Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311
3. Electrical Tests
DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT
Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311
SUPPLY OFF
TERMINALS (CLOSED) - (X11:2, X11:3) : OK
TERMINALS (OPEN) - (X11:1, X11:2) : OK
SUPPLY ON
TERMINALS (CLOSED) - (X11:1, X11:2) : OK
TERMINALS (OPEN) - (X11:2, X11:3) : OK
To check time & date go to main menu on the display for RED670 then open system time and
adjust time & date.
To test keeping time and date setting this, remove the auxiliary supply from the relay for
approximately 30 seconds, then restoring the auxiliary supply, the time and date setting should
not be lost.
Result: _____OK_______
Prim. Value
Values Sec. Values(V) Sec. Values(A) Prim. Values(A)
Values(KV) s
U1 66.394∟0 66.169∟0 I1 0.998∟0.695 1595.134∟0.287
U2 66.348∟240.0 67.178∟240.0 I2 1.001∟240.294 1589.208∟240.762
U3 66.367∟120.0 65.814∟121.0 I3 0.999∟120.179 1598.271∟120.186
U1 – U2 - 115.0∟30.03 Fn 60.000 Hz 60.000 Hz
U2 – U3 - 115.0∟-90.01
U3 – U1 - 114.935∟150.0
DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT
Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311
DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT
Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311
3 PH: Same setting like PH-PH but, note PHS is rotated by 30o at
3PH, Due to that, zones at resistive reach is reduced
Accuracy:
± 2.0% static accuracy, ± 2.0 degrees static angular
Accuracy Conditions:
Voltage range: (0.1-1.1) x Ur, Current range: (0.5-30) x Ir, Angle: at 0 degrees and 85
DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT
Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311
DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT
Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311
115O
FW
165O
ND
180O ND
345O
295O
RV
Line characteristic angle:
Relay directional angles: ArgDir (15) and ArgNegRes (115)
a) Forward direction; the operating cha Area from: 346.7 °to: 117.9°
b) Reverse direction; the operating cha Area from: 166.3° to: 296.4°
c) The only non-directional area from:118.0°to: 165.2° and from: 296.5°to: 346.6°
Test procedure: -
Apply Single Phase V & I Under PHS Setting.
- change the voltage angle from 0 degree up to 360 degree until the indication of
FW, REVESE and non-directional appears as per setting applied.
Settings:
Operation : On
TCoord : 0.0 S
TSendMin : 0.100 S
I. Permissive OR
Send logic : ZMO2 START
Permissive trip logic : ZMO2+CR
Zone 2 trip with CR : 0.047 S
Zone 2 trip without CR : 0.449 S
Send time : 0.032 S
DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT
Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311
Settings
CurrRev : On
TpickUpRev : 0.040 S
TdelayRev : 0.100 S
Scheme Check
Zone 2 trip with CR : 0.135 S
3U0= Ua + Ub + Uc
3I0= Ia + Ib + Ic
Limit: ± 2.5 % of Ur for 3U0> and ± 2.5 % of 3I0r
-1st stage: 3phase V&I healthy case.
- Decrease one phase voltage till the indication led fuse fail appears.
- Decrease the same phase current till the indication led fuse fail reset.
DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT
Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311
3.5.11.5 Check the relay operation if a fault occurred during the fuse fail [ OK ].
Pickup Test:
DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT
Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311
SETTINGS
Operation : On
TCoord : 0.090 s
TSendMin : 0.020 s
DEF t1 : 60.000 s
Scheme Check
Permissive OR
SETTINGS
CurrRev : On
TPickUpRev : 0.040 S
TDelayRev : 0.100 S
Scheme Check
DEF STFW trip with CR 0.224 S
DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT
Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311
Use fiber optic communication between ch1& ch2 then test of differential
protection element;
Also charge current should not active in the setting.
