The document reports on testing of a line differential protection relay. It details the mechanical and electrical checks performed, including settings adopted and secondary injection tests to check the reach and timing of the protection zones. Fault location was also checked.

Uploaded by

Mohamed Awad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
168 views

6lb+r-Red 670

The document reports on testing of a line differential protection relay. It details the mechanical and electrical checks performed, including settings adopted and secondary injection tests to check the reach and timing of the protection zones. Fault location was also checked.

Uploaded by

Mohamed Awad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 15

SITE TEST REPORT

Contractor’s name: Hitachi Energy


Sub.Contractor’s name: MRC

Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311

LINE DIFFERENTIAL PROTECTION RELAY – RED670- FINAL SETTING Page 1 of 15


Panel No: =6LA+R Equip. No.: 87L1 Dwg. Ref.: XD-MOB107

1. General Data & Information

Panel No. =6LA+R CT Ratio 1600/1 A


Relay Type ABB-RED 670 In 1A
Manufacturer Hitachi Energy VT Ratio 115000/115 V
Serial No T2240017 Vn 115 Vp-p
Software Version 1.2.3 DC. Auxiliary. Voltage 125 V DC
Opto-coupler supply: 125V DC Frequency Fn 60 Hz

2. Mechanical Checks and Visual Inspection

ITEM DESCRIPTION REMARKS


1. Inspect for any physical damage or defects.  Yes  N/A
2. Verify connections and ferrules as per approved drawings  Yes  N/A
3. Check tightness of all the connections.  Yes  N/A
4. Check Apparatus List  Yes  N/A
5. Check relay version and switching elements on printed circuit board  Yes  N/A

3. Electrical Tests

3.1. Function Test

ITEM DESCRIPTION REMARKS


1. Human Machine Interface (HMI) Checked.  Yes N/A
2. Case Earthing checked.  Yes N/A
3. LED’s Function Checked.  Yes N/A
4. Trip Contacts Checked.  Yes N/A
5. Reset Function Checked  Yes N/A
6. Group active Functions Checked  Yes N/A
7. Binary inputs checked.  Yes N/A
8. Output Relays Checked  Yes N/A
9. Event Display on HMI Screen Checked  Yes N/A
10. Test switch / plug checked for correct function.  Yes N/A
11. Watchdog contacts checked  Yes N/A
12. Current shorting facility.  Yes N/A

DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT

Contractor’s name: Hitachi Energy


Sub.Contractor’s name: MRC

Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311

LINE DIFFERENTIAL PROTECTION RELAY – RED670- FINAL SETTING Page 2 of 15


Panel No: =6LA+R Equip. No.: 87L1 Dwg. Ref.: XD-MOB107
3.2. Watch Dog Check

SUPPLY OFF
TERMINALS (CLOSED) - (X11:2, X11:3) : OK
TERMINALS (OPEN) - (X11:1, X11:2) : OK
SUPPLY ON
TERMINALS (CLOSED) - (X11:1, X11:2) : OK
TERMINALS (OPEN) - (X11:2, X11:3) : OK

3.3. Time and Date Check

To check time & date go to main menu on the display for RED670 then open system time and
adjust time & date.
To test keeping time and date setting this, remove the auxiliary supply from the relay for
approximately 30 seconds, then restoring the auxiliary supply, the time and date setting should
not be lost.
Result: _____OK_______

3.4. Setting Adopted

3.5. Secondary Injection Tests

PH voltage applied : 66.4 V


PH current applied : 1.0 A
Phase shift : 0,240,120 degree.
Frequency : 60 HZ.s
CT ratio : 1600/1 A
VT ratio : 115/0.115 KV

Prim. Value
Values Sec. Values(V) Sec. Values(A) Prim. Values(A)
Values(KV) s
U1 66.394∟0 66.169∟0 I1 0.998∟0.695 1595.134∟0.287
U2 66.348∟240.0 67.178∟240.0 I2 1.001∟240.294 1589.208∟240.762
U3 66.367∟120.0 65.814∟121.0 I3 0.999∟120.179 1598.271∟120.186
U1 – U2 - 115.0∟30.03 Fn 60.000 Hz 60.000 Hz
U2 – U3 - 115.0∟-90.01
U3 – U1 - 114.935∟150.0

DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT

Contractor’s name: Hitachi Energy


Sub.Contractor’s name: MRC

Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311

LINE DIFFERENTIAL PROTECTION RELAY – RED670- FINAL SETTING Page 3 of 15


Panel No: =6LA+R Equip. No.: 87L1 Dwg. Ref.: XD-MOB107
Distance Protection

3.5.1.Zone Reach Measurements:

Item Description Checked


1 Print out from Freja attached. OK

PH-E (PE): -Resistive reach: RFn (Ω/loop) = RFn (Ω/phase) = RFPE


-Reactive reach: XFn (Ω/loop) = XFn (Ω/phase)
= Xn (Ω/phase) + X1 (Ω/phase) = (2*X1 + X0) / 3
Chars. Angle = -15 to 115 at FW Direction

PH-PH (PP): -Resistive reach: RFn (Ω/phase) = ½ RFn (Ω/loop) = ½ RFPP.


