The document outlines the scope of a VMware professional services project. It describes what is included and excluded from the project scope. It also provides an estimated schedule for the project over a 4 week period, outlining the expected duration of each phase.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
37 views
SSa D
The document outlines the scope of a VMware professional services project. It describes what is included and excluded from the project scope. It also provides an estimated schedule for the project over a 4 week period, outlining the expected duration of each phase.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2
VMware Professional Services November 11, 2020
Service Scope and Description
1. Overview
2. Project Scope The scope of the service includes the following:
2.1 Out of Scope
The following are the out of scope items for this project: General Installation and configuration of custom or third-party applications and operating systems on deployed virtual machines. Operating system administration including the operating system itself or any operating system features or components. Management of change to virtual machines, operating systems, custom or third-party applications, databases, and administration of general network changes within Customer control. Remediation work associated with any problems resulting from the content, completeness, accuracy, and consistency of any data, materials, or information supplied by Customer. Installation or configuration of VMware products not included in the scope of this document. Installation and configuration of third-party software or other technical services that are not applicable to VMware components. Configuration of VMware products used for the service other than those implemented for the mutually agreed to use cases. Customer solution training other than the defined knowledge transfer session.
2.2 Estimated Schedule
The project defined in this SOW is estimated to be for a duration of up to four (4) weeks. VMware consulting services will operate according to a schedule agreed to by both parties. The consulting services are performed during normal business hours and workdays (weekdays and non-holidays). The following is an estimated outline of the duration of each phase in the project. Customer acknowledges that the estimated duration is indicative only and that VMware will not incur any penalty or forfeit any entitlement to payment, fees, or related expenses if the consulting services are not provided in accordance with the estimated duration.
Implementing VMware Dynamic Environment Manager: Manage, Administer and Control VMware DEM, Dynamic Desktop, User Policies and Complete Troubleshooting
AWS Certified Solutions Architect – Professional Exam Guide (SAP-C02): Gain the practical skills, knowledge, and confidence to ace the AWS (SAP-C02) exam on your first attempt
Gender Politics and Society in Spain Routledge Advances in European Politics 1st Edition Monic Threlfall - Own the ebook now with all fully detailed content
(Ebook) The Broken Olive Branch: Nationalism, Ethnic Conflict, and the Quest for Peace in Cyprus: The Impasse of Ethnonationalism (Syracuse Studies on Peace and Conflict Resolution). by Harry Anastasiou ISBN 9780815631965, 0815631960instant download