Pick Up Value = Idmin
SETTING Injected Current Measured Pick Up Measured Drop
PHASE
IdMin (A) I bias (A) Value (A) Out Value (A)
R 0.3 0.3 0.304 0.288
Y 0.3 0.3 0.304 0.289
B 0.3 0.3 0.303 0.288
R-Y 0.3 0.3 0.305 0.289
Y-B 0.3 0.3 0.304 0.290
B-R 0.3 0.3 0.305 0.289
R-Y-B 0.3 0.3 0.305 0.288
Limits: Pick up & Drop Out ±2% of Ir According to the Catalogue for Technical Data
Inject current
PHASE Delay Time (s) Operating Time (s)
(A)
R 0.303 1 1.01
Y 0.303 1 1.02
B 0.303 1 1.01
R-Y 0.303 1 1.01
Y-B 0.303 1 1.02
B-R 0.303 1 1.01
R-Y-B 0.303 1 1.02
DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT
Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311
3.7.3 Pick up & Drop off test & operating time for differential current Alarm
Use fiber optic communication between ch1&ch2 then test differential protection element;
also charging current should be active.as shown figure.
A current is injected into the R phase which is used as the bias current and another current
is injected into the Y phase which is used as differential current.
Inject a bias current of 1A in the R phase. The relay will trip and any contacts associated
with the R phase will operate.
Slowly increase the current in the Y phase until phase Y trips. Record the phase Y current
magnitude and check that it corresponds to the following equation;
3.8.1Section 1
DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT
Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311
3.8.2SLOPE Section 2
DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT
Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311
3.8.3SLOPE Section3
Repeat the test and check the result with the following equation;
When bias current is more than:
Ibias ≥ End section2*Ibase
Trip = Ibase*(IdminOp + slope section2/100*(End section2 - End section1)) + (slope
section3/100 * (Ibias- End section2*Ibase) A
Set End section1 = 1.25*IBase
End section2 =3.0*IBase
Slope section2 = 40%
Id
Slope Idmin I bias Id Measured (A) Errors %
calculated(Trip)
section3 set A
R Y B R Y B
80% 0.3 4.0 1.8 1.801 1.799 1.799 0.28 0.27 0.28
Idmin = 0.3 Ib
I2 ( F = 120 Hz ) A
Phase I2 / I1 ratio % I1 ( F =60 Hz ) A
Expected Blocking Measured
R 10 1.0 0.100 0.101
Y 10 1.0 0.100 0.101
B 10 1.0 0.100 0.102
DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT
Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311
I5 ( F = 300 Hz ) A
Phase I5 / I1 ratio % I1 ( F =60 Hz ) A
Expected Blocking Measured
R 25 1.0 0.250 0.255
Y 25 1.0 0.250 0.255
B 25 1.0 0.250 0.256
There are 2 condition during them the relay must decrease its sensitivity: during energized
or at external fault, where at that conditions the slope chars. Use the value of IdminHigh
instead of Idmin for just a time equal to tIdminHigh . After that slope chars. Back as usual
using Idmin as basic setting.
IdMinHigh
Phase Setting Value
Pickup Value (A)
( of IB ) A
R 0.6 0.604
Y 0.6 0.605
B 0.6 0.604
TIdMinHigh
Phase Setting Value Trip Time Measured
( seconds ) seconds
R 1 1.01
Y 1 1.01
B 1 1.01
DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT
Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311
3.10 CB Fail
- Current Pick up
I< setting (A) Phase Pick up (A) Drop off (A)
IP< = 1.0 A/B/C 1.006 0.999
IN< = 0.20 N 0.203 0.199
- Timing
Timer Setting (sec) Measured time(sec)
CB fail 1 timer 0.150 0.151
Item Test Equipment Serial Number Calibration date Calibration due date
1 Freja 300 1402796 23-SEP-2023 22-SEP-2024
02 Multimeter Fluke 177 32560406 26-Oct-2023 25-Oct-2024
DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :