Experimental-Research-Progress-Report - Form - Natividad Et Al.
Experimental-Research-Progress-Report - Form - Natividad Et Al.
ELECTRICAL SUPPLY
Presented to the
La Salle University
In Partial Fulfillment
RESEARCH PROJECT
by
March 2024
I. Gathering of Research Instruments Part 1
II. Date Conducted: February 10, 2024, 6:54pm - 7:30pm
In this Activity, one of the Researchers (Marc Anthonie Suico) had checked
around his locale for components that the Researchers could use for Data Gathering .
The Researcher had found a 12 volt Battery and a Car Alternator. Both are to be used
for Research. However in the 3rd picture, this Alternator could not be utilized, only
the Battery.
III. Gathering of Research Instruments Part 2
IV. Date Conducted: February 22, 2024, 8:10pm
In this Activity, The Researchers had a meeting with the agreement of purchasing
a 12 volt DC Motor online (Shopee). Where the payment would be divided into 5,
where each researcher had payed their part.
In this Activity, one of the Researchers (Marc Anthonie Suico) had found an
Alternator that can be used for Research.
VII. Gathering of Research Instruments Part 4
VIII. March 1, 2024, 11:50am
In this Activity, one of the Researchers (Marc Anthonie Suico) had received the DC
Motor.
IX. Gathering of Research Instruments Part 5 and Canvassing of Materials
X. March 11, 2024, 9:57am - 11:33am
In this Activity, the Researchers (Marc Anthonie Suico, Lyan John Villafuerte,
Marc Khynt Natividad & Vince Matthew D. Ortega) had agreed to meet in our
Research Locale to gather all the components that are on hand. Moreover, the
researchers had found a Belt (101 teeth) and tried to remove the Chain Pulley to
replace such with a Belt Pulley for Research, and could not find a replacement as that
moment. The researchers then went outside to Canvas for the remaining components
for pricing and for further negotiation.
XI. Gathering of Research Instruments Part 6
XII. March 12, 2024, 7:26pm
In this Activity, the Researchers (Marc Anthonie Suico) had found a pulley and a
much more suitable belt that could be used for Research. Unfortunately the pulley
was not the right size on the DC Motor Shaft so the search for a pulley continues
XIII. Construction of the DC Powered Generator.
XIV. Date Conducted: March 16-20, 2024
In this Activity, the Researchers (Vince Matthew D. Ortega) had went to a Milling
Store on March 16 to have a Custom Belt Pulley. Afterwards, on March 18, as the
researcher received the Custom Belt Pulley he then went to a Car Mechanic Shop to
have a Custom Frame for the 12 volt DC Motor and Alternator which was received
on March 20. Additionally, a new 12 volt battery served as a replacement for the
other battery prior.