Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
81 views
Power Generation Contract
Uploaded by
Ahmed al-sheaikh
AI-enhanced title
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save power generation contract For Later
Download
Save
Save power generation contract For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
81 views
Power Generation Contract
Uploaded by
Ahmed al-sheaikh
AI-enhanced title
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save power generation contract For Later
Carousel Previous
Carousel Next
Save
Save power generation contract For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 35
Search
Fullscreen
Hide ays se SK eC] Be 8 2021 67 i ie gh | ae oy 309429 fy 5 Une aye ane ha Ua pe 8G (1) Sey aa ne tan EA aud eat gH Al Se cond E3220 stl ely BU le dy la gat pa ae fp Sl i le CEST an do ty) ai eae le Os. 139634 eins Une CWOTECH” A) asta A652) A Mas Re ae Laem all ae ged Ball BS ye 19 48 SAD a 5 Yl a ag oe HI ee in hd an le (aR ay LG J) CA sing MT inn tay Se US J) i= ee PE Ag LS AD GA Doe 1 8 ak ny wa en aay lay MDF] A a EE CIN Aes a HD SAD op Sos) ben Ke 6 ay a MOF] 8 Ra gil ga ge ( ee AED sage os gh a itl of Ain EET eas cl Sak co MA i ly Bel ld SS ay aD ULSD say gil tala SAABENN Deal yay yay pany ip cya yp ny gal ATM pa tay yg aig (Bae) gph Jl a ScygG LD GY oly any Jas 2 AN pe ed ee eras en ity 26 ib AY La gay al Ki ga ay anal gg oe Las aes eeeA is ah gd ep oe oe FBO BO eg yoy (ana hg) at Aa ain ayiny aad (1) Qala cau she and PD oe gi ey aes ol ap hae ah yt a heat | RE DA ety a oS sy te a ty aby Dn tnd iy gd fle a BS ges oT a ay yt ay le BN A cay Ss ger gl a (Bene a ah gl UN a a it Lal AN J an ioe at ase ey aya 36 2021/1/14 Ba ee Del al ead + Sl ae se 4 i kJ My a hy 2020/1231 as WOTECH 252 ah He ABD yt Ey aN on De aa pe SS ae SBT a ef cd Ly A SE] 28 eg I on A eS A Me a id Pe apa A i gS ye Sf ge BD a gi ey 8 2) Sal ay De Sa Ga phe ga a SN Sy ba wa ED LLIB apts So ya Ae Ya Aa a yi Aa Hi aly Dae Se Sp ee Ha ce gal a a a any ag AA a Reta gS et sy oa al (8) gel nly a oeSb 6) Lh ae eae ge FUE De DG ae a J a 0) al Gy GAL So gD sly ge pag ak oye Ge pm PES OEE (He al ae a a ag LIBS a BS A 9 By ea J po Beet cht ly (8 gl A A cy a ay hy dl cla gel JA ge ib ad peg UD dp cil ad ad ASO SD IS SEO ELSE AS JAH gS BT | ) faa eee [i 2 DASE a (YI a Cl A iB) a Aah pil DAG al i gy Sa gS ((isirum intake) 4-6 Sl le papi in ye tnt a aa Ban hein 78 Sh eayd pod da a ol me esha FDS ass ay iy SS yt | Find EE oT nd a SG a Dg kg Pa pak np ES a La a (2) ew GR cay Jak O10) a ph ya a Ta Ri hash J JaB SAAD aS od Al ad Pa AN Gp Aad GA a oS LN gp Ae apa HAL Ltd sage gin ee Al ie I a py Aa pai sll gl “I OAS ok GB Tp ABSaa eats ae ay ey ai Ns yn ge A 3 a Ba Day a ea 5 OD ag a 42) sy de dc iy ad ed Ae DN, PBN hy goth eh Salad on Se ely a a 2-3 gy gi AL il a ay hn al gin a pod i ge Ua in gid Ay al EASON A a Aah ay gl perry Sg Aa ay a Io A oe LA ga gS gd AU il aa J AD ely AL oe Rn aya ns ly aD hye DUS ET A Gd ee GHD ld 3 i So te Os os iad cuss SASS ase ie SA ye apelin A AB a J GHIA | ge Rip 3 448 iy a ah at ae ee gh An a AD gb AB TIA 13) Gets HD Salt Dn ak AAD 9 yp ap ah oe gH Saad tS i GAN ge pla Sh gl ath Ja ANN SLAG ly a aie Lat sll te Ub gto ap dy ely aL lag atl BS GD Hy SD say pad A ed te dot AY ped GA gta yt el ALN LTH of GURY AA UN SG ks si i A gal gy ae gst Ue Be ah oe GBS BA 