Contracts For Difference CFD Allocation Round 4 Results
Contracts For Difference CFD Allocation Round 4 Results
The Department for Business, Energy and Industrial Strategy has today (7 July 2022 at 7.00am) published the outcome of the fourth allocation
round to coincide with National Grid ESO notifying applicants of the outcome of the round.
1
SCOTTISHPOWER
Brigstock Solar Farm England RENEWABLES (UK) Solar PV (>5MW) 49.90 45.99 2024/25 1 1
LIMITED
SOUTH FAMBRIDGE HALL
South Fambridge Hall Solar England Solar PV (>5MW) 45.00 45.99 2024/25 1 1
SOLAR PARK LIMITED
CORNWELL SOLAR FARM
Cornwell England Solar PV (>5MW) 35.00 45.99 2024/25 1 1
LIMITED
HARLESFORD SOLAR
Harlesford England Solar PV (>5MW) 26.65 45.99 2024/25 1 1
FARM LIMITED
BRACKS FARM SOLAR
Bracks Farm Solar Park England Solar PV (>5MW) 20.00 45.99 2024/25 1 1
PARK LIMITED
STOKEFORD SOLAR
Stokeford Solar Farm England Solar PV (>5MW) 20.80 45.99 2024/25 1 1
LIMITED
CARN NICHOLAS SOLAR
Carn Nicholas Solar Farm Wales Solar PV (>5MW) 8.00 45.99 2024/25 1 1
LIMITED
INNOVA RENEWABLES
Manor Farm Solar England Solar PV (>5MW) 18.80 45.99 2024/25 1 1
(MANOR FARM) LTD
Sparrow Lodge Farm Solar
England EEB33 LIMITED Solar PV (>5MW) 20.00 45.99 2024/25 1 1
PV
Enso Green Holdings K ENSO GREEN HOLDINGS
England Solar PV (>5MW) 49.99 45.99 2024/25 1 1
Limited K LIMITED
DROVER LANE SOLAR
Brackley England Solar PV (>5MW) 20.00 45.99 2024/25 1 1
FARM LIMITED
JBM SOLAR PROJECTS 13
Wick Farm England Solar PV (>5MW) 49.99 45.99 2024/25 1 1
LIMITED
CROUCH SOLAR FARM
Basildon England Solar PV (>5MW) 15.00 45.99 2024/25 1 1
LIMITED
LAYER SOLAR FARM
Layer England Solar PV (>5MW) 45.00 45.99 2024/25 1 1
LIMITED
ST CLERE'S SOLAR FARM
St Clere's England Solar PV (>5MW) 15.00 45.99 2024/25 1 1
LIMITED
LOW CARBON SOLAR
Wickham England Solar PV (>5MW) 35.00 45.99 2024/25 1 1
PARK 3 LIMITED
DOWN BARN FARM SF
Down Barn Farm Solar England Solar PV (>5MW) 40.00 45.99 2024/25 1 1
LIMITED
LOW CARBON SOLAR
Braintree England Solar PV (>5MW) 26.00 45.99 2024/25 1 1
PARK 9 LIMITED
BRYN HENLLYS SF
BRYN HENLLYS Solar Farm Wales Solar PV (>5MW) 26.30 45.99 2024/25 1 1
LIMITED
FOX COVERT SOLAR
Adstock England Solar PV (>5MW) 15.00 45.99 2024/25 1 1
FARM LIMITED
Longney Estate PV England EEB18 LIMITED Solar PV (>5MW) 25.00 45.99 2024/25 1 1
2
SCURF DYKE SOLAR
Scurf Dyke Solar England Solar PV (>5MW) 49.90 45.99 2024/25 1 1
LIMITED
NEXTPOWER SPV 11 NEXTPOWER SPV 11
England Solar PV (>5MW) 15.00 45.99 2024/25 1 1
LIMITED LIMITED
JBM SOLAR PROJECTS 17
Claydon England Solar PV (>5MW) 45.00 45.99 2024/25 1 1
LTD
INKERSALL SOLAR FARM
Staveley England Solar PV (>5MW) 20.00 45.99 2024/25 1 1
LIMITED
NEXTPOWER SPV 5 NEXTPOWER SPV 5
England Solar PV (>5MW) 40.00 45.99 2024/25 1 1
LIMITED LIMITED
MOSS LANE FARM SOLAR MOSS LANE FARM SOLAR
England Solar PV (>5MW) 25.00 45.99 2024/25 1 1
LIMITED LIMITED
JBM SOLAR PROJECTS 3
Doverdale England Solar PV (>5MW) 49.90 45.99 2024/25 1 1
LTD
MILLTOWN AIRFIELD
Milltown Airfield Solar PV Scotland Solar PV (>5MW) 49.90 45.99 2024/25 1 1
SOLAR PV LIMITED
NEXTPOWER SPV 6 NEXTPOWER SPV 6
England Solar PV (>5MW) 23.00 45.99 2024/25 1 1
LIMITED LIMITED
NEXTPOWER SPV 10 NEXTPOWER SPV 10
England Solar PV (>5MW) 40.00 45.99 2024/25 1 1
LIMITED LIMITED
