Time and Work Practice Sheet
Time and Work Practice Sheet
A B
A and B can do a work in 12 days. B
and C in 15 days and C and A in 20
days. If A, B and C work together,
they will complete the work in
(a) 5 Days
𝟓
(b) 7 𝟔 Days A can finish a work in 18 days and B
𝟐 in 36 days. If they work on it together
(c) 10 Days (d) 15 𝟑 Days for 9 days, then what percent of work
is left?
A B (a) 33.33% (b) 20%
B C (c) 75% (d) 25%
C A
C A B
B C C
A and B can do a piece of work in 10 A
days. B and C in 15 days and C and A B
in 20 days. C alone can do the work in
(a) 60 days (b) 120 days If A and B together can complete a
(c) 80 days (d) 30 days work in 12 days, B and C together in
15 days and C and A together in 20
A days, then B alone can complete the
B C A work in
C B (a) 30 days (b) 25 days
(c) 24 days (d) 20 days
A can do a piece of work in 4 hours,
A, B C
B and C can do it in 3 hours. A and C
can do it in 2 hours. How long will B A B
alone take to do it?
(a) 10 hours (b) 12 hours C
(c) 8 hours (d) 24 hours
A, B and C together can complete a
A B piece of work in 30 minutes. A and B
B C together can complete the same work
C A in 50 minutes. C alone can complete
the work in
(a) 60 minutes (b) 75 minutes
(c) 80 minutes (d) 150 minutes
A, B C
A and B can separately do a piece of
work in 6 days and 12 days
respectively. How long will they
together take to do the work? A, B and C can complete a piece of
(a) 9 days (b) 18 days work in 12, 24 and 36 days
(c) 6 days (d) 4 days respectively. In how many days will
they together complete the same
A work?
𝟔
B (a) 5 𝟏𝟏 days (b) 4 days
𝟔
(c) 6 𝟏𝟏 days (d) 6 days
A B
C
A man, a woman and a boy can
B C
together complete a piece of work in
3 days. If a man alone can do it in 6
days and a boy alone in 18 days, how
A long will a women alone take to
A can finish a work in 24 days, B in 9 complete the work?
days and C in 12 days. B and C start (a) 9 days (b) 21 days
the work but are forced to leave after (c) 24 days (d) 27 days
3 days. The remaining work was done
by A in
(a) 5 days (b) 6 days
𝟏
(c) 10 days (d) 10 𝟐 days
A B
3 men and 4 boys can complete a
piece of work in 12 days. 4 men and 3
A boys can do the same work in 10
days. Then 2 men and 3 boys can
finish the work in number of days is
𝟏 𝟓
A and B can do a job in 6 and 12 days (a) 17 𝟐 days (b) 5 𝟏𝟏 days
respectively. They began the work (c) 8 days (d) 22 days
together but A leaves after 3 days.
Then the total number of days needed A
𝟒
for the completion of the work is 𝟓
(a) 4 days (b) 5 days B
(c) 6 days (d) 9 days
B
𝟒
A does 𝟓 of a piece of work in 20 days.
He then calls in B and they finish the
remaining work in 3 days. How long B
A certain number of persons can alone will take to do whole work?
𝟏
complete a piece of work in 55 days. (a) 37 𝟐 days (b) 37 days
If there were 6 persons more, the (c) 40 days (d) 23 days
work could be finished in 11 days
less. How many persons were 𝟕
originally there? A,
𝟏𝟎
(a) 17 (b) 24 B
(c) 30 (d) 22
𝟕
A does 𝟏𝟎 part of work in 15 days with A can do a work in 20 days and B in
the help of B. In how the remaining 40 days. If they work on it together for
wok in 4 days with the help of B. In 5 days. Then the fraction of the work
how many days will A and B together that is left is
𝟓 𝟖
do the same work? (a) 𝟖 (b)
𝟏𝟓
𝟏 𝟐 𝟕 𝟏
(a) 10 𝟑 days (b) 12 𝟑 days (c) 𝟏𝟓 (d)
𝟏𝟎
𝟏 𝟏
(c) 13 𝟑 days (d) 8 𝟒 days
A B
B C
𝟏
A C
𝟐
A, B C
C A B 𝟑
𝟒
B
Vikas gets Rs. 350 for every day that
he works. If he earns Rs 9800 in a
month of 31 days, for how many days
Working 5 hours a day, A can did he work?
complete a work in 8 days and (a) 25 days (b) 30 days
working 6 hours a day, B can (c) 24 days (d) 28 days
complete the same work in 10 days.
