0% found this document useful (0 votes)
16 views

Surveying Assignment 4

Construction surveying assignment

Uploaded by

fadymaged
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
16 views

Surveying Assignment 4

Construction surveying assignment

Uploaded by

fadymaged
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 4
‘THE AMERICAN UNIVERSITY IN CAIRO Department of Construction Engineering CENG 2311 - Construction Surveying Homework Assignment No. 4 EDM & Total Station Applications |. Find the lowest level of high voltae elevated cable between two towers using total station, station ‘A(1200 E, XX N) was occupied and Point B below the cable was observed with target height 1.6m and the coordinates of B were ( 142SE, 1384N, 1.53) and zenith angle 90°20" 10” and then point Con cable was observed with zenith angle 88" 17°22” find the level of C (Remote Elevation). XX=Last six digits from your ID divided by 100 (eg, 1D 900172567. XX=1725.67) XX = 1919.6 LENA fo, Ales Mat hitdeg tone dag? Fea oon {as 5056" JA TS? $99.19 W534 1.64 89-196 ton lI? 2! 39”) = Bots 2. Tofind reduced level ofB from A, total station was used to observe B from A and then to observe A from B. The observations a Tom ] to | Zenithangle | Sipeditance | Heghtot —] Weight ottareet ins. A_[ 8 | ae soa | ea 182 To BA | _90°09"32" | —a2s.836 168 160 Tr reduced fevel ofA is 16.773 m find the reduced level OTB. fa Mn+ hit SapsinVa -hr A RL bare WM 4+ OB = 1.6 hers. gh gala t > NSN aaa 13-978 cake “R52 (GA 4152-16 + 2B 425.93 5:4(9/ 20!) 1 Avg > nat cs ae 19.3615 Ras 3. A slope distance AB XX m measured with EDM, if vertical angle is 01° 14' 20" and elevation of point A is 426.546m and height of instrument is 1.5m and height of target is 1.7m. The prism Prepared by: Prof. Adel EL-Shazly Scanned with CamScanner THE AMERICAN UNIVERSITY IN CAIRO fa Department of Construction Engineering oF CENG 2311 — Construction Surveying 15 ppm and scale ‘constant is -30mm , the pressure and temperature correct correction is 1.0004. Find: = The corrected horizontal distance AB projected on local map. 1 Thecorrected horizontal distance AB projected on national map (radius of Earth 6375 km). = The relative error due to neglecting sea level correction. 1 The accuracy of the corrected distance if EDM accuracy is + (3 mm +3ppm). -"SXeLast six digits from your ID divided by 100 (eg., 1 900172867 XX=1725.67) 512 1929.82 2 1929.62 - 39 2 23 Tove ® '929-59 532 1929.54 19295091 = 1929-619 1002204 Dit 1929-619 cos (of yy! ao!) = 1829-17 Rig 2926-546 415-144 1929.619 sini’ 19" no" ) = 468-08 o” ) 2 463- Daz D,- Slat hls qT te 1979.03 D3 1929.05x Iso04 = 9298) 9. As 426-596 496 ~9.\ot LIF to000 AD ATES yon ge WHS oe 44. Theabservations given below were taken with foal station. height of instrament =helght of trget=1.5) Prepared by: Prof. Adel EL-Shazly Scanned with CamScanner = THE AMERICAN UNIVERSITY IN CAIRO Sr Department of Construction Engineering OF CENG 2311 — Construction Surveying Taalon | eet pation] Torsone eating | Vericlangle | Soe doce M 4 1174552” + 01°18 45" | 225.364m M B 22033305” = ors227" | 228.054 m [Tr eoordinates ofA 15 (1000 E, 800 N, 10m) and bearing of Line AB is XX ®, find coordinates ‘ofM (Eating, Northing, Reduced level) XX=Last two digits from your ID (e.g., ID 900172567 XX= 67) 12 B.054 RU gr hla r5ap sie V 225. 36 jot 269 Sin Pat at") 7. b98 9.94 m = \2o04 Eat 89 cos (“1 ga! 241) Sin (62) = 1202. 94 Mm> Foo ¥r.69 cos(~1" 92/241) Cos (62)> Goh.r6 ” [1222 SKE) Jol.16M 9.92) Prepared by: Prof. Adel EL-Shazly Scanned with CamScanner A, 39° 32 4y3” = THE AMERICAN UNIVERSITY IN CAIRO Bp € { fess Department of Construction Engineering WF Fangs CENG 2311 - Construction Surveying 8 ‘5S. The following data were taken with total station to determine coordinates of unoccupied station ‘C using interscetion method from two oceupied stations A &B : Point A with coordinates (1400 E, XX N) was occupied and Observed horizontal angle CAB was 33° 37° 43” ; Point B coordinates (1300 F, 1300 N) was occupied and angles CBA was observed to be S6* 22? 16” Find the Coordinates of Point C (casting, northing). (XNeLast six digits from your ID divided by 100 (eg, 1D 900172867 XX=1725.67) © = TEq + dsr ky [$22 4959.99 Sin (65°23 96") 227i. oF Paw Dac Dae SinC SIN Sin Moz 2 Dans (O56 eu2 2 1929.624 95g 49 c05(65° 94° 7 Wtio 46") = 1928. OFA EVES A Dac = 953.99 Dace lsv.i9 dEz dsr Fy loot 698.5, Sra EO Fyyr%.o25 test [$0 -hoas= \ 99.025 + 199°1/5,? \9%.9025 649 65, 65° 29 46"! Prepared by: Prof. Adel EL-Shazly Scanned with CamScanner

You might also like