-25 18-Oct-25 SAR1,384,430.80 SAR0.00 0% 0% 18-Oct-25, PROCURMEN
POWER 89 13-Jan-24 29-Apr-24 18-Feb-25 10-Jun-25 SAR56,284.10 SAR0.00 0% 0% 10-Jun-25, POWER
POWER 110KV
110 CABLE 65 13-Jan-24 27-Mar-24 18-Feb-25 08-May-25 SAR21,941.61 SAR0.00 0% 0% 08-May-25, POWER 110KV CA
POWER LV HOUSE CONNECTION & TIE IN POINTS 64 11-Feb-24 29-Apr-24 19-Mar-25 10-Jun-25 SAR34,342.48 SAR0.00 0% 0% 10-Jun-25, POWER LV HOUS
LOW CURRENT 165 22-Feb-24 09-Sep-24 05-Apr-25 18-Oct-25 SAR1,328,146.71 SAR0.00 0% 0% 18-Oct-25, LOW CURREN
TELECOME NETWORK DIRECTLY BURIED 75 22-Feb-24 22-May-24 05-Apr-25 05-Jul-25 SAR57,379.70 SAR0.00 0% 0% 05-Jul-25, TELECOME NETW
ELV NETWORK
NETWO (ICT&SECURITY) 75 05-Mar-24 03-Jun-24 16-Apr-25 15-Jul-25 SAR1,019,950.93 SAR0.00 0% 0% 15-Jul-25, ELV NETWORK (I
STREET LIGHTING
LIG NET WORK 145 17-Mar-24 09-Sep-24 28-Apr-25 18-Oct-25 SAR250,816.07 SAR0.00 0% 0% 18-Oct-25, STREET LIGH

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
82 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
CONSTRUCTION 381 29-Nov-23 11-Feb-25 23-Dec-24 26-Mar-26 SAR4,374,708.32 SAR0.00 0.2% 0% 26-Mar-26, CONST
POWER 254 29-Nov-23 15-Sep-24 23-Dec-24 23-Oct-25 SAR308,914.73 SAR0.00 2.88% 0% 23-Oct-25, POWER
POWER 110KV
110 CABLE 164 29-Nov-23 28-May-24 23-Dec-24 09-Jul-25 SAR181,256.81 SAR0.00 4.67% 0% 09-Jul-25, POWER 110KV CA
CABLES INSTALLATION 164 29-Nov-23 28-May-24 23-Dec-24 09-Jul-25 SAR181,256.81 SAR0.00 4.67% 0% 09-Jul-25, CABLES INSTALL
POWER LV HOUSE CONNECTION & TIE IN POINTS 232 11-Dec-23 15-Sep-24 16-Jan-25 23-Oct-25 SAR127,657.92 SAR0.00 0.33% 0% 23-Oct-25, POWER LV H
4C x 300 mm2 AI/XPLE/PVC 210 11-Dec-23 20-Aug-24 16-Jan-25 28-Sep-25 SAR42,552.64 SAR0.00 1% 0% 28-Sep-25, 4C x 300 mm2 A
4C x 185 mm2 AI/XPLE/PVC 200 03-Jan-24 01-Sep-24 09-Feb-25 09-Oct-25 SAR42,552.64 SAR0.00 0% 0% 09-Oct-25, 4C x 185 mm2
4C x 70 m
mm2 AI/XPLE/PVC 212 03-Jan-24 15-Sep-24 09-Feb-25 23-Oct-25 SAR42,552.64 SAR0.00 0% 0% 23-Oct-25, 4C x 70 mm2 A
LOW CURRENT 340 03-Jan-24 11-Feb-25 09-Feb-25 26-Mar-26 SAR4,065,793.59 SAR0.00 0% 0% 26-Mar-26, LOW CU
TELECOME NETWORK DIRECTLY BURIED 340 03-Jan-24 11-Feb-25 09-Feb-25 26-Mar-26 SAR487,727.45 SAR0.00 0% 0% 26-Mar-26, TELECO
2 x 20MM - HDPE TELECOM DUCTS 193 03-Jan-24 22-Aug-24 09-Feb-25 01-Oct-25 SAR162,575.82 SAR0.00 0% 0% 01-Oct-25, 2 x 20MM - HD
2 x 50MM - HDPE TELECOM DUCTS 170 27-Apr-24 16-Nov-24 04-Jun-25 24-Dec-25 SAR162,575.82 SAR0.00 0% 0% 24-Dec-25, 2 x 50MM -
4 x 100M
100MM - HDPE TELECOM DUCTS 150 20-Aug-24 11-Feb-25 28-Sep-25 26-Mar-26 SAR162,575.82 SAR0.00 0% 0% 26-Mar-26, 4 x 100M
ELV NETWORK
NETWO (ICT&SECURITY) 232 27-Jan-24 31-Oct-24 04-Mar-25 08-Dec-25 SAR1,446,129.52 SAR0.00 0% 0% 08-Dec-25, ELV NETWO
CABLES & DUCTS 105 27-Jan-24 30-May-24 04-Mar-25 12-Jul-25 SAR582,829.10 SAR0.00 0% 0% 12-Jul-25, CABLES & DUCT
UNIT SUBSTATIONS
SUB 127 01-Jun-24 31-Oct-24 13-Jul-25 08-Dec-25 SAR863,300.42 SAR0.00 0% 0% 08-Dec-25, UNIT SUBS
STREET LIGHTING
LIG NET WORK 250 19-Feb-24 15-Dec-24 27-Mar-25 21-Jan-26 SAR2,131,936.62 SAR0.00 0% 0% 21-Jan-26, STREET LI
8M LIGH
LIGHTING COLUMN 229 19-Feb-24 20-Nov-24 27-Mar-25 28-Dec-25 SAR319,790.49 SAR0.00 0% 0% 28-Dec-25, 8M LIGHTI
STREET LIGHTING CABINET 233 19-Feb-24 25-Nov-24 27-Mar-25 01-Jan-26 SAR213,193.66 SAR0.00 0% 0% 01-Jan-26, STREET LIG
4C x 16 mm2
m CU/XPLE/STA/PVC CABLE 250 19-Feb-24 15-Dec-24 27-Mar-25 21-Jan-26 SAR426,387.32 SAR0.00 0% 0% 21-Jan-26, 4C x 16 mm
1C x 16 mm2
m CU/XPLE/STA/PVC CABLE 228 19-Feb-24 19-Nov-24 27-Mar-25 27-Dec-25 SAR426,387.32 SAR0.00 0% 0% 27-Dec-25, 1C x 16 mm
RING MAIN
MA UNITS (RMU'S) 218 07-Mar-24 25-Nov-24 19-Apr-25 01-Jan-26 SAR746,177.82 SAR0.00 0% 0% 01-Jan-26, RING MAIN
CROWD CORRIDO
CORRIDOR NO.03 BETWEEN SUPERBLOCK 2&3 678 04-Nov-23 25-Dec-24 26-Oct-22 A 12-Feb-26 SAR17,550,775.22 SAR0.00 0% 0% 12-Feb-26, CROWD C
EXTERNAL WET UTILITIES 350 04-Nov-23 25-Dec-24 23-Dec-24 12-Feb-26 SAR14,616,575.14 SAR0.00 0% 0% 12-Feb-26, EXTERNA
ENGINEERING 91 04-Nov-23 19-Feb-24 23-Dec-24 12-Apr-25 SAR0.00 SAR0.00 0% 0% 12-Apr-25, ENGINEERING
STORM WATER NETWORK 31 04-Nov-23 10-Dec-23 23-Dec-24 28-Jan-25 SAR0.00 SAR0.00 0% 0% 28-Jan-25, STORM WATER NETW
SEWAGE NETWORK
NETW 32 27-Nov-23 02-Jan-24 14-Jan-25 20-Feb-25 SAR0.00 SAR0.00 0% 0% 20-Feb-25, SEWAGE NETWORK
GREY WATER COLLECTION NETWORK 31 20-Dec-23 25-Jan-24 06-Feb-25 15-Mar-25 SAR0.00 SAR0.00 0% 0% 15-Mar-25, GREY WATER COLLE
IRR & FF NETWORK
NETW BRANCHES & TIE IN POINTS 32 13-Jan-24 18-Feb-24 02-Mar-25 12-Apr-25 SAR0.00 SAR0.00 0% 0% 12-Apr-25, IRR & FF NETWORK
PROCURMENT 204 11-Dec-23 13-Aug-24 28-Jan-25 02-Oct-25 SAR2,394,449.83 SAR0.00 0% 0% 02-Oct-25, PROCURMEN
STORM WATER NETWORK 144 11-Dec-23 30-May-24 28-Jan-25 23-Jul-25 SAR562,149.80 SAR0.00 0% 0% 23-Jul-25, STORM WATER N
RC PIPES 144 11-Dec-23 30-May-24 28-Jan-25 23-Jul-25 SAR140,537.45 SAR0.00 0% 0% 23-Jul-25, RC PIPES
GRP PIPES 144 11-Dec-23 30-May-24 28-Jan-25 23-Jul-25 SAR140,537.45 SAR0.00 0% 0% 23-Jul-25, GRP PIPES
PRECAST R.C
R MANHOLE 144 11-Dec-23 30-May-24 28-Jan-25 23-Jul-25 SAR140,537.45 SAR0.00 0% 0% 23-Jul-25, PRECAST R.C MA
DI GULLIES 144 11-Dec-23 30-May-24 28-Jan-25 23-Jul-25 SAR140,537.45 SAR0.00 0% 0% 23-Jul-25, DI GULLIES
SEWAGE NETWORK
NETW 145 03-Jan-24 27-Jun-24 20-Feb-25 17-Aug-25 SAR1,330,032.89 SAR0.00 0% 0% 17-Aug-25, SEWAGE NETW
UPVC PIPES 145 03-Jan-24 27-Jun-24 20-Feb-25 17-Aug-25 SAR443,344.30 SAR0.00 0% 0% 17-Aug-25, UPVC PIPES
GRP PIPES 145 03-Jan-24 27-Jun-24 20-Feb-25 17-Aug-25 SAR443,344.30 SAR0.00 0% 0% 17-Aug-25, GRP PIPES
PRECAST R.C
R MANHOLE 145 03-Jan-24 27-Jun-24 20-Feb-25 17-Aug-25 SAR443,344.30 SAR0.00 0% 0% 17-Aug-25, PRECAST R.C M
GREY WATER COLLECTION NETWORK 145 27-Jan-24 21-Jul-24 16-Mar-25 08-Sep-25 SAR352,113.62 SAR0.00 0% 0% 08-Sep-25, GREY WATER C
UPVC PIPES 145 27-Jan-24 21-Jul-24 16-Mar-25 08-Sep-25 SAR117,371.21 SAR0.00 0% 0% 08-Sep-25, UPVC PIPES
GRP PIPES 145 27-Jan-24 21-Jul-24 16-Mar-25 08-Sep-25 SAR117,371.21 SAR0.00 0% 0% 08-Sep-25, GRP PIPES
PRECAST R.C
R MANHOLE 145 27-Jan-24 21-Jul-24 16-Mar-25 08-Sep-25 SAR117,371.21 SAR0.00 0% 0% 08-Sep-25, PRECAST R.C M
IRR & FF NETWORK
NETW BRANCHES & TIE IN POINTS 145 19-Feb-24 13-Aug-24 12-Apr-25 02-Oct-25 SAR150,153.52 SAR0.00 0% 0% 02-Oct-25, IRR & FF NET
HDPE PIPES 145 19-Feb-24 13-Aug-24 12-Apr-25 02-Oct-25 SAR25,025.59 SAR0.00 0% 0% 02-Oct-25, HDPE PIPES
GATE VALVE
VALV 145 19-Feb-24 13-Aug-24 12-Apr-25 02-Oct-25 SAR25,025.59 SAR0.00 0% 0% 02-Oct-25, GATE VALVE
BUTTERFLAY VALVE
BUTTERFLA 145 19-Feb-24 13-Aug-24 12-Apr-25 02-Oct-25 SAR25,025.59 SAR0.00 0% 0% 02-Oct-25, BUTTERFLAY
AIR RELASE VALVE 145 19-Feb-24 13-Aug-24 12-Apr-25 02-Oct-25 SAR25,025.59 SAR0.00 0% 0% 02-Oct-25, AIR RELASE V
WASEHOUT VALVE 145 19-Feb-24 13-Aug-24 12-Apr-25 02-Oct-25 SAR25,025.59 SAR0.00 0% 0% 02-Oct-25, WASEHOUT V
FIRE HYDRA
HYDRANT 145 19-Feb-24 13-Aug-24 12-Apr-25 02-Oct-25 SAR25,025.59 SAR0.00 0% 0% 02-Oct-25, FIRE HYDRAN
CONSTRUCTION 299 01-Jan-24 25-Dec-24 19-Feb-25 12-Feb-26 SAR12,222,125.31 SAR0.00 0% 0% 12-Feb-26, CONSTRU
STORM WATER NETWORK 183 01-Jan-24 11-Aug-24 19-Feb-25 30-Sep-25 SAR2,940,475.81 SAR0.00 0% 0% 30-Sep-25, STORM WATE
(MH2-6-1 to MH2-6-8) 183 01-Jan-24 11-Aug-24 19-Feb-25 30-Sep-25 SAR2,940,475.81 SAR0.00 0% 0% 30-Sep-25, (MH2-6-1 to M
SEWAGE NETWORK
NETW 247 03-Jan-24 26-Oct-24 20-Feb-25 15-Dec-25 SAR7,337,971.70 SAR0.00 0% 0% 15-Dec-25, SEWAGE N
(MH4-5-1 to MH4-5-7) 243 03-Jan-24 21-Oct-24 20-Feb-25 10-Dec-25 SAR3,668,985.85 SAR0.00 0% 0% 10-Dec-25, (MH4-5-1 to
(MH4-7 to MH4-8-1)
M 247 03-Jan-24 26-Oct-24 20-Feb-25 15-Dec-25 SAR3,668,985.85 SAR0.00 0% 0% 15-Dec-25, (MH4-7 to M
GREY WATER COLLECTION NETWORK 279 27-Jan-24 25-Dec-24 16-Mar-25 12-Feb-26 SAR1,396,717.34 SAR0.00 0% 0% 12-Feb-26, GREY WA
(MH2-22-1 to MH2-22-7) 279 27-Jan-24 25-Dec-24 16-Mar-25 12-Feb-26 SAR1,396,717.34 SAR0.00 0% 0% 12-Feb-26, (MH2-22-
IRR & FF NETWORK
NETW BRANCHES & TIE IN POINTS 231 19-Feb-24 23-Nov-24 12-Apr-25 11-Jan-26 SAR546,960.46 SAR0.00 0% 0% 11-Jan-26, IRR & FF N
IRR &F.F (SEC
(SE LINE 10) 188 02-Mar-24 16-Oct-24 24-Apr-25 04-Dec-25 SAR273,480.23 SAR0.00 0% 0% 04-Dec-25, IRR &F.F (S
IRR &F.F (SEC
(SE LINE 8) 231 19-Feb-24 23-Nov-24 12-Apr-25 11-Jan-26 SAR273,480.23 SAR0.00 0% 0% 11-Jan-26, IRR &F.F (S

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
83 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
EXTERNAL DRY UTILITIES
U 600 27-Nov-23 19-Oct-24 26-Oct-22 A 15-Nov-25 SAR2,934,200.09 SAR0.00 0% 0% 15-Nov-25, EXTERNAL
ENGINEERING 380 27-Nov-23 25-Jan-24 26-Oct-22 A 20-Feb-25 SAR0.00 SAR0.00 0% 0% 20-Feb-25, ENGINEERING
POWER 32 27-Nov-23 02-Jan-24 26-Oct-22 A 10-Nov-22 A SAR0.00 SAR0.00 0% 0% 10-Nov-22 A, POWER
POWER LV HOUSE CONNECTION & TIE IN POINTS 32 27-Nov-23 02-Jan-24 26-Oct-22 A 10-Nov-22 A SAR0.00 SAR0.00 0% 0% 10-Nov-22 A, POWER LV HOUSE CONNECTION & TIE IN POIN
LOW CURRENT 32 20-Dec-23 25-Jan-24 14-Jan-25 20-Feb-25 SAR0.00 SAR0.00 0% 0% 20-Feb-25, LOW CURRENT
ELV NETWORK
NETWO (ICT&SECURITY) 32 20-Dec-23 25-Jan-24 14-Jan-25 20-Feb-25 SAR0.00 SAR0.00 0% 0% 20-Feb-25, ELV NETWORK (ICT&
PROCURMENT 165 20-Dec-23 07-Jul-24 14-Jan-25 03-Aug-25 SAR1,129,600.09 SAR0.00 0% 0% 03-Aug-25, PROCURMENT
POWER 145 20-Dec-23 09-Jun-24 14-Jan-25 10-Jul-25 SAR36,795.52 SAR0.00 0% 0% 10-Jul-25, POWER
POWER LV HOUSE CONNECTION & TIE IN POINTS 145 20-Dec-23 09-Jun-24 14-Jan-25 10-Jul-25 SAR36,795.52 SAR0.00 0% 0% 10-Jul-25, POWER LV HOUS
LOW CURRENT 145 13-Jan-24 07-Jul-24 06-Feb-25 03-Aug-25 SAR1,092,804.57 SAR0.00 0% 0% 03-Aug-25, LOW CURRENT
ELV NETWORK
NETWO (ICT&SECURITY) 145 13-Jan-24 07-Jul-24 06-Feb-25 03-Aug-25 SAR1,092,804.57 SAR0.00 0% 0% 03-Aug-25, ELV NETWORK
CONSTRUCTION 253 03-Jan-24 19-Oct-24 14-Jan-25 15-Nov-25 SAR1,804,600.00 SAR0.00 0% 0% 15-Nov-25, CONSTRUC
POWER 253 03-Jan-24 19-Oct-24 14-Jan-25 15-Nov-25 SAR212,763.20 SAR0.00 0% 0% 15-Nov-25, POWER
POWER LV HOUSE CONNECTION & TIE IN POINTS 253 03-Jan-24 19-Oct-24 14-Jan-25 15-Nov-25 SAR212,763.20 SAR0.00 0% 0% 15-Nov-25, POWER LV
4C x 300 mm2 AI/XPLE/PVC 238 03-Jan-24 01-Oct-24 14-Jan-25 28-Oct-25 SAR70,921.07 SAR0.00 0% 0% 28-Oct-25, 4C x 300 mm2
4C x 185 mm2 AI/XPLE/PVC 207 27-Jan-24 17-Sep-24 06-Feb-25 15-Oct-25 SAR70,921.07 SAR0.00 0% 0% 15-Oct-25, 4C x 185 mm2
4C x 70 m
mm2 AI/XPLE/PVC 233 27-Jan-24 19-Oct-24 06-Feb-25 15-Nov-25 SAR70,921.07 SAR0.00 0% 0% 15-Nov-25, 4C x 70 mm2
LOW CURRENT 189 27-Jan-24 10-Sep-24 20-Feb-25 08-Oct-25 SAR1,591,836.80 SAR0.00 0% 0% 08-Oct-25, LOW CURREN
ELV NETWORK
NETWO (ICT&SECURITY) 189 27-Jan-24 10-Sep-24 20-Feb-25 08-Oct-25 SAR1,591,836.80 SAR0.00 0% 0% 08-Oct-25, ELV NETWOR
CABLES & DUCTS 174 27-Jan-24 24-Aug-24 20-Feb-25 20-Sep-25 SAR728,536.38 SAR0.00 0% 0% 20-Sep-25, CABLES & DU
UNIT SUBSTATIONS
SUB 174 13-Feb-24 10-Sep-24 10-Mar-25 08-Oct-25 SAR863,300.42 SAR0.00 0% 0% 08-Oct-25, UNIT SUBSTA