8 a LN ae df 3 GU (Sho gl hh yh ae () pad apa yet ay iy AR ei be 3S | WOTECH(OF ROG ie gi A Ee ae LS st 9). spi da Geld a Sy iA al ah 2) Gal gp ene oS La Ss a pa gil BN A ee Doc Se Se ns J ML at ag ty a BS gp Ja pe Dae Gs 8 Jad fy) Pe LEAD a oa ght ha th Dy aon iy ld Doo $5 Sued sf SB Asa Daa A ed yA hind Sy py gl 2-5 (2) Sad Ma le sepa Jai Sh ind HA pte a CAI S8 and lye Las ny Ca clade ge ple +5 a ae Bye Big Sly hn ely Deh en loa sah oy ih Osh Ja Sl Sy PIS gy ND ae cell ag ae J atl Gt le gi Riad AT! yey Jal Ea Rly Syl ALA aly 3 gfe iy nal al ad espe ce ABLAN g4-S Leh ye ABS Ag a gg gan Qe ely BM pe LMS PED Can Se nf J cna A J oy J Dh stl gar DS BSE oo SS Gy Sal gi GA ia JL jee ee | ned at 9D gy Ral il oe Syn gD 6 J ge IAB GH! SS pes JAD ASL ny AB a ly gy ng Ey oy Ty Rata gal BD AGE eH Tl Inn Hd Ma sy ASD ade ge SD eH gl pt ge A sd a GS 1 Sy gan 53 J Md ayy SD gD SDD cp Bp aS gpl 0h Sh py 5 aly AD a aly SEND ae le) Bly SIS jo SDAA AE as (Sepa se gD) ad nA AS (Hey Sal a Povo WOTECHSD ay oe oe lon hy iy le ls a oe TS Say AY LD al le AL Sd ed Ge Spel et BS BS, iD gy Hy gD a Sa yd Leaked Ga A Una Ah sy ay AN sl ei a yg le pe a el Jai al de al go 9-5 AS Bhp Lg a gh ge OS 8 dg ofS) ny (1/4) ge PD SL yy ID aa Se gl BS yA ay le AP AEE fa Do oe gy ead JA fom () iad ape i ga Ahh Jat at LS Lake ai AI Rn gh ee nD lM gt aad sh JAD a he 9 hl go ls Sas nid a a ho lt ea A al Cakes 9 5 LS oe phd (S) 1/8) coe pe apa iy tal lig A ISN in en 16 ele gS Sl i ny Aha AS Nl ag AY lay ANS Bb 49S sl yous i AE a LAE a Da gon Ay (6) Sala Aisa yy cha a GG Mag Aa pe HAN ge 2-6 ah chal lad Li el YBN OA oe Md Hay nd ye Sa lf SY Hae Dad iy (2) Gell 49 Aha Bey GASU Aha Laing pian yas ele Ya amy GDA pple) le yall Bh gla i 2 Aha Ale ne 8 BHAT en UA oe ats Made a J SD gl Ahn ae a Je GR oe eta HB apne Dy (2) a a a Gad Bh pHi at hii Al gi Sh pd a Aha gi —ee gu ad i a KA AR hs fC Oy SLANT 3-6 egy yan fp Se ae ye yeh RD iy AN ye gh GAN de gal Lal og th aha el og 46 i op Mel Lak a (6) Sa (imum intake) ADAG ih a es ak (cha a oa asd Sad hp G45 Oe So a bo gis Ab gal 5-6 {aa Bad ye al i ge B01 gece LA! Lye AM Rn ged ASD Gy Oe Yel She (25) Gyptey Le # je 25 Aly ay hele 24, Jon le Ane ny iy BM eal oy 6-6 “gS a inp lib a an i Lh SM a SRY Ab Gey 7-6 CS il yay sk Hae gd ee al (6) Be c= BY tay ATG IL Sab lye 6 gaa a hy ALR Had DA BLD ee oe Aaa ans Bp me on ny oS ye eg LAA ae pe as ae GR oe 17 0) a 38 Rapin gh Bose ey J en Sas ge ABD ye le GUAM ge 2-7 ny) Ht le aa pd HAS Sy gad 95h le than St ah LN At yg IN a yl oe SE El ae i 3-7 Ee id eh yg cle pn ey Dna ay J a hd by Wi Hin gl) al DE G8 oe (1S) 22 Rak ll oe DA tu lh indy Up yee ne ye pened Andy SM ci ll Je 8s as Sf eho gAMN + Dune I ce 25 pang ch tly oie ple ALAN Ril Aa tal ny 4-7 ell GS OAs gan eS le gh Sa SIA yan ne I le teTae aie Gael gf Dea Hl be it i oA Da op yh adhe Yi He ky ea LS fA ah i Se HN AAT Sy DA oy 7 che MP ead JA gt Se yt ly Anal al) Ge om yf le vat A (1) ame Db abe hey ae a ll Aa I Js gn 9 0 Jas AS any aa SLL oO le (abFON At) yD DN it ce 3 Da Rak on ls gE Aa gh a fy weet JS) Gy On 2 DHL ANS gD gh ce all pay QA ine op iad) ee |Lc-s- lionel a 1) DAL pl np gee le ad ec gee al ha gh gle DLN gal 6-7 sal ay Sb pa Baan Ay Masel Bad ge Geb OAT le apa Ee ga Sc Lay 360 lage gpa OH AD on Oh ALA + BEY Ain gl ep a ly gl Ia Gb ying QD ALY gh! Debi ke (8 a Da AS ay a a gant a oe ae 