Abstract Schedule G
Abstract Schedule G
Name of the Project: 4 Laning from km 585.930 (Design Chainage 585.820) to km 628.555 (Design Chainage 630.960) - Design Length=45.140 Km of Mydukur – Badvel
Section of NH-67 on Hybrid Annuity Mode under Bharatmala Pariyojna, in the state of Andhra Pradesh.
4 Bituminous work - - -
5 Rigid Pavement
7 Widening and repair of Minor Bridges No. 4.00 0.21% 17,850,294 4,462,573
B- New realignment/bypass
4 Bituminous work -
4 Pedestrain Overpasses
(a) Underpass
iii Super-structure (including Crash Barriers etc. complete) No. 8 0.36% 31,557,925 3,944,741
iii Super-structure (including Crash Barriers etc. complete) No. 18 1.60% 138,917,875 7,717,660
Contract Price Weightage as per Annexure - I of Schedule - G
Total Project Cost
Item Ref.No. Stage for measurement of physical Progress Unit Qty % Weightage Unit Rate (Rs.) Remarks
(Rs.)
(b) Overpass
( c) Flyover
iii Super-structure (including crash barriers etc. complete) No. 14 1.29% 111,440,235 7,960,017
Contract Price Weightage as per Annexure - I of Schedule - G
Total Project Cost
Item Ref.No. Stage for measurement of physical Progress Unit Qty % Weightage Unit Rate (Rs.) Remarks
(Rs.)
1 Foundation
(a) ROB
(b) RUB
1 Foundation
3 Super-structure (including crash barriers etc. complete) No. 21.00 1.81% 157,139,110 7,482,815
D New-rail-road bridge
(a) ROB
(b) RUB
5 Project facilities
(a) Bus bays No. 12.00 0.42% 36,180,385 3,015,032
(b) Truck lay-byes No. - 0.00% - -
( c) Rest areas No. - 0.00% - -
6 Repair / Rehabilitation of Existing Major Bridges No. 1.00 0.09% 7,500,084 7,500,084
7 Road side plantation Km 16.97 0.26% 22,574,573 1,330,264
8 Protection works
(a) Boulder Pitching on Slopes Km - 0.00% - -
Other Works
(b) Toe/Retaining wall Km 10.264 2.55% 221,022,593 21,533,768
9 Tunnel
(a) Excavation Metre - 0.00% - -
Construction of Support system including rock bolting,
(b) Metre - 0.00% - -
lining etc.
10 Miscellaneous Works
(a) Highway Electrical Works Km 90.28 0.51% 44,015,672 487,546
4 Bituminous work - - -
5 Rigid Pavement
7 Widening and repair of Minor Bridges No. 4.00 0.21% 14,798,020 3,699,505
B- New realignment/bypass
4 Bituminous work -
4 Pedestrain Overpasses
(a) Underpass
iii Super-structure (including Crash Barriers etc. complete) No. 8 0.36% 26,161,743 3,270,218
5 of 15
Schedule - G
Name of the Project: 4 Laning from km 585.930 (Design Chainage 585.820) to km 628.555 (Design Chainage 630.960) - Design Length=45.140 Km of Mydukur –
Badvel Section of NH-67 on Hybrid Annuity Mode under Bharatmala Pariyojna, in the state of Andhra Pradesh.
iii Super-structure (including Crash Barriers etc. complete) No. 18 1.60% 115,163,901 6,397,994
(b) Overpass
( c) Flyover -
iii Super-structure (including crash barriers etc. complete) No. 14 1.29% 92,384,743 6,598,910
1 Foundation
(a) ROB
(b) RUB
1 Foundation
3 Super-structure (including crash barriers etc. complete) No. 21.00 1.81% 130,269,434 6,203,306
D New-rail-road bridge
(a) ROB
(b) RUB
6 of 15
Schedule - G
Name of the Project: 4 Laning from km 585.930 (Design Chainage 585.820) to km 628.555 (Design Chainage 630.960) - Design Length=45.140 Km of Mydukur –
Badvel Section of NH-67 on Hybrid Annuity Mode under Bharatmala Pariyojna, in the state of Andhra Pradesh.