- Reactive reach: XFn (Ω/phase) = ½ Xn (Ω/loop) = X1.

RFn: Zone n resistive reach resistance.


XFn: zone n positive sequence reactance.
X0: line zero sequence reactance.
X1: line positive sequence reactance.

DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT

Contractor’s name: Hitachi Energy


Sub.Contractor’s name: MRC

Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311

LINE DIFFERENTIAL PROTECTION RELAY – RED670- FINAL SETTING Page 4 of 15


Panel No: =6LA+R Equip. No.: 87L1 Dwg. Ref.: XD-MOB107

3 PH: Same setting like PH-PH but, note PHS is rotated by 30o at
3PH, Due to that, zones at resistive reach is reduced

Accuracy:
± 2.0% static accuracy, ± 2.0 degrees static angular
Accuracy Conditions:
Voltage range: (0.1-1.1) x Ur, Current range: (0.5-30) x Ir, Angle: at 0 degrees and 85

3.5.2.Zone Timing Test


Item Description Checked
1 Print out from Freja attached. OK
Limit: 24 ms ± 10ms ± 0.5 %.

3.5.3.Fault Locator Check


4. Line Length=14.2KM POLAR FORM: R1L=0.5Ω, X1L=4.3Ω, R0L=1.9Ω, X0L=8.9Ω
RECTANGULAR FORM: ZLP-N(sec)= 9.333∟80.591Ω & ZLP-P(sec) = 6.88∟83.367Ω
PHASE Line 100% Applied Line TEST AT Measured Fault % RESULT
Impedance(Ω) Impedance(Ω) Distance (KM)
A-N 9.333∟80.591 2.333∟80.591 25 % 3.492 24.82
B-N 9.333∟80.591 4.667∟80.591 50 % 7.031 49.63
C-N 9.333∟80.591 6.999∟80.591 75 % 10.562 74.75
A-B 6.88∟83.367 1.72∟83.367 25 % 3.536 25.21
B-C 6.88∟83.367 3.44∟83.367 50 % 7.101 50.03
C-A 6.88∟83.367 5.16∟83.367 75 % 10.58 74.71
A-B-C 6.88∟83.367 6.88∟83.367 100 % 14.73 99.63

DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT

Contractor’s name: Hitachi Energy


Sub.Contractor’s name: MRC

Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311

LINE DIFFERENTIAL PROTECTION RELAY – RED670- FINAL SETTING Page 5 of 15


Panel No: =6LA+R Equip. No.: 87L1 Dwg. Ref.: XD-MOB107

4.1.1.Phase Selection Function (PHS)


a. PHS Reach measurements
Item Description Checked
1 Print out from Freja attached. OK

Setting given as (Ω/loop ) not


(Ω/phase )
PHS , with Phase-to-Phase PHS , with Phase-to-Earth PHS , with 3 Phase

PH-E (PE): -Resistive reach: RFphs (Ω/loop) = RFphs (Ω/phase) = RFFwPE.


-Reactive reach: Xnphs (Ω/loop) = Xnphs (Ω/phase)
= (2*X1 + X0) / 3
PH-PH (PP): -Resistive reach: RFphs (Ω/phase) = ½ RFphs (Ω/loop) = ½ RFFwPP
- Reactive reach: X1phs (Ω/phase) = ½ X1phs (Ω/loop) = X1phs
(Ω/phase).

3PH: -Resistive reach: RFphs (Ω/phase) = 1.15 RFphs (Ω/phase).


