RSDC Application Manual
RSDC Application Manual
Access Road
Required attachments Format
1 Detailed Engineering Design AutoCAD,dwg,dxf
2 Certified Copy of Title deed/Proof of Ownership pdf
3 Survey Plan from Survey of Kenya pdf
4 Layout Plan (Geo-Referenced) AutoCAD,dwg,dxf
Directional Signages
1 Detailed Engineering Design AutoCAD,dwg,dxf
2 Layout Plan (Geo-Referenced) AutoCAD,dwg,dxf
Utility Lines-Communication, Power, Water & Sewer
1 Detailed Engineering Design AutoCAD,dwg,dxf
2 Layout Plan (Geo-Referenced) AutoCAD,dwg,dxf
3 List of coordinates Excel,csv
1
2
5. Select appropriate Region /Corridor, Road(s), follow the detailed steps in the system
and key in the details in the format specified and save.
6. Select appropriate Region /Corridor, Road(s), follow the detailed steps in the system
and key in the details in the format specified and save.
7. Attach the required documents and click attach and wait for the system to upload.
8. Upon successful upload click on ‘Submit’, your application status changes to
‘Applied’, End of Application process.
9. After your application has been vetted the respective KeNHA Region/Corridor will
contact you to schedule a field visit to confirm the details of your application.
10. Follow up the status of your application through your created account on the portal
by checking the ‘Applied’, ‘Verified’, ‘Approved’, ‘Paid Pending Confirmation’ and
‘Awaiting Approval Letter’.
11. . After the application has been approved, you will get the payment advice with which
you can make payment using the details specified therein.
12. You will be contacted by KeNHA Region/Corridor office when your approval letter is
ready.
Detailed Application Steps
I. Directional Signages
Step1 -Click New
2
3
Step4-Click Add to save ,if you have another signage click add
Step4-Attach, then wait for the system to upload and click submit. -End
3
4
Step2- Select Region/Corridor, Road and Key other details specified in the form
Step3-Attach, then wait for the system to upload and click submit.
4
5
Step3 -Select appropriate option the click next and key in the details
5
6
Option 3: Across the Road but Overhead Key details, tick the checkbox and save
Across Overhead -This is where the utility is crossing the Road overhead
Step4-Attach, then wait for the system to upload and click submit.
***End of application process for Utility Lines-The same process applies for application