2) SDE an yh hake oo gated AA ty lad gy ge ase ysl ley 2a nk el Ad gal Sule a Be od ge WR G0 + nt 6 a 8 (12) a Uy al fee es meee eee eet (aa ju 7 a gl a ABD gy pus Sy hd eA 2 AB aS oy ga 1-8 a Bah Be Soe Dl ga 5 (he eo) ae 3 DAH AN a Reale 2-8 ug GN a oe el (9) ES Sh anal gd A A La ed phe gat DAE yl a On I ge ol Hi a whee | ep Hap ge ge A 9 ge a AG ANN all cae ag yh kG MLA al a a a oh al oy oe gD fd Sa DAL Sa pe Ma gh G7 8 A iy 37 i AY Hy ase Sab ge ae Lt iy A il a a gg Do ge AN Ge 3-8 Ra Sgn aS Ge a fy Shetty Ae Gd DA al a oy gob Shc gf Ana la AD a i AS wm [AE SBad tes gl 9 lk gy Dg a a Ja a aad nl Se AA a oe AL le nl Sn Cd ha) a (12) se A ce ARM A a Ak es a SAD Sy Sa ae J pe A Se a ye Ha el a a6 (Gh ln A ge p30 DS a a Bl hae eats a Sn i gil a pe ga ld A i nl pny Sa A 1-9 anal jad ash ph ashy Al lg = LDL el ay Cia an Ah py Sa NAM pn ED PO AA he ay yf ped ele Dy ty 8 3H “a9 0 ab ep Ha ny ay ld LAD eA el SAD A hg gt Rd HU ag gh ad a Gh 3-9 2S) Se Baie Bg ay A A eae ANN an St | sd in oh iy Ul in ih ka ee 5 ge gd ty Dae hha etl yg AD ae 8 ALD oS ie gD as iy hn a JAS od St aa gl Jd AD ALL gp) J vga nS GD AS ly oil yt te Be gy ag aD Syn em AG yd lead A tp gle ee eS an iB Do AD gpa SD ny le aD UD ap wl ya ohh Spal ns AL CI ABD oe ELE hyd LO ay AN te 4-9 Aba Lhe go 35 Pe Sk ay oe te aay AT a cae om El Hh 5-9 ‘ean gh ge Bsa yh SS A 5 tA Ae je J J Bas op Hag Lak) ly i i ge ih he AY ie (gs J hie J) a an oe gd DSree AURA le ype ys A ipa sige AL le Se 6D A SY he ly i ga Sa 50S le Sh Sal pi pp gd tka 9 RU do BB al i BA gS Ga Y Ge ou ab NAD ap Re A ey a pa yn AD yg ld Ay NY gi 3 ae i eG Sele Doe ee AI ye dD 9 GE a Le dy Ud La AF Om A Gf a SD UY Hae Sg ak On BO A pe AN 4 NEN Nl ell a ae Gl A ak UD ll GA Sa je Aa SD eg ASD lI GB gL Jy td as 8-9 aD A 5 ah an ef J ye A ne ny A 0 a DA J A ay, 9-9 ese AY GARD Gl Ogle La (30) GK) a LL Dal ply gl se pal SD Aad ny jl AG el gn Se ag id as HIBS lay nh ae SD le Aa a ot AS sy as i Gal A GA 10-9 SAAN Aly Ral Amgal Chap 9 MD aos ng ca PMS SB Bg Ana ny Jd Say Sega ys al gh 1-10 Analy Jad ly fll 9 el hd ile AC Hy gtd (Bee cy Das Aah J 5k ee gis pny as He is Qi yh 2410 i A aS ged a Ds Say SAL al Sg MLD dy al 128 hb ge {ia iy Ahad Joan gal id Je go 3410) 2 A a i oS al Beth land gall en 6 eee oa CreA af el A LLY Dal Spl inal oR nln gle Pe i gt a BA eae Yun igh ey A Dal a ne A-1O eng SS La ly AL UNS ya a any Sy AD 34 S10 Ahad hye as ih I ge Ws BD JS gn iy a gy 10 a el 8 TT a AED Ange DAG a eg pl slg hy 71 gi sly yf iasy aly Sal gh a py 48 gy BHO 0 8 oe as ad gh ke BD RSL AL dk i 8 gS 910 (Se i Maal ge Sel pl a SY Aa a pla Se a ele Sb gt J AD gat oe La Ay an Ai eo iY la ly al ol 0 aly (I) ao ce EY Aba chaay chad ga Se Sa gpg na Dake A a A A gh tye hy 10-10 go ly hy of Dn as DU gf a yh at tl eh gal 11-10 A AB Sd a Ge p30 Dk ach pe sah 2 12-10 AS LaDy yy IE panty oy 13-10 Se oe 9 gi lh i Ay at ay git et 10 in Ge ED lp Hef gS lh Ha ay ge AD ye GR xD ya A ai ay ie as esisan hp la AD al ge 8 ae 6 Dah Pe EEA GS ay I-IT na gh Dia Sd hin iy and Ha sg yey Uae gy gg he GR ge D-H i op oe se Rio J a eg ey ol QA a hel J yl Se SOU SS oe Dy ik RIN ech BS ae oe le EA WE gh Qe yeh eH Lad py HD Gy cal, Syd He a SS os A git jay aD yl ie aA git HT ny (9) Gal gh cg A US I Sd ee ly ALLL Ae Spee ha a SA ny A hE ae cn il Sp thn gp oe A a ay a2} watt Be A lp Ae Gal ae i gl pA NUD a yah “12 at ph