0% found this document useful (0 votes)
48 views

Sample Card IBC

Uploaded by

Jezreel Flotilde
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views

Sample Card IBC

Uploaded by

Jezreel Flotilde
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 16

IBC INTERNATIONAL BUILDERS CORPORATION

MATERIALS QUALITY CONTROL UNIT

Project : 23GJ0071 CONSTRUCTION OF MULTI-PURPOSE BUILDING CONSTRUCTION/IMPROVEMENT


OF USWAG MULTI-PURPOSE BUILDING, MOLO, ILOILO CITY
(Project Name) ( City/Province)
Contract Amount : ₱ 98,468,403.21
Kind of Materials : Concrete Cylinder Sample
Type/Grade/Class :
Sample Identification : S1, S2, S3
Quantity Represented : 75 cu.m.
Original Source : Techno-Stress Concrete Batching Plant
Sampled at/Address : Techno-Stress Compound
(Give Accurate Location)
Manufacturer Address :
Supplier/Contractor : Techno-Stress Infrabase Inc.
Sampled by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 1/6/2024


(Designation) (Office) (Date)
Proposed use : Item 1052(16) Test Piles, furnished and driven
Test Desired : Compression Test
Governing Spec's : 4000 PSI (27.6 Mpa)
Send Test Result to : Jezreel S. Flotilde
Bill Charge to : IBC International Builders Corporation
(Name) (Address) (TIN No.)
Submitted by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 1/16/2024


(Designation) (Office) (Date)
Materials Engineer : MARK JOHN CARL T. GASCON DPWH R06
(Implementing Office) (Name/Designation) (Office)
Contact No./s :

Remarks :

Checked/Reviewed by/Date :
Date Submitted/ Received :
O.R. No. :
Date of O.R. :
Amount :
Date O.R. Presented :
Due Date :

Lab. No. :
RECEIVED BY: NOTED:

JOHN HERBERT MICMIC ENGR. JUDY F. SESE


UNIT HEAD, MATERIALS TESTING UNIT CONCURRENT MQC HEAD
IBC INTERNATIONAL BUILDERS CORPORATION
MATERIALS QUALITY CONTROL UNIT

Project : 23GJ0071 CONSTRUCTION OF MULTI-PURPOSE BUILDING CONSTRUCTION/IMPROVEMENT


OF USWAG MULTI-PURPOSE BUILDING, MOLO, ILOILO CITY
(Project Name) ( City/Province)
Contract Amount : ₱ 98,468,403.21
Kind of Materials : Concrete Cylinder Sample
Type/Grade/Class :
Sample Identification : S1, S2, S3
Quantity Represented : 75 cu.m.
Original Source : Techno-Stress Concrete Batching Plant
Sampled at/Address : Techno-Stress Compound
(Give Accurate Location)
Manufacturer Address :
Supplier/Contractor : Techno-Stress Infrabase Inc.
Sampled by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 1/6/2024


(Designation) (Office) (Date)
Proposed use : Item 1052(16) Test Piles, furnished and driven
Test Desired : Compression Test
Governing Spec's : 4000 PSI (27.6 Mpa)
Send Test Result to : Jezreel S. Flotilde
Bill Charge to : IBC International Builders Corporation
(Name) (Address) (TIN No.)
Submitted by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 1/16/2024


(Designation) (Office) (Date)
Materials Engineer : MARK JOHN CARL T. GASCON DPWH R06
(Implementing Office) (Name/Designation) (Office)
Contact No./s :

Remarks :

Checked/Reviewed by/Date :
Date Submitted/ Received :
O.R. No. :
Date of O.R. :
Amount :
Date O.R. Presented :
Due Date :

Lab. No. :
RECEIVED BY: NOTED:

JOHN HERBERT MICMIC ENGR. JUDY F. SESE


UNIT HEAD, MATERIALS TESTING UNIT CONCURRENT MQC HEAD
IBC INTERNATIONAL BUILDERS CORPORATION
MATERIALS QUALITY CONTROL UNIT