Working 8 hours a day, then can 'A' 12
jointly complete the work in 'A' 'B'
(a) 3 days (b) 4 days
(c) 4.5 days (d) 5.4 days 'B'
A B
A
B
I can do a piece of work in 8 days, A and B undertook a work for Rs. 350.
which can be done by you in 10 days. A got Rs. 150 more than that of B,
How long will it take to do it if we work when they worked together. B takes 9
together? days more than A, when they work
𝟒 𝟑
(a) 4 𝟗 days (b) 5 days individually. In how many days A and
𝟗
𝟏 𝟕 B working together can do the whole
(c) 5 𝟐 days (d) 4 days
𝟗 work :
𝟐
(a) 5 days (b) 4 𝟕 days
𝟓 𝟒
(c) 4 𝟕 days (d) 5 𝟕 days
A 2/3, 6
B
24 men working at 8 hours a day can 1/3 C, 12
finish a work in 10 days. Working at 3/4
the rate of 10 hours a day, the number
of men required to finish the same A C
work in 6 days is B
(a) 30 (b) 32
A completes 2/3 of a certain job in 6
(c) 34 (d) 36
days. B can complete 1/3 of the same
job in 8 days and C can complete 3/4
A B of the work in 12 days. All of them
B C work together for 4 days and then A
A and C quit. How long will it take for B
B to complete the remaining work
C 13 alone?
C (a) 3.8 days (b) 3.33 days
(c) 2.22 days (d) 4.3 days
A and B together can do a piece of
work in 12 days. B and C together can
do the same work in 16 days. After A
has been working at. If for 5 days and
B for 7 days, C finishes it in 13 days.
In how many days will C alone be able
to do the work?
(a) 16 days (b) 24 days
(c) 36 days (d) 48 days
A B
A B
Three diggers dug a ditch of 324 m
A B deep in six days working
B, A simultaneously. During one shift, the
third digger digs as many metres
A B
B
A
A
Two women Renu and Usha are A and B together can finish a work in
working on an embroidery design. If 30 days. They work together for 20
Usha worked alone, she would need days and then B left. A finished the
eight hours more to complete the remaining work in next 20 days. In
design than if they both worked how many days A alone can finish the
together. Now if Renu worked alone, work?
it would need 4.5 hours more to (a) 50 days (b) 60 days
complete the design than they both (c) 48 days (d) 54 days
working together. What time would it
take for Renu alone to complete the A
design? B A
(a) 10.5 hours (b) 12.5 hours
(c) 14.5 hours (d) 18.5 hours
A 12 B4
A can finish a work in 18 days and B
can do the same work in half of the
time taken by A. They both working
together. How much part of work can
A can do a work in 12 days and B in 4 do in one day?
days. If they work on it together for 24 𝟏 𝟐
(a) 𝟔 (b)
days, then what fraction of work is 𝟓
𝟏 𝟐
left? (c) 𝟗 (d)
𝟕
(a) 1/3 (b) 1/2
(c) 1/4 (d) 1/5
A B
B
A
A A
B C A C A can complete a work in 24 days, B
in 9 days, and C in 12 days. A, B and
A
B
A
2 men or 5 women or 7 boys can
finish a work in 469 days, then the A and B can complete a work alone in
number of days taken by 7 men, 5 28 days and 35 days respectively.
women and 2 boys to finish the work They start working together but after
is : some time A leaves and B does the
(a) 134 (b) 106 remaining work in 17 days. After how
(c) 100 (d) 98 many days from start. A left the work?
