0% found this document useful (0 votes)
12 views

Shravanicpp

Uploaded by

Nikita Borhade
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views

Shravanicpp

Uploaded by

Nikita Borhade
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 18

Downloaded by ShravaniKotme (shravanik3007@gmail.

com)
lOMoARcPSD|28546168

WeeklyDairyforCapstoneProject
Project diary report

Weekno:1
Date:2 January 2024to8
nd th
January 2024

Activitiesplanned:

1. Discussion on Synopsis
2. Finalizing contents of synopsis
3. Planned to arrange group for capstone project

Activitiesexecuted:
1. Formed a group for Capstone Project
2. Finalized contents of synopsis
3. Discussed the topics with mentor.

Reasonsfordelayif any:

Nodelayoccurred.
Correctivemeasuresadopted:

Noanycorrectivemeasuresadopted.
Remarkandsignatureoftheguide

Downloaded by ShravaniKotme ([email protected])


lOMoARcPSD|28546168

Weekno:3
Date:16 January 2024to22
th nd
January 2024

Activitiesplanned:

1.Planned to Visit Supermarket.

Activitiesexecuted:
1. Visited the Supermarket DMart

Reasonsfordelayany:

Tookmoretimeonresearch.
Correctivemeasuresadopted:

Noanycorrectivemeasuresadopted.
Remarkandsignatureoftheguide

Downloaded by ShravaniKotme ([email protected])


lOMoARcPSD|28546168

Weekno:2
Date:9 January 2024to15
th th
January 2024

Activitiesplanned:

2.Finalizating the project topic


3.Approval of Major project from HOD
Activitiesexecuted:

1.Finalise the topic.


Topicname:Supermarket Billing System

Reasonsfordelayany:

Nodelayoccurred.
Correctivemeasuresadopted:

Noanycorrectivemeasuresadopted.
Remarkandsignatureoftheguide

Downloaded by ShravaniKotme ([email protected])


lOMoARcPSD|28546168

Weekno:4
Date:23 January 2024to 29 January 2024
rd th

Activitiesplanned:

1. Planned to start the project.

Activitiesexecuted:

1 started the project.

Reasonsfordelayany:

Nodelayoccurred.
Correctivemeasuresadopted:

Noanycorrectivemeasuresadopted.
Remarkandsignatureoftheguide

Downloaded by ShravaniKotme ([email protected])


lOMoARcPSD|28546168

Weekno:5
Date: 30 January 2024to 05 February 2024
th th

Activitiesplanned:

1.Plannedtodiscusstherequiredrequirements
fortheproject.2.Planned tomake listonavailable requirements.
3.Plannedtocollecttherequirements
Activitiesexecuted:
1. Completedthecompatiblerequirements.R
equirementsare:
a) Laptopwith4GBRAMandinteli5processor
b) NotepadApplication
c) WebBrowser(GoogleChrome)
d) InternetConnection
e) Xampp Server (Apache. Mysql)
f) PHP
Reasonsfordelayany:

Delayedforcollectingtherequirements.
Correctivemeasuresadopted:

Noanycorrectivemeasuresadopted.
Remarkandsignatureoftheguide

Downloaded by ShravaniKotme ([email protected])


lOMoARcPSD|28546168

Weekno:6
Date: 13 February 2024to 19 February 2024
th th

Activitiesplanned:

1. Planned to study basic concept of project


.

Activitiesexecuted:

1.
Studied basic concepts of project

Reasonsfordelayany:

Noanydelayoccurred
Correctivemeasuresadopted:

Noanycorrectivemeasuresadopted.
Remarkandsignatureoftheguide

Downloaded by ShravaniKotme ([email protected])


lOMoARcPSD|28546168

Weekno:7
Date: 06 February 2024to 12 February 2024
th th

Activitiesplanned:

1. Plannedtostudythecomponentsofthesystem

Activitiesexecuted:
1.Studiedthevariouscomponents ofthesystem like:
A) buttons
B) frame
c) background
d) textfield

Reasonsfordelayany:

Noanydelayoccurred
Correctivemeasuresadopted:

Noanycorrectivemeasuresadopted.
Remarkandsignatureoftheguide

Downloaded by ShravaniKotme ([email protected])


lOMoARcPSD|28546168

From:

Weekno:8
Date: 13 February 2024to 19 February 2024
th th

Activitiesplanned:

1. Plannedtofindtheproperdiagramsfortheproject

Activitiesexecuted:
1. Foundtheproperdiagramsrelatedtoproject.

