0% found this document useful (0 votes)
66 views

GRIHA - Calculation Tables

The document provides consumption details for various electrical appliances and lighting used at a location including street lights, tube lights, and flood lights. It also provides calculations for annual energy generation from solar panels, wind turbines, and piezoelectric tiles. Water and waste water consumption details are given for facilities like WCs, showers, and basins. A life cycle analysis and costing is mentioned but not detailed.

Uploaded by

Vamsi
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views

GRIHA - Calculation Tables

The document provides consumption details for various electrical appliances and lighting used at a location including street lights, tube lights, and flood lights. It also provides calculations for annual energy generation from solar panels, wind turbines, and piezoelectric tiles. Water and waste water consumption details are given for facilities like WCs, showers, and basins. A life cycle analysis and costing is mentioned but not detailed.

Uploaded by

Vamsi
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Table Description Status street lights

Energy Consumption oat light 12v


Energy Generation
Water Consumption
Waste Water Produced
Storm water management
Solid waste produced
Life cycle analysis
Life Cycle Costing
Embodied energy
Embodied Carbon

Consumption Number Daily Power Needed


Annual
(W) Power Need (W)
Voltage (v) Lumen (lm) Life span (hours) Price per piece (Rs) Total Price (Rs)
Street Lights (24W) 50 12000 4380000 200 2600 50000 500 25000
WC lights- Tube Lights (18W) 12 2160 788400 100 152 50000 990 11880
Baby Feeding Room- Tube Lights (18W) 2 360 131400 100 152 50000 990 1980
Medical First Aid Room- Tubelights (18W) 3 540 197100 100 152 50000 990 2970
Pavilion Rooms- Tubelights (18W) 3 540 197100 100 152 50000 990 2970
Park- Bollards (15W) 100 15000 5475000 24 900 50000 1500 150000
OAT seating- Step Lights (2W) 90 1800 657000 12 40 50000 500 45000
OAT steps- Step Lights (2W) 60 1200 438000 12 40 50000 500 30000
WC- Ventilator (36W) 10 8640 3153600 220 87600 1400 14000
Shops- Tube Lights (18W) 6 1080 394200 100 152 50000 990 5940
Pavilion- Flood Light (50W) 6 3000 1095000 200 6180 35000 690 4140
LED Flood Lights (50W) 2 1000 365000 200 6180 35000 690 1380
total 17271800 295260
17270kw hr

Solar Panel calculation (400W) Wind tree energy production Piezoelectric tiles Method Total power generated annually (kW)
Area of one panel (sqm) 3.25 No. of wind trees 1 Area of one tile (sqm) 0.27 Solar panels 14235
No. of panels 10 Daily power generation (kW) 8.767 No. of tiles 50 Wind Tree 3200
Area of installation (sqm) 32.5 Annual power generation (kW) 3200 Energy per step (W) 0.07 Piezoelectric tiles 1916.25
total sunshine recieved (hrs) 6 Total power generation (kW) 3200 Footfall 1500 Total= 19351.25
Energy produced by one panel in 1hr(W) 650 Power per tile (W) 105
energy produced by 1 panel in 1 day (W) 3900 Total daily power (W) 5250
toal energy produced in 1 day (W) 39000 Total annual power (kW) 1916.25
total energy produced in 1 yr (W) 14235000

steps/ tile= 15000 75000 400w (1 x 2 m)= 2192 5.48hrs sunlight


Water Consumption Water needed Number
per use of units provided
Total used per day (L) Daily water usage (L) Annual water usage (L) tiles=50
WC half 3L 7 48 1008 367920 7w per foot step 6000 per tile size=0.45x0.6
WC full 5L 7 24 840 306600 CAPACITY 170L/HR footfall=1500
Water Stations 1L 2 1000 2000 730000 STORE 400L
Shower 30 L 5 24 3600 1314000
Basins 4.5L/ min 6 100 2700 985500
Urinals 1L 4 60 240 87600 geeration no. power daily power annual price total
Total 10388 3791620 solar panel 200
wind 4000 3200 kw 1200000

waste water production per day L per annum (L) piezoelectric 50 75000
Grey Water 6300 2299500
Black Water 2088 762120

Storm water management Area (sqm) Annaul rainfall (m)Total collection (cubic m)Total (L)
Sunshade 37.5 1.5 56.25 56250
Pavillion roof 500 1.5 750 750000
Toilet roof 115 1.5 172.5 172500
Strom water trench 132 1.5 198 198000
Total 1176.75 1176750

water demand reduction


low flow fixture 32% decrease in flow rate
dual flush 3L, 5L
xeriscaping
water leakage sensor

