Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
8 views
Model Set-4
Model set
Uploaded by
Jitendra Kumar Sah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Model Set-4 For Later
Download
Save
Save Model Set-4 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
8 views
Model Set-4
Model set
Uploaded by
Jitendra Kumar Sah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Model Set-4 For Later
Carousel Previous
Carousel Next
Save
Save Model Set-4 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 7
Search
Fullscreen
wear site Sen sirahT afatt weer wear Prom azar Gar orerta oifatie ah tore saaftahs der, Sa aS fel ae aa. siaihiar cent Geen ofan rarare fara waar oer udtart fact ; 2020/22/80 Model Set - 4 farsa : ar ararelt Key:B quite : goo aePTa ten feIS (4ox2=200) are: ¥4 Pe SHG MATA KEY Hares Vat Seeks We TAS | KEY Geoks RAT FAG ee Lave rater Ee rece et arene fagita soars Fart ot 1 1. aftrgerget aftcra arate terran ga wes 7 ) B. aah eraitar 2. ore Prom den Orn ale wearer Prorat arent ararer aReat w ? © B10 b.12 B, 2002/33/23 CO Dz 2owW/Rz/28, 4. The ‘fix’ of a plane table station with three known points, is bad if the plane table station lies ) A.In the great triangle B. Outside the great triangle © C. On the circumference of the (©) D.None of these circumscribing circle . 5. The shortcut key of insert table in MS Excel is ... ) A. Ctrl+T © B.AlteT © ©. Ctrl+Alt+T () D. Ctrl+Shift+T6. Over-turning of vehicles on a curve can be avoided by using... © A. Compound curve () B. Vertical curve © ©. Reverse curve D. Transition curve 7. In order to determine the nature features such as valleys, river, lake etc, the surveying © Acity surveying B. Location surveying © ©. Topographical surveying © D. Cadastral surveying 8. In a barrage, the crest level is kept...... _) A. Low with large gate B. High with large gates () C. High with no gates D. Low with no gates 9. The difference in level between the top of a bank and supply level in canal is called..... © A.Berm B. Free board D. None of them © Height of bank 10. A canal aligned nearly parallel to the contours of a country, is known as..... C © A. Side slope canal B. Contour canal ) C, Water shed canal ) D. Ridge canal 11. Planning of resources belongs to the......... planning. A. Pre-tender ) B. Post-tender (©) C. Both of above D. None of above 12. The aggregate is called fine aggregate if it completely retained on. -) A.0.15 mm sieve © 8.0.30 mm sieve © ©¢.75 mm sieve ) D. None of above13. The main responsibility of civil sub engineer is... © A.To teach the sub-ordinate © ©. To understand the duties and responsibility 14. CPM adopts © A. Deterministic approach © ©. Stochastic approach 15. Critical path...... © A\lsalways longest © ©. May be longest © B. To plan and execute the works O © D.Allof above (©) B. Probabilistic approach ) D. None of above © B.Is always shorter (©) D. May be shortest 16. Security deposit should be deducted at .....from contractor's bill CO A0% O c.4% O B.3% Ons% 17. The indentation provided in a face of the brick is called..... O A.Frog C. Strike 18. Loss on ignition in cement should not exceed... A.1% Oce% 19. The paint highly redistance to fire is. © A Enamel paint © ©. Asbestos paint © B. Pallet ) D. None of above OB4% © D.12% © B. Aluminium paint © D.Cement paint 20. In residential buildings, the average value of stair width is... © A60em © ¢.80cm © B.70cm © D.90em21. The process of making the back ground rough , before plastering is... © A. Dubbing B. Hacking CO ©.Blistering © D.Peeling 22. The under surface of an arch, is called A. Intrados © B. Haunch © ©. Back © Dsoffit 23. Bernoulli's equation assumes that © A. Fluid is non-viscous B. Fluid is homogeneous C. Flow is steady D. All of above 24. A piezometer opening in pipes measures A. Velocity head ) B. Total pressure C. Static pressure ) D. Negative static pressure 25. Hydraulic grade line © A. Ramains above the center line of (© B. Remains below the center line of conduit conduit C. Remains parallel to the center line of D. May be above or below the center conduit line