sale ty yl any i egy el apy dala lay 2 92-12 Ain ig Saga Sy Sel iy oe aed By 4S haa Sat OS Goce la 8 gon BEAT GEE any AD sp A Ab ae pn iS py La on he iy Dany At ae AT Bh ASA td San he apy ad Beet had mara atua) sete Ds SI ef Sa Bagh BN 6 JN gy Se EN oe A a TIS RE ge A ha (6) See Ye at ny A DAY ie ta gay RII OH Fi le capa iG DS = Rane at Shlas J Sa AN om Pie anes BD AE A Se a Sa AD Sr lg a A I Dada gat AP hs oe (30) oS ARTI IS Dh AI i PA AB op dae oe EN Dal go BAN a hye Dil le lt - Gi pn hyd oe Bas LI Se hy i OA Ata pe 313 adn gE pe gm al Vin ge ALL La ail I a ain 8 A San ie SA eg La (6) ce 3S A in yd yi ia Sa jj) ja De SE pt pl gi Sn ef BO San ID pe JL ply any J eb ABS SS etal ay in (9) aa gh ange US De il iS yf ad aye bl A Sy A A Sha case ad a Rate pty Hand AAS Se Ana in) AD gd lg J Sn gens B13 fast gl Ul Aa gota Spl(14) 33 By a LN oe gl a DD a Se So IS Sp pn ay DY ae 6 eo ee SB phe oe I i go al a aed D1 Feed Sm sl ty ABD oy hy BE EB and dy eS pee AAD St ha ge ak AY MN al 8 ag ad ne ga i 8 ISD en bal i cd ae ao hoe im SS RN Ge GF SL a As GO Da od Wa Spe ae Tie UR ge So ay al ab SUNN Sa Sal See sl Be a le eh AN lah a a Sa ig ila Spay soe J sly Sat eh ge AAO Se NT A (6) EA Sip ys) SHIM age Eig 8 a (13) (15) 38 Sele calc (Seka ly S08) Sy ae Len by on BI a AS Sd St (16) 33 sel as Pi Sgn Fy ts JA aa pe Ll J ea BARU ka FL A Sg J 8) DR one ts Prat wneen urate em rere nen Perera ene Day sia pep aD AS Sony Hh eid adil St a gt pe ta ty 3 shay (Sil) ho gin oa Al Bp olee ote i hc oe AB ae aS SAS yo JS Ah La (8) SADE DE a pS oe Sa et Be ee Ly Se DS tel eal Gh oe pp Sa ay Ge pe LE bp ee yeh le got AD tk] yoy FAB SN es 6B tl SEB fp St Sal Sin ni Sd AeA AD op i clin Be A a PLB SG EA yD GD oA SAL 5 aly pS as 8 so i nl sl pend cd 6 - ay au ie gD pany hy Oa i SEL Oe ta ape a Dat i ea 9) FD ae te BRD Ge Spe A Ly iy Lg oe yaa 194 4 [to ee ee pA ch Sapy ang anya le Ry at oe aye BLD ay (capt | et an) J a | ae as) eal fe kk fg Le es Aen URN oe gl ey IB Cakes fy ENN ce Sg Ayal a dh AT A a i ISD eg Sy a ne Min gh J any al tl J Ht BILD gp ay lg ab gl git pany Eg ee ys ap a ge Ly po foe IED mY 2718 6S co GS GID ABU a gh tl Sha in oe oe i ehI GR a pes Aas Ss el Js Fe Um lly SS gl J A 2 Sy ae (a gh ao) ee a abs J Sh aly lla 9 3-18 f(s) i a Ok eS i a ah at (Gn J) a Ss SN pe A Joe gE I on J Ge he oe (Ste 98 Sas fe yy LL Sal on oh OES A ay BO nays an J OS OR ane Aa Spl a ale a PAS eS GA Sl i SN OLN Ga Ga AD eS Uk ay cas ge ag i ao oe I ge yes Qe SLAM at Rad gic et ang ad JUS Nye nag J anh J ARR gle gy ee Ly AABN a UT AS a Un a A ha in ying i Ue GA oy ys sa CS VBS ehyy BS oS hl Wg cg Sg S18 ape ey AN oe US kp Sa lll ie Sy IS as OTB pS Sa in SA 5S pa cp el a J ins pba igh UY Atay Aaa a le Dy it (a as a al ae ey 1Bae Ee eee eee ee eae eee See Eee a eae Sse RS pe] yew ot il ed BU ae a a CO TAY gal se a ete nt eS ly eH one at at ealilv ae - Gy‘Annex Plant Site ‘Near Sand Basin- Number 1 -AL-Rimal Fist Satin. ldku Center ~ Buhayra Governorate sper the atached drawings oe mike Brn eDiets = asl yee bat TL ke oot ; see - ge 2m.o629 mn a‘Annex mee \WOTECH has an Electrical Demand of (26) MWe. 1 KV, 3 PH, $0 HZ, 0.90 < pif. < 0.95 EMC is pleased to address the optimum solution that would benefit WOTECH technically and commercially a8 a soltion ofa power generation plant which shows the experience that EMC have in the fel of