Final Project - Figures
Final Project - Figures
Final Project
2) Mark all columns grid lines 1-A, 1-B, 1-C, 1-D and 5-A, 5-B, 5-C, 5-D by TS 6x6x5/8”
3) Mark all the rest of columns grid lines 2-A, 3-A, 4-A, and 2-D, 3-D, 4-D by W18x35
4) Design the min. base plate size for (2) types of columns (TS 6x6x5/8 & W18x35) with
3/4" inches Dia. A325 anchor bolts. (see Min. dimension required on figure A)
5) Layout the steel framing with the grid line 1: A-B, B-C, C-D and grid lines 5: A-B, B-C,
C-D by W8x10. Mark the beams on grid line 2, 3, and 4 from A to D by W24x62
6) Mark the all beams around the building by W12x24 @18’ height (Top of Steel T.O.S.,
see section on figure B)
7) Draw full building framing sections by horizontal and vertical (Low eave height = 20’
@ grid line A&D; slope 1 1/4:12). This is a gable roof (see section on figure C).
9) Design the min. connection slice plate size for beam to beam W24x62 (see figure
D)
http://cdn2.hubspot.net/hub/211754/file-442450539-jpg/images/roof_types-resized-600.jp... 10/26/2016