Boq 156989

The document is a bill of quantities for construction work. It lists 3 items - providing layout and benchmarks, site mobilization and cleaning, and excavation for foundation trenches. The quantities, unit rates, and totals are provided for each item.

Uploaded by

masumnetrokona26
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views

Boq 156989

The document is a bill of quantities for construction work. It lists 3 items - providing layout and benchmarks, site mobilization and cleaning, and excavation for foundation trenches. The quantities, unit rates, and totals are provided for each item.

Uploaded by

masumnetrokona26
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

3/30/24, 11:57 AM View Form

M/S. Prianka Enterprise

Bill of Quantities

Bill of Quantities

Unit Total
Item Unit Price Total Price
Price Price
Item Code Measurement
Group Description of Item Quantity
no. (if Unit In figures In Figures
In Words In Words
any) (BDT) (BDT)
(BDT) (BDT)

Providing layout and carry over PWD Bench-Mark


(BM) at site from nearby BM pillar, Property lines, Seventy-
existing ground level (EGL), formation ground Seven
Four
level (FGL), highest flood levels (HFL), plinth Thousand
Hundred
levels (PL), mean sea level (MSL), setting and Seven
1 C/W N/A Sqm 194.400 400.001 point 77760.194
marking all pillars, marker, pegs etc, showing and Hundred
Zero Zero
maintaining reduced levels (RL?s) including and Sixty
One
locating, establishing, protecting all public utilities point One
within the premise of work and finally all to be Nine Four
presented in black and white,

Mobilization and cleaning site before commencing


actual physical work and during contract period
and demobilization after completion of the Works
under contract accepted by Engineer,This work
shall also covers clayey cleaning and clearing, Seventy-
cutting or filling, dressing the project area on and Seven
Four
in the ground to an extent that all the events of Thousand
Hundred
works of the project can be executed smoothly in a Seven
2 C/W N/A Sqm 194.400 400.001 point 77760.194
working environment with a particular attention on Hundred
Zero Zero
safety and security in all respects, and to stockpile and Sixty
One
the end outcome to a place for disposal agreed by point One
the Engineer, where, payments are to be based on Nine Four
ground area determined by the Engineer and be
proportionate to the percentage progress of work
under contract as a whole in all respects and
approved by the Engineer,

Earth work in excavation in all kinds of soil for


foundation trenches including, layout, providing
center lines, local bench-mark pillars, leveling,
ramming and preparing the base, fixing bamboo
spikes and marking layout with chalk powder,
providing necessary tools and plants, protecting Eighty-
and maintaining the trench dry etc,, stacking, Four Seven
cleaning the excavated earth at a safe distance Hundred Thousand
out of the area enclosed by the layout etc, all and Fifty Four
3 C/W N/A Sqm 194.400 450.001 87480.194
complete and accepted by the Engineer, subject to point Hundred
submit method statement of carrying out Zero Zero and Eighty
excavation work to the Engineer for approval, One point One
However, Engineer?s approval shall not relieve Nine Four
the contractor of his responsibilities and
obligations under the contract, Layout and marking
for earthwork in excavation in foundation accepted
by the Engineer-in-charge, [Plinth area of the
structure shall be considered for measurement]

Earth work in excavation in all kinds of soil for


foundation trenches including, layout, providing
center lines, local bench-mark pillars, leveling,
ramming and preparing the base, fixing bamboo
One Lakh
spikes and marking layout with chalk powder,
Two
providing necessary tools and plants, protecting
Four Thousand
and maintaining the trench dry etc,, stacking,
Hundred Five
cleaning the excavated earth at a safe distance
and Fifty Hundred
4 C/W N/A out of the area enclosed by the layout etc, all Cum 227.810 450.001 102514.728
point and
complete and accepted by the Engineer, subject to
Zero Zero Fourteen
submit method statement of carrying out
One point
excavation work to the Engineer for approval,
Seven
However, Engineer?s approval shall not relieve
Two Eight
the contractor of his responsibilities and
obligations under the contract, Earthwork in
excavation in foundation trenches up to 1,5 m
depth and maximum 10 m lead,

Supplying of straight and strong borrak bamboo


Eight Forty-
posts of having minimum 75 mm diameter
Hundred Eight
althrough and driving the same vertically in the
5 C/W N/A Meter 60.000 800.001 point 48000.060 Thousand
ground up to required depth by any means
Zero Zero point Zero
shaping the top of the post, all complete and
One Six
accepted by the Engineer-in-charge,

6 C/W N/A Palisading work by supplying bitumen drum sheet Ls/Sqm 5.000 6000.001 Six 30000.005 Thirty
walling tied with 20 BWG G,I, wire fixing the same Thousand Thousand
with already driven borrak bamboo posts with half point

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=5191386&userId=45947&nture=Works&tenId=956989&procMtd=… 1/12
3/30/24, 11:57 AM View Form
split borrak bamboo runners @ 450mm c/c Zero Zero point Zero
horizontally with iron nails, G,I wire etc, all One Zero Five
complete and accepted by the Engineer, (Rate is
excluding the cost of bamboo post),

50 mm down graded picked jhama khoa


consolidation in foundation trenches by mixing the
same with best quality local sand (F,M, 1,2) in 2:1 Six
Thirty
(khoa: sand) proportion to achieve minimum dry Thousand
Thousand
7 C/W N/A density of 95% with optimum moisture content Ls/Cum 5.000 6000.001 point 30000.005
point Zero
(Modified proctor test) including breaking and Zero Zero
Zero Five
screening chips, laying and spreading in 150 mm One
layers uniformly,and compacting etc, all complete
and accepted by the Engineer-in-charge

One Lakh
Eleven
Sand filling in foundation trenches and plinth with
Thousand
sand having F,M, 0,5 to 0,8 in 150mm layers
Four Six
including leveling, watering and compaction to
Hundred Hundred
achieve minimum dry density of 90% with optimum
8 C/W N/A Cum 279.190 400.001 point 111676.279 and
moisture content (Modified proctor test) by
Zero Zero Seventy-
ramming each layer up to finished level as per
One Six point
design supplied by the design office only etc, all
Two
complete and accepted by the Engineer,
Seven
Nine

Five
Earth filling in foundation trenches and plinth in
Thousand
150 mm layer with earth available within 90 m of One
Five
the building site to achive minimum dry density of Hundred
Hundred
90% with optimum moisture content (Modified and Fifty
9 C/W N/A Cum 37.060 150.001 5559.037 and Fifty-
proctor test) including carrying watering, leveling, point
Nine point
dressing and compacting to a specified Zero Zero
Zero
percentage each layer up to finished level etc, all One
Three
complete and accepted by the Engineer,
Seven

Fifteen
Thousand
Supplying and laying of single layer polythene
Sixty Two
sheet weighing one kilogram per 6,5 square meter
point Hundred
10 C/W N/A in floor or any where below cement concrete Sqm 254.090 60.001 15245.654
Zero Zero and Forty-
complete in all respect and accepted by the
One Five point
Engineer,
Six Five
Four

