Ans. A software life cycle model (also termed process model) is a pictorial
and diagrammatic representation of the software life cycle. A life cycle
model represents all the methods required to make a software product
transit through its life cycle stages. It also captures the structure in which
these methods are to be undertaken.
In other words, a life cycle model maps the various activities performed on
a software product from its inception to retirement. Different life cycle
models may plan the necessary development activities to phases in
different ways. Thus, no element which life cycle model is followed, the
essential activities are contained in all life cycle models though the action
may be carried out in distinct orders in different life cycle models. During
any life cycle stage, more than one activity may also be carried out.
Ans
b. Iterative Waterfall Model: The Iterative Waterfall Model is a software development approach
that combines the sequential steps of the traditional Waterfall Model with the flexibility of
iterative design. It allows for improvements and changes to be made at each stage of the
development process, instead of waiting until the end of the project. The iterative waterfall
model provides feedback paths from every phase to its preceding phases, which is the main
difference from the classical waterfall model.
i) When errors are detected at some later phase, these feedback paths allow for correcting
errors committed by programmers during some phase.
ii) The feedback paths allow the phase to be reworked in which errors are committed and
these changes are reflected in the later phases.
iii) But, there is no feedback path to the stage – feasibility study, because once a project has
been taken, does not give up the project easily.
iv) It is good to detect errors in the same phase in which they are committed.
v) It reduces the effort and time required to correct the errors.
vi) A real-life example could be building a new website for a small business.
c. Prototyping Model :
The Prototyping Model is an iterative software development model that focuses on creating a partial,
working model of the software to gather feedback early in the development process. It is particularly
useful when the requirements are not well-understood or are subject to change. Here's an overview
of the Prototyping Model:
1. Requirements Gathering:
Initial requirements are gathered, but they may not be comprehensive or fully
understood.
2. Quick Design and Prototype Building:
A basic prototype is created rapidly based on the initial requirements.
The prototype is a simplified version of the intended system, showcasing core
features.
3. Prototyping:
The prototype is shared with stakeholders, including users and clients.
Feedback is collected to identify any necessary changes or additions to the
requirements.
4. Refinement or Iteration:
Based on the feedback, the prototype is refined, improved, and expanded in
subsequent iterations.
This process is repeated until the prototype aligns closely with the stakeholders'
expectations.
5. Final System Implementation:
Once the prototype is refined and approved, the final system is implemented using
the insights gained from the prototyping phase.
6. Testing and Deployment:
The final system undergoes testing to ensure it meets quality standards.
The software is deployed for regular use.
7. Maintenance:
Ongoing maintenance may be required, addressing issues and making improvements
based on user feedback.
d. Incremental Model:
Incremental Model is a process of software development where requirements divided into
multiple standalone modules of the software development cycle. In this model, each module
goes through the requirements, design, implementation and testing phases. Every subsequent
release of the module adds function to the previous release. The process continues until the
complete system achieved.
The various phases of incremental model are as follows:
1. Requirement analysis: In the first phase of the
incremental model, the product analysis expertise
identifies the requirements. And the system functional
requirements are understood by the requirement
analysis team. To develop the software under the
incremental model, this phase performs a crucial role.
2. Design & Development: In this phase of the
Incremental model of SDLC, the design of the system
functionality and the development method are finished with success. When software
develops new practicality, the incremental model uses style and development phase.
3. Testing: In the incremental model, the testing phase checks the performance of each existing
function as well as additional functionality. In the testing phase, the various methods are
used to test the behavior of each task.
4. Implementation: Implementation phase enables the coding phase of the development
system. It involves the final coding that design in the designing and development phase and
tests the functionality in the testing phase. After completion of this phase, the number of the
product working is enhanced and upgraded up to the final system product.
e. Spiral Model
The Spiral Model is a Software Development Life Cycle (SDLC) model that provides a systematic
and iterative approach to software development. In its diagrammatic representation, looks like a
spiral with many loops. The exact number of loops of the spiral is unknown and can vary from
project to project. Each loop of the spiral is called a Phase of the software development process.
1. The exact number of phases needed to develop the product can be varied by the project
manager depending upon the project risks.
2. As the project manager dynamically determines the number of phases, the project manager
has an important role in developing a product using the spiral model.
3. It is based on the idea of a spiral, with each iteration of the spiral representing a complete
software development cycle, from requirements gathering and analysis to design,
implementation, testing, and maintenance.
3. Why Spiral Model is called meta model?
Ans. The Spiral model is called a Meta-Model because it subsumes all the other SDLC models. For
example, a single loop spiral actually represents the Iterative Waterfall Model.
1. The spiral model incorporates the stepwise approach of the Classical Waterfall Model.
2. The spiral model uses the approach of the Prototyping Model by building a prototype at the
start of each phase as a risk-handling technique.
