Processing Summary
Observation From To Solution H. Prec. V. Prec. Geodetic Ellipsoid ΔHeight
Type (Meter) (Meter) Az. Dist. (Meter)
(Meter)
BM_2_LHL --- BM_2_LHL CP_2_LHL Fixed 0.0014 0.0026 330°34'13. 12.3623 -0.5648
CP_2_LHL (B1) 9"
Acceptance Summary
Processed Passed Flag Fail
1 1 0 0
1
BM_2_LHL - CP_2_LHL (Invalid leap seconds-Invalid leap seconds) (S1)
Baseline observation: BM_2_LHL --- CP_2_LHL (B1)
RMS: 0.0117 m
To: CP_2_LHL
Vector
2
Standard Errors
Vector errors:
X 0.0000015134
Y -0.0000019128 0.0000063268
Occupations
From To
3
Tracking Summary
4
5
6
Residuals
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Processing style
Elevation mask: 10°00'00.0"
Continuous vectors: No
Force float: No
Acceptance Criteria
25