Project : 23GJ0071 CONSTRUCTION OF MULTI-PURPOSE BUILDING CONSTRUCTION/IMPROVEMENT


OF USWAG MULTI-PURPOSE BUILDING, MOLO, ILOILO CITY
(Project Name) ( City/Province)
Contract Amount : ₱ 98,468,403.21
Kind of Materials : Concrete Cylinder Sample
Type/Grade/Class :
Sample Identification : S1, S2, S3
Quantity Represented : 75 cu.m.
Original Source : Techno-Stress Concrete Batching Plant
Sampled at/Address : Techno-Stress Compound
(Give Accurate Location)
Manufacturer Address :
Supplier/Contractor : Techno-Stress Infrabase Inc.
Sampled by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 11/25/2023


(Designation) (Office) (Date)
Proposed use : Item 1052(16) Test Piles, furnished and driven
Test Desired : Compression Test
Governing Spec's : 5000 PSI (27.6 Mpa)
Send Test Result to : Jezreel S. Flotilde
Bill Charge to : IBC International Builders Corporation
(Name) (Address) (TIN No.)
Submitted by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 12/23/2023


(Designation) (Office) (Date)
Materials Engineer : MARK JOHN CARL T. GASCON DPWH R06
(Implementing Office) (Name/Designation) (Office)
Contact No./s :

Remarks :

Checked/Reviewed by/Date :
Date Submitted/ Received :
O.R. No. :
Date of O.R. :
Amount :
Date O.R. Presented :
Due Date :

Lab. No. :
RECEIVED BY: NOTED:

JOHN HERBERT MICMIC ENGR. JUDY F. SESE


UNIT HEAD, MATERIALS TESTING UNIT CONCURRENT MQC HEAD
IBC INTERNATIONAL BUILDERS CORPORATION
MATERIALS QUALITY CONTROL UNIT

Project : 23GJ0071 CONSTRUCTION OF MULTI-PURPOSE BUILDING CONSTRUCTION/IMPROVEMENT


OF USWAG MULTI-PURPOSE BUILDING, MOLO, ILOILO CITY
(Project Name) ( City/Province)
Contract Amount : ₱ 98,468,403.21
Kind of Materials : Concrete Cylinder Sample
Type/Grade/Class :
Sample Identification : S1, S2, S3
Quantity Represented : 75 cu.m.
Original Source : Techno-Stress Concrete Batching Plant
Sampled at/Address : Techno-Stress Compound
(Give Accurate Location)
Manufacturer Address :
Supplier/Contractor : Techno-Stress Infrabase Inc.
Sampled by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 7/31/2023


(Designation) (Office) (Date)
Proposed use : Item 1052(16) Test Piles, furnished and driven
Test Desired : Compression Test
Governing Spec's : 5000 PSI (27.6 Mpa)
Send Test Result to : Jezreel S. Flotilde
Bill Charge to : IBC International Builders Corporation
(Name) (Address) (TIN No.)
Submitted by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 8/28/2023


(Designation) (Office) (Date)
Materials Engineer : MARK JOHN CARL T. GASCON DPWH R06
(Implementing Office) (Name/Designation) (Office)
Contact No./s :

Remarks :

Checked/Reviewed by/Date :
Date Submitted/ Received :
O.R. No. :
Date of O.R. :
Amount :
Date O.R. Presented :
Due Date :

Lab. No. :
RECEIVED BY: NOTED:

JOHN HERBERT MICMIC ENGR. JUDY F. SESE


UNIT HEAD, MATERIALS TESTING UNIT CONCURRENT MQC HEAD
IBC INTERNATIONAL BUILDERS CORPORATION
MATERIALS QUALITY CONTROL UNIT

Project : 23GJ0071 CONSTRUCTION OF MULTI-PURPOSE BUILDING CONSTRUCTION/IMPROVEMENT


OF USWAG MULTI-PURPOSE BUILDING, MOLO, ILOILO CITY
(Project Name) ( City/Province)
Contract Amount : ₱ 98,468,403.21
Kind of Materials : Concrete Cylinder Sample
Type/Grade/Class :
Sample Identification : S1, S2, S3
Quantity Represented : 75 cu.m.
Original Source : Techno-Stress Concrete Batching Plant
Sampled at/Address : Techno-Stress Compound
(Give Accurate Location)
Manufacturer Address :
Supplier/Contractor : Techno-Stress Infrabase Inc.
Sampled by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 7/31/2023


