SWP of Movement of Vehicle Movement

The document outlines safety procedures for a construction job, including requirements for moving heavy vehicles safely on site such as using approved routes, experienced licensed operators, and flag persons. Safety precautions are provided for excavation work and ensuring equipment is in good condition with valid certification.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
297 views

SWP of Movement of Vehicle Movement

The document outlines safety procedures for a construction job, including requirements for moving heavy vehicles safely on site such as using approved routes, experienced licensed operators, and flag persons. Safety precautions are provided for excavation work and ensuring equipment is in good condition with valid certification.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

EHSMSM/WORKS/446/4009 Rev#01 Effective Date. 15.10.

2006

SAFE WORK PROCEDURE- FOR CONTRACT JOB


(Performance Criteria- Perfection in job with no Injury to persons or damage to property)
Page 1 of 1
1. DEPARTMENT : Infrastructure Project Corporate Services AIC Leader :
2. SECTION/LOCATION : KSMS DOC. No. : KSMS/SENCO/SWP/17
3. JOB TITLE : Construction of KSMS Building Name of Working Agency : Senco India.
4. JOB DURATION : Start Date: 15-12-2015 End Date : 18-02-2017. Work Order No. … 3800011924/109

Ste Reference to
Associated documents
p Activity Responsible Condition Tools
Requirements/Hazards Safety Precaution /criteria and
No (WHAT) persons and Tackles
/Impacts remarks
.
Dumper- Ok SS/GEN - 12
1. Hyva – Ok SS/GEN-29
Tractor _ Ok
Excavator - Ok
 Rout shall be identified.
 Vehicle shall be moved through only approved rout.
 Proper approach with demarcation to be provided at site / yard
& should be hard and levelled.
 Experienced operator with proper license eye test certificate
Movement of shall be allowed for operate the vehicle.
Heavy Vehicles  Vehicle shall be run with in the speed limit approved by client
1. Hit or dash  Dumper and Hyva shall be Parked 3mtr away from the
at site
2. Toppling of excavated pit depth below 5mtr. And if more than 5mtr.
vehicle. Parking distance from edge shall not be less than 5mtr..
3. Failure of  One flag man or signal man should be deployed to control the
equipment movement with flag.
 Area shall be barricaded with caution board.
4. Overload
 Vehicle with all the safety accessories as per the standard will
be allowed for the job and before starting the job.
 Used only Good condition of equipment i.e. valid test
certificate, pollution certificate, and insurance and fitness
certificate.

 Over load in vehicles is not be allowed.

Departmental Representative Representative from Safety Contractor’s Representative


EHSMSM/WORKS/446/4009 Rev#01 Effective Date. 15.10.2006

SAFE WORK PROCEDURE- FOR CONTRACT JOB


(Performance Criteria- Perfection in job with no Injury to persons or damage to property)
Page 1 of 1
1. DEPARTMENT : Infrastructure Project Corporate Services AIC Leader :
2. SECTION/LOCATION : KSMS DOC. No. : KSMS/SENCO/SWP/17
3. JOB TITLE : Construction of KSMS Building Name of Working Agency : Senco India.
4. JOB DURATION : Start Date: 15-12-2015 End Date : 18-02-2017. Work Order No. … 3800011924/109

Departmental Representative Representative from Safety Contractor’s Representative