Name of Contractor:
Type of Business:
Address:
3. Incident Information:
Date of Incident (DD/MM/YYYY) 14/05/2022 Time (24 hr): 02:30pm
Incident Type:
Restricted Work Case
Medical Treatment Case
First aid Injury
✘ Equipment / Property Damage
Near-miss
4. Incident Details:
Brief description of the main On Monday 17th May 2021, SAPAC were tasked to carry out Excavation Activity to Expose
circumstances leading to the Fibre Optic Line Near the Utility of NEOM Community 1 Station 12+600. Sapac started work at
Incident: (Attach additional approximately 01.00 Pm Site Supervisor then proceed the work by JCB since he came to know
pages if more space is there is no underground utilities at excavation point. Whilst carrying out the excavation
required) operator accidentally hit Water line (PVC Pipe 2") by teeth of the JCB bucket. Site Supervisor
immediately get in and Closely Inspect Damaged Pipe and noticed an Error warning tape Not
Found On the pipe where it has to be layed at least 30centi above, PVC Pipe Was Unprotected
Nd Layed Near Half Meter. This happened at approximately 02.30hrs.
Others____________________________
2. Injury Details:
To be supported with diagnosis by Licensed Health Care Professional and/or Medical Report
Other Unspecified
Struck by Falling Object
Mechanism: _____________________
Date
No. Actions: Responsibility Completed:
(DD/MM/YYYY)
1. Improper Methodology
2. Through Out Checking Of The Work Area Was Not Correctly Carried Out
3. Underground Utility Post Not Installed
Pits
6. Incident Cost:
(Approximate / Best Estimate)
No. Item / Area Amount (SAR.)
1. Injury Cost (Treatment, Hospital, Transport, Insurance, etc.)
2. Legal Cost (Compensation claims, judicial prosecutions, etc.)
Productivity Cost (Business disruptions, Delays, Production loss / day, Material, Salaries,
3.
etc.)
Asset Cost (Property, Machinery, Equipment, Structure, Vehicle, etc. – Repair &
4.
Maintenance)
Asset Cost (Property, Machinery, Equipment, Structure, Material, Vehicle, etc. –
5.
Replacement)
6. Enforcement Action (Penalty Issued by Authority etc.)
Incident Scene / Area Restoration Cost (arrangements to make safe, clean up,
7.
etc.)
8. ☐ Other Cost relevant to / associated with the Incident
9. Total Cost
✘ Complete investigation report attached – as per NEOM-OSH-GF SOP 2.0 Incident Notification, Investigation and Reporting
Relevant evidence included / attached to report (e.g. Copies of Relevant Procedures, Permits to Work, Photos, Drawings,
MSDS, Copy of Police Report, Copy of Medical Report, Interviews, etc.)
Corrective actions listed in this form and/or the attached investigation report will be fully implemented in a timely manner