LONG QUIZ
CIVIL CODE:
1. What Article of the Civil Code of the Philippines is the
Architect’s Civil Liability?
a. Art. 1725 c. Art. 1724
b. Art. 1723 d. Art. 1728
GENERAL CONDITIONS:
11. Additional information on contract documents issued to
bidders before date of bidding.
a. Notice to Proceed c. Special Provision
b. Proposal d. Bid Bulletin
GENERAL CONDITIONS:
21. Means information, advice or notification pertinent to the
project delivered in person or sent by registered mail to
the individual, firm or corporation at the last known
business address of such individual firm or corporation.
a. Written Notice c. Special Provision
c. Supplementary Bulletin d. Bid Bulletin
GENERAL CONDITIONS:
31. No further retention shall be made on the balance of the
contract when how may percent
a. 60% c. 50%
b. 30% d. 90%
SPP DOCUMENTS:
36. To minimize negative effect of simplified operations
associated with cost – reduction programs.
a. SPP DOC. 203 C. SPP DOC. 206
b. SPP DOC. 201 D. SPP DOC. 204B
GENERAL CONDITIONS:
41. Approximately, how many square meters of office space for
the architect is built by the contractor as temporary
facilities for the project?
a. 15 sqm. C. 20 sqm.
b. 10 sqm. D. 12 sqm.
43. How many days prior to bidding shall the contractor seek
the architect’s clarification as to the particular areas of
work, which requires evaluation of the architects?
a. 30 days c. 60 days
b. 15 days d. 20 days
SPP DOCUMENTS:
46. For Professional Architectural Consulting Services, the
following are the Methods of Compensation except?
a. Per Diem or Hourly Basis c. Retainer
b. Fixed / Lump Sum d. MDPE