0% found this document useful (0 votes)
57 views1 page

Plano de Vias - Moche

This document contains information about road sections including various lengths, widths, and other measurements listed in columns. The document provides technical specifications for multiple road infrastructure elements.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views1 page

Plano de Vias - Moche

This document contains information about road sections including various lengths, widths, and other measurements listed in columns. The document provides technical specifications for multiple road infrastructure elements.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SECCIONES VIALES

ESC. 1/250

LP LP

V E P.S. J V E P.P. B. P.P. E V J P.S. E V


D
1.80 2.40 6.00 3.40 1.20 2.40 7.20 1.20 7.20 2.40 1.20 3.40 6.00 2.40 1.80
D

'
O
50.00

'
O
SECCION A-A CARRETERA PANAMERICANA

L.P. L.P.

P.S. V P.S. J V J
P.S. J V P.S.
V E V

1.20 2.40 6.00 3.40 1.20 2.40 7.20 1.20 7.20 2.40 1.20 3.40 6.00 2.40 1.20

50.00

W
W
SECCION B-B FUTURA AUTOPISTA COSTERA (VIA NACIONAL)

LP LP
D 1
W

'
O
D 1
W

'
O
V J E P.S. B/J P.P. B/J P.P. B/J P.S. E J V

A'
1.80 3.60 3.00 6.60 4.00 3.00 7.20 7.20 7.20 3.00 4.00 6.60 3.00 3.60 1.80

A'
65.60

SECCION C-C AUTOPISTA A SALAVERRY

A'
1
W1

1
Q
V E J LP LP

1
A'
W1

1
V E PP E V

Q1

11
1
9.60 9.60 26.40 20.00 28.80 8.00 28.80 9.60 4.80 14.40

1
11
Q1

1
40.00
1.50 2.20 6.60 2.20 1.50 D

Q1
SECCION D-D CARRETERA INDUSTRIAL 14.00 D
SECCION X-X

1
Q
W2

Q1

1
W2

A'

1
LP LP LP LP LP LP

A'
D
V J E P E J V V J E P E J V V E B/J E V
P P
LP LP

W
OVALO
1.60 0.80 2.10 5.70 - 8.00 1.40-2.10 0.80 1.60 1.60 0.80 2.00 7.50 1.70 0.80 1.60 2.40 2.40 6.60 7.20 6.60 2.40 2.40 V E/CANAL P E V

D
LA

14.00 - 17.00 16.00


MARINA S 3
30.00
S W
3

1
R1 O

Q
1.80 2.40 6.60 2.40 1.80

SECCION E2-E2 AVENIDA INDEPENDENCIA (LAS DELICIAS) R1 O


PASAJE

SECCION E-E AVENIDA LA SECCION E1-E1 AVENIDA LA

1
15.00

Q
D

Q1
MARINA (CASCO URBANO) MARINA (ZONA AGRICOLA)
D
PASAJE

SECCION Y-Y

Q1
Ñ
1
1

Ñ
A
PASAJE

LP LP
S CAMPIÑA ALTA
A S
LP LP
V J E P E J V

1.50 1.55 6.60 1.50 R1

1
3.00 3.00 1.55
X R1

1
1

Ñ
1

X
18.70 V P P V

CARR

Q1
1.20 6.00 6.00 1.20

ETER
EA
LARR

A
JE

PANA
PASA

MERIC
14.40
SECCION F-F AVENIDA LA MARINA (LAS DELICIAS)

ANA
1

Q1
Ñ

S
4
1
A

Ñ
SECCION Z-Z

S
LP LP
A
U.C.03323
LP LP 1
1

12
I

12

Ñ
V E P E/CANAL V
LP LP
W3 I

Ñ
V P V
J J
W3

4
R2

4
1
1.50 1.20 7.00 1.20 1.50
R2

1
1.80 6.60 1.80

11
2.40 2.40
12.40

Ñ
Q2
Carrozable
15.00

Camino
Carrozable

11
E

Camino

Ñ
2.40 3.00 6.00 2.40 3.00 7.20 3.00 2.40
OCH

12
MANZANOS
SECCION G-G CALLE ELIAS SECCION G1-G1 CALLE ELIAS AGUIRRE D D M

12

Q2
O
AGUIRRE (CASCO URBANO) (SECTOR AGRICOLA)
11.40 VARIABLE 18.00
A RI

SECCION: A'-A' AVENIDA 1

1
A

Q3

1
LP LP
LP LP
X O
LP LP
O

Q3
X
R2
V P B P V
V J CANAL P J V V J P CANAL J V R2 E
CH
LP LP MO
1.20 5.80 3.00 5.95 1.20 1.80 1.20 2.50 6.00 1.20 1.80 1.81 1.20 6.00 2.50 1.20 1.80
RIO CAMPIÑA ALTA
17.15 14.00-14.50 14.51

