0% found this document useful (0 votes)
206 views

Time and Work Practice Sheet

The document contains practice problems related to time and work. It provides scenarios involving multiple workers completing jobs or pieces of work individually and together. For each scenario, it asks how long it would take to complete the work and provides multiple choice answers.

Uploaded by

SOURAV KAMBOJ
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
206 views

Time and Work Practice Sheet

The document contains practice problems related to time and work. It provides scenarios involving multiple workers completing jobs or pieces of work individually and together. For each scenario, it asks how long it would take to complete the work and provides multiple choice answers.

Uploaded by

SOURAV KAMBOJ
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 37

Time & Work - Practice Sheet

Page | 1 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
A B work together, the work will be
B C completed in
𝟑 𝟑
C A (a) 3 𝟒 days (b) 3 𝟕 days
A, B C 𝟓
(c) 5 𝟒𝟕 days (d) 4
𝟒
days
𝟗

A B
A and B can do a work in 12 days. B
and C in 15 days and C and A in 20
days. If A, B and C work together,
they will complete the work in
(a) 5 Days
𝟓
(b) 7 𝟔 Days A can finish a work in 18 days and B
𝟐 in 36 days. If they work on it together
(c) 10 Days (d) 15 𝟑 Days for 9 days, then what percent of work
is left?
A B (a) 33.33% (b) 20%
B C (c) 75% (d) 25%
C A
C A B
B C C
A and B can do a piece of work in 10 A
days. B and C in 15 days and C and A B
in 20 days. C alone can do the work in
(a) 60 days (b) 120 days If A and B together can complete a
(c) 80 days (d) 30 days work in 12 days, B and C together in
15 days and C and A together in 20
A days, then B alone can complete the
B C A work in
C B (a) 30 days (b) 25 days
(c) 24 days (d) 20 days
A can do a piece of work in 4 hours,
A, B C
B and C can do it in 3 hours. A and C
can do it in 2 hours. How long will B A B
alone take to do it?
(a) 10 hours (b) 12 hours C
(c) 8 hours (d) 24 hours
A, B and C together can complete a
A B piece of work in 30 minutes. A and B
B C together can complete the same work
C A in 50 minutes. C alone can complete
the work in
(a) 60 minutes (b) 75 minutes
(c) 80 minutes (d) 150 minutes

A and B together can do a work in 8 A B


days, B and C together in 6 days while B C
C and A together in 10 days, if they all

Page | 2 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
A C A, B C
A

A and B can do a piece of work in 10


days. B and C do it in 12 days. A and
C can do it in 15 days. How long will A, B and C individually can do a work
A take to do it alone? in 10 days, 12 days and 15 days
(a) 24 days (b) 20 days respectively. If they start working
(c) 40 days (d) 30 days together, then the number of days
required to finish the work is
A B (a) 16 days (b) 8 days
(c) 4 days (d) 2 days

A, B C
A and B can separately do a piece of
work in 6 days and 12 days
respectively. How long will they
together take to do the work? A, B and C can complete a piece of
(a) 9 days (b) 18 days work in 12, 24 and 36 days
(c) 6 days (d) 4 days respectively. In how many days will
they together complete the same
A work?
𝟔
B (a) 5 𝟏𝟏 days (b) 4 days
𝟔
(c) 6 𝟏𝟏 days (d) 6 days

A can do a piece of work in 20 days


and B can do the same piece of work
in 30 days. Find in how many days
both can do the work?
(a) 16 days (b) 14 days
(c) 10 days (d) 12 days
A piece of work can be done by Ram
B C and Shyam in 12 days, by Shyam and
C A Hari in 15 days and by Hari and Ram
in 20 days. Ram alone will complete
the work in
A B (a) 30 days (b) 32 days
(c) 36 days (d) 42 days
B and C can complete a piece of work
in 12 days. C and A can do it in 8 days.
All the three can do it in 6 days. A and
B together can complete it in
(a) 4 days (b) 6 days
(c) 8 days (d) 10 days
2 men or 3 women can complete a job
in 96 days. Then 6 men and 7 women

Page | 3 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
will complete the same job in how
many days?
(a) 18 days (b) 27 days
(c) 20 days (d) 24 days

A B
C
A man, a woman and a boy can
B C
together complete a piece of work in
3 days. If a man alone can do it in 6
days and a boy alone in 18 days, how
A long will a women alone take to
A can finish a work in 24 days, B in 9 complete the work?
days and C in 12 days. B and C start (a) 9 days (b) 21 days
the work but are forced to leave after (c) 24 days (d) 27 days
3 days. The remaining work was done
by A in
(a) 5 days (b) 6 days
𝟏
(c) 10 days (d) 10 𝟐 days

A B
3 men and 4 boys can complete a
piece of work in 12 days. 4 men and 3
A boys can do the same work in 10
days. Then 2 men and 3 boys can
finish the work in number of days is
𝟏 𝟓
A and B can do a job in 6 and 12 days (a) 17 𝟐 days (b) 5 𝟏𝟏 days
respectively. They began the work (c) 8 days (d) 22 days
together but A leaves after 3 days.
Then the total number of days needed A
𝟒
for the completion of the work is 𝟓
(a) 4 days (b) 5 days B
(c) 6 days (d) 9 days
B

𝟒
A does 𝟓 of a piece of work in 20 days.
He then calls in B and they finish the
remaining work in 3 days. How long B
A certain number of persons can alone will take to do whole work?
𝟏
complete a piece of work in 55 days. (a) 37 𝟐 days (b) 37 days
If there were 6 persons more, the (c) 40 days (d) 23 days
work could be finished in 11 days
less. How many persons were 𝟕
originally there? A,
𝟏𝟎
(a) 17 (b) 24 B
(c) 30 (d) 22

Page | 4 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
A B

𝟕
A does 𝟏𝟎 part of work in 15 days with A can do a work in 20 days and B in
the help of B. In how the remaining 40 days. If they work on it together for
wok in 4 days with the help of B. In 5 days. Then the fraction of the work
how many days will A and B together that is left is
𝟓 𝟖
do the same work? (a) 𝟖 (b)
𝟏𝟓
𝟏 𝟐 𝟕 𝟏
(a) 10 𝟑 days (b) 12 𝟑 days (c) 𝟏𝟓 (d)
𝟏𝟎
𝟏 𝟏
(c) 13 𝟑 days (d) 8 𝟒 days

A B
B C
𝟏
A C
𝟐
A, B C

Sunil completes a work in 4 days,


A and B can do a piece of work in 72 whereas Dinesh completes the work
days. B and C can do it in 120 days 𝟏
in 6 days, Ramesh works 1 𝟐 times as
and A and C can do it in 90 days.
When A, B and C work together, how fast as Sunil. The three together can
much work is finished by them in 3 complete the work in
𝟓 𝟓
days. (a) 1 𝟏𝟐 days (b) 1 𝟕 days
𝟏 𝟏 𝟑 𝟓
(a) 𝟒𝟎 (b) (c) 1 𝟖 days (d) 1 days
𝟑𝟎 𝟏𝟗
𝟏 𝟏
(c) 𝟐𝟎
(d)
𝟏𝟎
A, B
A B
B A

A is thrice as good a workman as B


and takes 60 days less then B for
A can finish a work in 18 days and B
doing a job. The time in which they
can do same work in half the time
can do it together is
taken by A. Then working together
(a) 15 days (b) 30 days
what part of the same work they can 𝟏
finish in a day? (c) 22 𝟐 days (d) 60 days
𝟏 𝟐
(a) 𝟔 (b)
𝟓
𝟏 𝟐 A, B %
(c) 𝟗 (d) 𝟏
𝟕 A
𝟐
A B B

Page | 5 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
A does 20% less work than B. if A can A does half as much work as B in one
𝟏
complete a piece of work in 7 𝟐 hours, sixth of the time. If together they take
then B can do it in 10 days to complete a work, how
(a) 10 hours (b) 4 hours much time shall B take to do it alone?
(c) 6 hours (d) 8 hours (a) 70 days (b) 30 days
(c) 40 days (d) 50 days
A B
A, B
A
C
B
B
A