SUPERBLOCK - S1 462 12-Nov-22 16-May-23 15-Oct-22 A 14-May-24 SAR1,200,005.78 SAR244,095.48 100% 20.34% 14-May-24, SUPERBLOCK - S1
EXTERNAL WET UTILITIES 51 12-Nov-22 10-Jan-23 17-Dec-23 14-Feb-24 SAR439,748.46 SAR0.00 100% 0% 14-Feb-24, EXTERNAL WET UTILITIES
ENGINEERING 21 12-Nov-22 06-Dec-22 17-Dec-23 10-Jan-24 SAR0.00 SAR0.00 0% 0% 10-Jan-24, ENGINEERING
UTILITIES REMOVAL/RELOCATION
REM 21 12-Nov-22 06-Dec-22 17-Dec-23 10-Jan-24 SAR0.00 SAR0.00 0% 0% 10-Jan-24, UTILITIES REMOVAL/RELOCATION
CONSTRUCTION 30 07-Dec-22 10-Jan-23 10-Jan-24 14-Feb-24 SAR439,748.46 SAR0.00 100% 0% 14-Feb-24, CONSTRUCTION
REMOVAL /RELOCATION
/RE OF SEWER WORK 30 07-Dec-22 10-Jan-23 10-Jan-24 14-Feb-24 SAR439,748.46 SAR0.00 100% 0% 14-Feb-24, REMOVAL /RELOCATION OF SEW
EXTERNAL DRY UTILITIES
U 462 12-Nov-22 16-May-23 15-Oct-22 A 14-May-24 SAR760,257.32 SAR244,095.48 100% 32.11% 14-May-24, EXTERNAL DRY UTILITIES
ENGINEERING 367 12-Nov-22 29-Dec-22 15-Oct-22 A 21-Jan-24 SAR0.00 SAR0.00 0% 0% 21-Jan-24, ENGINEERING
POWER 367 12-Nov-22 18-Dec-22 09-Nov-22 A 21-Jan-24 SAR0.00 SAR0.00 0% 0% 21-Jan-24, POWER
POWER 110KV
110 CABLE RELOCATION / DEMOLISH 22 12-Nov-22 06-Dec-22 09-Nov-22 A 30-Nov-22 A SAR0.00 SAR0.00 0% 0% 30-Nov-22 A, POWER 110KV CABLE RELOCATION / DEMOLI
POWER MV CABLES RELOCATION / DEMOLISH / DIVERTING 21 23-Nov-22 18-Dec-22 27-Dec-23 21-Jan-24 SAR0.00 SAR0.00 0% 0% 21-Jan-24, POWER MV CABLES RELOCATION
LOW CURRENT 22 05-Dec-22 29-Dec-22 15-Oct-22 A 19-Nov-22 A SAR0.00 SAR0.00 0% 0% 19-Nov-22 A, LOW CURRENT
EXISTING T
TELECOM DUCT / MANHOLE RELOCATION /DEMOLISH /DIVERTING 22 05-Dec-22 29-Dec-22 15-Oct-22 A 19-Nov-22 A SAR0.00 SAR0.00 0% 0% 19-Nov-22 A, EXISTING TELECOM DUCT / MANHOLE RELOC
CONSTRUCTION 126 07-Dec-22 16-May-23 17-Mar-23 A 14-May-24 SAR760,257.32 SAR244,095.48 100% 32.11% 14-May-24, CONSTRUCTION
POWER 81 07-Dec-22 14-Feb-23 17-Dec-23 19-Mar-24 SAR353,431.52 SAR0.00 100% 0% 19-Mar-24, POWER
POWER 110KV
110 CABLE RELOCATION / DEMOLISH 30 07-Dec-22 10-Jan-23 17-Dec-23 20-Jan-24 SAR141,372.61 SAR0.00 100% 0% 20-Jan-24, POWER 110KV CABLE RELOCATION
REMOVAL OF CABLE
REMOVA 30 07-Dec-22 10-Jan-23 17-Dec-23 20-Jan-24 SAR141,372.61 SAR0.00 100% 0% 20-Jan-24, REMOVAL OF CABLE
POWER MV CABLES RELOCATION / DEMOLISH / DIVERTING 50 19-Dec-22 14-Feb-23 22-Jan-24 19-Mar-24 SAR212,058.91 SAR0.00 100% 0% 19-Mar-24, POWER MV CABLES RELOCATIO
LOW CURRENT 47 15-Feb-23 16-May-23 17-Mar-23 A 14-May-24 SAR406,825.80 SAR244,095.48 100% 60% 14-May-24, LOW CURRENT
EXISTING T
TELECOM DUCT / MANHOLE RELOCATION /DEMOLISH /DIVERTING 47 15-Feb-23 16-May-23 17-Mar-23 A 14-May-24 SAR406,825.80 SAR244,095.48 100% 60% 14-May-24, EXISTING TELECOM DUCT / M
SUPERBLOCK - S2 502 12-Nov-22 05-Jul-23 15-Oct-22 A 04-Jul-24 SAR1,381,997.83 SAR352,796.12 100% 25.53% 04-Jul-24, SUPERBLOCK - S2
EXTERNAL WET UTILITIES 108 12-Nov-22 14-Feb-23 15-Nov-22 A 20-Mar-24 SAR621,740.51 SAR108,700.64 100% 17.48% 20-Mar-24, EXTERNAL WET UTILITIES
ENGINEERING 21 12-Nov-22 06-Dec-22 17-Dec-23 10-Jan-24 SAR0.00 SAR0.00 0% 0% 10-Jan-24, ENGINEERING
UTILITIES REMOVAL/RELOCATION
REM 21 12-Nov-22 06-Dec-22 17-Dec-23 10-Jan-24 SAR0.00 SAR0.00 0% 0% 10-Jan-24, UTILITIES REMOVAL/RELOCATION
CONSTRUCTION 108 07-Dec-22 14-Feb-23 15-Nov-22 A 20-Mar-24 SAR621,740.51 SAR108,700.64 100% 17.48% 20-Mar-24, CONSTRUCTION
REMOVAL /RELOCATION
/RE OF SEWER WORK 30 11-Jan-23 14-Feb-23 14-Feb-24 20-Mar-24 SAR513,039.87 SAR0.00 100% 0% 20-Mar-24, REMOVAL /RELOCATION OF SEW
REMOVAL /RELOCATION
/RE OF POTABLE WATER 30 07-Dec-22 10-Jan-23 15-Nov-22 A 20-Dec-22 A SAR108,700.64 SAR108,700.64 100% 100% 20-Dec-22 A, REMOVAL /RELOCATION OF POTABLE WATER
EXTERNAL DRY UTILITIES
U 502 12-Nov-22 05-Jul-23 15-Oct-22 A 04-Jul-24 SAR760,257.32 SAR244,095.48 100% 32.11% 04-Jul-24, EXTERNAL DRY UTILITIES
ENGINEERING 367 12-Nov-22 29-Dec-22 15-Oct-22 A 21-Jan-24 SAR0.00 SAR0.00 0% 0% 21-Jan-24, ENGINEERING
POWER 367 12-Nov-22 18-Dec-22 09-Nov-22 A 21-Jan-24 SAR0.00 SAR0.00 0% 0% 21-Jan-24, POWER
POWER 110KV
110 CABLE RELOCATION / DEMOLISH 22 12-Nov-22 06-Dec-22 09-Nov-22 A 30-Nov-22 A SAR0.00 SAR0.00 0% 0% 30-Nov-22 A, POWER 110KV CABLE RELOCATION / DEMOLI
POWER MV CABLES RELOCATION / DEMOLISH / DIVERTING 21 23-Nov-22 18-Dec-22 27-Dec-23 21-Jan-24 SAR0.00 SAR0.00 0% 0% 21-Jan-24, POWER MV CABLES RELOCATION
LOW CURRENT 32 23-Nov-22 29-Dec-22 15-Oct-22 A 19-Nov-22 A SAR0.00 SAR0.00 0% 0% 19-Nov-22 A, LOW CURRENT
EXISTING T
TELECOM DUCT / MANHOLE RELOCATION /DEMOLISH /DIVERTING 32 23-Nov-22 29-Dec-22 15-Oct-22 A 19-Nov-22 A SAR0.00 SAR0.00 0% 0% 19-Nov-22 A, EXISTING TELECOM DUCT / MANHOLE RELOC
CONSTRUCTION 174 19-Dec-22 05-Jul-23 06-Dec-22 A 04-Jul-24 SAR760,257.32 SAR244,095.48 100% 32.11% 04-Jul-24, CONSTRUCTION
POWER 135 19-Dec-22 05-Jul-23 22-Jan-24 04-Jul-24 SAR353,431.52 SAR0.00 100% 0% 04-Jul-24, POWER
POWER 110KV
110 CABLE RELOCATION / DEMOLISH 40 17-May-23 05-Jul-23 15-May-24 04-Jul-24 SAR141,372.61 SAR0.00 100% 0% 04-Jul-24, POWER 110KV CABLE RELOC
REMOVAL OF CABLE
REMOVA 40 17-May-23 05-Jul-23 15-May-24 04-Jul-24 SAR141,372.61 SAR0.00 100% 0% 04-Jul-24, REMOVAL OF CABLE

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
84 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
POWER MV CABLES RELOCATION / DEMOLISH / DIVERTING 80 19-Dec-22 21-Mar-23 22-Jan-24 27-Apr-24 SAR212,058.91 SAR0.00 100% 0% 27-Apr-24, POWER MV CABLES RELOCATI
LOW CURRENT 48 17-Jan-23 21-Mar-23 06-Dec-22 A 31-Jan-24 SAR406,825.80 SAR244,095.48 100% 60% 31-Jan-24, LOW CURRENT
EXISTING T
TELECOM DUCT / MANHOLE RELOCATION /DEMOLISH /DIVERTING 48 17-Jan-23 21-Mar-23 06-Dec-22 A 31-Jan-24 SAR406,825.80 SAR244,095.48 100% 60% 31-Jan-24, EXISTING TELECOM DUCT / MANH
SUPERBLOCK - S3 412 15-Feb-23 24-Jul-23 15-Oct-22 A 18-Jul-24 SAR1,372,246.77 SAR314,798.99 100% 22.94% 18-Jul-24, SUPERBLOCK - S3
EXTERNAL WET UTILITIES 98 15-Feb-23 01-May-23 01-Jan-23 A 28-Apr-24 SAR534,861.52 SAR95,113.06 100% 17.78% 28-Apr-24, EXTERNAL WET UTILITIES
ENGINEERING 32 15-Feb-23 23-Mar-23 20-Jan-24 26-Feb-24 SAR0.00 SAR0.00 0% 0% 26-Feb-24, ENGINEERING
UTILITIES REMOVAL/RELOCATION
REM 32 15-Feb-23 23-Mar-23 20-Jan-24 26-Feb-24 SAR0.00 SAR0.00 0% 0% 26-Feb-24, UTILITIES REMOVAL/RELOCATIO
CONSTRUCTION 98 25-Mar-23 01-May-23 01-Jan-23 A 28-Apr-24 SAR534,861.52 SAR95,113.06 100% 17.78% 28-Apr-24, CONSTRUCTION
REMOVAL /RELOCATION
/RE OF POTABLE WATER 30 25-Mar-23 01-May-23 01-Jan-23 A 05-Feb-23 A SAR95,113.06 SAR95,113.06 100% 100% 05-Feb-23 A, REMOVAL /RELOCATION OF POTABLE WATE
REMOVAL /RELOCATION
/RE OF SEWER WORK 30 25-Mar-23 01-May-23 20-Mar-24 28-Apr-24 SAR439,748.46 SAR0.00 100% 0% 28-Apr-24, REMOVAL /RELOCATION OF SE
EXTERNAL DRY UTILITIES
U 412 11-Mar-23 24-Jul-23 15-Oct-22 A 18-Jul-24 SAR837,385.25 SAR219,685.93 100% 26.23% 18-Jul-24, EXTERNAL DRY UTILITIES
ENGINEERING 315 11-Mar-23 16-Apr-23 15-Oct-22 A 20-Mar-24 SAR0.00 SAR0.00 0% 0% 20-Mar-24, ENGINEERING
POWER 32 11-Mar-23 16-Apr-23 12-Feb-24 20-Mar-24 SAR0.00 SAR0.00 0% 0% 20-Mar-24, POWER
POWER MV CABLES RELOCATION / DEMOLISH / DIVERTING 32 11-Mar-23 16-Apr-23 12-Feb-24 20-Mar-24 SAR0.00 SAR0.00 0% 0% 20-Mar-24, POWER MV CABLES RELOCATIO
LOW CURRENT 32 11-Mar-23 16-Apr-23 15-Oct-22 A 19-Nov-22 A SAR0.00 SAR0.00 0% 0% 19-Nov-22 A, LOW CURRENT
EXISTING T
TELECOM DUCT / MANHOLE RELOCATION /DEMOLISH /DIVERTING 32 11-Mar-23 16-Apr-23 15-Oct-22 A 19-Nov-22 A SAR0.00 SAR0.00 0% 0% 19-Nov-22 A, EXISTING TELECOM DUCT / MANHOLE RELOC
CONSTRUCTION 129 17-Apr-23 24-Jul-23 29-Jun-23 A 18-Jul-24 SAR837,385.25 SAR219,685.93 100% 26.23% 18-Jul-24, CONSTRUCTION
POWER 12 06-Jul-23 19-Jul-23 06-Jul-24 18-Jul-24 SAR471,242.03 SAR0.00 100% 0% 18-Jul-24, POWER
POWER MV CABLES RELOCATION / DEMOLISH / DIVERTING 12 06-Jul-23 19-Jul-23 06-Jul-24 18-Jul-24 SAR471,242.03 SAR0.00 100% 0% 18-Jul-24, POWER MV CABLES RELOCA
LOW CURRENT 116 17-Apr-23 24-Jul-23 29-Jun-23 A 21-Feb-24 SAR366,143.22 SAR219,685.93 100% 60% 21-Feb-24, LOW CURRENT
EXISTING T
TELECOM DUCT / MANHOLE RELOCATION /DEMOLISH /DIVERTING 116 17-Apr-23 24-Jul-23 29-Jun-23 A 21-Feb-24 SAR366,143.22 SAR219,685.93 100% 60% 21-Feb-24, EXISTING TELECOM DUCT / MAN
SUPERBLOCK - S4 355 11-Mar-23 17-Jun-23 15-Oct-22 A 02-Jun-24 SAR1,472,633.18 SAR509,405.35 100% 34.59% 02-Jun-24, SUPERBLOCK - S4
EXTERNAL WET UTILITIES 98 11-Mar-23 05-Jun-23 05-Feb-23 A 02-Jun-24 SAR594,565.35 SAR81,525.48 100% 13.71% 02-Jun-24, EXTERNAL WET UTILITIES
ENGINEERING 32 11-Mar-23 16-Apr-23 12-Feb-24 20-Mar-24 SAR0.00 SAR0.00 0% 0% 20-Mar-24, ENGINEERING
UTILITIES REMOVAL/RELOCATION
REM 32 11-Mar-23 16-Apr-23 12-Feb-24 20-Mar-24 SAR0.00 SAR0.00 0% 0% 20-Mar-24, UTILITIES REMOVAL/RELOCATI
CONSTRUCTION 98 02-May-23 05-Jun-23 05-Feb-23 A 02-Jun-24 SAR594,565.35 SAR81,525.48 100% 13.71% 02-Jun-24, CONSTRUCTION
REMOVAL /RELOCATION
/RE OF POTABLE WATER 30 02-May-23 05-Jun-23 05-Feb-23 A 11-Mar-23 A SAR81,525.48 SAR81,525.48 100% 100% 11-Mar-23 A, REMOVAL /RELOCATION OF POTABLE WAT
REMOVAL /RELOCATION
/RE OF SEWER WORK 30 02-May-23 05-Jun-23 28-Apr-24 02-Jun-24 SAR513,039.87 SAR0.00 100% 0% 02-Jun-24, REMOVAL /RELOCATION OF S
EXTERNAL DRY UTILITIES
U 323 03-Apr-23 17-Jun-23 15-Oct-22 A 24-Apr-24 SAR878,067.83 SAR427,879.87 100% 48.73% 24-Apr-24, EXTERNAL DRY UTILITIES
ENGINEERING 315 03-Apr-23 13-May-23 15-Oct-22 A 15-Apr-24 SAR0.00 SAR0.00 0% 0% 15-Apr-24, ENGINEERING
POWER 315 03-Apr-23 13-May-23 09-Nov-22 A 15-Apr-24 SAR0.00 SAR0.00 0% 0% 15-Apr-24, POWER
POWER 110KV
110 CABLE RELOCATION / DEMOLISH 32 03-Apr-23 13-May-23 09-Nov-22 A 30-Nov-22 A SAR0.00 SAR0.00 0% 0% 30-Nov-22 A, POWER 110KV CABLE RELOCATION / DEMOLI
POWER MV CABLES RELOCATION / DEMOLISH / DIVERTING 32 03-Apr-23 13-May-23 06-Mar-24 15-Apr-24 SAR0.00 SAR0.00 0% 0% 15-Apr-24, POWER MV CABLES RELOCATI
LOW CURRENT 32 03-Apr-23 13-May-23 15-Oct-22 A 19-Nov-22 A SAR0.00 SAR0.00 0% 0% 19-Nov-22 A, LOW CURRENT
EXISTING T
TELECOM DUCT / MANHOLE RELOCATION /DEMOLISH /DIVERTING 32 03-Apr-23 13-May-23 15-Oct-22 A 19-Nov-22 A SAR0.00 SAR0.00 0% 0% 19-Nov-22 A, EXISTING TELECOM DUCT / MANHOLE RELOC
CONSTRUCTION 47 14-May-23 17-Jun-23 01-Jan-23 A 24-Apr-24 SAR878,067.83 SAR427,879.87 100% 48.73% 24-Apr-24, CONSTRUCTION
POWER 47 14-May-23 17-Jun-23 01-Jan-23 A 24-Apr-24 SAR471,242.03 SAR183,784.39 100% 39% 24-Apr-24, POWER
POWER 110KV
110 CABLE RELOCATION / DEMOLISH 30 14-May-23 17-Jun-23 06-Mar-24 14-Apr-24 SAR188,496.81 SAR0.00 100% 0% 14-Apr-24, POWER 110KV CABLE RELOCAT
REMOVAL OF CABLE
REMOVA 30 14-May-23 17-Jun-23 06-Mar-24 14-Apr-24 SAR188,496.81 SAR0.00 100% 0% 14-Apr-24, REMOVAL OF CABLE
POWER MV CABLES RELOCATION / DEMOLISH / DIVERTING 47 14-May-23 27-May-23 01-Jan-23 A 24-Apr-24 SAR282,745.22 SAR183,784.39 100% 65% 24-Apr-24, POWER MV CABLES RELOCATI
LOW CURRENT 12 14-May-23 31-May-23 02-Mar-24 A 16-Mar-24 SAR406,825.80 SAR244,095.48 100% 60% 16-Mar-24, LOW CURRENT