power generation. ‘The Scope of Work includes Project management, Engineering, Supply, Installation testing, commissioning and start-up of generation Plant; the system consists of mainly: ‘Sets of Gas Generators to generate Net power output of 26 MW, three phase, SO Hz. EMC proposes an optimized design for power generation plant utilizing Gas Generators EMC keen on ensuring highest reliability. and availability through using standby Engine Generators to provide more availability and avoid losing fll load in cas of maintenance. Plant contains mechanical piping, electrical cabling and other accessories required for @ continbous operation, maximum availability and reliability EMC is responsible fr providing the following Scope of Works: Sets of Gas Generators “Metering within plant boundaries Motor Control Center (MCC) Medium Voltage Switch Gear Central Control Syste Balance of Plant (Mechanical ~ Electrical) Fire Fighting and Fie Alarm Systems Earthing System, Erection and installation of Equipment Construction Actvitios ofthe Project: Supply of lea tems ‘+ Inferspnnecting Piping valves, fitings within plant battery limit ‘© Electric & instrumentation: Power & Instrumentation cables and trays within plant battery limit + mecs + Installation of piping of diffrent sizes ‘+ Blectrcal Welding Works 2 ¢ Pome ur wp 25 | WOT?.cH‘The manufacturing fabrication equipment (welding machines, ‘cao, shielding gases, consumables) ‘yr and NDT tests Painting, sandblasting and insulation for the external cover of pipes Installation of Instruments, Eletieal LV MCCS. Installation of power and Instrumentation cables within plant battery limit Mechanical Completion and Pre-commissioning Works Firs Fl/Charge of Lube il forthe equipment 12. Inland tansportation 1B, Startup & Commissioning 14 Operation and Maintenance 20‘Annex |__ Plant Site Handover Minutes ao al RE ITE Ati Osea pata (8) (hes 4) RE IS Ta TR aC yaa AEE (ta) (2) ne 4 8) nr} a A GSE AC) ah ag SL BE pd Ai LY iy Aas 6 Sy AG Gy Ry agg Wn yd SN yf eS Ig iy gid AD Sy pn ay ay or) Si OD 5 iy As GY IO GI SO SS GD HS ae Ua ae cn a, aL ip Hh A a se Mo a a peas ae rs ian a ee (a el SA an ee A te ae Tee a (eee is ie an (a= uw 2210529esW ‘V4 Lisi Lag tg 155 4-4 » Wood Technology Company WOTECH gyi! glad cilS jab «5.23 Peet gata st al (ee he) Aihpall pe AS yo / Sala Ph gy La ally path pe ed ee gt pg YU Bad Ag ag ane oY AN Ld Sd ge ed Ha Y2 HB.O.O py cise ee oe ed TINA fad ida Bs SNS YVINIT dy agg 509 alpe HBL yay 5 2 A ag Lh al pe 68 Ae Ug i Je ay Py a pl pl Ga a gly Lge Gag tLe i ay til Jal! nf Jat 6.6 USD Cent /KWhr ALT pl GHG lad pb VY Anal oh) MA aa i ngs Rt al Gh hee pg 18 Dk Laple Gay wll Lhe oe oh gay - at LN te Lay al et Sak yal yelp ue Gla ak A ke (oP Tl Sol Not Gala dagen) (YE Ve reve ) Rey qinaall gil! ‘had i ad = SAI A ply Sl eal og) Sy a DUN ay Ally Ula deal play oa aS see HAY Sh ey LLeady G uc es SE eal ae 18 (Pr3 KE aon Zale els atl gay 5 JT Galen ats a SS Stone | ta tosaoaee vst wonanctetheg on | at eect stata pce sata apical ge sl case Tienda on PiRea ea uc | uO se Satie aa “hatin sa yt ea apr ea iim eeu yale ft oncom pa‘Annex ey ‘Tayout of Delivery Pains Pry ‘Two MV outgoing feeders (TT KV) located at seller power station each one an Randle the full load (26 MW). aeBi ( 4 it lj tt = eeBReRR BR ogee eeSerco mJ Ae) 58US0 Cant = (eal A J Oy dae ot (Ab 33.25 = ald nA Nd ye Bsn Ay Mae) Ja 8 ley saa Sn dy Hao 250% gh AN aD yea 125000 = AL ad 3 fale Abas So ASH oe I ODN AN oe II ey (sah a BUEN iN SS ale ey AOD Gh gal J pa ithe Hyd el (26/3 onc a AD) HIRST LAH) ey lo Yr pl piSa BS WOTECH er 2010528‘Minimuni consumption: ‘+ 125,000,000 kWar year.j nYear Value of Powerplant 1 49,827,305.18 2 48,853,213.60 3 47,825,546. 