One Lakh
Sixty
Thousand
One layer of brick flat soling in foundation or in Six
One
floor with first class or picked jhama bricks Hundred
Hundred
11 C/W N/A including preparation of bed and filling the Sqm 266.880 600.001 point 160128.267
and
interstices with local sand, leveling etc, complete Zero Zero
Twenty-
and accepted by the Engineer, One
Eight point
Two Six
Seven

Mass concrete (1:3:6) in foundation or floor with


cement, sand (F,M, 1,2) and picked jhama chips Thirty-One
including breaking chips, screening, mixing, laying, Seven Thousand
compacting to levels and curing for at least 7 days Thousand Three
12 C/W N/A including the supply of water, electricity and other Cum 4.480 7000.001 point 31360.004 Hundred
charges and costs of tools and plants etc, all Zero Zero and Sixty
complete and accepted by the Engineer, (Cement: One point Zero
CEM-II/A-M) Mass concrete in foundation (1:3:6) Zero Four
with cement, brick chips and sand of F,M, 1,2

13 C/W N/A Reinforced cement concrete works with minimum Cum 19.730 12000.001 Twelve 236760.020 Two Lakh
cement content relates to mix ratio 1:1,5:3 having Thousand Thirty-Six
minimum f'cr = 30 MPa, satisfying a specified point Thousand
compressive strength f?c = 25 MPa at 28 days on Zero Zero Seven
standard cylinders as per standard practice of One Hundred
Code ACI/BNBC/ASTM, Cement conforming to and Sixty
BDS EN-197-1 -CEM-I, 52,5N (52,5 MPa) / ASTM- point Zero
C 150 Type ? I, best quality Sylhet sand or coarse Two
sand of equivalent F,M, 2,2 and 20 mm down well
graded stone chips conforming to ASTM C-33,
making and placing shutter in position and
maintaining true to plumb, making shutter water-
tight properly, placing reinforcement in position;
mixing with standard mixer machine with hopper,
fed by standard measuring boxes or mixing in
batching plant, casting in forms, compacting by
vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time
approved; including cost of water, electricity,
testing charges of materials and concrete
cylinders as required, cost of all materials and
other charges etc, all complete, approved and
accepted by the Engineer-in- harge, (Rate is

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=5191386&userId=45947&nture=Works&tenId=956989&procMtd=… 2/12
3/30/24, 11:57 AM View Form
excluding the cost of reinforcement and its
fabrication, placing, binding etc, and the cost of
shuttering & centering) a) Individual and
Combined footings,

Reinforced cement concrete works with minimum


cement content relates to mix ratio 1:1,5:3 having
minimum f'cr = 30 MPa, satisfying a specified
compressive strength f?c = 25 MPa at 28 days on
standard cylinders as per standard practice of
Code ACI/BNBC/ASTM, Cement conforming to
BDS EN-197-1 -CEM-I, 52,5N (52,5 MPa) / ASTM-
C 150 Type ? I, best quality Sylhet sand or coarse
sand of equivalent F,M, 2,2 and 20 mm down well
graded stone chips conforming to ASTM C-33, One Lakh
making and placing shutter in position and Ninety-
maintaining true to plumb, making shutter water- Four
Twelve
tight properly, placing reinforcement in position; Thousand
Thousand
mixing with standard mixer machine with hopper, Five
14 C/W N/A Cum 16.210 12000.001 point 194520.016
fed by standard measuring boxes or mixing in Hundred
Zero Zero
batching plant, casting in forms, compacting by and
One
vibrator machine and curing at least for 28 days, Twenty
removing centering-shuttering after specified time point Zero
approved; including cost of water, electricity, One Six
testing charges of materials and concrete
cylinders as required, cost of all materials and
other charges etc, all complete, approved and
accepted by the Engineer-in- harge, (Rate is
excluding the cost of reinforcement and its
fabrication, placing, binding etc, and the cost of
shuttering & centering), b) Padestals, Column,
Column Capitals, lift wall and walls upto Ground
Floor, Ground Floor,

Reinforced cement concrete works with minimum


cement content relates to mix ratio 1:1,5:3 having
minimum f'cr = 30 MPa, satisfying a specified
compressive strength f?c = 25 MPa at 28 days on
standard cylinders as per standard practice of
Code ACI/BNBC/ASTM, Cement conforming to
BDS EN-197-1 -CEM-I, 52,5N (52,5 MPa) / ASTM-
C 150 Type ? I, best quality Sylhet sand or coarse
sand of equivalent F,M, 2,2 and 20 mm down well
graded stone chips conforming to ASTM C-33,
Eleven
making and placing shutter in position and
Lakh Fifty-
maintaining true to plumb, making shutter water-
Seven
tight properly, placing reinforcement in position; Twelve
Thousand
mixing with standard mixer machine with hopper, Thousand
Five
15 C/W N/A fed by standard measuring boxes or mixing in Cum 96.460 12000.001 point 1157520.096
Hundred
batching plant, casting in forms, compacting by Zero Zero
and
vibrator machine and curing at least for 28 days, One
Twenty
removing centering-shuttering after specified time
point Zero
approved; including cost of water, electricity,
Nine Six
testing charges of materials and concrete
cylinders as required, cost of all materials and
other charges etc, all complete, approved and
accepted by the Engineer-in- harge, (Rate is
excluding the cost of reinforcement and its
fabrication, placing, binding etc, and the cost of
shuttering & centering), c) Floor / roof slab, T-
beam, L-beam and rectangular beam, tie beam,
lintel, stair case slab and steps etc, upto ground
floor, Ground Floor,

Centering and shuttering, including strutting,


Seventeen
propping etc, (The formwork must be rigid enough
Thousand
both in and out of plane, to make the concrete Five
Three
surface true to the designed shape and size by Hundred
Hundred
16 C/W N/A using necessary MS sheets of minimum 16 BWG, Sqm 34.630 500.001 point 17315.035
and
angles of minimum size 40 mm x 40 mm x 5 mm, Zero Zero
Fifteen
flat bars etc,) and removal of form after hardening One
point Zero
of the concrete for: a) Individual and combined
Three Five
footing

Centering and shuttering, including strutting,


Seventy-
propping etc, (The formwork must be rigid enough
One
both in and out of plane, to make the concrete
Five Thousand
surface true to the designed shape and size by
Hundred Two
using necessary MS sheets of minimum 16 BWG,
17 C/W N/A Sqm 142.500 500.001 point 71250.143 Hundred
angles of minimum size 40 mm x 40 mm x 5 mm,
Zero Zero and Fifty
flat bars etc,) and removal of form after hardening
One point One
of the concrete for: b) Pedestal, column, column
Four
capital, lift wall and wall up to ground floor, Ground
Three
Floor,

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=5191386&userId=45947&nture=Works&tenId=956989&procMtd=… 3/12
3/30/24, 11:57 AM View Form