EXISTING T
TELECOM DUCT / MANHOLE RELOCATION /DEMOLISH /DIVERTING 12 14-May-23 31-May-23 02-Mar-24 A 16-Mar-24 SAR406,825.80 SAR244,095.48 100% 60% 16-Mar-24, EXISTING TELECOM DUCT / MAN
SUPERBLOCK - S5 323 03-Apr-23 13-Jul-23 15-Oct-22 A 11-Jul-24 SAR1,426,436.77 SAR740,101.55 100% 51.88% 11-Jul-24, SUPERBLOCK - S5
EXTERNAL WET UTILITIES 55 03-Apr-23 13-Jul-23 11-Jul-23 A 11-Jul-24 SAR507,686.36 SAR287,812.13 100% 56.69% 11-Jul-24, EXTERNAL WET UTILITIES
ENGINEERING 32 03-Apr-23 13-May-23 06-Mar-24 15-Apr-24 SAR0.00 SAR0.00 0% 0% 15-Apr-24, ENGINEERING
UTILITIES REMOVAL/RELOCATION
REM 32 03-Apr-23 13-May-23 06-Mar-24 15-Apr-24 SAR0.00 SAR0.00 0% 0% 15-Apr-24, UTILITIES REMOVAL/RELOCAT
CONSTRUCTION 50 06-Jun-23 13-Jul-23 11-Jul-23 A 11-Jul-24 SAR507,686.36 SAR287,812.13 100% 56.69% 11-Jul-24, CONSTRUCTION
REMOVAL /RELOCATION
/RE OF POTABLE WATER 30 06-Jun-23 13-Jul-23 11-Jul-23 A 01-Aug-23 A SAR67,937.90 SAR67,937.90 100% 100% 01-Aug-23 A, REMOVAL /RELOCATION OF POTABLE
REMOVAL /RELOCATION
/RE OF SEWER WORK 30 06-Jun-23 13-Jul-23 03-Aug-23 A 11-Jul-24 SAR439,748.46 SAR219,874.23 100% 50% 11-Jul-24, REMOVAL /RELOCATION OF S
EXTERNAL DRY UTILITIES
U 323 30-Apr-23 13-Jul-23 15-Oct-22 A 18-May-24 SAR918,750.41 SAR452,289.42 100% 49.23% 18-May-24, EXTERNAL DRY UTILITIES
ENGINEERING 315 30-Apr-23 05-Jun-23 15-Oct-22 A 08-May-24 SAR0.00 SAR0.00 0% 0% 08-May-24, ENGINEERING
POWER 315 30-Apr-23 05-Jun-23 09-Nov-22 A 08-May-24 SAR0.00 SAR0.00 0% 0% 08-May-24, POWER
POWER 110KV
110 CABLE RELOCATION / DEMOLISH 32 30-Apr-23 05-Jun-23 09-Nov-22 A 30-Nov-22 A SAR0.00 SAR0.00 0% 0% 30-Nov-22 A, POWER 110KV CABLE RELOCATION / DEMOLI
POWER MV CABLES RELOCATION / DEMOLISH / DIVERTING 32 30-Apr-23 05-Jun-23 30-Mar-24 08-May-24 SAR0.00 SAR0.00 0% 0% 08-May-24, POWER MV CABLES RELOCAT
LOW CURRENT 32 30-Apr-23 05-Jun-23 15-Oct-22 A 19-Nov-22 A SAR0.00 SAR0.00 0% 0% 19-Nov-22 A, LOW CURRENT
EXISTING T
TELECOM DUCT / MANHOLE RELOCATION /DEMOLISH /DIVERTING 32 30-Apr-23 05-Jun-23 15-Oct-22 A 19-Nov-22 A SAR0.00 SAR0.00 0% 0% 19-Nov-22 A, EXISTING TELECOM DUCT / MANHOLE RELOC
CONSTRUCTION 60 06-Jun-23 13-Jul-23 01-Jul-23 A 18-May-24 SAR918,750.41 SAR452,289.42 100% 49.23% 18-May-24, CONSTRUCTION
POWER 60 06-Jun-23 13-Jul-23 02-Jul-23 A 18-May-24 SAR471,242.03 SAR183,784.39 100% 39% 18-May-24, POWER

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
85 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
POWER 110KV
110 CABLE RELOCATION / DEMOLISH 30 06-Jun-23 13-Jul-23 06-Mar-24 14-Apr-24 SAR188,496.81 SAR0.00 100% 0% 14-Apr-24, POWER 110KV CABLE RELOCAT
REMOVAL OF CABLE
REMOVA 30 06-Jun-23 13-Jul-23 06-Mar-24 14-Apr-24 SAR188,496.81 SAR0.00 100% 0% 14-Apr-24, REMOVAL OF CABLE
POWER MV CABLES RELOCATION / DEMOLISH / DIVERTING 47 06-Jun-23 19-Jun-23 02-Jul-23 A 18-May-24 SAR282,745.22 SAR183,784.39 100% 65% 18-May-24, POWER MV CABLES RELOCAT
LOW CURRENT 20 06-Jun-23 24-Jun-23 01-Jul-23 A 16-Mar-24 SAR447,508.38 SAR268,505.03 100% 60% 16-Mar-24, LOW CURRENT
EXISTING T
TELECOM DUCT / MANHOLE RELOCATION /DEMOLISH /DIVERTING 20 06-Jun-23 24-Jun-23 01-Jul-23 A 16-Mar-24 SAR447,508.38 SAR268,505.03 100% 60% 16-Mar-24, EXISTING TELECOM DUCT / MAN
SUPERBLOCK - S7 348 03-Apr-23 17-Aug-23 15-Oct-22 A 18-May-24 SAR1,604,031.27 SAR1,235,132.56 100% 77% 18-May-24, SUPERBLOCK - S7
EXTERNAL WET UTILITIES 85 03-Apr-23 17-Aug-23 18-Apr-23 A 15-Apr-24 SAR608,152.93 SAR608,152.93 100% 100% 15-Apr-24, EXTERNAL WET UTILITIES
ENGINEERING 32 03-Apr-23 13-May-23 06-Mar-24 15-Apr-24 SAR0.00 SAR0.00 0% 0% 15-Apr-24, ENGINEERING
UTILITIES REMOVAL/RELOCATION
REM 32 03-Apr-23 13-May-23 06-Mar-24 15-Apr-24 SAR0.00 SAR0.00 0% 0% 15-Apr-24, UTILITIES REMOVAL/RELOCAT
CONSTRUCTION 50 15-Jul-23 17-Aug-23 18-Apr-23 A 20-Jun-23 A SAR608,152.93 SAR608,152.93 100% 100% 20-Jun-23 A, CONSTRUCTION
REMOVAL /RELOCATION
/RE OF POTABLE WATER 30 15-Jul-23 17-Aug-23 18-Apr-23 A 23-May-23 A SAR95,113.06 SAR95,113.06 100% 100% 23-May-23 A, REMOVAL /RELOCATION OF POTABLE W
REMOVAL /RELOCATION
/RE OF SEWER WORK 30 15-Jul-23 17-Aug-23 01-May-23 A 20-Jun-23 A SAR513,039.87 SAR513,039.87 100% 100% 20-Jun-23 A, REMOVAL /RELOCATION OF SEWER WO
EXTERNAL DRY UTILITIES
U 323 30-Apr-23 23-Jul-23 15-Oct-22 A 18-May-24 SAR995,878.34 SAR626,979.63 100% 62.96% 18-May-24, EXTERNAL DRY UTILITIES
ENGINEERING 315 30-Apr-23 05-Jun-23 15-Oct-22 A 08-May-24 SAR0.00 SAR0.00 0% 0% 08-May-24, ENGINEERING
POWER 32 30-Apr-23 05-Jun-23 30-Mar-24 08-May-24 SAR0.00 SAR0.00 0% 0% 08-May-24, POWER
POWER MV CABLES RELOCATION / DEMOLISH / DIVERTING 32 30-Apr-23 05-Jun-23 30-Mar-24 08-May-24 SAR0.00 SAR0.00 0% 0% 08-May-24, POWER MV CABLES RELOCAT
LOW CURRENT 32 30-Apr-23 05-Jun-23 15-Oct-22 A 19-Nov-22 A SAR0.00 SAR0.00 0% 0% 19-Nov-22 A, LOW CURRENT
EXISTING T
TELECOM DUCT / MANHOLE RELOCATION /DEMOLISH /DIVERTING 32 30-Apr-23 05-Jun-23 15-Oct-22 A 19-Nov-22 A SAR0.00 SAR0.00 0% 0% 19-Nov-22 A, EXISTING TELECOM DUCT / MANHOLE RELOC
CONSTRUCTION 47 06-Jun-23 23-Jul-23 20-Mar-23 A 18-May-24 SAR995,878.34 SAR626,979.63 100% 62.96% 18-May-24, CONSTRUCTION
POWER 47 06-Jun-23 18-Jul-23 20-Mar-23 A 18-May-24 SAR589,052.54 SAR382,884.15 100% 65% 18-May-24, POWER
POWER MV CABLES RELOCATION / DEMOLISH / DIVERTING 47 06-Jun-23 18-Jul-23 20-Mar-23 A 18-May-24 SAR589,052.54 SAR382,884.15 100% 65% 18-May-24, POWER MV CABLES RELOCAT
LOW CURRENT 8 06-Jun-23 23-Jul-23 30-Mar-23 A 08-Apr-24 SAR406,825.80 SAR244,095.48 100% 60% 08-Apr-24, LOW CURRENT
EXISTING T
TELECOM DUCT / MANHOLE RELOCATION /DEMOLISH /DIVERTING 8 06-Jun-23 23-Jul-23 30-Mar-23 A 08-Apr-24 SAR406,825.80 SAR244,095.48 100% 60% 08-Apr-24, EXISTING TELECOM DUCT / MA
SUPERBLOCK - S8 438 23-Jan-23 21-Sep-23 15-Oct-22 A 06-Mar-24 SAR1,472,713.34 SAR1,161,321.34 100% 78.86% 06-Mar-24, SUPERBLOCK - S8
EXTERNAL WET UTILITIES 174 23-Jan-23 21-Sep-23 23-May-23 A 03-Feb-24 SAR635,328.09 SAR635,328.09 100% 100% 03-Feb-24, EXTERNAL WET UTILITIES
ENGINEERING 32 23-Jan-23 28-Feb-23 27-Dec-23 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, ENGINEERING
UTILITY REMOVAL
REMO & RELOCATION 32 23-Jan-23 28-Feb-23 27-Dec-23 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, UTILITY REMOVAL & RELOCATIO
CONSTRUCTION 50 19-Aug-23 21-Sep-23 23-May-23 A 02-Jul-23 A SAR635,328.09 SAR635,328.09 100% 100% 02-Jul-23 A, CONSTRUCTION
REMOVAL /RELOCATION
/RE OF SEWER WORK 30 19-Aug-23 21-Sep-23 20-Jun-23 A 25-Jun-23 A SAR513,039.87 SAR513,039.87 100% 100% 25-Jun-23 A, REMOVAL /RELOCATION OF SEWER WO
REMOVAL /RELOCATION
/RE OF POTABLE WATER 30 19-Aug-23 21-Sep-23 23-May-23 A 02-Jul-23 A SAR122,288.22 SAR122,288.22 100% 100% 02-Jul-23 A, REMOVAL /RELOCATION OF POTABLE W
EXTERNAL DRY UTILITIES
U 351 15-Feb-23 27-Jul-23 15-Oct-22 A 06-Mar-24 SAR837,385.25 SAR525,993.25 100% 62.81% 06-Mar-24, EXTERNAL DRY UTILITIES
ENGINEERING 315 15-Feb-23 23-Mar-23 15-Oct-22 A 26-Feb-24 SAR0.00 SAR0.00 0% 0% 26-Feb-24, ENGINEERING
POWER 32 15-Feb-23 23-Mar-23 20-Jan-24 26-Feb-24 SAR0.00 SAR0.00 0% 0% 26-Feb-24, POWER
POWER MV CABLES RELOCATION / DEMOLISH / DIVERTING 32 15-Feb-23 23-Mar-23 20-Jan-24 26-Feb-24 SAR0.00 SAR0.00 0% 0% 26-Feb-24, POWER MV CABLES RELOCATION
LOW CURRENT 32 15-Feb-23 23-Mar-23 15-Oct-22 A 19-Nov-22 A SAR0.00 SAR0.00 0% 0% 19-Nov-22 A, LOW CURRENT
EXISTING T
TELECOM DUCT / MANHOLE RELOCATION /DEMOLISH /DIVERTING 32 15-Feb-23 23-Mar-23 15-Oct-22 A 19-Nov-22 A SAR0.00 SAR0.00 0% 0% 19-Nov-22 A, EXISTING TELECOM DUCT / MANHOLE RELOC
CONSTRUCTION 76 25-Mar-23 27-Jul-23 10-Jan-23 A 06-Mar-24 SAR837,385.25 SAR525,993.25 100% 62.81% 06-Mar-24, CONSTRUCTION
POWER 48 25-Mar-23 06-Apr-23 10-Jan-23 A 06-Mar-24 SAR471,242.03 SAR306,307.32 100% 65% 06-Mar-24, POWER
POWER MV CABLES RELOCATION / DEMOLISH / DIVERTING 48 25-Mar-23 06-Apr-23 10-Jan-23 A 06-Mar-24 SAR471,242.03 SAR306,307.32 100% 65% 06-Mar-24, POWER MV CABLES RELOCATIO
LOW CURRENT 68 25-Mar-23 27-Jul-23 03-Apr-23 A 29-Jan-24 SAR366,143.22 SAR219,685.93 100% 60% 29-Jan-24, LOW CURRENT
EXISTING T
TELECOM DUCT / MANHOLE RELOCATION /DEMOLISH /DIVERTING 68 25-Mar-23 27-Jul-23 03-Apr-23 A 29-Jan-24 SAR366,143.22 SAR219,685.93 100% 60% 29-Jan-24, EXISTING TELECOM DUCT / MANH
DISTRICT - D9 720 23-Nov-22 08-May-24 28-Sep-22 A 29-Mar-25 SAR65,751,784.69 SAR888,142.20 92.28% 1.35% 29-Mar-25, DISTRICT - D9
EXTERNAL WET UTILITIES 720 23-Nov-22 08-May-24 28-Sep-22 A 29-Mar-25 SAR52,304,252.29 SAR888,142.20 90.63% 1.7% 29-Mar-25, EXTERNAL WET UT
ENGINEERING 368 23-Nov-22 02-Apr-23 28-Sep-22 A 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, ENGINEERING
STORM WATER NETWORK 32 23-Nov-22 29-Dec-22 12-Oct-22 A 29-Oct-22 A SAR0.00 SAR0.00 0% 0% 29-Oct-22 A, STORM WATER NETWORK
SEWAGE NETWORK
NETW 32 17-Dec-22 22-Jan-23 28-Sep-22 A 08-Oct-22 A SAR0.00 SAR0.00 0% 0% 08-Oct-22 A, SEWAGE NETWORK
POTABLE WATER
WAT NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 32 09-Jan-23 14-Feb-23 25-Oct-22 A 13-Nov-22 A SAR0.00 SAR0.00 0% 0% 13-Nov-22 A, POTABLE WATER NETWORK BRANCH, HOUSE
GREY WATER COLLECTION NETWORK 32 01-Feb-23 09-Mar-23 01-Oct-22 A 15-Oct-22 A SAR0.00 SAR0.00 0% 0% 15-Oct-22 A, GREY WATER COLLECTION NETWORK
GREY WATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 32 25-Feb-23 02-Apr-23 13-Dec-22 A 14-Jan-24 SAR0.00 SAR0.00 0% 0% 14-Jan-24, GREY WATER DISTRIBUTION NETW
IRR & FF NETWORK
NETW BRANCHES & TIE IN POINTS 32 01-Feb-23 09-Mar-23 27-Dec-23 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, IRR & FF NETWORK BRANCHES &
AUTOMATED W WASTE COLLECTION NETWORK 32 25-Feb-23 02-Apr-23 27-Dec-23 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, AUTOMATED WASTE COLLECTION
CHILLED WATER
WATE SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 32 01-Feb-23 09-Mar-23 27-Dec-23 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, CHILLED WATER SUPPLY & RETUR
PROCURMENT 224 31-Dec-22 26-Sep-23 15-Oct-23 A 29-Jul-24 SAR7,390,344.61 SAR765,552.21 100% 10.36% 29-Jul-24, PROCURMENT
STORM WATER NETWORK 144 31-Dec-22 20-Jun-23 27-Dec-23 22-Jun-24 SAR1,167,541.89 SAR0.00 100% 0% 22-Jun-24, STORM WATER NETWORK
RC PIPES 144 31-Dec-22 20-Jun-23 27-Dec-23 22-Jun-24 SAR291,885.47 SAR0.00 100% 0% 22-Jun-24, RC PIPES
GRP PIPES 144 31-Dec-22 20-Jun-23 27-Dec-23 22-Jun-24 SAR291,885.47 SAR0.00 100% 0% 22-Jun-24, GRP PIPES
PRECAST R.C
R MANHOLE 144 31-Dec-22 20-Jun-23 27-Dec-23 20-Jun-24 SAR291,885.47 SAR0.00 100% 0% 20-Jun-24, PRECAST R.C MANHOLE
DI GULLIES 144 31-Dec-22 20-Jun-23 27-Dec-23 20-Jun-24 SAR291,885.47 SAR0.00 100% 0% 20-Jun-24, DI GULLIES
SEWAGE NETWORK
NETW 192 23-Jan-23 17-Jul-23 15-Oct-23 A 20-Jun-24 SAR3,135,077.54 SAR627,015.51 100% 20% 20-Jun-24, SEWAGE NETWORK

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
86 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
UPVC PIPES 145 23-Jan-23 17-Jul-23 15-Oct-23 A 02-Jun-24 SAR1,045,025.85 SAR313,507.75 100% 30% 02-Jun-24, UPVC PIPES