99 4 46,741,358.71 3 45,597,540. 6 44 390,811.43 7 43,117,727 5 41,774,593 53 3 40,357, 500.82 10 38,862,677.61 rT 37,285,531.52 2 35,621,642.40 13 33,866,238.37 14 '32,014289.17 15 16 a7 =] 18 23,530,336.76 19 21,109,911.92 20 18555 363.71 2 35,862,370.36 2 33,020,207.37, 23 10,021,725.41 24 '5,858,326.95 35 3520961.57 Note: Inaddition tothe above fee + Warchouse Spare parts, consumables or ay spares wil be reimbursed to WOTECH. ats cost ‘+ due oF delayed invoices ofthe electrical consumpions will be reimburse. [Sewatons [7 — | [Contecs |eParchase table reimbursement fee Year purchase value 1 47335 93992 eeceea 45 410,552.92 3 4543426564 +d 4 4,404,290.78 3 43,317,663.08 Po fe ee ea 42,17127086 [2 7 40,961,827.06 3 39,685 863.86. 3 38,339,722.68 fs 10 36,919,583.73. rT 35,421,25495 Tenia nee 33,84056028 a '32,172,927.40 ra 30,413,57472 35 28.557,457.63 16 26,599,254.11 v7 24,533,348.39 18 22,353819.92 19 20,054,016.32 20 17,628,505.53, 2 15,069,251 84 22 12,369,197.00 2 9.520,630.18 24 6.515,410.50 3 3.344,894.49 Note: Tn addition to the above fee c= (~*~ ‘+ Warehouse Spare parts, consumables or any spares willbe reimbursed to WOTECH at its cost. 1+ due oF delayed invoices ofthe electrical : ee will be reimbursed,fol oee(vTU) Germany Cummins inc. uw | Sener come TW rs Wau a agen Use 2] gall a, [a Peeeeeeeeeeeeee 2} wmec [aoe 7a ewaco ] 800R!-GE~APC-AEG- ABB. VERTIV.1 LEVER - SOCOMEC for 5 ue ee ee 5 -YOASASUNUGIT=Powersea—u ca] UB <] snes [rss ae ae ‘charger | SarT— ALCAD for Batteries (Ua or depen os = 7| wetting Paucine Php eng on Swen? oa | Farthing | FURSE us Soe lone r ROO ua | oa te s ri 9] scum [He x Toshiba USA cease fie* a a x ae a : WOTECH | ,
You might also like
QIMC - CG Report 2022 - English Final
PDF
No ratings yet
QIMC - CG Report 2022 - English Final
52 pages
L4-QAT-087B Method Statement For CIPP - UV Lining Work
PDF
No ratings yet
L4-QAT-087B Method Statement For CIPP - UV Lining Work
9 pages
Brochure Movialsa Gasification Plant English
PDF
No ratings yet
Brochure Movialsa Gasification Plant English
0 pages
Master Table: General Energy Conservation Special Notes
PDF
No ratings yet
Master Table: General Energy Conservation Special Notes
1 page
Lllllllllllllllllli 1 - L - L - L - L - 111
PDF
No ratings yet
Lllllllllllllllllli 1 - L - L - L - L - 111
108 pages
COMPONENTS
PDF
No ratings yet
COMPONENTS
1 page
Sai Institute of NDT Profile
PDF
No ratings yet
Sai Institute of NDT Profile
18 pages
60-Indlp-114201 - 0 - Fire Alarm System - Main Office Building - 60-Bu-1001 - Ground, First & Roof Floor Layout
PDF
No ratings yet
60-Indlp-114201 - 0 - Fire Alarm System - Main Office Building - 60-Bu-1001 - Ground, First & Roof Floor Layout
8 pages
PR Technip Energies Nfs en
PDF
No ratings yet
PR Technip Energies Nfs en
3 pages
Qafco PVL
PDF
No ratings yet
Qafco PVL
2 pages
Muthupandi Resume
PDF
No ratings yet
Muthupandi Resume
3 pages
NACE CP LEVEL1-ch1-Aug01
PDF
No ratings yet
NACE CP LEVEL1-ch1-Aug01
58 pages
