Davao 4-1000sqm Davao WArehouse - REV00 - 20.04.2023
Davao 4-1000sqm Davao WArehouse - REV00 - 20.04.2023
TOTAL DRAWING: 07
A B C D E F G H I J
7
REMARK: 7
1.DESIGN STANDARDS & CALCULATED LOADINGS: 2.3 BOLT CATEGORY 3. FABRICATION STANDARDS: REVISION
2.3.1 ANCHOR BOLT
1.1 DESIGN STANDARDS:
L
T2 T1
DxP
SAB W
PROJECTION MIN 5MM TACK WELD @3POINT N
REV.
1.2 CALCULATED LOADINGS: (OR 2 THREAD PICH) H (MIN 12xD) PRO DATE DESCRIPTION DRAW. CHECK PPD.
2. FABRICATED MATERIAL: 2.3.2 PRIMARY BOLT (HIGH STRENGTH) T.M.L STEEL PTE. LTD
5 5
5.2 - PURLIN C:
PHAN THANH LONG
4 4
TECHNICAL MANAGER
Eng.
s
t
Eng.
200
t
50
t
t Q DRAWING
t/4 f 19 6 t 4035°
0 7. METHOD TO JOINT STEEL:
5 t 19 L=100mm
7.1 JOINT STEEL SHAPE (I, H, U)
Eng.
PROJECT
LOCATION: PHILIPPINES
g
ITEM:
e t (mm) 2-3 4-5 6-8 7.2 JOINT BUILT UP (I, H)
b (mm) 2 2 2 STEEL STRUCTURE
t
e (mm) 7 8 9
b g (mm) 1.5 1.5 2
DRAWING NAME:
GENERAL NOTE
1 1
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
8000
REV. DATE DESCRIPTION DRAW. CHECK PPD.
6 6
E
APPROVAL DRAWINGS
8000
5 5
D
O/O OF STEEL LINE
8000
GENERAL DIRECTOR
CHECKER
Eng.
DESIGNER
B
3 3
Eng.
DRAWING
8000
Eng.
PROJECT
A
1000sqm DAVAO WAREHOUSE
2 2
6250 7500 7500 7500 7500 7500 6250
LOCATION: PHILIPPINES
50000
ITEM:
O/O OF STEEL LINE
1 2 3 4 5 6 7 8
STEEL STRUCTURE
COLUMN PLAN
1 NOTE: 1
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
8000
REV. DATE DESCRIPTION DRAW. CHECK PPD.
6 6
E
APPROVAL DRAWINGS
10%
10%
8000
1000
5 5
D
O/O OF STEEL LINE
4000
8000
GENERAL DIRECTOR
1000
TECHNICAL MANAGER
10%
10%
2000
M.ENG HUONG THANH KHANG
8000
CHECKER
Eng.
DESIGNER
B
3 3
Eng.
DRAWING
8000
Eng.
PROJECT
A
1000sqm DAVAO WAREHOUSE
2 2
6250 7500 7500 7500 7500 7500 6250
LOCATION: PHILIPPINES
50000
ITEM:
O/O OF STEEL LINE
1 2 3 4 5 6 7 8
STEEL STRUCTURE
ROOF PLAN
1 NOTE: 1
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
8000
REV. DATE DESCRIPTION DRAW. CHECK PPD.
6 6
E
APPROVAL DRAWINGS
8000
5 5
D
O/O OF STEEL LINE
8000
GENERAL DIRECTOR
CHECKER
Eng.
DESIGNER
B
3 3
Eng.
DRAWING
8000
Eng.
PROJECT
A
1000sqm DAVAO WAREHOUSE
2 2
6250 7500 7500 7500 7500 7500 6250
LOCATION: PHILIPPINES
50000
ITEM:
O/O OF STEEL LINE
1 2 3 4 5 6 7 8
STEEL STRUCTURE
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
8000
REV. DATE DESCRIPTION DRAW. CHECK PPD.
6 6
E
APPROVAL DRAWINGS
8000
5 5
D
O/O OF STEEL LINE
8000
GENERAL DIRECTOR
CHECKER
Eng.
DESIGNER
B
3 3
Eng.
DRAWING
8000
Eng.
PROJECT
A
1000sqm DAVAO WAREHOUSE
2 2
6250 7500 7500 7500 7500 7500 6250
LOCATION: PHILIPPINES
50000
ITEM:
O/O OF STEEL LINE
1 2 3 4 5 6 7 8
STEEL STRUCTURE
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
+9.000
2000
+7.000
REV. DATE DESCRIPTION DRAW. CHECK PPD.
6 2000 6
9000
APPROVAL DRAWINGS
7000
4200
±0.000
T.M.L STEEL PTE. LTD
GENERAL DIRECTOR
Eng.
DESIGNER
3 3
Eng.
DRAWING
Eng.
PROJECT
LOCATION: PHILIPPINES
ITEM:
STEEL STRUCTURE
DRAWING NAME:
SIDE WALL GL A, F
1 NOTE: 1
A B C D E F G H I J
A B C D E F G H I J
7 7
REVISION
+9.000
15% 15%
2000
+7.000
REV. DATE DESCRIPTION DRAW. CHECK PPD.
6 6
9000
APPROVAL DRAWINGS
7000
±0.000
T.M.L STEEL PTE. LTD
GENERAL DIRECTOR
+9.000
PHAN THANH LONG
4 15% 15% 4
2000
TECHNICAL MANAGER
+7.000
CHECKER
7000
4200
4000
Eng.
DESIGNER
±0.000
3 3
1500 5000 1500
Eng.
8000 8000 8000 8000 8000
DRAWING
40000
O/O OF STEEL LINE
A B C D E F
Eng.
PROJECT
LOCATION: PHILIPPINES
ITEM:
STEEL STRUCTURE
DRAWING NAME:
A B C D E F G H I J
A B C D E F G H I J
7 7
4000
REVISION
1500
+9.000
15%
* * * * 15%
* * * *
2000
* * * *
+7.000 * * * *
* * * * REV. DATE DESCRIPTION DRAW. CHECK PPD.
6 6
9000
APPROVAL DRAWINGS
7000
1000
±0.000
T.M.L STEEL PTE. LTD
GENERAL DIRECTOR
Eng.
DESIGNER
3 3
Eng.
DRAWING
Eng.
PROJECT
LOCATION: PHILIPPINES
ITEM:
STEEL STRUCTURE
DRAWING NAME:
A B C D E F G H I J