This document provides a quantity survey for a slab culvert with a 1.5m clear span and 4m roadway. It includes 8 items describing various components of the culvert including earth works, foundations, brick work, deductions, cement pointing, string courses, PCC for the slab, and reinforcement. Quantities for length, breadth, height and units are provided for each item.

Uploaded by

adarshprashant99
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views

Culvert 2018 Spring

This document provides a quantity survey for a slab culvert with a 1.5m clear span and 4m roadway. It includes 8 items describing various components of the culvert including earth works, foundations, brick work, deductions, cement pointing, string courses, PCC for the slab, and reinforcement. Quantities for length, breadth, height and units are provided for each item.

Uploaded by

adarshprashant99
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Slab Culvert 2018 Spring

prepare a quantity survey of slab culvert of 1.5m clear span and 4 m roadway as shown in drawing below

foundation 1:2:4 PCC


Brick Work Frisrt class 1:4
Exposed Part Should be pointed 1:2 C/S up to 15cm below ground
String Course 8cm Deep and 12cm Thick 1:4 C/s

SN Description of Works No. Length Breadth Height Quantity Unit Remarks


1.0 Earth Works in Excavation
Abutment Walls 2.0 5.30 0.75 0.75 5.96 5.3=5+0.15+0.15
Wing Walls 4.0 1.40 0.75 0.75 3.15 1.4=1.4-0.15+0.15
Total 9.11 Cum
2.0 PCC in Foundation (1:2:4)
2.1 Abutment Walls 2.00 5.30 0.75 0.30 2.39
Wing Walls 4.00 1.40 0.75 0.30 1.26
Total 3.65 Cum
3.0 First Class Brick Work
3.1 Abutment Walls 2.0 5.00 0.45 1.55 6.98 1.55=0.45+0.9+0.2
Wing Walls 4.0 1.40 0.45 1.55 3.91
Parapet Walls 45 cm thick 2.0 5.30 0.45 0.33 1.57 0.33=0.25+0.08
Parapet Walls 35 cm thick 2.0 5.30 0.35 0.40 1.48
4.0 Deductions
4.1 Bearing of RCC Slab (2.0) 5.00 0.30 0.20 (0.60)
Total 13.34 Cum
5.0 Cement pointing/plaster
15 cm Below bed
Inner faces the abutments 2.0 5.00 - 1.05 10.50 Level to below 1.05=0.9+0.15
slab
Face walls 2.0 5.30 2.02 21.41 Or 2.02=0.15+1.3+0.25+0.4-0.08
Inner side of parapets 2.0 5.30 0.65 6.89
2 of 2

Slab Culvert 2018 Spring

prepare a quantity survey of slab culvert of 1.5m clear span and 4 m roadway as shown in drawing below

foundation 1:2:4 PCC


Brick Work Frisrt class 1:4
Exposed Part Should be pointed 1:2 C/S up to 15cm below ground
String Course 8cm Deep and 12cm Thick 1:4 C/s

SN Description of Works No. Length Breadth Height Quantity Unit Remarks


End of parapet(45cm) 4.0 0.45 0.33 0.59 4=2*2
End of parapet(35cm) 4.0 0.35 0.40 0.56 4=2*2
Deductions
Rectangular Opening (2.0) 1.70 1.05 (3.57)
Triangular opening of face wall hidden by
(4.0) A= 0.98 (3.92) A=1/2*1.4*1.4 1.25=1.4-0.15
earth filling
Total 32.47 Sqm
6.0 String Course (8cm*12cm)
6.1 2.0 5.30 - 10.60
Total 10.60 Rm
7.0 PCC for RCC in slab -
PCC for RCC in slab 1.0 5.00 2.30 0.20 2.30 2.3=1.7+0.3*2
Total 2.30 Cum
8.0 Reinforcement -
Along short direction (16mm bar) 51.0 2.30 w/m= 1.58 184.96
Along long direction (10mm bar) 12.0 5.00 w/m= 0.62 37.00
Total 221.96 Kg

Page 2 Slab Culvert