0% found this document useful (0 votes)
22 views

Checklist

The document provides a checklist for inspection and repair work across several areas including the D.S.Q., boundary wall, main house, solar battery storage room, TV room, veranda, and art room. For each item, it lists the job description, estimated skilled and unskilled labor rates, and estimated durations.

Uploaded by

Deen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views

Checklist

The document provides a checklist for inspection and repair work across several areas including the D.S.Q., boundary wall, main house, solar battery storage room, TV room, veranda, and art room. For each item, it lists the job description, estimated skilled and unskilled labor rates, and estimated durations.

Uploaded by

Deen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 18

INSPECTION CHCKLIST

DESCRIPTION SKILLED UNSKILLED RATE SKILLED RATE UNSKILLED


A D.S.Q

Filling all broken edges with filler and any


damaged part of the walls including all the
1 reveals of windows and doors 2 1100 500
2 Sanding the walls second time 2 1100 500
3 Acrylic application 2 1100 500
Repair all the locks by screwing all the
4 screws 1 1100 500
scrabing the floor off all the dirt and making
5 it good and habitable 4 1100 500

clearing off all the debris around the dsq


and infront of the dsq on top of the septic
6 Tank and levelising 9 1100 500
7 Painting the pump room on septic tank 1 1100 500
clean the septic tank and repair any broken
8 edges 1 3 1100 500
1100
BOUNDARY WALL 1100
clear and levelize 2 feet around the bundary
1 wall 8 1100 500
Clear the ballallast and kifusi infront of the
2 plot 4 1100 500
clear all the poles and timbers arranging in
3 one area designated 2 1100 500
clear the debris around the area where
4 gum poles were stored 20 1100 500

clear and levelize the debris near the main


entrance from the boundary wall near the
5 kitchen but on the boundary wall side 30 1100 500
B INSIDE COMPOUND OF THE MAIN HOUSE 1100 500

Remove all timbers and papers and levelize


the ground including near the swimming
1 pool pump room area 12 1100 500
2 cast the top cover for the culvert 1 2 1100 500
construct the qurry tiles on top of pump
3 roon 2 2 1100 500
casting inside the pump room with water
4 proof 1 2 1100 500

Filling the filter with ballast and sand


designed for filter(The ballast and sand is in
5 boardwalk) Plumber 1 3 1500 500
6 SWIMMING POOL 1100 500
Smoothening the top surface of the
7 swimming pool by grinding 3 3 1100 500
8 Light fixing for the pool 1 1100 500
9 Jet Fixing for the pool 1 1100 500

Niche repair on the pool where leak is by


removing the tiles on the leaking area
plastering with waterproof and replacing
10 with new tiles 3 3 2000 500
C MAIN HOUSE 1100 500
Roof 1100 500

Placement of furniture pipe 600mm high


from the parapet wall height level to hold
1 marine nylone Rope 3 1100 500

2 cutting and placing the Marine Nylone Rope 3 1100 500


Placing the cover on top of the access stair
3 case to the roof 2 1100 500
Plaster works for the water tank pillers and
4 floor 6 1100 500

5 clean off all the debriss dust from the roof 6 1100 500

6 Paint the white paint on all parts of the roof 300 50 500
7 Fix the float switch 1 1100 500
8 Test water connection 1 1100 500
D SOLAR BATTERRY STORRAGE ROOM 1100 500

all the broken edges of all the window and


1 door reveals have been filled with filler 1 1 1100 500
all the damaged walls have been filled with
2 filler 1 1 1100 500

all the light points and socket points and


switch points and all the sanitarry fitting
points have been filled around the edges
3 with filler andrepaired 1 1100 500
4 Sanding the walls with sand paper 1 1 1100 500
5 Acrylic application to the walls 2 2 1100 500
6 Floor repairs with uniform colour 1 1 1100 500
7 Skirting repair with uniform colour 1 1 1100 500
8 Acrylic application to the floor 1 1 1100 500
9 Hardrail to the staicase painted white 1 1100 500

10 all the locks of the doors are well screwed 1 1100 500
11 the doors are well vanished 1 1 1100 500
Painting the windows with zinga paint using
12 hand brush 3 1 1100 500
13 placing the window panes 1100 500
1100 500
1100 500
E TV ROOM 1100 500

all the broken edges of all the window and


1 door reveals have been filled with filler 1 1 1100 500
all the damaged walls have been filled with
2 filler 1 1 1100 500

all the light points and socket points and


switch points and all the sanitarry fitting
points have been filled around the edges
3 with filler andrepaired 1 1100 500
4 Sanding the walls with sand paper 1 1 1100 500
5 Acrylic application to the walls 2 2 1100 500
6 Floor repairs with uniform colour 1 1 1100 500
7 Skirting repair with uniform colour 1 1 1100 500
8 Acrylic application to the floor 1 1 1100 500
9 Hardrail to the staicase painted white 1 1100 500