Centering and shuttering, including strutting,


propping etc, (The formwork must be rigid enough One Lakh
both in and out of plane, to make the concrete Forty-Six
Five
surface true to the designed shape and size by Thousand
Hundred
using necessary MS sheets of minimum 16 BWG, Eight
18 C/W N/A Sqm 293.610 500.001 point 146805.294
angles of minimum size 40 mm x 40 mm x 5 mm, Hundred
Zero Zero
flat bars etc,) and removal of form after hardening and Five
One
of the concrete for: c) Formwork/shuttering, prop point Two
and necessary supports etc, (steel) Tie beam and Nine Four
Lintels : Ground Floor, Ground Floor,

One Lakh
Centering and shuttering, including strutting,
Fifteen
propping etc, (The formwork must be rigid enough
Thousand
both in and out of plane, to make the concrete Five
Two
surface true to the designed shape and size by Hundred
Hundred
19 C/W N/A using necessary MS sheets of minimum 16 BWG, Sqm 230.550 500.001 point 115275.231
and
angles of minimum size 40 mm x 40 mm x 5 mm, Zero Zero
Seventy-
flat bars etc,) and removal of form after hardening One
Five point
of the concrete for: Floor and roof slab up to
Two Three
Ground Floor,
One

Supplying, fabrication, and fixing to details as per


design : Ribbed or deformed bar reinforcement for
Reinforced Cement Concrete, produced and
marked in accordance with BDS ISO 6935 - 2:
2006 (or standard subsequently released from
BSTI) including straightening and cleaning rust, if
any, bending and binding in position with supply of
Seventeen
G,I, wires, splices or laps what so ever etc,
Lakh
complete in all respects and accepted by the
Ninety
Engineer ( Measurement shall be recorded only on One
Thousand
Standard Mass per Unit length of Bars, while, dia Hundred
Three
of bars exceeds its standard), Grade 400 (RB 400 and Ten
20 C/W N/A Kg 16275.470 110.001 1790317.975 Hundred
/RB 400W: complying BDS ISO 6935-2:2006) point
and
ribbed or deformed bar produced and marked Zero Zero
Seventeen
according to Bangladesh standard, with minimum One
point Nine
yield strength, fy (ReH)= 400 MPa but fy not
Seven
exceeding 450 MPa and whatever is the yield
Five
strength within allowable limit as per BNBC/ ACI
318, the ratio of ultimate tensile strength fu to yield
strength fy, shall be at least 1,25 and minimum
elongation after fracture and minimum total
elongation at maximum force is 16% and 8%
respectively : up to ground floor, a) up to Plinth
Level & b) up to ground floor,

Brick works with first class bricks with cement


sand (F,M, 1,2) mortar (1:4) in exterior walls
Thirty-Five
including filling the interstices with mortar, raking
Thousand
out joints, cleaning and socking the bricks at least
Six Four
for 24 hours before use and washing of sand,
Hundred Hundred
necessary scaffolding, curing at least for 7 days
21 C/W N/A Cum 59.120 600.001 point 35472.059 and
etc, all complete including cost of water, electricity
Zero Zero Seventy-
and other charges (measurement to given as 250
One Two point
mm width for one brick length and 375 mm for one
Zero Five
brick and a half brick length) accepted by the
Nine
Engineer-in-charge, (Cement: CEM-II/B-M) In
ground floor: Upto Plinth, Ground floor

Damp proof course (DPC) (1:1,5:3) of cement


concrete with cement, sand and stone chips Sixty
Five
including breaking of chips, screening, centering, Thousand
Thousand
shuttering, casting, curing and finishing with a coat Seven
22 C/W N/A Sqm 12.140 5000.001 point 60700.012
of bitumen including the supply of water, electricity, Hundred
Zero Zero
costs of tools & plants and other charges etc, all point Zero
One
complete and accepted by Engineer-in-charge, One Two
(Cement: CEM-II/B-M)

One Lakh
Minimum 6 mm thick cement sand (F,M, 1,2)
Forty-
plaster (1:4) with fresh cement to ceiling, R,C,C,
Seven
columns, beams, surface of stair case, sunshades,
Three Thousand
cornices, railings, drop wall, louvers, fins and
Hundred Seven
finishing the corners and edges including washing
23 C/W N/A Sqm 492.650 300.001 point 147795.493 Hundred
of sand, cleaning the surface, curing at least for 7
Zero Zero and
days, cost of water, electricity, scaffolding and
One Ninety-
other charges etc, all complete in all respect as
Five point
per drawing and accepted by the Engineer-in-
Four Nine
charge, (Cement: CEM-II/B-M) Ground floor,
Three

24 C/W N/A Minimum 12 mm thick cement sand (F,M, 1,2) Sqm 42.300 300.001 Three 12690.042 Twelve
plaster with neat cement finishing to dado with Hundred Thousand
cement (1:4) up to 150 mm including washing of point Six
sand, finishing the edges and corners and curing Zero Zero Hundred
at least for 7 days, cost of water, electricity, One and Ninety
scaffolding and other charges etc, all complete in point Zero
all respect as per drawing and accepted by the Four Two

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=5191386&userId=45947&nture=Works&tenId=956989&procMtd=… 4/12
3/30/24, 11:57 AM View Form
Engineer-in-charge, (Cement: CEM-II/B-M),
Ground floor,

One Lakh
Minimum 12 mm thick cement sand (F,M, 1,2) Sixteen
plaster (1:6) having with fresh cement to both Thousand
inner and outer surface of wall, finishing the edges Three Four
and corners including washing of sand, cleaning Hundred Hundred
25 C/W N/A the surface, curing at least for 7 days, cost of Sqm 388.320 300.001 point 116496.388 and
water, electricity, scaffolding and other charges Zero Zero Ninety-Six
etc, all complete in all respect as per drawing and One point
accepted by the Engineer-in-charge, (Cement: Three
CEM-II/B-M), Ground floor, Eight
Eight

Supplying, fitting and fixing of rolling shutter of any


design and shape made of 24 SWG G,P, sheet
unit minimum 69 mm width having 10 mm and 12
mm dia circular folding at ends, rolled in machine,
locked together properly to form rolling shutter, top
of the shutter to be fitted with circular spring box
made of 26 BWG sheet, containing best quality
spring made in China, nutted with 38 mm G,I, pipe
at one end and the other end nutted to shutter
including fitting the G,I, pipe again with 375 mm x
300 mm x 6 mm pankha at ends with side guide
Three Seventy-
channel (side channel consist of 50 mm x 100 mm
Thousand Five
x 6 mm M,S, plate with 2 mm x 19 mm x 3 mm F,I,
Five Thousand
bar, middle channel consist of 2 mm x 150 mm x 6
26 C/W N/A Sqm 21.600 3500.001 Hundred 75600.022 Six
mm M,S, plate with 2 mm x19 mm x 6 mm fixed to
point Hundred
wall or column with clamps embedded in R,C,C,
Zero Zero point Zero
part by cement concrete (1:2:4) including cutting
One Two Two
holes (minimum 3 mm x 25 mm x 6 mm) mending
the damages, finishing, curing, bottom end of
shutter fitted to folded G,P, sheet (min 125 mm
width in two layers), which is again fitted to 25 mm
x 25 mm x 3 mm angle, providing handle with F,I,
bar 25 mm x 6 mm and locking arrangement in
both sides, painting two coats with approved
colour and brand of synthetic enamel paint over a
coat of priming etc, complete in all respect
accepted by the Engineer-in-charge, [Rate is
excluding the cost of painting]