3. Also, the spiral model can be considered as supporting the Evolutionary model – the
iterations along the spiral can be considered as evolutionary levels through which the
complete system is built.
4. Comparison of different lifecycle model.
Ans
1. Flexibility:
Classical Waterfall Model: Least flexible. Changes are challenging once a phase is
completed.
Iterative Waterfall Model: More flexible than the Classical Waterfall due to iterations
allowing revisiting of phases.
Prototyping Model: Highly flexible. The iterative nature allows quick adaptation to
changing requirements.
2. Phases and Iterations:
Classical Waterfall Model: Linear with distinct phases; no iterations.
Iterative Waterfall Model: Linear phases with iterations for feedback and
adjustments.
Prototyping Model: Involves rapid iterations for prototyping, refining, and improving
the system.
3. User Involvement:
Classical Waterfall Model: Limited user involvement until the final stages.
Iterative Waterfall Model: Early and periodic user involvement in each iteration.
Prototyping Model: Continuous user involvement from the beginning due to
prototype feedback.
4. Risk Management:
Classical Waterfall Model: Limited risk management; issues may surface late in the
process.
Iterative Waterfall Model: Improved risk management with iterations allowing early
identification and mitigation.
Prototyping Model: Incorporates risk management through early prototyping and
feedback.
5. Adaptability to Changes:
Classical Waterfall Model: Not adaptable to changes once a phase is completed.
Iterative Waterfall Model: More adaptable due to iterative nature and revisiting
phases.
Prototyping Model: Highly adaptable to changes based on user feedback during
prototyping.
6. Project Size and Complexity:
Classical Waterfall Model: Suited for smaller, well-defined projects with stable
requirements.
Iterative Waterfall Model: Suitable for medium-sized projects with some flexibility in
requirements.
Prototyping Model: Effective for projects with unclear or evolving requirements,
especially for innovative or complex systems.
7. Implementation Time:
Classical Waterfall Model: Longer implementation time, as changes are not easily
accommodated.
Iterative Waterfall Model: Reduced implementation time due to iterative
development.
Prototyping Model: Potentially shorter implementation time, as rapid prototyping
allows quick feedback and adjustments.
5. What do you mean by software process?
Ans. Software processes in software engineering refer to the methods and techniques used to
develop and maintain software. Some examples of software processes include:
Waterfall: a linear, sequential approach to software development, with distinct phases such
as requirements gathering, design, implementation, testing, and maintenance.
Agile: a flexible, iterative approach to software development, with an emphasis on rapid
prototyping and continuous delivery.
Scrum: a popular Agile methodology that emphasizes teamwork, iterative development, and
a flexible, adaptive approach to planning and management.
DevOps: a set of practices that aims to improve collaboration and communication between
development and operations teams, with an emphasis on automating the software delivery
process.
Ans. A prototype is a preliminary version or an early model of a software system that is developed to
showcase and test certain aspects of the final product. It is typically a simplified version that helps
stakeholders visualize and interact with the intended functionality of the system. The main purposes
of creating a prototype are to gather feedback, validate requirements, and identify potential issues
early in the development process.
8. What are the major advantages of 1st construction of working prototype before developing the
actual product?
Ans. Constructing a working prototype before developing the actual product offers several major
advantages in the software development process. Here are some key benefits:
1. Requirements Clarification: Prototypes provide a tangible representation of the proposed
system, helping to clarify and refine requirements. Stakeholders can interact with the
prototype to better understand and communicate their needs, reducing ambiguity and
misunderstandings.
2. User Feedback: Early user involvement is facilitated through prototypes, allowing
stakeholders and end-users to provide feedback on the design and functionality. This
feedback helps in refining the system based on actual user expectations and preferences.
3. Risk Identification and Mitigation: Prototypes help identify potential risks, technical
challenges, and design flaws early in the development process. This enables teams to
address issues before full-scale development, reducing the risk of costly errors later in the
project.
4. Visualization of Concepts: Prototypes allow stakeholders to visualize and experience the
proposed system, making abstract concepts more concrete. This aids in conveying ideas,
exploring design alternatives, and ensuring that the envisioned product aligns with
stakeholders' expectations.
5. Improved Communication: Prototypes serve as a communication tool between different
stakeholders, including developers, designers, project managers, and end-users. They
provide a common understanding of the system and facilitate more effective communication
among team members.
6. Time and Cost Savings: Despite the initial investment in creating a prototype, it often leads
to time and cost savings in the long run. Identifying and addressing issues early in the
development process helps prevent costly changes during later stages.
7. Faster Decision-Making: Prototypes expedite decision-making by providing a concrete basis
for discussions. Stakeholders can make informed decisions about design elements,
functionalities, and user interfaces, leading to faster progress in the development process.
8. Adaptability to Changes: Prototypes are inherently flexible and can be modified and refined
easily. This adaptability is valuable in situations where requirements evolve or change,
allowing for quick adjustments without significant impact on the overall development
timeline.
