0% found this document useful (0 votes)
9 views4 pages

Annex D

The document provides soil parameters and calculations for bored pile capacity for a bridge project. It includes layers of soil with properties, strength parameter plots, and charts showing ultimate end-bearing, skin friction, and allowable pullout and bearing capacity for pile lengths and diameters.

Uploaded by

Nicholas Catahan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views4 pages

Annex D

The document provides soil parameters and calculations for bored pile capacity for a bridge project. It includes layers of soil with properties, strength parameter plots, and charts showing ultimate end-bearing, skin friction, and allowable pullout and bearing capacity for pile lengths and diameters.

Uploaded by

Nicholas Catahan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Annex D: Bored Pile Capacity

Project: Bridgetowne STP, Cistern, Park, and Pedestrian Crossing (Bridge BH-1 to 4)
Location: Bridgetowne, Pasig City
Soil Parameters:
 6 11 40 
Layer thickness (m)  17 18 19 
Soil unit weight (kN/m3)  0 5 3000 
c' (kPa) or H-B s'c (kPa)  
0.8 0.8 0.8
K  
f' or H-B rock quality SP1 :=  29 24 1.75 
H-B rock type  0 0 1 
max skin friction (kPa)  
max bearing capacity (kPa)  20 40 300 
soil (0) or rock (1)  100 150 5000 
 0 1 
 0

Hoek-Brown Parameters (M, S): HB( SP1) = ( 2 0.028 )

Groundwater depth: zw = 1
Water unit weight: γw = 9.81

Analysis Parameters:
Bearing FS: FSb = 2.5
Bearing FS under EQ: FSbEQ = 1.88
Uplift FS: FSu = 4
Influence depth: IF = 2
Pile Parameters:
Minimum length:  20 
Maximum length: PL1 :=  40 
Length increment:  
1
T
Pile diameters: PD1 := ( 0.8 1.0 1.2 1.5 1.8 )
Pile unit weight: γp = 24
Cap embedment: CE = 0

Calculations:
Q := ϕplot( SP1 , 500 ) q b1 := q b ( SP1 , PL1 , PD1) (
Qall1 := Qall SP1 , PL1 , PD1 , FSb )
S := τplot( SP1 , 500 ) q s1 := q s( SP1 , PL1) Qallp1 := Qp ( SP1 , PL1 , PD1)
R := cplot( SP1 , 500 )
version updated: 8/31/2018

\\Mac\Home\Documents\Consulting\2021 9/15/2021
Files\2103235 Bridgetowne Bridge STP and
Strength Parameter Plots:
Instantaneous Friction Angle Instantaneous Cohesion
60 100

80
50
Instantaneous Friction Angle (deg)

Instantaneous Cohesion (kPa)


60

40

40

30
20

20 0
0 10 20 30 40 50 0 10 20 30 40 50

Normal Stress (kPa) Normal Stress (kPa)

Normal Stress-Shear Stress

150
Shear Stress (kPa)

100

50

0
0 10 20 30 40 50

Normal Stress (kPa)

\\Mac\Home\Documents\Consulting\2021 9/15/2021
Files\2103235 Bridgetowne Bridge STP and
Ultimate End-Bearing and Skin Friction:
Ultimate End-Bearing Ultimate Skin Friction
3
5.006 10 300

3
5.004 10

Ultimate Skin Friction (kPa)


3
5.002 10 200
Pressure (kPa)

3
5 10

3
4.998 10 100

3
4.996 10

3
4.994 10 0
20 25 30 35 40 0 10 20 30 40

Pile Length (m) Pile Length (m)

Allowable Pullout Capacity (Buoyant weight of pile is included):


Allowable Pullout Capacity
10500
10000 800mm
1000mm
9500
1200mm
9000
1500mm
8500 1800mm
8000
Allowable Pullout Capacity (kN)

7500
7000
6500
6000
5500
5000
4500
4000
3500
3000
2500
2000
1500
1000
500
20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Pile Tip Depth (m)

\\Mac\Home\Documents\Consulting\2021 9/15/2021
Files\2103235 Bridgetowne Bridge STP and
Allowable Bearing Capacity (Buoyant weight of pile has been deducted):
Allowable Bearing Capacity
20000
800mm
19500
1000mm
19000 1200mm
18500 1500mm
18000 1800mm

17500
17000
16500
16000
15500
15000
14500
14000
13500
13000
Allowable Bearing Capacity (kN)

12500
12000
11500
11000
10500
10000
9500
9000
8500
8000
7500
7000
6500
6000
5500
5000
4500
4000
3500
3000
2500
2000
20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Pile Tip Depth (m)

\\Mac\Home\Documents\Consulting\2021 9/15/2021
Files\2103235 Bridgetowne Bridge STP and

You might also like