- Reactive reach: X1phs (Ω/phase) = 1.335 * X1phs (Ω/phase).
Take in consideration that, although PHS rotate by 30 0, it still keeps directional
angle (-15, 115) as its starting boundary

b. PHS timing test:

Item Description Checked


1 Print out from Freja attached. OK
Limit: 24 ms ± 10ms ± 0.5 %.

DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT

Contractor’s name: Hitachi Energy


Sub.Contractor’s name: MRC

Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311

LINE DIFFERENTIAL PROTECTION RELAY – RED670- FINAL SETTING Page 6 of 15


Panel No: =6LA+R Equip. No.: 87L1 Dwg. Ref.: XD-MOB107
4.1.2.Directional test
90O

115O

FW
165O
ND
180O ND

345O

295O
RV
Line characteristic angle:
Relay directional angles: ArgDir (15) and ArgNegRes (115)
a) Forward direction; the operating cha Area from: 346.7 °to: 117.9°
b) Reverse direction; the operating cha Area from: 166.3° to: 296.4°
c) The only non-directional area from:118.0°to: 165.2° and from: 296.5°to: 346.6°
Test procedure: -
Apply Single Phase V & I Under PHS Setting.
- change the voltage angle from 0 degree up to 360 degree until the indication of
FW, REVESE and non-directional appears as per setting applied.

4.1.3.Distance Scheme Communication Test

Settings:
Operation : On
TCoord : 0.0 S
TSendMin : 0.100 S

3.5.8.1 Scheme Check

I. Permissive OR
Send logic : ZMO2 START
Permissive trip logic : ZMO2+CR
Zone 2 trip with CR : 0.047 S
Zone 2 trip without CR : 0.449 S
Send time : 0.032 S

DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT

Contractor’s name: Hitachi Energy


Sub.Contractor’s name: MRC

Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311

LINE DIFFERENTIAL PROTECTION RELAY – RED670- FINAL SETTING Page 7 of 15


Panel No: =6LA+R Equip. No.: 87L1 Dwg. Ref.: XD-MOB107
3.4.8.2. Z Current Reversal WEI (PSCH,85)

Settings

CurrRev : On
TpickUpRev : 0.040 S
TdelayRev : 0.100 S
Scheme Check
Zone 2 trip with CR : 0.135 S

4.1.4.Automatic Switch on to Fault (SOTF)


a) SOTF with distance protection:

Mode Impedance AutoInit off


2 Bi/p CB open + CB Manual Close

SOTF WITH Z3 Time W/O SOTF = 845 mSec


Time WITH SOTF = 21 mSec

4.1.5.Fuse failure supervision function (FUSE)

Setting Measured Values


3U0>(V) 3I0<(A) 3U0>(V) 3I0<(A)
30 % 10 % 19.645 0.101

3U0= Ua + Ub + Uc
3I0= Ia + Ib + Ic
Limit: ± 2.5 % of Ur for 3U0> and ± 2.5 % of 3I0r
-1st stage: 3phase V&I healthy case.
- Decrease one phase voltage till the indication led fuse fail appears.
- Decrease the same phase current till the indication led fuse fail reset.

3.5.11.1 Fuse failure operating time = 31 m sec.

-1ST stage: 3phase V&I healthy case.


-2ND stage: put fuse fail condition (take contact fuse fail)

DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT

Contractor’s name: Hitachi Energy


Sub.Contractor’s name: MRC

Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311

LINE DIFFERENTIAL PROTECTION RELAY – RED670- FINAL SETTING Page 8 of 15


Panel No: =6LA+R Equip. No.: 87L1 Dwg. Ref.: XD-MOB107
3.5.11.2 Check the blocking of the relay when the general block functions

(VT MCB TRIP) is activated [OK].

3.5.11.5 Check the relay operation if a fault occurred during the fuse fail [ OK ].

- 1st stage: 3phases V&I healthy case. (Take time 1 sec)


- 2nd stage: fuse fail condition (take time < 5 sec)
- 3rd stage: fault condition
* Trip for t < 5 sec, Block for t > 5 sec

3.6 Four Step Residual Over Current (PTOC,51N_67N)

Pickup Test:

PHASE I1> SETTING (A) PICK UP (A) DROP OFF (A)


N 0.22 0.249 0.241

Operating Time Test: Accuracy: IEC 60255-3, class 5 +40 ms


Function Curve Injected current (A) Expected time (s) Measured time (s)

EF4PTOC DMT 2*Is 60 60.064

Check the operating characteristic angle: I inj = 1A

A- Forward direction: from 212 to 17.0


B- Reverse direction: from 30.0 to 200.1

a) Polarizing voltage (3u0) pickup and drop off test:

Set Is=3Io = 0.22 A

DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT

Contractor’s name: Hitachi Energy


Sub.Contractor’s name: MRC

Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311

LINE DIFFERENTIAL PROTECTION RELAY – RED670- FINAL SETTING Page 9 of 15


Panel No: =6LA+R Equip. No.: 87L1 Dwg. Ref.: XD-MOB107
3.6.1 EF Scheme Communication (PSCH,85)

