SLG - Sequence of Operation

The document describes a symmetrical line-to-ground fault event at Bus460. It provides a timeline of the fault with the triggering conditions that caused circuit breakers to trip at various locations on the network to isolate the fault.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views

SLG - Sequence of Operation

The document describes a symmetrical line-to-ground fault event at Bus460. It provides a timeline of the fault with the triggering conditions that caused circuit breakers to trip at various locations on the network to isolate the fault.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project: ETAP Page: 1

Location: 22.0.2C Date: 02-04-2024

Contract: SN: JAKSONGREN

Engineer: Revision: Base


Study Case: SM
Filename: Siya Plot- Part-1 Config.: Normal

Sequence-of-Operation Event Summary Report

Symmetrical Line-to-Ground Fault at Bus460.

Time (ms) ID If (kA) T1 (ms) T2 (ms) Condition


100 ICOG- 1 7.648 100 Phase - OC1 - ST

100 ICOG- 1 7.795 100 Neutral - OC1 - ST

141 ICOG- 1 7.648 141 Phase - OC1 - 51

156 ICOG- 1 7.795 156 Neutral - OC1 - 51

160 ICOG-1 Breaker -0.001 60.0 Tripped by ICOG- 1 Phase - OC1 - ST

160 ICOG-1 Breaker -0.001 60.0 Tripped by ICOG- 1 Neutral - OC1 - ST

201 ICOG-1 Breaker -0.001 60.0 Tripped by ICOG- 1 Phase - OC1 - 51

216 ICOG-1 Breaker -0.001 60.0 Tripped by ICOG- 1 Neutral - OC1 - 51

250 MCR Incomer Relay-1 7.502 250 Phase - OC1 - ST

250 MCR Incomer Relay-1 7.795 250 Neutral - OC1 - ST

294 MCR Incomer Relay-1 7.795 294 Neutral - OC1 - 51

308 MCR Incomer Relay-1 7.502 308 Phase - OC1 - 51

310 MCR Incomer Breaker-1 -0.001 60.0 Tripped by MCR Incomer Relay-1 Phase - OC1 - ST

310 MCR Incomer Breaker-1 -0.001 60.0 Tripped by MCR Incomer Relay-1 Neutral - OC1 - ST

354 MCR Incomer Breaker-1 -0.001 60.0 Tripped by MCR Incomer Relay-1 Neutral - OC1 - 51

368 MCR Incomer Breaker-1 -0.001 60.0 Tripped by MCR Incomer Relay-1 Phase - OC1 - 51

400 R_TR Bay-101_LV 7.502 400 Phase - OC1 - ST

400 R_TR Bay-101_LV 7.795 400 Ground - OC1 - ST

456 R_TR Bay-101_LV 7.502 456 Phase - OC1 - 51

460 PT I/C Feeder breaker -0.001 60.0 Tripped by R_TR Bay-101_LV Phase - OC1 - ST

460 PT I/C Feeder breaker -0.001 60.0 Tripped by R_TR Bay-101_LV Ground - OC1 - ST

463 R_TR Bay-101_LV 7.795 463 Ground - OC1 - 51

516 PT I/C Feeder breaker -0.001 60.0 Tripped by R_TR Bay-101_LV Phase - OC1 - 51

523 PT I/C Feeder breaker -0.001 60.0 Tripped by R_TR Bay-101_LV Ground - OC1 - 51

590 Line End Relay 3.897 590 Ground - OC1 - 51

600 Line End Relay 3.751 600 Phase - OC1 - 50

600 R_TR-Bay101_LVSEF 7.795 600 Ground - OC1 - 50

634 Line End Relay 3.751 634 Phase - OC1 - 51

650 Line End Breaker -0.001 60.0 Tripped by Line End Relay Ground - OC1 - 51

660 Line End Breaker -0.001 60.0 Tripped by R_TR-Bay101_LVSEF Ground - OC1 - 50

660 Line End Breaker -0.001 60.0 Tripped by Line End Relay Phase - OC1 - 50

694 Line End Breaker -0.001 60.0 Tripped by Line End Relay Phase - OC1 - 51

* LVSST maintenance curve ignored in SQOP.