(Designation) (Office) (Date)
Proposed use : Item 1052(16) Test Piles, furnished and driven
Test Desired : Compression Test
Governing Spec's : 5000 PSI (27.6 Mpa)
Send Test Result to : Jezreel S. Flotilde
Bill Charge to : IBC International Builders Corporation
(Name) (Address) (TIN No.)
Submitted by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 8/7/2023


(Designation) (Office) (Date)
Materials Engineer : MARK JOHN CARL T. GASCON DPWH R06
(Implementing Office) (Name/Designation) (Office)
Contact No./s :

Remarks :

Checked/Reviewed by/Date :
Date Submitted/ Received :
O.R. No. :
Date of O.R. :
Amount :
Date O.R. Presented :
Due Date :

Lab. No. :
RECEIVED BY: NOTED:

JOHN HERBERT MICMIC ENGR. JUDY F. SESE


UNIT HEAD, MATERIALS TESTING UNIT CONCURRENT MQC HEAD
IBC INTERNATIONAL BUILDERS CORPORATION
MATERIALS QUALITY CONTROL UNIT

Project : 23GJ0071 CONSTRUCTION OF MULTI-PURPOSE BUILDING CONSTRUCTION/IMPROVEMENT


OF USWAG MULTI-PURPOSE BUILDING, MOLO, ILOILO CITY
(Project Name) ( City/Province)
Contract Amount : ₱ 98,468,403.21
Kind of Materials : Concrete Cylinder Sample
Type/Grade/Class :
Sample Identification : S1, S2, S3
Quantity Represented : 75 cu.m.
Original Source : Techno-Stress Concrete Batching Plant
Sampled at/Address : Techno-Stress Compound
(Give Accurate Location)
Manufacturer Address :
Supplier/Contractor : Techno-Stress Infrabase Inc.
Sampled by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 8/2/2023


(Designation) (Office) (Date)
Proposed use : Item 1052(16) Test Piles, furnished and driven
Test Desired : Compression Test
Governing Spec's : 5000 PSI (27.6 Mpa)
Send Test Result to : Jezreel S. Flotilde
Bill Charge to : IBC International Builders Corporation
(Name) (Address) (TIN No.)
Submitted by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 8/9/2023


(Designation) (Office) (Date)
Materials Engineer : MARK JOHN CARL T. GASCON DPWH R06
(Implementing Office) (Name/Designation) (Office)
Contact No./s :

Remarks :

Checked/Reviewed by/Date :
Date Submitted/ Received :
O.R. No. :
Date of O.R. :
Amount :
Date O.R. Presented :
Due Date :

Lab. No. :
RECEIVED BY: NOTED:

JOHN HERBERT MICMIC ENGR. JUDY F. SESE


UNIT HEAD, MATERIALS TESTING UNIT CONCURRENT MQC HEAD
IBC INTERNATIONAL BUILDERS CORPORATION
MATERIALS QUALITY CONTROL UNIT

Project : 23GJ0071 CONSTRUCTION OF MULTI-PURPOSE BUILDING CONSTRUCTION/IMPROVEMENT


OF USWAG MULTI-PURPOSE BUILDING, MOLO, ILOILO CITY
(Project Name) ( City/Province)
Contract Amount : ₱ 98,468,403.21
Kind of Materials : Concrete Cylinder Sample
Type/Grade/Class :
Sample Identification : S1, S2, S3
Quantity Represented : 75 cu.m.
Original Source : Techno-Stress Concrete Batching Plant
Sampled at/Address : Techno-Stress Compound
(Give Accurate Location)
Manufacturer Address :
Supplier/Contractor : Techno-Stress Infrabase Inc.
Sampled by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 8/2/2023


(Designation) (Office) (Date)
Proposed use : Item 1052(16) Test Piles, furnished and driven
Test Desired : Compression Test
Governing Spec's : 5000 PSI (27.6 Mpa)
Send Test Result to : Jezreel S. Flotilde
Bill Charge to : IBC International Builders Corporation
(Name) (Address) (TIN No.)
Submitted by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 8/30/2023


(Designation) (Office) (Date)
Materials Engineer : MARK JOHN CARL T. GASCON DPWH R06
(Implementing Office) (Name/Designation) (Office)
Contact No./s :

Remarks :