Supplying, fitting and fixing of Aluminium sliding


window as per the U,S, Architectural Aluminium
Manufacturer?s Association (AAMA) standard
specification having 1,2 mm thick outer bottom
(size 75,50 mm, 32mm), 1,2 mm thick outer top
(size 75,50 mm, 16,80 mm), 1,2 mm thick shutter
top (size 33 mm,26,80, 22 mm), 1,2 mm thick
shutter bottom (size 60mm, 24,40 mm), 1,2 mm
thick outer side (size 75,50 mm,19,90 mm), 1,2
mm thick sliding fixed side (size 31 mm, 26 Three Sixty-One
mm),1,2 mm thick shutter lock (size 49,20 mm Thousand Thousand
26,20 mm) and 1,2 mm thick inter lock (size 34,40 Five Seven
27 C/W N/A mm, 32,10 mm) sections all aluminium members Sqm 17.640 3500.001 Hundred 61740.018 Hundred
(total weight kg/sqm) will be anodized to point and Forty
aluminium bronze/silver colour with a coat not less Zero Zero point Zero
than 15 micron in thickness and density of 4 mg One One Eight
per square cm etc, including all accessories like
sliding door key lock, sliding door wheel, sliding
door mohiar, sliding door neoprene, bolts and nuts
including sealants, keeping provision for fitting 5
mm thick glass including labour charge for fitting of
accessories, making grooves and mending good
damages, carriage, and electricity complete in all
respect as per drawing and accepted by the
Engineer, Silver colour Window1, ii) Ground Floor

Supplying, fitting and fixing in Aluminium door Three Sixty-One


frames, windows, partitions and curtain wall Thousand Thousand
distortion free glass of approved quality and shade Five Seven
28 C/W N/A including cost of fitting fixing all necessary Sqm 17.640 3500.001 Hundred 61740.018 Hundred
accessories etc, complete in all respect as per point and Forty
drawing and accepted by the Engineer-in-charge, Zero Zero point Zero
Silver colour Window 1, i) Ground Floor, One One Eight

Supplying, fitting and fixing window grills of any


design made with approx 20 x 5 mm F,I, bar as Three Sixty-One
inner members but no outer frame; including Thousand Thousand
fabricating, welding cost of electricity and tools Five Seven
29 C/W N/A and plants etc, complete for all floors accepted by Sqm 17.640 3500.001 Hundred 61740.018 Hundred
the Engineer, (Total weight per sqm should be point and Forty
approx 10 kg, and add or deduct, @ Tk, 152 for Zero Zero point Zero
each kg, excess or less respectively) i) Ground One One Eight
Floor,

30 C/W N/A 38 mm thick artificial patent stone (1:1,5:3) flooring Sqm 203.520 500.001 Five 101760.204 One Lakh
with cement, best quality coarse sand (50% Hundred One

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=5191386&userId=45947&nture=Works&tenId=956989&procMtd=… 5/12
3/30/24, 11:57 AM View Form
quantity of Sylhet sand or coarse sand of point Thousand
equivalent F,M, 2,2 and 50% best quality local Zero Zero Seven
sand of FM 1,2) and 12 mm down well graded One Hundred
stone chips, laying the concrete in alternate and Sixty
panels, compacting and finishing the top with neat point Two
cement and curing at least for 7 days in all floors Zero Four
including cost of water, electricity and other
charges etc, all complete and accepted by the
Engineer-in-charge,(Cement: CEM-II/B-M) In
ground floor, i) Ground Floor

Interior premium acrylic emulsion painting (silky


finish) of approved best quality and colour
delivered from authorized local agent of the
manufacturer(Berger luxury silk emulsion/Elite
super aclose silky finish/Asian royal luxury silk
emulsion or equivalent brand) in a sealed
container; applying to interior wall and ceiling with Two Lakh
surface preparation including cleaning drying, Six
making free from dirt, grease, wax, removing all Thousand
Three
chalked and scaled materials, fungus, mending One
Hundred
good the surface defects using sand paper and Hundred
31 C/W N/A Sqm 687.210 300.001 point 206163.687
necessary scaffolding; applying 1 coat of interior and Sixty-
Zero Zero
sealer of specified brand on prepared,surface; Three
One
then applying 1 coat of interior putty of specified point Six
brand for levelling, spot filling, crack filling and Eight
cutting by sand paper/zero water paper; finally Seven
applying 2 coats of interior emulsion paint by
spreading with ush/roller/spray machine &
necessary scaffolding etc,upto desired finishing,
elapsing specified time for drying or recoating; all
complete in all floors and accepted by the
Engineer-in-charge, i) Ground Floor,

Exterior premium acrylic emulsion paint of


approved best quality and color with high
performance against dirt picking tendency and
efflorosence resistence properties along with water
resisting properties and resistance properties
against fungi, fading and flaking from authorized
local agent of the manufacturer in a sealed
container; applying to exterior surface with surface
Fifty-Eight
preparation including cleaning drying, making free
Thousand
from dirt, grease, wax, removing all chalked and Three
Two
scaled materials, fungus, mending good the Hundred
Hundred
32 C/W N/A surface defects using sand paper and necessary Sqm 194.160 300.001 point 58248.194
and Forty-
scaffolding; applying necessary exterior sealer of Zero Zero
Eight point
specified brand on prepared surface; then One
One Nine
applying necessary exterior putty of specified
Four
brand for levelling, spot filling, crack filling and
cutting by sand paper/zero water paper; finally
applying 2 coats of exterior emulsion paint
spreading by brush/roller/spray & necessary
scaffolding etc, upto desired finishing, elapsing
specified time for drying or recoating; all complete
in all floors and accepted by the Engineer-in-
charge, i) Ground Floor,

Standard synthetic enamel paint of approved best


quality and colour delivered from authorized local Twenty-
agent of the manufacturer in a sealed container, Three
having high water resistance, high bondibility, Thousand
Three
flexibility property; using specified brand thinner Five
Hundred
applying to metallic or wooden surface by Hundred
33 C/W N/A Sqm 78.480 300.001 point 23544.078
brass/roller/spray in 2 coats over single coat anti- and Forty-
Zero Zero
corrosive coating including cleaning, drying, Four point
One
making free from dirt, grease, wax, removing all Zero
chalked and scaled materials, all complete in all Seven
floors and accepted by the Engineer-in-charge, i) Eight
Ground Floor,

