The document contains a table listing project tasks with their start and end dates. It includes tasks like requirement gathering, feasibility study, creating diagrams, and database table design occurring between July 2021 to November 2021.

Uploaded by

subhabirajdar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views3 pages

Gantchart

The document contains a table listing project tasks with their start and end dates. It includes tasks like requirement gathering, feasibility study, creating diagrams, and database table design occurring between July 2021 to November 2021.

Uploaded by

subhabirajdar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Task name Start End

identify the problem 7/12/2021 7/18/2021


requrement gathring 7/21/2021 7/28/2021
feasibility study 8/1/2021 8/5/2021
title 8/9/2021 8/10/2021
module specification 8/10/2021 8/18/2021
entity relationship diagram 9/13/2021 9/20/2021
use case diagram 10/4/2021 10/20/2021
class diagram 10/24/2021 10/28/2021
dataabase table design 11/15/2021 11/22/2021
Duration 1 1
2 1 1 21 21 02 02
/20 02
2 /2
0
/2
0
1/
2
0/
2
6 14 3/ 23 11 /3 /2
04/ 2 46/ 6 / /
7 8 10 9 12 14 1 16 181 0 2
7
identify the problem
4
requrement gathring
1
feasibility study Start
8
title Duration
7
module specification
16
entity relationship diagram
4
use case diagram
7
class diagram
dataabase table design