CL 38 - 01
CL 38 - 01
Conveying materials obtained from road cutting including all lifts, laying in
layers of 20cm to 30cm. breaking clods, dressing to the required lines,
curves, grades and section, watering and compacting to not less than Cubic
548 14818.71 159.79 2,367,881.67 0.00 2,367,881.67
97% of standard Proctor density for a lead of over 50m. to 300m. Metre
inclusive from the site of excavation to the site of deposition as directed.