of conduit 26. Maximum efficiency of transmission of power through a pipe is.... ) A. 25% OC B.33.3% C.50% D. 66.67 % 27. The addition of pozzolana Portland cement causes © AvLess heat of hydration © B. Increasing in shrinkage C. Decreasing in permeability © D.Allof above28. The ammount of reinforcement for main bars in slab, is based upon © 8B. Maximum bending moment A. Minimum bending moment © ©. Maximum shear force D. Minumum shear force 29. The percentage of minimum requirements of the gross section area in slabs i: © A010 % B.0.12 % © ¢.015 % D. 0.18 % 30. In a single reinforced beam, if the permissible stress in concrete reaches earlier than that in steel, the beam section is called... (© A. Under-reinforced section © B. Over-reinforced section © ©. Economic section ») D. Critical section 31. The column whose slenderness ratio is less than 80 are known as... A. Short column B. Long column. C. Weak column D. None 32. Water for domestic consumption should be : ) A. Colourless, odourless and tasteless (_) B. Freefrom dissolve salts ) C. Hygienically safe © D. Attractive for looks }. Factor os safety is defined as the ratio of ) A. Ultimate stress to working stress B. Working stress to ultimate stress C. Breaking stress to ultimate stress ©) D. Ultimate stress to breaking stress 34. A reinforced cement concrete beam is considerd to be made of B. Heterogenous material © A. Homogeneous material C ) C. Composite material © D. Isotropic material 35. Yellow colour of a ‘coloured light traffic signal’ indicates... ) A.Go B. Stop D. Clearance time C. Be ready to go36. Floating gradient is generally provide... © A Along maximum gradient B. Along minimum gradient C. At summit curve © D.Atvalley curve 37. Setting out of Lemniscate transition curves, is done with © A. Perpendicular offsets B. Radius offset ) C. Deflection angle (© D. Polar deflection angles 38. The head light of vehicles should be such that its lower beam illuminates object 39. Sewerage system is designed for... CO A. Maximum flow only B. Minimum flow only »)) C. Average flow only © D. Maximum and minimum flow 40. Depth of shallow tube well shall not be more than (considering economic point ) 41. The quantity of flushing water required for pour flush water seal latrine is .. .. O A05-15 litres © ©.2-3 litres ) B. 1.5 - 2 litres ) 0. 3-4 litres 42. Plinth area of a building is : ©) A. Total area of a floor at plint level B. Total floor area of all floor © ©. Total area of building and land ) D. None of the above 43. Generally soil is considered as... A. Single phase system ) B. Two phase system (© C. Three phase system D. None of aboveAA. If the cofficient of passive earth pressure is 1/3, then the cofficient of active earth pressure is..... ) A.W3 c.3 B.1 D. 3/2 45. The ratio of volume of voids to the total volume of soil mass is called A. Water content ratio C. Void ratio 46. As moisture content of soil increase, cohesion of soil A. Increase C. Constant 47. Valuation is done for : A. Present value based on reality C. Market value B. Porosity D. Degree of saturation B. Decrease D. All of above B. Minimum value D. None of the above 48. In the analysis of rates, the profit and overhead for contractor is generally taken as: A.5 % C.15% 49. The width of the right of way , is influenced by A. Formation width C. Classification of road 50. Prearicn oar AES I IA FL? © A sero SSR a ae B. 20% D.10 % B. Shoulder or berms D. All of above [Answer Sheet “Routine Of PSC" Youtube Channel 30 79¢¢ 8 Seag7e 1 Mice cecal
You might also like
PART 1 Project Engineer
PDF
100% (4)
PART 1 Project Engineer
9 pages
Public Service Commission Sub Asst. Engineers Recruitment Ex-Amination - 2001
PDF
100% (1)
Public Service Commission Sub Asst. Engineers Recruitment Ex-Amination - 2001
7 pages
Notes 20221213180659
PDF
No ratings yet
Notes 20221213180659
5 pages
Model Exam - 1
PDF
100% (2)
Model Exam - 1
6 pages
MCQs
PDF
No ratings yet
MCQs
10 pages
N
PDF
No ratings yet
N
14 pages
Questions Only Xcr
PDF
No ratings yet
Questions Only Xcr
20 pages
jlee branch paper solve for
PDF