V P V
SECCION H1-H1 AV PERU (VIA PAISAJISTICA URBANA) SECCION: H2-H2 SECCION: H3-H3 W3

Q4 Q4

Y LA LUNA
DEL SOL
6.00
W3

A HUACAS
1.20 1.20

CARRETERA
8.40

SECCION Z1-Z1 A
Q4 Q4 A

1
LP LP

1
X

D
V J/E
P
J/E V X
1.20 1.80 6.00 1.80 1.20

W3
11.99
I P´
SECCION I-I I

W3
LP LP LP LP
LP LP
V E P.P. E V
V P V
V E/CANAL P E V V E P E V
Q4
ESQUEMA DE ORDENAMIENTO
Q4
J J

1.50 6.00-9.00 1.50 1.20 1.80 6.00 1.80 1.20


1.20 1.80 5.40 1.80 1.20 A A W URBANO

11
0-1.00 0-1.00
1.80 2.40 6.60 2.40 1.80
3
9.00 - 14.00 15.00
12.00
W
3

11
11.40

1
1
SECCION J1-J1 AVENIDA LAS SECCION J2-J2 AVENIDA LAS SECCION J3-J3

W4 W4

L
AMERICAS (CASCO URBANO) AMERICAS (SECTOR AGRICOLA)
SECCION 1-1 P
H2 H2 P
1

L
LP LP
LP LP

1
LP LP

1
V P V
V E P E V CURVA DEL SUN A
V P V
LP LP
A O O
1.20 1.80 6.00 1.80 1.20

L
1.20 1.50 6.00 1.49 1.20 1.20 0.80 5.40 0.80 1.20

1
V P V

1
9.40 12.00
2

11.40

1
B

L
1.20 5.60 1.20

1
CAMPIÑA BAJA

1
1
SECCION K-K SECCION K1-K 1 SECCION K2-K2 8.00
1 1 P P
CAMPIÑA ALTA

1
B

1
B
SECCION 2-2

Z
LP LP LP LP
I

V
I T T

H
B
1
20.00

H2
1
1

Z1

2
Z
V J E P J P E J V V J E P V P E J V 1
EL ROSARIO
A A

Z1
2.40 1.00 2.40 7.20 4.00 7.20 2.40 1.00 2.40 1.50 1.00 2.30-4.40 6.00 1.00 6.00 2.30-4.40 1.00 1.50 LP LP

1 1
30.00 23.60 - 26.80

1 1
V V

1
V J P J V

Z1 Z1
1

K1 K
1 1
SECCION L-L SECCION L1-L1
1.000.80 5.40 0.801.00
L L
INGRESO

1 1
A
LOTES

INTERIORES

LP LP 9.00
K2 SAN AGUSTIN
K2 V V H2
H2

1 1
V J E P E J V
SECCION 3-3

K
1 1
1.20 1.00 1.80-4.00 6.00 1.80-4.00 1.00 1.20
11

K
14.00-18.40

1
V V
11

1
LP LP
B B CAMPIÑA BAJA H3 H3 I I

1
SECCION M-M
CAMPIÑA BAJA A

1
1
A

1
K2

1
V P V

11
K2 CAMPIÑA ALTA

1
LP

1 1

11
LP 1.20 5.40 1.20

1
11
TALLO 1 Y 2 H2 T T

11
7.80
H2

02399
1
V E P B P E V 1
11

1
V V CRUCE EL GALLO

1
1
1.20 1.50 6.00 2.00 6.00 1.50 1.20 11

1
LP LP

11
2.15 2.15
L L

J1
I I
11
19.40-20.70
SECCION 4-4

11

1 1
P P

1 1

CALLE

1 1

11
FUTURA
CALLE

SECCION N-N

FUTURA
1 2 2

2 2
CALLE
1 1 1

J1
J1
1 1

FUTURA
E E
1

2 2

AV. LA
1

V J
FUTURA

P J V D CALLE

EL ORCON D 3 3

H3

MARINA
D
C
B

J1

PASAJE
PASAJE

1 1
H3

D
LP LP

EXISTENTE
3 3

CAMINO
1.20 1.10 5.40 1.10 1.20 V V

1 1
J1
1

A
V E P E V 1

V
HUARTACO CANAL
DE REGADÍO
- PASE
DE SERVICIO

A
1.80 3.00 7.20 3.00 1.80 10.00 URB. PARAÍSO
H2

J1
V
16.80 H2

CANCELADA)
1

J1
1

(EXPROPIACION
SECCION 5-5

CANCELADA)
(EXPROPIACION
CALLE
E

FUTURA
1

CALLE
1

FUTURA
E I

AV.
SECCION Ñ-Ñ (SECTOR INDUSTRIAL)