GRP PIPES 145 23-Jan-23 17-Jul-23 15-Oct-23 A 02-Jun-24 SAR1,045,025.85 SAR313,507.75 100% 30% 02-Jun-24, GRP PIPES
PRECAST R.C
R MANHOLE 144 23-Jan-23 17-Jul-23 27-Dec-23 20-Jun-24 SAR1,045,025.85 SAR0.00 100% 0% 20-Jun-24, PRECAST R.C MANHOLE
POTABLE WATER
WAT NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 144 15-Feb-23 09-Aug-23 27-Dec-23 20-Jun-24 SAR669,686.91 SAR0.00 100% 0% 20-Jun-24, POTABLE WATER NETWORK B
DI PIPES 144 15-Feb-23 09-Aug-23 27-Dec-23 20-Jun-24 SAR74,409.66 SAR0.00 100% 0% 20-Jun-24, DI PIPES
HDPE PIPES 144 15-Feb-23 09-Aug-23 27-Dec-23 20-Jun-24 SAR74,409.66 SAR0.00 100% 0% 20-Jun-24, HDPE PIPES
GRP PIPES 144 15-Feb-23 09-Aug-23 27-Dec-23 20-Jun-24 SAR74,409.66 SAR0.00 100% 0% 20-Jun-24, GRP PIPES
DI & GRP FITTING
FI 144 15-Feb-23 09-Aug-23 27-Dec-23 20-Jun-24 SAR74,409.66 SAR0.00 100% 0% 20-Jun-24, DI & GRP FITTING
GATE VALVE
VALV 144 15-Feb-23 09-Aug-23 27-Dec-23 20-Jun-24 SAR74,409.66 SAR0.00 100% 0% 20-Jun-24, GATE VALVE
BUTTERFLAY VALVE
BUTTERFLA 144 15-Feb-23 09-Aug-23 27-Dec-23 20-Jun-24 SAR74,409.66 SAR0.00 100% 0% 20-Jun-24, BUTTERFLAY VALVE
WATER METER
MET 144 15-Feb-23 09-Aug-23 27-Dec-23 20-Jun-24 SAR74,409.66 SAR0.00 100% 0% 20-Jun-24, WATER METER
AIR RELASE VALVE 144 15-Feb-23 09-Aug-23 27-Dec-23 20-Jun-24 SAR74,409.66 SAR0.00 100% 0% 20-Jun-24, AIR RELASE VALVE
WASHOUT V VALVE 144 15-Feb-23 09-Aug-23 27-Dec-23 20-Jun-24 SAR74,409.66 SAR0.00 100% 0% 20-Jun-24, WASHOUT VALVE
GREY WATER COLLECTION NETWORK 192 11-Mar-23 02-Sep-23 15-Oct-23 A 20-Jun-24 SAR633,804.51 SAR126,760.90 100% 20% 20-Jun-24, GREY WATER COLLECTION N
UPVC PIPES 145 11-Mar-23 02-Sep-23 15-Oct-23 A 02-Jun-24 SAR211,268.17 SAR63,380.45 100% 30% 02-Jun-24, UPVC PIPES
GRP PIPES 145 11-Mar-23 02-Sep-23 15-Oct-23 A 02-Jun-24 SAR211,268.17 SAR63,380.45 100% 30% 02-Jun-24, GRP PIPES
PRECAST R.C
R MANHOLE 144 11-Mar-23 02-Sep-23 27-Dec-23 20-Jun-24 SAR211,268.17 SAR0.00 100% 0% 20-Jun-24, PRECAST R.C MANHOLE
GREY WATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 192 03-Apr-23 26-Sep-23 15-Oct-23 A 09-Jul-24 SAR157,010.67 SAR11,775.80 100% 7.5% 09-Jul-24, GREY WATER DISTRIBUTION
DI PIPES 145 03-Apr-23 26-Sep-23 15-Oct-23 A 24-Jun-24 SAR19,626.33 SAR5,887.90 100% 30% 24-Jun-24, DI PIPES
HDPE PIPES 145 03-Apr-23 26-Sep-23 15-Oct-23 A 24-Jun-24 SAR19,626.33 SAR5,887.90 100% 30% 24-Jun-24, HDPE PIPES
GRP PIPES 145 03-Apr-23 26-Sep-23 15-Jan-24 09-Jul-24 SAR19,626.33 SAR0.00 100% 0% 09-Jul-24, GRP PIPES
DI & GRP FITTING
FI 145 03-Apr-23 26-Sep-23 15-Jan-24 09-Jul-24 SAR19,626.33 SAR0.00 100% 0% 09-Jul-24, DI & GRP FITTING
GATE VALVE
VALV 145 03-Apr-23 26-Sep-23 15-Jan-24 09-Jul-24 SAR19,626.33 SAR0.00 100% 0% 09-Jul-24, GATE VALVE
BUTTERFLAY VALVE
BUTTERFLA 145 03-Apr-23 26-Sep-23 15-Jan-24 09-Jul-24 SAR19,626.33 SAR0.00 100% 0% 09-Jul-24, BUTTERFLAY VALVE
AIR RELASE VALVE 145 03-Apr-23 26-Sep-23 15-Jan-24 09-Jul-24 SAR19,626.33 SAR0.00 100% 0% 09-Jul-24, AIR RELASE VALVE
WASEHOUT VALVE 145 03-Apr-23 26-Sep-23 15-Jan-24 09-Jul-24 SAR19,626.33 SAR0.00 100% 0% 09-Jul-24, WASEHOUT VALVE
IRR & FF NETWORK
NETW BRANCHES & TIE IN POINTS 156 25-Feb-23 02-Sep-23 20-Jan-24 29-Jul-24 SAR300,307.03 SAR0.00 100% 0% 29-Jul-24, IRR & FF NETWORK BRANCH
HDPE PIPES 145 11-Mar-23 02-Sep-23 03-Feb-24 29-Jul-24 SAR50,051.17 SAR0.00 100% 0% 29-Jul-24, HDPE PIPES
GATE VALVE
VALV 145 11-Mar-23 02-Sep-23 03-Feb-24 29-Jul-24 SAR50,051.17 SAR0.00 100% 0% 29-Jul-24, GATE VALVE
BUTTERFLAY VALVE
BUTTERFLA 145 25-Feb-23 19-Aug-23 20-Jan-24 15-Jul-24 SAR50,051.17 SAR0.00 100% 0% 15-Jul-24, BUTTERFLAY VALVE
AIR RELASE VALVE 145 11-Mar-23 02-Sep-23 03-Feb-24 29-Jul-24 SAR50,051.17 SAR0.00 100% 0% 29-Jul-24, AIR RELASE VALVE
WASEHOUT VALVE 145 11-Mar-23 02-Sep-23 03-Feb-24 29-Jul-24 SAR50,051.17 SAR0.00 100% 0% 29-Jul-24, WASEHOUT VALVE
FIRE HYDRA
HYDRANT 145 11-Mar-23 02-Sep-23 03-Feb-24 29-Jul-24 SAR50,051.17 SAR0.00 100% 0% 29-Jul-24, FIRE HYDRANT
AUTOMATED W WASTE COLLECTION NETWORK 145 03-Apr-23 26-Sep-23 03-Feb-24 29-Jul-24 SAR99,165.24 SAR0.00 100% 0% 29-Jul-24, AUTOMATED WASTE COLLEC
CHILLED WATER
WATE SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 145 11-Mar-23 02-Sep-23 03-Feb-24 29-Jul-24 SAR1,227,750.82 SAR0.00 100% 0% 29-Jul-24, CHILLED WATER SUPPLY & R
MILD STEEL PIPE 145 11-Mar-23 02-Sep-23 03-Feb-24 29-Jul-24 SAR409,250.27 SAR0.00 100% 0% 29-Jul-24, MILD STEEL PIPE
MILD STEEL FITTING 145 11-Mar-23 02-Sep-23 03-Feb-24 29-Jul-24 SAR409,250.27 SAR0.00 100% 0% 29-Jul-24, MILD STEEL FITTING
GATE VALVE
VALV 145 11-Mar-23 02-Sep-23 03-Feb-24 29-Jul-24 SAR409,250.27 SAR0.00 100% 0% 29-Jul-24, GATE VALVE
CONSTRUCTION 408 31-Dec-22 08-May-24 01-Oct-23 A 29-Mar-25 SAR44,913,907.68 SAR122,589.99 89.09% 0.27% 29-Mar-25, CONSTRUCTION
STORM WATER NETWORK 232 31-Dec-22 05-Oct-23 27-Dec-23 03-Oct-24 SAR5,880,951.61 SAR0.00 100% 0% 03-Oct-24, STORM WATER NETWORK
(MH6-1 to MH6-6)
M 207 31-Dec-22 05-Sep-23 27-Dec-23 03-Sep-24 SAR980,158.60 SAR0.00 100% 0% 03-Sep-24, (MH6-1 to MH6-6)
(MH6-5 to MH6-5-1)
M 192 23-Jan-23 11-Sep-23 20-Jan-24 09-Sep-24 SAR980,158.60 SAR0.00 100% 0% 09-Sep-24, (MH6-5 to MH6-5-1)
(MH4-24 to M
MH4-27) 177 15-Feb-23 17-Sep-23 12-Feb-24 15-Sep-24 SAR980,158.60 SAR0.00 100% 0% 15-Sep-24, (MH4-24 to MH4-27)
(MH5-9 to MH5-9-3)
M 162 11-Mar-23 24-Sep-23 06-Mar-24 21-Sep-24 SAR980,158.60 SAR0.00 100% 0% 21-Sep-24, (MH5-9 to MH5-9-3)
(MH5-7 to MH5-7-3)
M 147 03-Apr-23 30-Sep-23 30-Mar-24 28-Sep-24 SAR980,158.60 SAR0.00 100% 0% 28-Sep-24, (MH5-7 to MH5-7-3)
(MH5-6 to MH5-10)
M 132 30-Apr-23 05-Oct-23 25-Apr-24 03-Oct-24 SAR980,158.60 SAR0.00 100% 0% 03-Oct-24, (MH5-6 to MH5-10)
SEWAGE NETWORK
NETW 389 23-Jan-23 16-Apr-24 01-Oct-23 A 06-Mar-25 SAR17,882,978.86 SAR122,589.99 82.96% 0.69% 06-Mar-25, SEWAGE NETWORK
REMOVAL / RELOCATION OF SEWER WORK 30 23-Jan-23 26-Feb-23 27-Dec-23 31-Jan-24 SAR586,331.28 SAR0.00 100% 0% 31-Jan-24, REMOVAL / RELOCATION OF SEWE
(MH1-72 to M
MH1-83) 290 27-Feb-23 21-Dec-23 01-Oct-23 A 11-Nov-24 SAR2,162,080.95 SAR122,589.99 96.4% 5.67% 11-Nov-24, (MH1-72 to MH1-83)
(MH1-81 to M
MH1-81-12) 211 15-Apr-23 26-Dec-23 05-Mar-24 16-Nov-24 SAR2,162,080.95 SAR0.00 98% 0% 16-Nov-24, (MH1-81 to MH1-81-12)
(MH1-81-11 to MH1-81-11-1) 175 04-Jun-23 31-Dec-23 24-Apr-24 20-Nov-24 SAR2,162,080.95 SAR0.00 92.4% 0% 20-Nov-24, (MH1-81-11 to MH1-81-11
(MH1-81-3 to MH1-81-3-5) 174 24-Jul-23 12-Feb-24 10-Jun-24 05-Jan-25 SAR2,162,080.95 SAR0.00 65.8% 0% 05-Jan-25, (MH1-81-3 to MH1-81-3-5
(MH1-81-2-1 to MH1-81-2-6) 174 09-Sep-23 30-Mar-24 31-Jul-24 20-Feb-25 SAR2,162,080.95 SAR0.00 50.3% 0% 20-Feb-25, (MH1-81-2-1 to MH1-8
(MH1-81-5 to MH1-81-2-1/1) 298 15-Apr-23 03-Apr-24 05-Mar-24 25-Feb-25 SAR2,162,080.95 SAR0.00 98% 0% 25-Feb-25, (MH1-81-5 to MH1-81-
(MH1-83-1 to MH1-83-7) 262 04-Jun-23 08-Apr-24 24-Apr-24 02-Mar-25 SAR2,162,080.95 SAR0.00 92.4% 0% 02-Mar-25, (MH1-83-1 to MH1-83
(MH1-83-2 to MH1-83-2-1) 226 24-Jul-23 16-Apr-24 10-Jun-24 06-Mar-25 SAR2,162,080.95 SAR0.00 65.8% 0% 06-Mar-25, (MH1-83-2 to MH1-83
POTABLE WATER
WAT NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 294 15-Feb-23 01-Feb-24 27-Dec-23 14-Dec-24 SAR4,650,254.91 SAR0.00 83.46% 0% 14-Dec-24, POTABLE WATER NETW
REMOVAL / RELOCATION OF POTABLE WATER 30 15-Feb-23 21-Mar-23 27-Dec-23 31-Jan-24 SAR163,050.96 SAR0.00 100% 0% 31-Jan-24, REMOVAL / RELOCATION OF POTA
POTABLE W WATER (L-4) 205 22-Mar-23 25-Nov-23 31-Jan-24 06-Oct-24 SAR641,029.14 SAR0.00 100% 0% 06-Oct-24, POTABLE WATER (L-4)
POTABLE W WATER (L-5) 209 15-Apr-23 23-Dec-23 24-Feb-24 03-Nov-24 SAR641,029.14 SAR0.00 90% 0% 03-Nov-24, POTABLE WATER (L-5)
POTABLE W WATER (L-6) 196 11-May-23 31-Dec-23 18-Mar-24 11-Nov-24 SAR641,029.14 SAR0.00 78% 0% 11-Nov-24, POTABLE WATER (L-6)
POTABLE W WATER (L-7) 183 04-Jun-23 08-Jan-24 14-Apr-24 19-Nov-24 SAR641,029.14 SAR0.00 78% 0% 19-Nov-24, POTABLE WATER (L-7)

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
87 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
POTABLE W WATER (L-11) 170 01-Jul-23 16-Jan-24 07-May-24 27-Nov-24 SAR641,029.14 SAR0.00 78% 0% 27-Nov-24, POTABLE WATER (L-11)
POTABLE W WATER (L-15) 169 10-Jul-23 24-Jan-24 16-May-24 05-Dec-24 SAR641,029.14 SAR0.00 78% 0% 05-Dec-24, POTABLE WATER (L-15)
POTABLE W WATER (L-16) 156 02-Aug-23 01-Feb-24 09-Jun-24 14-Dec-24 SAR641,029.14 SAR0.00 78% 0% 14-Dec-24, POTABLE WATER (L-16)
GREY WATER COLLECTION NETWORK 384 11-Mar-23 08-May-24 27-Dec-23 29-Mar-25 SAR2,593,903.63 SAR0.00 83.74% 0% 29-Mar-25, GREY WATER COLL
(MH1-28-5-1 to MH1-28-12) 193 11-Mar-23 30-Oct-23 27-Dec-23 17-Aug-24 SAR432,317.27 SAR0.00 100% 0% 17-Aug-24, (MH1-28-5-1 to MH1-28-12)
(MH1-28-3 to MH1-28-3-4) 157 30-Apr-23 04-Nov-23 12-Feb-24 21-Aug-24 SAR432,317.27 SAR0.00 100% 0% 21-Aug-24, (MH1-28-3 to MH1-28-3-4)
(MH1-28-2-1 to MH1-28-2-6) 121 15-Jun-23 08-Nov-23 30-Mar-24 26-Aug-24 SAR432,317.27 SAR0.00 100% 0% 26-Aug-24, (MH1-28-2-1 to MH1-28-2-6)
(MH1-28 to MMH1-28-2) 89 05-Aug-23 16-Nov-23 19-May-24 04-Sep-24 SAR432,317.27 SAR0.00 100% 0% 04-Sep-24, (MH1-28 to MH1-28-2)
(MH1-28-2-1/1 to MH1-28-5)
(MH1-28-2-1 89 20-Sep-23 02-Jan-24 09-Jul-24 22-Oct-24 SAR432,317.27 SAR0.00 86.8% 0% 22-Oct-24, (MH1-28-2-1/1 to MH1-28-5
(MH1-26-7 to MH1-26) 184 07-Nov-23 08-May-24 25-Aug-24 29-Mar-25 SAR432,317.27 SAR0.00 15.64% 0% 29-Mar-25, (MH1-26-7 to MH1-26
GREY WATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 249 03-Apr-23 25-Jan-24 15-Jan-24 09-Nov-24 SAR986,150.77 SAR0.00 92.28% 0% 09-Nov-24, GREY WATER DISTRIBU
GREY WATER
WATE DISTRBITION (LINE 01) 194 03-Apr-23 22-Nov-23 15-Jan-24 04-Sep-24 SAR123,268.85 SAR0.00 100% 0% 04-Sep-24, GREY WATER DISTRBITION
GREY WATER
WATE DISTRBITION (LINE 02) 173 06-May-23 27-Nov-23 13-Feb-24 09-Sep-24 SAR123,268.85 SAR0.00 100% 0% 09-Sep-24, GREY WATER DISTRBITION
GREY WATER
WATE DISTRBITION (LINE 03) 152 04-Jun-23 02-Dec-23 13-Mar-24 14-Sep-24 SAR123,268.85 SAR0.00 100% 0% 14-Sep-24, GREY WATER DISTRBITION
GREY WATER
WATE DISTRBITION (LINE 06) 131 06-Jul-23 06-Dec-23 15-Apr-24 18-Sep-24 SAR123,268.85 SAR0.00 100% 0% 18-Sep-24, GREY WATER DISTRBITION
GREY WATER
WATE DISTRBITION (LINE 07) 110 05-Aug-23 11-Dec-23 14-May-24 24-Sep-24 SAR123,268.85 SAR0.00 100% 0% 24-Sep-24, GREY WATER DISTRBITIO
GREY WATER
WATE DISTRBITION (LINE 08) 89 03-Sep-23 16-Dec-23 12-Jun-24 29-Sep-24 SAR123,268.85 SAR0.00 99.5% 0% 29-Sep-24, GREY WATER DISTRBITIO
GREY WATER
WATE DISTRBITION (LINE 09) 74 03-Oct-23 27-Dec-23 16-Jul-24 10-Oct-24 SAR123,268.85 SAR0.00 92.4% 0% 10-Oct-24, GREY WATER DISTRBITIO
GREY WATER
WATE DISTRBITION (LINE 11) 74 01-Nov-23 25-Jan-24 14-Aug-24 09-Nov-24 SAR123,268.85 SAR0.00 46.3% 0% 09-Nov-24, GREY WATER DISTRBITI
IRR & FF NETWORK
NETW BRANCHES & TIE IN POINTS 268 11-Mar-23 24-Jan-24 03-Feb-24 21-Dec-24 SAR1,640,881.39 SAR0.00 91.37% 0% 21-Dec-24, IRR & FF NETWORK BR
IRR &F.F ( LINE
