NC Procedure
NC Procedure
unit -II
NC HANDLING FLOW CHART
Is NC No
observed Continue the
in the process
process
Yes
Follow the instructions as per control
plan.
Yes
Is Raise NC and
process initiate
stopped corrective actions
No Is
initiated
100% segregation of previous correctiv No
hour production (Particular e actions
process) are
effective
?
Yes
X Are all
No the Status will be
Products/ closed.
parts
rejected Status will be kept
open.Analysis will be
Accepted Parts/products done and possible
will Yes A corrective
move to the next stage actions will be taken.
as per the process flow
Is Yes
Rework Rework and Review of NCs raised for the day
possible Reinspection (End of the day)
No
Is it
No O.K
X
Move the rejected materials (with
rejection tag) to the non
conformance
area
No
Offer the rejected parts to IQC Is it
rejected? A
thro
MRN for confirmation
Yes