A takes 10 days less than the time


taken by B to finish a piece of work. If A takes twice as much time as B
both A and B can do it in 12 days, thrice as much as C to complete a
then the time taken by B alone to piece of work. They together
finish the work is complete the work in 1 day. In what
(a) 30 days (b) 27 days time, will A alone complete the work?
(c) 20 days (d) 25 days (a) 9 days (b) 5 days
(c) 6 days (d) 4 days
B A C

C A B 𝟑
𝟒

A Babu and Asha can do a job together


𝟑
in 7 days. Asha is 1 𝟒 times as efficient
To do a certain work, B would take as Babu. The same job can be done
time thrice as long as A and C by Asha alone in
together and C twice as long as A and 𝟒𝟗
(a) 𝟒 days
𝟒𝟗
(b) 𝟑 days
B together. The three men together 𝟐𝟖
complete the work in 10 days. The (c) 11 days (d) 𝟑
days
time taken by A to complete the work
separately is A, B C
(a) 22 days (b) 24 days
(c) 30 days (d) 20 days A
B C
B
𝟏
A
𝟔
A, B and C alone can complete a work
B in 20 days, 30 days and 60 days
respectively. A works alone, however
on every third day, he takes the help

Page | 6 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
of B and C. in how many days will the
work be completed? A C
(a) 10 days (b) 12 days A, B C
(c) 15 days (d) 18 days

B and C together can complete a work


in 8 days; A and B together can
complete the same work in 12 days
and A and C together can complete
the same work in 16 days. In how
If two persons, with equal abilities, many days can A, B and C together
can do two jobs in two days, then 100 complete the same work?
persons with equal abilities can do 𝟗
(a) 3 𝟏𝟑 days
𝟓
(b) 7 𝟏𝟑 days
100 similar jobs in 𝟓 𝟓
(a) 100 days (b) 10 days (c) 7 𝟏𝟐 days (d) 3 𝟏𝟐 days
(c) 5 days (d) 2 days

B
Vikas gets Rs. 350 for every day that
he works. If he earns Rs 9800 in a
month of 31 days, for how many days
Working 5 hours a day, A can did he work?
complete a work in 8 days and (a) 25 days (b) 30 days
working 6 hours a day, B can (c) 24 days (d) 28 days
complete the same work in 10 days.
Working 8 hours a day, then can 'A' 12
jointly complete the work in 'A' 'B'
(a) 3 days (b) 4 days
(c) 4.5 days (d) 5.4 days 'B'

'A' can complete a piece of work in12


days. 'A' and 'B' together can
complete the same piece of work in 8
days. In how many days can 'B' alone
30 men can do a piece of work in 16 complete the same piece of work?
days. How many men would be (a) 15 days (b) 18 days
required to do the same work in 20 (c) 24 days (d) 28 days
days.
(a) 12 (b) 36
(c) 48 (d) 24

B C 12 men can do a piece of work in 10


A B days. How many men would be

Page | 7 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
required to do the same work in 8 (a) 12 hours (b) 8 hours
days? 𝟏
(c) 13 hours (d) 5
𝟏
hours
(a) 14 (b) 18 𝟑 𝟐
(c) 16 (d) None of these

A B
A
B

A and B together do job in 6.75 days A certain number of people were


and A could do the job in 9 days if he supposed to complete a work in 24
worked alone. How many days would days. The work, however, took 32
B take to do the job if he worked days, since 9 people weres absent
alone? throughout. How many people were
(a) 27 days (b) 18 days supposed to be working originally?
(c) 24 days (d) 21 days (a) 32 (b) 27
(c) 36 (d) 30

If 5 men take an hour to dig a ditch,


then how long should 12 men take to
dig a ditch of the same type?
(a) 25 min (b) 30 min
Two men undertake to do a piece of (c) 28 min (d) 20 min
work for Rs 600. One alone could do
it in 6 days and the other in 8 days. A B
With the assistance of a boy they
finish it in 3 days. The boy's share
should be B
(a) 75 (b) 225 A
(c) 300 (d) 100
A and B weave a carpet in 10 days
A B % and 15 days respectively. They begin
B to work together but B leaves after 2
days. In what time will A complete the
remaining work?
A B 𝟏 𝟐
(a) 6 𝟑 days (b) 6 𝟑 ays
(c) 7 days (d) 8 days
A can do 50% more work than B can
do in the same time. B alone can do a
piece of work in 20hr. A, with the help
of B, can finish the same work in how
many hours?

Page | 8 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
A B

I can do a piece of work in 8 days, A and B undertook a work for Rs. 350.
which can be done by you in 10 days. A got Rs. 150 more than that of B,
How long will it take to do it if we work when they worked together. B takes 9
together? days more than A, when they work
𝟒 𝟑
(a) 4 𝟗 days (b) 5 days individually. In how many days A and
𝟗
𝟏 𝟕 B working together can do the whole
(c) 5 𝟐 days (d) 4 days
𝟗 work :
𝟐
(a) 5 days (b) 4 𝟕 days
𝟓 𝟒
(c) 4 𝟕 days (d) 5 𝟕 days

A 2/3, 6
B
24 men working at 8 hours a day can 1/3 C, 12
finish a work in 10 days. Working at 3/4
the rate of 10 hours a day, the number
of men required to finish the same A C
work in 6 days is B
(a) 30 (b) 32
A completes 2/3 of a certain job in 6
(c) 34 (d) 36
days. B can complete 1/3 of the same
job in 8 days and C can complete 3/4
A B of the work in 12 days. All of them
B C work together for 4 days and then A
A and C quit. How long will it take for B
B to complete the remaining work
C 13 alone?
C (a) 3.8 days (b) 3.33 days
(c) 2.22 days (d) 4.3 days
A and B together can do a piece of
work in 12 days. B and C together can
do the same work in 16 days. After A
has been working at. If for 5 days and
B for 7 days, C finishes it in 13 days.
In how many days will C alone be able
to do the work?
(a) 16 days (b) 24 days
(c) 36 days (d) 48 days

A B
A B
Three diggers dug a ditch of 324 m
A B deep in six days working
B, A simultaneously. During one shift, the
third digger digs as many metres

Page | 9 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
more than the second as the second
digs more than the first. The third B
digger's work in 10 days is equal to
the first digger's work in 14 days.
How many metres does the first
A does half as much work as B does
digger dig per shift?
in 1/6th of the time taken by B. If they
(a) 15 m (b) 18 m
take 10 days to complete the work
(c) 21 m (d) 27 m
together. How much time shall B take
to do it alone?
(a) 70 days (b) 30 days
(c) 40 days (d) 50 days

A B

B
A
A

Two women Renu and Usha are A and B together can finish a work in
working on an embroidery design. If 30 days. They work together for 20
Usha worked alone, she would need days and then B left. A finished the
eight hours more to complete the remaining work in next 20 days. In
design than if they both worked how many days A alone can finish the
together. Now if Renu worked alone, work?
it would need 4.5 hours more to (a) 50 days (b) 60 days
complete the design than they both (c) 48 days (d) 54 days
working together. What time would it
take for Renu alone to complete the A
design? B A
(a) 10.5 hours (b) 12.5 hours
(c) 14.5 hours (d) 18.5 hours

A 12 B4
A can finish a work in 18 days and B
can do the same work in half of the
time taken by A. They both working
together. How much part of work can
A can do a work in 12 days and B in 4 do in one day?
days. If they work on it together for 24 𝟏 𝟐
(a) 𝟔 (b)
days, then what fraction of work is 𝟓
𝟏 𝟐
left? (c) 𝟗 (d)
𝟕
(a) 1/3 (b) 1/2
(c) 1/4 (d) 1/5
A B
B
A

Page | 10 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
A B

A and B can complete a work in 15 A can complete a work in 4 hours. B


days and 10 days respectively. They and C in 3 hours and A and C in 2
took contract to complete the work hours. In how much time will B alone
for Rs. 30000. The share of A in that take to complete the work.
money will be- (a) 10 hours (b) 12 hours
(a) Rs. 18000 (b) Rs. 16500 (c) 8 hours (d) 24 hours
(c) Rs. 12500 (d) Rs. 12000
A B
A B A
A
B B
C

