Compute for the work cycles (n) within 2 percent of the sample mean using a confidence level of 99 percent

for p
and 4.35?

squared
x mean n = (zs/ax)^2, a is used when given is allowable % error
difference
n = (zs/e)^2, e is used when given is allowable error not %
4.20 0.05 CL of 90% = z-value of 1.65
4.00 0.18 CL of 95% = z-value of 1.96
4.80 0.14 CL of 98% = z-value of 2.33
4.30 0.02 CL of 99% = z-value of 2.58
4.90 0.23 Standard deviation = square root of (total squared differen
n = sample size
4.35 0.01
26.55 4.425 0.62

s =square root [0.62/(6-1)] = 0.35

n = [(2.58x0.35)/(0.02x4.425)]^2 = 104.11

=(2.58x0.35) 0.90
=(0.02x4.425) 0.09
=0.90/0.09 10.20
=10.20^2 104.11

Below are six cycles of observed times and performance ratings. With an allowance factor of 20% of job tim

Elements PR 1 2 3 4
A 110% 8 9 8 11
B 85% 36 49 39 35
C 105% 15 17 13 20
D 90% 8 6 9 30*
Note: PR = Performance Rating

OBSERVED TIME (OT)


Element A Observed Time Element B Observed Time Element C Observed Time
= (8+9+8+11+7+10)/6 = (36+49+39+35+43)/5 = (15+17+13+20+18+19)/6
= 53/6 =202/5 = 102/6
8.83 40.4 17

Element B Observed Time: observation 112 of cycle 5 was discarded being an outlier
Element D Observed Time: observation 30 & 35 of cycle 4 & 5 respetively was discarded being an outlier

NORMAL TIME (NT)


Element A Normal Time Element B Normal Time Element C Normal Time
= 8.83 x 110% = 40.4 x 85% = 17 x 105%
9.71 34.34 17.85

STANDARD TIME (ST)


Element A Standard Time Element B Standard Time Element C Standard Time
= 8.83 x 110% x 120% = 40.4 x 85% x 120% = 17 x 105% x 120%
11.65 41.21 21.42

Computed Standard Time for entire job = 82.66 (11.65 + 41.21 + 21.42 + 8.36)

A time study was conducted on a job that contains four elements. The observed times and performance
ratings for six cycles are shown in the following table. Assuming allowance factor of 15% of job time.
Compute the standard time for this job.
OBSERVATION (MINUTES PER CYCLE)
ELEMENT PR 1 2 3 4
1 90% 1.44 0.50 0.43 0.45
2 85% 1.50 1.54 1.47 1.51
3 110% 0.84 0.89 0.77 0.83
4 100% 1.10 1.14 1.08 1.20

A.) DETERMINE THE AVERAGE CYCLE TIME FOR EACH ELEMENT


B.) FIND THE NORMAL TIME FOR EACH ELEMENT
C.) ASSUMING AN ALLOWANCE FACTOR OF 15 PERCENT JOB TIME, COMPUTE THE
STANDARD TIME FOR THIS JOB.
confidence level of 99 percent for pilot times (minutes) of 4.2, 4.00, 4.80, 4.30, 4.90,
d 4.35?

n given is allowable % error


n given is allowable error not %
5
6
3
8
e root of (total squared difference/n-1)

allowance factor of 20% of job time, compute for the standard time of this job.

Observed Time Normal Time Standard


5 6
(OT) (NT) Time (ST)
7 10 8.83 9.71 11.65
112* 43 40.4 34.34 41.21
18 19 17 17.85 21.42
35* 8 7.75 6.98 8.38
73.98 68.88 82.66

Observed Time (OT) = Average of observations


Element D Observed Normal Time (NT) = OT x Performance Rating
Time
= (8+6+9+8)/4 Standard Time (ST) = NT x Allowance Factor
= 31/4 Allowance Factor for job (Afjob) = 1 + A;
7.75 AFday = 1/(1-A)

utlier
scarded being an outlier

Element D Normal
Time
= 7.75 x 90%
6.98

Element D Standard
= 7.75 xTime
90% x 120% Allowance Factor for job (Afjob) = 1 + A
8.38

times and performance


r of 15% of job time.

S PER CYCLE) Answers:


5 6 Total Observation OT NT ST
0.48 0.46 2.32 0.46 0.42 0.48 AF = 100% + 15% =
1.49 1.52 9.03 1.51 1.28 1.47 115% or 1.15
0.85 0.80 4.98 0.83 0.91 1.05
1.16 1.26 6.94 1.16 1.16 1.33
3.96 3.77 4.33