L 2) 206 11-Mar-23 13-Nov-23 03-Feb-24 09-Oct-24 SAR182,320.15 SAR0.00 100% 0% 09-Oct-24, IRR &F.F ( LINE 2)
IRR &F.F ( LINE
L 3) 186 06-Apr-23 16-Nov-23 29-Feb-24 13-Oct-24 SAR182,320.15 SAR0.00 100% 0% 13-Oct-24, IRR &F.F ( LINE 3)
IRR &F.F (LINE
(LI 4) 166 07-May-23 20-Nov-23 27-Mar-24 16-Oct-24 SAR182,320.15 SAR0.00 100% 0% 16-Oct-24, IRR &F.F (LINE 4)
IRR &F.F (LINE
(LI 5) 146 03-Jun-23 23-Nov-23 27-Apr-24 20-Oct-24 SAR182,320.15 SAR0.00 100% 0% 20-Oct-24, IRR &F.F (LINE 5)
IRR &F.F ( LINE
L 6) 126 03-Jul-23 27-Nov-23 23-May-24 23-Oct-24 SAR182,320.15 SAR0.00 100% 0% 23-Oct-24, IRR &F.F ( LINE 6)
IRR &F.F ( LINE
L 7) 106 30-Jul-23 30-Nov-23 24-Jun-24 27-Oct-24 SAR182,320.15 SAR0.00 100% 0% 27-Oct-24, IRR &F.F ( LINE 7)
IRR &F.F (LINE
(LI 8) 86 26-Aug-23 04-Dec-23 21-Jul-24 30-Oct-24 SAR182,320.15 SAR0.00 100% 0% 30-Oct-24, IRR &F.F (LINE 8)
IRR &F.F ( LINE
L 9) 84 21-Sep-23 28-Dec-23 17-Aug-24 24-Nov-24 SAR182,320.15 SAR0.00 73.5% 0% 24-Nov-24, IRR &F.F ( LINE 9)
IRR &F.F ( L
LINE 11) 84 19-Oct-23 24-Jan-24 12-Sep-24 21-Dec-24 SAR182,320.15 SAR0.00 48.8% 0% 21-Dec-24, IRR &F.F ( LINE 11)
AUTOMATED W WASTE COLLECTION NETWORK 174 27-Sep-23 20-Apr-24 29-Jul-24 18-Feb-25 SAR842,904.54 SAR0.00 47% 0% 18-Feb-25, AUTOMATED WASTE
CHILLED WATER
WATE SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 207 11-Mar-23 14-Nov-23 03-Feb-24 10-Oct-24 SAR10,435,881.97 SAR0.00 100% 0% 10-Oct-24, CHILLED WATER SUPPLY
LINE 01 191 11-Mar-23 26-Oct-23 03-Feb-24 21-Sep-24 SAR2,087,176.39 SAR0.00 100% 0% 21-Sep-24, LINE 01
LINE 02 169 10-Apr-23 31-Oct-23 04-Mar-24 26-Sep-24 SAR2,087,176.39 SAR0.00 100% 0% 26-Sep-24, LINE 02
LINE 03 147 14-May-23 05-Nov-23 03-Apr-24 01-Oct-24 SAR2,087,176.39 SAR0.00 100% 0% 01-Oct-24, LINE 03
LINE 04 125 13-Jun-23 09-Nov-23 07-May-24 06-Oct-24 SAR2,087,176.39 SAR0.00 100% 0% 06-Oct-24, LINE 04
LINE 05 103 17-Jul-23 14-Nov-23 06-Jun-24 10-Oct-24 SAR2,087,176.39 SAR0.00 100% 0% 10-Oct-24, LINE 05
EXTERNAL DRY UTILITIES
U 685 17-Dec-22 28-Feb-24 15-Oct-22 A 12-Mar-25 SAR13,447,532.40 SAR0.00 98.71% 0% 12-Mar-25, EXTERNAL DRY UTI
ENGINEERING 348 17-Dec-22 22-Jan-23 15-Oct-22 A 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, ENGINEERING
POWER 348 17-Dec-22 22-Jan-23 09-Nov-22 A 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, POWER
POWER 110KV
110 CABLE RELOCATION / DEMOLISH 32 17-Dec-22 22-Jan-23 09-Nov-22 A 30-Nov-22 A SAR0.00 SAR0.00 0% 0% 30-Nov-22 A, POWER 110KV CABLE RELOCATION / DEMOLI
POWER MV CABLES RELOCATION / DEMOLISH / DIVERTING 32 17-Dec-22 22-Jan-23 27-Dec-23 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, POWER MV CABLES RELOCATION
POWER LV HOUSE CONNECTION & TIE IN POINTS 32 17-Dec-22 22-Jan-23 27-Dec-23 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, POWER LV HOUSE CONNECTION
LOW CURRENT 348 17-Dec-22 22-Jan-23 15-Oct-22 A 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, LOW CURRENT
EXISTING T
TELECOM DUCT / MANHOLE RELOCATION /DEMOLISH /DIVERTING 32 17-Dec-22 22-Jan-23 27-Dec-23 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, EXISTING TELECOM DUCT / MAN
TELECOME NETWORK DIRECTLY BURIED 32 17-Dec-22 22-Jan-23 15-Oct-22 A 19-Nov-22 A SAR0.00 SAR0.00 0% 0% 19-Nov-22 A, TELECOME NETWORK DIRECTLY BURIED
ELV NETWORK
NETWO (ICT&SECURITY) 32 17-Dec-22 22-Jan-23 27-Dec-23 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, ELV NETWORK (ICT&SECURITY)
STREET LIGHTING
LIG NET WORK 32 17-Dec-22 22-Jan-23 27-Dec-23 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, STREET LIGHTING NET WORK
PROCURMENT 175 09-Jan-23 17-Jul-23 27-Dec-23 27-Jul-24 SAR2,653,026.38 SAR0.00 100% 0% 27-Jul-24, PROCURMENT
POWER 144 09-Jan-23 03-Jul-23 20-Jan-24 15-Jul-24 SAR78,497.11 SAR0.00 100% 0% 15-Jul-24, POWER
POWER LV HOUSE CONNECTION & TIE IN POINTS 144 09-Jan-23 03-Jul-23 20-Jan-24 15-Jul-24 SAR78,497.11 SAR0.00 100% 0% 15-Jul-24, POWER LV HOUSE CONNECT
LOW CURRENT 175 09-Jan-23 17-Jul-23 27-Dec-23 27-Jul-24 SAR2,574,529.27 SAR0.00 100% 0% 27-Jul-24, LOW CURRENT
TELECOME NETWORK DIRECTLY BURIED 144 09-Jan-23 03-Jul-23 27-Dec-23 20-Jun-24 SAR80,331.58 SAR0.00 100% 0% 20-Jun-24, TELECOME NETWORK DIREC
ELV NETWORK
NETWO (ICT&SECURITY) 145 09-Jan-23 03-Jul-23 20-Jan-24 15-Jul-24 SAR2,207,550.75 SAR0.00 100% 0% 15-Jul-24, ELV NETWORK (ICT&SECURI
STREET LIGHTING
LIG NET WORK 144 23-Jan-23 17-Jul-23 01-Feb-24 27-Jul-24 SAR286,646.94 SAR0.00 100% 0% 27-Jul-24, STREET LIGHTING NET WOR
CONSTRUCTION 369 23-Jan-23 28-Feb-24 27-Dec-23 12-Mar-25 SAR10,794,506.02 SAR0.00 98.39% 0% 12-Mar-25, CONSTRUCTION
POWER 287 23-Jan-23 25-Nov-23 27-Dec-23 07-Dec-24 SAR3,336,002.69 SAR0.00 100% 0% 07-Dec-24, POWER
POWER 110KV
110 CABLE RELOCATION / DEMOLISH 154 23-Jan-23 27-Jul-23 27-Dec-23 02-Jul-24 SAR2,458,224.80 SAR0.00 100% 0% 02-Jul-24, POWER 110KV CABLE RELOC
REMOVAL OF CABLE
REMOVA 30 23-Jan-23 26-Feb-23 27-Dec-23 31-Jan-24 SAR329,869.42 SAR0.00 100% 0% 31-Jan-24, REMOVAL OF CABLE
CABLES INSTALLATION 104 27-Feb-23 04-Jul-23 31-Jan-24 04-Jun-24 SAR362,513.62 SAR0.00 100% 0% 04-Jun-24, CABLES INSTALLATION
UNIT SUBSTATION
SUB TYPE 1 89 27-Feb-23 13-Jun-23 31-Jan-24 18-May-24 SAR882,920.88 SAR0.00 100% 0% 18-May-24, UNIT SUBSTATION TYPE 1
UNIT SUBSTATION
SUB TYPE 2 89 09-Apr-23 27-Jul-23 12-Mar-24 02-Jul-24 SAR882,920.88 SAR0.00 100% 0% 02-Jul-24, UNIT SUBSTATION TYPE 2
POWER MV CABLES RELOCATION / DEMOLISH / DIVERTING 12 23-Jan-23 05-Feb-23 03-Feb-24 17-Feb-24 SAR494,804.13 SAR0.00 100% 0% 17-Feb-24, POWER MV CABLES RELOCATION

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
88 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
POWER LV HOUSE CONNECTION & TIE IN POINTS 256 23-Jan-23 25-Nov-23 03-Feb-24 07-Dec-24 SAR382,973.76 SAR0.00 100% 0% 07-Dec-24, POWER LV HOUSE CON
4C x 300 mm2 AI/XPLE/PVC 226 23-Jan-23 21-Oct-23 03-Feb-24 02-Nov-24 SAR127,657.92 SAR0.00 100% 0% 02-Nov-24, 4C x 300 mm2 AI/XPLE/PV
4C x 185 mm2 AI/XPLE/PVC 221 15-Feb-23 07-Nov-23 26-Feb-24 19-Nov-24 SAR127,657.92 SAR0.00 100% 0% 19-Nov-24, 4C x 185 mm2 AI/XPLE/PV
4C x 70 mmm2 AI/XPLE/PVC 236 15-Feb-23 25-Nov-23 26-Feb-24 07-Dec-24 SAR127,657.92 SAR0.00 100% 0% 07-Dec-24, 4C x 70 mm2 AI/XPLE/PV
LOW CURRENT 369 23-Jan-23 28-Feb-24 27-Dec-23 12-Mar-25 SAR7,458,503.33 SAR0.00 97.67% 0% 12-Mar-25, LOW CURRENT
EXISTING TTELECOM DUCT / MANHOLE RELOCATION /DEMOLISH /DIVERTING 16 23-Jan-23 09-Feb-23 03-Feb-24 21-Feb-24 SAR650,921.28 SAR0.00 100% 0% 21-Feb-24, EXISTING TELECOM DUCT / MAN
TELECOME NETWORK DIRECTLY BURIED 347 23-Jan-23 03-Feb-24 27-Dec-23 15-Feb-25 SAR682,818.43 SAR0.00 96.42% 0% 15-Feb-25, TELECOME NETWOR
2 x 20MM - HDPE TELECOM DUCTS 307 23-Jan-23 18-Dec-23 27-Dec-23 30-Dec-24 SAR227,606.14 SAR0.00 99.25% 0% 30-Dec-24, 2 x 20MM - HDPE TELEC
2 x 50MM - HDPE TELECOM DUCTS 247 20-Mar-23 10-Jan-24 31-Mar-24 22-Jan-25 SAR227,606.14 SAR0.00 95% 0% 22-Jan-25, 2 x 50MM - HDPE TELE
4 x 100M
100MM - HDPE TELECOM DUCTS 220 17-May-23 03-Feb-24 28-May-24 15-Feb-25 SAR227,606.14 SAR0.00 95% 0% 15-Feb-25, 4 x 100MM - HDPE TEL
ELV NETWORK
NETWO (ICT&SECURITY) 338 23-Jan-23 28-Feb-24 03-Feb-24 12-Mar-25 SAR2,631,408.19 SAR0.00 94.34% 0% 12-Mar-25, ELV NETWORK (ICT
CABLES & DUCTS 323 23-Jan-23 11-Feb-24 03-Feb-24 23-Feb-25 SAR1,748,487.31 SAR0.00 93% 0% 23-Feb-25, CABLES & DUCTS
UNIT SUBSTATIONS
SUB 323 09-Feb-23 28-Feb-24 20-Feb-24 12-Mar-25 SAR882,920.88 SAR0.00 97% 0% 12-Mar-25, UNIT SUBSTATIONS
STREET LIGHTING
LIG NET WORK 272 23-Jan-23 16-Dec-23 03-Feb-24 25-Dec-24 SAR3,493,355.42 SAR0.00 99.99% 0% 25-Dec-24, STREET LIGHTING NET
REMOVAL OF EXISTING LIGHTING COLUMN
REMOVA 10 23-Jan-23 02-Feb-23 03-Feb-24 14-Feb-24 SAR0.00 SAR0.00 0% 0% 14-Feb-24, REMOVAL OF EXISTING LIGHTIN
8M LIGH
LIGHTING COLUMN 204 23-Jan-23 27-Sep-23 03-Feb-24 07-Oct-24 SAR243,649.90 SAR0.00 100% 0% 07-Oct-24, 8M LIGHTING COLUMN
STREET LIGHTING CABINET 193 09-Feb-23 02-Oct-23 20-Feb-24 12-Oct-24 SAR365,474.85 SAR0.00 100% 0% 12-Oct-24, STREET LIGHTING CABIN
4C x 16 mm2
m CU/XPLE/STA/PVC CABLE 190 05-Mar-23 22-Oct-23 14-Mar-24 31-Oct-24 SAR487,299.80 SAR0.00 100% 0% 31-Oct-24, 4C x 16 mm2 CU/XPLE/STA
1C x 16 mm2
m CU/XPLE/STA/PVC CABLE 182 28-Mar-23 05-Nov-23 07-Apr-24 14-Nov-24 SAR487,299.80 SAR0.00 100% 0% 14-Nov-24, 1C x 16 mm2 CU/XPLE/ST
RING MAIN
MA UNITS (RMU'S) 152 11-May-23 11-Nov-23 21-May-24 20-Nov-24 SAR852,774.65 SAR0.00 100% 0% 20-Nov-24, RING MAIN UNITS (RM
UNIT SUBSTATIONS
SUB 157 23-May-23 28-Nov-23 02-Jun-24 08-Dec-24 SAR882,920.88 SAR0.00 100% 0% 08-Dec-24, UNIT SUBSTATIONS
FEEDER PILLERS 172 23-May-23 16-Dec-23 02-Jun-24 25-Dec-24 SAR173,935.55 SAR0.00 99.8% 0% 25-Dec-24, FEEDER PILLERS
DISTRICT - D10 824 17-Dec-22 09-Sep-24 01-Oct-22 A 30-Aug-25 SAR90,311,497.93 SAR0.00 84.25% 0% 30-Aug-25, DISTRICT - D1
EXTERNAL WET UTILITIES 747 17-Dec-22 12-Jun-24 01-Oct-22 A 27-May-25 SAR59,879,669.40 SAR0.00 85.69% 0% 27-May-25, EXTERNAL WET U
ENGINEERING 367 17-Dec-22 22-May-23 01-Oct-22 A 26-Feb-24 SAR0.00 SAR0.00 0% 0% 26-Feb-24, ENGINEERING
STORM WATER NETWORK 32 17-Dec-22 22-Jan-23 12-Oct-22 A 29-Oct-22 A SAR0.00 SAR0.00 0% 0% 29-Oct-22 A, STORM WATER NETWORK
SEWAGE NETWORK
NETW 32 09-Jan-23 14-Feb-23 27-Dec-23 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, SEWAGE NETWORK
POTABLE WATER
WAT NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 32 01-Feb-23 09-Mar-23 25-Oct-22 A 13-Nov-22 A SAR0.00 SAR0.00 0% 0% 13-Nov-22 A, POTABLE WATER NETWORK BRANCH, HOUSE
GREY WATER COLLECTION NETWORK 32 25-Feb-23 02-Apr-23 01-Oct-22 A 15-Oct-22 A SAR0.00 SAR0.00 0% 0% 15-Oct-22 A, GREY WATER COLLECTION NETWORK
GREY WATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 32 20-Mar-23 29-Apr-23 13-Dec-22 A 25-Jan-24 SAR0.00 SAR0.00 0% 0% 25-Jan-24, GREY WATER DISTRIBUTION NETW
IRR & FF NETWORK
NETW BRANCHES & TIE IN POINTS 32 25-Feb-23 02-Apr-23 20-Jan-24 26-Feb-24 SAR0.00 SAR0.00 0% 0% 26-Feb-24, IRR & FF NETWORK BRANCHES
AUTOMATED W WASTE COLLECTION NETWORK 32 12-Apr-23 22-May-23 20-Jan-24 25-Feb-24 SAR0.00 SAR0.00 0% 0% 25-Feb-24, AUTOMATED WASTE COLLECTIO
CHILLED WATER
WATE SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 32 25-Feb-23 02-Apr-23 20-Jan-24 26-Feb-24 SAR0.00 SAR0.00 0% 0% 26-Feb-24, CHILLED WATER SUPPLY & RETU
PROCURMENT 188 23-Jan-23 12-Nov-23 06-Jan-24 20-Aug-24 SAR8,421,551.43 SAR0.00 100% 0% 20-Aug-24, PROCURMENT
STORM WATER NETWORK 145 23-Jan-23 17-Jul-23 08-Jan-24 03-Jul-24 SAR1,297,268.77 SAR0.00 100% 0% 03-Jul-24, STORM WATER NETWORK
RC PIPES 145 23-Jan-23 17-Jul-23 08-Jan-24 03-Jul-24 SAR324,317.19 SAR0.00 100% 0% 03-Jul-24, RC PIPES
GRP PIPES 145 23-Jan-23 17-Jul-23 08-Jan-24 03-Jul-24 SAR324,317.19 SAR0.00 100% 0% 03-Jul-24, GRP PIPES
PRECAST R.C
R MANHOLE 145 23-Jan-23 17-Jul-23 08-Jan-24 03-Jul-24 SAR324,317.19 SAR0.00 100% 0% 03-Jul-24, PRECAST R.C MANHOLE
DI GULLIES 145 23-Jan-23 17-Jul-23 08-Jan-24 03-Jul-24 SAR324,317.19 SAR0.00 100% 0% 03-Jul-24, DI GULLIES