A and B can complete a work in 20


C days and 12 days respectively. A
A and B took a contract to complete a started to work alone, then after 4
work for Rs. 4500. A alone, can days B joined and worked together
complete the work in 8 days and 'B' will completing the work. How many
alone can in 12 days with the help of days did work take to complete?
C they completed the work in 4 days. (a) 10 days (b) 20 days
Then the share of C in that money is- (c) 15 days (d) 6 days
(a) Rs. 2250 (b) Rs. 1500
(c) Rs. 750 (d) Rs. 375 P Q
Q R
A R P
B C P

A B P & Q can complete a work in 12 days,


C the same work is completed by Q & R
B in 15 days & P & R in 20 days.
Therefore 'P' alone can complet the
A can finish a work in as much time work in how many day?
as B and C together can. If A and B (a) 10 days (b) 20 days
can finish the work in 10 days and C (c) 30 days (d) 60 days
alone, can in 50 days then, in how
much time B alone can complete thw A 24 B
work? C A, B C
(a) 15 days (b) 20 days
(c) 25 days (d) 30 days B C

A A
B C A C A can complete a work in 24 days, B
in 9 days, and C in 12 days. A, B and

Page | 11 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
C start working together. But B and C A B
had to leave after 3 days. The time B C
taken by A to finish the remaining C A
work was-
(a) 8 days (b) 12 days
(c) 7 days (d) 6 days B
C
A B A
B C
C A A and B can do a work in 30 days, B
A and C can do the same work in 24
days and C and A can in 20 days. If
they all work together for 10 days
A and B together, Can finish a work in then B and C left the work then, how
72 days, B and C in 120 days and C much time will A take to complete the
and A in 90 days then, in how many work?
days will A alone finish the work? (a) 18 days (b) 24 days
(a) 80 days (b) 100 days (c) 30 days (d) 36 days
(c) 120 days (d) 150 days
A 25
A B
B
B C
C
A C
A, B C
C

A can paint a house in 25 days and B


A and B together complete a work in can do it in 10 days. Along with C,
72 days B and C in 120 days and A they did the job in 6.25 days only.
and C in 90 days. If A, B and C work Then in how many days, C alone can
together. How much work they will do the job?
complete in 3 days? (a) 50 days (b) 40 days
𝟏 𝟏
(a) 𝟒𝟎 (b) (c) 30 days (d) 60 days
𝟑𝟎
𝟏 𝟏
(c) 𝟐𝟎 (d)
𝟏𝟎
A B
C, A B
A B
C
A, B C
A
A can complete a work in 6 days and
B can complete the same work in 12
days. If they work together. How A is half as efficient as B. C does half
much work will be done by A? of the work done by A and B working
𝟏 𝟐 together. If C alone can complete the
(a) 𝟑 (b)
𝟑 work in 20 days then, in how many
𝟏 𝟏
(c) 𝟒 (d) days can A, B and C together
𝟔
complete the work?

Page | 12 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
𝟐 𝟐
(a) 5 𝟑 𝐝𝐚𝐲𝐬 (𝐛) 𝟔 𝟑days
(c) 6 days (d) 7 days A
B
A B
A A and B can complete the work in 12
days and 15 days respectively. They
started working together but after 4
days A left the work. In how many
A can complete a work in 20 days and
days would B complete the remaining
B can complete in 40 days. A starts
work?
the work then they work regularly on 𝟐𝟎 𝟐𝟓
alternate days. On which day the (a) 𝟑 days (b) 𝟑 days
work will be done? (c) 6 days (d) 5 days
(a) 24 days (b) 25 days
(c) 26 days (d) 27 days A B

A
B

A
2 men or 5 women or 7 boys can
finish a work in 469 days, then the A and B can complete a work alone in
number of days taken by 7 men, 5 28 days and 35 days respectively.
women and 2 boys to finish the work They start working together but after
is : some time A leaves and B does the
(a) 134 (b) 106 remaining work in 17 days. After how
(c) 100 (d) 98 many days from start. A left the work?
𝟐
𝟕
A, 15 (a) 14 𝟓 days (b) 9 days
𝟏𝟎 𝟓
B (c) 8 days (d) 7 𝟗 days

A B

𝟕
A can complete the 𝟏𝟎 th part of a work
in 15 days. After that, with the help of
B completes in 4 days. In how many If 8 women collect 200 kg of tea
days will A and B working together leaves in 10 hours. How many more
complete the work? (in kg) of tea leaves will 12 women
𝟏
(a) 10 𝟑 days
𝟐
(b) 12 𝟑 days collect in 8 hours ?
𝟏 𝟏 (a) 24 kg (b) 40 kg
(c) 13 𝟑 days (d) 8 𝟒 days (c) 50 kg (d) 100 kg

A B A, B C

Page | 13 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet

A, B and C can do a work in 24 days, A boy and a girl together fill a cistern
6 days and 12 days respectively. All with water. Boys popurs 4L water in
of the three together will do that work every 3 minute while the girls pours
in- 3L water in every 4 minute. How much
𝟏
(a) 𝟒 days
𝟕
(b) 𝟐𝟒 days time will it take to fill 100L water in the
𝟑 cistern?
(c) 3 𝟕 days (d) 4 days (a) 36 minute (b) 42 minute
(c) 48 minute (d) 44 minute

A man can do a work in 5 days, but he


can do it in 3 days with the assistance
of his son. How much time his son
will take alone to complete that work?
(a) 7 days (b) 8 days
𝟏 𝟏 2 men and 1 women together can
(c) 7 𝟐 days (d) 6 𝟐 days complete a piece of work in 14 days,
while 4 women and 2 men together
can do it in 8 days. If a man get Rs.
600 per day, how much should a
women get day?
(a) Rs. 400 (b) Rs. 450
(c) Rs. 480 (d) Rs. 360

2 men, 3 women and 4 children


together now 10 hectare field in 10
days. If the capacity of 1 man, 1
A fort has provisions for 50 days. If
women and 1 child is in the ratio 5 : 4
after 10 days 500 men strengthen
: 2, then in how much time 6 men, 4
them and the food lasts 35 days
women and 7 children will now a field
longer, how many men were there in
of 16 hectare area?
the fort at the start.
(a) 5 days (b) 6 days
(a) 3500 (b) 3000
(c) 7 days (d) 8 days
(c) 2500 (d) 4000

Page | 14 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
𝟏 Ganga and Saraswati, working
𝟐 separately can mow field in 8 and 12
hours respectively. If they work in
stretches of one hour alternately.
A road of 5 km length will be Ganga is beginning at 9 am. When will
constructed in 100 days. So 280 the moving be completed?
workers were employed. But after 80 (a) 6 o’clock day and night
𝟏
days it was found that only 3 𝟐 km (b) 6.30 o’clock day and night
road was completed. Now how many (c) 5 o’clock day and night
more people were needed to finish (d) 5.30 o’clock day and night
the work in the specified time?
(a) 480 (b) 80
(c) 200 (d) 100

'X'

12 men can complete a work in 90


'X' days. 30 days after they started work,
2 men left and 8 men joined. How
'X' number of men can finish a piece many days will it take to complete the
of work in 30 days. If there were 6 men remaining work?
more, the work could be finished in 10 (a) 90 days (b) 60 days
days less. The original number of (c) 40 days (d) 50 days
men is?
(a) 6 (b) 10 A B
(c) 12 (d) 15

3/4
The rate of working of A and B are in
the ratio of 2 : 3. The number of days
taken by them to finish the work is in
Jyothi can do 3/4th of a job in 12 days. the ratio:
Mala is twice as efficient as Jyothi. In (a) 2 : 3 (b) 4 : 9
how many days Mala will finish the (c) 3 : 2 (d) 9 : 4
job?
(a) 6 (b) 8
(c) 12 (d) 16

A man can do a piece of work in 30


hours. If he works with his son then
the same piece of work is finished in

Page | 15 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
20 hours. If the son works alone then 𝟖
(c) 3 𝟏𝟏 𝐡𝐨𝐮𝐫𝐬 (𝐝) 𝟐
𝟖
hours
𝟏𝟏
he can do the work in:
(a) 60 hours (b) 50 hours
(c) 25 hours (d) 10 hours

x,
𝟐
x y ( )
𝟓
y

X can copy 80 pages in 20 hours, x 35 persons are engaged to complete


and y together can copy 135 pages in a work in 60 days. After 32 days it is
27 hours. Then y can copy 20 pages 𝟐
observed that only (𝟓) th part of the
in
(a) 20 hours (b) 24 hours work has been done. The number of
(c) 3 hours (d) 12 hours more persons to be engaged to
complete the remaining work in the
A said period is
(a) 20 (b) 35
(c) 30 (d) 25
B B
A, B, C

A can do a piece of work in 18 days.