𝟐
𝟕
A, 15 (a) 14 𝟓 days (b) 9 days
𝟏𝟎 𝟓
B (c) 8 days (d) 7 𝟗 days
A B
𝟕
A can complete the 𝟏𝟎 th part of a work
in 15 days. After that, with the help of
B completes in 4 days. In how many If 8 women collect 200 kg of tea
days will A and B working together leaves in 10 hours. How many more
complete the work? (in kg) of tea leaves will 12 women
𝟏
(a) 10 𝟑 days
𝟐
(b) 12 𝟑 days collect in 8 hours ?
𝟏 𝟏 (a) 24 kg (b) 40 kg
(c) 13 𝟑 days (d) 8 𝟒 days (c) 50 kg (d) 100 kg
A B A, B C
A, B and C can do a work in 24 days, A boy and a girl together fill a cistern
6 days and 12 days respectively. All with water. Boys popurs 4L water in
of the three together will do that work every 3 minute while the girls pours
in- 3L water in every 4 minute. How much
𝟏
(a) 𝟒 days
𝟕
(b) 𝟐𝟒 days time will it take to fill 100L water in the
𝟑 cistern?
(c) 3 𝟕 days (d) 4 days (a) 36 minute (b) 42 minute
(c) 48 minute (d) 44 minute
'X'
3/4
The rate of working of A and B are in
the ratio of 2 : 3. The number of days
taken by them to finish the work is in
Jyothi can do 3/4th of a job in 12 days. the ratio:
Mala is twice as efficient as Jyothi. In (a) 2 : 3 (b) 4 : 9
how many days Mala will finish the (c) 3 : 2 (d) 9 : 4
job?
(a) 6 (b) 8
(c) 12 (d) 16
x,
𝟐
x y ( )
𝟓
y
𝟏
𝟐 The labourers A, B, C were given a
𝟏
contract of Rs 750 for doing a certain
𝟒
piece of work. All the three together
can finish the work in 8 days. A and C
together can do it in 12 days, while A
𝟏
and B together can do it in 13𝟑 days.
The money will be divided in the ratio.
John does 1/2 piece of work in 3 (a) 4 : 5 : 6 (b) 4 : 7 : 5
hours, joe does 1/4 of the remaining (c) 5 : 7 : 4 (d) 5 : 6 :8
work in 1 hour and George finishes
remaining work in 5 hours. How long
would it have taken the three working
together to do the work?
𝟏 𝟏
(a) 2 𝟕 𝐡𝐨𝐮𝐫𝐬 (𝐛) 𝟑 𝟕 hours
A B
A
11. (c) 12. (c) 13. (c) 14. (a) 15. (a)
16. (c) 17. (c) 18. (b) 19. (a) 20. (a)
21. (a) 22. (c) 23. (c) 24. (a) 25. (a)
26. (d) 27. (c) 28. (c) 29. (a) 30. (b)
