Cause Effect Analysis Updated
Cause Effect Analysis Updated
Delay Fragent of ..
Number of
Working Submission
Sr. Number of BL Revised Approval A or Delay Attributable Type of Impact On
Delay events BL Start Date BL Finish Date Actual start date Operation as of
No. days scheduleas B Days Delaying party delay Finish Date
Actual Documenst
actual
Mobilization & Set Up 10/1/2023 10/9/2023 8.00 12/20/2023 10/27/2023 12/20/2023 Excusable and
3 80 Neom/Contactor
of Equipment Compensable
Stat Bathymetric 10/10/2023 12/26/2023 77.00 1/21/2024 4/6/2024 76.00 Delay not Attributable Excusable and
5 Yes
survey Area 1 to any party Compensable
Submission of
6 Bathymetirc Report 12/27/2023 1/22/2024 26.00 4/6/2024 5/5/2024 29.00
Area 1
Review & Approval of
7 Bathymetric report NA NA 5/5/2024 5/29/2024 24.00
Area 1
Stat Bathymetric 12/9/2023 3/18/2024 100.00 4/6/2024 6/13/2024 68.00
8
survey Area 2
Submission of
9 Bathymetirc Report 3/19/2024 4/17/2024 29.00 6/18/2024 7/17/2024 29.00
Area 2
Review & Approval of
10 Bathymetric report NA NA 7/18/2024 8/10/2024 23.00
Area 2
Stat Bathymetric 2/1/2024 3/14/2024 42.00 6/18/2024 6/26/2024 8.00
11 11/20/2023
survey Area 3
Submission of
12 Bathymetirc Report 3/15/2024 4/17/2024 33.00 6/26/2024 7/17/2024 21.00
Area 3
Review & Approval of
13 Bathymetric report NA NA 7/18/2024 8/10/2024 23.00
Area 3
Submission of
15 Oceanographic Report 1/3/2024 1/16/2024 13.00 3/31/2024 4/16/2024 16.00
Area 1
Review & Approval of
16 Bathymetric report NA NA 4/17/2024 5/10/2024 23.00
Area 1
Submission of
18 Oceanographic Report 1/24/2024 2/1/2024 8.00 5/9/2024 5/24/2024 15.00
Area 2
Review & Approval of
19 Bathymetric report NA NA 5/9/2024 6/2/2024 24.00
Area 2
Submission of
21 Oceanographic Report 3/9/2024 3/23/2024 14.00 6/29/2024 7/14/2024 15.00
Area 3
Review & Approval of
22 Bathymetric report NA NA 1/14/1900 2/7/1900 24.00
Area 3
NOTE:- As per Impact-As planned analysis, The remaining days on which work has to be executed would be added.
Cause and Effect Analysis
Delay Fragent of ..
As per Approved BL Schedule in excel provided to the Client, RGF was supposed
to provide all the documenst to be approved B or A to prceed with work please
view the attached Site start work Certificate
after RGf has received the Permit from Neom (14. November 23) and a
minimum Code B to start the Mobilze
we have include in our excel submitted and approved File and Note E, which is
saying Due to previous experinece in the same area and same month duration
we will face a big number of Standby due to bad weather and the proposed
time schedule could be extended around 60% from actual. Also check the
attached file for Fielwork & Bad weather
Our submitted Schedule was based on our Filedwor only as all days are just
what is performed from RGF only
Our submitted Schedule was based on our Filedwor only as all days are just
what is performed from RGF only
Our submitted Schedule was based on our Filedwor only as all days are just
what is performed from RGF only
Our submitted Schedule was based on our Filedwor only as all days are just
what is performed from RGF only
Our submitted Schedule was based on our Filedwor only as all days are just
what is performed from RGF only