He worked at it for 12 days and B
finished the remaining work in 8
days. B alone can do the whole work A C
𝟏
in A B
𝟑
(a) 16 days (b) 24 days
(c) 35 days (d) 28 days

𝟏
𝟐 The labourers A, B, C were given a
𝟏
contract of Rs 750 for doing a certain
𝟒
piece of work. All the three together
can finish the work in 8 days. A and C
together can do it in 12 days, while A
𝟏
and B together can do it in 13𝟑 days.
The money will be divided in the ratio.
John does 1/2 piece of work in 3 (a) 4 : 5 : 6 (b) 4 : 7 : 5
hours, joe does 1/4 of the remaining (c) 5 : 7 : 4 (d) 5 : 6 :8
work in 1 hour and George finishes
remaining work in 5 hours. How long
would it have taken the three working
together to do the work?
𝟏 𝟏
(a) 2 𝟕 𝐡𝐨𝐮𝐫𝐬 (𝐛) 𝟑 𝟕 hours

Page | 16 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
B

Raman can do a work in 5 days, Jatin A B


can do the same work in 7 days and
Sachin can do the same work in 9
days. If they can do the same work A and B can together do a piece of
together and they are paid Rs. 2860, work in 10 days If A work with twice
then what is the share (in Rs) of of his efficiency and B works with an
Raman? efficiency 1/3rd less than his
(a) 1260 (b) 700 efficiency, then the work gets
(c) 900 (d) 870 completed in 6 days. In how many
days can A and B do the work alone
A, B C respectively?
A B (a) 40/3,40 (b) 20/3,20
% B C (c) 30,20/3 (d) 50/3,25
%
A B /
C
A piece of work was finished by A, B A, B C
and C together, A and B together C
finished 60% of the work and B and C
together finished 70% of the work. A and B do (3/5)th part of a work and
Who among the three is most the rest of the work is completed by
efficient? C. If A, B and C take the same work
(a) Only A (b) Only B for Rs 5000, then what is the share of
(c) Only C (d) A or B C (in Rs.)
(a) 3000 (b) 2500
(c) 2000 (d) 1500

10 women can do a piece of work in 6


days, 6 men can do same work in 5
days and 8 children can do it in 10
days what is the ratio of the efficiency
of a women, a man and child
respectively.
(a) 4 : 6 : 3 (b) 4 : 5 : 3
(c) 2 : 4 : 3 (d) 4 : 8 : 3

A B
A

Page | 17 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet

1. (c) 2. (b) 3. (b) 4. (c) 5. (d)

6. (d) 7. (b) 8. (a) 9. (d) 10. (d)

11. (c) 12. (c) 13. (c) 14. (a) 15. (a)

16. (c) 17. (c) 18. (b) 19. (a) 20. (a)

21. (a) 22. (c) 23. (c) 24. (a) 25. (a)

26. (d) 27. (c) 28. (c) 29. (a) 30. (b)

31. (c) 32. (c) 33. (c) 34. (c) 35. (d)

36. (a) 37. (d) 38. (b) 39. (d) 40. (c)

41. (d) 42. (a) 43. (a) 44 (b) 45. (b)

46. (a) 47. (b) 48. (a) 49. (b) 50. (b)

51. (b) 52. (b) 53. (a) 54. (a) 55. (b)

56. (c) 57. (b) 58. (a) 59. (d) 60. (c)

61. (c) 62. (b) 63. (a) 64. (c) 65. (c)

66. (c) 67. (c) 68. (b) 69. (a) 70. (a)

71. (b) 72. (d) 73. (d) 74. (c) 75. (c)

76. (c) 77. (b) 78. (c) 79. (c) 80. (d)

81. (c) 82. (a) 83. (a) 84. (c) 85. (c)

86. (b) 87. (b) 88. (c) 89. (c) 90. (a)

91. (a) 92. (b) 93. (d) 94. (d) 95. (a)

96. (a) 97. (c) 98. (d) 99. (a) 100. (c)

Page | 18 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet

Solutions A=3 …… (1)


B+C=4 .…... (2)
A+C=6 …… (3)
Put the value of A is eq4 3rd
1.
A+B B+C C+A 3+C=6
12 15 20 C=3
6
Put the value of C in eq4 …….. (2)
5 4 3 3+B=4
B=1 (work/hr)
60 (total work) 𝟏𝟐
Total work done by B = 𝟏
= 12 hr.

[(A+B) + (B+C) + (C+A)] efficiency 4.


A+B B+C C+A
= 5 + 4 + 3 = 12
8 days 6 days 10 days
2A + 2B + 2C = 12
A+B+C=6
15 20 12
𝟔𝟎
Total work done by A, B, C in ⇒ 10 days
𝟔

120 (total work)


2.
A+B B+C A + B = 15
C+A
15 B + C = 20
10 20 C + A= 12
2 6
2A + 2B + 2C = 47
𝟒𝟕
6 4 3 = A+B+C= 𝟐

𝟏𝟐𝟎 𝟐𝟒𝟎
Time taken by A + B + C = 𝟒𝟕 = 𝟒𝟕
60 (total work) 𝟐

𝟓
To complete the work = 5 𝟒𝟕 days
[(A+B) + (B+C) + (C+A)] = 13
2 (A+B+C) = 13
5. A B
A + B + C = 6.5 …(1)
18 36
A+B=6 ...(2)
C=6.5-6 = 0.5 work/day
2 1
𝟔𝟎
C (total work done) = = 120 days
𝟎.𝟓

3. 36
A B+C A+C
Work done by (A+B) in one day
4 hr 3 hr 2 hr
=1+2=3
9 day work = 9  3 = 27
3 4 6
Work left = 36 – 27 = 9

12 (total work)

Page | 19 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet

% of work remained =
𝟗
 100 = 25% A + B = 6 …. (1)
𝟑𝟔 B + C = 5 …. (2)
6. C + A = 4 ….. (3)
A+B B+C C+A 2(A + B + C) = 15
12 15 20 𝟏
6 A + B + C = 7 𝟐 

Put the value of eq4 (2) in eq (4)


5 4 3
𝟏 𝟏
B+5=7𝟐 B = 2 𝟐 work/day

Time taken by B to complete work


60 (total work)
𝟔𝟎
= 𝟐.𝟓 = 24 days
A + B = 5 ….... (1)
9.
B + C = 4 ……. (2)
A B
C + A= 3 ……. (3) 6 days 12 days
2A+ 2B + 2C = 12
A + B + C = 6 …… (4)  2 1
 Put the value of B + C in eq4 (4) by (3)
3+B=6 B = 3 work/day 12
𝟔𝟎
Total work by (A + B) in one day
Total work done by = 𝟑
= 20 days
= 1+2= 3
Total work done by (A+B)
7. A+B+C A+B 𝟏𝟐
= 𝟑
= 4 days
30 min 50 min
10.
A B
5 3 20 days 30 days

150
3 2
A + B + C = 5 ……. (1)
A+B = 3 ……. (2)
60
On subtracting (2) by (1) A + B (1 day work) = 5
C = 2 work / min Total work done by (A+B)
Time taken by C to complete the work 𝟔𝟎
= 𝟓
= 12 days
𝟏𝟓𝟎
= = 75 min
𝟐
11. B+C C+A A+B+C
8. A+B B+C 12 days 8 days 6 days
A+C
10 days 12 days 15 days
2 3 4
6 5 4
A + B + C(total
= 4 work)
24
60 (total work)