Standard synthetic enamel paint of approved best


quality and colour delivered from authorized local
Sixty-Eight
agent of the manufacturer in a sealed container,
Thousand
having high water resistance, high bondibility,
Three Three
flexibility property; using specified brand thinner
Hundred Hundred
applying to metallic or wooden surface by
34 C/W N/A Sqm 227.940 300.001 point 68382.228 and
brass/roller/spray in 2 coats over single coat anti-
Zero Zero Eighty-
corrosive coating including cleaning, drying,
One Two point
making free from dirt, grease, wax, removing all
Two Two
chalked and scaled materials, all complete in all
Eight
floors and accepted by the Engineer-in-charge, i)
Ground Floor, Roof

35 C/W N/A Supplying, fitting and fixing of 100 mm inside Rm 45.780 800.001 Eight 36624.046 Thirty-Six
diameter & wall thickness 2,7 mm - 3,4 mm best Hundred Thousand
quality uPVC rain water down pipe fitting, fixed in point Six
position with head and shoes, bends, min,20 mm Zero Zero Hundred
width F,I, Bar clamp and nails, and including all One and
accessories such as round grating/domed roof Twenty-

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=5191386&userId=45947&nture=Works&tenId=956989&procMtd=… 6/12
3/30/24, 11:57 AM View Form
grating, bands, sockets approved and accepted by Four point
the Engineer- in- charge, i) Ground Floor, Roof Zero Four
Six

Five Lakh
Eighteen Sixteen
Thousand Thousand
36 C/W N/A Drain Work Cum 28.700 18000.001 point 516600.029 Six
Zero Zero Hundred
One point Zero
Two Nine

Eighteen
Eighteen
Thousand
Thousand
37 C/W N/A Building Name Plate L/S 1.000 18000.001 point 18000.001
point Zero
Zero Zero
Zero One
One

Eighteen
Eighteen
Thousand
Thousand
38 C/W N/A Site Cleaning L/S 1.000 18000.001 point 18000.001
point Zero
Zero Zero
Zero One
One

Eighteen
Eighteen
Thousand
Thousand
39 C/W N/A Unseen Work L/S 1.000 18000.001 point 18000.001
point Zero
Zero Zero
Zero One
One

ONSTRUCTION OF 183,120 Sqm ROAD :


Providing layout and carry over PWD Bench-Mark
Forty-Five
(BM) at site from nearby BM pillar, Property lines,
Two Thousand
existing ground level (EGL), formation ground
Hundred Seven
level (FGL), highest flood levels (HFL), plinth
and Fifty Hundred
40 C/W N/A levels (PL), mean sea level (MSL), setting and Sqm 183.120 250.001 45780.183
point and Eighty
marking all pillars, marker, pegs etc, showing and
Zero Zero point One
maintaining reduced levels (RL?s) including
One Eight
locating, establishing, protecting all public utilities
Three
within the premise of work and finally all to be
presented in black and white,

Mobilization and cleaning site before commencing


actual physical work and during contract period
and demobilization after completion of the works
under contract to be accepted by the Engineer-in-
charge, This work shall also cover cleaning and
clearing, cutting or filling, dressing the project area Sixty-Four
Three
on and in the ground to an extent that all the Thousand
Hundred
events of works of the project can be executed AND
and Fifty
41 C/W N/A smoothly in a working environment with a Sqm 183.120 350.001 64092.183 Ninety-
point
particular attention on safety and security in all Two point
Zero Zero
respects, and to stockpile the end outcome to a One Eight
One
place for disposal agreed by the Engineer-in- Three
charge, where, payments are to be based on
ground area determined by the Engineer-in-charge
and be proportionate to the percentage progress
of work under contract as a whole in all respects
and approved by the Engineer-in-charge

Earth work in excavation in all kinds of soil for


foundation trenches including, layout, providing
center lines, local bench-mark pillars, leveling,
ramming and preparing the base, fixing bamboo
spikes and marking layout with chalk powder,
providing necessary tools and plants, protecting
Sixty-Four
and maintaining the trench dry etc,, stacking, Three
Thousand
cleaning the excavated earth at a safe distance Hundred
AND
out of the area enclosed by the layout etc, all and Fifty
42 C/W N/A Sqm 183.120 350.001 64092.183 Ninety-
complete and accepted by the Engineer, subject to point
Two point
submit method statement of carrying out Zero Zero
One Eight
excavation work to the Engineer for approval, One
Three
However, Engineer?s approval shall not relieve
the contractor of his responsibilities and
obligations under the contract, Layout and marking
for earthwork in excavation in foundation accepted
by the Engineer-in-charge, [Plinth area of the
structure shall be considered for measurement]

Mechanical compaction of earth beyond plinth


area, required for pre-approved specific Fifty-Four
engineering purpose in 150 mm layers including Thousand
Two
levelling, watering and consolidation each layer Nine
Thousand
with chain dozer, grader, roller etc, to achieve Hundred
43 C/W N/A Cum 27.470 2000.001 point 54940.027
minimum dry density of 95% with optimum and Forty
Zero Zero
moisture content (modified proctor test) up to point Zero
One
finished level all complete and accepted by the Two
engineer-in-charge subjected to submission of the Seven
method statement,

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=5191386&userId=45947&nture=Works&tenId=956989&procMtd=… 7/12
3/30/24, 11:57 AM View Form

Earth work in road embankment up to a lift of 1,5


m in all kinds of soil including cutting and throwing
earth in layers not exceeding 150 mm in thickness, Fifty-Four
breaking clods up to 40 mm size in each layer, Thousand
Four
ramming, leveling and dressing as per required Nine
Hundred
side slope and alignment with earth borrowed from Hundred
44 C/W N/A Cum 137.340 400.001 point 54936.137
the road side govt, acquired land for any leads and and Thirty-
Zero Zero
maintaining the embankment true to level and side Six point
One
slopes as per profiles for one year from the date of One Three
completion including making dug, bailing, profiling Seven
etc, complete and accepted by the Engineer-in-
charge,

Sand filling in foundation trenches and plinth with Eleven


sand having F,M, 0,5 to 0,8 in 150mm layers Thousand
Five
including leveling, watering and compaction to Four
Hundred
achieve minimum dry density of 90% with optimum Hundred
45 C/W N/A Cum 22.890 500.001 point 11445.023
moisture content (Modified proctor test) by and Forty-
Zero Zero
ramming each layer up to finished level as per Five point
One
design supplied by the design office only etc, all Zero Two
complete and accepted by the Engineer, Three

Providing compacted sub-base course with well


graded material of crushed well burnt picked
jhama / 1st class brick bats and sand (FM 0,8) Ten
with mixing proportion 2 : 1 having compacted Thousand
thickness made as per specification including local Four Nine
handling, spreading uniformly to proper grade Hundred Hundred
46 C/W N/A camber and super elevation, packing, rolling Cum 27.470 400.001 point 10988.027 and
properly with 8 to 10 ton capacity power driven Zero Zero Eighty-
road roller and watering properly for compaction of One Eight point
100% MDD (standard) blinding with sand including Zero Two
cost of fuel, lubricants, spares, maintenance, Seven
driver etc, all complete and accepted by the
Engineer-in-charge,