Checked/Reviewed by/Date :
Date Submitted/ Received :
O.R. No. :
Date of O.R. :
Amount :
Date O.R. Presented :
Due Date :

Lab. No. :
RECEIVED BY: NOTED:

JOHN HERBERT MICMIC ENGR. JUDY F. SESE


UNIT HEAD, MATERIALS TESTING UNIT CONCURRENT MQC HEAD
IBC INTERNATIONAL BUILDERS CORPORATION
MATERIALS QUALITY CONTROL UNIT

Project : 23GJ0071 CONSTRUCTION OF MULTI-PURPOSE BUILDING CONSTRUCTION/IMPROVEMENT


OF USWAG MULTI-PURPOSE BUILDING, MOLO, ILOILO CITY
(Project Name) ( City/Province)
Contract Amount : ₱ 98,468,403.21
Kind of Materials : Concrete Cylinder Sample
Type/Grade/Class :
Sample Identification : S1, S2, S3
Quantity Represented : 75 cu.m.
Original Source : Techno-Stress Concrete Batching Plant
Sampled at/Address : Techno-Stress Compound
(Give Accurate Location)
Manufacturer Address :
Supplier/Contractor : Techno-Stress Infrabase Inc.
Sampled by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 9/16/2023


(Designation) (Office) (Date)
Proposed use : Item 1052(16) Test Piles, furnished and driven
Test Desired : Compression Test
Governing Spec's : 5000 PSI (27.6 Mpa)
Send Test Result to : Jezreel S. Flotilde
Bill Charge to : IBC International Builders Corporation
(Name) (Address) (TIN No.)
Submitted by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 9/23/2023


(Designation) (Office) (Date)
Materials Engineer : MARK JOHN CARL T. GASCON DPWH R06
(Implementing Office) (Name/Designation) (Office)
Contact No./s :

Remarks :

Checked/Reviewed by/Date :
Date Submitted/ Received :
O.R. No. :
Date of O.R. :
Amount :
Date O.R. Presented :
Due Date :

Lab. No. :
RECEIVED BY: NOTED:

JOHN HERBERT MICMIC ENGR. JUDY F. SESE


UNIT HEAD, MATERIALS TESTING UNIT CONCURRENT MQC HEAD
IBC INTERNATIONAL BUILDERS CORPORATION
MATERIALS QUALITY CONTROL UNIT

Project : 23GJ0071 CONSTRUCTION OF MULTI-PURPOSE BUILDING CONSTRUCTION/IMPROVEMENT


OF USWAG MULTI-PURPOSE BUILDING, MOLO, ILOILO CITY
(Project Name) ( City/Province)
Contract Amount : ₱ 98,468,403.21
Kind of Materials : Concrete Cylinder Sample
Type/Grade/Class :
Sample Identification : S1, S2, S3
Quantity Represented : 75 cu.m.
Original Source : Techno-Stress Concrete Batching Plant
Sampled at/Address : Techno-Stress Compound
(Give Accurate Location)
Manufacturer Address :
Supplier/Contractor : Techno-Stress Infrabase Inc.
Sampled by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 9/16/2023


(Designation) (Office) (Date)
Proposed use : Item 1052(16) Test Piles, furnished and driven
Test Desired : Compression Test
Governing Spec's : 5000 PSI (27.6 Mpa)
Send Test Result to : Jezreel S. Flotilde
Bill Charge to : IBC International Builders Corporation
(Name) (Address) (TIN No.)
Submitted by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 10/14/2023


(Designation) (Office) (Date)
Materials Engineer : MARK JOHN CARL T. GASCON DPWH R06
(Implementing Office) (Name/Designation) (Office)
Contact No./s :

Remarks :

Checked/Reviewed by/Date :
Date Submitted/ Received :
O.R. No. :
Date of O.R. :
Amount :
Date O.R. Presented :
Due Date :

Lab. No. :
RECEIVED BY: NOTED:

JOHN HERBERT MICMIC ENGR. JUDY F. SESE


UNIT HEAD, MATERIALS TESTING UNIT CONCURRENT MQC HEAD
IBC INTERNATIONAL BUILDERS CORPORATION
MATERIALS QUALITY CONTROL UNIT