Page | 20 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
- (B + C = 2) S + H = 4 …. (2)
A = 2 H + R = 3 …. (3)
A+B+C= 4 2R + 2S + 2H = 12
- (A + C = 3) R+S+H = 6 
B= 1 Put the value of (2) in eq4 (4)
A + B = 2 + 1 = 3 work/day
R+4=6 R=2
Total work complete by 𝟔𝟎
𝟐𝟒
Total work done by R = 𝟐
= 30 days
(A+B) in = 𝟑
= 8 days

12. 15. 2M  96 = 3F  96
A B C
𝑴 𝟑
10 12 15 =
𝑭 𝟐

Total work = 2M  96 = 2  3  96
6 5 4
Work done by = 6M + 7F = 6  3 + 7  2
= 18 + 14 = 32
60 (total work) 𝟐 ×𝟑 ×𝟗𝟔
Total work done = = 18 days
(A+B+C) can work in 1 day 𝟑𝟐
= 6 + 5 + 4 = 15
Total work done by A+B+C in
𝟔𝟎 16. A B C
= = 4 day
𝟏𝟓
24 9 12
13. C
A B
12 24 36 3 8 6

30 15 10 72 (Total work)

B + C = 8 + 6 = 14
360 (Total work)
(A+B+C) can work in 1 day (B+C) 3 days work = 14  3 = 42
= 30 + 15 + 10 = 55 Remaining work = 72 – 42 = 30
Total work done by (A+B+C) in Time taken by A to complete the work
𝟑𝟔𝟎 𝟔 𝟑𝟎
= = 6 𝟏𝟏 = 𝟑
= 10 days
𝟓𝟓

14. Ram + Shyam + Hari +


Shyam Hari Shyam 17. A B
12 15 20 6 12

5 4 3 2 1

60 (Total work) 12 (Total work)


R + S = 5 …. (1) (A+B) 3 days work = (1 + 2)  3 = 9

Page | 21 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
Remain work = 12 – 9 = 3 Time taken by (2M + 3B) to complete the
Remaining work done by B 𝟒𝟐𝟎 𝟏
work = 𝟐𝟒
= 17 𝟐 days
𝟑
in = 3 days
𝟏

Total work done in = 3 days + 3 days 𝟒


21. A (𝟑 part of work) = 20 days
= 6 days 𝟒 𝟏
A (1 day work) = =
𝟓 ×𝟐𝟎 𝟐𝟓
𝟒 𝟏
18. Let People = 𝒙 Remain work = 1 - 𝟓 = 𝟓

𝒙  55 = (𝒙 + 6)  4 Remain work done by (A+B) in 3 days =


𝟏
𝟓
5𝒙 = 4𝒙 + 24 𝟏
1 day work of (A+B) = 𝟏𝟓
𝒙 = 24
𝟏 𝟏 𝟏𝟎−𝟔
Work by (B) = 𝟏𝟓 - 𝟐𝟓 = 𝟏𝟓𝟎
𝟒
19. = 𝟏𝟓𝟎 work/day
Man+
𝟏
Female+ Time taken to complete work by B = 𝟒
Boy Man Boy 𝟏𝟓𝟎

3 6 18 𝟏𝟓𝟎 𝟏
= 𝟒
= 37 𝟐 days

6 3 1 𝟕 𝟑
22. Remaining work = 1 - 𝟏𝟎 = 𝟏𝟎
𝟑
(A+B) complete Remaining work ( ) part
𝟏𝟎
18 (Total work)
= 4 days
M+F+B=6
𝟏𝟎 𝟒𝟎
3+F+1=6 Total work = 4  =
𝟑 𝟑

F=2 𝟏
= 13 𝟑 days
𝟏𝟖
Total work done by F in = 𝟐
= 9 days
23. A+B B+C C+A
20. (3M + 4B)  12 = (4M + 3B) 10 72 120 90
36M + 48B = 40M + 30B
4M = 18B 5 3 4
𝑴 𝟗
𝑩
= 𝟐 (work Ratio)

Total work => (3  9 + 4  2)  12 360 (Total work)

= 35  12 = 420
(A+B) + (B+C) + (C+A) = 5 + 4 + 3
Work done by (2M + 3B) in day 2 (A + B + C) = 12
= 2  9 + 3  2 = 24 A+B+C=6
(A+B+C) work done in 3 days
= 3  6 = 18

Page | 22 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
𝟏𝟖 𝟏 = 9 + 6 + 4 = 19
Part of work done = =
𝟑𝟔𝟎 𝟐𝟎
Time taken by Ramesh, Sunil & Dinesh to
24. complete the work
A B
𝟐𝟒 𝟓
18 9 = 𝟏𝟗 = 1 𝟏𝟗 day

1 2 27. Let B work/day = 𝒙


A work/day = 3 𝒙
18
Time taken by A to complete work = D
(A+B) one day work = 3
𝟑 Time taken by B to complete work= D+60
Part of one day work = 𝟏𝟖
𝟏 (D + 60)  𝒙 = D  3𝒙
=𝟔
D + 60 = 3D
2D = 60
25.
A B D = 30
20 40
A B
30 90
2 1

3 1
40
(A+B) one day work = 3
90
(A+B) 5 day work = 5  3 = 15
(A+B) one day work = 4
Fraction of work by (A+B) in 5 days
Time taken by (A+B) to complete total
𝟏𝟓 𝟑
= 𝟒𝟎 = 𝟖 𝟗𝟎 𝟏
work = = 22 𝟐 days
𝟒
𝟑 𝟓
Work left = 1 - 𝟖 = 𝟖

28. Let B one hr. work = 𝒙


26. A work/hr. = 0.8 𝒙
Sunil Dinesh
4 6 B work/hr.  Time taken by B = A work/day
 Time taken by A
𝟏
6 4 𝒙  (B hr) = 0.8 𝒙  7 𝟐
𝟎.𝟖 𝒙 𝟏𝟓
B hr =  = 6 hr
24 𝒙 𝟐
𝟏
Ramesh = 1  Sunil
𝟐
𝟑
= 𝟐  6 = 9 work/day

One day work of Sunil, Dinesh & Ramesh

Page | 23 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
29. C A alone complete the work in
A B
𝟏𝟐𝟎
𝒙 - 10 𝒙 12 = 𝟓
= 24 days

𝑾𝒐𝒓𝒌 𝑾𝒐𝒓𝒌
31. =
𝑴𝒂𝒏 ×𝑫𝒂𝒚 ×𝑯𝒓. 𝑴𝒂𝒏 × 𝑫𝒂𝒚 × 𝑯𝒓
𝟏
𝒙 𝑾𝒐𝒓𝒌 𝒙 𝑾𝒐𝒓𝒌
𝟐
1 (Total work) = 𝟏
𝑩 ×𝒚 𝒅𝒂𝒚 𝑨 × 𝒚 𝒅𝒂𝒚
𝟔

𝟏 𝟏 𝟏
A (1 day work) = 𝒙−𝟏𝟎 A = B
𝟔 𝟐
𝟏
B (1 day work = 𝑨 𝟑
𝒙 =𝟏
𝑩
𝟏
A+B (1 day work) = 𝟏𝟐
(A+B) complete work in 10 days.
𝟏 𝟏 𝟏
+ = So that work = (3 + 1)  10 = 40
𝒙 𝒙−𝟏𝟎 𝟏𝟐
𝒙−𝟏𝟎+𝒙 𝟏
= If work done by (B)
𝒙𝟐 −𝟏𝟎𝒙 𝟏𝟐

24 𝒙 – 120 = 𝒙2 – 10𝒙 Then time required to complete the work


𝟒𝟎
𝒙2 – 34𝒙 + 120 = 0 = 𝟏
= 40 days
𝒙2 – 30𝒙 – 4𝒙 + 120 = 0
𝒙 = 30, 4 32. A B C
= 30 days 6𝒙 3𝒙 2𝒙