Ten
Thousand
Nine
Supplying and laying of single layer polythene Hundred
Sixty
sheet weighing one kilogram per 6,5 square meter and
point
47 C/W N/A in floor or any where below cement concrete Sqm 183.120 60.001 10987.383 Eighty-
Zero Zero
complete in all respect and accepted by the Seven
One
Engineer, point
Three
Eight
Three

Brick works of width one brick or one and a half


brick length with first ,bricks in cement sand (F,IM,
Twenty-
1,2) mortar (1,6) in superstructure including raking
One
out joints, filling the interstices with mortar Six
Thousand
cleaning and soaking the bricks at least for 24 Thousand
Three
48 C/W N/A hours before use and washing of send necessary Cum 3.560 6000.001 point 21360.004
Hundred
scaffolding curing at least for 7 days etc, all Zero Zero
and Sixty
complete (measurement to given as 250 mm width One
point Zero
for one brick length and 375 mm for brick length
Zero Four
and accepted by the Engineer,( (Cement: CEM-
11/A-M) In ground floor

Minimum 12 mm thick cement sand (F,M, 1,2)


Seven
plaster with neat cement finishing to plinth wall
Three Thousand
(1:4) with cement up to 150 mm below ground
Hundred Five
level with neat cement finishing including washing
and Fifty Hundred
49 C/W N/A of sand, finishing the edges and corners and Sqm 21.570 350.001 7549.522
point and Forty-
curing at least for 7 days, cost of water, electricity
Zero Zero Nine point
and other charges etc, all complete in all respect
One Five Two
as per drawing and accepted by the Engineer,
Two
(Cement: CEM-II/A-M) Ground floor

Providing expansion joints across the R,C,C, road


pavement with 20 mm gap between the adjacent
panels, Supplying dowel bars of size 12 mm dia
and 600 mm long M,S rod placed @ 750 mm c/c,
One Seventeen
300 mm of the bar being fixed within one slab
Thousand Thousand
keeping remaining portion the bar free within the
Two Two
adjacent slab being inserted in 20 mm dia and 300
50 C/W N/A Sqm 14.400 1200.001 Hundred 17280.014 Hundred
mm long P,V,C, pipe embedded in the slab, inside
point and Eighty
of pipe fully greased, filling the gap between the
Zero Zero point Zero
slabs (with admixture) of hot bitumen and coarse
One One Four
sand (F,M, 2,2) in proportion of 2:1, finishing the
top with bitumen, spreading coarse sand over the
joint, all complete as per plan, drawing and
accepted by the Engineer-in-charge,

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=5191386&userId=45947&nture=Works&tenId=956989&procMtd=… 8/12
3/30/24, 11:57 AM View Form

Reinforced cement concrete works with minimum


cement content relates to mix ratio 1:1,5:3 having
minimum f'cr = 30 MPa, satisfying a specified
compressive strength f?c = 25 MPa at 28 days on
standard cylinders as per standard practice of
Code ACI/BNBC/ASTM, Cement conforming to
BDS EN-197-1 -CEM-I, 52,5N (52,5 MPa) / ASTM-
C 150 Type ? I, best quality Sylhet sand or coarse
Three
sand of equivalent F,M, 2,2 and 20 mm down well
Lakh
graded stone chips conforming to ASTM C-33,
Twenty-
making and placing shutter in position and
Twelve Nine
maintaining true to plumb, making shutter water-
Thousand Thousand
tight properly, placing reinforcement in position;
51 C/W N/A Cum 27.470 12000.001 point 329640.027 Six
mixing with standard mixer machine with hopper,
Zero Zero Hundred
fed by standard measuring boxes or mixing in
One and Forty
batching plant, casting in forms, compacting by
point Zero
vibrator machine and curing at least for 28 days,
Two
removing centering-shuttering after specified time
Seven
approved; including cost of water, electricity,
testing charges of materials and concrete
cylinders as required, cost of all materials and
other charges etc, all complete, approved and
accepted by the Engineer-in-charge, (Rate is
excluding the cost of reinforcement and its
fabrication, placing, binding etc, and the cost of
shuttering & centering), Road

Supplying, fabrication, and fixing to details as per


design : Ribbed or deformed bar reinforcement for
Reinforced Cement Concrete, produced and
marked in accordance with BDS ISO 6935 - 2:
2006 (or standard subsequently released from
BSTI) including straightening and cleaning rust, if
any, bending and binding in position with supply of
One Lakh
G,I, wires, splices or laps what so ever etc,
Thirty-Six
complete in all respects and accepted by the
One Thousand
Engineer ( Measurement shall be recorded only on
Hundred Three
Standard Mass per Unit length of Bars, while, dia
and Ten Hundred
52 C/W N/A of bars exceeds its standard), Grade 400 (RB 400 Kg 1239.220 110.001 136315.439
point and
/RB 400W: complying BDS ISO 6935-2:2006)
Zero Zero Fifteen
ribbed or deformed bar produced and marked
One point Four
according to Bangladesh standard, with minimum
Three
yield strength, fy (ReH)= 400 MPa but fy not
Nine
exceeding 450 MPa and whatever is the yield
strength within allowable limit as per BNBC/ ACI
318, the ratio of ultimate tensile strength fu to yield
strength fy, shall be at least 1,25 and minimum
elongation after fracture and minimum total
elongation at maximum force is 16% and 8%
respectively : up to ground floor, Reinforcement

CONCEALED CONDUIT POINT WIRING ( BYA)


(WITHOUT SWITCH) Concealed conduit wiring for
following point looping at the switch board with
earth terminal with IC - 2x1,5 sqmm PVC insuated
cable ( BYA ) & IC - 2x1,5 sqmm PVC insulated
FCC ( BYA ) Green Yellow bi - colour including
circuit wiring ( From SDB to Switchboard ) with IC -
2x2,5 sqmm PVC insulated cable ( BYA ) & IC -
225 sqmm PVC insulated ECC ( BYA ) ( Green
Yellow bi - colour ) through PVC conduit tone
conduit from switch board to common point on
ceiling is considered to draw 3 pair of cable ) of
reputed manufacturer of minimum 25 mm dia & One
Thirty-One
1,7 mm wall copper, thickness complete with 18 Thousand
Thousand
SWG GP sheet / PVC switch board pull box with One
Nine
53 E/W N/A 3mm thick ebonite sheet cover , fixing materials Point 29.000 1100.001 Hundred 31900.029
Hundred
etc ( without switch ) as required including point
point Zero
mending the damages good , All electrical Zero Zero
Two Nine
contacts shall be of brass connected through One
connector or soldering ( no twisting shall be
allowed ) and cables shall be manufactured and
tested according to IEC BS VDE standard along
with relevant BDS standard as per detailed
specification mentioned in Annexure - 1 , The work
shall be carried out as per direction & approval of
the Engineer In Charge, Cable manufacturer (s)
must have valid type test certificate (within last
seves years) from internationally accredited
laboratory (like CPRI, KEMA des accepted /
approved by the Engineer In Charge, Light /
exhaust or wall bracket fan point, Fan point

