PKT-E-M3-300-ER-0020-R RFQ For Bagging Package
PKT-E-M3-300-ER-0020-R RFQ For Bagging Package
Bagging Package
JOB NO : 188806
P.T. R E K A Y A S A I N D U S T R I
SHEET 1 OF 8
DOC. NO. : A
Requisition for Design, Fabrication, and Supply PKT-E-M3-300-ER-0020-R
Bagging Package
21/06/18 AYHLI HN HN
P.T. R E K A Y A S A I N D U S T R I
SHEET 2 OF 8
DOC. NO. : A
Requisition for Design, Fabrication, and Supply PKT-E-M3-300-ER-0020-R
Bagging Package
21/06/18 AYHLI HN HN
TABLE OF CONTENTS
1. GENERAL .................................................................................................................... 3
2. ITEMS TO BE PURCHASED........................................................................................ 3
3. REFERENCES ............................................................................................................. 3
3.1 Codes and Standards ........................................................................................ 3
3.2 Project Specifications ....................................................................................... 4
4. CONFLICT.................................................................................................................... 4
5. SCOPE OF WORK ....................................................................................................... 4
5.1 Responsibility, Warranty and Guarantee ......................................................... 4
5.2 Scope of Work.................................................................................................... 5
5.3 Spare Parts......................................................................................................... 5
5.4 Special Tools...................................................................................................... 5
6. VENDOR’S DATA REQUIREMENTS ........................................................................... 5
7. DEVIATION .................................................................................................................. 5
8. RESPONSIBILITY ........................................................................................................ 6
9. GUARANTEE ............................................................................................................... 6
10. QUALITY ASSURANCE............................................................................................... 6
11. DELIVERY SCHEDULE ............................................................................................... 6
12. PACKING, SHIPPING, AND TRANSPORTATION ....................................................... 6
13. SPECIAL NOTES ......................................................................................................... 6
APPENDIX :
Appendix–A : LIST OF SCOPE OF SUPPLY AND WORK
Appendix–B : VENDOR’S DATA REQUIREMENT SHEET
Appendix–C : LIST OF SHOP INSPECTION AND TEST
Appendix–D : PRESERVATION REQUIREMENTS
Appendix–E : DEVIATION LISTS
Appendix–F : SPIR FORM
Appendix–G : EXPERIENCE RECORD
P.T. R E K A Y A S A I N D U S T R I
SHEET 3 OF 8
DOC. NO. : A
Requisition for Design, Fabrication, and Supply PKT-E-M3-300-ER-0020-R
Bagging Package
21/06/18 AYHLI HN HN
1. GENERAL
PT. PUPUK KALIMANTAN TIMUR (PKT), a company duly organized under the laws of the Republic
of Indonesia at its industrial complex in Bontang, East Kalimantan, Indonesia, intends to construct
NPK Chemical Process plant
The required capacity is 1 x 500,000 Metric Tons Per Year on 330 stream Days Per Years, 22 hours
per day for nitrate and urea base
PT. Rekayasa Industri, here and after referred to as ‘Purchaser’, intends to obtain Vendor's quotation
for the supply of equipment and works as mentioned in this requisition.
2. ITEMS TO BE PURCHASED
The following equipment shall be furnished in accordance with the requirements specified in this
requisition and the related documents listed in section 3.
3. REFERENCES
P.T. R E K A Y A S A I N D U S T R I
SHEET 4 OF 8
DOC. NO. : A
Requisition for Design, Fabrication, and Supply PKT-E-M3-300-ER-0020-R
Bagging Package
21/06/18 AYHLI HN HN
4. CONFLICT
If there is any conflict between this requisition and the documents referred to in section 3, the order
of precedence shall be as follows:
1. This Requisition
2. Mechanical Data Sheet
3. Project Specification
4. Piping and Instrumentation Diagram
5. Code and Standard
NOTE: *) In the event of conflicting specifications, the vendor shall notify purchaser and obtain
written clarification of the points in the question and unless notified otherwise, the more
stringent requirements shall be applied.
5. SCOPE OF WORK
The vendor’s scope of work shall include but not limited to following:
P.T. R E K A Y A S A I N D U S T R I
SHEET 5 OF 8
DOC. NO. : A
Requisition for Design, Fabrication, and Supply PKT-E-M3-300-ER-0020-R
Bagging Package
21/06/18 AYHLI HN HN
Unless vendor proposes any exceptions and alternatives, vendor’s design shall be strictly in
compliance with this requisition.
If vendor proposes any deviations and exceptions which are deemed necessary, a list of
deviations and exceptions with explanations shall be submitted with their proposal and subject
to Purchaser’s approval.
5.3. Spare Parts
The vendor shall separately quote with unit price for two years normal operation spare parts in
accordance with the vendor’s recommendation. The spare parts required for construction, and
field test shall be provided as per vendor’s recommendation that is included in the quotation.
5.4. Special Tools
The vendor shall supply all special tools necessary for construction, maintenance and
operation. Special tools shall be those tools not commercially.
Vendor shall submit the following technical data in his Quotation (mandatory):
1. Price breakdown
2. Data sheet of Vendor’s proposed equipment
3. Technical specification of Vendor’s proposed equipment
4. Preliminary Outline drawing (c/w dimensions, loading data, and anchor plan)
5. Original brochure or catalog (2 sets)
6. Special tools List (if any)
7. Spare part list for construction and commissioning
8. Spare part list for 2 years operation (separately quote)
7. DEVIATION
Unless vendor proposes any exceptions and alternatives, Vendor’s design shall be strictly in
compliance with this requisition and all technical specifications specified in section 3. If Vendor
P.T. R E K A Y A S A I N D U S T R I
SHEET 6 OF 8
DOC. NO. : A
Requisition for Design, Fabrication, and Supply PKT-E-M3-300-ER-0020-R
Bagging Package
21/06/18 AYHLI HN HN
proposes any deviation and exception which are deemed necessary, deviations and exceptions with
explanations shall be submitted in deviation list proposal and subject to Purchaser’s approval.
8. RESPONSIBILITY
Vendor shall be responsible for any discrepancies, errors or omissions in drawings and other
documents prepared by vendor. Needless to say, this shall be applied to documents and materials
not only for shop fabrication work, but also for field work performed by Purchaser in accordance with
the vendor’s ones. All vendor’s documents shall be prepared, checked and approved by Vendor’s
responsible persons, and then submitted to Purchaser.
9. GUARANTEE
1. Vendor shall be responsible for warranty of mechanical strength, integrity and reliability of the
equipment supplied. Any defects or failure arise during the agreed warranty period shall be
repaired by Vendor without any additional cost to Purchaser.
2. Vendor shall guarantee the performance specified in Datasheet for Equipments Devices.
Vendor shall submit their Inspection & Test Plan (ITP), Inspection & Test Procedure and all
supplementary documents such as WPS, PQR, NDT Procedure, FAT Procedure, etc. for reviewed
by Purchaser.
Vendor shall propose for 9 months delivery time or its best possible delivery schedule and this will be
considered by Purchaser on vendor evaluation.
All equipment shall be packed and marked for ocean freight, and shall have protection devices for
transportation, loading, and unloading. All equipment and materials shall be kept clean out of water,
oil, dust, etc. For detailed instruction on preservation, see Appendix D: Preservation Requirement.
1. Vendor shall specify clearly in his proposal the codes and standards for design, fabrication, test,
and inspection.
2. Vendor’s proposal shall comply with this requisition. If vendor proposes any deviations and
exceptions, there should be clearly stated with a list of deviations and alternatives. Otherwise,
vendor shall be deemed to be strictly in compliance with this requisition.
3. Vendor shall submit the overall schedule showing detailed items of engineering works,
manufacturing, inspection and testing, and also estimated field erection, pre-commissioning and
commissioning with the proposal.
4. The following work shall be completed at shop:
P.T. R E K A Y A S A I N D U S T R I
SHEET 7 OF 8
DOC. NO. : A
Requisition for Design, Fabrication, and Supply PKT-E-M3-300-ER-0020-R
Bagging Package
21/06/18 AYHLI HN HN
P.T. R E K A Y A S A I N D U S T R I