30. 3  B = (A + C) 1 2 3
𝑩 𝟏𝒙
𝑨+𝑪
= 𝟑𝒙 …. (1)

2  C = (A+B) 6 𝒙 (Total work)


𝑪 𝟏𝒚
=
𝑨+𝑩 𝟐𝒚 1 day work of (A+B+C) = 6
1𝒙 + 3𝒙 = 1y + 2y This work done by (A)
4𝒙 = 3y 𝟔
= = 6 days
𝟏
𝒙 𝟑
𝒚
=𝟒
𝑩 𝟑 33. Babu + Aasha
𝑨+𝑪
= 𝟗  12 (work of A, B, C)
𝑪 𝟒 7 day
𝑨+𝑩
= 𝟖  12 (work of A, B, C)

B=3 C=4
1 work/day
A = 12 – 7 = 5
Total work = (A+B+C)  10 days 7 work
= 12  10 = 120 work

Page | 24 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
𝟑 Work done by (A+B) in one day = 3 + 2 = 5
Asha = 1 𝟒 Babu
𝟑×𝟓×𝟖
Asha + Babu = 1 work Time taken by (A+B) = = 24 hr.
𝟓
𝟕 8 hr. in day
𝟒
Babu + Babu = 1 work
𝟐𝟒
𝟒 so Time taken in day = = 3 day
Babu = part of work 𝟖
𝟏𝟏
𝟒 𝟕
Asha = 1 - 𝟏𝟏 = 𝟏𝟏 part of work
37. 30 Man  16 days = 20 days  𝒙 Man
Then Asha can complete the work in
24 Man = 𝒙
𝟕
= 𝟕 = 11 days
𝟏𝟏

38. A+B A+C


B+C
34. 8 12 16
A B C
20 30 60
18 12 9

3 2 1
144 (Total work)

60 (Total work)
2 (A + B + C) = 39
𝟑𝟗
1 day (A)  3 (A + B + C) 1 day work = 𝟐
2 day (A)  3 Total work done by (A+B+C)
3 day (A+B+C)  6 𝟏𝟒𝟒 𝟏𝟒𝟒 × 𝟐 𝟗𝟔
= 𝟑𝟗 = =
𝟑𝟗 𝟏𝟑
𝟐

𝟓
3 days work  12 =7
𝟏𝟑
day
5 5
15 days work  60 work 39. days worked =
𝟗𝟖𝟎𝟎
= 28 days
𝟑𝟓𝟎
= 15 days

40.
𝟐 𝒘𝒐𝒓𝒌 𝟏𝟎𝟎 𝒘𝒐𝒓𝒌
35. =
𝟐 𝒎𝒂𝒏 × 𝟐 𝒅𝒂𝒚 𝟏𝟎𝟎 𝒎𝒂𝒏 × 𝒙 𝒅𝒂𝒚 A A+B
𝒙 = 2 days 12 8

2 3
36. A  5  8 = B  6  10
𝑨 𝟔 × 𝟏𝟎 𝟑 24
𝑩
= 𝟓× 𝟖
=𝟐

A + B = 3 work
Total work = 3  5  8 A = 2 work

Page | 25 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
B = 1 work 44. A = 1.5 B
24 total work B
B complete total work in 20 days

=
𝟐𝟒
= 24 days   1 work per day
𝟏
 20 Work

41. 12 male  10 days = 8 days  𝒙 man  B = 1 work per day

𝒙=
𝟏𝟐 ×𝟏𝟎
= 15 man  A = 1.5 work per day
𝟖
 A+B = 2.5 work per day

42.  Then time required to complete the job


A+B A 𝟐𝟎
𝟑 9  = = 8 days
6 𝟐.𝟓
𝟒

4 3 45. Let No. of People = 𝒙


𝒙  24 = (𝒙 – 9)  32
27
24 𝒙 = 32 𝒙 – 9  32
A + B = 4 work/day
A = 3 work/day 9  32 = 8 𝒙
B = 1 work/day 𝒙 = 36 man
B complete total work in
𝟐𝟕
= 𝟏 = 27 days
A+B B+C
10 18
43. A B A+B+Boy
6 8 3 9 5

4 3 8 90

46. M1 D1 H1 = M2 D2 H2
24 (Total work)
A = 4 work/day B = 3 work/day 5  60 min. = 12  H2
𝟓 × 𝟔𝟎
C = 8 – (4+3) = 1 work/day H2 = = 25 min
𝟏𝟐
Ratio of their share is 4 : 3 : 1
4 𝒙 + 3 𝒙 + 1 𝒙 = 600
8 𝒙 = 600
𝒙 = 75 Rs.
Boys pay = 1 𝒙
= 75  1 = 75 Rs.

Page | 26 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
47. 50.
A B A+B B+C
10 15 12 16

3 2 4 3

30 48
A + B = 5 work/day
2 days work of (A+B) A5
B5+ 2
= 5  2 = 10
C 2 + 11
Remaining work = 30-10 = 20
Remaining work is done by A
(A + B) worked 5 days = 5  4 = 20
𝟐𝟎 𝟐
in = 𝟑
= 6 day 𝟑 (B + C) worked 2 days = 2  3 = 6
Remaining work = 48 – (20 + 6) = 22
48. C (complete remaining work in 11 day)
I you = 22
8 10 1 day = 2 work
C complete total work in
5 𝟒𝟖
4 = = 24 days
𝟐

40
51. A’s share = Rs. 250

1 day work of I and you = 5 + 4 = 9 B’s share = Rs. 100

I and you can complete the whole work in It means the ratio of efficiency of A : B
𝟒𝟎 𝟒 = 250 : 100 = 5 : 2
= 𝟗
= 4 𝟗 days
 Ratio of days taken by A and B= 2𝒙 : 5𝒙
Now, 5𝒙 – 2𝒙 = 9 ⇒ 𝒙 = 3
49. M1 D1 H1 = M2 D2 H2
  Number of days taken by A = 6
24  8  10 = 10  6  Man
(efficiency = 16.66%)
Man = 32
 Number of days taken by B = 15 (efficiency
= 6.66%)
 Therefore number of days taken by A and
𝟏𝟎𝟎 𝟑𝟎𝟎 𝟐
B, working together = 𝟐𝟑.𝟑𝟑 = 𝟕𝟎
= 4 𝟕 days

Page | 27 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet

52.
𝟐
A  work  = 6 days 1st digger day in 1 hr = 5  3 = 15m
𝟑

A = 9 days / complete work


𝟏 54. Renu+Usha Usha Renu
B  𝟑 work = 8 days 𝒙 𝒙 + 8 𝒙 + 4.5
B = 24 days (complete work) 𝟏 𝟏 𝟐
𝒙
= 𝒙 + 𝟖 + 𝟐𝒙 + 𝟗
𝟑
C  𝟒 work = 12 days 𝟐𝒙 + 𝟗 + 𝟐 𝒙 + 𝟏𝟔 𝟏
=𝒙
𝟐𝒙𝟐 +𝟗𝒙+𝟏𝟔𝒙+𝟕𝟐
C = 16 days (complete work)
𝟒𝒙 + 𝟐𝟓 𝟏
=𝒙
𝟐𝒙𝟐 +𝟗𝒙+𝟏𝟔𝒙+𝟕𝟐
A B C 4𝒙2 + 25𝒙 = 2𝒙2 + 25𝒙 + 72
9 24 16
2𝒙2 = 72
𝒙=6
16 6 9
= 6 + 4.5 (Total time)
= 10.5 hr.
144 (Total work) 55.
(A+B+C) in 4 days
= (16 + 9 + 6)  4 = 124 A B
Remaining work = 144 – 124 = 20 12 24

Remaining work done by B in


𝟐𝟎 2 1
= 𝟔
= 3.33 days

24
st
53. Let 1 digger day = 𝒙 A+B=3
2nd digger day = 𝒙 + y Work in 4 days = 3  4 days
3rd digger day = 𝒙 + 2y = 12
𝒙  14 = (𝒙 + 2y)  10 Work Ratio => 𝟐𝟒 = 𝟐
𝟏𝟐 𝟏

