APEX Start Date: 15Jul96 Run Date: 22Oct96 Version: Sample Project Finish Date: 06Feb98 Data Date: 23Sep96 Act. ID Description Rem Dur PCT Early Start Early Finish Late Finish Total Float AS100 DeIine System Requirements 0 100 16Jul96A 31juil96A AS102 Approve System Design 0 100 27aug96a 09sep96a AS103 Install Robot Base 18 0 25sep
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
54 views
PPM
APEX Start Date: 15Jul96 Run Date: 22Oct96 Version: Sample Project Finish Date: 06Feb98 Data Date: 23Sep96 Act. ID Description Rem Dur PCT Early Start Early Finish Late Finish Total Float AS100 DeIine System Requirements 0 100 16Jul96A 31juil96A AS102 Approve System Design 0 100 27aug96a 09sep96a AS103 Install Robot Base 18 0 25sep