10 all the locks of the doors are well screwed 1 1100 500
11 the doors are well vanished 1 1 1100 500
Painting the windows with zinga paint using
12 hand brush 3 1 1100 500
13 placing the window panes 1100 500
1100 500
VERANDA BETWEEN TV ROOM AND ART
F ROOM 1100 500

all the broken edges of all the window and


1 door reveals have been filled with filler 1 1 1100 500
all the damaged walls have been filled with
2 filler 1 1 1100 500

all the light points and socket points and


switch points and all the sanitarry fitting
points have been filled around the edges
3 with filler andrepaired 1 1100 500
4 Sanding the walls with sand paper 1 1 1100 500
5 Acrylic application to the walls 2 2 1100 500
6 Floor repairs with uniform colour 1 1 1100 500
7 Skirting repair with uniform colour 1 1 1100 500
8 Acrylic application to the floor 1 1 1100 500
9 Hardrail to the staicase painted white 1 1100 500

10 all the locks of the doors are well screwed 1 1100 500
11 the doors are well vanished 1 1 1100 500
Painting the windows with zinga paint using
12 hand brush 3 1 1100 500
13 placing the window panes 1100 500
G ART ROOM 1100 500

all the broken edges of all the window and


1 door reveals have been filled with filler 1 1 1100 500
all the damaged walls have been filled with
2 filler 1 1 1100 500

all the light points and socket points and


switch points and all the sanitarry fitting
points have been filled around the edges
3 with filler andrepaired 1 1100 500
4 Sanding the walls with sand paper 1 1 1100 500
5 Acrylic application to the walls 2 2 1100 500
6 Floor repairs with uniform colour 1 1 1100 500
7 Skirting repair with uniform colour 1 1 1100 500
8 Acrylic application to the floor 1 1 1100 500
9 Hardrail to the staicase painted white 1 1100 500

10 all the locks of the doors are well screwed 1 1100 500
11 the doors are well vanished 1 1 1100 500
Painting the windows with zinga paint using
12 hand brush 3 1 1100 500
13 placing the window panes 1100 500
H BEDROOM 3 1100 500

all the broken edges of all the window and


1 door reveals have been filled with filler 1 1 1100 500
all the damaged walls have been filled with
2 filler 1 1 1100 500

all the light points and socket points and


switch points and all the sanitarry fitting
points have been filled around the edges
3 with filler andrepaired 1 1100 500
4 Sanding the walls with sand paper 1 1 1100 500
5 Acrylic application to the walls 2 2 1100 500
6 Floor repairs with uniform colour 1 1 1100 500
7 Skirting repair with uniform colour 1 1 1100 500
8 Acrylic application to the floor 1 1 1100 500
9 Hardrail to the staicase painted white 1 1100 500

10 all the locks of the doors are well screwed 1 1100 500
11 the doors are well vanished 1 1 1100 500
Painting the windows with zinga paint using
12 hand brush 3 1 1100 500
13 placing the window panes 1100 500
I BEDROOM4 1100 500

all the broken edges of all the window and


1 door reveals have been filled with filler 1 1 1100 500
all the damaged walls have been filled with
2 filler 1 1 1100 500

all the light points and socket points and


switch points and all the sanitarry fitting
points have been filled around the edges
3 with filler andrepaired 1 1100 500
4 Sanding the walls with sand paper 1 1 1100 500
5 Acrylic application to the walls 2 2 1100 500
6 Floor repairs with uniform colour 1 1 1100 500
7 Skirting repair with uniform colour 1 1 1100 500
8 Acrylic application to the floor 1 1 1100 500
9 Hardrail to the staicase painted white 1 1100 500

10 all the locks of the doors are well screwed 1 1100 500
11 the doors are well vanished 1 1 1100 500
Painting the windows with zinga paint using
12 hand brush 3 1 1100 500
13 placing the window panes 1100 500
BEDROOM UPPER LEVEL AROUND THE
J DOME 1100 500

all the broken edges of all the window and


1 door reveals have been filled with filler 1 1 1100 500
all the damaged walls have been filled with
2 filler 1 1 1100 500

all the light points and socket points and


switch points and all the sanitarry fitting
points have been filled around the edges
3 with filler andrepaired 1 1100 500
4 Sanding the walls with sand paper 1 1 1100 500
5 Acrylic application to the walls 2 2 1100 500
6 Floor repairs with uniform colour 1 1 1100 500
7 Skirting repair with uniform colour 1 1 1100 500
8 Acrylic application to the floor 1 1 1100 500
9 Hardrail to the staicase painted white 1 1100 500