14 𝒙 = 10 𝒙 + 20y
4 𝒙 = 20y 56. B A
𝒙 𝟓
= 𝟏
𝒚 𝟏 𝒙 𝟔
𝒙
Ratio of work 𝟏
1 work 𝟐
work
5k : 6k : 7k
𝟏 𝟏
B𝒙=A𝟔𝒙+A𝟔𝒙
Total work in 6 days = 324
𝟏
1 day = 54 B𝒙 = A  𝟔  2 𝒙
5k + 6k + 7k = 54 𝑩 𝟏
𝑨
=𝟑
18k = 54
(A+B) in 10 days
k=3
(1+3)  10 = 40 total work

Page | 28 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
𝟒𝟎 𝒙 = 6,000
Work done by B = 𝟏
= 40
A = 2 𝒙 = 6000  2 = 12000

57. A+B
30 60.

work/day A B A+B+C
8 12 4
30
(A+B) work for 20 days = 20 work
3 2 6
Remaining work = 30 – 20 = 10 work
A complete work in 20 days = 10
𝟏𝟎 𝟏 24 (Total work)
1 day = 𝟐𝟎 = 𝟐 work

A can complete the total work in A=3


𝟑𝟎
= 𝟏 = 60 days B=2
𝟐
C = 6 – (3 + 2)
58.
=1
A A+B
Ratio of Amount
18 days 9 days
3:2:1
3 𝒙 + 2 𝒙 + 1 𝒙 = 4500
1 2
6 𝒙 = 4500
18 𝒙 = 750
C Part = 1 𝒙 = 750
(A+B) 1 day = 3 work
𝟑 𝟏
Ratio of work = = work/day 61.
𝟏𝟖 𝟔
A+B C
59. 10 50

A B
15 5 1
10

50
2 3 A=B+C
A+B=5
30
Ratio of work = Ratio of Amount A–B=1

2:3 2A = 6

2 𝒙 + 3 𝒙 = 30,000 (A = 3)

5 𝒙 = 30,000 A+B=5

Page | 29 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
B=5–3=2 64.
B can complete the work P+Q Q+R R+P
𝟓𝟎 12 15 20
= 𝟐
= 25 days

5 4 3
62.

A B+C A+C 60 (Total


4 3 2 P + Q + Q + R + Rwork)
+P
=5+4+3
3 4 6 2 (P + Q + R) = 12
P+Q+R=6
12 (Total work) Q+R=4
A=3 P+4=6
A+C=6 P=2
C=3 P can complete whole work in
B+C=4 𝟔𝟎
= 𝟐
= 30 days
B=1
B can complete whole work in
65.
𝟏𝟐
= = 12 hr.
𝟏 A B C
24 9 12
63.
A B 3 8 6
20 12
72 (Total work)
3 5 (A+B+C) = 17
(A+B+C) work for 3 days
60
= (3 + 8 + 6)  3 = 51
A = 3 work/day
Remaining work = 72 – 51 = 21
B = 5 work/day
Remaining work is done by A
A work 4 day = 4  3 = 12
𝟐𝟏
In = 7 days
Remaining work = 60 – 12 = 48 𝟑

Remaining work done by (A+B) in


𝟒𝟖
= 𝟖
= 6 days

Total days = 6 + 4 = 10 days

Page | 30 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
66. 𝟏𝟐
Complete work (A+B) = = 4 days
𝟑
A+B B+C C+A A work in 4 day = 4  2 = 8
72 120 90
Part of work done by A
𝟖 𝟐
= 𝟏𝟐 = 𝟑
5 3 4

69.
360 (Total work)
2 (A+B+C) = 5 + 3 +4 A+B B+C C+A
30 24 20
A+B+C=6
- (B + C = 3)
4 5 6
A = 6 – 3 = 3 work/day
𝟑𝟔𝟎
A can complete work in = 𝟑
= 120 days
120 (Total work)
2 (A+B+C) = 15
67. 𝟏𝟓
A+B+C =
𝟐
A+B B+C C+A
72 B+C = 5
120 90
A = 7.5 – 5
= 2.5 work/day
5 3 4
𝟏𝟓
(A+B+C) work for 10 days = 10  𝟐
= 75

360 (Total work) Remaining work = 120 – 75 = 45


Remaining work is done by A in
2 (A+B+C) = 12 𝟒𝟓
= = 18 days
𝟐.𝟓
A+B+C = 6
70.
3 days work of (A+B+C) = 6  3 = 18
A B A+B+C
𝟏𝟖 𝟏
Part of work = 𝟑𝟔𝟎 = 𝟐𝟎 25 10 6.25

68. 2 5 8
A B
6 12 50 (Total work)
A+B+C = 8
2 1 C = 8 – (5 + 2)
C=1
12 𝟓𝟎
C complete whole work in = 𝟏
= 50 days
A+B = 3 work/day

Page | 31 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
𝟏 𝟕 𝟕 𝟔𝟕
71. A=B =7 +5 +2= boys
𝟐 𝟐 𝟓 𝟐
𝑨 𝟏
= (𝟐)  𝟐 =
𝟐 𝟐 Now, B1  D1 = B2  D2
𝑩 𝟒
𝟔𝟕
𝟏 7  469 =  D2
C = (A+B)  𝟐
𝟐

𝑪 𝟏 𝟑 ⇒ D2 = 98 days
𝑨+𝑩
= (𝟐)  𝟔
𝑨 𝟐
𝑩
=𝟒 74. (A+B) in 4 days = 𝟏𝟎
𝟑

𝑪 𝟑
= (A+B) 1 work =
𝟒 ×𝟏𝟎
=
𝟒𝟎 𝟏
= 13 𝟑 days
𝑨+𝑩 𝟔
𝟑 𝟑

A=2 B=4 C=3 75.


C complete work in 20 days
A B
Total work = 20  3 = 60 12 15
A+B+C = 2 + 4 + 3 = 9
A+B+C can complete the whole work in 5 4
𝟔𝟎 𝟐𝟎 𝟐
= 𝟗
= 𝟑
= 6 days𝟑
60
72.
A B
(A+B) = 9 (one day work)
20 40
4 day work of (A+B)
= 9  4 = 36
2 1
Remaining work = 60 – 36 = 24

40 B complete the remaining work in


𝟐𝟒
A = 2 (First term) = = 6 days
𝟒
B = 1 (Second term)
2 days work = 3 76.
 13  13 A A
26 days 39 work 28 35
+½ (done by A) +1 work
26 ½ day = 40 5 4
th
So the work will be done on 27
140
𝟕 A work/ day = 5
73. 2 men = 7 boys ⇒ 1 man = 𝟐 boys
B work/ day = 4
𝟕
5 women = 7 boys ⇒ 1 woman = 𝟓 boys
(A+B)  𝒙 day + B  17 = total work
7 men + 5 women + 2 boys (5+4)  𝒙 + 17  4 = 140

Page | 32 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet

9  𝒙 = 140 – 68 = 72 Son complete the whole work in


𝟕𝟐 𝟏𝟓 𝟏
𝒙= = 8 days = 𝟐
= 7 𝟐 day
𝟗

so A left the work after 8 days.


80. M = 5 work/day
77. Women  hours = 8  10 = 80 women hours W = 4 work/day

Now, women  hours = 12  8 = 96 women B = 2 work/day

hours Total work = (3W + 2M + 4B)  10


Since new work force is 20% greater than = (2  5 + 3  4 + 4  2)  10
previous work force. = 300
So, the new quantity of tea leaves will be 10 hectare = 300
𝟑𝟎𝟎
increased by 20% which is equal to 16 hectare = 𝟏𝟎
 16 = 480
𝟐𝟎
200  𝟏𝟎𝟎
= 40 kg., hence (b) Now we have = 6 m + 4B + 7B
=65+44+72
78. = 30 + 16 + 14 = 60
A B C They complete the total work in
24 6 12 𝟒𝟖𝟎
= = 8 days
𝟔𝟎

1 4 2
81. Boy 3 Min.  4 lit.
4 4
24 (Total work)
12 Min.  16 lit.

