Detail "A" Detail "B" Detail "C": Section
Detail "A" Detail "B" Detail "C": Section
URE
REAR AND MIDDLE OF THE REINFORCING ELEMENTS AND BLADED PERPENDICULAR
EMBEDMENT TO THE REINFORCING ELEMENTS.
4. AT NO TIME SHALL ANY CONSTRUCTION EQUIPMENT BE IN DIRECT CONTACT WITH
UCT
THE REINFORCING ELEMENTS.
5. BACKFILL LAYERS SHALL BE COMPACTED UP TO OR SLIGHTLY ABOVE THE
STR
ELEVATION OF EACH LEVEL OF REINFORCEMENT CONNECTION PRIOR TO PLACING
THAT LAYER OF REINFORCING ELEMENT.
6. AT THE COMPLETION OF EACH DAYS WORK, THE CONTRACTOR SHALL GRADE THE
WALL FACE BACKFILL MATERIAL AWAY FROM THE FACE AND LIGHTLY COMPACT THE SURFACE.
EMBEDMENT
REINFORCING ELEMENTS:
12. THE WELDED WIRE FORMS SHOWN ARE AN ACCEPTABLE METHOD OF CONSTRUCTING
THE VERTICAL GRSS WALL. ALTERNATE FORMING SYSTEMS MAY BE USED PROVIDED
CULVERT DETAIL THE GRSS WALL IS CONSTRUCTED AS SHOWN AND THE COMPACTION REQUIREMENTS
PERMANENT WALL FOOTING/STRUCTURE
ELEVATION VIEW ARE MET.
END SLOPE TERMINATION DETAIL ELEVATION VIEW
13. CUT WIRE FORMS AND PLACE GEOTEXTILE TO CONFORM TO EXISTING AND/OR
ELEVATION VIEW PROPOSED STRUCTURE PROJECTIONS IN SUCH A MANNER THAT LOSS OF BACKFILL
MATERIAL DOES NOT OCCUR.
14. OVERLAP THE WELDED WIRE FORM AND OMIT THE SUPPORT STRUTS WHERE GRSS
SPACING IS LESS THAN 18".
NOTE: ENTIRE HEIGHT OF PERMANENT FACE SYSTEM UNIT
15. CUT THE VERTICAL PORTION OF THE TOP WELDED WIRE BASKET DOWN TO THE
MUST BE BENCHED INTO SIDESLOPE IN ACCORDANCE WITH
SPACING SUBGRADE SURFACE BEFORE CONSTRUCTING THE PAVEMENT SECTION.
STANDARD SHEET TITLED "EARTHWORK TRANSITION AND
16. ADDITIONAL STRUTS MAY BE REQUIRED TO STIFFEN THE WELDED WIRE FORMS.
BENCHING DETAILS." SPACING
FACING NOTES:
VARIES
17. ONLY HAND OPERATED EQUIPMENT ALLOWED WITHIN 3’-0" OF THE FACING. LIFT
VARIES
THICKNESS MAY HAVE TO BE MODIFIED TO ACHIEVE REQUIRED COMPACTION.
WELDED WIRE FORM STRUCTURE MONITOR FACING DURING FILL PLACEMENT AND COMPACTION.
OR CULVERT 18. HARD FACING ELEMENTS (TIMBERS, ETC.) SHALL BE SET AT A SLIGHT BACKWARD
WELDED WIRE FORM SPACING
SPACING FOOTING BATTER (TOWARD THE REINFORCED FILL) TO ASSURE CORRECT FINAL VERTICAL
WELDED WIRE FORM SPACING
SEE NOTE ABOVE ALIGNMENT AFTER BACKFILL PLACEMENT AND COMPACTION. COMPACTION EQUIPMENT
AND OPERATION PROCEDURES MAY HAVE TO BE MODIFIED TO MAINTAIN VERTICAL WALL.
CUT WELDED WIRE FORMS AND PLACE
EXISTING GROUND DRAINAGE NOTES:
REINFORCEMENT AND GEOTEXTILE FACE WRAP
AROUND CULVERT TO PREVENT LOSS OF
BACKFILL MATERIAL. 19. TYPE AND LIMITS OF DRAINAGE TREATMENT WILL BE SHOWN IN THE CONTRACT DOCUMENTS.
