Inspection and Test Plan Fire Installation Works

Uploaded by

Habib Bagci
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

HUNGARY GLASS PACKAGING FACTORY INVESTMENT FIRE INSTALLATİON WORKS

Scope Fire Installation Works Document no HSCM-QC-ITP-011


BOQ no 14.06.000.0000 Inspection and Test Plan for Fire Installation Works Revision 00
ITP No ITP-002 Submittal Date
Control Category
Activity Inspection
Description Inspection Method References Acceptance Criteria
no Frequency Sub- Project
Contractor Employer
Contractor Director
1 MATERIALS
1.1 Control of pipes and paint products to be used. 100% H Certificate Check Material Submittal,Project Specification Material Submittal,Project
Specification,EN 10255

1.2 Pipe Fitting Equipment (Bolt, DObel, Rod, Profile, Clip). 100% H Certificate Check Material Submittal,Project Specification Material Submittal,Project Specification

1.3 Fire Equipments (Fire Pump, Fire Cabinet, Zone Valves, Compressor, Valves). 100% H Certificate Check Material Submittal,Project Specification,NFPA Material Submittal,Project
Specification,NFPA
2 INSTALLATİON
2.1 Pipe Installation as per approved drawings. 100% W Visual Check-Drawings Check Approved Drawing,DIN Standards,NFPA Approved Drawing,DIN Standards,NFPA

2.2 Valve and Accessory Assembly Control. 100% W Visual Check-Drawings Check Approved Drawing,DIN Standards,NFPA Approved Drawing,DIN Standards,NFPA

2.3 Hangers and support installation support spacing,ducting route,reinforcement & hangers. 100% W Visual Check-Drawings Check DIN Standards,NFPA,,Project DIN Standards,NFPA,,Project
specification,Approved Drawing,MOS specification,Approved Drawing,MOS

2.4 Fittings, Threaded Branch and Clamp Compliance Control. 100% W Certificate Check-Drawings Check DIN Standards,NFPA,,Project DIN Standards,NFPA,,Project
specification,MOS specification,MOS

2.5 Pipe Internal Cleanliness Control with Flushing Application. 100% W Visual Check, DIN Standards,NFPA,,Project DIN Standards,NFPA,,Project
specification,MOS specification,MOS

2.6 Sprinkler Installation Control Suitable for Intended Use. 100% W Visual Check-Drawings Check DIN Standards,NFPA,,Project DIN Standards,NFPA,,Project
specification,MOS specification,MOS
3 EQUIPMENT INSTALLATİON
3.1 Equipment Foundation Location Check as per Approved Drawing. 100% W Survey check-Drawings Check Approved Drawing,Project specification Approved Drawing,Project specification

3.2 Fire Equipments (Fire Pump, Fire Cabinet, Zone Valves, Compressor, Valves) Check as per Approved Drawing. 100% H Visual Check-Drawings Check Approved Drawing,Project specification Approved Drawing,Project specification

3.3 Dilatation Expansion Joint Installation Control. 100% W Visual Check-Drawings Check Approved Drawing,Project specification Approved Drawing,Project specification

3.4 Verify unit Installation is as per approved Drawing, Check Vibration pad Place Beneath the Package Equipment installation. 100% W Visual Check-Drawings Check Approved Drawing,Project specification Approved Drawing,Project specification

3.5 Fire Cabinet Model, Sheet Thickness, Lock, Paint Color etc. Compliance Check. 100% W Visual Check-Drawings Approved Drawing,Project specification Approved Drawing,Project specification
Check,Certificate Check

3.6 Fire Brigade Connection Nozzles, Cabinet Internal Sets (Tube and Hose) Assembly Control. 100% W Visual Check-Drawings Check Approved Drawing,Project specification Approved Drawing,Project specification

4 FINAL INSPECTION
4.1 Calibration of test equipment. 100% H Document Review Accredited Firm / Site Verification As Per Report

4.2 Check Orientation & Level is per IFC Drawing.Check drain system is as per approved drawing. 100% W Visual Check-Drawings Check Approved Drawing,Project specification,MOS Approved Drawing,Project
specification,MOS

4.3 Check for leak test for pipe installation. 100% W Visual Check,Sealing Check Approved Drawing,Project specification,MOS Approved Drawing,Project
specification,MOS

4.4 Control of Tightness Tests of Pipes (Pressure and tightness test shall be performed according standards.) 100% W Visual Check,Sealing Check Approved Drawing,Project specification,NFPA Approved Drawing,Project
specification,NFPA

4.5 Conducting Operational Tests, Complete Commissioning of the Entire System and Labeling. 100% H Form Check,Visual Check Approved Drawing,Project specification,NFPA Approved Drawing,Project
specification,NFPA

Preparared by Reviewed by Approved by

H= Hold Point
W= Witness point
S= Surveillance Point
T= Test point
R= Review of Records