System Life Cycle Revision Questions
System Life Cycle Revision Questions
1. A company buys a new software package. This package includes a user guide.
Give two sections that should be included in this user guide.
How to load/install/run the software
How to save files
How to do a search
How to sort data
How to print out
How to add, delete or amend records
The purpose of the system/program/software package
Limitations of the system
Screen layouts (input format)
Print layouts (output format)
Hardware requirements
Software requirements
Sample runs (with results and actual test data used)
Error handling/meaning of errors
Troubleshooting guide/help lines/FAQs (frequently asked questions)
How to log in/log out
Tutorials
Error messages/meaning of error messages
Glossary
2. A school is to introduce a new, computerized registration system. One method of introduction
of the new system is by phased implementation.
Give two other methods that the school could use.
Methods: Direct, parallel, pilot
3. The manager of a local cinema has employed a systems analyst to update the present
administration system.
Give two methods the analyst might use to collect data about the present system.
Observation
Questionnaires
Interviews
Examination of existing documents
4. A small company has decided to computerize its stock control system.
a) State two fact-finding methods that could be used to obtain information about the current
system.
b) Explain why parallel running is often chosen as a method of implementation.
With this method, the old and new systems are run side by side for a time before the new system
takes over altogether so that if the new system fails, the old system is still available as a backup.