GEOSYNTHETIC 20. CONCENTRATED DRAINAGE MUST BE DIVERTED AWAY FROM THE GRSS STRUCTURE.
REINFORCING ELEMENT 21. SEEPAGE ZONES INTERCEPTING THE EXCAVATION SLOPE OR THE WALL FOUNDATION AREA
SHALL BE POSITIVELY DRAINED BY PROVIDING ADDITIONAL UNDERDRAIN AND UNDERDRAIN
FILTER MATERIAL AT THE SEEPAGE ZONE, AS DETERMINED BY THE ENGINEER.
UNDERCUTS:
DETAIL "D" DETAIL "E" DETAIL "F" 22. A MAXIMUM 2’-0" UNDERCUT MAY BE ORDERED BY THE ENGINEER WHERE NECESSARY TO
PROVIDE STABLE BEDDING CONDITIONS. UNDERCUTTING SHALL BE PAID FOR UNDER
SECTION 206.
3’-0" 3’-0"
DATE/TIM E = 03-DEC-2010 14:
3" A CULVERT
ITEM
FILE NAM E = 554-0201.
(SHEET 1 OF 6)
A-A
PLAN
APPROVED OCTOBER 28, 2010 ISSUED UNDER EB 10-041
DETAIL "G" DETAIL "H" DETAIL "I" /S/ ANTHONY TORRE, P.E.
554-02
ACTING DEPUTY CHIEF ENGINEER
EFFECTIVE DATE: 05/05/11
(RESEARCH)
2 MAX
BACKFILL PHASE
4"
GEOSYNTHETIC REINFORCED
SOIL SYSTEM HEIGHT 6" DIA. MIN.
FINISHED GRADE
AT FACE OF WALL
WALLS - TYPICAL SECTIONS
EXISTING
GROUND
STATE OF NEW YORK
DEPARTMENT OF TRANSPORTATION
SHEET 1 OF 6
PAYMENT LINES FOR SELECT
dgn
(SHEET 2 OF 6)
SECONDARY GEOSYNTHETIC
LOWER SLOPE BACKFILL:
LOWER REINFORCING ELEMENT (SEE NOTE 10)
12" 12" 12" (TYP.)
12" 12" SEED SLOPE PRIOR TO 2. BACKFILL MATERIAL SHALL BE DUMPED ONTO, OR PLACED PARALLEL TO THE
PLACEMENT OF EROSION REAR AND MIDDLE OF THE REINFORCING ELEMENTS AND BLADED PERPENDICULAR
CONTROL PRODUCT. TO THE REINFORCING ELEMENTS.
3. AT NO TIME SHALL ANY CONSTRUCTION EQUIPMENT BE IN DIRECT CONTACT WITH
SPACING
THE REINFORCING ELEMENTS.
y713-07, TURF 12" y713-07, TURF 12" 4. BACKFILL LAYERS SHALL BE COMPACTED UP TO OR SLIGHTLY ABOVE THE
REINFORCEMENT MAT, REINFORCEMENT MAT, VARIES ELEVATION OF EACH LEVEL OF REINFORCEMENT CONNECTION PRIOR TO PLACING
CLASS III, TYPE C CLASS III, TYPE C 5’-0" THAT LAYER OF REINFORCING ELEMENT.
1 5. AT THE COMPLETION OF EACH DAYS WORK, THE CONTRACTOR SHALL GRADE THE
BACKFILL BACKFILL BACKFILL MATERIAL AWAY FROM THE FACE AND LIGHTLY COMPACT THE SURFACE.
y733-03 y733-03
BACKFILL y733-03 REINFORCING ELEMENTS:
DRAINAGE
BACKFILL 6. REINFORCING ELEMENTS TO BE CONTINUOUS THROUGHOUT THEIR EMBEDMENT LENGTHS.
