Bits Selection
Bits Selection
BT - Broken teeth and cutters OC - Off centre wear 8 - Reasons bit was pulled or run completed
BU - Balled up bit PB - Pinched bit BHA- Change bottom hole assembly HR - Hours on bit
CC - Cracked cone * PN- Plugged nozzle or flow by areas DMF - Downhole motor failure LOG - Run logs
CD - Cone dragged * RG - Rounded gauge DTF - Downhole tool failure PP - Pump pressure
CI - Cone interference RO - Ring out DSF - Drill string failure PR - Penetration rate
CR - Cored SD - Shirttail damage DST - Drill stem test Rig - Rig repair
CT - Chipped Teeth & cutters SS - Shelf sharpening wear DP - Drill Plug TD - Total depth / casing depth
ER - Erosion TR - Cone tracking CM - Condition mud TW - Twist off
FC - Flat crested wear WO - Wash out CP - Core point TQ - Torque
HC - Heat checking WT - Worn teeth or cutters FM - Formation change WC - Weather conditions
LD - Junk damage NO - No dull characteristics HP - Hole problems
LC - Lost cone * * Show cone # or #'s under location 4 LIH - Left in hole
TCI/Insert bits.
4 Soft formations 1. Very soft shale
Low compressive strengths 2. Soft shales.
3. Medium soft shale / lime
4. Medium lime shale.
5 Soft - medium hard formations 1. Very soft shale / sand.
Low compressive strengths 2. Soft shale / sand.
3. Medium soft shale / lime.
6 Medium - hard formations 1. Medium lime / shale.
High compressive strengths 2. Medium hard lime / sand.
3. Medium hard lime/sand/slate
7 Hard semi - abrasive 1. Hard lime / dolomite.
and abrasive formations 2. Hard sand /dolomite.
3. Hard dolomite.
8 Extremely hard & abrasive 1. Hard chert.
& abrasive 2. Very hard chert.
3. Hard granite.
Insert manufacturers bit codes you use in your operational area into appropriate series/formation type
Number of nozzles
Nozzle size 1 2 3 4 5 6 7 8 9
7/32 0.038 0.075 0.113 0.150 0.188 0.225 0.263 0.301 0.338
3/8 0.110 0.221 0.331 0.442 0.552 0.663 0.773 0.884 0.994
9/32 0.062 0.124 0.186 0.249 0.311 0.373 0.435 0.497 0.559
5/16 0.077 0.153 0.230 0.307 0.383 0.460 0.537 0.614 0.690
11/32 0.093 0.186 0.278 0.371 0.464 0.557 0.650 0.742 0.835
3/8 0.110 0.221 0.331 0.442 0.552 0.663 0.773 0.884 0.994
13/32 0.130 0.259 0.389 0.518 0.648 0.778 0.907 1.037 1.167
7/16 0.150 0.301 0.451 0.601 0.752 0.902 1.052 1.203 1.353
15/32 0.173 0.345 0.518 0.690 0.863 1.035 1.208 1.381 1.553
1/2 0.196 0.393 0.589 0.785 0.982 1.178 1.374 1.571 1.767
17/32 0.222 0.443 0.665 0.887 1.108 1.330 1.552 1.773 1.995
9/16 0.249 0.497 0.746 0.994 1.243 1.491 1.740 1.988 2.237
19/32 0.277 0.554 0.831 1.108 1.384 1.661 1.938 2.215 2.492
5/8 0.307 0.614 0.920 1.227 1.534 1.841 2.148 2.454 2.761
21/32 0.338 0.676 1.015 1.353 1.691 2.029 2.368 2.706 3.044
11/16 0.371 0.742 1.114 1.485 1.856 2.227 2.599 2.970 3.341
23/32 0.406 0.811 1.217 1.623 2.029 2.434 2.840 3.246 3.652
3/4 0.442 0.884 1.325 1.767 2.209 2.651 3.093 3.534 3.976
36 ft/hr
82 secs
35 ft/hr
80 secs
Rate of penetration
Rate of penetration
33 ft/hr
33 ft/hr
75 secs
73 secs
31 ft/hr
70 secs 30 ft/hr 30 ft/hr
68 secs 29 ft/hr
62 secs
60 secs 60 secs 25 ft/hr
30 Klbs 40 Klbs 50 Klbs 100 RPM 120 RPM 140 RPM
Weight on bit RPM
Bit details Bit hydraulics Depth Feet Total Rot ROP Parameters (Average) Mud details IADC Bit Grade Comments
No Size Mfgr Type Ser No Jets 32'nds TFA HSI ft/sec Out made Hrs Hrs feet WOB RPM TQ GPM PSI Type Wt Vis PV YP I O D L B G O R
2 26.00 REED Y12 JE2828 20 20 20 20 1.2 0.8 286 638 0 2 0.5 0 5/15 60/90 4/6 1100 800 SW 8.6 ~ ~ ~ 1 1 NO A E I NO TD Drill cement.
EHP
5 12.25 Reed
51HDL
5940299 18 18 18 0 0.7 6.4 374 6148 387 16 14.3 27 35/50 120 2/6 871 3650 WBM 11.8 46 27 26 2 7 LT G12###1/16" BT PR Limestone/Chert, (90% in some samples )
7 8.50 Bbits BB657 405424RR 6 x 12 0.7 3.7 242 7085 15 3 1.0 15 7580 170 2/6 500 3900 OBM 13.5 70 40 20 Add 4.5hrs drilling cmt plugs etc.