SEWAGE NETWORK
NETW 145 15-Feb-23 09-Aug-23 03-Feb-24 29-Jul-24 SAR3,610,089.29 SAR0.00 100% 0% 29-Jul-24, SEWAGE NETWORK
UPVC PIPES 145 15-Feb-23 09-Aug-23 03-Feb-24 29-Jul-24 SAR1,203,363.10 SAR0.00 100% 0% 29-Jul-24, UPVC PIPES
GRP PIPES 145 15-Feb-23 09-Aug-23 03-Feb-24 29-Jul-24 SAR1,203,363.10 SAR0.00 100% 0% 29-Jul-24, GRP PIPES
PRECAST R.C
R MANHOLE 145 15-Feb-23 09-Aug-23 03-Feb-24 29-Jul-24 SAR1,203,363.10 SAR0.00 100% 0% 29-Jul-24, PRECAST R.C MANHOLE
POTABLE WATER
WAT NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 145 11-Mar-23 02-Sep-23 08-Jan-24 03-Jul-24 SAR688,289.32 SAR0.00 100% 0% 03-Jul-24, POTABLE WATER NETWORK B
DI PIPES 145 11-Mar-23 02-Sep-23 08-Jan-24 03-Jul-24 SAR76,476.59 SAR0.00 100% 0% 03-Jul-24, DI PIPES
HDPE PIPES 145 11-Mar-23 02-Sep-23 08-Jan-24 03-Jul-24 SAR76,476.59 SAR0.00 100% 0% 03-Jul-24, HDPE PIPES
GRP PIPES 145 11-Mar-23 02-Sep-23 08-Jan-24 03-Jul-24 SAR76,476.59 SAR0.00 100% 0% 03-Jul-24, GRP PIPES
DI & GRP FITTING
FI 145 11-Mar-23 02-Sep-23 08-Jan-24 03-Jul-24 SAR76,476.59 SAR0.00 100% 0% 03-Jul-24, DI & GRP FITTING
GATE VALVE
VALV 145 11-Mar-23 02-Sep-23 08-Jan-24 03-Jul-24 SAR76,476.59 SAR0.00 100% 0% 03-Jul-24, GATE VALVE
BUTTERFLAY VALVE
BUTTERFLA 145 11-Mar-23 02-Sep-23 08-Jan-24 03-Jul-24 SAR76,476.59 SAR0.00 100% 0% 03-Jul-24, BUTTERFLAY VALVE
WATER METER
MET 145 11-Mar-23 02-Sep-23 08-Jan-24 03-Jul-24 SAR76,476.59 SAR0.00 100% 0% 03-Jul-24, WATER METER
AIR RELASE VALVE 145 11-Mar-23 02-Sep-23 08-Jan-24 03-Jul-24 SAR76,476.59 SAR0.00 100% 0% 03-Jul-24, AIR RELASE VALVE
WASHOUT V VALVE 145 11-Mar-23 02-Sep-23 08-Jan-24 03-Jul-24 SAR76,476.59 SAR0.00 100% 0% 03-Jul-24, WASHOUT VALVE
GREY WATER COLLECTION NETWORK 146 03-Apr-23 26-Sep-23 06-Jan-24 03-Jul-24 SAR704,227.23 SAR0.00 100% 0% 03-Jul-24, GREY WATER COLLECTION N
UPVC PIPES 144 03-Apr-23 26-Sep-23 06-Jan-24 30-Jun-24 SAR234,742.41 SAR0.00 100% 0% 30-Jun-24, UPVC PIPES
GRP PIPES 144 03-Apr-23 26-Sep-23 06-Jan-24 30-Jun-24 SAR234,742.41 SAR0.00 100% 0% 30-Jun-24, GRP PIPES
PRECAST R.C
R MANHOLE 145 03-Apr-23 26-Sep-23 08-Jan-24 03-Jul-24 SAR234,742.41 SAR0.00 100% 0% 03-Jul-24, PRECAST R.C MANHOLE
GREY WATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 144 30-Apr-23 19-Oct-23 25-Jan-24 21-Jul-24 SAR157,010.67 SAR0.00 100% 0% 21-Jul-24, GREY WATER DISTRIBUTION
DI PIPES 144 30-Apr-23 19-Oct-23 25-Jan-24 21-Jul-24 SAR19,626.33 SAR0.00 100% 0% 21-Jul-24, DI PIPES
HDPE PIPES 144 30-Apr-23 19-Oct-23 25-Jan-24 21-Jul-24 SAR19,626.33 SAR0.00 100% 0% 21-Jul-24, HDPE PIPES
GRP PIPES 144 30-Apr-23 19-Oct-23 25-Jan-24 21-Jul-24 SAR19,626.33 SAR0.00 100% 0% 21-Jul-24, GRP PIPES

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
89 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
DI & GRP FITTING
FI 144 30-Apr-23 19-Oct-23 25-Jan-24 21-Jul-24 SAR19,626.33 SAR0.00 100% 0% 21-Jul-24, DI & GRP FITTING
GATE VALVE
VALV 144 30-Apr-23 19-Oct-23 25-Jan-24 21-Jul-24 SAR19,626.33 SAR0.00 100% 0% 21-Jul-24, GATE VALVE
BUTTERFLAY VALVE
BUTTERFLA 144 30-Apr-23 19-Oct-23 25-Jan-24 21-Jul-24 SAR19,626.33 SAR0.00 100% 0% 21-Jul-24, BUTTERFLAY VALVE
AIR RELASE VALVE 144 30-Apr-23 19-Oct-23 25-Jan-24 21-Jul-24 SAR19,626.33 SAR0.00 100% 0% 21-Jul-24, AIR RELASE VALVE
WASEHOUT VALVE 144 30-Apr-23 19-Oct-23 25-Jan-24 21-Jul-24 SAR19,626.33 SAR0.00 100% 0% 21-Jul-24, WASEHOUT VALVE
IRR & FF NETWORK
NETW BRANCHES & TIE IN POINTS 157 08-Mar-23 13-Sep-23 31-Jan-24 10-Aug-24 SAR343,208.04 SAR0.00 100% 0% 10-Aug-24, IRR & FF NETWORK BRAN
HDPE PIPES 145 22-Mar-23 13-Sep-23 14-Feb-24 10-Aug-24 SAR57,201.34 SAR0.00 100% 0% 10-Aug-24, HDPE PIPES
GATE VALVE
VALV 145 22-Mar-23 13-Sep-23 14-Feb-24 10-Aug-24 SAR57,201.34 SAR0.00 100% 0% 10-Aug-24, GATE VALVE
BUTTERFLAY VALVE
BUTTERFLA 145 08-Mar-23 30-Aug-23 31-Jan-24 27-Jul-24 SAR57,201.34 SAR0.00 100% 0% 27-Jul-24, BUTTERFLAY VALVE
AIR RELASE VALVE 145 22-Mar-23 13-Sep-23 14-Feb-24 10-Aug-24 SAR57,201.34 SAR0.00 100% 0% 10-Aug-24, AIR RELASE VALVE
WASEHOUT VALVE 145 22-Mar-23 13-Sep-23 14-Feb-24 10-Aug-24 SAR57,201.34 SAR0.00 100% 0% 10-Aug-24, WASEHOUT VALVE
FIRE HYDRA
HYDRANT 145 22-Mar-23 13-Sep-23 14-Feb-24 10-Aug-24 SAR57,201.34 SAR0.00 100% 0% 10-Aug-24, FIRE HYDRANT
AUTOMATED W WASTE COLLECTION NETWORK 145 23-May-23 12-Nov-23 25-Feb-24 20-Aug-24 SAR86,769.59 SAR0.00 100% 0% 20-Aug-24, AUTOMATED WASTE COLL
CHILLED WATER
WATE SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 145 03-Apr-23 26-Sep-23 26-Feb-24 20-Aug-24 SAR1,534,688.52 SAR0.00 100% 0% 20-Aug-24, CHILLED WATER SUPPLY &
MILD STEEL PIPE 145 03-Apr-23 26-Sep-23 26-Feb-24 20-Aug-24 SAR511,562.84 SAR0.00 100% 0% 20-Aug-24, MILD STEEL PIPE
MILD STEEL FITTING 145 03-Apr-23 26-Sep-23 26-Feb-24 20-Aug-24 SAR511,562.84 SAR0.00 100% 0% 20-Aug-24, MILD STEEL FITTING
GATE VALVE
VALV 64 03-Apr-23 20-Jun-23 26-Feb-24 14-May-24 SAR511,562.84 SAR0.00 100% 0% 14-May-24, GATE VALVE
CONSTRUCTION 431 15-Feb-23 12-Jun-24 27-Dec-23 27-May-25 SAR51,458,117.97 SAR0.00 83.35% 0% 27-May-25, CONSTRUCTION
STORM WATER NETWORK 167 23-May-23 09-Dec-23 19-May-24 07-Dec-24 SAR6,616,070.56 SAR0.00 100% 0% 07-Dec-24, STORM WATER NETWO
(MH3-14-5 to MH3-14-1) 117 23-May-23 11-Oct-23 19-May-24 09-Oct-24 SAR601,460.96 SAR0.00 100% 0% 09-Oct-24, (MH3-14-5 to MH3-14-1)
(MH3-12 to M
MH-A3-1-5) 122 23-May-23 17-Oct-23 19-May-24 15-Oct-24 SAR601,460.96 SAR0.00 100% 0% 15-Oct-24, (MH3-12 to MH-A3-1-5)
(MH-EP-A10 to MH9-4) 119 01-Jun-23 23-Oct-23 28-May-24 21-Oct-24 SAR601,460.96 SAR0.00 100% 0% 21-Oct-24, (MH-EP-A10 to MH9-4)
(MH5-5 to MH5-5-3)
M 124 01-Jun-23 29-Oct-23 28-May-24 27-Oct-24 SAR601,460.96 SAR0.00 100% 0% 27-Oct-24, (MH5-5 to MH5-5-3)
(MH5-2 to MH5-5)
M 121 11-Jun-23 04-Nov-23 06-Jun-24 02-Nov-24 SAR601,460.96 SAR0.00 100% 0% 02-Nov-24, (MH5-2 to MH5-5)
(MH-EP-A22 to MH-5-2-1) 126 11-Jun-23 09-Nov-23 06-Jun-24 07-Nov-24 SAR601,460.96 SAR0.00 100% 0% 07-Nov-24, (MH-EP-A22 to MH-5-2-1)
(MH4-11to MH4-11-2)
M 131 11-Jun-23 15-Nov-23 06-Jun-24 13-Nov-24 SAR601,460.96 SAR0.00 100% 0% 13-Nov-24, (MH4-11to MH4-11-2)
(MH4-8 to MH4-8-1)
M 136 11-Jun-23 21-Nov-23 06-Jun-24 19-Nov-24 SAR601,460.96 SAR0.00 100% 0% 19-Nov-24, (MH4-8 to MH4-8-1)
(MH-EP-A15 to MH7-9) 133 20-Jun-23 27-Nov-23 20-Jun-24 25-Nov-24 SAR601,460.96 SAR0.00 100% 0% 25-Nov-24, (MH-EP-A15 to MH7-9)
(MH9-1 to MH9-6)
M 130 03-Jul-23 03-Dec-23 30-Jun-24 01-Dec-24 SAR601,460.96 SAR0.00 100% 0% 01-Dec-24, (MH9-1 to MH9-6)
(MH-EP-A11 to MH8-11) 135 03-Jul-23 09-Dec-23 30-Jun-24 07-Dec-24 SAR601,460.96 SAR0.00 100% 0% 07-Dec-24, (MH-EP-A11 to MH8-11)
SEWAGE NETWORK
NETW 399 15-Feb-23 05-Jun-24 03-Feb-24 27-May-25 SAR20,650,265.86 SAR0.00 71.78% 0% 27-May-25, SEWAGE NETWO
REMOVAL / RELOCATION OF SEWER WORK 30 15-Feb-23 21-Mar-23 03-Feb-24 09-Mar-24 SAR732,914.10 SAR0.00 100% 0% 09-Mar-24, REMOVAL / RELOCATION OF SEW
(MH-EP-B1 to
t MH1-72) 164 22-Mar-23 07-Oct-23 09-Mar-24 25-Sep-24 SAR1,810,668.34 SAR0.00 100% 0% 25-Sep-24, (MH-EP-B1 to MH1-72)
(MHA-2-3 to MH-A-7) 124 11-May-23 07-Oct-23 28-Apr-24 25-Sep-24 SAR1,810,668.34 SAR0.00 100% 0% 25-Sep-24, (MHA-2-3 to MH-A-7)
(MH-A-2 to M
MH-EP-A7-1) 89 01-Jul-23 12-Oct-23 13-Jun-24 01-Oct-24 SAR1,810,668.34 SAR0.00 100% 0% 01-Oct-24, (MH-A-2 to MH-EP-A7-1)
(MH-EP-A6-A to MH-B-4-2-1) 89 16-Aug-23 28-Nov-23 04-Aug-24 17-Nov-24 SAR1,810,668.34 SAR0.00 100% 0% 17-Nov-24, (MH-EP-A6-A to MH-B-4-
(MH-B-4-4 to MH-B-4-3) 173 11-May-23 03-Dec-23 28-Apr-24 21-Nov-24 SAR1,810,668.34 SAR0.00 100% 0% 21-Nov-24, (MH-B-4-4 to MH-B-4-3)
(MH-B-4 to M
MH-B-9) 137 01-Jul-23 07-Dec-23 13-Jun-24 26-Nov-24 SAR1,810,668.34 SAR0.00 100% 0% 26-Nov-24, (MH-B-4 to MH-B-9)
(MH1-93 to M
MH1-93-7) 101 16-Aug-23 12-Dec-23 04-Aug-24 01-Dec-24 SAR1,810,668.34 SAR0.00 100% 0% 01-Dec-24, (MH1-93 to MH1-93-7)
(MH1-90-1 to MH1-90-4) 89 03-Oct-23 14-Jan-24 19-Sep-24 02-Jan-25 SAR1,810,668.34 SAR0.00 67.3% 0% 02-Jan-25, (MH1-90-1 to MH1-90-4)
(MH-B-10 to MH-B-17) 89 19-Nov-23 29-Feb-24 06-Nov-24 18-Feb-25 SAR1,810,668.34 SAR0.00 10.84% 0% 18-Feb-25, (MH-B-10 to MH-B-17)
(MH-B-17 to MH-B-18) 89 04-Jan-24 20-Apr-24 23-Dec-24 10-Apr-25 SAR1,810,668.34 SAR0.00 0% 0% 10-Apr-25, (MH-B-17 to MH-B-1
(MH-B-18 to MH-B-25) 89 20-Feb-24 05-Jun-24 08-Feb-25 27-May-25 SAR1,810,668.34 SAR0.00 0% 0% 27-May-25, (MH-B-18 to MH-B
POTABLE WATER
WAT NETWORK BRANCH, HOUSE CONNECTIONS,TIE IN POINTS 411 11-Mar-23 12-Jun-24 27-Dec-23 04-May-25 SAR4,450,166.11 SAR0.00 98.08% 0% 04-May-25, POTABLE WATER N
REMOVAL / RELOCATION OF POTABLE WATER 30 11-Mar-23 13-Apr-23 27-Dec-23 31-Jan-24 SAR176,638.54 SAR0.00 100% 0% 31-Jan-24, REMOVAL / RELOCATION OF POTA
POTABLE W WATER (L-8) 174 15-Apr-23 31-Oct-23 31-Jan-24 31-Aug-24 SAR854,705.51 SAR0.00 100% 0% 31-Aug-24, POTABLE WATER (L-8)
POTABLE W WATER (L-9) 173 27-Apr-23 08-Nov-23 10-Feb-24 08-Sep-24 SAR854,705.51 SAR0.00 100% 0% 08-Sep-24, POTABLE WATER (L-9)
POTABLE W WATER (L-10) 172 07-May-23 16-Nov-23 19-Feb-24 16-Sep-24 SAR854,705.51 SAR0.00 100% 0% 16-Sep-24, POTABLE WATER (L-10)
POTABLE W WATER (L-12) 171 16-May-23 25-Nov-23 28-Feb-24 25-Sep-24 SAR854,705.51 SAR0.00 100% 0% 25-Sep-24, POTABLE WATER (L-12)
POTABLE W WATER (L-14) 349 25-May-23 12-Jun-24 09-Mar-24 04-May-25 SAR854,705.51 SAR0.00 90% 0% 04-May-25, POTABLE WATER
GREY WATER COLLECTION NETWORK 364 30-Apr-23 04-Jun-24 12-Feb-24 26-Apr-25 SAR2,992,965.73 SAR0.00 79.29% 0% 26-Apr-25, GREY WATER COLL
(MH1-2-5-4 to
t MH1-2-1) 348 30-Apr-23 13-May-24 12-Feb-24 07-Apr-25 SAR598,593.15 SAR0.00 98% 0% 07-Apr-25, (MH1-2-5-4 to MH1-2
(MH1-2-5-1 to
t MH1-2-9) 312 15-Jun-23 18-May-24 30-Mar-24 12-Apr-25 SAR598,593.15 SAR0.00 98% 0% 12-Apr-25, (MH1-2-5-1 to MH1-2
(MH1-22-13-1 to MH1-22-5)
(MH1-22-13- 276 05-Aug-23 22-May-24 19-May-24 16-Apr-25 SAR598,593.15 SAR0.00 98% 0% 16-Apr-25, (MH1-22-13-1 to MH
(MH1-22-8 to MH1-22-8-3) 240 20-Sep-23 27-May-24 09-Jul-24 21-Apr-25 SAR598,593.15 SAR0.00 86.8% 0% 21-Apr-25, (MH1-22-8 to MH1-2
(MH1-22-5-1 to MH1-22-1) 204 07-Nov-23 04-Jun-24 25-Aug-24 26-Apr-25 SAR598,593.15 SAR0.00 15.64% 0% 26-Apr-25, (MH1-22-5-1 to MH1
GREY WATER DISTRIBUTION NETWORK BRANCH,HOUSE CONNECTION & TIE IN POINTS 249 18-Jul-23 07-May-24 27-Apr-24 16-Feb-25 SAR1,051,894.15 SAR0.00 49.9% 0% 16-Feb-25, GREY WATER DISTRI
GREY WATER
WATE DISTRBITION (LINE 04) 168 18-Jul-23 30-Jan-24 27-Apr-24 13-Nov-24 SAR131,486.77 SAR0.00 98% 0% 13-Nov-24, GREY WATER DISTRBITI
GREY WATER
WATE DISTRBITION (LINE 05) 147 16-Aug-23 04-Feb-24 26-May-24 18-Nov-24 SAR131,486.77 SAR0.00 98% 0% 18-Nov-24, GREY WATER DISTRBIT
GREY WATER
WATE DISTRBITION (LINE 07) 126 14-Sep-23 08-Feb-24 29-Jun-24 23-Nov-24 SAR131,486.77 SAR0.00 98% 0% 23-Nov-24, GREY WATER DISTRBIT
GREY WATER
WATE DISTRBITION (LINE 09) 105 15-Oct-23 13-Feb-24 28-Jul-24 27-Nov-24 SAR131,486.77 SAR0.00 77.8% 0% 27-Nov-24, GREY WATER DISTRBIT
GREY WATER