SETTINGS

Operation : On
TCoord : 0.090 s
TSendMin : 0.020 s
DEF t1 : 60.000 s

Scheme Check

Permissive OR

Send logic : DEF STFW


Permissive trip logic : DEF STFW+CR
DEF STFW trip without CR : 60.021 S
Send time : 0.029 S
DEF STFW trip with CR : 0.115 S

3.6.2 EF Current Reversal WEI (PSCH,85)

SETTINGS

CurrRev : On
TPickUpRev : 0.040 S
TDelayRev : 0.100 S

Scheme Check
DEF STFW trip with CR 0.224 S

DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT

Contractor’s name: Hitachi Energy


Sub.Contractor’s name: MRC

Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311

LINE DIFFERENTIAL PROTECTION RELAY – RED670- FINAL SETTING Page 10 of 15


Panel No: =6LA+R Equip. No.: 87L1 Dwg. Ref.: XD-MOB107

3.7 Differential Protection

3.7.1Pick up & Drop off Test for Differential Current (Id):

Use fiber optic communication between ch1& ch2 then test of differential
protection element;
Also charge current should not active in the setting.
Pick Up Value = Idmin
SETTING Injected Current Measured Pick Up Measured Drop
PHASE
IdMin (A) I bias (A) Value (A) Out Value (A)
R 0.3 0.3 0.304 0.288
Y 0.3 0.3 0.304 0.289
B 0.3 0.3 0.303 0.288
R-Y 0.3 0.3 0.305 0.289
Y-B 0.3 0.3 0.304 0.290
B-R 0.3 0.3 0.305 0.289
R-Y-B 0.3 0.3 0.305 0.288
Limits: Pick up & Drop Out ±2% of Ir According to the Catalogue for Technical Data

3.7.2 Operating Time Test for Differential Current (Id)

Set; DT Mode & Idmin = 0.3 Ibase , IdMinHigh=1 IB , tIdMinHigh= 1 Sec

Inject current
PHASE Delay Time (s) Operating Time (s)
(A)
R 0.303 1 1.01
Y 0.303 1 1.02
B 0.303 1 1.01
R-Y 0.303 1 1.01
Y-B 0.303 1 1.02
B-R 0.303 1 1.01
R-Y-B 0.303 1 1.02

Accuracy: Instantaneous Operation: 25 ms.typically at 0 to 10*Id


According to the Catalogue for Technical Data

DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT

Contractor’s name: Hitachi Energy


Sub.Contractor’s name: MRC

Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311

LINE DIFFERENTIAL PROTECTION RELAY – RED670- FINAL SETTING Page 11 of 15


Panel No: =6LA+R Equip. No.: 87L1 Dwg. Ref.: XD-MOB107

3.7.3 Pick up & Drop off test & operating time for differential current Alarm

SETTING Measured Pick Up Measured Drop Out


PHASE
Id Alarm (A) Value (A) Value (A)
R 0.15 0.151 0.145
Y 0.15 0.151 0.145
B 0.15 0.151 0.146

3.7.4 Delay time for differential current Alarm

Set IdAlarm = 0.15 IB. Inject at 1.2xPickup

PHASE Delay (sec) Operating time in sec


R 10 10.01
Y 10 10.02
B 10 10.02

3.8BIAS CHARACTERISTIC TESTING

Use fiber optic communication between ch1&ch2 then test differential protection element;
also charging current should be active.as shown figure.
A current is injected into the R phase which is used as the bias current and another current
is injected into the Y phase which is used as differential current.
Inject a bias current of 1A in the R phase. The relay will trip and any contacts associated
with the R phase will operate.
Slowly increase the current in the Y phase until phase Y trips. Record the phase Y current
magnitude and check that it corresponds to the following equation;

3.8.1Section 1

When bias current is between:


0 ≤ Ibias ≤ Endsection1*IBase
Trip= IdminOp *Ibase
Set End section1 = 1.25*IBase

DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT

Contractor’s name: Hitachi Energy


Sub.Contractor’s name: MRC

Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311

LINE DIFFERENTIAL PROTECTION RELAY – RED670- FINAL SETTING Page 12 of 15


Panel No: =6LA+R Equip. No.: 87L1 Dwg. Ref.: XD-MOB107

Slope Idmin set I bias Id Id Measured (A) Errors %


section1 A calculated(Trip) R Y B R Y B
IdminOp 0.3 0.3 0.3 0.301 0.301 0.302 1.66 1.33 1.33

Limits; ± 2 %Ir According to the Technical Reference Catalogue

3.8.2SLOPE Section 2

When bias current is between:


