MS Structure Works

The document outlines a construction project schedule with 29 tasks over several months in 2023 and 2024. It includes tasks like site clearance, material submittals, installation of built-up sections, and shop drawings, with associated start and end dates.

Uploaded by

Hassan raxa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Engineeric Construction Services

ID Task Task Name Duration December


Start 2023 January 2024 February 2024 March 2024 April 2024
Mode 18 23 28 2 7 12 17 22 27 1 6 11 16 21 26 2 7 12 17 22 27 1 6
1 ADAMJEE INSURANCE M.S STRUCTURE WORK 90 days? 1/1/2024
2 Mobilization 6 days 1/1/2024
3 Site Clearance 4 days 1/1/2024
4 Site office 2 days 1/5/2024
5 As-Built 16 days? 1/1/2024
6 Existing Detail & Dimensioning 3 days 1/1/2024
7 Dismantling of Existing Structure 5 days 1/4/2024
8 Inspection of work 1 day? 1/9/2024
9 Hidden Elements 2 days 1/10/2024
10 Removal of Existing False Ceiling 5 days 1/12/2024
11 Material Submittals 8 days 1/17/2024
12 Transportation for Hot Rolled section to Site of 2 days 1/17/2024
Work
13 Shifting Section @ 10th Floor 6 days 1/19/2024
14 Installation of Buil-up Section 40 days 1/6/2024
15 Fixing of Angels & Plates 13 days 1/6/2024
16 Cleaning, Cutting & Straightening Sections 7 days 1/19/2024
17 Fixing in Position 14 days 1/26/2024
18 Two Coats of Epoxy Zinc Phosphate Primer 3 days 2/9/2024
19 Two Coats of Anti Rust Enamel Paint 3 days 2/12/2024
20 MS Foundation Platform for Fibre Tank 15 days 2/15/2024
21 Dismantle of Existing Tank 2 days 2/15/2024
22 MS Foundation Platform for Fibre Tanks over 1 day 2/17/2024
column pedestal
23 Ms Corrugated Structure 3 days 2/18/2024
24 Connection with Existing Shed 2 days 2/21/2024
25 Fixing of Plate 2 days 2/23/2024
26 welding angles with section 3 days 2/25/2024
27 Fixing Corrugated sheet 2 days 2/28/2024
28 Shop Drawings 30 days 3/1/2024
29 Detail & Dimensioning 30 days 3/1/2024

Page 1
Engineeric Construction Services

2024 May 2024 June 2024 July 2024 August 2024 September 2024 October 2024
6 11 16 21 26 1 6 11 16 21 26 31 5 10 15 20 25 30 5 10 15 20 25 30 4 9 14 19 24 29 3 8 13 18 23 28 3 8 13 18 23 28

Page 2
Engineeric Construction Services

Task Project Summary Manual Task Start-only Deadline

Project: MS Split Inactive Task Duration-only Finish-only Progress


Date: 11/21 Milestone Inactive Milestone Manual Summary Rollup External Tasks Manual Progress

Summary Inactive Summary Manual Summary External Milestone