Solid waste produced Quantity(L) No. of dustbin Daily total waste (L) Annual total waste (L)
Wet waste dusbins (leftover food) 120 9 1080 394200
Dry waste dustbin (shops) 120 9 1080 394200
Sanitary waste 62 4 248 90520
Total 878920

Vermicompost
Wet waste 394200 Vermicomposting
worms 350 / m2 Worms 350/sqm
compost dimension Compost dimentions 6.5*1.5*0.6
worms on soil 22000 No of beds 4
Total compost area 39sqm
Total compost volume 23.4 m3
manure produces annually 14.44 tonns

Life Cycle Costing Quantity Unit Cost Unit Total


Bamboo (10 mm- dia, 12m- lenght) 3.5 m3 cb.m 100 kg 280000
Mud Plaster 570 M2 sq.m 30 per cb.m 17100
Air Dreid Sawn Timber 7.65 m3 cb.m 2300 per cb.m 17595
Composite Wall- (Plastic bottle, sand and mud plaster) 40 m3 cb.m 25 per cb.m 1000
Plywood- 30mm 30 m2 sq.m 750 per cb.m 22500
Gravel- 5mm 1400 m2 sq.m 830 per sq.m 1162000
Pavers- plastic filler 1100 m2 sq.m 300 per sq.m 330000
Thatch roof 772 m2 sq.m 2900 per sq.m 2238800
red sandstone 590 m2 sq.m 3500 per sq.m 2065000
concrete 30 m3 cb.m 4200 per cb.m 126000
steel 0.6 m3 cb.m 6800 per cb.m 4080
asphalt 300m2 sq.m 2500 per sq.m 750000
compressed earth brick 4.32 m3 cb.m 35 per piece 7000
aluminium composite panel 144 m2 sq.m 1160 per sq.m 167040
Total 7188115

Life cycle assessment Quantity unit Density unit Weight Element GWP/ Kg value Urban embodied carbon embodied energy life span Transportation Distance Transportation mode Emission factor Fuel consumption-transportation
disel for 100 coebon
km GWP
bamboo structure 3.5 m3 cb.m 600 kg/m3 per cb.m 2100 -0.162 -340.2 5.1MJ/kg 25 100 Truck 2.89 12.7 36.703
mud plaster 570 M2 sq.m 1300 kg/m3 per sq.m 741000 0.1 74100 2.4-5.3 10-50 100 Truck 2.89 12.7 36.703
Air dreid timber 7.65 m3 cb.m 700 kg/m3 per cb.m 5355 0.3 1606.5 1.5 to 3.5MJ/kg 50 100 Truck 2.89 12.7 36.703
composite wall 40 m3 cb.m 1618 kg/ m3 per cb.m 64720 1.5 97080 2.1 MJ/Kg 25 100 Truck 2.89 12.7 36.703
doors- plywood 30 m2 sq.m 400 kg/ m3 per sq.m 12000 0.5 6000 6MJ/kg 35 100 Truck 2.89 12.7 36.703
Gravel 1400 m2 sq.m 1680 (dry) & 2000 (wet) per sq.m 2352000 0.3 705600 0.3MJ/kg 3-10 100 Truck 2.89 12.7 36.703
promenade pavers 1100 m2 sq.m 143 kg/ m2 per sq.m 157300 21.4 3366220 80-120 MJ/Kg 20-25 100 Truck 2.89 12.7 36.703
tatch roof 772 m2 sq.m 35 kg/m2 per sq.m 27000 22.18 598860 0.5-5 15-40 100 Truck 2.89 12.7 36.703
red sandstone 590 m2 sq.m 1900 kg/m3 per sq.m 112100 30 3363000 30-60 100+ 100 Truck 2.89 12.7 36.703
concrete 30 m3 cb.m 2,400 kg/m3 per cb.m 72000 0.3 21600 3.5MJ/kg 100 100 Truck 2.89 12.7 36.703
steel 0.6 m3 cb.m 7850kg/m³ per cb.m 4710 0.6 2826 23MJ/kg 50-100 100 Truck 2.89 12.7 36.703
asphalt 300m2 sq.m 2322 kg/m³ per sq.m 696600 0.08 55728 7MJ/kg 25 100 Truck 2.89 12.7 36.703
compressed earth brick 4.32 m3 cb.m 1600 kg/m3 per cb.m 6912 0.1 691.2 3MJ/kg 100+ 100 Truck 2.89 12.7 36.703
aluminium composite panel 144 m2 sq.m 1500 kg/m3 per sq.m 216000 10 2160000 50-150MJ/kg 20-25 100 Truck 2.89 12.7 36.703
total 4469797

cross check the colored cells