Module 3 PDD-Ktunotes - in
Module 3 PDD-Ktunotes - in
Recompute the
Manufacturing Costs
Good
N
enough
?
Y
Acceptable Design
Raw Materials
Labor
Manufacturing System Finished Goods
Purchased
Components
Equipment Indirect
Standard Custom Labor Support
and Tooling Allocation
Raw
Processing Tooling
Material
The “3 seconds” in the numerator reflects the theoretical minimum time required to
handle and insert a part that is perfectly suited for assembly.
2. Identify Potential
Environmental Impacts
Concept
Development 3. Select Material and DFE
Guidelines
5. Assess Environmental
Impact
Detail 6. Refine Design
Design Compare to
DFE Goals N
Y
Process 7. Reflect on DFE Process
Improvement and Results