10 all the locks of the doors are well screwed 1 1100 500
11 the doors are well vanished 1 1 1100 500
Painting the windows with zinga paint using
12 hand brush 3 1 1100 500
13 placing the window panes 1100 500
K FIRST FLOOR VERANDA 1100 500
all the damaged walls have been filled with
1 filler 1 1 1100 500

all the light points and socket points and


switch points and all the sanitarry fitting
points have been filled around the edges
2 with filler andrepaired 1 1100 500
3 Sanding the walls with sand paper 1 1 1100 500
4 Acrylic application to the walls 2 2 1100 500
5 Floor repairs with uniform colour 1 1 1100 500
6 Skirting repair with uniform colour 1 1 1100 500
7 Acrylic application to the floor 1 1 1100 500
8 Hardrail to the staicase painted white 1 1100 500

9 all the locks of the doors are well screwed 1 1100 500
10 the doors are well vanished 1 1 1100 500
Painting the windows with zinga paint using
11 hand brush 3 1 1100 500
12 placing the window panes 1100 500
Paint well the pergollas and arrange them
13 well 2 1100 500
L staircase 1100 500

all the broken edges of all the window and


1 door reveals have been filled with filler 1 1 1100 500
all the damaged walls have been filled with
2 filler 1 1 1100 500

all the light points and socket points and


switch points and all the sanitarry fitting
points have been filled around the edges
3 with filler andrepaired 1 1100 500
4 Sanding the walls with sand paper 1 1 1100 500
5 Acrylic application to the walls 2 2 1100 500
6 Floor repairs with uniform colour 1 1 1100 500
7 Skirting repair with uniform colour 1 1 1100 500
8 Acrylic application to the floor 1 1 1100 500
9 Hardrail to the staicase painted white 1 1100 500

10 all the locks of the doors are well screwed 1 1100 500
11 the doors are well vanished 1 1 1100 500
Painting the windows with zinga paint using
12 hand brush 3 1 1100 500
13 placing the window panes 1100 500
14 1100 500
M Bedroom 1 1100 500

all the broken edges of all the window and


1 door reveals have been filled with filler 1 1 1100 500
all the damaged walls have been filled with
2 filler 1 1 1100 500

all the light points and socket points and


switch points and all the sanitarry fitting
points have been filled around the edges
3 with filler andrepaired 1 1100 500
4 Sanding the walls with sand paper 1 1 1100 500
5 Acrylic application to the walls 2 2 1100 500
6 Floor repairs with uniform colour 1 1 1100 500
7 Skirting repair with uniform colour 1 1 1100 500
8 Acrylic application to the floor 1 1 1100 500
9 Hardrail to the staicase painted white 1 1100 500

10 all the locks of the doors are well screwed 1 1100 500
11 the doors are well vanished 1 1 1100 500
Painting the windows with zinga paint using
12 hand brush 3 1 1100 500
13 placing the window panes 1100 500
N Bedroom 2 1100 500

all the broken edges of all the window and


1 door reveals have been filled with filler 1 1 1100 500
all the damaged walls have been filled with
2 filler 1 1 1100 500

all the light points and socket points and


switch points and all the sanitarry fitting
points have been filled around the edges
3 with filler andrepaired 1 1100 500
4 Sanding the walls with sand paper 1 1 1100 500
5 Acrylic application to the walls 2 2 1100 500
6 Floor repairs with uniform colour 1 1 1100 500
7 Skirting repair with uniform colour 1 1 1100 500
8 Acrylic application to the floor 1 1 1100 500
9 Hardrail to the staicase painted white 1 1100 500

10 all the locks of the doors are well screwed 1 1100 500
11 the doors are well vanished 1 1 1100 500
Painting the windows with zinga paint using
12 hand brush 3 1 1100 500
13 placing the window panes 1100 500
O Ground floor sitting area 1100 500

all the broken edges of all the window and


1 door reveals have been filled with filler 1 1 1100 500
all the damaged walls have been filled with
2 filler 1 1 1100 500

all the light points and socket points and


switch points and all the sanitarry fitting
points have been filled around the edges
3 with filler andrepaired 1 1100 500
4 Sanding the walls with sand paper 1 1 1100 500
5 Acrylic application to the walls 2 2 1100 500
6 Floor repairs with uniform colour 1 1 1100 500
7 Skirting repair with uniform colour 1 1 1100 500
8 Acrylic application to the floor 1 1 1100 500
9 Hardrail to the staicase painted white 1 1100 500

