143
A B C D E F G A B C D E F G NOTES:
GENERAL;
1. All dimensions are in mm
unless otherwise specified.
2. Dimesions to be read not scaled.
Only figured dimesion to be used.
3. Contructor to check and verify
well all the dimesions on site before
200mm thick machine dressed the comencement of works
masonry wall rendered and
150mm thick brick masonry wall painted to Architect's approval.
rendered and painted to CONSTRUCTION;
Architect's approval.
1. All slabs at ground level to be
E-01 poured over 1000gauge
E-02 Ceramic tiles floor finish polythene sheeting on 50 mm
to architect's approval on
150mm thick concrete thick murrum blinding layer
floor slab on D.P.M on which on 300 mm well
100mm thick layer on a compacted hardcore filling.
0.855 3.504 2.583 3.709 2.053 0.898
well compacted hardcore
base.
2. All soil under slabs and
1 2 3 around external foundations to
4 5 6 7 200x25mm facia
board paintend be ttreated against termites.
to approval
SRUCTURAL;
1. All black cotton soil to be from
bellow all building and paved
200mm thick machine dressed surfaces.
masonry wall rendered and 2. For all R.C works refer to
painted to Architect's approval. structural drawings.
3. Depth of foudation to be
150mm thick brick masonry wall
E-04 determined on site to structural
rendered and painted to eng. Approval.
Architect's approval. 200mm thick machine dressed
masonry wall rendered and
painted Architect's approval. MECHANICAL;
200mm thick machine dressed 1. All plumbing and drainage to coply
masonry wall rendered and E-03
28" DEG ROOFING PITCH Roof Details:
Approved Roofing sheet (box profile) with local authority regulations.
painted Architect's approval. Struts en Ties 50x100mm
Wall plate 75x100mm
King post 50x100
Purlin 50x75mm
2. All service ducts to be accessible
from all floors
200x25mm facia 3. SPV denotes soil vent pipe to be
SEPTIC TANK
board paintend provided at te head of the drainage
to approval
4. PV denotes permanent ventilations
to be provided on all doors and
S-04 S-04 300mm R.C Beam to
windows except bathroom and water
S-03
S.E details
S-01
closet doors.
0.200 12.600 0.200 5. All underround foul and waste
0.600
drain pipes shall be upvc to comply
0.600 0.200 with Bs 5255.
0.200 0.200 3.000 0.200 2.701 0.200 0.062 2.637 0.200 2.000 0.200
6. All inspections chambers covers
and framing shall be cast iron to
0.200
0.200
0.200
0.200
0.855 3.504 2.583 3.709 2.053 0.898 comply with Bs 497 table 2 grade A.
0.200
1.200
1.200
1.200
6
2.000 Ceramic Tiles FF
1.500 with Bs 556 minimum slope in the
0.200
1.515
0.200
0.200
1.000
1.000
8. All testing of pipes must be done
Inbuilt Wardrobe
pv before plastering.
0.200
1.049
Bedroom 2 Dinning
3.000
3.000
Service
Kitchen
0.200
hatch
Arch to dedail,
Ceramic Tiles FF
Ceramic Tiles FF
Kitchen
Non slip ceramic tiles FF
0.400
1.800
0.200
E-03
Arch above S.E details
3.300
W1 2000x1200 CASEMENT.
0.200
Inbuilt cupshelves
to detail.
W2 1500x1200 CASEMENT.
0.900
2.100
WC Corridor Passage
1.300
0.200
SHW
E-02
0.200
0.200
13.200
0.200
to architect's approval on
Main Lounge 150mm thick concrete D1 1500x2100 D/HALF C/MNT.
600x200mm R.C strip
Master Bedroom
Ceramic Tiles FF
Bedroom 1
4.200
4.200
Ceramic Tiles FF
100mm thick layer on a
3.700
Ceramic Tiles FF
blinding layer of
well compacted hardcore
50mm to S.E detail. D3 900x2100 PANEL.
base.
0.200
0.200
Foundation depth to
D4 800x2000 FLUSH.
0.200
be determined on site.
0.200
0.300
0.300
pv
0.129
PROJECT TITLE:
0.200 0.600
0.200
0.200
0.200
pv
0.200
BUNGALOW
2.700
1.300
0.200
0.200
0.200
0.200
0.400 0.200 0.200 0.200 0.200 0.200 inlet TWL TWL outlet TWL
gauge waste water pipe MH MH
0.200 1.500 0.900 1.000 0.200 2.600 0.200 1.000 0.800 2.000 0.800 0.200 .
.
.
.
Scum baffle build up of
600X65 mm precast r .c
250X150 mm thick slab reinforcement 10mm
0.200 3.200 0.200 1.000 0.200 2.600 0.200 1.000 0.200 4.000 0.200 Scum baffle build up of reiforced beams twisted bars at 100mm c/c.
750X65 mm precast r .c
slab reinforcement 10mm Date: APRIL 2024.
0.200 3.200 0.200 5.000 0.200 4.000 0.200 twisted bars at 100mm c/c. 200 mm thick plastered
S-06 S-06 internally and water proofed
DRAWING TITLE:
FLOOR PLANS,ELEVATIONS AND SECTION.
S-03
masonary walling.
0.200 12.600 0.200 200 mm thick plastered
internally and water proofed
S-04 SCALE 1:1000.
FLOOR PLAN. masonary walling. S-05 100 mm thick r .c foundation slab (debt to be
Designed and drawn By:
S-02 S-02 detremined on site considering the capacity
of thank ).
SEPTIC TANK PLAN KIPTOO.O.GEORGE
S-01
S-05
GSPublisherVersion 0.1.100.100