31. (c) 32. (c) 33. (c) 34. (c) 35. (d)
36. (a) 37. (d) 38. (b) 39. (d) 40. (c)
46. (a) 47. (b) 48. (a) 49. (b) 50. (b)
51. (b) 52. (b) 53. (a) 54. (a) 55. (b)
56. (c) 57. (b) 58. (a) 59. (d) 60. (c)
61. (c) 62. (b) 63. (a) 64. (c) 65. (c)
66. (c) 67. (c) 68. (b) 69. (a) 70. (a)
71. (b) 72. (d) 73. (d) 74. (c) 75. (c)
76. (c) 77. (b) 78. (c) 79. (c) 80. (d)
81. (c) 82. (a) 83. (a) 84. (c) 85. (c)
86. (b) 87. (b) 88. (c) 89. (c) 90. (a)
91. (a) 92. (b) 93. (d) 94. (d) 95. (a)
96. (a) 97. (c) 98. (d) 99. (a) 100. (c)
𝟓
To complete the work = 5 𝟒𝟕 days
[(A+B) + (B+C) + (C+A)] = 13
2 (A+B+C) = 13
5. A B
A + B + C = 6.5 …(1)
18 36
A+B=6 ...(2)
C=6.5-6 = 0.5 work/day
2 1
𝟔𝟎
C (total work done) = = 120 days
𝟎.𝟓
3. 36
A B+C A+C
Work done by (A+B) in one day
4 hr 3 hr 2 hr
=1+2=3
9 day work = 9 3 = 27
3 4 6
Work left = 36 – 27 = 9
12 (total work)
% of work remained =
𝟗
100 = 25% A + B = 6 …. (1)
𝟑𝟔 B + C = 5 …. (2)
6. C + A = 4 ….. (3)
A+B B+C C+A 2(A + B + C) = 15
12 15 20 𝟏
6 A + B + C = 7 𝟐
150
3 2
A + B + C = 5 ……. (1)
A+B = 3 ……. (2)
60
On subtracting (2) by (1) A + B (1 day work) = 5
C = 2 work / min Total work done by (A+B)
Time taken by C to complete the work 𝟔𝟎
= 𝟓
= 12 days
𝟏𝟓𝟎
= = 75 min
𝟐
11. B+C C+A A+B+C
8. A+B B+C 12 days 8 days 6 days
A+C
10 days 12 days 15 days
2 3 4
6 5 4
A + B + C(total
= 4 work)
24
60 (total work)
12. 15. 2M 96 = 3F 96
A B C
𝑴 𝟑
10 12 15 =
𝑭 𝟐
Total work = 2M 96 = 2 3 96
6 5 4
Work done by = 6M + 7F = 6 3 + 7 2
= 18 + 14 = 32
60 (total work) 𝟐 ×𝟑 ×𝟗𝟔
Total work done = = 18 days
(A+B+C) can work in 1 day 𝟑𝟐
= 6 + 5 + 4 = 15
Total work done by A+B+C in
𝟔𝟎 16. A B C
= = 4 day
𝟏𝟓
24 9 12
13. C
A B
12 24 36 3 8 6
30 15 10 72 (Total work)
B + C = 8 + 6 = 14
360 (Total work)
(A+B+C) can work in 1 day (B+C) 3 days work = 14 3 = 42
= 30 + 15 + 10 = 55 Remaining work = 72 – 42 = 30
Total work done by (A+B+C) in Time taken by A to complete the work
𝟑𝟔𝟎 𝟔 𝟑𝟎
= = 6 𝟏𝟏 = 𝟑
= 10 days
𝟓𝟓
5 4 3 2 1
3 6 18 𝟏𝟓𝟎 𝟏
