Gigafactory PDF
Gigafactory PDF
500,000
40!
Vehicles
Global cell supply
35!
growing, but almost
GWh/Year Production
entirely in Asia
Gigafactory!
30!
Others!
Lishen!
25!
BYD!
BAK!
20!
ATL!
Maxell!
15!
Sony!
Panasonic!
10!
35,000 LGC!
Vehicles
SDI!
5!
0!
2010! 2011! 2012! 2013! 2014! 2015! 2016! 2017! 2018! 2019! 2020!
Battery pack cost/kWh reduced >30% by Gen III volume ramp in 2017
This study source was downloaded by 100000843602567 from CourseHero.com on 04-24-2023 06:00:31 GMT -05:00
Source: IIT Takeshita 2013
Gigafactory Process Flow
Pack
Enclosure
Raw Steel/
Aluminum
Cathode
Manufacturing
Cathode
Can &
Cap
Electrode
Aluminum Foil
Module
Pack
Raw Materials
Cell
Module
Cell
Module
Assembly
Separator
Separator
Winding
Manufacturing
Cell
Cell
Module
…
…
Anode
Cell
Module
Manufacturing
Anode
Electrolyte
Copper
Electrode
Manufacturing
Foil
Battery Pack
Battery Pack Vehicle Assembly
Recycling
Lifetime Usage
(Fremont, CA)
This study source was downloaded by 100000843602567 from CourseHero.com on 04-24-2023 06:00:31 GMT -05:00
Tesla Gigafactory
Employees 6,500
This study source was downloaded by 100000843602567 from CourseHero.com on 04-24-2023 06:00:31 GMT -05:00
Rendering
Gigafactory Location Finalists
Finished battery packs from the Gigafactory to Fremont, CA for vehicle assembly.
Final site selection activities are underway.
This study source was downloaded by 100000843602567 from CourseHero.com on 04-24-2023 06:00:31 GMT -05:00
Gigafactory Projected Timeline
Site
Selection
ACTIVE
Tesla and its partners will invest ≈$4-5 billion in the Gigafactory through 2020.
Initial Project
Design
CapEx will be shared by Gigafactory partners.
Tesla will directly invest ≈$2 billion.
Partner
Discussions
Zoning &
Design / Build
2020
(500k Veh/Yr)
TODAY
2014
2015
2016
2017
This study source was downloaded by 100000843602567 from CourseHero.com on 04-24-2023 06:00:31 GMT -05:00
Forward Looking Statements
Certain statements in this communication, including statements regarding the Tesla
Gigafactory and its development plans, production capacity, cost savings, costs, timeline and
vehicle production estimates, are “forward-looking statements” that are subject to risks
and uncertainties. These forward-looking statements are based on management’s current
expectations, and as a result of certain risks and uncertainties, actual events or results may
differ materially from those contained in the forward-looking statements. Various
important factors could cause actual results to differ materially from those in the forward-
looking statements, including potential difficulties in finding a suitable Tesla Gigafactory site,
obtaining required permits, negotiating terms with technology and other partners,
maintaining implementation schedules, output and cost estimates and vehicle demand.
Please refer to Tesla’s most recent Annual Report on Form 10-K and its other filings with
the Securities and Exchange Commission. These filings contain and identify important
factors that could cause actual results to differ materially from those contained in Tesla’s
forward-looking statements. Tesla disclaims any obligation to update information contained
in these forward-looking statements.
This study source was downloaded by 100000843602567 from CourseHero.com on 04-24-2023 06:00:31 GMT -05:00