9. Enhanced Quality: By incorporating user feedback and refining the design iteratively, the
prototype contributes to the overall quality of the final product. It helps in identifying and
resolving issues related to usability, functionality, and user satisfaction.
10. User Training and Documentation: Prototypes can be used for user training and
documentation purposes. They provide a hands-on experience for users to familiarize
themselves with the system before the final product is deployed.
9. For a project having many high risks, would you recommend the use of prototype model or
spiral model?
Ans. Both the Prototype Model and the Spiral Model are well-suited for projects with high risks, but
they approach risk management in different ways. The choice between the two depends on the
specific characteristics and requirements of the project. Here's a comparison to help you decide:
Prototype Model:
1. Early Risk Identification: Prototyping allows for early identification of risks as stakeholders
interact with a tangible representation of the system.
2. User Feedback: Users can provide feedback on the prototype, helping to refine and adjust
requirements based on actual usage and expectations.
3. Reduced Ambiguity: Prototypes clarify requirements and reduce ambiguity by providing a
visual and interactive representation of the proposed system.
Considerations:
1. Scope Creep: Care must be taken to manage scope creep, as frequent changes to the
prototype might impact timelines and costs.
2. Level of Detail: Deciding on the appropriate level of detail in the prototype is crucial to
balance effort and benefits.
Spiral Model:
1. Complexity: The Spiral Model might introduce more complexity in project management, and
it requires a good understanding of the project's risks.
2. Resource Intensity: Continuous iterations and risk assessments may increase resource
requirements.
10. What is SRS (Software Requirement Specification) If the prototyping model is being use in
development effort, is it necessary to develop SRS document? Justify your answer
Ans. A Software Requirements Specification (SRS) is a comprehensive document that outlines the
detailed functional and non-functional requirements of a software system. It serves as a
communication bridge between stakeholders, including clients, users, and development teams,
providing a clear understanding of what the software is expected to accomplish.
Even when the Prototyping Model is used in the development effort, it is still necessary to develop
an SRS document. Here are the justifications for this:
2. Basis for Prototyping: The SRS document provides the foundational information for creating
the initial prototype. It defines the functional and non-functional aspects of the system that
need to be addressed during the prototyping phase.
3. Prototyping Alignment with Requirements: The SRS document serves as a reference point
to ensure that the prototype aligns with the specified requirements. It helps in verifying that
the prototype accurately represents the intended features and functionalities.
4. User Feedback and Refinement: The SRS document serves as a reference for obtaining initial
feedback from stakeholders. Users can provide input based on the documented
requirements, allowing for iterative refinement of both the SRS and the prototype.
5. Complete Documentation: While the prototype may showcase specific aspects of the
system, the SRS provides a comprehensive and complete set of requirements. This detailed
documentation is essential for a thorough understanding of the entire system, including
features not covered in the prototype.
6. Traceability: The SRS document establishes traceability between the requirements and the
developed system. This traceability is crucial for ensuring that all specified requirements are
addressed, tested, and validated during the development process.
7. Basis for Formal Agreements: The SRS serves as a basis for formal agreements between
stakeholders. It outlines the agreed-upon scope, features, and functionalities, helping
manage expectations and preventing misunderstandings.
11. What are the major disadvantages of Iterative Waterfall model? How do you overcome the
drawbacks?
Ans. The Iterative Waterfall Model, which combines elements of the traditional Waterfall Model with
iteration, aims to address some of the rigidity issues associated with the pure Waterfall approach.
However, it still has certain disadvantages. Here are the major drawbacks and ways to overcome
them:
1. Emphasize Communication:
Encourage regular and effective communication between all project stakeholders,
including users, to ensure that their needs and expectations are well understood.
2. Implement Agile Practices:
Adopt Agile practices within the iterative approach, such as daily stand-up meetings,
frequent reviews, and retrospectives to enhance collaboration and adaptability.
3. Continuous Improvement:
Establish a culture of continuous improvement. Regularly assess the effectiveness of
the iterative process and make adjustments based on lessons learned from each
iteration.
4. Use Collaboration Tools:
Implement collaboration tools that facilitate communication, feedback, and tracking
of changes, reducing the overhead associated with documentation.
5. Early Risk Assessment:
Introduce risk assessment early in the project and make it an integral part of each
iteration to identify and address potential issues proactively.
6. Flexibility and Adaptability:
Encourage a mindset of flexibility and adaptability among team members. Ensure
that processes are not overly rigid and can accommodate changes efficiently.
7. User-Centric Approach:
Prioritize user involvement and feedback throughout the development process to
ensure that the final product meets user expectations and needs.
8. Clear Change Management:
Establish clear change management processes to handle modifications efficiently
while minimizing the impact on project timelines and resources.