1 EHT Line Km - - -
7 of 15
VUP
Type of
S No Chainage Component Side Nos Remarks
Structure
Foundation A1 & A2 4
1 586702 VUP Substructure A1 & A2 4
Superstructure A1 & A2 2
Foundation A1 & A2 8
2 589928 VUP Substructure A1 & A2 8 With SR
Superstructure A1 & A2 4
Foundation A1 & A2 4
3 592470 VUP Substructure A1 & A2 4
Superstructure A1 & A2 2
Foundation A1 & A2 4
4 603030 VUP Substructure A1 & A2 4
Superstructure A1 & A2 2
Foundation A1 & A2 4
Girder
5 622180 VUP Substructure A1 & A2 4
Type
Superstructure A1 & A2 2
Foundation A1 & A2 4
6 623510 VUP Substructure A1 & A2 4
Superstructure A1 & A2 2
Foundation A1 & A2 4
Girder
7 628933 VUP Substructure A1 & A2 4
Type
Superstructure A1 & A2 2
Foundation A1 & A2 4
Girder
8 630430 VUP Substructure A1 & A2 4
Type
Superstructure A1 & A2 2
ABS
Foundation 36
Substructure 36
Superstructure 18
LVUP
Foundation BHS 2
1 587820 LVUP Substructure BHS 2
Superstructure BHS 2
Foundation BHS 2
2 598610 LVUP Substructure BHS 2
Superstructure BHS 2
Foundation BHS 2
3 626720 LVUP Substructure BHS 2
Superstructure BHS 2
Foundation BHS 2
4 627638 LVUP Substructure BHS 2
Superstructure BHS 2
ABS
Foundation 8
Substructure 8
Superstructure 8
Foundation Sub Str Super Str
Flyover SIDE
No's No's Span's
LHS 3 3 2
589+422 (2x30)
RHS 3 3 2
LHS 4 4 3
593+845 ( 2x20 +1x30)
RHS 4 4 3
LHS 3 3 2
624+620 ( 2x25)
RHS 3 3 2
Total 20 20 14
MNB-WIDENING
Type of Type of
S No Chainage Component Side Nos
Structure Construction
1 605+380 MNB Widening up to slab BHS 2
2 605+574 MNB Widening up to slab BHS 2
4
At Grade Minor Junctions
Existing
S. Design Side (Left/ Right/ Type of
Chainage
No. Chainage (km) Both) Junction
(km)
1 586.650 586.650 Left Y
2 591.715 592.475 Right T
3 591.750 592.500 Left Y
4 593.130 593.890 Both +
5 594.970 595.730 Right T
6 596.165 596.925 Left T
7 596.835 597.595 Left T
8 596.950 597.700 Left Y
9 598.575 599.500 Left Y
10 602.085 603.030 Both X
11 603.490 604.460 Left Y
12 604.160 605.130 Left T
13 610.295 611.265 Left T
14 612.385 613.355 Left T
15 619.140 620.095 Right T
16 619.200 620.155 Left T
17 621.065 622.015 Left T
18 621.225 622.180 Right T
19 622.400 623.350 Right Y
Badvel
21 628.440 Both +
Bypass
Badvel
22 630.450 Left T
Bypass
23 628.250 630.650 Right Y
Grade Separated Intersections:
(a) Major Junctions:
Existing Type of
S. Design Type of Cross
Chainage Structure
No. Chainage (km) Road
(km) Proposed
Mydukur
24 586.700 Existing NH-67 VUP
Bypass
Mydukur
25 589.450 NH-40 Flyover
Bypass
Mydukur
26 592.470 Existing NH-67 VUP
Bypass
27 602.057 603.030 Other Road VUP
Badvel
28 623.485 Existing NH-67 VUP
Bypass
Badvel
29 630.432 Existing NH-67 VUP
Bypass
(b) Minor Junctions:
Existing Type of
S. Design Type of Cross
Chainage Structure
No. Chainage (km) Road
(km) Proposed
30 593.100 593.860 Other Road Flyover
31 621.225 622.180 Other Road VUP
Badvel
32 628.475 Other Road Viaduct
Bypass
Plantation
S.No TCS Length Remarks
1 2A 1.9
2 2B 1.85
3 3 0.55
4 4 11.39
5 7 0.15
6 8 1.13
16.97
Destination
Yellampalle-Annalur Road
To Bovillavaripalle
Other Road with Pond