CLIFTON England VOLTALIA UK LTD Solar PV (>5MW) 35.00 45.99 2024/25 1 1
BLUEFIELD SIF
Oulton Solar Farm Phase 2 England Solar PV (>5MW) 6.00 45.99 2024/25 1 1
INVESTMENTS LIMITED
BLUEFIELD SIF
Romsey Solar Farm Phase 2 England Solar PV (>5MW) 6.48 45.99 2024/25 1 1
INVESTMENTS LIMITED
BLUEFIELD SIF
Yelvertoft Solar Farm England Solar PV (>5MW) 49.90 45.99 2024/25 1 1
INVESTMENTS LIMITED
Walpole Green Limited England WALPOLE GREEN LIMITED Solar PV (>5MW) 40.00 45.99 2024/25 1 1
LIGHTSOURCE SPV 205
Thorpe Bank Solar Farm England Solar PV (>5MW) 40.00 45.99 2024/25 1 1
LIMITED
LIGHTSOURCE SPV 100
Cowley House Solar Farm England Solar PV (>5MW) 40.00 45.99 2024/25 1 1
LIMITED
ALFRETON SOLAR
Alfreton Solar Farm England Solar PV (>5MW) 19.65 45.99 2023/24 1 1
LIMITED
SIDDINGTON SOLAR
Siddington Solar Park England Solar PV (>5MW) 19.94 45.99 2023/24 1 1
FARM LIMITED
LOW FARM SOLAR
Low Farm Solar Park England Solar PV (>5MW) 49.89 45.99 2023/24 1 1
LIMITED
Tycroes solar farm Wales SPRING DEV 02 LIMITED Solar PV (>5MW) 42.10 45.99 2024/25 1 1
JBM SOLAR PROJECTS 12
Myttons England Solar PV (>5MW) 49.99 45.99 2024/25 1 1
LTD
3
North Fossil Solar Farm England SPRING DEV 03 LIMITED Solar PV (>5MW) 39.19 45.99 2024/25 1 1
JBM SOLAR PROJECTS 18
Bunker's Hill England Solar PV (>5MW) 49.90 45.99 2024/25 1 1
LTD
LIGHTSOURCE SPV 152
Inkersall Grange Solar Farm England Solar PV (>5MW) 49.90 45.99 2024/25 1 1
LIMITED
Wood lane Solar Farm England EEB30 LIMITED Solar PV (>5MW) 40.00 45.99 2024/25 1 1
Driffield England HARMONY TB LTD Solar PV (>5MW) 30.00 45.99 2024/25 1 1
HIGHER STOCKBRIDGE England VOLTALIA UK LTD Solar PV (>5MW) 35.00 45.99 2024/25 1 1
Speyslaw Solar PV Scotland EEB11 LIMITED Solar PV (>5MW) 20.00 45.99 2024/25 1 1
JBM SOLAR PROJECTS 23
Eastfields England Solar PV (>5MW) 25.00 45.99 2024/25 1 1
LIMITED
Cullerlie Solar PV Scotland EEB16 LIMITED Solar PV (>5MW) 8.75 45.99 2024/25 1 1
Cawarden Solar Farm England SPRING DEV 07 LIMITED Solar PV (>5MW) 47.61 45.99 2024/25 1 1
Houndbeare Farm Solar
England SPRING DEV 01 LIMITED Solar PV (>5MW) 14.04 45.99 2024/25 1 1
Farm
High Cayton Solar PV England EEB29 LIMITED Solar PV (>5MW) 49.99 45.99 2024/25 1 1
Tuckey Farm PV England EEB24 LIMITED Solar PV (>5MW) 25.00 45.99 2024/25 1 1
CLEVE HILL SOLAR PARK
Cleve Hill Solar Project England Solar PV (>5MW) 112.00 45.99 2023/24 1 1
LIMITED
Hasland Solar Farm England KS SPV 47 LIMITED Solar PV (>5MW) 49.90 45.99 2023/24 1 1
High Park Foot Solar PV England EEB17 LIMITED Solar PV (>5MW) 20.00 45.99 2024/25 1 1
BL SOLAR 9 (MANOR
Manor Farm PV England Solar PV (>5MW) 18.50 45.99 2024/25 1 1
FARM) LIMITED
BL SOLAR 10 (FERRY
FERRY FARM 3 NORTH England Solar PV (>5MW) 9.75 45.99 2024/25 1 1
FARM) LIMITED
Ranksborough Solar PV England EEB27 LIMITED Solar PV (>5MW) 30.00 45.99 2024/25 1 1
TwinHub Floating Offshore Floating Offshore
England WAVE HUB LIMITED 32.00 87.30 2026/27 1 2
Wind Project Wind
STORNOWAY WIND FARM Remote Island Wind
Stornoway Wind Farm Scotland 200.00 46.39 2026/27 1 2
LIMITED (RIW)
Orkney Community Wind Remote Island Wind
Scotland Orkney Islands Council 28.80 46.39 2026/27 1 2
Farm Project - Hoy (RIW)
Orkney Community Wind Remote Island Wind
Scotland Orkney Islands Council 28.80 46.39 2026/27 1 2