54 E/W N/A Concealed conduit wiring with the following PVC RM 70.000 1100.001 One 77000.070 Seventy-
insulated and stranded cable (BYA) & PVC Thousand Seven
insulated green/white coloured ECC wire (BYA) One Thousand
through PVC conduit of reputed manufacturer) Hundred point Zero
complete with 18 SWG GP sheet pull box with point Seven
3mm thick ebonite sheet cover, fixing materials,

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=5191386&userId=45947&nture=Works&tenId=956989&procMtd=… 9/12
3/30/24, 11:57 AM View Form
other accessories etc, as required including Zero Zero
mending the damages good, All electrical contacts One
shall be of brass/copper connected through
connector or soldering ( no twisting shall be
allowed) and cables shall be manufactured and
tested according to relavent IEC/BDS/BS/VDE
standards and as per detailed specification
mentioned in Annexure-A, The work shall be
carried out as per direction/approval/acceptance of
the Engineer,Cables manufactured by BRB/
Paradise/BBS/Poly/ Supersign / Fecto Industries
(Citizen)/ Evana/Khawaja (777 Energy
Cable)/MEP/RR/Singer/Macro/
Transcom(Transtec) or equivalent approved by the
Engineering-in-Charge, 1C-2x2,5 sq,mm,(BYA)
cable with 2,5 sq,mm (BYA) ECC wire through
PVC pipe of minimum inner dia 16 mm having wall
thickness of 1,5 mm

Concealed conduit wiring with the following PVC


insulated and stranded cable (BYA) & PVC
insulated green/white coloured ECC wire (BYA)
through PVC conduit of reputed manufacturer)
complete with 18 SWG GP sheet pull box with
3mm thick ebonite sheet cover, fixing materials,
other accessories etc, as required including
mending the damages good, All electrical contacts
shall be of brass/copper connected through
One
connector or soldering ( no twisting shall be
Thousand Thirty-
allowed) and cables shall be manufactured and
One Three
tested according to relavent IEC/BDS/BS/VDE
55 E/W N/A RM 30.000 1100.001 Hundred 33000.030 Thousand
standards and as per detailed specification
point point Zero
mentioned in Annexure-A, The work shall be
Zero Zero Three
carried out as per direction/approval/acceptance of
One
the Engineer,Cables manufactured by BRB/
Paradise/BBS/Poly/ Supersign / Fecto Industries
(Citizen)/ Evana/Khawaja (777 Energy
Cable)/MEP/RR/Singer/Macro/
Transcom(Transtec) or equivalent approved by the
Engineering-in-Charge, 1C-2x10 sq,mm,(BYA)
cable with 10 sq,mm (BYA) ECC wire through PVC
pipe of minimum inner dia 20 mm having wall
thickness of 1,5 mm

GANG SWITCH, Providing & fixing 250 volt 5/6


amps (minimum) Concealed type following
switch/switch socket Manufactured / Assembled
and tested in accordance with IEC / VDE / NEMA /
BS / JIS along with relevant BDS IEC standard , Five
Three
mounted on required size 18 SWG galvanized Hundred
Thousand
56 E/W N/A plain sheet board Plastic Board ( Self - Each 6.000 500.001 point 3000.006
point Zero
extinguishing 650 degree centigrade ) of 76,2 mm Zero Zero
Zero Six
, ( 3 inch ) depth, All electrical contacts shall be of One
brass/copper, Assembled and made in
BANGLADESH/CHINA/INDIA/TURKEY/VIETNAM,
Four gang switch, One gang switch & one 5/10
Amps pin socketcombined

Five
Two
GANG TYPE FAN REGULATOR Assembled and Hundred
Thousand
57 E/W N/A made in Each 4.000 500.001 point 2000.004
point Zero
BANGLADESH/CHINA/INDIA/TURKEY/VIETNAM Zero Zero
Zero Four
One

SOCKET OUTLETS, Providing & fixing 250 volt


single phase 3 - pin combined switch socket outlet
( surface / Concealed type ) Manufactured /
Assembled and tested in accordance with IEC /
Five
VDE / NEMA / BS / JIS along with relevant BDS Three
Hundred
IEC standard , mounted on required size 18 SWG Thousand
58 E/W N/A Each 6.000 500.001 point 3000.006
galvanized plain sheet board Plastic Board ( Self - point Zero
Zero Zero
extinguishing 650 degree centigrade ) of 76,2 mm Zero Six
One
, ( 3 inch ) depth , ( Manufacturer shall have
certificate of standard which they follow )
13/15/16/20 Amps, Assembled and made in
BANGLADESH/CHINA/INDIA/TURKEY/VIETNAM

Supplying, fitting and fixing of the 250 V, A,C, Four


Sixteen
capacitor type ceiling fan, with regulator and other Thousand
Thousand
59 E/W N/A accessories etc, (1400 mm sweep capacitor type : Each 4.000 4000.001 point 16000.004
point Zero
Millet/G,E,C,/Singer or equivalent,) & all complete Zero Zero
Zero Four
as per direction of the Engineer in charge: One

60 E/W N/A Providing and fixing of following axial flow A,C Each 4.000 2000.001 Two 8000.004 Eight
capacitor type wall mounted exhaust fan complete Thousand Thousand
with blade, steel frame standard wall louver point point Zero
shutter, PVC insulated connecting wire etc Zero Zero Zero Four
complete as required including cutting wall and One
mending good the damages as per direction of the
Engineer-in-charge (12 inch) Ehaust fan plastic

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=5191386&userId=45947&nture=Works&tenId=956989&procMtd=… 10/12
3/30/24, 11:57 AM View Form
body (Foreign made approved by the Engineering-
in-Charge)

Braket light Fittings Light source : Ix9W LED, One


One
Material : SS pipe ( Da - 20mm , thick - 1,2mm ) & Thousand
Thousand
SS Sheet body, MS Sheet , Glass , 1-230m , H - Five
Five
61 E/W N/A 200mm , P - 150min, GLORIA cat no , GWHI - Each 1.000 1500.001 Hundred 1500.001
Hundred
2503-2863, Energy Cat No - 30007, Commo Cat point
point Zero
No - HDR1 - GWH4-03, Asha Cat No - ACS - RS - Zero Zero
Zero One
1223 657, Crescent - CB - 2028 1 or equivalent, One