7. REINFORCING ELEMENTS SHALL BE PLACED PERPENDICULAR TO THE FACING, EXCEPT
WHEN IN CONFLICT WITH A STRUCTURE AS SHOWN IN DETAIL "A".
8. REINFORCING ELEMENTS SHALL BE PRETENSIONED TO REMOVE ANY SLACK. MAINTAIN
THE TENSIONING BY STAKING OR ANCHORING WITH BACKFILL MATERIAL.
DETAIL "A" DETAIL "B" DETAIL "C" 9. OVERLAPPING LAYERS OF REINFORCING ELEMENTS SHALL BE SEPARATED BY A MINIMUM
3" THICKNESS OF BACKFILL MATERIAL.
10. SECONDARY GEOSYNTHETIC REINFORCING ELEMENTS SHALL MEET THE REQUIREMENTS
OF y737-01, GEOTEXTILE STABILIZATION, CLASS I.
15. TYPE AND LIMITS OF DRAINAGE TREATMENT WILL BE SHOWN IN THE CONTRACT
STRUCTURE DOCUMENTS.
CULVERT SPACING
SPACING OR 16. CONCENTRATED DRAINAGE MUST BE DIVERTED AWAY FROM THE GRSS STRUCTURE.
SPACING
SEE NOTE ABOVE FOOTING 17. SEEPAGE ZONES INTERCEPTING THE EXCAVATION SLOPE OR WALL FOUNDATION
AREA SHALL BE POSITIVELY DRAINED BY PROVIDING ADDITIONAL UNDERDRAIN AND
UNDERDRAIN FILTER MATERIAL AT THE SEEPAGE ZONE, AS DETERMINED BY THE ENGINEER.
EXISTING GROUND CUT AND PLACE REINFORCEMENT AND TURF
REINFORCEMENT MAT AROUND CULVERT TO
PREVENT LOSS OF BACKFILL MATERIAL.
PRIMARY GEOSYNTHETIC
REINFORCING ELEMENT
EMBEDMENT
DATE/TIM E = 03-DEC-2010 14:
1.5D D
dgn
PROPOSED
FINISHED SLOPE BACKFILL MEETING THE 6" DIA. MIN.
1
6" SEEPAGE ZONE
REQUIREMENTS OF y733-20,
1 (SEE NOTE 17 ON
UNDERDRAIN FILTER
SHEET 3 OF 6)
MATERIAL, TYPE I.
PAYMENT LINES FOR 4"
STRUCTURE EXCAVATION EXISING GROUND SURFACE
(SECTION 206) 18" MIN
(MODIFY AS
REQUIRED WHERE 4"
LARGER UNDERDRAIN
VARIES PIPE IS SPECIFIED) 6" DIA. MIN.
EXCAVATION PHASE
3" 3"
3"
UPPER ANCHOR TRENCH.
SUBGRADE SURFACE MI
NI
(SEE DETAIL "A" OR DETAIL "B" MUM
ON SHEET 3 OF 6) SLO
UNDERDRAIN FILTER PE
2%
y733-20
6" 6"
SEE DETAIL "C" ON SHEET 3 OF 6
A
FOR SECONDARY REINFORCING PLACEMENT 3" ITEM
D 206.02
PAYMENT LINES FOR EMBANKMENT IN PLACE
(SECTION 203).
GEOSYNTHETICALLY REINFORCED SOIL SYSTEM
HEIGHT TO BE USED FOR PAYMENT PURPOSES A-A
(SEE NOTE 1 ON SHEET 3 OF 6) PRIMARY REINFORCING ELEMENTS.
(SEE NOTES 6, 7, 8 AND 9 AND
GEOSYNTHETICALLY DETAIL "H" ON SHEET 3 OF 6)
REINFORCED SOIL SYSTEM DETAIL "C"
VARIES
DRAINAGE AS SHOWN IN THE CONTRACT PLANS.
1 SEE NOTES AND DETAILS ON THIS SHEET.
(SHEET 4 OF 6)
STAPLES
GEOCELLS
TOPSOIL
FASCIA SIDE
SOLID OR
PERFORATED
FACING
CELL CELL
OFFSET
LENGTH DEPTH
BACKFILL WITH MATERIAL MEETING
THE REQUIREMENTS OF y733-14, UNIT A UNIT B
SELECT STRUCTURAL FILL.