10 all the locks of the doors are well screwed 1 1100 500
11 the doors are well vanished 1 1 1100 500
Painting the windows with zinga paint using
12 hand brush 3 1 1100 500
13 placing the window panes 1100 500
P Ground floor veranda 1100 500

all the broken edges of all the window and


1 door reveals have been filled with filler 1 1 1100 500
all the damaged walls have been filled with
2 filler 1 1 1100 500

all the light points and socket points and


switch points and all the sanitarry fitting
points have been filled around the edges
3 with filler andrepaired 1 1100 500
4 Sanding the walls with sand paper 1 1 1100 500
5 Acrylic application to the walls 2 2 1100 500
6 Floor repairs with uniform colour 1 1 1100 500
7 Skirting repair with uniform colour 1 1 1100 500
8 Acrylic application to the floor 1 1 1100 500
9 Hardrail to the staicase painted white 1 1100 500

10 all the locks of the doors are well screwed 1 1100 500
11 the doors are well vanished 1 1 1100 500
Painting the windows with zinga paint using
12 hand brush 3 1 1100 500
13 placing the window panes 1100 500
Q external 1100 500

all the broken edges of all the window and


1 door reveals have been filled with filler 1 1 1100 500
all the damaged walls have been filled with
2 filler 1 1 1100 500

all the light points and socket points and


switch points and all the sanitarry fitting
points have been filled around the edges
3 with filler andrepaired 1 1100 500
4 Sanding the walls with sand paper 1 1 1100 500
5 Acrylic application to the walls 2 2 1100 500
6 Floor repairs with uniform colour 1 1 1100 500
7 Skirting repair with uniform colour 1 1 1100 500
8 Acrylic application to the floor 1 1 1100 500
9 Hardrail to the staicase painted white 1 1100 500

10 all the locks of the doors are well screwed 1 1100 500
11 the doors are well vanished 1 1 1100 500
Painting the windows with zinga paint using
12 hand brush 3 1 1100 500
13 placing the window panes 1100 500

TOTAL
25% 50% 75% 100%
AMOUNT STATUS COMPLETED COMPLETED COMPLETED COMPLETED

2,200.00
1,000.00
2,200.00

1,100.00

2,000.00

4,500.00
1,100.00

2,600.00

4,000.00

2,000.00

1,000.00

10,000.00

15,000.00
-

6,000.00
2,100.00

3,200.00

2,100.00

3,000.00
-

4,800.00
1,100.00
1,100.00

7,500.00
-
-

3,300.00

3,300.00

2,200.00

6,600.00

3,000.00

15,000.00
1,100.00
1,100.00
-

1,600.00

1,600.00

500.00
1,600.00
3,200.00
1,600.00
1,600.00
1,600.00
1,100.00

1,100.00
1,600.00

3,800.00
-
-
-
-

1,600.00

1,600.00

500.00
1,600.00
3,200.00
1,600.00
1,600.00
1,600.00
1,100.00

1,100.00
1,600.00

3,800.00
-
-

1,600.00

1,600.00

500.00
1,600.00
3,200.00
1,600.00
1,600.00
1,600.00
1,100.00

1,100.00
1,600.00

3,800.00
-
-

1,600.00

1,600.00

500.00
1,600.00
3,200.00
1,600.00
1,600.00
1,600.00
1,100.00

1,100.00
1,600.00

3,800.00
-
-

1,600.00

1,600.00

500.00
1,600.00
3,200.00
1,600.00
1,600.00
1,600.00
1,100.00

1,100.00
1,600.00

3,800.00
-
-

1,600.00

1,600.00

500.00
1,600.00
3,200.00
1,600.00
1,600.00
1,600.00
1,100.00

1,100.00
1,600.00

3,800.00
-
-

1,600.00

1,600.00

500.00
1,600.00
3,200.00
1,600.00
1,600.00
1,600.00
1,100.00

1,100.00
1,600.00

3,800.00
-
-

1,600.00

500.00
1,600.00
3,200.00
1,600.00
1,600.00
1,600.00
1,100.00

1,100.00
1,600.00

3,800.00
-

2,200.00
-

1,600.00

1,600.00

500.00
1,600.00
3,200.00
1,600.00
1,600.00
1,600.00
1,100.00

1,100.00
1,600.00

3,800.00
-
-
-

1,600.00

1,600.00

500.00
1,600.00
3,200.00
1,600.00
1,600.00
1,600.00
1,100.00

1,100.00
1,600.00

3,800.00
-
-

1,600.00

1,600.00

500.00
1,600.00
3,200.00
1,600.00
1,600.00
1,600.00
1,100.00

1,100.00
1,600.00

3,800.00
-
-

1,600.00

1,600.00

500.00
1,600.00
3,200.00
1,600.00
1,600.00
1,600.00
1,100.00

1,100.00
1,600.00

3,800.00
-
-

1,600.00

1,600.00

500.00
1,600.00
3,200.00
1,600.00
1,600.00
1,600.00
1,100.00

1,100.00
1,600.00

3,800.00
-
-

1,600.00

1,600.00

500.00
1,600.00
3,200.00
1,600.00
1,600.00
1,600.00
1,100.00

1,100.00
1,600.00

3,800.00
-

408,400.00