Tube Light Fittings Light source 20W T - 8 LED One


tube, Material : MS Sheet , Design Acrylic ( thick Thousand
Twelve
2,5mm ), 1-1240mm B - 60mm 11-106mm, Gloria Five
Thousand
62 E/W N/A cat no - GTF ( LED ) 755x1x20W, Energy EMC - Each 8.000 1500.001 Hundred 12000.008
point Zero
43002, Cosmo cat no - RDTC1-11F - 03, Asha Cat point
Zero Eight
No, ACS - ILS 317x1x40W, Cracant - CTI,S - Zero Zero
68x1x40 Watt or equivalent, One

Ceilling mounted Soucer light Light source 7W


Three Twenty-
LED Bulb, Material : MS Shoct , Brass aloy , Glass
Thousand Four
Size : D - 313mm 11-12mm, Gloria cat no - GCLF
63 E/W N/A Each 8.000 3000.001 point 24000.008 Thousand
640 LED CFL - 7 Energy EPSI - 9023, Anha Cat
Zero Zero point Zero
No, ACS - P3652, Crescant - CPM - 423 - P - BLK
One Zero Eight
or equivalent

SINCLE PHASE DISTRIBUTION BOARD (SPDB)


Providing and fixing single phase distribution
board (SPDB) [concealed / surt'acel] having the
followi omponen ts and specification: 1, Steel
board : Approximate size: 20 inch x 15 inch x4
inch, MS sheet : I8SWG with hinged type door and
locking arrangement duly painted with powder
coating with epoxy polyester resin on all surfaces
of board (gray / off-white) etc, ln front side there
will be tempered thick fiber glass of minimum 8
mm thickness with rubber gaskers to observe the
inside arrangemenl, 2, Copper bar: Approximate Five
Five
size: 10 inch x 1inch x 3mm (2 nos) and 6 inch x 1 Thousand
Thousand
64 E/W N/A inch x 3mm, (I no) mounted on insulator at both Each 1.000 5000.001 point 5000.001
point Zero
ends, capacity: 60- I 00A, 3, 1 No, DPMCB(main Zero Zero
Zero One
control) and following nos,SpMCB, DpMCB and One
SPMCB Manufactured / Assembled and tested in
accordance with relevant BDS IEC 60898-t:2016
and IEC / VDE / NEMA / BS / JIS standard,
Minimum breaking capacity 6/10 KA with thermal
overcunent and instantaneous electromagnetic
short circuit release, 4, Loop Cable Ifrom
phase,bar to SPMCB(circuit & power)] Size: lC- I
x2,5 sq mm (BYM) with DPMCB and SpMCBs
accepted / approved by the Engineer-in-charge, 8-
way SPDB Incoming: 1x50A DP MCB (10 KA)
Outgoing : 8x5-10A SP MCB (10 KA)

Twelve Twenty-
Thousand Four
65 E/W N/A Lightning Arrester Set 2.000 12000.001 point 24000.002 Thousand
Zero Zero point Zero
One Zero Two

Providing & fixing 25,4 mm ( l inch ) dia 457 mm ( I


5 ti) long solid copper rod with 6,6 mm thick 150
mm x l50 mm copper made base with sharp end
top, fixed on the top of 2,0 inch( 2,5 - 3 mm thick ) Four
Twenty-
dia l0 feet long Gl pole by necessary accessories Hundred
Seven
The pole shall fixed on parapet wall with and Fifty
66 E/W N/A Per meter 60.000 450.001 27000.060 Thousand
necessary CC work and other accessories for point
point Zero
anesting lightning as per plan (enclosed) and as Zero Zero
Six
per direction ofthe Engineer' [Fig:421], Providing & One
drawing no-2 HDBC wire through 12,7 mm (7 r
feet) dia C l feet pipe including htting, fixing the
G,l, pipe in wall or column complete as required,

Earthing Earthing the electrical installation with 40


mm (1,5 inch) dia c,l, pipe (earth electrode) having
6,35 mm, dia hole across the pipe at 305 mm,
interval securely bonded by soldering with 2 nos,
ofNo-2 SWG HDBC earth leads (at the top ofthe
Three
electrode) with its protection by 20 mm, (3/4 inch) Three
Thousand
dia G,l, pipe up-to plinth level run at a depth of Thousand
67 E/W N/A Each 1.000 3000.001 point 3000.001
609,6 mm (2 feet) below G,L up-to main board to point Zero
Zero Zero
be eanhed including necessary connecting copper Zero One
One
sockets, bolts, nuts, etc, complete for maintaining
earth resistance within I ohm, IFig : 4,191 Depth of
bonom of main electrode at 31242 mm, (102,5
feet) from CL & length ofelectrode J0480 mm, (100
feet) (For Lighting Arrester)

68 E/W N/A FIRE EXTINGUISHER DRY CHEMICAL Each 1.000 5000.001 Five 5000.001 Five
POWDER TYPE Supply & fixing of the following Thousand Thousand

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=5191386&userId=45947&nture=Works&tenId=956989&procMtd=… 11/12
3/30/24, 11:57 AM View Form
capacities multi purpose ABC dry chemical powder point point Zero
stored pressure type with manometer system fire Zero Zero Zero One
extinguisher suitable for repeated use complete One
with wall bracket , Nitrogen ( N2 ) cartridge , easy
refilling system etc, as per sample accepted &
approved by the Engineer in Charge, Mono
Ammonium Phosphate ( minimum 40 percent )
based ABC dry chemical agent & has a moisture -
proof , anti - caking properties , Working pressure
12 BAR minimum & Test pressure 25 BAR
minimum , Proper fire rating ( as per NFPA 10 - BS
/ EN ) according to the capacity of the extinguisher
Manufacturer's certificate shall have to be
submitted if needed Also sample of the dry
chemical powder will be tested by the proper
authority in Bangladesh if needed, 5 Kg capaciy

FIRE EXTINGUISHER CARBON - DI - OXIDE


TYPE Supply & fixing of the following capacities
Carbon - di - Oxide stored pressure type with
manometer system fire extinguisher suitable for
repeated use complete with wall bracket , CO ,
cartridge , easy refilling system etc, as per sample Five
Five
accepted & approved by the Engineer in Charge, Thousand
Thousand
69 E/W N/A Working pressure : 12 BAR minimum & Test Each 1.000 5000.001 point 5000.001
point Zero
pressure : 25 BAR minimum , Proper fire rating ( Zero Zero
Zero One
as per NFPA 10 / BS / EN ) according to the One
capacity of the extinguisher , Manufacturer's
certificate shall have to be submitted if needed ,
Also sample of the Carbon - di - Oxide will be
tested by the proper authority in Bangladesh if
needed 5 Kg , Capacity,

Seventy-
Three
Lakh
Sixteen
Thousand
Grand
7316351.358 Three
Total:
Hundred
and Fifty-
One point
Three Five
Eight

This Bill of Quantities is Electronically Signed by Mr. Md. Alam on behalf of M/S. Prianka Enterprise

https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?formId=5191386&userId=45947&nture=Works&tenId=956989&procMtd=… 12/12

You might also like