Farm Project - Quanterness (RIW)
PEEL NRE WIND FARMS Remote Island Wind
Mossy Hill Scotland 48.00 46.39 2026/27 1 2
(NO. 1) LIMITED (RIW)
4
PEEL NRE WIND FARMS Remote Island Wind
Beaw Field Scotland 72.00 46.39 2026/27 1 2
(YELL) LIMITED (RIW)
Viking Energy Wind Farm Remote Island Wind
Viking Wind Farm Scotland 220.00 46.39 2026/27 1 2
LLP (RIW)
ORBITAL PROJECTS 4
Orbital Marine Eday 2 Scotland Tidal Stream 4.80 178.54 2026/27 1 2
LIMITED
MAGALLANES TIDAL
Morlais Magallanes GR3 Wales Tidal Stream 5.62 178.54 2025/26 1 2
ENERGY LTD
ORBITAL PROJECTS 3
Orbital Marine Eday 1 Scotland Tidal Stream 2.40 178.54 2026/27 1 2
LIMITED
MeyGen Phase 2 Scotland MeyGen PLC Tidal Stream 28.00 178.54 2026/27 1 2
INCH CAPE OFFSHORE
Inch Cape Phase 1 Scotland Offshore Wind 1080.00 37.35 2026/271 3 3
LIMITED
EAST ANGLIA THREE
EA3, Phase 1 England Offshore Wind 1372.34 37.35 2026/271 3 3
LIMITED
NORFOLK BOREAS
Norfolk Boreas (Phase 1) England Offshore Wind 1396.00 37.35 2026/271 3 3
LIMITED
ORSTED HORNSEA
Hornsea Project Three
England PROJECT THREE (UK) Offshore Wind 2852.00 37.35 2026/27 1 3
Offshore Wind Farm
LIMITED
MORAY OFFSHORE
Moray West Offshore Wind
Scotland WINDFARM (WEST) Offshore Wind 294.00 37.35 2026/27 1 3
Farm
LIMITED
1
This project will be built in three phases. The delivery year listed is for phase 1.
5
(B) Estimated notional monetary budget impact (negative values are shown as strike prices are below the market reference prices) as
calculated by National Grid ESO according to the Allocation Framework published on 25 November 2021, presuming all offered contracts
are accepted (2012 prices).
(C) Estimated actual monetary budget impact as calculated by National Grid ESO according to the Allocation Framework published on 25
November 2021, presuming all offered contracts are accepted (2012 prices).
6
(D) The total value of all applications originally received, valued at the administrative strike price, as calculated by National Grid ESO according
to the Allocation Framework published on 25 November 2021 (2012 prices).
7
(E) Breakdown of the outcome by technology, year and clearing price
Total Capacity
Technology Pot 2023/24 2024/25 2025/26 2026/27
(MW)
£/MWh 45.99 45.99 NA NA
Solar PV (>5MW) Pot 1 2209.41
MW 251.38 1958.03 NA NA
Onshore Wind £/MWh - 42.47 NA NA
Pot 1 887.96
(>5MW) MW - 887.96 NA NA
Energy from Waste £/MWh - 45.99 NA NA
Pot 1 30.00
(with CHP) MW - 30.00 NA NA
£/MWh NA NA 178.54 178.54
Tidal Stream Pot 2 40.82
MW NA NA 5.62 35.20
Floating Offshore £/MWh NA NA - 87.30
Pot 2 32.00
Wind MW NA NA - 32.00
Remote Island Wind £/MWh NA NA - 46.39
Pot 2 597.60
(RIW) MW NA NA - 597.6
£/MWh NA NA - 37.35
Offshore Wind Pot 3 6994.34
MW NA NA - 6994.34
(F) Maximum % saving on administrative strike price for each technology as a result of competition
2023/24 / 2024/25
Clearing Price
Technology Type Administrative Strike Price Maximum % saving
£/MWh
£/MWh
Solar PV (>5MW) 47.00 45.99 2%
Onshore Wind (>5MW) 53.00 42.47 20%
Energy from Waste (with CHP) 121.00 45.99 62%
8
2025/26 / 2026/27
Clearing Price
Technology Type Administrative Strike Price Maximum % saving
£/MWh
£/MWh
Tidal Stream 211.00 178.54 15%
Floating Offshore Wind 122.00 87.30 28%
Remote Island Wind (RIW) 62.00 46.39 25%
Offshore Wind 46.00 37.35 19%