A+B+C = (1+4+2) work/day


Girl 4 Min  3 lit.
Time taken by A, B, C together to complete
𝟐𝟒 𝟑
3  3
the work = 𝟕
= 3𝟕 days
12 Min. 9 lit.
79. (Girl + Boy) 12 Min.  25 lit.
Man Man+Son Total work 100 lit. in
5 3 𝟏𝟎𝟎
 𝟐𝟓
 12 = 48 min.

3 5
82. (2M + 1F)  14 = (4F + 2M)  8
15 28M + 14F = 32F + 16M
Man + Son = 5 work/day 12M = 18F
- Man = 3 work/day 𝑴 𝟏𝟖
𝑭
= 𝟏𝟐
Son = 2 work/day
Ratio of work = Ratio of Money they get

Page | 33 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
𝟑
=
𝟔𝟎𝟎
Mala = 2  Jyoti
𝟐 𝑭
𝟐 = 2 work/day
F = 600  𝟑 = 400
Mala finish all work in
𝟏𝟔
= 𝟐
= 8 days
83. Let total No. of peoples = 𝒙
𝒙  50 = 𝒙  10 + (𝒙 + 500)  35
87.
40 𝒙 = 35 𝒙 + 35  500
Ganga Saraswati
5 𝒙 = 35  500
8 12
𝒙 = 3500

3 2
84. 3 ½ km. Road in = 80  280
𝟖𝟎 × 𝟐𝟖𝟎
Total 5 km. = 𝟏 5 24
𝟑
𝟐
Ganga = 3
𝟖𝟎 × 𝟐𝟖𝟎 × 𝟐
= 5 Saraswati = 2
𝟕

Work remain = 32000 2 hr.  5


𝟑𝟐𝟎𝟎𝟎 𝟏.𝟓 4 4
1 ½ km. =  = 9600
𝟓 𝟏𝟎
8 hr  20 work
This work is complete in 20 days + 1 hr (ganga)  + 3
(Remaining) 9 hr 23 work
𝟗𝟔𝟎𝟎 𝟐
 𝟐𝟎
= 480 (people required) 9½ hr.  23 + 𝟐 = 24 work
More people needed to finish the work Time required = 9:30 hr
= 480 – 280 So the time
= 200 = 9:00 am + 9:30 hr
= 6:30 pm
85. 𝒙  30 = (𝒙 +6)  20
30 𝒙 = 20 𝒙 + 120 88. 12M  90 = 1080M total work
10 𝒙 = 120 30M  12 + 18M  𝒙 = 1080M
𝒙 = 12 Man
18M  𝒙 = (1080 – 360)M

𝟑 18M  𝒙 = 720M
86. Jyoti 𝟒 park of work = 12 days
𝒙 = 40 days
𝟒
Jyoti 1 work in = 12  = 16 days 𝟑

Jyoti 𝟏
89. Time 𝜶 𝒆𝒇𝒇𝒊𝒄𝒊𝒆𝒏𝒄𝒚
16 days 𝟐
Efficiency = 𝟑
  work/day
𝟑
16 work So time Ratio =
𝟐

Page | 34 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
90. 𝟏 𝟑
George (5 hr) = 
𝟐 𝟒
M M+B 𝟒𝟎
George complete whole work in = 𝟑
30 20
John Joe George
𝟒𝟎
2 3 6 8 𝟑

60 20 15 9
M+B=3
M=2
120 (Total work)
B=1
One day work of John + Joe + George
Boy complete the work in
= 20 + 15 + 9 = 44
𝟔𝟎
= 𝟏
= 60 hr. They complete whole work in
𝟏𝟐𝟎 𝟖
= 𝟒𝟒
= 2 𝟏𝟏 day
91. 𝒙 (20 hr) = 80 page
𝒙 (1 hr) = 4 page/hr 𝟐
94. Work  𝟓 = 35  32
(𝒙 + y)  27 = 135 page
𝟓
27  4 + y  27 = 135 Total work = 35  32 
𝟐

y  27 = 135 – 108 = 27 = 2800


𝟑
𝟐𝟕
y = 𝟐𝟕 = 1 page/hr Remaining work = 2800  𝟓 = 5603 = 1680

y required to Read 20 page Remaining time = 60–32 = 28 days


𝟐𝟎 No. of people total need to complete work
= = 20 hr.
𝟏
𝟏𝟔𝟖𝟎
= = 60
𝟐𝟖

92. A  18 = A  12 + B  8 No. of people more required

A6=B8 = 60 – 35 = 25
𝑨 𝟒 95.
𝑩
=𝟑
A+B+C A+C A+B
Total work = 18  4 = 72 8 12 13 𝟏𝟑 (𝟒𝟎 )
𝟑
Time required to complete whole work
𝟕𝟐
by B = = 24 days 15 10 9
𝟑

93. John (3 hr) = ½ work 120 (Total work)


Total work by John in = 6 hr. A + B + C = 15 A + B + C = 15
𝟏 𝟏 - (A + C = 10) - (A + B = 9)
Joe (1 hr.) = 𝟐  𝟒 work
B = 5 C= 6
Joe complete the whole work in = 8 hr.

Page | 35 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
Time & Work - Practice Sheet
A + B + C = 15 Ratio of their efficiency
A + 5 + 6 = 15  4:8:3
A = 15 – 11 = 4
Ratio of Money will be divided 𝟐
99. (A+B)  10 = (2A + B  𝟑)  6
4:5:6
10 A + 10B = 12 A + 4B
6B = 2A
96. 𝑨 𝟑
𝑩
=𝟏
R J S
5 7 9 Total work = (A+B)  10 = (3+1)  10 = 40
𝟒𝟎
Total work done by A in 𝟑
63 45 35 𝟒𝟎
Total work done by B in = 𝟏

= 40 days
5  7  9 (Total work)
Ratio of efficiency in Ratio of share
100. Let total work = 5
63 : 45 : 35
𝟑
Work done by (A+B) = 5  = 3
63 𝒙 + 45 𝒙 + 35 𝒙 = 2860 𝟓

143 𝒙 = 2860 Work done by C = 5 – 3 = 2


𝒙 = 20 Ratio of work = 3 :2

Share of Raman = 63 𝒙 = 63  20 A+B C

= 1260 Amount divide in that Ratio so


3 𝒙 + 2 𝒙 = 5000
𝑨+𝑩 𝟔𝟎 𝟔 𝒙 = 1000
97. 𝑨+𝑩+𝑪
= 𝟏𝟎𝟎 = 𝟏𝟎
C get their share
𝑩+𝑪 𝟕𝟎 𝟕
= 𝟏𝟎𝟎 = 𝟏𝟎
𝑨+𝑩+𝑪 = 2  1000 = 2000
A + B + C = 10 A + B + C = 10
- A+B = 6 - B+C= 7
C= 4 A = 3
A + B + C = 10
B=3
So C is most efficient.

98. 10F  6 = 6M  5 = 8B  10
𝟔𝟎𝑭 𝟑𝟎𝑴 𝟖𝟎𝑩
𝟐𝟒𝟎
= 𝟐𝟒𝟎
= 𝟐𝟒𝟎
(divide all by 240 lcm)
𝑭 𝑴 𝑩
= =
𝟒 𝟖 𝟑

Page | 36 Subscribe Youtube Channel :- https://bit.ly/3pZEj4m The Winners Institute Indore


Download Winners App :- https://bit.ly/3jGfBlP Contact Number - 9009335533
T. W. I.
The

WiNNERS
Institute

The Winners Institute


(We Shape the Winners of Tomorrow)

Our Courses
SSC Bank Railway MPPSC
Sub Inspector Constable
CET and all Competitive Exams

Follow
The Winners Institute
CLICK HERE
CLICK HERE
CLICK HERE
CLICK HERE
T. W. I.
The

WiNNERS
Institute

Winners Institute App CLICK HERE

For Online Course Enquiry Å Call - 9009335533

You might also like