WATE DISTRBITION (LINE 10) 84 13-Nov-23 18-Feb-24 26-Aug-24 02-Dec-24 SAR131,486.77 SAR0.00 25.3% 0% 02-Dec-24, GREY WATER DISTRBIT

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
90 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
GREY WATER
WATE DISTRBITION (LINE A1) 74 12-Dec-23 06-Mar-24 25-Sep-24 19-Dec-24 SAR131,486.77 SAR0.00 2.1% 0% 19-Dec-24, GREY WATER DISTRBIT
GREY WATER
WATE DISTRBITION (LINE A2 ROAD 48) 74 10-Jan-24 04-Apr-24 24-Oct-24 18-Jan-25 SAR131,486.77 SAR0.00 0% 0% 18-Jan-25, GREY WATER DISTRBI
GREY WATER
WATE DISTRBITION (LINE A3 ROAD 41) 74 08-Feb-24 07-May-24 23-Nov-24 16-Feb-25 SAR131,486.77 SAR0.00 0% 0% 16-Feb-25, GREY WATER DISTRB
IRR & FF NETWORK
NETW BRANCHES & TIE IN POINTS 314 03-Apr-23 14-Apr-24 26-Feb-24 08-Mar-25 SAR1,914,361.62 SAR0.00 68.81% 0% 08-Mar-25, IRR & FF NETWORK
IRR &F.F ( LINE
L 1) 196 03-Apr-23 25-Nov-23 26-Feb-24 21-Oct-24 SAR174,032.87 SAR0.00 100% 0% 21-Oct-24, IRR &F.F ( LINE 1)
IRR &F.F ( LINE
L 2) 176 03-May-23 28-Nov-23 24-Mar-24 24-Oct-24 SAR174,032.87 SAR0.00 100% 0% 24-Oct-24, IRR &F.F ( LINE 2)
IRR &F.F ( LINE
L 3) 156 30-May-23 02-Dec-23 23-Apr-24 28-Oct-24 SAR174,032.87 SAR0.00 100% 0% 28-Oct-24, IRR &F.F ( LINE 3)
IRR &F.F ( LINE
L 4) 136 26-Jun-23 05-Dec-23 20-May-24 31-Oct-24 SAR174,032.87 SAR0.00 100% 0% 31-Oct-24, IRR &F.F ( LINE 4)
IRR &F.F ( LINE
L 5) 116 26-Jul-23 09-Dec-23 20-Jun-24 04-Nov-24 SAR174,032.87 SAR0.00 100% 0% 04-Nov-24, IRR &F.F ( LINE 5)
IRR &F.F ( LINE
L 7) 96 22-Aug-23 12-Dec-23 17-Jul-24 07-Nov-24 SAR174,032.87 SAR0.00 100% 0% 07-Nov-24, IRR &F.F ( LINE 7)
IRR &F.F ( LINE
L 8) 84 18-Sep-23 25-Dec-23 13-Aug-24 20-Nov-24 SAR174,032.87 SAR0.00 77.5% 0% 20-Nov-24, IRR &F.F ( LINE 8)
IRR &F.F ( LINE
L 10) 84 16-Oct-23 21-Jan-24 09-Sep-24 17-Dec-24 SAR174,032.87 SAR0.00 51.2% 0% 17-Dec-24, IRR &F.F ( LINE 10)
IRR &F.F ( A3
A ROAD41) 84 12-Nov-23 17-Feb-24 07-Oct-24 13-Jan-25 SAR174,032.87 SAR0.00 23.68% 0% 13-Jan-25, IRR &F.F ( A3 ROAD41)
IRR &F.F ( A1)
A 84 09-Dec-23 14-Mar-24 03-Nov-24 09-Feb-25 SAR174,032.87 SAR0.00 4.5% 0% 09-Feb-25, IRR &F.F ( A1)
IRR &F.F ( A2
A ROAD48) 84 04-Jan-24 14-Apr-24 30-Nov-24 08-Mar-25 SAR174,032.87 SAR0.00 0% 0% 08-Mar-25, IRR &F.F ( A2 ROAD4
AUTOMATED W WASTE COLLECTION NETWORK 279 23-May-23 20-Apr-24 25-Feb-24 25-Jan-25 SAR737,541.47 SAR0.00 47% 0% 25-Jan-25, AUTOMATED WASTE C
CHILLED WATER
WATE SUPPLY & RETURN NETWORK BRANCHES AND BURIED LIMNES 311 10-Apr-23 30-May-24 04-Mar-24 11-Mar-25 SAR13,044,852.46 SAR0.00 96% 0% 11-Mar-25, CHILLED WATER SU
LINE 01 295 10-Apr-23 12-May-24 04-Mar-24 20-Feb-25 SAR2,608,970.49 SAR0.00 96% 0% 20-Feb-25, LINE 01
LINE 02 273 14-May-23 16-May-24 03-Apr-24 25-Feb-25 SAR2,608,970.49 SAR0.00 96% 0% 25-Feb-25, LINE 02
LINE 03 251 13-Jun-23 21-May-24 07-May-24 02-Mar-25 SAR2,608,970.49 SAR0.00 96% 0% 02-Mar-25, LINE 03
LINE 04 229 17-Jul-23 26-May-24 06-Jun-24 06-Mar-25 SAR2,608,970.49 SAR0.00 96% 0% 06-Mar-25, LINE 04
LINE 05 207 16-Aug-23 30-May-24 11-Jul-24 11-Mar-25 SAR2,608,970.49 SAR0.00 96% 0% 11-Mar-25, LINE 05
EXTERNAL DRY UTILITIES
U 804 09-Jan-23 09-Sep-24 15-Oct-22 A 30-Aug-25 SAR30,431,828.53 SAR0.00 81.43% 0% 30-Aug-25, EXTERNAL DR
ENGINEERING 328 09-Jan-23 06-Apr-23 15-Oct-22 A 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, ENGINEERING
POWER 328 09-Jan-23 06-Apr-23 15-Oct-22 A 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, POWER
POWER 110KV
110 CABLE RELOCATION / DEMOLISH 32 23-Jan-23 28-Feb-23 09-Nov-22 A 30-Nov-22 A SAR0.00 SAR0.00 0% 0% 30-Nov-22 A, POWER 110KV CABLE RELOCATION / DEMOLI
POWER MV CABLES RELOCATION / DEMOLISH / DIVERTING 32 01-Mar-23 06-Apr-23 27-Dec-23 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, POWER MV CABLES RELOCATION
POWER MV NETWORK HOUSE CONNECTION & TIE IN POINTS 32 09-Jan-23 14-Feb-23 27-Dec-23 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, POWER MV NETWORK HOUSE CO
POWER LV HOUSE CONNECTION & TIE IN POINTS 32 09-Jan-23 14-Feb-23 15-Oct-22 A 19-Nov-22 A SAR0.00 SAR0.00 0% 0% 19-Nov-22 A, POWER LV HOUSE CONNECTION & TIE IN POI
LOW CURRENT 32 09-Jan-23 14-Feb-23 27-Dec-23 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, LOW CURRENT
EXISTING TTELECOM DUCT / MANHOLE RELOCATION /DEMOLISH /DIVERTING 32 09-Jan-23 14-Feb-23 27-Dec-23 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, EXISTING TELECOM DUCT / MAN
TELECOME NETWORK DIRECTLY BURIED 32 09-Jan-23 14-Feb-23 27-Dec-23 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, TELECOME NETWORK DIRECTLY
ELV NETWORK
NETWO (ICT&SECURITY) 32 09-Jan-23 14-Feb-23 27-Dec-23 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, ELV NETWORK (ICT&SECURITY)
STREET LIGHTING
LIG NET WORK 32 09-Jan-23 14-Feb-23 27-Dec-23 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, STREET LIGHTING NET WORK
SCADA SYSTEM
SYS 32 09-Jan-23 14-Feb-23 27-Dec-23 03-Feb-24 SAR0.00 SAR0.00 0% 0% 03-Feb-24, SCADA SYSTEM
PROCURMENT 187 18-Jan-23 09-Aug-23 08-Jan-24 21-Aug-24 SAR5,950,740.76 SAR0.00 100% 0% 21-Aug-24, PROCURMENT
POWER 147 21-Jan-23 09-Aug-23 31-Jan-24 29-Jul-24 SAR2,291,793.08 SAR0.00 100% 0% 29-Jul-24, POWER
POWER MV NETWORK HOUSE CONNECTION & TIE IN POINTS 145 15-Feb-23 09-Aug-23 03-Feb-24 29-Jul-24 SAR2,196,305.66 SAR0.00 100% 0% 29-Jul-24, POWER MV NETWORK HOU
POWER LV HOUSE CONNECTION & TIE IN POINTS 145 21-Jan-23 15-Jul-23 31-Jan-24 27-Jul-24 SAR95,487.42 SAR0.00 100% 0% 27-Jul-24, POWER LV HOUSE CONNECT
LOW CURRENT 187 18-Jan-23 09-Aug-23 08-Jan-24 21-Aug-24 SAR3,658,947.69 SAR0.00 100% 0% 21-Aug-24, LOW CURRENT
TELECOME NETWORK DIRECTLY BURIED 145 21-Jan-23 15-Jul-23 08-Jan-24 03-Jul-24 SAR91,807.52 SAR0.00 100% 0% 03-Jul-24, TELECOME NETWORK DIREC
ELV NETWORK
NETWO (ICT&SECURITY) 145 21-Jan-23 15-Jul-23 31-Jan-24 27-Jul-24 SAR1,967,048.23 SAR0.00 100% 0% 27-Jul-24, ELV NETWORK (ICT&SECUR
STREET LIGHTING
LIG NET WORK 145 15-Feb-23 09-Aug-23 03-Feb-24 29-Jul-24 SAR286,646.94 SAR0.00 100% 0% 29-Jul-24, STREET LIGHTING NET WOR
SCADA SYSTEM
SYS 145 18-Jan-23 12-Jul-23 26-Feb-24 21-Aug-24 SAR1,313,445.00 SAR0.00 100% 0% 21-Aug-24, SCADA SYSTEM
CONSTRUCTION 508 15-Feb-23 09-Sep-24 27-Dec-23 30-Aug-25 SAR24,481,087.76 SAR0.00 76.92% 0% 30-Aug-25, CONSTRUCTIO
POWER 312 15-Feb-23 16-Jan-24 27-Dec-23 05-Jan-25 SAR14,476,922.52 SAR0.00 99.86% 0% 05-Jan-25, POWER
POWER 110KV
110 CABLE RELOCATION / DEMOLISH 122 01-Mar-23 27-Jul-23 27-Dec-23 21-May-24 SAR722,592.50 SAR0.00 100% 0% 21-May-24, POWER 110KV CABLE RELOC
REMOVAL OF CABLE
REMOVA 30 01-Mar-23 04-Apr-23 27-Dec-23 31-Jan-24 SAR329,869.42 SAR0.00 100% 0% 31-Jan-24, REMOVAL OF CABLE
CABLES INSTALLATION 92 05-Apr-23 27-Jul-23 31-Jan-24 21-May-24 SAR392,723.08 SAR0.00 100% 0% 21-May-24, CABLES INSTALLATION
POWER MV CABLES RELOCATION / DEMOLISH / DIVERTING 26 05-Apr-23 08-May-23 31-Jan-24 02-Mar-24 SAR494,804.13 SAR0.00 100% 0% 02-Mar-24, POWER MV CABLES RELOCATIO
POWER MV NETWORK HOUSE CONNECTION & TIE IN POINTS 233 08-Apr-23 21-Nov-23 03-Feb-24 10-Nov-24 SAR12,791,446.84 SAR0.00 100% 0% 10-Nov-24, POWER MV NETWORK
3C x 500 mm2 AI/XPLE/SWA/PVC 233 08-Apr-23 21-Nov-23 03-Feb-24 10-Nov-24 SAR12,791,446.84 SAR0.00 100% 0% 10-Nov-24, 3C x 500 mm2 AI/XPLE/SW
POWER LV HOUSE CONNECTION & TIE IN POINTS 312 15-Feb-23 16-Jan-24 27-Dec-23 05-Jan-25 SAR468,079.05 SAR0.00 95.64% 0% 05-Jan-25, POWER LV HOUSE CON
4C x 300 mm2 AI/XPLE/PVC 282 15-Feb-23 12-Dec-23 27-Dec-23 01-Dec-24 SAR156,026.35 SAR0.00 100% 0% 01-Dec-24, 4C x 300 mm2 AI/XPLE/P
4C x 185 mm2 AI/XPLE/PVC 277 11-Mar-23 30-Dec-23 20-Jan-24 18-Dec-24 SAR156,026.35 SAR0.00 93.93% 0% 18-Dec-24, 4C x 185 mm2 AI/XPLE/P
4C x 70 mmm2 AI/XPLE/PVC 292 11-Mar-23 16-Jan-24 20-Jan-24 05-Jan-25 SAR156,026.35 SAR0.00 93% 0% 05-Jan-25, 4C x 70 mm2 AI/XPLE/PV
LOW CURRENT 477 15-Feb-23 09-Sep-24 03-Feb-24 30-Aug-25 SAR10,004,165.24 SAR0.00 43.72% 0% 30-Aug-25, LOW CURREN
EXISTING TTELECOM DUCT / MANHOLE RELOCATION /DEMOLISH /DIVERTING 28 15-Feb-23 13-May-23 03-Feb-24 06-Mar-24 SAR610,238.70 SAR0.00 100% 0% 06-Mar-24, EXISTING TELECOM DUCT / MAN
TELECOME NETWORK DIRECTLY BURIED 341 15-Feb-23 26-Mar-24 03-Feb-24 16-Mar-25 SAR780,363.92 SAR0.00 95% 0% 16-Mar-25, TELECOME NETWOR
2 x 20MM - HDPE TELECOM DUCTS 301 15-Feb-23 08-Feb-24 03-Feb-24 28-Jan-25 SAR260,121.31 SAR0.00 95% 0% 28-Jan-25, 2 x 20MM - HDPE TELE
2 x 50MM - HDPE TELECOM DUCTS 273 11-Apr-23 03-Mar-24 30-Mar-24 20-Feb-25 SAR260,121.31 SAR0.00 95% 0% 20-Feb-25, 2 x 50MM - HDPE TEL
4 x 100M
100MM - HDPE TELECOM DUCTS 246 08-Jun-23 26-Mar-24 27-May-24 16-Mar-25 SAR260,121.31 SAR0.00 95% 0% 16-Mar-25, 4 x 100MM - HDPE TE

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
91 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
ELV NETWORK
NETWO (ICT&SECURITY) 363 15-Feb-23 24-Apr-24 03-Feb-24 15-Apr-25 SAR2,505,321.38 SAR0.00 94.44% 0% 15-Apr-25, ELV NETWORK (ICT
CABLES & DUCTS 348 15-Feb-23 03-Apr-24 03-Feb-24 24-Mar-25 SAR1,602,780.04 SAR0.00 93% 0% 24-Mar-25, CABLES & DUCTS
UNIT SUBSTATIONS
SUB 348 05-Mar-23 24-Apr-24 20-Feb-24 15-Apr-25 SAR902,541.34 SAR0.00 97% 0% 15-Apr-25, UNIT SUBSTATIONS
STREET LIGHTING
LIG NET WORK 291 17-Aug-23 22-Aug-24 28-Aug-24 12-Aug-25 SAR3,481,351.24 SAR0.00 18.85% 0% 12-Aug-25, STREET LIGHT
REMOVAL OF EXISTING LIGHTING COLUMN
REMOVA 10 17-Aug-23 28-Aug-23 28-Aug-24 09-Sep-24 SAR0.00 SAR0.00 0% 0% 09-Sep-24, REMOVAL OF EXISTING LI
8M LIGH
LIGHTING COLUMN 76 29-Aug-23 26-Nov-23 09-Sep-24 08-Dec-24 SAR243,649.90 SAR0.00 100% 0% 08-Dec-24, 8M LIGHTING COLUMN
12M LIGHTING
LIGH COLUMN 76 16-Sep-23 13-Dec-23 28-Sep-24 25-Dec-24 SAR243,649.90 SAR0.00 100% 0% 25-Dec-24, 12M LIGHTING COLUM
STREET LIGHTING CABINET 127 02-Nov-23 24-Apr-24 13-Nov-24 15-Apr-25 SAR243,649.90 SAR0.00 18.33% 0% 15-Apr-25, STREET LIGHTING
4C x 16 mm2
m CU/XPLE/STA/PVC CABLE 159 26-Nov-23 29-Jun-24 07-Dec-24 18-Jun-25 SAR487,299.80 SAR0.00 25.5% 0% 18-Jun-25, 4C x 16 mm2 CU/X
1C x 16 mm2
m CU/XPLE/STA/PVC CABLE 151 19-Dec-23 13-Jul-24 30-Dec-24 02-Jul-25 SAR487,299.80 SAR0.00 0% 0% 02-Jul-25, 1C x 16 mm2 CU/X
RING MAIN
MA UNITS (RMU'S) 121 29-Jan-24 18-Jul-24 09-Feb-25 08-Jul-25 SAR730,949.70 SAR0.00 0% 0% 08-Jul-25, RING MAIN UNIT
UNIT SUBSTATIONS
SUB 126 10-Feb-24 05-Aug-24 20-Feb-25 26-Jul-25 SAR902,541.34 SAR0.00 0% 0% 26-Jul-25, UNIT SUBSTATIO
FEEDER PILLERS 141 10-Feb-24 22-Aug-24 20-Feb-25 12-Aug-25 SAR142,310.90 SAR0.00 0% 0% 12-Aug-25, FEEDER PILLER
SCADA SYSTEM
SYS 15 24-Aug-24 09-Sep-24 12-Aug-25 30-Aug-25 SAR2,626,890.00 SAR0.00 0% 0% 30-Aug-25, SCADA SYSTE
NORTH SIDE AUTO
AUTOMATIC WASTE COLLECTION SYSTEM(S1&S2&S3&S4&S5&S7$S8) 310 23-May-23 27-May-24 25-Feb-24 02-Mar-25 SAR942,069.78 SAR0.00 27.15% 0% 02-Mar-25, NORTH SIDE AUTOM
ENGINEERING 32 23-May-23 02-Jul-23 25-Feb-24 02-Apr-24 SAR0.00 SAR0.00 0% 0% 02-Apr-24, ENGINEERING
PROCURMENT 144 03-Jul-23 19-Dec-23 02-Apr-24 26-Sep-24 SAR99,165.24 SAR0.00 96.44% 0% 26-Sep-24, PROCURMENT