Project : 23GJ0071 CONSTRUCTION OF MULTI-PURPOSE BUILDING CONSTRUCTION/IMPROVEMENT


OF USWAG MULTI-PURPOSE BUILDING, MOLO, ILOILO CITY
(Project Name) ( City/Province)
Contract Amount : ₱ 98,468,403.21
Kind of Materials : Concrete Cylinder Sample
Type/Grade/Class :
Sample Identification : S1, S2, S3
Quantity Represented : 75 cu.m.
Original Source : Techno-Stress Concrete Batching Plant
Sampled at/Address : Techno-Stress Compound
(Give Accurate Location)
Manufacturer Address :
Supplier/Contractor : Techno-Stress Infrabase Inc.
Sampled by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 11/25/2023


(Designation) (Office) (Date)
Proposed use : Item 1052(16) Test Piles, furnished and driven
Test Desired : Compression Test
Governing Spec's : 5000 PSI (27.6 Mpa)
Send Test Result to : Jezreel S. Flotilde
Bill Charge to : IBC International Builders Corporation
(Name) (Address) (TIN No.)
Submitted by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 12/2/2023


(Designation) (Office) (Date)
Materials Engineer : MARK JOHN CARL T. GASCON DPWH R06
(Implementing Office) (Name/Designation) (Office)
Contact No./s :

Remarks :

Checked/Reviewed by/Date :
Date Submitted/ Received :
O.R. No. :
Date of O.R. :
Amount :
Date O.R. Presented :
Due Date :

Lab. No. :
RECEIVED BY: NOTED:

JOHN HERBERT MICMIC ENGR. JUDY F. SESE


UNIT HEAD, MATERIALS TESTING UNIT CONCURRENT MQC HEAD
IBC INTERNATIONAL BUILDERS CORPORATION
MATERIALS QUALITY CONTROL UNIT

Project : 23GJ0071 CONSTRUCTION OF MULTI-PURPOSE BUILDING CONSTRUCTION/IMPROVEMENT


OF USWAG MULTI-PURPOSE BUILDING, MOLO, ILOILO CITY
(Project Name) ( City/Province)
Contract Amount : ₱ 98,468,403.21
Kind of Materials : Concrete Cylinder Sample
Type/Grade/Class :
Sample Identification : S1, S2, S3, S4, S5, S6
Quantity Represented : 75 cu.m.
Original Source : Techno-Stress Concrete Batching Plant
Sampled at/Address : Techno-Stress Compound
(Give Accurate Location)
Manufacturer Address :
Supplier/Contractor : Techno-Stress Infrabase Inc.
Sampled by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 1/16/2023


(Designation) (Office) (Date)
Proposed use : Item 1052(16) Test Piles, furnished and driven
Test Desired : Compression Test
Governing Spec's : 4000 PSI (27.6 Mpa)
Send Test Result to : Jezreel S. Flotilde
Bill Charge to : IBC International Builders Corporation
(Name) (Address) (TIN No.)
Submitted by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 1/31/2023


(Designation) (Office) (Date)
Materials Engineer : MARK JOHN CARL T. GASCON DPWH R06
(Implementing Office) (Name/Designation) (Office)
Contact No./s :

Remarks :

Checked/Reviewed by/Date :
Date Submitted/ Received :
O.R. No. :
Date of O.R. :
Amount :
Date O.R. Presented :
Due Date :

Lab. No. :
RECEIVED BY: NOTED:

JOHN HERBERT MICMIC ENGR. JUDY F. SESE


UNIT HEAD, MATERIALS TESTING UNIT CONCURRENT MQC HEAD
IBC INTERNATIONAL BUILDERS CORPORATION
MATERIALS QUALITY CONTROL UNIT

Project : 23GJ0071 CONSTRUCTION OF MULTI-PURPOSE BUILDING CONSTRUCTION/IMPROVEMENT


OF USWAG MULTI-PURPOSE BUILDING, MOLO, ILOILO CITY
(Project Name) ( City/Province)
Contract Amount : ₱ 98,468,403.21
Kind of Materials : Concrete Cylinder Sample
Type/Grade/Class :
Sample Identification : S1, S2, S3
Quantity Represented : 75 cu.m.
Original Source : Techno-Stress Concrete Batching Plant
Sampled at/Address : Techno-Stress Compound
(Give Accurate Location)
Manufacturer Address :
Supplier/Contractor : Techno-Stress Infrabase Inc.
Sampled by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 1/6/2024