WND Petrojet NDT RT and PWHT Unit Rates
PDF
No ratings yet
WND Petrojet NDT RT and PWHT Unit Rates
4 pages
FI 01 - PAil Filling Line E&I Works - REI
PDF
No ratings yet
FI 01 - PAil Filling Line E&I Works - REI
11 pages
Sep Mgse CM SCM 0031 Procedure For Valve Testing and Installation
PDF
No ratings yet
Sep Mgse CM SCM 0031 Procedure For Valve Testing and Installation
6 pages
Al Zaman Company Profile
PDF
No ratings yet
Al Zaman Company Profile
57 pages
230450-4
PDF
No ratings yet
230450-4
2 pages
Radiography Test: Material Price Comparison
PDF
No ratings yet
Radiography Test: Material Price Comparison
6 pages
TEFCO DNV Offshore Equipments
PDF
No ratings yet
TEFCO DNV Offshore Equipments
12 pages
Commercial Bid Form For XH-MR-V21CO37N1 - Valves
PDF
No ratings yet
Commercial Bid Form For XH-MR-V21CO37N1 - Valves
1 page
Crescent Techno Coating
PDF
No ratings yet
Crescent Techno Coating
12 pages
Final DDRS
PDF
No ratings yet
Final DDRS
374 pages
Assingment 1 Mobile Robot
PDF
No ratings yet
Assingment 1 Mobile Robot
12 pages
Quotation For Arc Gun With Power Source DC Drive 400amp Export
PDF
No ratings yet
Quotation For Arc Gun With Power Source DC Drive 400amp Export
5 pages
52420456 - RFI
PDF
No ratings yet
52420456 - RFI
1 page
Attention: Rajeev Singh ADDRESS:Nagpur-441102 (Maharashtra) QUOTATION NO:9051/NMA/19-20 DATE:8.4.19 Company Name:M/S Aaradhya Construction
PDF
No ratings yet
Attention: Rajeev Singh ADDRESS:Nagpur-441102 (Maharashtra) QUOTATION NO:9051/NMA/19-20 DATE:8.4.19 Company Name:M/S Aaradhya Construction
2 pages
Elaf ProfileEn2
PDF
No ratings yet
Elaf ProfileEn2
31 pages
Chairman Kamal 20 Inch Offer Ref BD20023.6
PDF
No ratings yet
Chairman Kamal 20 Inch Offer Ref BD20023.6
4 pages
1.3- Competent Persons Designation Procedure
PDF
No ratings yet
1.3- Competent Persons Designation Procedure
13 pages
338.1 KWP Solar PV Project Proposal For pumps-WASIA-1
PDF
No ratings yet
338.1 KWP Solar PV Project Proposal For pumps-WASIA-1
16 pages
Technical & Commercial Offer
PDF
No ratings yet
Technical & Commercial Offer
30 pages
PLG-0011 3998 - 18-1037025250-00146 A LTC/C/NFE/3998/18: Review Response by Contractor
PDF
No ratings yet
PLG-0011 3998 - 18-1037025250-00146 A LTC/C/NFE/3998/18: Review Response by Contractor
2 pages
PWPS-001 For 6inch 9.53mm
PDF
No ratings yet
PWPS-001 For 6inch 9.53mm
4 pages
Abrasive Blaster CV (Khadeer Khan)
PDF
No ratings yet
Abrasive Blaster CV (Khadeer Khan)
14 pages
rfq3000278081-1 Xls Encrypt
PDF
No ratings yet
rfq3000278081-1 Xls Encrypt
8 pages
Bill of Materials Only Use
PDF
No ratings yet
Bill of Materials Only Use
2 pages
8TPH THERMEX BOILER QUOTATION
PDF
No ratings yet
8TPH THERMEX BOILER QUOTATION
23 pages
AnSafe Comments
PDF
No ratings yet
AnSafe Comments
4 pages
BID Qoutation
PDF
No ratings yet
BID Qoutation
6 pages
Schedule - Operation & Maintenance of Gas Turbine Power Plant-22-10-20 To 31-10-20
PDF
100% (1)
Schedule - Operation & Maintenance of Gas Turbine Power Plant-22-10-20 To 31-10-20
2 pages
SP-1 - BASMA - Dry Dock Works
PDF
No ratings yet
SP-1 - BASMA - Dry Dock Works
3 pages
Commercial Offer
PDF
No ratings yet
Commercial Offer
3 pages
Techno Bond Approvls Saudi Arabia
PDF
No ratings yet
Techno Bond Approvls Saudi Arabia
25 pages
Linde India Limited COR-Mahadyuta-053
PDF
No ratings yet
Linde India Limited COR-Mahadyuta-053
3 pages
