RTN #42 Emergency Lane Closure For North Shore RD at Shelly Bay Water Repairs April 20 2024-PUBLIC
RTN #42 Emergency Lane Closure For North Shore RD at Shelly Bay Water Repairs April 20 2024-PUBLIC
The Ministry of Public Works wishes to inform the motoring public that North Shore Road, at Shelly Bay
Beach entrance and the junction of Lemon Grove Road will experience a single-temporary lane closure to
accommodate trench work for a damaged water line. The lane closure will affect the westbound lane.
The trench work will take place on Saturday, April 20th, 2024 between the hours of 8:00 am and 12:00 pm.
Traffic control will be managed by Contractors representatives with cones and signs.
Motorists are advised to use caution when traveling through this section on North Shore Road by Shelly
Bay beach entrance.
The Ministry of Public Works encourages the full cooperation of the public and apologizes for any
inconvenience that may result.
Should there be any questions regarding these works, contact Mr. Karel Morgan-Evans, Operations
Engineer, MPW at# 501-6638
ByOrder ~
The Hon. Michael Weeks JP, MP
Acting Minister of Public Works