(Designation) (Office) (Date)
Proposed use : Item 1052(16) Test Piles, furnished and driven
Test Desired : Compression Test
Governing Spec's : 4000 PSI (27.6 Mpa)
Send Test Result to : Jezreel S. Flotilde
Bill Charge to : IBC International Builders Corporation
(Name) (Address) (TIN No.)
Submitted by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 1/20/2024


(Designation) (Office) (Date)
Materials Engineer : MARK JOHN CARL T. GASCON DPWH R06
(Implementing Office) (Name/Designation) (Office)
Contact No./s :

Remarks :

Checked/Reviewed by/Date :
Date Submitted/ Received :
O.R. No. :
Date of O.R. :
Amount :
Date O.R. Presented :
Due Date :

Lab. No. :
RECEIVED BY: NOTED:

JOHN HERBERT MICMIC ENGR. JUDY F. SESE


UNIT HEAD, MATERIALS TESTING UNIT CONCURRENT MQC HEAD
IBC INTERNATIONAL BUILDERS CORPORATION
MATERIALS QUALITY CONTROL UNIT

Project : 23GJ0071 CONSTRUCTION OF MULTI-PURPOSE BUILDING CONSTRUCTION/IMPROVEMENT


OF USWAG MULTI-PURPOSE BUILDING, MOLO, ILOILO CITY
(Project Name) ( City/Province)
Contract Amount : ₱ 98,468,403.21
Kind of Materials : Concrete Cylinder Sample
Type/Grade/Class :
Sample Identification : S1, S2, S3
Quantity Represented : 75 cu.m.
Original Source : Techno-Stress Concrete Batching Plant
Sampled at/Address : Techno-Stress Compound
(Give Accurate Location)
Manufacturer Address :
Supplier/Contractor : Techno-Stress Infrabase Inc.
Sampled by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 1/6/2024


(Designation) (Office) (Date)
Proposed use : Item 1052(16) Test Piles, furnished and driven
Test Desired : Compression Test
Governing Spec's : 4000 PSI (27.6 Mpa)
Send Test Result to : Jezreel S. Flotilde
Bill Charge to : IBC International Builders Corporation
(Name) (Address) (TIN No.)
Submitted by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 2/3/2024


(Designation) (Office) (Date)
Materials Engineer : MARK JOHN CARL T. GASCON DPWH R06
(Implementing Office) (Name/Designation) (Office)
Contact No./s :

Remarks :

Checked/Reviewed by/Date :
Date Submitted/ Received :
O.R. No. :
Date of O.R. :
Amount :
Date O.R. Presented :
Due Date :

Lab. No. :
RECEIVED BY: NOTED:

JOHN HERBERT MICMIC ENGR. JUDY F. SESE


UNIT HEAD, MATERIALS TESTING UNIT CONCURRENT MQC HEAD
IBC INTERNATIONAL BUILDERS CORPORATION
MATERIALS QUALITY CONTROL UNIT

Project : 23GJ0071 CONSTRUCTION OF MULTI-PURPOSE BUILDING CONSTRUCTION/IMPROVEMENT


OF USWAG MULTI-PURPOSE BUILDING, MOLO, ILOILO CITY
(Project Name) ( City/Province)
Contract Amount : ₱ 98,468,403.21
Kind of Materials : Concrete Cylinder Sample
Type/Grade/Class :
Sample Identification : S1, S2, S3
Quantity Represented : 75 cu.m.
Original Source : Techno-Stress Concrete Batching Plant
Sampled at/Address : Techno-Stress Compound
(Give Accurate Location)
Manufacturer Address :
Supplier/Contractor : Techno-Stress Infrabase Inc.
Sampled by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 1/5/2024


(Designation) (Office) (Date)
Proposed use : Item 1052(16) Test Piles, furnished and driven
Test Desired : Compression Test
Governing Spec's : 4000 PSI (27.6 Mpa)
Send Test Result to : Jezreel S. Flotilde
Bill Charge to : IBC International Builders Corporation
(Name) (Address) (TIN No.)
Submitted by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 2/2/2024