CELL
WIDTH
SPACING
FACING
OFFSET
GEOGRID GEOGRID
EMBEDMENT EMBEDMENT
DIRECTION 3’-0" MIN. SPACING DIRECTION 3’-0" MIN.
18"
WELDED WIRE FORM
EXISTING GROUND
SUPPORT
STRUT
dgn
18"
4’-0"
FILE NAM E = 554-0205.
(SHEET 5 OF 6)
GALVANIZE FORM IF
PERMANENT APPLICATION
1 TOP OF WALL 1
VARIES VARIES
ELEVATION
GEOGRID (y737-07)
6" X " GALVANIZED STEEL SPIKE (TYP.)
SPACED 1’-0" FROM TIMBER ENDS AND ON CENTERS " X 7" TREATED
OF 3’-0" OR LESS. BATTEN STRIP 2" STAINLESS STEEL OR GALVANIZED
ROOFING STAPLES PLACED EVERY 3"
TO SECURE THE GEOGRID TO THE TIMBER (TYP.).
ALSO SEE "ALTERNATE CONNECTION DETAIL."
GEOGRID (y737-07)
4" MIN.
ROUGH CUT 16d COMMON GALVANIZED NAIL
(TYP.) STAGGERED 6 IN. 0.C. 4" MIN.
ROUGH CUT
(TYP.)
2" STAINLESS STEEL OR GALVANIZED ALTERNATE CONNECTION DETAIL
ROOFING STAPLES PLACED EVERY 3"
TO SECURE THE GEOGRID TO THE TIMBER (TYP.).
ALSO SEE "ALTERNATE CONNECTION DETAIL."
8" MIN.
BENCH - 3’-0" MIN. ROUGH CUT
(TYP.)
PAVED SHOULDER
FINAL GRADE
SUBGRADE SURFACE
BOTTOM OF WALL DETAIL SEE "TOP OF WALL DETAIL"
1. TREATED TIMBER FACING TO BE PAID FOR UNDER ITEM 554.3003, GEOSYNTHETICALLY REINFORCED
SOIL SYSTEM WALL - TIMBERS. FACING DETAILS
2. TREATED TIMBERS ARE TO BE GRADED FOR AN EXTREME FIBER STRESS OF AT LEAST 1000 PSI
STATE OF NEW YORK
CONFORMING TO THE PROVISIONS OF y712-14, STRESS GRADED TIMBER AND LUMBER, WITH THE 18"
FULL DIMENSION THICKNESS SHOWN ON THE PLANS. TIMBERS ARE TO BE TREATED IN ACCORDANCE MAX. PRIMARY GEOGRID REINFORCEMENT
MEETING THE REQUIREMENTS OF
DEPARTMENT OF TRANSPORTATION
WITH y708-31, WOOD PRESERVATIVE - WATERBORNE. TREATMENT TO BE APPLIED IN CONFORMANCE FINAL GRADE -
WITH AMERICAN WOOD PRESERVERS ASSOCIATION (AWPA) USE CATEGORY DESIGNATION UC4B. y737-07 (TYP.). (SEE NOTE 8)
SLOPE TO DRAIN
ACCEPTABLE TIMBER LENGTHS ARE 8’-0" TO 12’-0".
U.S. CUSTOMARY STANDARD SHEET
EXISTING
10
3. TREATED TIMBERS SHALL BE SET AT A SLIGHT BACKWARD BATTER (TOWARD THE REINFORCED FILL)
DATE/TIM E = 03-DEC-2010 14:
GROUND
TO ASSURE CORRECT FINAL VERTICAL ALIGNMENT AFTER PLACEMENT AND COMPACTION.
dgn
5. PULL AND HOLD TAUT THE GEOGRID AND GEOGRID/TIMBER CONNECTIONS UNTIL SUFFICIENT FILL IS (SHEET 6 OF 6)
PLACED OVER THE GRID TO MAINTAIN TENSION. TYPICAL WALL FACE DETAIL