= 𝟒
= 37 𝟐 days
6 3 1 𝟕 𝟑
22. Remaining work = 1 - 𝟏𝟎 = 𝟏𝟎
𝟑
(A+B) complete Remaining work ( ) part
𝟏𝟎
18 (Total work)
= 4 days
M+F+B=6
𝟏𝟎 𝟒𝟎
3+F+1=6 Total work = 4 =
𝟑 𝟑
F=2 𝟏
= 13 𝟑 days
𝟏𝟖
Total work done by F in = 𝟐
= 9 days
23. A+B B+C C+A
20. (3M + 4B) 12 = (4M + 3B) 10 72 120 90
36M + 48B = 40M + 30B
4M = 18B 5 3 4
𝑴 𝟗
𝑩
= 𝟐 (work Ratio)
= 35 12 = 420
(A+B) + (B+C) + (C+A) = 5 + 4 + 3
Work done by (2M + 3B) in day 2 (A + B + C) = 12
= 2 9 + 3 2 = 24 A+B+C=6
(A+B+C) work done in 3 days
= 3 6 = 18
3 1
40
(A+B) one day work = 3
90
(A+B) 5 day work = 5 3 = 15
(A+B) one day work = 4
Fraction of work by (A+B) in 5 days
Time taken by (A+B) to complete total
𝟏𝟓 𝟑
= 𝟒𝟎 = 𝟖 𝟗𝟎 𝟏
work = = 22 𝟐 days
𝟒
𝟑 𝟓
Work left = 1 - 𝟖 = 𝟖
𝑾𝒐𝒓𝒌 𝑾𝒐𝒓𝒌
31. =
𝑴𝒂𝒏 ×𝑫𝒂𝒚 ×𝑯𝒓. 𝑴𝒂𝒏 × 𝑫𝒂𝒚 × 𝑯𝒓
𝟏
𝒙 𝑾𝒐𝒓𝒌 𝒙 𝑾𝒐𝒓𝒌
𝟐
1 (Total work) = 𝟏
𝑩 ×𝒚 𝒅𝒂𝒚 𝑨 × 𝒚 𝒅𝒂𝒚
𝟔
𝟏 𝟏 𝟏
A (1 day work) = 𝒙−𝟏𝟎 A = B
𝟔 𝟐
𝟏
B (1 day work = 𝑨 𝟑
𝒙 =𝟏
𝑩
𝟏
A+B (1 day work) = 𝟏𝟐
(A+B) complete work in 10 days.
𝟏 𝟏 𝟏
+ = So that work = (3 + 1) 10 = 40
𝒙 𝒙−𝟏𝟎 𝟏𝟐
𝒙−𝟏𝟎+𝒙 𝟏
= If work done by (B)
𝒙𝟐 −𝟏𝟎𝒙 𝟏𝟐
30. 3 B = (A + C) 1 2 3
𝑩 𝟏𝒙
𝑨+𝑪
= 𝟑𝒙 …. (1)
B=3 C=4
1 work/day
A = 12 – 7 = 5
Total work = (A+B+C) 10 days 7 work
= 12 10 = 120 work
3 2 1
144 (Total work)
60 (Total work)
2 (A + B + C) = 39
𝟑𝟗
1 day (A) 3 (A + B + C) 1 day work = 𝟐
2 day (A) 3 Total work done by (A+B+C)
3 day (A+B+C) 6 𝟏𝟒𝟒 𝟏𝟒𝟒 × 𝟐 𝟗𝟔
= 𝟑𝟗 = =
𝟑𝟗 𝟏𝟑
𝟐
𝟓
3 days work 12 =7
𝟏𝟑
day
5 5
15 days work 60 work 39. days worked =
𝟗𝟖𝟎𝟎
= 28 days
𝟑𝟓𝟎
= 15 days
40.
𝟐 𝒘𝒐𝒓𝒌 𝟏𝟎𝟎 𝒘𝒐𝒓𝒌
35. =
𝟐 𝒎𝒂𝒏 × 𝟐 𝒅𝒂𝒚 𝟏𝟎𝟎 𝒎𝒂𝒏 × 𝒙 𝒅𝒂𝒚 A A+B
𝒙 = 2 days 12 8
2 3
36. A 5 8 = B 6 10
𝑨 𝟔 × 𝟏𝟎 𝟑 24
𝑩
= 𝟓× 𝟖
=𝟐
A + B = 3 work
Total work = 3 5 8 A = 2 work
=
𝟐𝟒
= 24 days 1 work per day
𝟏
20 Work
𝒙=
𝟏𝟐 ×𝟏𝟎
= 15 man A = 1.5 work per day
𝟖
A+B = 2.5 work per day
4 3 8 90
46. M1 D1 H1 = M2 D2 H2
24 (Total work)
A = 4 work/day B = 3 work/day 5 60 min. = 12 H2
𝟓 × 𝟔𝟎
C = 8 – (4+3) = 1 work/day H2 = = 25 min
𝟏𝟐
Ratio of their share is 4 : 3 : 1
4 𝒙 + 3 𝒙 + 1 𝒙 = 600
8 𝒙 = 600
𝒙 = 75 Rs.
