MCPI-REBAR CBQrev3.0.42018N
CBQ #: 35A
SUBJECT: MAINBARS FOR CHB (39TH, 42ND, 43RD)
COMMERCIAL
MEMBER/ BEND BEND BEND BEND TOTAL WT (CUT TOTAL WT (COMM.
GRID LINE FLR. LEVEL BAR DESC BAR Ø CUT LEN #PCS SETS TOTAL PCS WT / LM
STRUCTURE END1 LEN1 END2 LEN2 PCS/B QTY LEN LENGTH) CUT)
- - -
TOWER 39TH,42ND,43RD CHB MAINBAR 10 3 70 1 70 3 23.3 9.00 0.616 129.36 129.36
MAINBAR 12 3 357 1 357 3 119.0 9.00 0.888 951.05 951.05
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
TOTALS : 1,080.41 kg 1,080.41 kg
WASTE: 0.3%
SUMMARY:
COMMERCIAL LENGTHS Note: 1. Commercial length adjustment is cm.
BAR Ø 9 10.5 12 13.5 15 UNIT WT. TOTAL WEIGHT 2. If in case cut length can be acquired from multiple
10 mm 24 0 0 0 0 0.616 133.06 lengths such as 9.0m, 10.5m, 12.0m, 13.5m, & 15.0m,
12 mm 119 0 0 0 0 0.888 951.05 prefered commercial length is m.
16 mm 0 0 0 0 0 1.578 -
20 mm 0 0 0 0 0 2.466 -
25 mm 0 0 0 0 0 3.853 -
28 mm 0 0 0 0 0 4.834 -
32 mm 0 0 0 0 0 6.313 -
36 mm 0 0 0 0 0 7.990 -
TOTAL 1,084.10
Page 4 of 7
1
Cayetano Avenue, C5 Tipas,
Road, Brgy. Extension, Diversion 888
628-8228 )02Palingon,
( Taguig City
BUDGET CODE WORK ITEM QTY. UNIT LABOR UNIT COST TOTAL COST
-
REBAR WORKS -
INSTALLATION OF GRADE 60 REBARS -
Elevator and Shear Wall Main Bar 71,595.80 kgs 2.21 158,226.72
INSTALLATION OF GRADE 40 REBARS -
Elevator and Shear Wall Ties 28,999.92 kgs 2.21 64,089.82
REBAR HAULING AT JOBSITE -
Hauling 100,595.72 kgs 0.11 11,065.53
GRAND TOTAL 233,382.07
JOB SITE PCD Management
Prepared by: Checked by: Checked by: Validated by: Approved by:
CBQ #:
SUBJECT:
SUMMARY:
COMMERCIAL LENGTHS Note: 1. Commercial length adjustment is cm.
BAR Ø 9 10.5 12 13.5 15 UNIT WT. TOTAL WEIGHT 2. If in case cut length can be acquired from multiple
10 mm 0 0 0 0 0 0.616 - lengths such as 9.0m, 10.5m, 12.0m, 13.5m, & 15.0m,
12 mm 0 0 0 0 0 0.888 - prefered commercial length is m.
16 mm 0 0 0 0 0 1.578 -
20 mm 0 0 0 0 0 2.466 -
25 mm 0 0 0 0 0 3.853 -
28 mm 0 0 0 0 0 4.834 -
32 mm 0 0 0 0 0 6.313 -
36 mm 0 0 0 0 0 7.990 -
TOTAL 0.00 kg
Page 6 of 7
MCPI-REBAR CBQrev3.0.42018N
CBQ #:
SUBJECT:
COMMERCIAL
MEMBER/ BEND BEND BEND BEND TOTAL WT (CUT TOTAL WT (COMM.
GRID LINE FLR. LEVEL BAR DESC BAR Ø CUT LEN #PCS SETS TOTAL PCS WT / LM
STRUCTURE END1 LEN1 END2 LEN2 PCS/B QTY LEN LENGTH) CUT)
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
TOTALS : 0.00 kg 0.00 kg
WASTE:
SUMMARY:
COMMERCIAL LENGTHS Note: 1. Commercial length adjustment is cm.
BAR Ø 9 10.5 12 13.5 15 UNIT WT. TOTAL WEIGHT 2. If in case cut length can be acquired from multiple
10 mm 0 0 0 0 0 0.616 - lengths such as 9.0m, 10.5m, 12.0m, 13.5m, & 15.0m,
12 mm 0 0 0 0 0 0.888 - prefered commercial length is m.
16 mm 0 0 0 0 0 1.578 -
20 mm 0 0 0 0 0 2.466 -
25 mm 0 0 0 0 0 3.853 -
28 mm 0 0 0 0 0 4.834 -
32 mm 0 0 0 0 0 6.313 -
36 mm 0 0 0 0 0 7.990 -
TOTAL -