Reasonsfordelayany:

Noanydelayoccurred
Correctivemeasuresadopted:

Noanycorrectivemeasuresadopted.
Remarkandsignatureoftheguide

Downloaded by ShravaniKotme ([email protected])


lOMoARcPSD|28546168

From:01December2021to10December2021

Weekno:9
Date: 27 February 2024to 04 March 2024
th th

Activitiesplanned:

1. Planned to rough design for frontend

Activitiesexecuted:
1. finished designing frontend

Reasonsfordelayany:

Noanydelayoccurred
Correctivemeasuresadopted:

Noanycorrectivemeasuresadopted.
Remarkandsignatureoftheguide

Downloaded by ShravaniKotme ([email protected])


lOMoARcPSD|28546168

From:13December2021to15December2021

Weekno:10
Date:13thDecember2021to15thDecember2021
Activitiesplanned:
2. Planned to rough design for backend
1.

Activitiesexecuted:
1. finished designing frontend

Reasonsfordelayany:

Noanydelayoccurred
Correctivemeasuresadopted:

Noanycorrectivemeasuresadopted.
Remarkandsignatureoftheguide

Downloaded by ShravaniKotme ([email protected])


lOMoARcPSD|28546168

From:20December2021to30December2021

Weekno:11
Date:20December2021to30December2021
Activitiesplanned:

1.PLANNED TO start ACTUAL DESIGNING


AND CODING
Activitiesexecuted:
STARTED ACTUAL DESIGING AND CODING

Reasonsfordelayany:

Tookmoretimeonresearch.
Correctivemeasuresadopted:

Noanycorrectivemeasuresadopted.
Remarkandsignatureoftheguide

Downloaded by ShravaniKotme ([email protected])


lOMoARcPSD|28546168

From:02January2022to07January2022

Weekno:12
Date:02January2022to07January2022
Activitiesplanned:

1. Plannedto finish coding and designing.

Activitiesexecuted:

1. Finished coding and designing

Reasonsfordelayany:

Nodelayoccurred.
Correctivemeasuresadopted:

Noanycorrectivemeasuresadopted.
Remarkandsignatureoftheguide

Downloaded by ShravaniKotme ([email protected])


lOMoARcPSD|28546168

From:09January2022to14January2022

Weekno:13
Date:09January2022to14January2022
Activitiesplanned:

1. Plannedto test the coding


2.

Activitiesexecuted:
1. Tested coding successfully

Reasonsfordelayany:

Noanydelayoccurred
Correctivemeasuresadopted:

Noanycorrectivemeasuresadopted.
Remarkandsignatureoftheguide

Downloaded by ShravaniKotme ([email protected])


lOMoARcPSD|28546168

From:17January2022to25January2022

Weekno:14
Date:17January2022to25January2022
Activitiesplanned:

3. Plannedto take final verdict from mentor

Activitiesexecuted:

Took final verdict from mentor

Reasonsfordelayany:

Noanydelayoccurred
Correctivemeasuresadopted:

Noanycorrectivemeasuresadopted.
Remarkandsignatureoftheguide

Downloaded by ShravaniKotme ([email protected])


lOMoARcPSD|28546168

From:01February2022to10February 2022

Weekno:15
Date:01February2022to10February2022
Activitiesplanned:

1. Planned to recheck the completed task and fix mistakes if any

Activitiesexecuted:

1. Rechecked the tasks and fixed mistakes

Reasonsfordelayany:

Noanydelayoccurred
Correctivemeasuresadopted:

Noanycorrectivemeasuresadopted.
Remarkandsignatureoftheguide

Downloaded by ShravaniKotme ([email protected])


lOMoARcPSD|28546168

From:14thFebruary2022to19thFebruary2022

Weekno:16
Date:14thFebruary2022to19thFebruary2022
Activitiesplanned:
1. Take printout and Submit

Activitiesexecuted:
Took printout and submitted

Reasonsfordelayany:

Noanydelayoccurred
Correctivemeasuresadopted:

Noanycorrectivemeasuresadopted.
Remarkandsignatureoftheguide

Downloaded by ShravaniKotme ([email protected])