(Designation) (Office) (Date)
Materials Engineer : MARK JOHN CARL T. GASCON DPWH R06
(Implementing Office) (Name/Designation) (Office)
Contact No./s :

Remarks :

Checked/Reviewed by/Date :
Date Submitted/ Received :
O.R. No. :
Date of O.R. :
Amount :
Date O.R. Presented :
Due Date :

Lab. No. :
RECEIVED BY: NOTED:

JOHN HERBERT MICMIC ENGR. JUDY F. SESE


UNIT HEAD, MATERIALS TESTING UNIT CONCURRENT MQC HEAD
IBC INTERNATIONAL BUILDERS CORPORATION
MATERIALS QUALITY CONTROL UNIT

Project : 21-188 Rehabilitation of Public Markets - Jaro Public Market

(Project Name) ( City/Province)


Contract Amount : -
Kind of Materials : Concrete Cylinder Sample
Type/Grade/Class :
Sample Identification : S1, S2, S3
Quantity Represented : 75 cu.m.
Original Source : Pavia Concrete Batching Plant
Sampled at/Address : Jobsite
(Give Accurate Location)
Manufacturer Address :
Supplier/Contractor : AMO-IBC
Sampled by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 1/16/2024


(Designation) (Office) (Date)
Proposed use : Item 405(1)b3 - Structural Concrete, fc'=20.68Mpa, Class "A", 28 days
Test Desired : Compression Test
Governing Spec's : 3000 PSI (20.7 Mpa)
Send Test Result to : Jezreel S. Flotilde
Bill Charge to : IBC International Builders Corporation
(Name) (Address) (TIN No.)
Submitted by : Jezreel S. Flotilde
(Name) (Signature)

: MQC Assist. Head IBC 1/31/2024


(Designation) (Office) (Date)
Materials Engineer :
(Implementing Office) (Name/Designation) (Office)
Contact No./s :

Remarks :

Checked/Reviewed by/Date :
Date Submitted/ Received :
O.R. No. :
Date of O.R. :
Amount :
Date O.R. Presented :
Due Date :

Lab. No. :
RECEIVED BY: NOTED:

JOHN HERBERT MICMIC ENGR. JUDY F. SESE


UNIT HEAD, MATERIALS TESTING UNIT CONCURRENT MQC HEAD
IBC INTERNATIONAL BUILDERS CORPORATION
MATERIALS QUALITY CONTROL UNIT

Project : 23G00063 - Construction of Pandan-Ibajay Road, Brgy. Sta. Ana, Pandan, Antique.

(Project Name) ( City/Province)


Contract Amount : -
Kind of Materials :
Type/Grade/Class : Class "A"
Sample Identification : S1, S2, S3, S4, S5, S6
Quantity Represented : SPECIAL MIX
Original Source : N/A
Sampled at/Address : IBC Laboratory, Ungka I, Pavia, Iloilo.
(Give Accurate Location)
Manufacturer Address : IBC
Supplier/Contractor : IBC
Sampled by : JEZREEL S. FLOTILDE
(Name) (Signature)

: MQC Assist. Head IBC 3/13/2024 & 3/14/2024


(Designation) (Office) (Date)
Proposed use : 400(4)a1 Precast Concrete Piles, furnished, 400mm x 400mm
Test Desired : SPECIAL MIX (use design of Paliwan Bridge)
Governing Spec's : 4000 psi @ 28 days
Send Test Result to : Jezreel S. Flotilde
Bill Charge to : IBC
(Name) (Address) (TIN No.)
Submitted by : JEZREEL S. FLOTILDE
(Name) (Signature)

: MQC Assist. Head IBC 3/18/2024


(Designation) (Office) (Date)
Materials Engineer :
(Implementing Office) (Name/Designation) (Office)
Contact No./s :

Remarks : 3 PCS 3 PCS


Checked/Reviewed by/Date :
Date Submitted/ Received : TEST PILE TEST PILE
O.R. No. :
Date of O.R. : 23G00063 23G00063
Amount :
Date O.R. Presented : 3/13/24 3/13/24
Due Date :

Lab. No. :
RECEIVED BY: NOTED:

JOHN HERBERT MICMIC ENGR. JUDY F. SESE


UNIT HEAD, MATERIALS TESTING UNIT CONCURRENT MQC HEAD