Inspection and Test Plan Fire Installation Works
Inspection and Test Plan Fire Installation Works
1.2 Pipe Fitting Equipment (Bolt, DObel, Rod, Profile, Clip). 100% H Certificate Check Material Submittal,Project Specification Material Submittal,Project Specification
1.3 Fire Equipments (Fire Pump, Fire Cabinet, Zone Valves, Compressor, Valves). 100% H Certificate Check Material Submittal,Project Specification,NFPA Material Submittal,Project
Specification,NFPA
2 INSTALLATİON
2.1 Pipe Installation as per approved drawings. 100% W Visual Check-Drawings Check Approved Drawing,DIN Standards,NFPA Approved Drawing,DIN Standards,NFPA
2.2 Valve and Accessory Assembly Control. 100% W Visual Check-Drawings Check Approved Drawing,DIN Standards,NFPA Approved Drawing,DIN Standards,NFPA
2.3 Hangers and support installation support spacing,ducting route,reinforcement & hangers. 100% W Visual Check-Drawings Check DIN Standards,NFPA,,Project DIN Standards,NFPA,,Project
specification,Approved Drawing,MOS specification,Approved Drawing,MOS
2.4 Fittings, Threaded Branch and Clamp Compliance Control. 100% W Certificate Check-Drawings Check DIN Standards,NFPA,,Project DIN Standards,NFPA,,Project
specification,MOS specification,MOS
2.5 Pipe Internal Cleanliness Control with Flushing Application. 100% W Visual Check, DIN Standards,NFPA,,Project DIN Standards,NFPA,,Project
specification,MOS specification,MOS
2.6 Sprinkler Installation Control Suitable for Intended Use. 100% W Visual Check-Drawings Check DIN Standards,NFPA,,Project DIN Standards,NFPA,,Project
specification,MOS specification,MOS
3 EQUIPMENT INSTALLATİON
3.1 Equipment Foundation Location Check as per Approved Drawing. 100% W Survey check-Drawings Check Approved Drawing,Project specification Approved Drawing,Project specification
3.2 Fire Equipments (Fire Pump, Fire Cabinet, Zone Valves, Compressor, Valves) Check as per Approved Drawing. 100% H Visual Check-Drawings Check Approved Drawing,Project specification Approved Drawing,Project specification
3.3 Dilatation Expansion Joint Installation Control. 100% W Visual Check-Drawings Check Approved Drawing,Project specification Approved Drawing,Project specification
3.4 Verify unit Installation is as per approved Drawing, Check Vibration pad Place Beneath the Package Equipment installation. 100% W Visual Check-Drawings Check Approved Drawing,Project specification Approved Drawing,Project specification
3.5 Fire Cabinet Model, Sheet Thickness, Lock, Paint Color etc. Compliance Check. 100% W Visual Check-Drawings Approved Drawing,Project specification Approved Drawing,Project specification
Check,Certificate Check
3.6 Fire Brigade Connection Nozzles, Cabinet Internal Sets (Tube and Hose) Assembly Control. 100% W Visual Check-Drawings Check Approved Drawing,Project specification Approved Drawing,Project specification
4 FINAL INSPECTION
4.1 Calibration of test equipment. 100% H Document Review Accredited Firm / Site Verification As Per Report
4.2 Check Orientation & Level is per IFC Drawing.Check drain system is as per approved drawing. 100% W Visual Check-Drawings Check Approved Drawing,Project specification,MOS Approved Drawing,Project
specification,MOS
4.3 Check for leak test for pipe installation. 100% W Visual Check,Sealing Check Approved Drawing,Project specification,MOS Approved Drawing,Project
specification,MOS
4.4 Control of Tightness Tests of Pipes (Pressure and tightness test shall be performed according standards.) 100% W Visual Check,Sealing Check Approved Drawing,Project specification,NFPA Approved Drawing,Project
specification,NFPA
4.5 Conducting Operational Tests, Complete Commissioning of the Entire System and Labeling. 100% H Form Check,Visual Check Approved Drawing,Project specification,NFPA Approved Drawing,Project
specification,NFPA
H= Hold Point
W= Witness point
S= Surveillance Point
T= Test point
R= Review of Records