Boys pay = 1 𝒙
= 75 1 = 75 Rs.
3 2 4 3
30 48
A + B = 5 work/day
2 days work of (A+B) A5
B5+ 2
= 5 2 = 10
C 2 + 11
Remaining work = 30-10 = 20
Remaining work is done by A
(A + B) worked 5 days = 5 4 = 20
𝟐𝟎 𝟐
in = 𝟑
= 6 day 𝟑 (B + C) worked 2 days = 2 3 = 6
Remaining work = 48 – (20 + 6) = 22
48. C (complete remaining work in 11 day)
I you = 22
8 10 1 day = 2 work
C complete total work in
5 𝟒𝟖
4 = = 24 days
𝟐
40
51. A’s share = Rs. 250
I and you can complete the whole work in It means the ratio of efficiency of A : B
𝟒𝟎 𝟒 = 250 : 100 = 5 : 2
= 𝟗
= 4 𝟗 days
Ratio of days taken by A and B= 2𝒙 : 5𝒙
Now, 5𝒙 – 2𝒙 = 9 ⇒ 𝒙 = 3
49. M1 D1 H1 = M2 D2 H2
Number of days taken by A = 6
24 8 10 = 10 6 Man
(efficiency = 16.66%)
Man = 32
Number of days taken by B = 15 (efficiency
= 6.66%)
Therefore number of days taken by A and
𝟏𝟎𝟎 𝟑𝟎𝟎 𝟐
B, working together = 𝟐𝟑.𝟑𝟑 = 𝟕𝟎
= 4 𝟕 days
52.
𝟐
A work = 6 days 1st digger day in 1 hr = 5 3 = 15m
𝟑
24
st
53. Let 1 digger day = 𝒙 A+B=3
2nd digger day = 𝒙 + y Work in 4 days = 3 4 days
3rd digger day = 𝒙 + 2y = 12
𝒙 14 = (𝒙 + 2y) 10 Work Ratio => 𝟐𝟒 = 𝟐
𝟏𝟐 𝟏
14 𝒙 = 10 𝒙 + 20y
4 𝒙 = 20y 56. B A
𝒙 𝟓
= 𝟏
𝒚 𝟏 𝒙 𝟔
𝒙
Ratio of work 𝟏
1 work 𝟐
work
5k : 6k : 7k
𝟏 𝟏
B𝒙=A𝟔𝒙+A𝟔𝒙
Total work in 6 days = 324
𝟏
1 day = 54 B𝒙 = A 𝟔 2 𝒙
5k + 6k + 7k = 54 𝑩 𝟏
𝑨
=𝟑
18k = 54
(A+B) in 10 days
k=3
(1+3) 10 = 40 total work
57. A+B
30 60.
work/day A B A+B+C
8 12 4
30
(A+B) work for 20 days = 20 work
3 2 6
Remaining work = 30 – 20 = 10 work
A complete work in 20 days = 10
𝟏𝟎 𝟏 24 (Total work)
1 day = 𝟐𝟎 = 𝟐 work
A B
15 5 1
10
50
2 3 A=B+C
A+B=5
30
Ratio of work = Ratio of Amount A–B=1
2:3 2A = 6
2 𝒙 + 3 𝒙 = 30,000 (A = 3)
5 𝒙 = 30,000 A+B=5
5 4 3
62.
69.