Endsection1*Ibase ≤ Ibias ≤ Endsection2*IBase

Trip = (IdminOp *Ibase+ slope section2/100 *(Ibias - End section1*Ibase ) A


Where; Idmin ; The Basic Diff Current Setting.
To check more than one point at the same slope, Change the bias current value and
the equation above can be used, and also for other differential settings '' Different
slopes, Is1 ''.
Apply the above procedure for each phase.
0

DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT

Contractor’s name: Hitachi Energy


Sub.Contractor’s name: MRC

Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311

LINE DIFFERENTIAL PROTECTION RELAY – RED670- FINAL SETTING Page 13 of 15


Panel No: =6LA+R Equip. No.: 87L1 Dwg. Ref.: XD-MOB107
Set End section1 = 1.25*IBase
End section2 =3.0*IBase

Slope Idmin I bias Id calculated Id Measured (A) Errors %


section2 set A (Trip) A R Y B R Y B
40 % 0.3 1.5 0.4 0.401 0.402 0.401 1.25 1 1

Limits; ± 2 %Ir According to the Technical Reference Catalogue – Page24

3.8.3SLOPE Section3

Repeat the test and check the result with the following equation;
When bias current is more than:
Ibias ≥ End section2*Ibase
Trip = Ibase*(IdminOp + slope section2/100*(End section2 - End section1)) + (slope
section3/100 * (Ibias- End section2*Ibase) A
Set End section1 = 1.25*IBase
End section2 =3.0*IBase
Slope section2 = 40%

Id
Slope Idmin I bias Id Measured (A) Errors %
calculated(Trip)
section3 set A
R Y B R Y B
80% 0.3 4.0 1.8 1.801 1.799 1.799 0.28 0.27 0.28

Limits; ± 2 %Ir According to the Technical Reference Catalogue

3.8.4Test of 2nd Harmonics

Idmin = 0.3 Ib

I2 ( F = 120 Hz ) A
Phase I2 / I1 ratio % I1 ( F =60 Hz ) A
Expected Blocking Measured
R 10 1.0 0.100 0.101
Y 10 1.0 0.100 0.101
B 10 1.0 0.100 0.102

DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT

Contractor’s name: Hitachi Energy


Sub.Contractor’s name: MRC

Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311

LINE DIFFERENTIAL PROTECTION RELAY – RED670- FINAL SETTING Page 14 of 15


Panel No: =6LA+R Equip. No.: 87L1 Dwg. Ref.: XD-MOB107

3.8.5Test of 5th Harmonics

I5 ( F = 300 Hz ) A
Phase I5 / I1 ratio % I1 ( F =60 Hz ) A
Expected Blocking Measured
R 25 1.0 0.250 0.255
Y 25 1.0 0.250 0.255
B 25 1.0 0.250 0.256

3.9 Enhanced Differential (IdminHigh)

There are 2 condition during them the relay must decrease its sensitivity: during energized
or at external fault, where at that conditions the slope chars. Use the value of IdminHigh
instead of Idmin for just a time equal to tIdminHigh . After that slope chars. Back as usual
using Idmin as basic setting.

3.9.1 IdminHigh Pickup

IdMinHigh
Phase Setting Value
Pickup Value (A)
( of IB ) A
R 0.6 0.604
Y 0.6 0.605
B 0.6 0.604

3.9.2 Idmin High Time test

TIdMinHigh
Phase Setting Value Trip Time Measured
( seconds ) seconds
R 1 1.01
Y 1 1.01
B 1 1.01

DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :
SITE TEST REPORT

Contractor’s name: Hitachi Energy


Sub.Contractor’s name: MRC

Name of Substation: Mobile Substation Semi-Trailer 115KV HV GIS-SS-01 Contract No.: 4500448311

LINE DIFFERENTIAL PROTECTION RELAY – RED670- FINAL SETTING Page 15 of 15


Panel No: =6LA+R Equip. No.: 87L1 Dwg. Ref.: XD-MOB107

3.10 CB Fail
- Current Pick up
I< setting (A) Phase Pick up (A) Drop off (A)
IP< = 1.0 A/B/C 1.006 0.999
IN< = 0.20 N 0.203 0.199

- Timing
Timer Setting (sec) Measured time(sec)
CB fail 1 timer 0.150 0.151

5. Binary inputs and output checked: []

6. Test Equipment’s Used

Item Test Equipment Serial Number Calibration date Calibration due date
1 Freja 300 1402796 23-SEP-2023 22-SEP-2024
02 Multimeter Fluke 177 32560406 26-Oct-2023 25-Oct-2024

DATE: 09 /11/2023
TESTING ENGINEER SEC- Engineer
Sec Id No: MRC – 006 Id. No.:
Signature: _____________________ Signature: _____________________
Name : MALIK KHALID Name :