Work Measurement
Work Measurement
for p
and 4.35?
squared
x mean n = (zs/ax)^2, a is used when given is allowable % error
difference
n = (zs/e)^2, e is used when given is allowable error not %
4.20 0.05 CL of 90% = z-value of 1.65
4.00 0.18 CL of 95% = z-value of 1.96
4.80 0.14 CL of 98% = z-value of 2.33
4.30 0.02 CL of 99% = z-value of 2.58
4.90 0.23 Standard deviation = square root of (total squared differen
n = sample size
4.35 0.01
26.55 4.425 0.62
n = [(2.58x0.35)/(0.02x4.425)]^2 = 104.11
=(2.58x0.35) 0.90
=(0.02x4.425) 0.09
=0.90/0.09 10.20
=10.20^2 104.11
Below are six cycles of observed times and performance ratings. With an allowance factor of 20% of job tim
Elements PR 1 2 3 4
A 110% 8 9 8 11
B 85% 36 49 39 35
C 105% 15 17 13 20
D 90% 8 6 9 30*
Note: PR = Performance Rating
Element B Observed Time: observation 112 of cycle 5 was discarded being an outlier
Element D Observed Time: observation 30 & 35 of cycle 4 & 5 respetively was discarded being an outlier
Computed Standard Time for entire job = 82.66 (11.65 + 41.21 + 21.42 + 8.36)
A time study was conducted on a job that contains four elements. The observed times and performance
ratings for six cycles are shown in the following table. Assuming allowance factor of 15% of job time.
Compute the standard time for this job.
OBSERVATION (MINUTES PER CYCLE)
ELEMENT PR 1 2 3 4
1 90% 1.44 0.50 0.43 0.45
2 85% 1.50 1.54 1.47 1.51
3 110% 0.84 0.89 0.77 0.83
4 100% 1.10 1.14 1.08 1.20
allowance factor of 20% of job time, compute for the standard time of this job.
utlier
scarded being an outlier
Element D Normal
Time
= 7.75 x 90%
6.98
Element D Standard
= 7.75 xTime
90% x 120% Allowance Factor for job (Afjob) = 1 + A
8.38