LA MARINA
1 1
FUTURA
CALLE

I
(EXPROPIACION

J1
CANCELADA)

J2
1
1
LP LP
LP LP
G G
B

J2 J2
J2
CAMPIÑA BAJA B 1
1
1
H3 H3
V J P J V 1
SANTA CLARA

J2 J2
E

V
E

A
T T

1
1
1.40 1.20 6.50 1.20 1.40

1
1

1
CENTRO URBANO

1 1
1

1
J

A
1.80 2.40 9.00 5.60 9.00 2.40 1.80 8 8

7 7
11.70 MOCHE 1 1

7 7

J3
S.P.C.

1 1
SERVICIOS DE SALUD

7 7
1

1 1
32.00 1

1 1
H2 H2

1 1
1
U.C.03380
PROLONGACION AV. FEDERICO VILLAREAL

1 1
1

1
8 8 1
CAMPIÑA ALTA

J3
1
FUTURO
PASAJE
(EXPROPIACION

CANCELADA)

1
SECCION O - O SECCION 6-6 1 1

1 1
9 9
8

1 1
1 8

9 9
I.E. EMILIO LEFEBVRE

1 1 1

J3 J3 L L

1 1
LP LP LP
LOS MUERTOS

1 1
LP 1 1

U
HUARTACO 1 1
I I

9 9
1 1

9 9
4 4

7 7
E1 E

U
7 7
V J E P B P E J V
P P O

10 10

U
1 1
V E P E V LP LP 1 1 1

1
10 10
J3 O

1
4 4

H2 H2

1
1

U
1.80 1.00 2.40 6.00 2.00 6.00 2.40 1.00 1.80

B
1 1 1

1
1.20 2.00 7.20 2.00 1.20
J3

1 1
1 1
Ñ Ñ

1 1
P
YY 1 1

A
1 1
24.40 13.60

1 1

1 1
G1

Ñ
1 MONTEMAR

B
1 1

1 1

Ñ
4.00
G1

T
4

A
B

Ñ
B

Ñ
SECCION P-P SECCION P'-P'

V
1 1
LA CRUZ

T
Ñ

4
SECCION 7-7

Ñ
B
4

Ñ
1 1
B

1 1
LP LP

Ñ
LP LP

Ñ
LA CRUZ

B
G1
1 1

AV. INDEPENDENCIA
1 1

G1

Ñ
1 1

Ñ
H2
1 1
LP LP

AV.

Ñ
H2

LA
MAR
F F LA CRUZ L

INA
2.00 1.50 14.50 1.50 2.00 V P B V

E2 E2
1.80 1.50 6.00 3.40 6.00 1.50 1.80
L

1 1
T
1

T
1
21.50 22.00 1.40 3.57 4.07 2.96 1.40
Y

AV.
Y
5

1 1

1
INDEP
1

AVENIDA DOS .
13.40
N
PROLONG. AVENIDA DOS C C

ENDEN
SECCION Q2-Q2 F N

CIA

6 6
SECCION Q1-Q1

1
1 1

1
SECCION 8-8 F

A
M
LA CRUZ
V

6 6

A
M
H1 G1 1 1 6 6

1
1 1
V

AV.
G1

6 6

1
INDE
CALLE

LOS
LAURELES
PASAJE

H1

UGARTE
LOS

AV.
ALGARROBOS

LP LP
G1

PEND
N

ALFONSO
LP LP
E2

LA

CALLE
E2

Y
6
6

ENCI
MAR
1 1

1
V

S
N

ROSALE
G1

INA

A
CAMPIÑA BAJA ALTO MOCHE

1
LOS
CALLE

GRAU
II
L1

MIGUEL
2
M

BLO
V

CALLE
Y
F

2
PA
Y
1.40 6.60 1.40 1 1

G1

N
F 1 1

. JUA
6
L1

M
1 1 6

AV

1
9.40 CALLE

Ñ
AV.
LOS

6 6

G.
LAURELES

G1

6 6

1
5

ON
1.50 2.40 5.90 2.00 8.00 2.00 8.00 2.00

2
Y
IND
1 1
3.00 2.00 10.80 4.00 12.60 2.40 1.50

OL

2
1
EPE

PR
AV.