CONSTRUCTION 278 03-Jul-23 27-May-24 02-Apr-24 02-Mar-25 SAR842,904.54 SAR0.00 19% 0% 02-Mar-25, CONSTRUCTION
EXTERNAL MAIN R
ROADS (OUTSIDE) 561 01-May-24 18-Aug-25 15-Sep-24 19-Jul-26 SAR31,582,020.57 SAR0.00 0% 0% 19-Jul-26, EXTE
ENGINEERING 75 01-May-24 31-Jul-24 15-Sep-24 11-Dec-24 SAR0.00 SAR0.00 0% 0% 11-Dec-24, ENGINEERING
ROAD CROSS-SECTIONS
CROSS-SE 26 01-May-24 30-May-24 15-Sep-24 15-Oct-24 SAR0.00 SAR0.00 0% 0% 15-Oct-24, ROAD CROSS-SECTIONS
GANTRY SIGNBOARD
SIGNBO 26 15-May-24 13-Jun-24 29-Sep-24 29-Oct-24 SAR0.00 SAR0.00 0% 0% 29-Oct-24, GANTRY SIGNBOARD
METHOD STATEMENT
STATEM 37 19-Jun-24 31-Jul-24 29-Oct-24 11-Dec-24 SAR0.00 SAR0.00 0% 0% 11-Dec-24, METHOD STATEMENT
PROCUREMENT 269 01-Aug-24 19-Dec-24 11-Dec-24 30-Oct-25 SAR0.00 SAR0.00 0% 0% 30-Oct-25, PROCUREME
ABC,BBC,BWC,MC1,RC2
ABC,BBC,BWC,M 269 01-Aug-24 19-Dec-24 11-Dec-24 30-Oct-25 SAR0.00 SAR0.00 0% 0% 30-Oct-25, ABC,BBC,BW
CONSTRUCTION 226 20-Nov-24 18-Aug-25 21-Oct-25 19-Jul-26 SAR31,582,020.57 SAR0.00 0% 0% 19-Jul-26, CON
AIRPORT ROAD RAMP 2 82 20-Nov-24 15-Mar-25 21-Oct-25 24-Jan-26 SAR1,724,621.63 SAR0.00 0% 0% 24-Jan-26, AIRPORT R
GANTRY SIGNB
SIGNBOARD 22 18-Feb-25 15-Mar-25 29-Dec-25 24-Jan-26 SAR1,219,797.75 SAR0.00 0% 0% 24-Jan-26, GANTRY S
AIRPORT ROAD RAMP 1 81 30-Nov-24 19-Mar-25 30-Oct-25 01-Feb-26 SAR1,839,213.55 SAR0.00 0% 0% 01-Feb-26, AIRPORT
GANTRY SIGNB
SIGNBOARD 22 06-Feb-25 19-Mar-25 07-Jan-26 01-Feb-26 SAR1,219,797.75 SAR0.00 0% 0% 01-Feb-26, GANTRY
AIRPORT TUNNE
TUNNEL - OUTSIDE 123 09-Dec-24 05-May-25 09-Nov-25 05-Apr-26 SAR1,510,803.66 SAR0.00 0% 0% 05-Apr-26, AIRPOR
10M LIGHTING C
COLUMN 76 02-Feb-25 05-May-25 03-Jan-26 05-Apr-26 SAR680,786.48 SAR0.00 0% 0% 05-Apr-26, 10M LIG
KING ABDULAZIZ ROAD RAMP 1 73 18-Dec-24 06-Apr-25 18-Nov-25 10-Feb-26 SAR408,814.43 SAR0.00 0% 0% 10-Feb-26, KING AB
KING ABDULAZIZ ROAD RAMP 2 73 28-Dec-24 15-Apr-25 27-Nov-25 19-Feb-26 SAR371,649.48 SAR0.00 0% 0% 19-Feb-26, KING AB
KING ABDULAZIZ ROAD AT GRADE 1 123 06-Jan-25 02-Jun-25 07-Dec-25 03-May-26 SAR841,834.59 SAR0.00 0% 0% 03-May-26, KING
12M LIGHTING C
COLUMN 76 02-Mar-25 02-Jun-25 31-Jan-26 03-May-26 SAR680,786.48 SAR0.00 0% 0% 03-May-26, 12M L
KING ABDULAZIZ ROAD AT GRADE 2 123 15-Jan-25 15-Jun-25 16-Dec-25 12-May-26 SAR832,543.36 SAR0.00 0% 0% 12-May-26, KING
12M LIGHTING C
COLUMN 76 11-Mar-25 15-Jun-25 09-Feb-26 12-May-26 SAR680,786.48 SAR0.00 0% 0% 12-May-26, 12M L
KING ABDULAZIZ ROAD TUNNEL - OUTSIDE 123 25-Jan-25 24-Jun-25 25-Dec-25 21-May-26 SAR3,235,876.66 SAR0.00 0% 0% 21-May-26, KING
12M LIGHTING C
COLUMN 76 20-Mar-25 24-Jun-25 18-Feb-26 21-May-26 SAR680,786.48 SAR0.00 0% 0% 21-May-26, 12M L
KING ABDULAZIZ ROAD TUNNEL - U TURN 73 03-Feb-25 22-May-25 04-Jan-26 02-Apr-26 SAR49,553.26 SAR0.00 0% 0% 02-Apr-26, KING A
JADAT AL HARA
HARAM TUNNEL RAMP - SOUTH 1 73 12-Feb-25 01-Jun-25 13-Jan-26 12-Apr-26 SAR1,114,948.44 SAR0.00 0% 0% 12-Apr-26, JADAT
JADAT AL HARA
HARAM TUNNEL RAMP - SOUTH 2 73 22-Feb-25 14-Jun-25 22-Jan-26 21-Apr-26 SAR981,774.04 SAR0.00 0% 0% 21-Apr-26, JADAT
HARAM BOULEV
BOULEVARD @STA. 0+171.50 ~ 0+976 123 03-Mar-25 31-Jul-25 01-Feb-26 01-Jul-26 SAR7,400,996.54 SAR0.00 0% 0% 01-Jul-26, HARA
12M LIGHTING C
COLUMN 76 01-May-25 31-Jul-25 01-Apr-26 01-Jul-26 SAR680,786.48 SAR0.00 0% 0% 01-Jul-26, 12M L
GANTRY SIGNB
SIGNBOARD 22 15-May-25 12-Jun-25 15-Apr-26 10-May-26 SAR1,219,797.75 SAR0.00 0% 0% 10-May-26, GANT
HARAM BOULEV
BOULEVARD @STA. 1+560 ~ 2+526.77 130 12-Mar-25 18-Aug-25 10-Feb-26 19-Jul-26 SAR5,480,950.28 SAR0.00 0% 0% 19-Jul-26, HAR
12M LIGHTING C
COLUMN 83 11-May-25 18-Aug-25 11-Apr-26 19-Jul-26 SAR510,589.86 SAR0.00 0% 0% 19-Jul-26, 12M
GANTRY SIGNB
SIGNBOARD 22 25-May-25 22-Jun-25 25-Apr-26 19-May-26 SAR1,219,797.75 SAR0.00 0% 0% 19-May-26, GANT
JADAT AL HARA
HARAM TUNNEL RAMP - NORTH 1 73 22-Mar-25 12-Jul-25 19-Feb-26 19-May-26 SAR1,306,967.34 SAR0.00 0% 0% 19-May-26, JADA
JADAT AL HARA
HARAM TUNNEL RAMP - NORTH 2 73 05-Apr-25 21-Jul-25 01-Mar-26 01-Jun-26 SAR1,282,190.71 SAR0.00 0% 0% 01-Jun-26, JADA
JADAT AL HARAM
HARA TUNNEL - WEST OF AIRPORT ROAD SIDE 73 14-Apr-25 30-Jul-25 10-Mar-26 10-Jun-26 SAR3,199,282.61 SAR0.00 0% 0% 10-Jun-26, JADA
LOCAL ROADS AND
AN PAVINGS 676 18-Jul-24 11-Oct-25 01-Jan-23 A 23-Jul-26 SAR8,182,482.72 SAR0.00 0% 0% 23-Jul-26, LOC

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
92 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
ENGINEERING 217 18-Jul-24 13-Oct-24 01-Jan-23 A 18-Jan-25 SAR0.00 SAR0.00 0% 0% 18-Jan-25, ENGINEERING
CIVIL/STRUCTURAL
CIVIL/STRUCTUR 42 18-Jul-24 04-Sep-24 01-Jan-23 A 11-Dec-24 SAR0.00 SAR0.00 0% 0% 11-Dec-24, CIVIL/STRUCTURAL
METHOD STATEMENT
STATEM 32 05-Sep-24 13-Oct-24 11-Dec-24 18-Jan-25 SAR0.00 SAR0.00 0% 0% 18-Jan-25, METHOD STATEMENT
PROCUREMENT 149 14-Oct-24 10-Apr-25 18-Jan-25 19-Jul-25 SAR0.00 SAR0.00 0% 0% 19-Jul-25, PROCUREMENT
CIVIL/STRUCTURAL
CIVIL/STRUCTUR 149 14-Oct-24 10-Apr-25 18-Jan-25 19-Jul-25 SAR0.00 SAR0.00 0% 0% 19-Jul-25, CIVIL/STRUCTUR
CONSTRUCTION 230 20-Nov-24 11-Oct-25 21-Oct-25 23-Jul-26 SAR8,182,482.72 SAR0.00 0% 0% 23-Jul-26, CON
NORTH 190 20-Nov-24 11-Oct-25 21-Oct-25 07-Jun-26 SAR1,756,353.50 SAR0.00 0% 0% 07-Jun-26, NORT
LOCAL ROAD NO.
N 01 62 20-Nov-24 10-May-25 21-Oct-25 31-Dec-25 SAR55,747.42 SAR0.00 0% 0% 31-Dec-25, LOCAL RO
LOCAL ROAD NO.
N 03 62 30-Nov-24 19-May-25 30-Oct-25 10-Jan-26 SAR55,437.71 SAR0.00 0% 0% 10-Jan-26, LOCAL RO
LOCAL ROAD NO.
N 05 62 09-Dec-24 28-May-25 09-Nov-25 19-Jan-26 SAR55,747.42 SAR0.00 0% 0% 19-Jan-26, LOCAL RO
LOCAL ROAD NO.
N 07 62 18-Dec-24 10-Jun-25 18-Nov-25 28-Jan-26 SAR52,650.34 SAR0.00 0% 0% 28-Jan-26, LOCAL RO
LOCAL ROAD NO.
N 09 62 28-Dec-24 19-Jun-25 27-Nov-25 07-Feb-26 SAR27,873.71 SAR0.00 0% 0% 07-Feb-26, LOCAL RO
LOCAL ROAD NO.
N 25 62 06-Jan-25 29-Jun-25 07-Dec-25 16-Feb-26 SAR24,776.63 SAR0.00 0% 0% 16-Feb-26, LOCAL R
LOCAL ROAD NO.
N 26 62 15-Jan-25 08-Jul-25 16-Dec-25 25-Feb-26 SAR55,747.42 SAR0.00 0% 0% 25-Feb-26, LOCAL R
LOCAL ROAD NO.
N 29 62 25-Jan-25 17-Jul-25 25-Dec-25 07-Mar-26 SAR32,829.04 SAR0.00 0% 0% 07-Mar-26, LOCAL R
LOCAL ROAD NO.
N 31 62 03-Feb-25 27-Jul-25 04-Jan-26 16-Mar-26 SAR26,944.59 SAR0.00 0% 0% 16-Mar-26, LOCAL
LOCAL ROAD NO.
N 32 62 12-Feb-25 05-Aug-25 13-Jan-26 30-Mar-26 SAR18,582.47 SAR0.00 0% 0% 30-Mar-26, LOCAL
LOCAL ROAD NO.
N 33 62 22-Feb-25 14-Aug-25 22-Jan-26 08-Apr-26 SAR36,855.24 SAR0.00 0% 0% 08-Apr-26, LOCAL
LOCAL ROAD NO.
N 34 (NEAR HARAM RAMP NORTH - 01) 62 03-Mar-25 24-Aug-25 01-Feb-26 18-Apr-26 SAR418,105.67 SAR0.00 0% 0% 18-Apr-26, LOCAL
LOCAL ROAD NO.
N 36 62 12-Mar-25 02-Sep-25 10-Feb-26 27-Apr-26 SAR49,553.26 SAR0.00 0% 0% 27-Apr-26, LOCAL
LOCAL ROAD NO.
N 45 62 22-Mar-25 11-Sep-25 19-Feb-26 06-May-26 SAR541,988.82 SAR0.00 0% 0% 06-May-26, LOCA
AMIDA RAMP - A 62 05-Apr-25 21-Sep-25 01-Mar-26 16-May-26 SAR114,591.92 SAR0.00 0% 0% 16-May-26, AMID
AMIDA RAMP - B 62 14-Apr-25 01-Oct-25 10-Mar-26 25-May-26 SAR58,844.50 SAR0.00 0% 0% 25-May-26, AMID
EXISTING ROAD (NEAR HARAM RAMP NORTH - 02) 62 23-Apr-25 11-Oct-25 24-Mar-26 07-Jun-26 SAR130,077.32 SAR0.00 0% 0% 07-Jun-26, EXIST
SOUTH 222 30-Nov-24 23-Aug-25 30-Oct-25 23-Jul-26 SAR6,426,129.22 SAR0.00 0% 0% 23-Jul-26, SOU
LOCAL ROAD N
NO. 11 62 30-Nov-24 09-Feb-25 30-Oct-25 10-Jan-26 SAR473,853.09 SAR0.00 0% 0% 10-Jan-26, LOCAL RO
LOCAL ROAD NO.
N 10 62 09-Dec-24 18-Feb-25 09-Nov-25 19-Jan-26 SAR86,718.21 SAR0.00 0% 0% 19-Jan-26, LOCAL RO
LOCAL ROAD NO.
N 12 62 18-Dec-24 27-Feb-25 18-Nov-25 28-Jan-26 SAR591,542.09 SAR0.00 0% 0% 28-Jan-26, LOCAL RO
LOCAL ROAD NO.
N 13 62 28-Dec-24 09-Mar-25 27-Nov-25 07-Feb-26 SAR433,591.06 SAR0.00 0% 0% 07-Feb-26, LOCAL RO
LOCAL ROAD NO.
N 14 62 06-Jan-25 18-Mar-25 07-Dec-25 16-Feb-26 SAR102,203.61 SAR0.00 0% 0% 16-Feb-26, LOCAL R
LOCAL ROAD NO.
N 15 62 15-Jan-25 27-Mar-25 16-Dec-25 25-Feb-26 SAR284,931.27 SAR0.00 0% 0% 25-Feb-26, LOCAL R
LOCAL ROAD NO.
N 16 62 25-Jan-25 10-Apr-25 25-Dec-25 07-Mar-26 SAR284,931.27 SAR0.00 0% 0% 07-Mar-26, LOCAL R
LOCAL ROAD NO.
N 17 62 03-Feb-25 20-Apr-25 04-Jan-26 16-Mar-26 SAR235,378.00 SAR0.00 0% 0% 16-Mar-26, LOCAL
LOCAL ROAD NO.
N 18 62 12-Feb-25 29-Apr-25 13-Jan-26 30-Mar-26 SAR142,465.63 SAR0.00 0% 0% 30-Mar-26, LOCAL
LOCAL ROAD NO.
N 20 62 22-Feb-25 08-May-25 22-Jan-26 08-Apr-26 SAR449,076.46 SAR0.00 0% 0% 08-Apr-26, LOCAL
LOCAL ROAD NO.
N 21 62 03-Mar-25 18-May-25 01-Feb-26 18-Apr-26 SAR269,445.87 SAR0.00 0% 0% 18-Apr-26, LOCAL
LOCAL ROAD NO.
N 22 62 12-Mar-25 27-May-25 10-Feb-26 27-Apr-26 SAR653,483.67 SAR0.00 0% 0% 27-Apr-26, LOCAL
LOCAL ROAD NO.
N 23 62 22-Mar-25 09-Jun-25 19-Feb-26 06-May-26 SAR61,941.58 SAR0.00 0% 0% 06-May-26, LOCA
LOCAL ROAD NO.
N 24 62 05-Apr-25 18-Jun-25 01-Mar-26 16-May-26 SAR774,269.75 SAR0.00 0% 0% 16-May-26, LOCA
LOCAL ROAD NO.
N 38 62 14-Apr-25 28-Jun-25 10-Mar-26 25-May-26 SAR545,085.90 SAR0.00 0% 0% 25-May-26, LOCA
LOCAL ROAD NO.
N 41 62 23-Apr-25 07-Jul-25 24-Mar-26 07-Jun-26 SAR176,533.50 SAR0.00 0% 0% 07-Jun-26, LOCA
LOCAL ROAD NO.
N 42 62 03-May-25 16-Jul-25 02-Apr-26 16-Jun-26 SAR266,348.79 SAR0.00 0% 0% 16-Jun-26, LOCA
LOCAL ROAD NO.
N 43 62 12-May-25 26-Jul-25 12-Apr-26 25-Jun-26 SAR161,048.11 SAR0.00 0% 0% 25-Jun-26, LOCA
LOCAL ROAD NO.
N 44 62 21-May-25 04-Aug-25 21-Apr-26 05-Jul-26 SAR111,494.84 SAR0.00 0% 0% 05-Jul-26, LOCA
LOCAL ROAD NO.
N 48 78 12-May-25 13-Aug-25 12-Apr-26 14-Jul-26 SAR154,853.95 SAR0.00 0% 0% 14-Jul-26, LOCA
LOCAL ROAD NO.
N 49 78 21-May-25 23-Aug-25 21-Apr-26 23-Jul-26 SAR30,661.08 SAR0.00 0% 0% 23-Jul-26, LOC
LOCAL ROAD NO.
N 54 62 21-May-25 04-Aug-25 21-Apr-26 05-Jul-26 SAR136,271.48 SAR0.00 0% 0% 05-Jul-26, LOCA
TESTING & COMMISSIONING
COMM 356 23-Oct-24 11-Oct-25 27-May-25 29-Jul-26 SAR55,660,745.24 SAR0.00 0% 0% 29-Jul-26, TEST
WET UTILITIES 350 30-Nov-24 12-Aug-25 27-May-25 22-Jul-26 SAR14,850,985.38 SAR0.00 0% 0% 22-Jul-26, WET
DRY UTILITIES 184 27-Jan-25 06-Sep-25 29-Nov-25 08-Jul-26 SAR6,451,079.11 SAR0.00 0% 0% 08-Jul-26, DRY
MEP SERVICES 334 23-Oct-24 11-Oct-25 26-Jun-25 29-Jul-26 SAR34,358,680.75 SAR0.00 0% 0% 29-Jul-26, MEP
PROJECT CLOSE O
OUT 268 13-Jan-25 26-Nov-25 16-Sep-25 03-Aug-26 SAR1,597,200.00 SAR0.00 0% 0% 03-Aug-26, PR
ENGINEERING 266 13-Jan-25 11-Oct-25 16-Sep-25 01-Aug-26 SAR0.00 SAR0.00 0% 0% 01-Aug-26, EN

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
93 of 94
Critical Remaining Work
Milestone
RUA AL MADINAH MAIN INFRASTRUCTURE PACKAGE
REV03- UPDATE AS OF 14-12-2023
WBS Summary
Activity ID Activity Name Original BL1 Start BL1 Finish Start Finish BL1 Total Cost Earned Value Cost Schedule % Performance
Duration Complete % Complete 2022 2023 2024 2025 2026 2027
Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q
DEMOBLIZATION 10 02-Oct-25 26-Nov-25 23-Jul-26 03-Aug-26 SAR1,597,200.00 SAR0.00 0% 0% 03-Aug-26, DE

WBS Summary Summary Date Revision Checked Approved

Actual Work
Remaining Work
94 of 94
Critical Remaining Work
Milestone