��"' 3. ELECTRICAL DUCTS FROM IDNO TO LV PANEL WILL CROSS
I 62 ABOVE THE MULTIPLE NUMBER OF SURFACE WATER LINE (2.1
A.LIU .llU I : MTR) BELOW F.G.L
I
g 0::-
t, 4. EV CHARGER'S ARE AS UNDER
m
+ � a). 10 NO. ABB CHARGER
B). 04 NO. ALPITRONIC HYC 400 CHARGER (DUAL OUTLET)
0 y
I
? TOTAL 18 NO. EV PARKING BAYS AND ELECTRICAL
EQUIPMENTS
PROPOSED EV
PROPOSED CHARGING BAYS
PROPOSED EV � EXISTING HEAVY DUTY GEOCELLUAR (TOP LEVEL OF
NAL BOLLARD PROPOSED PROPOSED (TYPICAL)
CHARGING BAYS l::L22'.JATTENUATION TANK 20.75 MTR)
(TYPICAL) ABB CHARGER LIGHTING POLE
+ (TYPICAL)
+ (TYPICAL) (TYPICAL)
, EXIT
PROPOSED/
LIGHTIN�_f1OLE
{TYPICAL,f
...
0
0
CX)
onlTY
1li
PROPOSED EV
CHARGING BAYS
(TYPICAL)
---y
"' I
EQUIPMENT AREA 1
111111ulw!llllt:::i11111llt::===i----====---•'
0 5 10 15 20 25m
SCALE 1:250
SCALE 1:50
11011
5506 1322 3416 767 COLOUR CONVENTIONS
2143 BLACK- EXISTING OR UNCHANGED
BLUE- MODIFIED OR TO BE MOVED
GREEN - REDUNDANT DR TO BE REMOVED
PROPOSED RED- PROPOSED OR ADDITIONAL
PURPLE- WORKS FOR FUTURE
EV CHARGING
BAY (TYPICAL)
�"'
0
Rev Date Description of Revisions Drawn Chkd Appr
��
\ ' Suitability
SO - WORK IN PROGRESS
...
LO
EQUIPMENT AREA 2
SCALE 1:50 PROPOSED
NAL BOLLARD
\\�\
Poise Group Ltd
1°' "' PROPOSED 124 City Road
i
-
London
LO
0
a,
., CX)
r-- HYC 400
�
CHARGER EC1V 2NX
\�2\\l?� g
1220 Contractor(s)
�\�\�-\�- �
0
ABB CHARGER
\\ ' I
Project
iI
----------.....\
�
--< ilHfll-++----l-' "' IONITY
C'O
LEEDS SKELTON
PROPOSED
KERB
PROPOSED PROPOSED
LVPANEL PROPOSED ABB POWER Drawing Title
\\�\
(TYPICAL) KERB PROPOSED CABINETS
HARDSTAND PROPOSED
ABB CHARGER
- 11111
NAL BOLLARD
{TYPICAL) Drawn HARSHAD Signed Date 16/04/24
- - 11111
PROPOSED Scale{s) ELR & Mileage
GRASSCRETE SCALE 1:25
HARDSTAND ;
R.T.D ELR&Mileage
� Alternative Reference Sheet
�
0 2 4 6 8 10m 0 1 2 3 4 Sm 01 of 01
--1 11111 I I I 1111 I I Drawing Number Revision
21.98
nn 21 SCALE 1:100 SCALE 1:50
9586-POI-DRG-CIV-500013 P01