1
31.80

NDE
1 1

LA

Ñ
LEYENDA
36.30 1 1 1 1

A
NCI

2
MAR
SECCION 9-9

2
A
D

INA

2
LOTE VD-100-II

AVENIDA DOS . SECCIÓN PROPUESTA

1 1
5

2
1 1

A
1
C

AVENIDA DOS . SECCIÓN PROPUESTA

5
1

Ñ
1 1
SECCION Q4-Q4 B

G1
SECCION Q3-Q3 1
C 2
O O

Ñ
G1 C
A

2
AV

Ñ
1
. IND

1
VIA DE ARTICULACION REGIONAL ( PANAM. )

L1
1 1
1 1

Ñ
1

EP
1

EN
1.00 1.75 5.40 1.00

DE

L1
NC
9.15

IA
1 1
Ñ

M
Ñ

1
1

1
SECCION 10-10

E2

M
1 1

CAMINO
LP

A
DE
E2

HERRADURA
VIA INTEGRACION REGIONAL (PROYECTADA)

1 1

A
1
1

1.50 2.50 6.60 3.80 6.60 2.50 1.50 FAJA V E/J P BC P V


1.50 2.50 6.60 1.50 2.50 6.50 3.80 6.50 2.50 1.50
MARGINAL

1 1
25.00

1 1
RIO
35.00
MOCHE 1.20 1.80 6.00 2.00 6.00 1.80 1.20
Ñ Ñ
SECCION: R1-R1 PROLONGACION GONZALES PRADA SECCION: R2-R2 PROLONGACION GONZALES PRADA

1
C

1
20.00

CALLE
C


2

Area:912.50m2

RECREACIÓN
PÚBLICA
VIAS ARTERIALES

SERV.

PUB.
SECCION 11-11

COMP.

E2
L.P.

COMP.
L.P.

PUB.
SERV.
E2
AV
. IN
E PS T E PP J PP E T PS E

DE
VIAS COLECTORAS

PE
G1

ND
EN
G1

CI
3.00 6.60 1.50 3.00 7.20 1.20 5.00 1.20 7.27 2.96 1.47 6.58 3.03
CAMPIÑA BAJA

A
1.20 1.50-2.00 4.00 - 5.00 1.20
40.00 - 50.00

A
9.15

SECCION S-S CARRETERA INDUSTRIAL - VIA DE EVITAMIENTO


SECCION 12-12 (CALLE LOS SAUCES) VIAS LOCALES
L.P L.P

V
C

E2
J E

2.40 1.50 2.40 6.60 4.20 6.60 2.40 1.50 2.40 LIMITE JURISDICCIONAL DEL DISTRITO C

E2
E E
30.00
DE MOCHE
SECCION T-T 1.80 3.00 7.20 3.00 1.80

L.P 16.80
L.P

V J E SECCION 13-13
2.40 1.50 2.40 6.60 2.40 2.40

17.70

SECCION U-U
L.P L.P

V J P CANAL P J V

1.80 1.80 5.50 1.80


20.00
5.50 1.80 1.80
LEYENDA:
SECCION V-V
L.P L.P L.P L.P
P.P. = PISTA PRINCIPAL
PLANO : ESCALA: 1/12500 LAMINA:
V E P B/J P J V V P B/J P V
P.S. = PISTA SECUNDARIA
2.40 0.75 5.00 7.20

28.11-30.55
2.00 7.20 3.60 2.40 1.80 7.20 1.00

19.00
7.20 1.80
C = CANAL
B = BERMA
MUNICIPALIDAD DISTRITAL DE MOCHE ESQUEMA VIAL FECHA: JULIO - 2018

SECCION: W-W AV. SANTA ROSA SECCION: W1-W1 AV. SANTA ROSA DEL DISTRITO DE MOCHE APROBADO:
LP

P
LP LP LP
LP

V P V
LP
J = JARDIN
L.P. = LIMITE DE PROPIEDAD EQUIPO TÉCNICO DE DESARROLLO URBANO Y RURAL
EV0-1
GERENTE DESARROLLO URBANO Y RURAL:
V J/E J/E V V J CANAL P J V
1.20 1.80 6.00 1.80 1.20 1.00 6.00 1.00
12.00 1.80 1.20 2.90

14.90
6.00 1.20 1.80 8.00 E = ESTACIONAMIENTO ARQ. IRVING MONTENEGRO TERAN
ARQ. URSULA SAGASTEGUI RODRIGUEZ
BACH. ARQ. ALEJANDRA YGLESIAS LEGOAS
SECCION W2-W2 SECCION W3-W3 SECCION W4-W4 V = VEREDA C.A.P. 12909 BACH. ARQ. KATHERINE JANNETH SICCHE ISLA

You might also like