360 (Total work)
2 (A+B+C) = 5 + 3 +4 A+B B+C C+A
30 24 20
A+B+C=6
- (B + C = 3)
4 5 6
A = 6 – 3 = 3 work/day
𝟑𝟔𝟎
A can complete work in = 𝟑
= 120 days
120 (Total work)
2 (A+B+C) = 15
67. 𝟏𝟓
A+B+C =
𝟐
A+B B+C C+A
72 B+C = 5
120 90
A = 7.5 – 5
= 2.5 work/day
5 3 4
𝟏𝟓
(A+B+C) work for 10 days = 10 𝟐
= 75
68. 2 5 8
A B
6 12 50 (Total work)
A+B+C = 8
2 1 C = 8 – (5 + 2)
C=1
12 𝟓𝟎
C complete whole work in = 𝟏
= 50 days
A+B = 3 work/day
𝑪 𝟏 𝟑 ⇒ D2 = 98 days
𝑨+𝑩
= (𝟐) 𝟔
𝑨 𝟐
𝑩
=𝟒 74. (A+B) in 4 days = 𝟏𝟎
𝟑
𝑪 𝟑
= (A+B) 1 work =
𝟒 ×𝟏𝟎
=
𝟒𝟎 𝟏
= 13 𝟑 days
𝑨+𝑩 𝟔
𝟑 𝟑
1 4 2
81. Boy 3 Min. 4 lit.
4 4
24 (Total work)
12 Min. 16 lit.
3 5
82. (2M + 1F) 14 = (4F + 2M) 8
15 28M + 14F = 32F + 16M
Man + Son = 5 work/day 12M = 18F
- Man = 3 work/day 𝑴 𝟏𝟖
𝑭
= 𝟏𝟐
Son = 2 work/day
Ratio of work = Ratio of Money they get
3 2
84. 3 ½ km. Road in = 80 280
𝟖𝟎 × 𝟐𝟖𝟎
Total 5 km. = 𝟏 5 24
𝟑
𝟐
Ganga = 3
𝟖𝟎 × 𝟐𝟖𝟎 × 𝟐
= 5 Saraswati = 2
𝟕
𝟑 18M 𝒙 = 720M
86. Jyoti 𝟒 park of work = 12 days
𝒙 = 40 days
𝟒
Jyoti 1 work in = 12 = 16 days 𝟑
Jyoti 𝟏
89. Time 𝜶 𝒆𝒇𝒇𝒊𝒄𝒊𝒆𝒏𝒄𝒚
16 days 𝟐
Efficiency = 𝟑
work/day
𝟑
16 work So time Ratio =
𝟐
60 20 15 9
M+B=3
M=2
120 (Total work)
B=1
One day work of John + Joe + George
Boy complete the work in
= 20 + 15 + 9 = 44
𝟔𝟎
= 𝟏
= 60 hr. They complete whole work in
𝟏𝟐𝟎 𝟖
= 𝟒𝟒
= 2 𝟏𝟏 day
91. 𝒙 (20 hr) = 80 page
𝒙 (1 hr) = 4 page/hr 𝟐
94. Work 𝟓 = 35 32
(𝒙 + y) 27 = 135 page
𝟓
27 4 + y 27 = 135 Total work = 35 32
𝟐
A6=B8 = 60 – 35 = 25
𝑨 𝟒 95.
𝑩
=𝟑
A+B+C A+C A+B
Total work = 18 4 = 72 8 12 13 𝟏𝟑 (𝟒𝟎 )
𝟑
Time required to complete whole work
𝟕𝟐
by B = = 24 days 15 10 9
𝟑
= 40 days
5 7 9 (Total work)
Ratio of efficiency in Ratio of share
100. Let total work = 5
63 : 45 : 35
𝟑
Work done by (A+B) = 5 = 3
63 𝒙 + 45 𝒙 + 35 𝒙 = 2860 𝟓
98. 10F 6 = 6M 5 = 8B 10
𝟔𝟎𝑭 𝟑𝟎𝑴 𝟖𝟎𝑩
𝟐𝟒𝟎
= 𝟐𝟒𝟎
= 𝟐𝟒𝟎
(divide all by 240 lcm)
𝑭 𝑴 𝑩
= =
𝟒 𝟖 𝟑
WiNNERS
Institute
Our Courses
SSC Bank Railway MPPSC
Sub Inspector Constable
CET and all Competitive Exams
Follow
The Winners Institute
CLICK HERE
CLICK HERE
CLICK HERE
CLICK HERE
T. W. I.
The
WiNNERS
Institute