Project Utility Scale Grid Connected 1000 MW Floating Solar PV project(s) in Odisha, India
Project background
IFC has been engaged by GRIDCO (Client) to develop ~1000 MW equivalent of FSPV projects at multiple
locations/reservoirs in the State on Public Private Partnership (PPP) mode. IFC’s scope of work includes
screening of sites for FSPV projects.
The Government of Odisha, through its nodal agency for RE initiatives - Grid Corporation of Odisha
(GRIDCO/Client), aims to develop ~1000 MW equivalent of FSPV projects at multiple locations/reservoirs in
the State on Public Private Partnership (PPP) model.
Most parts of the state of Odisha receive average daily solar irradiance from 5.0 to 5.5 kWh/m2 (as per
satellite datasets) along with the average sunny days from 280- 300 in a year. Based on climatic conditions,
the State can be divided into two major climatic zones - composite and warm & humid, which are both
suitable for deploying large-scale solar power projects. Odisha being an agricultural state faces difficulty in
developing ground-mounted large-scale solar projects due to the unavailability of wasteland.
Project is having total Capacity of 1000MW Which will split in to three transactions let’s say Each transaction
of 300 - 350 MW.
We AFRY as Lead Consultant will be responsible for proposing criteria and help in selection of three to four
sites with highest solar exploitable potential. This includes considering the parameters described in the
scope of this ToR (irradiation, and availability at the substation among others), but also the
permitting/licensing challenges, distance for power evacuations, limitations in total potential for
evacuation, land assessment around the potential site for assembly of FSVP system before it is pushed to
water body, social and environmental concerns or/and technical solutions, amongst other factors. A long list
of reservoirs may be provided by Government, out of which the Consultant would be required to shortlist
reservoirs based on the screening criteria.
In carrying out the work, the Consultant shall Consider views and concerns of key stakeholders, including
GRIDCO, OPTCL, GoO, OERC, OHPC,
Energy department, GoO and relevant authorities, where appropriate. Before interacting with any
stakeholder, the Consultant shall coordinate with GRIDCO/IFC as GRIDCO/IFC will lead the
relations with stakeholders
Odisha, India
ojects at multiple
of work includes
n of Odisha
cations/reservoirs in
holders, including
ng with any
the
FEASIBILITY STUDY for Utility Scale Grid Connected Floating Solar PV project(s) i
SCOPE of local subconsultant
ToR Sections
Task 3: Transaction
Implementation and Bid
Process Management
Task 3: Transaction
Implementation and Bid
Process Management
Based on the modeling and due-diligence undertaken, the Consultant would be required to
define technical specifications and reference standards including but not limited to the
following to be
included in bid documents:
g. Transformers suitable for operation in high humidity conditions and in conjunction with AFRY Pune
the FSPV plant (taking into account the environmental conditions and hydrodynamic
forcing)
h. Cables and Hardware
i. LT and HT panels
j.Transmission Interconnection
For each Transaction, prepare the relevant technical schedules on International & Indian