No ratings yet
jlee branch paper solve for
8 pages
SDO Test
PDF
No ratings yet
SDO Test
28 pages
P 22
PDF
No ratings yet
P 22
4 pages
SET-4 (CHANDAN's Guidance)
PDF
No ratings yet
SET-4 (CHANDAN's Guidance)
15 pages
Civil Engineering MCQ's
PDF
No ratings yet
Civil Engineering MCQ's
124 pages
Set 17 of Council License Exam Apex
PDF
No ratings yet
Set 17 of Council License Exam Apex
7 pages
Engineer 5000 Mcqs
PDF
100% (1)
Engineer 5000 Mcqs
173 pages
PPSC SDO, Irrigation Paper 2024
PDF
No ratings yet
PPSC SDO, Irrigation Paper 2024
11 pages
GMC Surveyor Draftman - A - 09-09-2018
PDF
No ratings yet
GMC Surveyor Draftman - A - 09-09-2018
29 pages
Jharkhand JE CIVIL
PDF
No ratings yet
Jharkhand JE CIVIL
135 pages
GWSSB Aae Civil 2015
PDF
No ratings yet
GWSSB Aae Civil 2015
12 pages
Mix Question WBPSC JE Set-02
PDF
No ratings yet
Mix Question WBPSC JE Set-02
5 pages
SETs Sample
PDF
No ratings yet
SETs Sample
8 pages
Set 1
PDF
No ratings yet
Set 1
3 pages
Set - 5 Solution
PDF
No ratings yet
Set - 5 Solution
7 pages
KMC 2018 PDF
PDF
100% (2)
KMC 2018 PDF
11 pages
Mtech Model Questions
PDF
No ratings yet
Mtech Model Questions
121 pages
PWD 2018 Question Paper
PDF
No ratings yet
PWD 2018 Question Paper
12 pages
Civil Sub Overseer Sest 1
PDF
100% (1)
Civil Sub Overseer Sest 1
15 pages
Civil Engineer Set 1
PDF
No ratings yet
Civil Engineer Set 1
26 pages
Civil Engineering Objective Type Questio
PDF
No ratings yet
Civil Engineering Objective Type Questio
15 pages
Nec Model Set-1 PDF - 230905 - 193908
PDF
100% (4)
Nec Model Set-1 PDF - 230905 - 193908
11 pages
UG Question Papers (Paper 2) - Compressed
PDF
No ratings yet
UG Question Papers (Paper 2) - Compressed
362 pages
Combined Test-4
PDF
No ratings yet
Combined Test-4
7 pages
Civil Engineering Objective Type Questions
PDF
100% (7)
Civil Engineering Objective Type Questions
15 pages
2020-Ans-Msc - Kmc-Sae PDF
PDF
No ratings yet
2020-Ans-Msc - Kmc-Sae PDF
5 pages
Full Mock Test Series 01 Answer
PDF
No ratings yet
Full Mock Test Series 01 Answer
10 pages
GWSSB DEE (Civil) Exam Paper 22-05-2016
PDF
No ratings yet
GWSSB DEE (Civil) Exam Paper 22-05-2016
12 pages
Assistant 4th Level Bagmati Pradesh 2078 1
PDF
No ratings yet
Assistant 4th Level Bagmati Pradesh 2078 1
4 pages
Draftsman Grade II Town Planning Surveyor GR II
PDF
No ratings yet
Draftsman Grade II Town Planning Surveyor GR II
13 pages
MCQ'S: Civil Engineering
PDF
No ratings yet
MCQ'S: Civil Engineering
16 pages
Ae Civil Under Trade Commerce 2016 Engineering Paper III
PDF
No ratings yet
Ae Civil Under Trade Commerce 2016 Engineering Paper III
6 pages
4
PDF
No ratings yet
4
4 pages
Q. No Questions 1 2 3
PDF
No ratings yet
Q. No Questions 1 2 3
8 pages
Set - 4
PDF
No ratings yet
Set - 4
8 pages
Exit EXAM 5
PDF
No ratings yet
Exit EXAM 5
6 pages
Exit EXAM 6
PDF
No ratings yet
Exit EXAM 6
11 pages
Set 7 Nec Civil Engineer
PDF
No ratings yet
Set 7 Nec Civil Engineer
80 pages
Debremarkos University Model Exit Exam 2015
PDF
No ratings yet
Debremarkos University Model Exit Exam 2015
27 pages
Nec Model Set-2 PDF - 230905 - 193958
PDF
No ratings yet
Nec Model Set-2 PDF - 230905 - 193958
13 pages
Civil Engineering Model Exam: (Level-04 and Level-05)
PDF
No ratings yet
Civil Engineering Model Exam: (Level-04 and Level-05)
3 pages
Gate Civil Engineering
PDF
No ratings yet
Gate Civil Engineering
33 pages
Civil_5th Lvl_2081-4-26
PDF
No ratings yet
Civil_5th Lvl_2081-4-26
13 pages
Set 2
PDF
No ratings yet
Set 2
5 pages
WBPSC Je Practice Mcqs Practice Set-5
PDF
No ratings yet
WBPSC Je Practice Mcqs Practice Set-5
31 pages
TOR - Training Management For 3 Day Hollow Concrete Block HCB Quality Enhancement Training
PDF
No ratings yet
TOR - Training Management For 3 Day Hollow Concrete Block HCB Quality Enhancement Training
10 pages
1712206591ICCR GSS SJSS 2024-25 Advertisement - 2024
PDF
No ratings yet
1712206591ICCR GSS SJSS 2024-25 Advertisement - 2024
3 pages
MCQ On Flow Through Pipes 5eea6a0c39140f30f369e166
PDF
No ratings yet
MCQ On Flow Through Pipes 5eea6a0c39140f30f369e166
24 pages
MCQHydraulics
PDF
No ratings yet
MCQHydraulics
76 pages