Cause Effect Analysis Updated

Uploaded by

taimur ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views

Cause Effect Analysis Updated

Uploaded by

taimur ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Cause and Effect Analysis

Delay Fragent of ..
Number of
Working Submission
Sr. Number of BL Revised Approval A or Delay Attributable Type of Impact On
Delay events BL Start Date BL Finish Date Actual start date Operation as of
No. days scheduleas B Days Delaying party delay Finish Date
Actual Documenst
actual

10/1/2023 4/28/2024 210.00 12/20/2023 Excusable and


1 Contact -30 Neom Yes
Compensable

Non-permit form Coast 10/1/2023 11/14/2023 44.00 11/14/2023 Excusable and


2 -44 Neom Yes
Guard Compensable

Mobilization & Set Up 10/1/2023 10/9/2023 8.00 12/20/2023 10/27/2023 12/20/2023 Excusable and
3 80 Neom/Contactor
of Equipment Compensable

12/23/2023 3/31/2024 Excusable and


4 Bad weather report -22 CG/Neom/Contarctor Yes
Compensable

Stat Bathymetric 10/10/2023 12/26/2023 77.00 1/21/2024 4/6/2024 76.00 Delay not Attributable Excusable and
5 Yes
survey Area 1 to any party Compensable

Submission of
6 Bathymetirc Report 12/27/2023 1/22/2024 26.00 4/6/2024 5/5/2024 29.00
Area 1
Review & Approval of
7 Bathymetric report NA NA 5/5/2024 5/29/2024 24.00
Area 1
Stat Bathymetric 12/9/2023 3/18/2024 100.00 4/6/2024 6/13/2024 68.00
8
survey Area 2
Submission of
9 Bathymetirc Report 3/19/2024 4/17/2024 29.00 6/18/2024 7/17/2024 29.00
Area 2
Review & Approval of
10 Bathymetric report NA NA 7/18/2024 8/10/2024 23.00
Area 2
Stat Bathymetric 2/1/2024 3/14/2024 42.00 6/18/2024 6/26/2024 8.00
11 11/20/2023
survey Area 3
Submission of
12 Bathymetirc Report 3/15/2024 4/17/2024 33.00 6/26/2024 7/17/2024 21.00
Area 3
Review & Approval of
13 Bathymetric report NA NA 7/18/2024 8/10/2024 23.00
Area 3

Start of oceanographic 10/7/2023 1/2/2024 87.00 1/3/2024 3/30/2024 87.00


14
survey area 1

Submission of
15 Oceanographic Report 1/3/2024 1/16/2024 13.00 3/31/2024 4/16/2024 16.00
Area 1
Review & Approval of
16 Bathymetric report NA NA 4/17/2024 5/10/2024 23.00
Area 1

Start of oceanographic 10/28/2023 1/23/2024 87.00 2/7/2024 5/6/2024 89.00


17
survey area 2
11/20/2023

Submission of
18 Oceanographic Report 1/24/2024 2/1/2024 8.00 5/9/2024 5/24/2024 15.00
Area 2
Review & Approval of
19 Bathymetric report NA NA 5/9/2024 6/2/2024 24.00
Area 2

Start of oceanographic 12/11/2023 3/7/2024 87.00 3/31/2024 6/29/2024 90.00


20
survey area 3

Submission of
21 Oceanographic Report 3/9/2024 3/23/2024 14.00 6/29/2024 7/14/2024 15.00
Area 3
Review & Approval of
22 Bathymetric report NA NA 1/14/1900 2/7/1900 24.00
Area 3
NOTE:- As per Impact-As planned analysis, The remaining days on which work has to be executed would be added.
Cause and Effect Analysis

Delay Fragent of ..

Contractor JV's Remarks

As per Approved BL Schedule in excel provided to the Client, RGF was supposed
to provide all the documenst to be approved B or A to prceed with work please
view the attached Site start work Certificate

Work on Line could not be started due to non-possession received


from Client. RGF has provided all the documenst in earlier Time of
Date (05.october) and as per section 2.2 in attached Site Start work

after RGf has received the Permit from Neom (14. November 23) and a
minimum Code B to start the Mobilze

we have include in our excel submitted and approved File and Note E, which is
saying Due to previous experinece in the same area and same month duration
we will face a big number of Standby due to bad weather and the proposed
time schedule could be extended around 60% from actual. Also check the
attached file for Fielwork & Bad weather

Our submitted Schedule was based on our Filedwor only as all days are just
what is performed from RGF only

no adding of 24 Days in schedule and this required to be added as per Neom


Management

Our submitted Schedule was based on our Filedwor only as all days are just
what is performed from RGF only

no adding of 24 Days in schedule and this required to be added as per Neom


Management

Our submitted Schedule was based on our Filedwor only as all days are just
what is performed from RGF only

no adding of 24 Days in schedule and this required to be added as per Neom


Management

Our submitted Schedule was based on our Filedwor only as all days are just
what is performed from RGF only

no adding of 24 Days in schedule and this required to be added as per Neom


Management
Our submitted Schedule was based on our Filedwor only as all days are just
what is performed from RGF only

no adding of 24 Days in schedule and this required to be added as per Neom


Management

Our submitted Schedule was based on our Filedwor only as all days are just
what is performed from RGF only

no adding of 24 Days in schedule and this required to be added as per Neom


Management