A232 - Project Guideline
A232 - Project Guideline
COURSE ASSESSMENT:
COURSEWORK MARKS
QUIZES (INDIVIDUAL):
ASSIGNMENT:
FINAL EXAM:
- Face to face
50%
- Comprehensive (Chapter 1-9)
TOTAL MARKS 100%
1
PROJECT GUIDELINE
BKAM3063 OPERATION AND PROJECT
MANAGEMENT
A232: FIRST SEMESTER (MARCH) 2023/2024
Not any groups can do the same project’s title, thus approval is given
based on “first come first serve” basis.
You can propose of any project, but avoid new product development and
construction project which requires high technicalities. Developing new
service project is acceptable.
ITEM SPECIFICATIONS
Font’s size 12
Font’s type Verdana
Spacing Double
Paper size A4
Margin:
Top 1”
Bottom 1”
Left 1.5”
Right 1.25”
Header 0.5”
Footer 0.5”
Microsoft Word
2
The PID should include the following items:
The written PID SHOULD also include the following sections: TABLE OF
CONTENT (complete format with BOTTOM-CENTRALIZED page
number), REFERENCES and APPENDIX.
Deadline to submit the written PID is on the 23rd MAY 2024 (THURSDAY)
before 0300pm:
Hardcopy : through the box outside lecturer’s room.
Softcopy : through the one drive link that will be provided.
3
GROUP PROJECT 2: OPERATION MANAGEMENT
Please take note that, the contents of your conference paper could be
in the following:
✓ Research paper - content Introduction, Literature review,
Research Methodology, Findings, Conclusion and
Recommendation as per research paper example provided.
✓ Conceptual paper – Flexible that depends on your contents.
4
PROJECT 1 AND PROJECT 2 PRESENTATION
PROJECT 1
PROJECT 2
Each group must prepare the presentation slides (by using the Microsoft
Power Point or other presentation software).
Each group must provide a printed copy of the presentation slides to the
lecturer during the presentation session (in class).