A249 - LPO#20966 For Supply of Earthing Materials (QIECO) - 08-08-2021
PDF
No ratings yet
A249 - LPO#20966 For Supply of Earthing Materials (QIECO) - 08-08-2021
2 pages
SeaBoss Pre-Move Survey
PDF
No ratings yet
SeaBoss Pre-Move Survey
8 pages
Sodium Ion Battery-Compare-V1
PDF
No ratings yet
Sodium Ion Battery-Compare-V1
6 pages
APT-52420469-DIR-001
PDF
No ratings yet
APT-52420469-DIR-001
2 pages
Offer For RLPP SCJV Etylene 1500 GPM (E + D + J)
PDF
No ratings yet
Offer For RLPP SCJV Etylene 1500 GPM (E + D + J)
1 page
Abb CV PDF
PDF
No ratings yet
Abb CV PDF
5 pages
Blasting Pot, Hose Certificates
PDF
No ratings yet
Blasting Pot, Hose Certificates
10 pages
MPR-012 - P0933 - Remelt Tank
PDF
No ratings yet
MPR-012 - P0933 - Remelt Tank
24 pages
EduSkills Training - Pre Qualification Business Profile PDF
PDF
No ratings yet
EduSkills Training - Pre Qualification Business Profile PDF
19 pages
MTC Pipe 12 Dan Pipe 6
PDF
No ratings yet
MTC Pipe 12 Dan Pipe 6
7 pages
Titanium Alloys Piping Welding: Functional Specification
PDF
No ratings yet
Titanium Alloys Piping Welding: Functional Specification
29 pages
MEDB00000GN Revision1 A60 Steel Bulkhead Insul 45t 64k
PDF
No ratings yet
MEDB00000GN Revision1 A60 Steel Bulkhead Insul 45t 64k
2 pages
Cummins RFP
PDF
No ratings yet
Cummins RFP
10 pages
الامتحان-الاقليمي-في-اللغة-العربية-والتربية-الاسلامية-السادس-ابتدائي- -الرشيدية
PDF
No ratings yet
الامتحان-الاقليمي-في-اللغة-العربية-والتربية-الاسلامية-السادس-ابتدائي- -الرشيدية
7 pages
ثقافة اسلامية جديد
PDF
No ratings yet
ثقافة اسلامية جديد
112 pages
مجلة اللسان العربي 027
PDF
No ratings yet
مجلة اللسان العربي 027
320 pages
Exhibit C A-1 Form Rev.06 20190518
PDF
No ratings yet
Exhibit C A-1 Form Rev.06 20190518
27 pages
Manning
PDF
No ratings yet
Manning
46 pages
Exhibit C Rev 020 SCO 020
PDF
No ratings yet
Exhibit C Rev 020 SCO 020
24 pages
CHANGED IN MILESTONE DATES of Amended
PDF
No ratings yet
CHANGED IN MILESTONE DATES of Amended
12 pages
QURR - WND - FC1 - 18 - Aug - 2017 R0
PDF
No ratings yet
QURR - WND - FC1 - 18 - Aug - 2017 R0
20 pages
2.exhibit C Form A-1 Rev.08, 11 May. 19
PDF
No ratings yet
2.exhibit C Form A-1 Rev.08, 11 May. 19
22 pages
PTJ Gate House Cost Including MOU Factor
PDF
No ratings yet
PTJ Gate House Cost Including MOU Factor
3 pages
OSBL-Comparison Elgendy& PTJ MD& Bruns
PDF
No ratings yet
OSBL-Comparison Elgendy& PTJ MD& Bruns
1 page
Press Equipment
PDF
No ratings yet
Press Equipment
1 page
Firefighting Cars
PDF
No ratings yet
Firefighting Cars
1 page
Forecast Value - Site Services Provided by Offshore Subcontractors
PDF
No ratings yet
Forecast Value - Site Services Provided by Offshore Subcontractors
2 pages
Cost Report Rev.00
PDF
No ratings yet
Cost Report Rev.00
16 pages
A0982 Commissioning Schedule 2024 03 20
PDF
No ratings yet
A0982 Commissioning Schedule 2024 03 20
1 page
2783 QR Sep.2020
PDF
No ratings yet
2783 QR Sep.2020
36 pages
Wotech Tracking Sheet - Weekly Activities 21-Mar-24
PDF
No ratings yet
Wotech Tracking Sheet - Weekly Activities 21-Mar-24
14 pages
27-08-13-Activity Resource Assignments
PDF
No ratings yet
27-08-13-Activity Resource Assignments
26 pages
A0982 Installation Site Report MW116 CW 12
PDF
No ratings yet
A0982 Installation Site Report MW116 CW 12
3 pages
Delayed Sub-System As of 02-09-2023
PDF
No ratings yet
Delayed Sub-System As of 02-09-2023
5 pages